NATIONAL HIGH SPEED RAIL CORPORATION LIMITED (NHSRCL)

(A Joint Sector Company of Govt. of India and Participating State Government)


2nd Floor, Asia Bhawan, Road No.205, Sector-9, Dwarka, New Delhi-110077, India

Addendum No. 04
Country: INDIA
Name of Work: Design and Construction of Civil and Building Works including Testing and Commissioning on Design Build Lump Sum Price Basis for
Double Line High Speed Railway involving Viaduct & Bridges, Crossing Bridges, Maintenance Depot and Station (Anand/Nadiad), between Vadodara
(MAHSR Km. 401.898) and Ahmedabad (MAHSR Km. 489.467), excluding Works for 01 No. PSC Bridge and 04 No. Steel Truss Bridges, in the State of
Gujarat for the Project for Construction of Mumbai-Ahmedabad High Speed Rail
Date: 27.12.2019
Loan Agreement No.: ID-P277 & ID-P279
IFB Number: Package No. MAHSR-C-6
Following are to be considered:

Item
Refer Para No. Original/As Existing Revised
No.
1. Bidding Documents, Design and Construction of Civil and Building Works including Design and Construction of Civil and Building Works including
Name of the Works Testing and Commissioning on Design Build Lump Sum Price Testing and Commissioning on Design Build Lump Sum Price
Basis for Double Line High Speed Railway involving Viaduct Basis for Double Line High Speed Railway involving Viaduct
& Bridges, Crossing Bridges, Maintenance Depot and Station & Bridges, Crossing Bridges, Maintenance Depot and Station
(Anand/Nadiad), between Vadodara (MAHSR Km. 401.898) (Anand/Nadiad), between Vadodara and Ahmedabad from
and Ahmedabad (MAHSR Km. 489.467), excluding Works for MAHSR Km. 401.898 to MAHSR Km. 489.467, excluding
01 No. PSC Bridge and 04 No. Steel Truss Bridges, in the State Works for 01 No. PSC Bridge and 04 No. Steel Truss Bridges,

MAHSR-C6-ADDENDUM NO. 04 Page 1 of 44


Item
Refer Para No. Original/As Existing Revised
No.
of Gujarat for the Project for Construction of Mumbai- in the State of Gujarat for the Project for Construction of
Ahmedabad High Speed Rail Mumbai-Ahmedabad High Speed Rail
2. Part 1, Section I. The Instructions to Bidders governing this bidding process are The Instructions to Bidders governing this bidding process are
Instructions to Bidders the “Instructions to Bidders included in Option A, Single-Stage the “Instructions to Bidders included in Option A, Single-Stage
(ITB), Page 01 of 32 Two-Envelope Bidding, Section I,” of the Standard Bidding Two-Envelope Bidding, Section I,” of the Standard Bidding
Documents for Procurement of Plant Design, Supply and Documents for Procurement of Electrical and Mechanical
Installation (Trial Version) published by JICA in July 2015. Plant, and for Building and Engineering Works, designed by
Those Instructions to Bidders are available on the JICA’s web the Contractor (Trial Version) published by JICA in July 2015.
site shown below. Those Instructions to Bidders are available on the JICA’s web
site shown below.
3. Part 2, Section VI-1, “Right of Way” means the total land width/area, which is “Right of Way” means the land area of the Project, either
Division 03000, Sub- required and legally owned by the Employer for the Project, to acquired by the Employer or for which the Employer has the
Division 03010, Clause 1, accommodate the track, viaduct, tunnel, station, depot, facility, permission of the Stakeholder to construct the Viaduct &
Page 11 of 30 property, etc. of the Employer. This land may be owned by the Bridges etc. over their area. The Right of Way has been shown
Employer or the Employer has the permission of the Owner. in ROW Ortho Map.”
4. Part 2, Section VI-1, In addition to the Contractor’s submittals referenced in Sub- Employer is in the process of implementing a document control
Division 03000, Sub- Division 03020 Sub-Clause 2.0 [Submission Procedure], the system such that all drawings/documents related to the
Division 03020, Sub-Clause Contractor shall implement a secure document control system construction phase are well documented and archived, etc. The
5.1, 1st and 2nd Paragraph, such that all documents generated by the Contractor can be Contractor shall utilize the document control system being
Page 23 of 30 transmitted to the Engineer by electronic means (and vice versa) setup by the Employer such that all documents generated by the
and that all documents generated by either party are Contractor can be transmitted to the Engineer by electronic
electronically captured at the point of origin and can be means (and vice versa) and that all documents generated by
reproduced later, electronically and in hard copy. either party are electronically captured at the point of origin and
can be reproduced later, electronically and in hard copy. In
The Engineer shall provide one user facility from his system to addition to the Contractor’s submittals referenced in Sub-
the Contractor for communication and for storing the Division 03020 Sub-Clause 2.0 [Submission Procedure],
documents. Contractor shall also transmit all documents through
Document Control system provided by the Employer.

MAHSR-C6-ADDENDUM NO. 04 Page 2 of 44


Item
Refer Para No. Original/As Existing Revised
No.

Employer shall provide eight (8) user license(s) from its system
to the Contractor for communication and for storing the
documents. Employer may consider Contractor’s request for
additional license(s) on case by case basis and Contractor shall
bear the cost of additional license(s). All the licenses provided
to the Contractor shall be continued up to the Completion of the
Contract. The Contractor shall be responsible to maintain
periodical backup of data/documents for his record.
5. Part 2, Section VI-1, Division
8 Installation of C-6 T-3 T-3 T-3 T-3 shall 8 Installation of C-6 T-3 T-3 T-3 T-3 shall
04000, Appendix 04000-1,
rail for gantry design, rail for gantry design,
Chapter III, 4. C-6 and T-3, C-6 C-6 C-6
crane in procure crane in procure
Page 10 of 19
maintenance materials and maintenance materials and
depot install rail for depot install rail for
gantry crane gantry crane
6. Part 2, Section VI-1, <Item No. 6 has been modified in the Interface table between
Division 04000, Appendix C-6 and E-1.
04000-1, Chapter III, C-6 Three new items 30, 31 and 32 have been added in the Interface
and E-1, Page 12 of 19 table between C-6 and E-1>
Refer Attachment No. 10 of this Addendum.
7. Part 2, Section VI-1, Division <Add the following item after item 7 in Sub-Clause 1.6>
05000, Sub-Division 05020,
“8) The Contractor shall be responsible for strictly abiding by
Sub-Clause 1.6, Page 9 of 43
the criteria and method specified in the Employer’s
Requirements for verification of running safety of Bridges and
Viaduct of mainline (other than span arrangement which have
been fixed in the DRC in the Employer’s Requirements).”

MAHSR-C6-ADDENDUM NO. 04 Page 3 of 44


Item
Refer Para No. Original/As Existing Revised
No.
8. Part 2, Section VI-1, a) General arrangement, location plan, geometry, setting out
a) General arrangement, location plan, geometry, and setting
Division 05000, Sub- drawings and running safety verification report;
out drawings;
Division 05020, Sub-Clause
3.2.1, Item 1) a) Page 15 of
43
9. Part 2, Section VI-1, “Running Safety shall be verified.”
Division 05000,
<The above sentence has been added in Additional
Attachment, Design
Information/Requirements for the following Design Segment
Segment Table for C6
Types:
Package, Page 33 of 43
1. Viaduct & Bridges for Main Line
2. Civil Works for Approach Lines>
10. Part 2, Section VI-2, Division <Add the following Sub-Clause after existing Sub-Clause 1.3>
02000, Sub-Division 02030,
“1.4. Verification of Running Safety
Clause 1, Page 13 of 45
1. The span arrangement and structural planning shall satisfy
the requirements of running safety in normal load combinations
as well as in seismic conditions.
2. The Contractor shall verify the running safety of proposed
span arrangement and structural planning for Bridges and
Viaduct of mainline (other than span arrangement which have
been fixed in the DRC in the Employer’s Requirements) in
accordance with the criteria set out and the method specified in
the Employer’s Requirements.
3. The criteria and the method of verification of running safety
are provided in Attachment-6 hereto.”

MAHSR-C6-ADDENDUM NO. 04 Page 4 of 44


Item
Refer Para No. Original/As Existing Revised
No.
11. Part 2, Section VI-2, <Add the following item in the list of Attachments>
Division 02000,
Attachments, Page 45 of 45 “6. Verification of Running Safety (Attachment - 6)”

Refer Attachment No. 14 of this Addendum for Attachment-6


of DRC – “Verification of Running Safety”.
12. Part 2, Section VI-1, “3PVC is required for river training and related protection
Division 05000, works.”
Attachment, Design
<The above sentence has been added in Additional
Segment Table for C6
Information/Requirements in the following Design Segment
Package, Page 33 of 43
Types:
1. Crossing Bridges>
13. Part 2, Section VI-2, The need for any protection for river bridges shall be The need for any protection for river bridges shall be
Division 02000, Sub- investigated, and suitable protection works, or river training investigated, and suitable protection works, or river training
Division 02030, Sub-Clause works shall be provided with proper design. works shall be provided with proper design.
3.4.5, Page 20 of 45
The piers and foundations of the river Crossing Bridges The piers and foundations of the river Crossing Bridges
mentioned in Table No. 2.2.1 of DFM 02020 have been mentioned in Table No. 2.2.1 of DFM 02020 (except pier &
designed for scour, water pressure and fluid stream force. All foundation at P1 of Mahi River) have been designed for scour,
other piers and foundations falling inside or in the flooding zone
water pressure and fluid stream force. All other piers and
of any water body shall be protected from scour. foundations (including pier & foundation at P1 of Mahi River)
The Contractor shall propose the river training and protection falling inside or in the flooding zone of any water body shall be
works as per the provision of Indian Railways Bridge manual, protected from scour.
Chapter VIII, RDSO GE G-4, RDSO GE G-8 and IRC 89. After The Contractor shall propose the river training and protection
obtaining no objection/approval of the relevant authorities on works as per the provision of Indian Railways Bridge manual,
the design and construction method of such works, the Chapter VIII, RDSO GE G-4, RDSO GE G-8 and IRC 89. After
Contractor shall submit the same to the Engineer for approval. obtaining no objection/approval of the relevant authorities on

MAHSR-C6-ADDENDUM NO. 04 Page 5 of 44


Item
Refer Para No. Original/As Existing Revised
No.
the design and construction method of such works, the
Contractor shall submit the same to the Engineer for approval.
For P1 of Mahi River, refer to the Basic Design drawings.
14. Part 2, Section VI-1, Division
The Contractor’s Site offices and facilities shall be provided The Contractor’s Site offices and facilities shall be provided
06000, Sub-Division 06040,
within or in the vicinity of the work site, with all necessary within or in the vicinity of the work site, with all necessary
Sub-Clause 3.2, Page 20 of
facilities including furniture, office equipment, office supplies, facilities including furniture, office equipment, office supplies,
51
utility services, sanitary system and vehicle parking. Division utility services, sanitary system and vehicle parking. Division
4000 of the General Specification indicates that the Engineer 4000 of the General Specification indicates that the Engineer
will have 3 sub site offices and 8 site huts established for the will have 1 sub site offices and 2 site huts established for the
C4 Contract. The Contractor shall establish the same number of C6 Contract. The Contractor shall establish the same number
Site Offices and Site Huts in close proximity to the Engineer’s of Site Offices and Site Huts in close proximity to the
Offices. Engineer’s Offices.
15. Part 2, Section VI-1, Full height fence, barriers, barricades etc. shall be erected Full height fence, barriers, barricades etc. shall be erected
Division 08000, Appendix around the Site to prevent the surrounding from excavated soil, around the Site wherever required as approved by the Engineer
08000-1, Sub-Clause 4.2.2, rubbish etc., which may cause inconvenience to and endanger to ensure Site safety along the length and width of the Site and
Page 27 of 151 the public. The barricade especially those exposed to public also to prevent the surroundings from excavated soil, rubbish
shall be aesthetically maintained by regular cleaning and etc., which may cause inconvenience to public and/or may
painting as directed by the Engineer. These shall be maintained endanger the safety of the public. The Contractor shall provide
in one line and level. steel barricading in urban areas, near habitation, road
crossings, area under excavation and any other areas as
instructed by the Engineer. The fence, barriers, barricades etc.,
especially those exposed to public shall be aesthetically
maintained by regular cleaning and painting as directed by the
Engineer. These shall be maintained in one line and level.

MAHSR-C6-ADDENDUM NO. 04 Page 6 of 44


Item
Refer Para No. Original/As Existing Revised
No.
16. Part 2, Section VI-1, Division 1) The Contractor shall be responsible for clearing of Site (1) The Employer and the landowners shall transplant/cut the
8000, Appendix 08000-1, including cutting and removal of shrubs, vegetation and trees trees, existing in the ROW before award of the Contract. The
Sub-Clause 6.3.4, Item 1, wherever required for execution of the work after obtaining Contractor will ensure that the transplanted trees are not
Page 81 of 151 necessary approval from the Engineer. The studs and roots as damaged by construction works, if otherwise inescapable in
existing at site shall also be removed by the Contractor. The cut which case Engineer’s approval shall be taken on the proposed
material is to be disposed of by the Contractor outside the ROW action.
at his own cost. The permission for cutting the trees within the
ROW shall be arranged by the Employer. The Contractor shall be responsible for clearing of site
including cutting and removal of shrubs, vegetation. The studs
and roots as existing shall also be removed by the Contractor.
The cut material shall be the property of the Contractor and
shall be disposed of by the Contractor outside the ROW, at his
own cost.
17. Part 2, Section VI-2, Design Life Design Life
Division 01000, Sub- S. No. Item S. No. Item
(Years) (Years)
Division 01030, Clause 3,
Table, S. No. 2, Page 10 of 2 Earth Structures 100 2 Earth Structures (Mainline, 100
12 Approach lines, SMD with Ramp,
Ramp, excluding drainage and
miscellaneous works)
18. Part 2, Section VI-2, Division
02000, Sub-Division 02010, Flow chart in Sub-Clause 1.1 Flow chart in Sub-Clause 1.1 has been modified. Refer
Sub-Clause 1.1, Page 03 of Attachment No. 01 of this Addendum.
45
19. Part 2, Section VI-2, Division
02000, Sub-Division 02020, i. Standard penetration test; i. Standard penetration test shall be conducted at an interval of
Sub-Clause 1.5.3, Item 2), 1m;

MAHSR-C6-ADDENDUM NO. 04 Page 7 of 44


Item
Refer Para No. Original/As Existing Revised
No.
Page 11 of 45
20. Part 2, Section VI-2, Division Table: List of Standard Design Table: List of Standard Designs has been modified. Refer
02000, Sub-Division 02030, Attachment No. 02 of this Addendum.
Sub-Clause 2.1.1, Table, Page
14 of 45
21. Addendum No. 3, Item No. The Standard Design of feeder structure shall be used with The Standard Design of feeder structure shall be used with
40, Part 2, Section VI-2, respect to the designated areas close to the Transformer Sub- respect to the designated areas close to the Traction Sub-
Division 02000, Sub-Division Station (TSS), Section Point (SP), Sub-Section Point (SSP), Station (TSS), Sectioning Post (SP), Sub-Sectioning Post
02030, Sub-Clause 2.1.2, and Signalling and Telecommunication Equipment Room (SSP), and Signalling and Telecommunication Equipment
Item 3) b), Page 16 of 45 (SER) excluding station area; station rigid frame, station Room (SER) excluding station area; station rigid frame,
approach, and branch section. The locations of the areas where station approach, and branch section. The locations of the
the feeder structure is used have been shown in the Employer’s areas where the feeder structure is used have been shown in
Requirements – Drawings, which shall be confirmed by E-1 the Employer’s Requirements – Drawings, which shall be
Contractor during his review of the span arrangement and pier confirmed by E-1 Contractor during his review of the span
locations proposed by the Contractor. arrangement and pier locations proposed by the Contractor.
The girder length of feeder structure to be applied shall be as The girder length of feeder structure to be applied shall be as
follows: follows:
i. TSS, SP : L= 44m (PSC Box girder); i. TSS, SP : L= 44m (PSC Box girder);
SSP, SER : L=33m (PSC Box girder), 32m ii. SSP, SER : L=33m (PSC Box girder), 32m
(PSC I-girder) (PSC I-girder)
22. Part 2, Section VI-2, This Section explains the procedure for preparing Technical This Sub-Division explains the procedure for preparing
Division 02000, Attachment Design drawings for simply supported PSC I girders for viaduct Technical Design drawings for simply supported PSC I girders
5, Sub-Division 02010, Sub- in between stations excluding those at station approaches, for viaduct in between stations excluding those at station
Clause 1.1, Page 6 of 165 approach line and its connection to main line, SMD, and gantry approaches, approach line and its connection to main line,
girders (for TSS, SP and SSP). Modification of Standard SMD, and gantry girders (for TSS, SP, SSP and SER).
Design drawings shall be done in accordance with this Section. Modification of Standard Design drawings shall be done in
accordance with this Sub-Division.

MAHSR-C6-ADDENDUM NO. 04 Page 8 of 44


Item
Refer Para No. Original/As Existing Revised
No.
23. Part 2, Section VI-2, Division
02000, Sub-Division 02030, <Add the following item r) after q) in Sub-Clause 2.1.2, Item
Sub-Clause 2.1.2, Item 4), 4)>
Page 18 of 45
r) Where the use of 35m PSC Box girder (SBS or FSLM) has
been specified adjacent to the structures mentioned above,
instead of one single adjacent span, two adjacent spans shall
be of 35m PSC Box girder, second span can be SBS or FSLM.

24. Part 2, Section VI-2, Division Standard Standard


Type of Standard Type of Standard
02000, Sub-Division 02030, Heights of Bearing Heights of Bearing
Pier Superstructures Pier Superstructures
Sub-Clause 2.2.1, Table, Pier Pier
Page 18 of 45 PSC I girder PSC I girder
F/M
(L= 25m, 30m, 7m, 10m, (L= 25m, 30m, 7m, 10m,
Rectangul 35m) 13m, 16m, Rectangul 35m) 13m, 16m,
F/M F/F available
ar Type PSC Box girder 19m, 22m, ar Type PSC Box girder 19m, 22m,
for some cases
(L=30m, 35m, 25m, 28m (L=30m, 35m, 25m, 28m
as per DFM
40m, 45m) 40m, 45m)
25. Part 2, Section VI-2, For river crossing bridges, bottom of pile cap shall be kept at For river crossing bridges, the top of pile cap shall be kept at a
Division 02000, Sub- 0.3m above Low Water Level (LWL). minimum of 0.5m below the riverbed.
Division 02030, Sub-Clause
2.3.3, Last Sentence, Page
20 of 45
26. Part 2, Section VI-2, T-3 Contractor will install kilometer posts/gradient posts on T-3 Contractor will install kilometer posts/gradient posts on
Division 02000, Sub- noise barriers, etc. Attachment 4C provides general features of noise barriers, etc.
Division 02040, Sub-Clause such posts.
2.5, Page 37 of 45

MAHSR-C6-ADDENDUM NO. 04 Page 9 of 44


Item
Refer Para No. Original/As Existing Revised
No.
27. Part 2, Section VI-2, OHE location OHE location
Division 02000, Sub- Girder Bridge Curve Interm One Quar Girder Bridge Curve Interm One Quar
End End
Division 02040, Sub-Clause Type length radius Non ediate Cent Type length radius Non ediate Cent
diaph
diaphr
third ter diaph
diaphr
third ter
e er e er
3.1, Table, Page 37 of 45 ragm agm 1/3 1/4 ragm agm 1/3 1/4
R=400 R=400
PSC ✔ ✔ ✔ PSC ✔ ✔
0m 0m
I- 20m I- 20m
Straigh Straigh
girder ✔ ✔ ✔ girder ✔ ✔
t t
28. Part 2, Section VI-2, <Add the following items after existing item 7 before Clause 1
Division 02000, Attachment of Attachment No. 2>
No. 2, Page 03 of 21
“(8) In case the erection operation is to be done and/or being
done at river bridge piers during the monsoon period, the
Contractor shall measure the scour depth at such piers prior to
the commencement of erection operation and report the results
to the Engineer for his approval and/or direction as necessary.
In case of heavy flooding/scouring, the Engineer may not
permit the erection operation(s).
(9) Prior to the commencement of PSC Box Girder erection
operation, the Contractor shall confirm that the concrete of the
pier caps subject to the erection loads has attained full
compressive strength and submit necessary information to the
Engineer, for his approval.”
29. Part 2, Section VI-2, OHE mast location (Available OHE mast location (Available
Division 02000, Attachment Bridge Length Standard Design drawings) Bridge Length Standard Design drawings)
in Standard Curve radius in Standard Curve radius
5, Sub-Division 02010, End Intermediate End Intermediate
Design None Design None
Sub-Clause 1.1.3, Table Diaphragm diaphragm Diaphragm diaphragm
1.1.1, Page 6 of 165

MAHSR-C6-ADDENDUM NO. 04 Page 10 of 44


Item
Refer Para No. Original/As Existing Revised
No.
R=4000m ✔ ✔ ✔ R=4000m ✔ ✔ N/A
20m 20m
Straight ✔ ✔ ✔ Straight ✔ ✔ N/A

30. Part 2, Section VI-2, Applicable Curve Applicable Curve


Girder Slab OHE mast Applicable Girder Slab OHE mast Applicable
Division 02000, Attachment Standard Design Standard Design
radius radius
5, Sub-Division 02010, drawings height width location condition
drawings height width location condition
(R) (R)
Sub-Clause 1.2.1.1, Table
1.1.2, Page 7 of 165 SP3-11001 to SP3-11001 to
None None
11002 11002 R ≥ 4000m
12.4m 4000m
SP3-11003 to End R ≥ 4000m SP3-11003 to End L=18 to 20m
12.4m 4000m
11004 diaphragm L=18 to 20m 11004 diaphragm
1.7m
SP3-11005 to Intermediate SP3-12001 to
None
11006 diaphragm 12002 Straight
1.7m 11.9m Straight
SP3-12001 to SP3-12003 to End L=18 to 20m
None
12002 12004 diaphragm

SP3-12003 to End Straight


11.9m Straight
12004 diaphragm L=18 to 20m
SP3-12005 to Intermediate
12006 diaphragm

MAHSR-C6-ADDENDUM NO. 04 Page 11 of 44


Item
Refer Para No. Original/As Existing Revised
No.
31. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02010,
Sub-Clause 1.3.2.2, Figure
1.1.4 and Table 1.1.7, Page
11, 12 of 165

Cable layout for PSC I girder of Cable layout for PSC I girder of Cable layout for PSC I girder of Cable layout for PSC I girder of
Bridge Length 25m and 30m Bridge Length 35m Bridge Length 25m Bridge Length 30m and 35m

Figure 1.1.4: PC cable layout given in Standard Design Figure 1.1.4: PC cable layout given in Standard Design

Table 1.1.7: Modification for PC cable Table 1.1.7: Modification for PC cable
Nos. of PC Nos. of PC
Target Bridge Cable to be Initial Tensile Stress Target Bridge Cable to be Initial Tensile Stress
cables to be cables to be
Length (m) omitted (N/mm2) for all cables Length (m) omitted (N/mm2) for all cables
omitted omitted

18 No change N/A 1200 18 No change N/A 1200

19 No change N/A No change 19 No change N/A No change

21 1 C1 1200 21 1 C1 1200

22 1 C1 No change 22 1 C1 No change

23 1 C1 No change 23 1 C1 No change

24 1 C1 No change 24 No change N/A 1200

MAHSR-C6-ADDENDUM NO. 04 Page 12 of 44


Item
Refer Para No. Original/As Existing Revised
No.
26 1 C1 No change 26 1 C1 1100

27 1 C1 No change 27 1 C1 1100

28 1 C1 No change 28 1 C1 1200

29 No change N/A No change 29 1 C1 No change

31 1 C1 No change 31 1 C1 No change

32 1 C1 No change 32 1 C1 No change

33 1 C1 No change 33 1 C1 No change

34 1 C1 No change 34 1 C1 No change

32. Part 2, Section VI-2, b. The Ultimate Bearing Capacity of bearing stratum shall be b. The Unconfined Compressive Strength (UCS) of bearing
Division 02000, Attachment 6000 kN/m2 or greater. stratum shall be 20 MPa or greater; and Nj (Empirical
5, Sub-Division 02020, Sub- coefficient depending on the spacing of discontinuities, refer to
IS12070 Clause 6.2) shall be greater than or equal to 0.1.
Clause 2.2.1.2,
1. Item b),
2. Figure 2.2.1
Page 93 of 165

Figure 2.2.1: Spread foundation


33. Part 2, Section VI-1, vii. Cable ducts vii. Cable ducts*
Division 01000, Sub-
Division 01020, Sub-Clause Note*: There are three types of Cable Ducts i.e. for power
1.3, Item C. vii., Page 5 of supply, Signal and Telecommunication (hereinafter called

MAHSR-C6-ADDENDUM NO. 04 Page 13 of 44


Item
Refer Para No. Original/As Existing Revised
No.
12 Communication), and LCX (for train radio). LCX cable ducts
shall be of polymer based at station and GRC based at SMD
with Ramps and Ramps. LCX cable shall be installed by E-1
contractor on the Noise Barriers of Viaduct & Bridges and
underneath platforms.
34. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02010,
Sub-Clause 1.2.2, Figure
1.1.1, Page 8 of 165

<Figure revised by deleting LCX Duct>

MAHSR-C6-ADDENDUM NO. 04 Page 14 of 44


Item
Refer Para No. Original/As Existing Revised
No.
35. Part 2, Section VI-2, Division
←Straight alignment section Transition curved section→
02000, Attachment 5, Sub- girder girder
Division 02010, Sub-Clause
1.3.3.1, Figure 1.1.8, Page 14
of 165

<Figure revised by deleting LCX Duct>

36. Part 2, Section VI-2, Division 3) Duct arrangement at OHE mast foundation 3) Duct arrangement
02000, Attachment 5, Sub- The angle of LCX duct diverting around OHE mast foundation
The diverting angle of ducts for power supply; signal and
Division 02010, Sub-Clause shall be set less than or equal to 4.0º degree for both
telecommunication cables shall not be greater than 30º.
1.3.3.1, Item 3) Page 14 of horizontal and vertical direction.
<This change shall be applicable for all the Standard Design
165
drawings showing the duct arrangements.>

Figure 1.1.9: <Deleted>

Figure 1.1.9: Arrangement of duct diverting at OHE mast


(Plan view)

MAHSR-C6-ADDENDUM NO. 04 Page 15 of 44


Item
Refer Para No. Original/As Existing Revised
No.
37. Part 2, Section VI-2, <Attachment 4c has been revised>
Division 02000, Attachment Refer Attachment No. 03 of this Addendum.
4c
38. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02010, Sub-
Clause 2.2.2, Figure 1.2.1,
Page 34 of 165

<Figure revised by deleting LCX Duct>

MAHSR-C6-ADDENDUM NO. 04 Page 16 of 44


Item
Refer Para No. Original/As Existing Revised
No.
39. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02010, Sub-
Clause 3.2.2.1, Figure 1.3.1,
Page 56 of 165

<Figure revised by deleting LCX Duct>


40. Part 2, Section VI-2, <Add the following bullet point before Figure 5.2.1>
Division 02000, Attachment
5, Sub-Division 02050, Sub- • The diverting angle of LCX duct (GRC) on SMD
Clause 2.1.1, Page 133 of girder shall not be greater than 4° degree.
165
41. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02050, Sub-
Clause 2.1.1, Figure 5.2.3,
Page 134 of 165

MAHSR-C6-ADDENDUM NO. 04 Page 17 of 44


Item
Refer Para No. Original/As Existing Revised
No.
42. Part 2, Section VI-3, 9.12.1.2. Cable Duct for LCX 9.12.1.2. Cable Duct for LCX at Station
Division 02000,
Sub-Clause 9.12, 9.12.2.2. Cable Duct for LCX 9.12.2.2. Cable Duct for LCX at Station
1. Heading of 9.12.1.2,
Page 140 of 170,
2. Heading of 9.12.2.2, <Add the following Sub-Clause after existing Sub-Clause
9.12.1.2>
Page 142 of 170,
3. New Sub-Clause 9.12.1.3 “9.12.1.3. Cable Duct for LCX at SMD with Ramps, Ramps
a) In the case of LCX cable duct at SMD with Ramps and
Ramps, as the duct shall not have metal reinforcement so as
not to affect radio wave transmission, the concrete shall be
Glass fibre Reinforced Concrete (GRC) and the fibre used
shall be alkali-resistance glass fibre. The cement used shall
not have a chloride ion content of more than 0.30 kg/m3.
b) The pull-out strength of the bolt-insert for the LCX cable
ducts shall be at least 3kN/bolt.
c) The LCX cable duct shall have radio wave transmission
range for VHF band (30MHz~300MHz) and for UHF band
(300MHz~3GHz). The transmission is influenced by
rainwater/moisture content in the cable duct and
appropriate measures shall be taken to mitigate the risk of
moisture ingress, as per the approved method statement.
d) GRC material: The alkali-resistance glass fibre used in
LCX cable ducts, shall be in lengths of 13-19 mm, with
diameter in the range of 18 µm ± 2 µm, shall be clean and
without any cracks; shall be dry having water-content less
than 0.5%; and shall have a zirconia content of not less than

MAHSR-C6-ADDENDUM NO. 04 Page 18 of 44


Item
Refer Para No. Original/As Existing Revised
No.
16.0%. The Contractor shall submit the material certificate
from the Manufacturer to the Engineer for review and
approval.”
43. Part 2, Section VI-2,
Division 02000, Attachment The vertical drainage pipes shall be fixed to the column and The vertical drainage pipes shall be fixed to the column and
5, Sub-Division 02010, extended downwards up to 500mm above the ground level. extended downwards up to 200mm above the ground level.
1. Sub-Clause 1.3.7.1, 2nd
bullet, Page 23 of 165
2. Sub-Clause 2.3.8.1, 3rd
Paragraph, Page 51 of 165
3. Sub-Clause 3.4.1.3, 4th
Paragraph, Page 59 of 165
44. Addendum No. 3, Item No. <Sub-Clause 2.3.2.2.a is modified. Refer Attachment No. 08
49, Part 2, Section VI-2, of this Addendum.>
Division 02000, Attachment
5, Sub-Division 02010, Sub-
Clause 2.3.2.2.a
45. Part 2, Section VI-2, 2.3.4.2. Vertical curve and girder setting <Deleted>
Division 02000, Attachment The Contractor shall refer to Sub-Paragraph 1.3.4.2,
5, Sub-Division 02010, Sub- DFM02010.
Clause 2.3.4.2, Page 44 of
165
46. Part 2, Section VI-2, 2.3.5.2 Adjusting the width of the PSC box girder <Sub-Clause 2.3.5.2 is modified. Refer Attachment No. 04 of
Division 02000, Attachment this Addendum.>
5, Sub-Division 02010, Sub-
Clause 2.3.5.2, Page 45 of
165

MAHSR-C6-ADDENDUM NO. 04 Page 19 of 44


Item
Refer Para No. Original/As Existing Revised
No.
47. Part 2, Section VI-2, 3.4.2 Anemometer “3.4.2. Anemometer” has been modified. For modified Sub-
Division 02000, Attachment Clause 3.4.2, refer Attachment No. 05 of this Addendum.
5, Sub-Division 02010, Sub-
Clause 3.4.2, Page 61 of 165
48. Part 2, Section VI-2, In addition to Ultimate Bearing Capacity of bearing stratum, the In addition to Ultimate Bearing Capacity of bearing stratum, the
Division 02000, Attachment Contractor shall pay special attention to Black Cotton Soil. The Contractor shall pay special attention to Black Cotton Soil (as
5, Sub-Division 02020, Sub- soil with the Free Swell Index (FSI) greater than or equal to 100 defined in IS 1498) with the Free Swell Index (FSI) greater than
Clause 1.1.2.1, 4th shall be classified as Black Cotton Soil as per IS1498. or equal to 100.
Paragraph, Page 64 of 165
49. Part 2, Section VI-2, Figures 2.1.6 and 2.1.7 have been modified. Refer Attachment
Division 02000, Attachment No. 15 of this addendum.
5, Sub-Division 02020, Sub-
Clause 1.1.5, Figure 2.1.6
and 2.1.7, Page 69 of 165
50. Part 2, Section VI-2, The Standard Design drawing for foundation shall be selected The Standard Design drawing for foundation shall be selected
Division 02000, Attachment taking account of the combination of the ground conditions and taking into account the combination of the ground conditions
5, Sub-Division 02020, Sub- rectangular pier configuration (refer to Sub-Paragraph 1.2.2.1) and rectangular pier configuration (refer to Sub-Paragraph
Clause 1.2.2.3, 3rd Sentence, are tabulated below. 1.2.2.1 and 1.2.2.2, DFM02020) are tabulated below.
Page 76 of 165
51. Part 2, Section VI-2, Spread Foundation shall be provided. The selection of spread Spread Foundation shall be provided. The selection of spread
Division 02000, Attachment foundation design shall be made as per the Table given in Sub- foundation design shall be made as per Table 2.1.15
5, Sub-Division 02020, Sub- Paragraph 1.2.2.2 hereinabove. hereinabove
Clause 1.2.4.1, 1st Paragraph,
Page 78 of 165
52. Part 2, Section VI-2, STEP 5: Select Standard Design drawings for pier STEP 5: Select Standard Design drawings for pier
Division 02000, Attachment Based on the superstructure combination and the pier height, as Based on the superstructure combination and the pier height, as
5, Sub-Division 02020, Sub- per Sub-Paragraph 1.2.1.1 and 1.2.2.1 hereinabove. per Sub-Paragraph 1.2.1.1., 1.2.2.1 and 1.2.2.2, Paragraph
Clause 1.3.1, Step 5 and Step 1.2.3 of DFM 02020 hereinabove.

MAHSR-C6-ADDENDUM NO. 04 Page 20 of 44


Item
Refer Para No. Original/As Existing Revised
No.
6, Page 81 of 165 STEP 6: Select Standard Design drawings for foundation
(spread foundation, pile foundation) STEP 6: Select Standard Design drawings for foundation
Based on the superstructure combination, the pier height and (spread foundation, pile foundation)
the ground conditions, as per Sub-Paragraph 1.2.1.2 and Based on the superstructure combination, the pier height and
1.2.2.2, Paragraph 1.2.3 and 1.2.4 hereinabove. the ground conditions, as per Sub-Paragraph 1.2.1.2 and
1.2.2.3, Paragraph 1.2.4 of DFM 02020 hereinabove.
53. Part 2, Section VI-2, Refer to Paragraph 2.3.3, DFM2010. Refer to Paragraph 1.3.3 and 2.3.3, DFM2010.
Division 02000, Attachment
5, Sub-Division 02020, Sub-
Clause 1.3.2, Page 81 of 165
54. Part 2, Section VI-2, <Add the following item after item e) in Sub-Paragraph 1.3.3.4
Division 02000, Attachment and before Figure 2.1.12>
5, Sub-Division 02020, Sub-
Clause 1.3.3.4, Page 84 of
165 “f) Items a) to e) mentioned above shall also apply to short piles.
Where required, short piles shall be lengthened beyond the
thresholds defined in Table 2.1.17.”
55. Part 2, Section VI-2,
Division 02000, Attachment
5, Sub-Division 02030, Sub-
Clause 1.3.7, Figure 3.1.10,
Page 112 of 165

MAHSR-C6-ADDENDUM NO. 04 Page 21 of 44


Item
Refer Para No. Original/As Existing Revised
No.
56. Part 2, Section VI-2, 1.3.5. Opening on slab 1.3.5. Opening on slab
Division 02000, Attachment
5, Sub-Division 02040, Sub- Refer to Paragraph 1.3.6, DFM2010. Refer to Paragraph 1.3.6 and 2.3.7, DFM2010.
Clause 1.3.5, Page 123 of
165
57. Part 2, Section VI-2, <Add the following after Figure 5.2.6>
Division 02000, Attachment
5, Sub-Division 02050, Sub- Table 5.2.17.a: Modification for PC cable
Clause 2.4.1.1, Page 144 of Nos. of PC
165 Ramp Target Bridge Initial tensile stress
cables to be
girder Length (m) (N/mm2) for all cables
omitted

17.5 No change 1300


Flat girder
20 - 1350

17.5 No change 1300


Slope girder
20 - 1300

58. Part 2, Section VI-2, <Sub-Clause 3.3.2.1 is modified. Refer Attachment No. 06 of
Division 02000, Attachment this Addendum.>
5, Sub-Division 02050, Sub-
Clause 3.3.2.1, Page 151 of
165
59. Addendum No. 3, Item No. <Sub-Clause 4.3.1.2 and 4.3.1.3 are modified. Refer
78, Part 2, Section VI-2, Attachment No. 07 of this Addendum.>
Division 02000, Attachment
5, Sub-Division 02050, Sub-
Clause 4.3.1.2 and 4.3.1.3

MAHSR-C6-ADDENDUM NO. 04 Page 22 of 44


Item
Refer Para No. Original/As Existing Revised
No.
60. Part 2, Section VI-1, Construction road and approach roads to Switching Stations, Construction Road and Approach Roads to Switching Stations,
Division 01000, Sub- SER and DSS, Maintenance Depots and Ramps (including SER and DSS, Maintenance Depot and Ramps (including
Division 01020, Clause 11, attached to Sub Maintenance Depot) shall be constructed as per attached to Sub Maintenance Depot) shall be constructed as per
Page 12 of 12 GS06040. GS06040.
The Contractor shall also be responsible for construction and
maintenance of Construction Road/Approach Road, wherever
required, in the ROW of P-1(C) Contractor as per GS 04040
Interface Management.
61. Part 2, Section VI-1, <New item has been added in the interface table between C-6
Division 04000, Appendix and P-1(C)>
04000-1, Chapter III, C-6 Refer Attachment No. 09 of this Addendum.
and P-1(C), Page 08 of 19
62. Part 2, Section VI-2, Division Approach Road Approach Road
03000, Sub-Clause 2.3, Page Approach Roads shall be permanent roads to the Ramps Approach roads shall be permanent roads to the Ramp
02 of 05, (including attached to Sub Maintenance Depot), Switching (including attached to Sub Maintenance Depot), Switching
Stations, SER and DSS/IDSS. The Approach Roads for Stations, SERs and DSS/IDSSs. The Approach roads for
Switching Stations, SER, and DSS/IDSS shall be provided from Switching Stations, SERs and DSS/IDSSs shall be provided
the nearest existing road to each gate having minimum width as from the nearest existing road to each gate. For Ramps,
per ROW Ortho Map attached in Reference approach road shall be connected to nearest construction road.
Information/Reports. For Ramps, Approach Roads shall be The width of Approach Road shall be as per Clause 3 of DRC
connected to the nearest Construction Road. 03000.
63. Part 2, Section VI-2, 3.1.1. Design Requirement Criteria 3.1.1. Design Requirement Criteria
Division 03000, Sub-Clause 2) In case of nallah/river/canals/ponds etc., construction road 2) For crossing nallah/river/canals/ponds etc., suitable cross
3.1.1 (2), Page 03 of 05 shall be discontinued as shown in the ROW Ortho Map. drainage works shall be provided with the approval of the
Engineer, except those stretches where discontinuity has
been shown in ROW Ortho Map.

MAHSR-C6-ADDENDUM NO. 04 Page 23 of 44


Item
Refer Para No. Original/As Existing Revised
No.
64. Part 2, Section VI-2, 3.2. Approach Road 3.2. Approach Road
Division 03000, Sub-Clause Specification of approach road for permanent road is as below. Specification of approach road for permanent road is as below.
3.2, Page 04 of 05 1) In addition to clause 3.1 in this design requirement & criteria, 1) In addition to Sub-Clause 3.1 in this design requirement &
regarding the cross section of approach road, add the following criteria, Approach Road shall be to following standards:
two layers to the construction road. i) The width of Approach Road to SER, DSS/IDSS, SP, SSP and
Bituminous Surfacing Ramps shall be 4m except that in curves it shall be widened to
・Binder Course minimum thickness: 50 mm 7m.
・Wearing Course minimum thickness: 25mm ii) The width of Approach Road to TSS shall be 7m except that
in curves it shall be widened to 10m.
iii)Bituminous Surfacing
a. Binder Course minimum thickness: 50 mm
b. Wearing Course minimum thickness: 25mm
65. Part 2, Section VI-2, Sub- Asphalt pavement of approach road shall be same as on-site <Deleted>
Division 07030, Sub-Clause road.
1.8, 4th Para, Page 03 of 06
66. Part 2, Section VI-2, Sub- Approach road to Maintenance Depot shall be provided from Approach road to Maintenance Depot shall be provided from
Division 07030, Sub-Clause the nearest existing road to gate having minimum width as per the nearest existing bituminous road to gate. The Approach
1.8, 1st Para, Page 03 of 06 ROW. Road shall have width of 7m except at curves where width shall
be 10m.
67. Part-2, Section VI-3, Division <Add the following before Sub-Clause 9.2.1>
03000, Sub-Clause 9.2, Page In addition to Sub-Clause 9.1 in this Technical Specifications,
43 of 49 Approach Road shall be to the standards as below.
68. Part 2, Section VI-2, Sub- <Add new paragraph after last paragraph of Sub-Clause 2.3.2.>
Division 05010, Sub-Clause d) Main Distribution Board Room (MDB)
2.3.2, Page 23 of 44 The Location of MDB Room in the plan is tentative and for
optimization of resources, alternative location may be
suggested by the contractor and as approved by the Engineer.

MAHSR-C6-ADDENDUM NO. 04 Page 24 of 44


Item
Refer Para No. Original/As Existing Revised
No.
69. Part 2, Section VI-2, Sub- Gutter shall be of stainless-steel material and down take pipes Gutter shall be of stainless-steel material. If downtake pipe is
Division 05010, Sub-Clause shall be of stainless steel or PVC. If down take pipe is in exposed, then it shall be of stainless-steel. If downtake pipe is
3.3.1, 4th Paragraph, Page 33 exposed condition it shall be of stainless-steel type. PVC pipes concealed, it shall be of PVC, and concealment shall be
of 44 shall only be used when they are concealed, and concealment provided with maintenance access panel (refer Annexure-13).
shall be provided with maintenance access panel.
<For Annexure-13 of DRC 05010, refer Attachment No. 16 of
this Addendum>
70. Part 2, Section VI-2, Sub- Rain water down-take pipes shall be provided for roof water U-PVC rainwater down-take pipes shall be provided for roof
Division 07010, Sub-Clause drainage. Number of rain water down-take pipes shall be water drainage. Number of rain water down-take pipes shall be
2.4.3.2, Page 10 of 39 decided based on roof area, slope and rainfall intensity as per decided based on roof area, slope and rainfall intensity as per
NBC 2016. The minimum diameter of rain water down-take NBC 2016. The minimum diameter of rainwater down-take
pipe shall be 150 mm which shall be preferably designed along pipe shall be 150 mm which shall be preferably designed along
the columns. PVC/GI spouts may be used for drainage of chajja the columns. PVC/GI spouts may be used for drainage of chajja
or small canopies. or small canopies. Gutters shall be of galvalume.
71. Part 2, Environment Control System Environment Control System
Section VI-2, 17 ECS system BMS point list 17 ECS system BMS point list including equipment
Division 05000, control, monitoring strategy and logic through
Sub-Division 05030, BMS.
Sub-Clause 1.5,
Table M-1,
Page 14 of 64
72. Part 2, <Add the following Item aa) after last Item in Sub-Clause
Section VI-2, 4.4.14)>
Division 05000, aa) The Contractor shall prepare and submit drawings, which
Sub-Division 05030, clearly illustrate details of equipment down to sub-assembly
Sub-Clause 4.4.14, and component level, equipment locations and configurations.
Page 61 of 64 Drawings shall indicate plan views, elevations, sections,
charts, tables, schematics and diagrams with legends,
dimensions, part numbers, tolerances, setting clearances,
materials, etc., as required covering the facilities being

MAHSR-C6-ADDENDUM NO. 04 Page 25 of 44


Item
Refer Para No. Original/As Existing Revised
No.
provided under the Contract. Drawings shall also be prepared
showing circuit wiring for each of the systems included in the
Contract

73. Part 2, Section VI-2, Division <Add the following Item i) after existing Item h)>
05000,
Sub-Division 05040, Sub- i) Essential power load for Platform Screen Doors (to be
Clause 6.10.2, Page 12 of 73 provided in future) shall be included in the design @
48kVA/Track side with PSD as below:
Indicative PSD
S. Stations No. of Track
Elect Load @
No. Name sides with PSD
48kVA/Track
Anand/N 02 96 kVA
1
adiad
74. Part 2, Section VI-2, Division
07000, Sub-Division 07010, Table 3: Design parameters for air-conditioned spaces Table 3: Design parameters for air-conditioned spaces
Sub-Clause 2.2.5, Page 07 of
39 Items Specification/ Applicable Standard Items Specification/ Applicable Standard
Range Range
Noise 35-40 dB(A) NBC 2016, Vol-2, Part-8, Noise 45-50 dB(A) NBC 2016, Vol-2, Part-8,
Level Section-4, Table-4 Level Section-4, Table-4
75. Part 2, Section VI-2, Division The structure shall be designed for service life as stipulated The structure shall be designed for service life as
07000, Sub-Division 07010, below: stipulated below:
Sub-Clause 3.1 d), Page 10 of
39 i) Concrete Structure – 100 years i) Concrete Structure – 60 years
ii) Structural steel Structure / Shed – 60 years ii) Structural steel Structure / Shed – 60 years

MAHSR-C6-ADDENDUM NO. 04 Page 26 of 44


Item
Refer Para No. Original/As Existing Revised
No.
76. Part 2, Section VI-2, Division 4.1 Scope of Work 4.1 Scope of Work
07000, Sub-Division 07010,
Sub-Clause 4.1, Page 20 of 4.1.2 For the design parameters for the air-conditioned 4.1.2 For the design parameters for the air-conditioned
39 spaces, the Contractor shall refer to Table 3 in Clause spaces, the Contractor shall refer to Table 3 in Clause
2.2.3 of this Sub-Division. 2.2.5 of this Sub-Division.

4.1.4 For the design parameters for the non air-conditioned 4.1.4 For the design parameters for the non air-conditioned
spaces, the Contractor shall refer to Clause 2.2.3, Tables spaces, the Contractor shall refer to Clause 2.2.5, Tables
4 and item c), in this Sub-Division. Roof extractor units 4 and item c), in this Sub-Division. Roof extractor units
and exhaust fans shall be provided in the Maintenance and exhaust fans shall be provided in the Maintenance
Depots and Safety Confirmation Car Shed. Refer Basic Depots and Safety Confirmation Car Shed. Refer Basic
Design drawings. Design drawings.

77. Part 2, Section VI-2, Division 4.2.1 VAC system shall be designed by the Contractor 4.2.1 VAC system shall be designed by the Contractor
07000, Sub-Division 07010, considering the following: considering the following:
Sub-Clause 4.2.1, Page 21 of
39 e) The Contractor shall refer to Room Data Sheet, e) The Contractor shall refer to Room Data Sheet,
in Clause 2.2.3 in Table3, Table 4 and Clause in Clause 2.2.5 in Table3, Table 4 and Clause
c) of this Division. c) of this Division.

f) The Contractor shall design the VAC system f) The Contractor shall design the VAC system
for the Sheds, rooms and spaces of for the Sheds, rooms and spaces of
Maintenance Depot as per Clause 2.2.3 and Maintenance Depot as per Clause 2.2.5 and
submit the same to the Engineer for obtaining submit the same to the Engineer for obtaining
approval. The Contractor shall submit his approval. The Contractor shall submit his
VAC design as the output obtained from VAC design as the output obtained from
commercially available/proven VAC software. commercially available/proven VAC software.

MAHSR-C6-ADDENDUM NO. 04 Page 27 of 44


Item
Refer Para No. Original/As Existing Revised
No.
78. Part 2, Section VI-2, Division 4.5.1.2 Inside design conditions, refer to Room Data Sheet 4.5.1.2 Inside design conditions, refer to Room Data Sheet
07000, Sub-Division 07010, Clause 2.2.3 for Temperature and Humidity. Clause 2.2.5 for Temperature and Humidity.
Sub-Clause 4.5.1.2, Page 22
of 39
79. Part 2, Section VI-2, Division 4.5.5.1 All fans and motors meant for smoke exhaust system 4.5.5.1 <Deleted>
07000, Sub-Division 07010, shall be fire rated as per Clause 4.6 of Part-4, NBC
Sub-Clause 4.5.5.1, Page 22 2016.
of 39
80. Part 2, Section VI-2, Division 4.5.5.2 Thermal and acoustic insulation shall have very low 4.5.5.2 Thermal and acoustic insulation shall have very low
07000, Sub-Division 07010, smoke development index level and shall be Class-O smoke development index level and shall be Class-0
Sub-Clause 4.5.5.2, Page 23 rated as per BS-476 Part-6 – Fire Propagation test – rated as per BS-476 Part-6 – Fire Propagation test –
of 39 Clause-10. Clause-10 and BS 476 part-7.

81. Part 2, Section VI-2, Division


4.6 Environment Control System (ECS) 4.6 Environment Control System (ECS)
07000, Sub-Division 07010,
Sub-Clause 4.6, Page 24 of 4.6.3 Ventilation for Air-Conditioned Areas 4.6.3 Ventilation for Air-Conditioned Areas
39 4.6.3.1 The areas and rooms to be air-conditioned shall be as 4.6.3.1 The areas and rooms to be air-conditioned shall be as
per the Room Data Sheet, reference Clause 2.2.3 Table per the Room Data Sheet, reference Clause 2.2.5 Table
3 in this Division. 3 in this Division.
4.6.3.2 Air volume for ventilation for air-conditioned areas 4.6.3.2 Air volume for ventilation for air-conditioned areas
shall be as per the Room Data Sheet, reference Clause shall be as per the Room Data Sheet, reference Clause
2.2.3 Table 3 in this Division. 2.2.5 Table 3 in this Division.
4.6.4 Ventilation for Non-Air-Conditioned Areas/ Shed 4.6.4 Ventilation for Non-Air-Conditioned Areas/ Shed
Areas Areas
4.6.4.1 Air volume for ventilation for non-air-conditioned 4.6.4.1 Air volume for ventilation for non-air-conditioned
areas and Shed areas shall be as per as per the room areas and Shed areas shall be as per as per the room

MAHSR-C6-ADDENDUM NO. 04 Page 28 of 44


Item
Refer Para No. Original/As Existing Revised
No.
data sheet, reference Clause 2.2.3 Table4 of this data sheet, reference Clause 2.2.5 Table4 of this
Division. Division.
4.6.5 Types of Ventilation Fans 4.6.5 Types of Ventilation Fans
4.6.5.1 For areas requiring ventilation, as indicated in the room 4.6.5.1 For areas requiring ventilation, as indicated in the room
data sheet in Clause 2.2.3 of this Division, the data sheet in Clause 2.2.5 of this Division, the
ventilation shall be catered by propeller/axial ventilation shall be catered by propeller/axial
flow/centrifugal fans/ roof extractor unit as the case flow/centrifugal fans/ roof extractor unit as the case
demands as per relevant regulation/ IS standards. demands as per relevant regulation/ IS standards.
82. Part 2, Section VI-2, Sub- 6.4.8. Please refer Clause 2.4 – 3.0 of C-6, Part 2, Sec.-VI-2, Refer the following Sub-Clause of Part2, Section VI-2, DRC
Division 07010, Sub-Clause DRC 5050 (Station) for piping work, valves, pumps, sanitary 05050(Station):
6.4.8, Page 37 of 39 fixtures and CP fittings. a) Sub-Clause 2.4 for Hydro Pneumatic System;
b) Sub-Clause 2.5 a) to g) and j) to o) for Piping Works;
c) Sub-Clause 2.6 for Valves;
d) Sub-Clause 2.7 for Y Type Strainers; and
e) Sub-Clause 3 for Sanitary Fixtures and CP Fittings.
83. Part-2 Section VI-2, Division
The roadbed for track shall be as per Standard Design drawings. The roadbed for track shall be as per Standard Design drawings.
07000,
(Refer to DRC 3000) (Refer to TS 3000)
Sub-Division 07030, Sub-
Clause 1.5, Page 3 of 6
84. Part-2 Section VI-2, Division On-site and off-site road shall be as per the Standard Design On-site road shall be as per the Standard Design drawings.
07000, drawings. Road for building shall be designed by the Road for building shall be designed by the Contractor, and the
Sub-Division 07030, Sub- Contractor, and the Engineer’s approval shall be obtained Engineer’s approval shall be obtained before start of work.
Clause 1.8, Page 3 of 6 before start of work.

MAHSR-C6-ADDENDUM NO. 04 Page 29 of 44


Item
Refer Para No. Original/As Existing Revised
No.
85. Part-2 Section VI-2, Division
This design can be applied to the on-site roads and the off-site This design can be applied to the on-site roads of Anand
07000,
roads of Anand /Nadiad Maintenance Depot: /Nadiad Maintenance Depot:
Sub-Division 07030,
Attachment-1, Sub-Clause
5.1.2, Page 22 of 24

Figure 12 On-site Road (Case of width=10m) Figure 12 On-site Road (Case of width=10m)

Figure 13 <Deleted>

Figure 13 Off-site Road


86. Part 2, Section VI-3, Division <Add the following note after table in Item d) in Sub-Clause
02000, Sub-Clause 4.8.3, 4.8.3>
Item d), Page 38 of 170 Note: For Precast-RCC (M75 Grade) Cable Duct, maximum
cement content of 500 kg/cum shall be permissible.
87. Part 2, Section VI-3, 4.11.1 Transporting 4.11.1 Transporting
Division 02000,
b) Transportation of concrete shall conform to IRS: CBC (CL. b) Transportation of concrete shall conform to IS 4926 (CL. 5.2)
1. Sub-Clause 4.11.1,

MAHSR-C6-ADDENDUM NO. 04 Page 30 of 44


Item
Refer Para No. Original/As Existing Revised
No.
Item b), Page 42 of 8.1, 5.7), if not in contravention to the following provisions. for Ready Mix Concrete and IRS:CBC (CL 8.1, 5.7) for other
170 than Ready Mix Concrete, if not in contravention to the
4.11.3 Placing following provisions.
2. Sub-Clause 4.11.3,
Item f), Page 44 of 170 f) Concrete when delivered shall be maintained at a temperature 4.11.3 Placing
of not more than 40°C as far as possible. It shall be compacted
in its final position within 30 minutes of its discharge from the f) Concrete when delivered shall be maintained at a temperature
mixer or agitating transit mixer, unless carried in properly of not more than 40°C as far as possible. It shall be compacted
designed agitators, operating continuously, in which case this in its final position within 30 minutes of its discharge from the
time may be within one hour of its discharge from the mixer or mixer or agitating transit mixer, unless carried in properly
agitating transit mixers, subject to the Contractor’s designed agitators, operating continuously, in which case this
demonstration of adequate workability of such concrete. time may be within one hour of its discharge from the agitating
transit mixers, subject to the Contractor’s demonstration of
adequate workability of such concrete.
88. Part 2, Section VI-3, f) If cracks develop in concrete construction, which in the f) If cracks develop in concrete construction, which in the
Division 02000, Sub-Clause opinion of the Engineer may be detrimental to the strength of opinion of the Engineer, are detrimental to the strength/stability
4.16.2, Item f) to h) Page 51 the construction, the Contractor, at his own cost, shall dismantle of the construction, the Contractor, at his own cost, shall
of 170 the construction, carry away the debris, replace the construction dismantle the construction, carry away the debris, replace the
and carry out all consequential work thereto. construction and carry out all consequential work thereto.
g) If any cracks develop in the concrete construction, which in g) If any cracks develop in the concrete construction, which in
the opinion of the Engineer, are not detrimental to the stability the opinion of the Engineer, are not detrimental to the
of the construction, the Contractor, at his own risk and cost shall strength/stability of the construction, the Contractor, at his own
rectify the work. The Contractor shall grout the cracks with risk and cost shall rectify the work. The Contractor shall repair
polymer cement grout of approved quality, to the satisfaction of the cracks 0.2mm or more by grouting or other methods. The
the Engineer. approval of the Engineer shall be obtained for the method prior
to repairing of the cracks.
h) <Deleted>

MAHSR-C6-ADDENDUM NO. 04 Page 31 of 44


Item
Refer Para No. Original/As Existing Revised
No.
h) External crack width shall be restricted to 0.2 mm or less on
all concrete structures, unless otherwise specified in the
drawings.
89. Part 2, Section VI-3, 5.2.5. Sheathing Ducts Sub-Clause 5.2.5 Sheathing Ducts has been modified. Refer
Division 02000, Sub-Clause Attachment No. 11 of this Addendum.
5.2.5, Page 54 of 170
90. Part 2, Section VI-1, “3PVC is required for stoppers in case column type stoppers
Division 05000, are proposed by the Contractor.”
Attachment, Design
<The above sentence has been added in Additional
Segment Table for C6
Information/Requirements in the following Design Segment
Package, Page 33 of 43
Types:
1. Viaduct & Bridges for Main Line
2. Crossing Bridges
3. Station
4. Sub Maintenance Depots
5. Civil Works for Approach Lines>
91. Part 2, Section VI-3, <Add the following item after item b) of Sub-Clause 7.2.1.1>
Division 02000, Sub-Clause
7.2.1.1, Page 81 of 170 “c) Steel box stoppers made of ready-made square steel tubes
(or called “column type” tubes) may substitute the welded type
steel box stoppers indicated in the Standard Design Drawings
and the Technical Specifications, subject to the Engineer's
approval. Other details such as resilient rubber, sponge rubber,
infill concrete etc. shall be as indicated in the Standard Design
Drawings. Such substitute shall have the same outer dimensions

MAHSR-C6-ADDENDUM NO. 04 Page 32 of 44


Item
Refer Para No. Original/As Existing Revised
No.
as indicated in the Standard Design Drawings (except the four
round corners) and the overall strength (including other
mechanical & chemical properties) which is equivalent or
higher than indicated in the Standard Design Drawings. In order
to achieve the above-mentioned requirements, the Contractor
shall conform to the Appendix 9 of this Division for adoption
of “column type tubes” as substitute. Furthermore, such
substitute drawings shall be verified by the third-party. The
Contractor shall be fully responsible for any modification to the
design details required by such substitution, without any
additional cost implication to the Employer.”

<For Appendix 9 of TS Division 02000, refer Attachment No.


13 of this Addendum>
92. Part 2, Section VI-3, Physical Standard Name of Test and Name of Test and
Item Unit Physical Standard
Division 02000, Sub-Clause Properties Value Referred Standard Item Unit Referred
Properties Value
7.2.1.1, Table 7.1., Item: Post filling M30 or Standard
Grade - IS 516
Post filling concrete, Page concrete more Same as that
82 of 170 Post of concrete
filling Grade - where IS 516
concrete stopper is
installed.
93. Part 2, Section VI-3, <Add the following item after existing item in Sub-Clause 7.3
Division 02000, Sub-Clause c) 2)>. Refer Attachment No. 12 of this addendum for “3) Steel
7.3, Page 84 of 170 Box Stoppers Installation Methodology”.
94. Part 2, Section VI-3, ii. For routine load test ii. For routine load test
Division 02000, Sub-Clause  0.67x Ultimate Bearing Capacity of Pile’ capacity, as
8.1.11.7, Item d) 5) ii., Page mentioned in the drawings.

MAHSR-C6-ADDENDUM NO. 04 Page 33 of 44


Item
Refer Para No. Original/As Existing Revised
No.
106 of 170  Maximum vertical settlement of pile exceeds 50 mm.  0.67x Ultimate Bearing Capacity of Pile’ capacity as
mentioned in the drawings or the design load as provided
by the Engineer, whichever is greater
 Maximum vertical settlement of pile exceeds 50 mm.
95. Part 2, Section VI-3, 8.4.1.1. Content 8.4.1.1. Content
Division 02000, <Add the following Para after existing Para and before Sub-
1. Sub-Clause 8.4.1.1, Clause 8.4.2>
Page 126 of 170 The Contractor shall design a liner plate with reinforcing ring
2. Sub-Clause 8.4.2.3, to resist all external loading including earth pressures, ground
Page 127 of 170 water pressure, effect of traffic loads, etc. The Contractor may
3. Sub-Clause 8.4.3.2, propose the Engineer to use other kind of arrangement in lieu
Page 128 of 170 of the corrugated liner plate with reinforcing ring when there is
4. Sub-Clause 8.4.3.3, an advantage.
Items 9), Page 129 of
170 8.4.2.3. Permanent Liner Plate 8.4.2.3. Liner Plate
1) Permanent liner plate material shall conform to IS: 2062, 1) Liner plate material shall conform to JIS G 3101 (SS330)
and shall follow the provisions of Drawings. Welding work and or its equivalent.
painting work shall conform to Sub- Clause 7.2.2 and 7.2.3 2) Reinforcing ring material shall conform to JIS G 3101
respectively and as specified in the Drawings. (SS400) or its equivalent.
2) The Contractor shall fabricate mild steel (MS) liners from
corrugated MS sheets as per the Drawings, built up to the
required diameter by welding as per the Method Statement.

8.4.3.2. Control of Position and Alignment 8.4.3.2. Control of Position and Alignment
The permissible tolerances with respect to position and The permissible tolerances with respect to position and
inclination, alignment shall conform to Sub-Clause 8.1.4.2, inclination, alignment shall conform to Sub-Clause 8.1.4.2,
except “Cut-off-Level” which shall be read as “top level” and except “Cut-off-Level” which shall be read as “top level” and

MAHSR-C6-ADDENDUM NO. 04 Page 34 of 44


Item
Refer Para No. Original/As Existing Revised
No.
diameter of Shinso pile shall be the least diameter of concrete diameter of Shinso pile shall be the least diameter of concrete
portion measured inside of liner plate. portion measured inside of reinforcing ring.

8.4.3.3. Shinso Pile Excavation 8.4.3.3. Shinso Pile Excavation


9) Liner plates shall be installed as soon as practicable and not 9) Liner plates shall be installed as soon as practicable and not
more than 24 hours after each increment of excavation is more than 24 hours after each increment of excavation is
complete. If excavation operations become difficult before complete. If excavation operations become difficult before
reaching the predetermined depth, further plan of action shall reaching the predetermined depth, further plan of action shall
be submitted by the Contractor to the Engineer and obtain his be submitted by the Contractor to the Engineer and obtain his
approval for the same. Where the Shinso pile is required to be approval for the same.
founded in hard rock, minimum anchorage of 0.5 m, shall be
provided. However, any changes to the Shinso pile design based
on soil strata encountered during excavation shall be as
instructed by the Engineer.
96. Part 2, Section VI-3. Sub- 1) Hardtop Non-Metallic Monolith surface hardening 1) Hardtop Non-Metallic Monolith surface hardening
Division 05010, Sub-Clause compound (Nitoflor or equivalent make) shall be used. compound shall be used. Execution shall be carried out as per
5.1.2, Item 1), Page 18 of 75 Execution shall be carried out as per manufacturer’s manufacturer’s specifications
specifications
97. Addendum No. 3, Item No. 5.4.1 Requirements 5.4.1 Requirements
93, Part 2, Section VI-3, Sub- 2) Thickness: 8 mm to 16 mm (as per drawing). 2) Tile thickness shall vary from 10mm to 16mm depending on
Division 05010, Sub-Clause the size of the tile to be used as per the approval of the Engineer.
5.4, Page 20 of 75 For all large spaces such as office lounges, toilets, nursery,
lobbies and for wall cladding applications, bigger tile size of
800mm x 1600mm (approx.) shall be used.
98. Part 2, Section VI-3, Sub- 9.1 Powder Coated Aluminium CNC Cut Jali or Panel 9.1 Powder Coated Aluminium CNC Cut Jali or Panel
Division 05010, Sub- 9.1.1 Technical Data
9.1.1 Technical Data
Clause 9.1, Page 33 of 75 1) CNC cut perforated panels shall be as per the Basic Design
1) Sub-Clause 15.6 shall be referred for Aluminium CNC
drawings.

MAHSR-C6-ADDENDUM NO. 04 Page 35 of 44


Item
Refer Para No. Original/As Existing Revised
No.
2) Fixing details shall be as per shop drawings and as approved Cut Jali or Panel.
by the Engineer
2) Sub-Clause 13.6 shall be referred for powder coating.
3) Powder coating: Powder coating shall be carried out only
after CNC cutting. Thickness of 60 - 80 µ. Item no: CPWD
Volume 2 _ 21.1.3 shall be used as reference for powder coating
99. Part 2, Section VI-3. Sub- 9.5.1 Requirements 9.5.1 Requirements
Division 05010 Sub- 1) GRC panels shall be fixed on/between RCC or Block work/ 1) GRC panels shall be fixed on/between RCC or Block work/
Clause 9.5.1, Item 1), 7) Column or Structural Steel work with ‘Dry fixing’ method Column or Structural Steel work with ‘Dry fixing’ method
Page 38 of 75 using Stainless Steel (Grade 304) using Stainless Steel (Grade 316)

7) The colouring pigment shall be Bayerfox Germany or 7) The colouring pigment shall be in compliance with DIN 53
equivalent. 237.
100. Part 2, Section VI-3. Sub- 5) Fixing: Sheets shall be fixed to roof purlins and side runners 5) Fixing: Sheets shall be fixed to roof purlins and side runners
Division 05010 Sub- at crest as per manufacturer´s recommendation and water at crest as per manufacturer´s recommendation and water
Clause 10.1.2, Item 5) tightness provisions using polymer coated galvanized hexa tightness provisions using polymer coated galvanized hexa
Bullet points, Page 41 of 75 head self-drilling self-tapping (SDST) screws with sealing head self-drilling self-tapping (SDST) screws with sealing
tapes and screw fasteners with the following properties: tapes and screw fasteners with the following properties:
 Case Hardener Carbon steel AISI11018/10B21  Case Hardener Carbon steel AISI11018/10B21
 Screw diameter 5.5 mm (In case of Stitching 4.8 mm)  Screw diameter 5.5 mm (In case of Stitching 4.8 mm)
 Metal Bonded EPDM Washer 2-3 mm width 16MM  Metal Bonded EPDM Washer 2-3 mm width 16mm
Diameter (In case of stitching 14mm diameter) Diameter (In case of stitching 14mm diameter)
 Organic/Geomet/Dorken/Xylin coating insuring 1000-  Organic coating ensuring 1000-hour salt spray life
hour salt spry life  EOTA approved.
 EOTA approved. The sheets shall be bent to required curved profile and fixed
The sheets shall be bent to required curved profile and fixed with rib & flute.
with Trimdek or equivalent rib & flute.

MAHSR-C6-ADDENDUM NO. 04 Page 36 of 44


Item
Refer Para No. Original/As Existing Revised
No.
101. Addendum No. 3, Item 10.2 Built-Up Double Skin Corrugated Galvalume Steel Sheets 10.2 Built-Up Double Skin Corrugated Galvalume Steel Sheets
No. 96, Part 2, Section 10.2.1 Requirements 10.2.1 Requirements
VI-3. Sub-Division 1) Top sheet: Fluroresin/PVDF coated corrugated galvalume 1) Top sheet: Fluroresin/PVDF coated corrugated galvalume
05010 steel sheet, thickness minimum 0.6 mm profile height 160 steel sheet, thickness minimum 0.6 mm TCT(0.55 mm
Sub-Clause 10.2.1, Items mm (minimum) @ 500 mm with necessary accessories and BMT) Klip-lok or approved equivalent profile having 700
1), 3), 7) bolts. mm effective cover width with four major deep
Sub-Clause 10.2.2, Item 3) 3) Bottom sheet: galvanized steel sheet, thickness minimum 0.6 corrugation, height 43 mm (minimum) @ 233 mm with
Page 42 of 75 mm profile height 160 mm (minimum) @ 500 mm with necessary accessories and bolts along with micro
necessary accessories and bolts, complying to CPWD stiffeners perpendicular to ribs.
specification Sub-Clause no. 12.1 3) Bottom sheet: Zincalume sheet thickness, minimum 0.6
7) Sheet coil shall be of JSW, Tata Steel or of an equivalent mm TCT (0.55 mm BMT) profile height 28.5 mm
make. (minimum) @ 203 mm c/c with subtle square fluting in
the pan and the end ribs shall have anti-capillary groove
10.2.2 Technical Data and return leg.
3) The steel sheet shall have minimum 550MPa yield strength, 7) Coated steel material shall be manufactured as per BIEC
metallic coated with zinc-aluminium alloy (i.e. 55% Al, 43.4% Licence technology.
Zinc, 1.6% Si – zincalume/galvalume), AZ150- minimum of
150 gm/m2 Al-Zn alloy coating total on both sides, pre-painted 10.2.2 Technical Data
with exterior quality XRW paint system of Super Durable 3) The steel sheet shall have minimum 550MPa yield strength,
Polyester resin with stable inorganic pigment (lead free) metallic coated with zinc-aluminium alloy (i.e. 55% Al, 43.4%
Zinc, 1.6% Si – zincalume/galvalume), AZ150- minimum of
150 gm/m2 Al-Zn alloy coating total on both sides, pre-painted
with exterior premium durability of PVDF paint system stable
inorganic pigment (lead free).
102. Part 2, Section VI-3. Sub- 2) Sheet coil shall be of JSW, Tata Steel or of an equivalent 2) Coated steel material shall be manufactured as per BIEC
Division 05010, make Licence technology.
Sub-Clause 10.3.1, Item 2),
Page 43 of 75

MAHSR-C6-ADDENDUM NO. 04 Page 37 of 44


Item
Refer Para No. Original/As Existing Revised
No.
Sub-Clause 10.4.1, Item 2)
Page 43 of 75
103. Part 2, Section VI-3. 15.6 Aluminium CNC cut Jali or Panels 15.6. Aluminium CNC cut Jali or Panels
Sub-Division 05010, Sub- 15.6.1 Requirements 15.6.1. Requirements
Clause 15.6, Page 62 of 75 1) Grade of aluminium extruded tubing and other aluminium 1) CNC cut perforated panels shall be as per the Basic Design
sections shall be as per IS 733 and IS 1285. drawings.
2) Finishing shall be done at the factory. 2) Finishing shall be done at the factory.
3) Thickness: 3 mm to 6 mm 3) Thickness
4) Panel size: 2400 mm x 1200 mm to 3000 mm x 1200 mm a. For false ceiling and other interior application –
5) Powder coating: thickness of 60 - 80 µ. Item no: CPWD minimum 1.5mm for Non-Perforated and minimum 2.5
Volume 2 _ 21.1.3. mm for perforated panels; to be designed based on the
6) Colour and shade of coating shall be as approved by the panel size, load and other safety considerations.
Engineer. b. For Façade 3 mm to 6 mm to be designed based on the
7) Aluminium cleats, sleeves, splice plates, gaskets, screws, panel size, load and other safety considerations
toggles, nuts, bolts and clamps shall be used as per Vendor’s 4) Panel size: 2400 mm x 1200 mm to 3000 mm x 1200 mm
specifications. 5) Panel shall be Powder coated or Fluororesin (FEVE) or
PVDF coated.
6) Colour and shade of coating shall be as approved by the
Engineer.
7) Aluminium cleats, sleeves, splice plates, gaskets, screws,
toggles, nuts, bolts and clamps shall be used as per Vendor’s
specifications.
8) Fixing details shall be as per shop drawings and as
approved by the Engineer
15.6.2 Technical Data
1) Grade of aluminium extruded tubing and other aluminium
sections shall be as per IS 733 and IS 1285.
2) For Powder coating refer Sub-Clause 13.6

MAHSR-C6-ADDENDUM NO. 04 Page 38 of 44


Item
Refer Para No. Original/As Existing Revised
No.
3) For Fluororesin coating refer Sub-Clause 13.3
4) For PVDF coating refer Sub-Clause 13.5
5) Coating shall be done after CNC cutting.
6) Fire rating: Non-Combustible as per class A1 of BS EN
13501-1.
104. Addendum No. 03, Item No. 17.1.2 Technical Data 17.1.2 Technical Data
100, Part 2, Section VI-3, 2) Compliance to PSA MOB PF2 PS/SPU and 2) Panel shall be as per IS 2046 or BS EN 438 whichever is the
Division 05000, CISCA standard most stringent.
Sub-Division 05010, Sub-
Clause 17.1.2
105. Addendum No. 03, Item No. The VRV or VRF units shall be capable of operating within The VRV or VRF unit shall be capable of providing guaranteed
101, Part 2, Section VI-3, range of ambient temperatures. The condensing units shall be capacity cooling within specified ambient range as per
Division 05000, capable to provide guaranteed capacity cooling within specified ISHRAE. However, the units shall be operable under extreme
Sub-Division 05030, Sub- ambient range and shall be efficiently operable under extreme temperature conditions from -5°C up to 55°C without tripping
Clause 2.3.1.1 b), Page 15 of temperature prevailing in the region from -5° up to +55° C. and derating in the capacity will be allowed beyond specified
50 In case contractor in not able to meet the requirement of upper ambient temperature (as per ISHRAE) with approval of
limit of +55℃ temperature for operation of air-conditioning Engineer.
equipment, derating in the capacity will be allowed for ambient
temperature beyond 50℃ with approval of the Engineer.
106. Part 2, Section VI-3, Division A multifunctional compact centralized controller shall be A multifunctional compact centralized controller shall be
05000, provided with the system. These controllers shall be capable of provided with the system. It shall have provision for interface
Sub-Division 05030, Sub- controlling all the indoor and outdoor units. with BMS for status etc. These controllers shall be capable of
Clause 2.3.1.8 a), Page 21 of controlling all the indoor and outdoor units.
50

MAHSR-C6-ADDENDUM NO. 04 Page 39 of 44


Item
Refer Para No. Original/As Existing Revised
No.
107. Part 2, Section VI-3, Division a) Propeller fan shall be direct-driven three or four blade a) Propeller fan shall be direct-driven three or four blade
05000, type mounted on a steel mounting plate with orifice ring. type mounted on a steel mounting plate with orifice ring.
Sub-Division 05030, Sub- b) The following accessories shall be provided with the fans: b) Mounting plate shall be of steel construction, square
Clause 2.3.2.1, Page 22 of 50 shaped with streamlined venturi inlet coated with baked
enamel paint and shall be of standard size.
c) Fan blades and hub assembly shall be statically and
dynamically balanced at the manufacturer’s works. Motor
shall be standard permanent split capacitor or shaded
pole for small sizes, totally enclosed with pre-lubricated
sleeve or ball bearings.
d) The following accessories shall be provided with the fans:
108. Part-2, Section VI-3, Division
Labels shall not be less than 45mm high. Lettering shall be of Labels shall not be less than 45mm high. Lettering shall be of
05000, Sub-Division 05040,
not less than mmm high. All labels shall be securely fixed to not less than 10mm high. All labels shall be securely fixed to
Sub-Clause 9.17, Item b) vii),
the panels by bolts and nuts. the panels by bolts and nuts.
Page 17 of 79

109. Part 2,
<The following notes shall be read in conjunction with all the
Section VI-4,
Maintenance Depot drawings>
Drawings,
Division 12000 Note: Provision for the Crushed Stone Pavement of thickness
100mm shall stand deleted in the drawings of Maintenace
Depot. Instead of Crushed Stone Pavement of 100mm
thickness, the finished ground level shall be achieved with
backfill duly compacted (refer TS 03000).
110. Part-2, Section VI-4, <The following notes shall be read in conjunction with all the
Drawings drawings>

MAHSR-C6-ADDENDUM NO. 04 Page 40 of 44


Item
Refer Para No. Original/As Existing Revised
No.
Note 1: The description of “Gross weight of steel and 10%
wastage tonne” in the Drawings titled “Rebar Weight Table”
shall be read as “Gross weight of steel tonne”.
Note 2: LCX Cable Ducting shown in any of the sectional
elevation, sectional plan, cross section, detail etc. in the
Standard Design drawings shall be ignored (except for
drawings related to stations, SMD with Ramps and Ramps).
Refer Addendum No. 04 for LCX Cable Duct details at
Stations, SMD with Ramps and Ramps. LCX cable shall be
installed by E-1 contractor on the Noise Barriers of Viaduct &
Bridges and underneath platforms.
Note 3: Rebar weight tables given in the Standard Design
Drawings are for reference only. No claim and/or variation in
the Accepted Contract Amount shall be admissible on account
of incorrect rebar weights in the tables. The Contractor shall
verify the weights from the bar arrangement drawings and
provide the same at his own cost.
Note 4: Wherever applicable, the thickness of wall for the
corrugated HDPE Sheathing shall be as per IS 1343 2012. Any
notes/clauses in the Drawings related to thickness of
corrugated HDPE Sheathing Ducts shall be ignored.
111. Part 2, Section VI-4, Replaced with “New List of Drawings” issued in Attachment
Drawings No. 18 of this addendum.
In these lists, the original drawings which have not been revised
are shown in ‘Black’, drawings which have been revised are
shown in ‘Blue’ and drawings which have been newly added
are shown in ‘Red’.

MAHSR-C6-ADDENDUM NO. 04 Page 41 of 44


Item
Refer Para No. Original/As Existing Revised
No.
Note that only those drawings that have been revised or newly
added are enclosed in Attachment.
Attachment may be downloaded by the Bidders, who have
purchased the Bid Document, through the link provided to the
respective Bidders.

112. Part 2, Section VI-5,


Additional Geotechnical Investigation Reports have been
Attachment 1D GAD
added in Attachment 1D of Reference Information/Reports,
Refer Attachment No. 17 of this Addendum.
113. Part-1, Section III, Sub-
2. The Bidder has obtained debt restructuring in the 2. The Bidder has obtained debt restructuring in the
Clause 3.2 (c) (iii), Column
immediately preceding three (3) years from the date of immediately preceding three (3) years from the date of
3, Bankruptcy/Insolvency and
deadline of submission of this Bid or has applied for it or are deadline of submission of this Bid or has applied for it or are
Debt Restructuring, Page 21
currently in the process of corporate debt restructuring (as on currently in the process of corporate debt restructuring (as on
of 32
the date of deadline of submission of this Bid), the Bidder shall the date of deadline of submission of this bid), the Bidder shall
open a dedicated ‘Contract Specific Bank Account’ for credit open a dedicated “Trust & Retention account” (T & R account)
of advances and all other payments received from the in consultation with the Employer. Contractor shall submit a
Employer under this Contract and for expenditures/ debits certified list of vendors/suppliers/sub-contractors/ consultants,
made/to-be-made for the purpose of execution of the Works associated and engaged for the execution of the contract work.
pertaining to this Contract; and shall not divert the funds for Bank will make payments on instruction of the Contractors to
the purpose(s) other than the intended purpose(s). pre-certified vendors/suppliers/sub-contractors/ consultants
only. The funds will be paid in the designated currency to Trust
and Retention account only. The Contractor shall not divert the
funds for the purpose(s) other than the intended purpose(s).
114. Part-3, Section VIII, Part-B, The funds will be paid in the designated currency to the
The funds will be paid in the designated currency to the
PC, Sub-Clause 14.7, last two dedicated ‘Contract Specific Bank Account’ to be opened by the
paragraphs, Page 36 of 73 Bidder for credit of advances and all other payments received
from the Employer under this Contract and for

MAHSR-C6-ADDENDUM NO. 04 Page 42 of 44


Item
Refer Para No. Original/As Existing Revised
No.
designated bank of the Contractor. expenditures/debits made/to-be-made for the purpose of
execution of the Works pertaining to this Contract. The details
Payment to the Contractor which is not to be covered by the of the Contract Specific Contract Account will be specified after
JICA ODA Loan shall be made directly into a bank account the award of work.
nominated by the Contractor. Responsibility for the payment
of Bank Charges shall be with the Employer. Payment to the Contractor which is not to be covered by the
JICA ODA Loan shall also be made to the dedicated ‘Contract
Specific Bank Account’. Responsibility for the payment of Bank
Charges shall be with the Employer.
115. Part 2, Following ROW Plan drawings have been modified to avoid
Section VI-5, ponds/canals etc.:
Attachment-5 ROW Plan,
Sheet 1 of 14, 6 of 14, 7 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 1 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 1 of 14
14, 9 of 14, 11 of 14 14 Rev. R0 Rev. R1

Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 6 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 6 of 14


14 Rev. R0 Rev. R1

Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 7 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 7 of 14


14 Rev. R0 Rev. R1

Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 9 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 9 of 14


14 Rev. R0 Rev. R1

Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 11 of Drawing No. RI/NHSRC/HSR-MA/ROW/C-6/001 Sheet 11 of


14 Rev. R0 14 Rev. R1

For revised Drawings, refer Attachment No. 19 of this


addendum.

MAHSR-C6-ADDENDUM NO. 04 Page 43 of 44


Item
Refer Para No. Original/As Existing Revised
No.
116. Part 1, Section II, Bid Data <Add the following after ITB 8.2 in Bid Data Sheet>
Sheet
(BDS), B. Bidding ITB 8.4 Employer is providing a Drawing
Documents, (New) Change Record for the Bidder’s
Page 4 of 32 guidance and reference for the
preparation of the Bids. The
information being provided is for
guidance only and shall not be part of
the Contract Agreement.

For Drawing Change Record, refer Attachment No.


20 of this Addendum.

MAHSR-C6-ADDENDUM NO. 04 Page 44 of 44