Professional Documents
Culture Documents
7.5X7.5X1.3M
1 2 3 4 5 5' 6 7 8 9 10 11 12 13 14 15 15' 16 17 18 19
GENERAL NOTES:
1. THIS DRAWING IS THE PROPERTY OF AL KHAWAJAH
ENGINEERING CONSULTANCY P.O.BOX NO.:49229, DUBAI, U.A.E
IT IS NOT ALLOWED TO REPRODUCE ITS CONTENTS IN ANY
FORM EXCEPT FOR THE PURPOSE FOR WHICH IT IS INTENDED.
2. THIS DRAWING IS NOT TO BE SCALED. STATE DIMENSIONS
ONLY ARE TO BE CONSIDERED.
3. ANY DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION
OF THE ENGINEER AND RESOLVED BEFORE COMMENCEMENT
OF ANY WORK.
PLOT LIMIT
PLOT LIMIT
A
B 900THK
C
800THK 900THK 900THK
1000THK
D 1100THK 900THK
5
1300THK
E 800THK
S-403
U.G. WATER TANK
Tower Crane QTZ145 (H25/15) 1100THK 1000THK 800THK
F
2
700THK RAFT SLAB S-403 700THK RAFT SLAB
G 700THK RAFT SLAB
700THK RAFT SLAB 900THK
800THK
1300THK
10 1
S-403
S-404 U.G. WATER TANK
H
1000THK 1100THK 900THK 900THK 1000THK
900THK
I 800THK
6 7
S-403 S-403 800THK 800THK
1000THK 1200THK
J 900THK
K
800THK
800THK 1000THK
800THK
800THK
4
8 S-403
L S-403
1100THK 1000THK 1100THK 1000THK 1000THK 1000THK 1000THK
1000THK 1100THK 1000THK 1000THK
800THK 900THK
11
S-404
9
S-403
M 900THK 800THK 800THK 800THK 900THK 900THK
1100THK 900THK
N
800THK 900THK 1000THK 800THK 800THK 800THK
ELYSEE LIMITED
FOUNDATION LAYOUT
RAFT THICKNESS
T20@200C/C
TOP (B/W)
T20@200C/C
CONCRETE
STRENGTH
50MPa
KWEC AL KHAWAJAH
ENGINEERING
CONSULTANCY
S-201 1:100
TOWER CRANE FOUNDATION
Tower Crane QTZ145 (H25/15)
H=1.3m
7500X7500X1300 mmTHK.
t20@150 (t&b) b.w.
7.5m
2m
2 4
7.5 m
2m
1 3
1300 THK
t20@150 (t&b) b.w.
Tower Crane QTZ145 (H25/15)
Hook height (theoretical), jib horizontal, limit switch protection distances of 0.7 m between pulley block and trolley.
30m 2.9-14.5 16 18 20 22 24 26
27 30 m 5
10 8.9 7.8 6.9 6.2 5.6 5.0 5.0 4.7 t
1.5
0 10.7 20 60 (m)
Standard trolley 2/4 fall (when using 4-fall substract 0.3 t from the loads 2-fall)
SHENJIAN 1
Tower Crane QTZ145 (H25/15)
1 Standard
○
2 Option with drop in price (for repositioning the crane less frequentely)
○
3 Option for heavy duty traveling
○
● In service (10 KN)
■ Out of service (10 KN)
Without load, without ballast with maximum jib and height
SHENJIAN 2
Tower Crane QTZ145 (H25/15)
Forces – Stresses
2m
ES HS
R R
C H P M ET P M ET
TRACT COMP TRACT COMP
m kg DaN m daN daN daN kg DaN m DaN DaN DaN
1+0+1 8.8 54130 99376 1831 23725 50790 44130 70760 4628 16246 38311
1+1+1 11.8 55710 103850 1989 25008 52863 45710 72760 5133 15851 38706
1+2+1 14.8 57290 108799 2147 26468 55113 47290 72760 5638 15456 39101
1+3+1 17.8 58770 114071 2295 28075 57460 48770 72760 6862 15086 39471
1+4+1 20.8 60250 119786 2443 29848 59973 50250 72760 7335 14716 39841
1+5+1 23.8 61730 125946 2591 31787 62652 51730 72760 7809 14346 40211
1+6+1 26.8 63210 132550 2759 33893 65498 53210 72760 8460 13976 40581
1+7+1 29.8 64690 139597 2887 36165 68510 54690 98036 9111 23083 50428
1+8+1 32.8 66170 147088 3034 38604 71689 56170 125913 9762 33165 61250
1+9+1 35.8 67650 155023 3182 41209 75034 57650 155742 10413 43979 72804
1+10+1 38.8 69130 163402 3330 43981 78546 59130 197525 11063 56525 85090
1+11+1 41.8 70610 172225 3478 46918 82223 60610 221261 11714 67803 98108
1+12+1 44.8 72090 181491 3626 50023 86068 62090 256949 12365 80814 111859
1+13+1 47.8 73570 191201 3774 53293 90076 63570 294591 13016 94556 126341
1+14+1 50.8 75050 201356 3922 56730 44255 65050 334185 13667 109031 141556
1+15+1 53.8 76630 211954 4070 60334 98599 66530 375732 14318 124238 157503
1+16+1 56.8 78010 222996 4218 64104 103109 68010 419233 14969 140178 174183
1+17+1 59.8 79490 234481 4366 68040 107785 69490 464685 15620 156849 191594
1+18+1
1+19+1
1+20+1
SHENJIAN 32
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
Column Base Design : Default single column example: working load stability checks
C15
Input Data
Loading Data
Unfactored Loads
Load Col LF LF P Hx Hy Mx My
Case no. ULS ULS (kN) (kN) (kN) (kNm) (kNm)
ovt
in service 1 1 1.5 795 45 0 0 2345
water up lift 1 1 1.5 -360 0
Sketch of Base
BS8110 - 1997 Y
C1 X
D1
B
A
Y
Mx
P
Hx
X
Z
Y
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
0.20 X 0.20 X
7.50
7.50
0.20 0.20
7.50 7.50
Y Y
Mx Mx
P P
Hx Hx
0.00
0.00
1.00 1.00
1.30 1.30
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
1513×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 221.516 mm
M
Ast =
f st . z
1513×105
=
391.3 ×1 163.8
= 332.239 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .
3663×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 216.532 mm
M
Ast =
f st . z
3663×105
=
391.3 ×1 163.8
= 804.357 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
8363×104
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 223.077 mm
M
Ast =
f st . z
8363×104
=
391.3 ×1 163.8
= 183.643 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
Column number:1
Ash = ucrit . d
= 7500 ×1225
= 9.188×106 mm²
100 . Asx
xb
F1x =
d
100 ×2 491.7
7500
=
1225
= 0.0271
100 . Asy
yb
F1y =
d
100 ×4 575.5
5 687.5
=
1225
= 0.0657
tab 3.11
tab 3.11
tab 3.11
F2 = 1
tab 3.11
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
0.79 .
v cx = F1x0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
tab 3.11
0.79 .
v cy = F1y0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
Weighted average of vc
Veff
vv =
Ash
745444
=
9188×103
= 0.0811 MPa
tab 3.11
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
tab 3.11
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
v c = v c_. F3
= .3358 ×1.1696
= 0.3928 MPa
v c. Ash
Vcap =
1000
.39276 ×9188×103
=
1000
= 3 608.679 kN
The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required
Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×1225 - (1000 - 0 )×0
= 1.225×106 mm²
Ast
F1 =
Ash
332.22
=
1225×103
= 0.0003
f 1 = f 1i . 100
= .00027 ×100
= 0.0270
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f2 = 1
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
54.542 ×1×103
=
1225×103
= 0.0445 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.04452 - .39276 )×1000
=
0.95 ×450
= -0.8146
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×1225 - (1000 - 0 )×0
= 1.225×106 mm²
Ast
F1 =
Ash
804.48
=
1225×103
= 0.0007
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f 1 = f 1i . 100
= .00066 ×100
= 0.0660
f2 = 1
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
132.57 ×1×103
=
1225×103
= 0.1082 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.10822 - .39276 )×1000
=
0.95 ×450
= -0.6656
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
0.20 X 0.20 X
7.50
7.50
0.20 0.20
7.50 7.50
Y Y
Mx Mx
P P
Hx Hx
0.00
0.00
1.00 1.00
1.30 1.30
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
0
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 225.000 mm
M
Ast =
f st . z
0
=
391.3 ×1 163.8
= 0.0000×100 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .
1277×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 222.061 mm
M
Ast =
f st . z
1277×105
=
391.3 ×1 163.8
= 280.416 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
0
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 225.000 mm
M
Ast =
f st . z
0
=
391.3 ×1 163.8
= 0.0000×100 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 a f b . d 2 . f cu
. . .
1277×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 222.061 mm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
Ast =
f st . z
1277×105
=
391.3 ×1 163.8
= 280.416 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
Column number:1
Ash = ucrit . d
= 15500 ×1225
= 18.99×106 mm²
100 . Asx
xb
F1x =
d
100 ×0
3875
=
1225
= 0.0000×100
100 . Asy
yb
F1y =
d
100 ×0
3875
=
1225
= 0.0000×100
tab 3.11
tab 3.11
tab 3.11
F2 = 1
tab 3.11
0.79 .
v cx = F1x0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
tab 3.11
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
0.79 .
v cy = F1y0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
Weighted average of vc
Veff
vv =
Ash
740351
=
1899×104
= 0.0390 MPa
tab 3.11
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
tab 3.11
v c = v c_. F3
= .3358 ×1.1696
= 0.3928 MPa
v c. Ash
Vcap =
1000
.39276 ×1899×104
=
1000
= 7 458.512 kN
The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required
Shear Calculations:
Area used for shear calculations:
Ast
F1 =
Ash
0
=
1225×103
= 0.0000×100
f 1 = f 1i . 100
= 0 ×100
= 0.0000×100
f2 = 1
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
46.02 ×1×103
=
1225×103
= 0.0376 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.03757 - .39276 )×1000
=
0.95 ×450
= -0.8309
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×1225 - (1000 - 0 )×0
= 1.225×106 mm²
Ast
F1 =
Ash
0
=
1225×103
= 0.0000×100
f 1 = f 1i . 100
= 0 ×100
= 0.0000×100
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f2 = 1
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
46.02 ×1×103
=
1225×103
= 0.0376 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.03757 - .39276 )×1000
=
0.95 ×450
= -0.8309
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
0.20 X 0.20 X
7.50
7.50
0.20 0.20
7.50 7.50
Y Y
Mx Mx
P P
Hx Hx
0.00
1.00
1.30
1.00 0.00
1.30
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
1512×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 221.519 mm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
Ast =
f st . z
1512×105
=
391.3 ×1 163.8
= 332.019 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
6109×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 210.810 mm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
Ast =
f st . z
6109×105
=
391.3 ×1 163.8
= 1 341.473 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
f st
est =
Es
391.3
=
200000
= 0.0020
d
xb =
est
1+
ec
1225
=
.00196
1+
.0035
= 785.256 mm
%redis
bb = 1 -
100
0
=1 -
100
= 1.0000
a = b. x
= .9 ×612.5
= 551.250 mm
a . . . . .
Mu = a . d - b a f f cu 1×10-6
2
551.25
= 551.25 × 1225 - ×1000 ×.66667 ×.66667 ×40 ×1×10-6
2
= 9 303.968 kNm
M
z = d . 0.5 + 0.25 -
2 . a . f . b . d 2 . f cu
2832×105
= 1225 × 0.5 + 0.25 -
2 ×.66667 ×.66667 ×1000 ×1225 2 ×40
= 1 218.463 mm
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
M
Ast =
f st . z
2832×105
=
391.3 ×1 163.8
= 621.878 mm²
2 . (d - z)
Neutralaxis=
b
2 ×(1225 - 1 163.8 )
=
.9
= 136.000 mm
Column number:1
Ash = ucrit . d
= 7500 ×1225
= 9.188×106 mm²
100 . Asx
xb
F1x =
d
100 ×2 489.8
7500
=
1225
= 0.0271
100 . Asy
yb
F1y =
d
100 ×7 629.8
5 687.5
=
1225
= 0.1095
tab 3.11
tab 3.11
tab 3.11
F2 = 1
tab 3.11
0.79 .
v cx = F1x0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
tab 3.11
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
0.79 .
v cy = F1y0.33333 . F20.25
1.25
0.79
= ×.15 0.33333 ×1 0.25
1.25
= 0.3358 MPa
Weighted average of vc
Veff
vv =
Ash
1296×103
=
9188×103
= 0.1411 MPa
tab 3.11
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
tab 3.11
v c = v c_. F3
= .3358 ×1.1696
= 0.3928 MPa
v c. Ash
Vcap =
1000
.39276 ×9188×103
=
1000
= 3 608.679 kN
The concrete shear capacity for this perimeter is sufficient: no shear reinforcement required
Shear Calculations:
Area used for shear calculations:
Ast
F1 =
Ash
331.97
=
1225×103
= 0.0003
f 1 = f 1i . 100
= .00027 ×100
= 0.0270
f2 = 1
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
54.547 ×1×103
=
1225×103
= 0.0445 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.04453 - .39276 )×1000
=
0.95 ×450
= -0.8146
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
Shear Calculations:
Area used for shear calculations:
Ash = bw. de - (bw - bf ). bf
= 1000 ×1225 - (1000 - 0 )×0
= 1.225×106 mm²
Ast
F1 =
Ash
1 341.5
=
1225×103
= 0.0011
f 1 = f 1i . 100
= .0011 ×100
= 0.1100
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
f2 = 1
f cu 0.33333
F3 =
25
40 0.33333
=
25
= 1.170
v c = v c1. F3
= .3358 ×1.1696
= 0.3928 MPa
v cu = 0.8 . f cu
= 0.8 × 40
= 5.060 MPa
V . 1×103
v=
Ash
221.51 ×1×103
=
1225×103
= 0.1808 MPa
(v - v c). b
Asv/sv =
0.95 . f yv
(.18082 - .39276 )×1000
=
0.95 ×450
= -0.4958
0.40 . b
Asv/svn =
0.95 . f yv
0.40 ×1000
=
0.95 ×450
= 0.9357
Job Number Sheet
Job Title
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com
E-Mail : mail@prokon.com Calcs by Checked by Date
F F
F F
EGG
G
GG
G
GG
G
GG
G
GG
G
GG
G
G
SECTION:G
G
GG
G
GG
G
GG
G
GE
col1
col1
4Y40-E +
4Y40-F +
PLAN
186Y40-G
3R8-SA
A
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
SECTION