The steam turbine start-up procedure involves:
1) Using main and reheat control valves to start the turbine and bring it up to minimum speed.
2) Gradually opening the main and reheat stop valves by operating a starting and load limit device to allow trip oil flow.
3) Increasing turbine speed up to 85-90% rated speed by opening the control valves further.
4) Having the speed governor take over to maintain speed until the turbine is ready for synchronization.
The steam turbine start-up procedure involves:
1) Using main and reheat control valves to start the turbine and bring it up to minimum speed.
2) Gradually opening the main and reheat stop valves by operating a starting and load limit device to allow trip oil flow.
3) Increasing turbine speed up to 85-90% rated speed by opening the control valves further.
4) Having the speed governor take over to maintain speed until the turbine is ready for synchronization.
The steam turbine start-up procedure involves:
1) Using main and reheat control valves to start the turbine and bring it up to minimum speed.
2) Gradually opening the main and reheat stop valves by operating a starting and load limit device to allow trip oil flow.
3) Increasing turbine speed up to 85-90% rated speed by opening the control valves further.
4) Having the speed governor take over to maintain speed until the turbine is ready for synchronization.
Method of Operation KA02. Operation of the starting and load
The turbine is started and brought up to limit device is continued until piston discs speed with the help of main control valves KA02 reach their lower end position. MAA10+20AA002 and reheat control valves When hand wheel KA01 is turned back or MAB10+20AA002. Reference speed setter motor MAX47BY001M of starting and load MAX46BY001 is set to minimum speed at limit device MAX47BY001 is operated in the this point if the hydraulic governor is to be open direction, the control oil is allowed to used. In this case, the speed reference of drain first from the auxiliary start-up oil the electro-hydraulic controller is set to circuit and then from the start-up oil circuit. maximum. For start-up using the electro- The pistons of test valves MAX47AA011and hydraulic controller on the other hand, 012 and MAX47AA021 and 022 are forced reference speed setter MAX46BY001 is set upwards by the restoring springs whereby at maximum and the speed reference of the the trip oil flows to the space below piston electro-hydraulic controller is at minimum. disc KA02 and slowly drains from the space The stop and control valves are in the above piston KA01. The pressure difference closed position, as the trip oil circuit is not thus occurring lifts both pistons together into yet pressurized. By turning hand wheel their upper end positions, thus causing main KA01 clockwise or by operating motor and reheat stop valves MAA10+20 AA001 MAX47BY001M of starting and load limit and MAB10+20 AA001 to open. Main trip device MAX47BY001 in the close direction, valves MAX51AA005 and MAX51AA006 are spring KA06 in auxiliary follow-up piston now held in their upper position by the oil KA08 is relieved by the linkage action, pressure of the trip oil under their stepped thereby preventing a build-up of auxiliary differential pistons. secondary oil pressure. Hydraulic amplifier MAX45BY011 with follow-up pistons KA01 After the stop valves have opened, further and KA02 is now in the control valves closed turning of hand wheel KA01 or operation of position. As a result, no pressure can build motor MAX47BY001M of the starting and up in the secondary oil circuit when main trip load limit device in the open direction will, valves MAX51 AA005 and MAX51AA006 after passing through a certain dead range, are latched in. cause lever KA03 and sleeve KA04 to move downwards, as a result of which the By further turning hand wheel KA01, valve increasing secondary oil pressure above KA02 of starting and load limit device hydraulic amplifier MAX45BY011 with MAX47BY001 is moved further downwards follow-up pistons KA01 and KA02 will whereby control oil is admitted first into the gradually open control valves MAA10+20 start-up oil circuit and then into the auxiliary AA002 and MAB10+20AA002. This will run start-up oil circuit. The start-up oil flows to the turbine up to approximately 85 to 90 % the space above the pistons of test valves of rated speed. At this point, hydraulic speed MAX47AA011 and 012 and governor MAX46BY001 will take over and MAX47AA021and 022, forcing them down maintains this speed. Starting and load limit against the action of the return springs. The device MAX47 BY001 is then set at the auxiliary start-up oil raises the pistons of maximum position. A pressure gauge main trip valves MAX51 AA005 and MAX44 CP501 and electrical speed MAX51AA006, thereby permitting trip oil to transducers MYA01 CS011 to 013 are used flow to test valves MAX47AA011 and 012 to measure the speed. and MAX47AA021 and AA022 of the main and reheat stop valves. Further speed increase, synchronizing and loading of the turbine are accomplished by Trip oil now flows to the space above piston adjusting reference speed setter MAX46 KA01 of main and reheat stop valves BY001. By turning hand wheel KA01 or MAA10+20 AA001 and MAB10 + 20AA001 and forces it down against piston discs
BHEL Bhopal 2-2105-00/1
operating motor MAX46BY001M, additional tension is applied to speed setting spring KA02, which results in an increase in speed. setting (minimum) brings the controller into Since, in interconnected system operation, action, bringing the turbine up to rated seed turbine speed is determined by the grid, for synchronizing. operation of the reference speed setter In constant pressure operation after amounts to a load change for the turbine. synchronization, the turbine generator unit is loaded up to approximately 15 to 20 % of Load Limitation rated output by increasing the speed reference. Further load increases are Starting and load limit device MAX47 BY001 accomplished by increasing the load acts mechanically on diaphragm KA09 of reference (brought into control at this load) hydraulic speed governor MAX46 BY001, within the permissible rate of load change. enabling it to be used to limit turbine load, The speed reference is left at a value i.e. to limit opening of control valves corresponding to a load output of MAA10+ 20AA002 and MAB10+20 AA002 approximately 15 to 20 % to a preset value. This setting is made by adjusting starting and load limit device MAX47BY001 manually or by means of its Load Rejection motor. On load rejection, i.e. sudden disconnection of the loaded turbine generator unit from the Electro-Hydraulic Controller grid, the turbine is intercepted by a load rejection control module before it reaches If the turbine is to be started up using the trip out speed. The resulting sustained electro-hydraulic controller, the reference speed deviation will be a value setter of the electro-hydraulic controller corresponding to the droop of the speed should initially be set to a minimum speed controller and the set reference speed. so that the controller takes over run-up of the turbine generator unit as soon as the During constant pressure operation, this turbine is operating at a low turning gear value would be approximately rated speed speed. When the stop valves have opened, since during loading the load controller was starting and load limit device MAX47BY001 switched into the circuit at a low load. should be driven into open position. Slowly Naturally, the reference speed may also be increasing the speed reference of the reduced to rated speed after a load electro-hydraulic controller from its initial rejection.