The turbine has a hydraulic speed governor and electro-hydraulic turbine controller that adjust the main and reheat control valves. The hydraulic and electro-hydraulic systems are switched in parallel to provide minimum valve position control. Additional control elements are needed for reheat condensing turbines to start up with steam and admit steam to the reheater immediately while the HP turbine cannot accommodate all steam from the boiler. Rejected steam is routed to the reheater via relief valves. The oil supply is maintained by main and auxiliary oil pumps to lubricate the turbine. The turbine has electro-pneumatic gland steam control, high pressure electro-hydraulic bypass system, and automatic testing for protective devices and valves.
The turbine has a hydraulic speed governor and electro-hydraulic turbine controller that adjust the main and reheat control valves. The hydraulic and electro-hydraulic systems are switched in parallel to provide minimum valve position control. Additional control elements are needed for reheat condensing turbines to start up with steam and admit steam to the reheater immediately while the HP turbine cannot accommodate all steam from the boiler. Rejected steam is routed to the reheater via relief valves. The oil supply is maintained by main and auxiliary oil pumps to lubricate the turbine. The turbine has electro-pneumatic gland steam control, high pressure electro-hydraulic bypass system, and automatic testing for protective devices and valves.
The turbine has a hydraulic speed governor and electro-hydraulic turbine controller that adjust the main and reheat control valves. The hydraulic and electro-hydraulic systems are switched in parallel to provide minimum valve position control. Additional control elements are needed for reheat condensing turbines to start up with steam and admit steam to the reheater immediately while the HP turbine cannot accommodate all steam from the boiler. Rejected steam is routed to the reheater via relief valves. The oil supply is maintained by main and auxiliary oil pumps to lubricate the turbine. The turbine has electro-pneumatic gland steam control, high pressure electro-hydraulic bypass system, and automatic testing for protective devices and valves.
The turbine has a hydraulic speed control valves MAB10+20AA002 and
governor MAX46BY001 and an electro- reheat stop valves MAB10+20AA001 is hydraulic turbine controller. The hydraulic routed into condenser MAG10BC001 speed governor adjusts main & reheat through LP bypass valves. control valves MAA10+20AA002 and The IP turbine is fitted with its own control MAB10+20AA002 by way of hydraulic valves to prevent steam remaining in the amplifier MAX45BY011 whilst: the electro- reheater from entering the turbine via the hydraulic turbine controller adjusts these IP section and causing further acceleration control valves by way of electro-hydraulic of the turbine after the main steam control converter MAX45BY001. valves have been closed due to a load Hydraulic amplifier MAX45BY011 and rejection condition. In addition the steam electro-hydraulic converter MAX45BY001 pressure in the main steam line would are switched in parallel to form a minimum build up after sudden closure of the main value gate. The system not exercising steam control valves, thus causing the control at any given time is at its maximum relief/HP bypass valves to open, with the position. result that even more steam would flow into the IP section of the turbine. The special operating conditions existing in reheat condensing turbines necessitate The oil supply is maintained by main oil additional control elements. On start-up of pump MAV21AP001, driven directly by the the high-pressure boiler, it is necessary to turbine shaft, and by two electrically driven start up with a considerable steam rate full-load auxiliary oil pumps and one straight away and, due to the high electrically driven bearing oil pump. temperature in the reheater, to admit The turbine is equipped with an electro- steam to the reheater immediately. pneumatic gland steam control system, As long as the HP section of the turbine is high pressure electro-hydraulic bypass unable to accommodate all the steam system and an automatic turbine tester for supplied by the boiler. The rejected steam the protective devices, main stop and is routed directly to the reheater via the control valves and reheat stop and control relief valve/HP bypass valve. The steam valves and an automatic functional group from the reheater, which can not be control. accommodated by the IP section with its