You are on page 1of 25
ah dee] Sher Ge 2g = akg SER Ssafta_ate_frior feet ee . Office of the SDG, Project Region . C.P.W.D., Kendriya Sadan, ae whey Sector 9-A, Chandigarh-160009 RaLAR., Fett ae, Phone& Fax No. 0172-2747101 ‘eee9 v, vding - 160009 ‘agar War tere &, 0172-2747101 sdg-chnd@epwd.gov.in ‘BEM: 20 (1)/SDGIPRCHIEE-CANIM/QAI2021-221 2480 Featiaa-+42 12021 To So HSE NA, F HS.3G.E. TH say oRatore sae Hoaloftefae, Haat, TAL | Subject: C/o Permanent campus under Phase-1 for IIM Jammu at Jagti, Jammu. SH:- Clo Academic Block, Professors Residences, Associate & Assistant Professor Residence, Director's Residence, Type B staff Residence, Type C staff Residence, Hostel block, Executive Hostel Block, MDP block, Indoor Sports Complex, Dining Block, Shopping Block, Medical Center, Clock tower, Electric Sub Station Building, Guard Room and Gate i/c internal water supply, sanitary installation and Internal & External Electrical Works, Retaining Walls and Soil Stabilization, Storm Water Drains, (Cement Concrete Roads & Paths, UG/OHT Tanks, External Water Supply & Irrigation Lines, Sewerage System, HT & LT Electric Sub Station Equipments, Fire Fighting, Fire Alarm System, DG Set, HVAC, CCTV, Access Control, LAN and Data Networking, IP PBX, UPS System, Public Address System, Audio & Visual ‘System, Building Management System and SCADA, MRL lifts, Signage, STP, WTP, Pump Sets, RO System, Solar Hot Water System, Solid Waste Managersent, Rain Water Collection Pond, Landscaping and Horticulture Works etc. Please find enclosed herewith the inspection report carried out by this office from 30.11.2021 to 03.12.2021 for the above said work. You are requested to take immediate action in respect of the defectsideficiencies and report compliance thereof. ‘You are also requested to send latest status of the work and pictures from site with date and signature. Encls: Inspection report 24 pages 1) ‘rater a o. at, &. weshre copy to: 1. ardorae aiftdar a afte seers (AR), TRL, chs for, wean Fe, sy a Tee gravee ardargt Ba | 2 artoran xtiar o aftes vata.) sng.ang.a. ud ang.srg.ce ator tage aise, wats fas, arent ae, wy at quae od areas artaré Fy orto afar (fit) ANNEXURE-56 (Refer SOP No. 7/2) OBSERVATION of CE (W cum TLAA) unit, O/o SDG (PRCH) PARTICULARS OF WORKS SIo| (a) Name of work:- Cio Permanent campus under Phase-1 for IM Jammu at Jagti, Jammu. SH:- C/o Academic Block, Professors Residences, Associate & Assistant Professor Residence, Director's Residence, Type B staff Residence, Type C staff Residence, Hostel block, Executive Hostel Block, MDP block, Indoor Sports Complex, Dining Block, Shopping Block, Medical Center, Clock | tower, Electric Sub Station Building, Guard | Room and Gate i/c internal water supply, sanitary installation and Internal & External Electrical Works, Retaining Walls and Soil Stabilization, Storm Water Drains, Cement Concrete Roads & Paths, UG/OHT Tanks, External Water Supply & Irrigation Lines, Sewerage System, HT & LT Electric Sub Station Equipments, Fire Fighting, Fire Alarm System, DG Set, HVAC, CCTV, Access Control, LAN and Data Networking, IP PBX, UPS System, Public Address System, Audio & Visual System, Building Management System and SCADA, MRL lifts, Signage, STP, WTP, Pump Sets, RO System, Solar Hot Water System, Solid Waste Management, Rain Water Collection Pond, Landscaping and Horticulture Works etc. (b) Description & scope of work’ Building work with RCC framed structure(G+1) storey and swimming pool, Badminton courts, Squash court, Indoor | games and Gym hall, E&M works like filtration plant, DG set and LT panel etc. 12 ‘Sub —Division & name of Assistant Engineer: Civil:- Er. Harsh sharma AE-1, Er Chob Singh AE- 2, Er Nirvikar Amal AE-3, Er S.K.Singh AE- 4, Er Lalit kumar Pal AE-65. Elect: 1. Yaduveer Singh, AE-! 2. Er. Ajay Yadav, AE-IL Division & name of Executive Engineer: Civil:- Er. Bajrang Singh ,EE & SM (C)-III Elect:- Er. Ajay Kumar Chadha, EE&SM (E) () Zone & name of Chief Engineer: Er. Vivek Bansal CE cum ED, IIT & lIM Projects, Jammu ate _ 3 | Agency/Contractor ] @) | Name: Wis Ramacivil India Construction Pvt. Lid. | (&) _ | Registration class: ‘CPWD, Class Super ] Ta ‘Agreement No.: OT/EE/CEcumEDIMT&IIM/2020-21 18 Stipulated date of start: 34.40.2020 16 Stipulated time & date of completion 30.10.2022 (24 Months ) | 77 |(@) | Estimate cost put to tender: Rs _443,47,00,000- (Rs 350,14,00,000/- (civil, Rs 93,27,00,000/- (Elect)) (6) _| Schedule of rates applicable: | PAR 2019 with upto date correction slips, 78 ‘Accepted tendered cost with overall age: | Rs _376,64,62,300/- _(Rs277,37,62,8300/- (Civil, Rs 99,47,00,000/- (Elect) 15.01% below 19 Y%age progress at the time of inspection | Civik- 22% Work delayed. vis-d-vis expected as per contract and | Elect:- 1.3% Work delayed reasons for delay, if an 710 Inspecting officer: Name & Designation: Er Arvind Garg, CE Er Tejinder kumar, EE Er MS.Sajwan, AE Er Deepak Rai, AE(E) Ti Officer & contractor present — during inspection: Name & Designation: Er Bajrang: Singh, EE(C), Er. Ajay Kumar Chadha, EE(E) Er Harsh sharma, AE(C), Er Chob Singh, AE(C), Er Nirvikar_ Amal, AE(C), ErS.KSingh , AE(C), Er Lalit Kumar Pal,.| AE(C), Er. Yaduveer Singh, AE(E), Er. Ajay | Yadav, AE (E) | Agency's Engineers Sh. T.R Sahu, Project Manager Sh. KP Singh , Deputy PM, ‘Sh, Ajay Kumar, Sh. S.K.Tiwari, Sh Arun Sharma, Sh Deepak Panwar, Sh_Kshitiz Garg, Sh Rahul Sharma, Sh Ramesh Kumar, Sh Sunil Yadav, Sh Gaurav Dhull, Sh Rajeev Namdev, Sh Bharat Girdhar, Sh Vineet Srivastava, Sh Nitin Sharma, Sh Manoj Sharma, Sh. Rajiv_and Sh Ishwar 12 Date of inspection and number: 01 & 02.12.2021 (1* inspection) 2.0 | Quality/ control aids: = | 21 Is site equipped with (@) _| Copy of agreement: Yes () | CPWD Specifications/aiong with (upto | Yes, date) correction slips: A (©) | List of ISI marked/approved material to be | Yes used : (@ _| Guard file containing inspection Reports of | Yes CTE/QCTA/AE(QC)/ICEISE etc. (©) _| Testing facilities to check conformanceto |Yes acceptance criteria: | GAGW Circulars on Quality control: Yes 22 Is field laboratory existing and well Civil Yes equipped? Elect:- Not applicable 3.0 Departmental procedure aspects: 34 Maintenance of inspection Register: Maintained. 32 Highlights of Inspections by CE,SE, AE(P) | Two inspection notes of SDG,PRCH dated requiring compliance: 25.02.2021 and 17.11.202tentered. 33 ‘Are Test Registers maintained in standard | Yes forms? 34 Are Test Registers reviewed by EE/SE with | Civik- dates? Reviewed/signed by EE. Not reviewed by CE cum ED. EE to got reviewed from CE cum ED and submit copy. Elect'- Not reviewed by EE & SM. 3.5 | Cement regist (@) [Is cement store checked by AE/EE | Yes periodically as stipulated? (&) | Comment on cement stock with reference | Balance 10600 as on 07.12.2021. Tallies to cement register: with store, ‘%6 | Site Order Book and Schedule of defects: (@) | IS site order book properly maintained? _| Civik-Yes 7 Elect- No (©) __| Is the Site Order book reviewed by EE/SE? | Civil: Entry by EE on 14.04.21, 06.07.21 (Mention details) 30.09.21 & 28/11/2021. Not reviewed by CE cum ED. EE to got reviewed from CE cum ED and submit copy. Elect: Blank a (| Have timely notices been issued to the | Civil: No notice issued till date of inspection. contactor with — schedule. ~—of | Electrical: No notice issued till date of defects/damages and date of compliance? _| inspection. In case of failure to rectify defects/damages whether action under clause 14/17 initiated? 4.0 Process control aspects: a a4 Is soil investigation done? (give brief | EE to submit the copy of soil test report details) 42 Suitability of water for construction: (@) _ | Whatis the source of water? Bore well supply. (6) | Has water been tested and approved by | Tested on 27.01.2021 . Not approved by EE Engineer-in-charge before construction? G _A— eae Has water been tested subsequently (Le. after every 3 months) and found fit for use in works? Yes. On 12.10.2021 21.04.21, 19.07.21, and 43 ‘Are 10% (25% for concrete) of all samples | EE to submit detailed report for testing taken in presence of EE. a4 Are all mandatory tests carried out at! Civil-Yes as per mandatory test statement stipulated frequency? of 6" RIA bill. UPV tests not mentioned in this statement EE to explain Elect- Yes 45 ‘Are materials approved by Engineer-in- | Civil-Yes charge? If so, are samples available at | Elect: Gl Box not approved site? 46 Are samples units/items completed and | EE to intimate. approved by EE before start of mass finishing work? a7 ‘Specific control on RCC work like | RCC work in Academic Building, Hostel, centering/shuttering, proportioning with | Dining Block, Shopping Block, Medical boxes: mixing by full bag capacity hopper fed mixer: control of ‘slump: placing/compaction with vibrator: | mix Centre, MDP, Professor/Asst Prof.’ Type B&C under progress. AAC masonry work started in Hostel Block. RCC done with design mix M-25, M-30, M-35 & M-40 batch concrete. Record of Slump test is maintained. Centering and Shuttering is of MS plates, marine ply and aluminum Compaction of concrete done with needle | vibrators. 48 Any other particular comments _ on | As per annexure A adequacy of process control: 50 Site inspection for observations and comments on quality control system in place: Observations on fioor slope-(especially in _ | Stage not reached yet 54 Bath, WC, Kitchen, terrace, Balcony etc.) _ Sub-head of Whether in progress Whether Location work in progress | (If so, tickmark) | Inspected (If so, tick mark) (@) Earth Work | Mainly RCC workin | Yes ‘As mentioned in (b) Concrete work_| every building. In Annexure-B (c) RCC Work hostel block brick, (d) Brick work ‘AAC block masonry (e) Stone work | and gypsum plaster (f) Marbie work | work in progress. i (g) Wood work (h) Steel work (i) Flooring (@) Roofing (k) Finishing ()) Internal Services I 52 Observations on ac for | Stage not reached yet dampness/leakages prevention. fe if dampness/ieakage noticed, then state locations & probable reasons. 53 ‘Samples collected by QC Core/cell T) AAC block Birla Aerocon G-1 60 ‘Observations on site material QC aspects. _| As per Annexure -B (Keeping in view the requirements of contract specifications: BIS marked/CPWD approved products etc.) (Attach separate sheet, if required) 70 Observations on workmanship QC aspects, | As per Annexure -B (Attach separate sheet, if required) 80 Test audit of RA bill Civil Copy of 6th RIA bill provided. Gross (Indicate RA bill No. gross amount, Vr.No. | Work done is —_Rs.60,22,14,,911/- and date. Outstanding Secured advance is. Rs.4,,63,76,121/-, Observations are as per annexure C. Electrical:- copy of 1 RA Bill provided Gross work done is Rs. 1,37,09,580/- a1 Deviation in Quantities. ’) | Whether deviation in quantities noticed? | No B) | Iso, the reason there of and whether prior | NA. approval of competent authority has been obtained before allowing deviations? ©) | Whether revised T/S is required due to NA 7 these deviation? If yes, the action taken. 82 Items not confirming to specifications: (@) _ | Whether notice was issued as specified in | No contract? (6) __| Whether approval in principle was obtained | NA from competent — authority before acceptance of sub standard work? a3 Extra/substituted items: @ | Are justifications of item in remark column | NA of EW/SI proper? (©) | Whether prior concurrence of technical | N.A. sanctioning authority for execution of El/SI has been obtained before execution? Also rates finalized before execution. (© | Whether sanction of competent authority | NA issued? 64 Part rates-whether rates held back are | Civil-Full rate paid. adequate? Elect:- Part rate paid. a5 ‘Comments on secured advance paid with |Civi: Secured advance for TMT reference to materials lying at site. reinforcement bars amounting to _Rs. ae ash 4,63,76,121/-is outstanding in 6th RIA bill. | EE has given certificate that balance quantity is lying at site under custody of contractor. 86 Test check by AE/EE Civil: As per 6” R/A bill statement attached AE's check is more than 50% and EE’s (@)_| Critical tems check is more than 10%.EE to submit ()__[ Hidden items: detailed statement about critical & hidden (©) _ | Extent (Whether satisfactory): items. Electrical: As per 1% RIA bill statement attached AE's check is more than 60% and EE's check is more than 10%. 87 ‘Any other observations? The observation made about quality of material and workmanship relate to only what could be randomly seen at locations specified. Executive Engineer and supervisory staff shall thoroughly inspect the entire work for such defects as observed as well as for other defects and take suitable remedial measures properly. The Executive Engineer shall be responsible for accepting any defective work that went unnoticed but pointed out during such inspection. 88 Progress of Work and Programme Chart (@) [Whether ‘progress of work is as per] Civil No, work is delayed. 7 milestones stipulated milestone/approved _revised | amounting to Rs 1,38,68,912/- has been milestone? If not action taken by EE. withheld for the same. ‘1st mile stone has been re-Scheduled from 10.08.21 to 10.11.21 Elect- No milestone has been withheld, whereas only 1.3% work has been executed i till date (©) | Whether contractor has submitted the | EE has submitted soft copy of Primavera Programme to complete various activities of | programme chart and revised primavera work within stipulated date of completion as | programme chart. per contract condition duly accepted by EE? (©) | Whether monthly progress report submitted | EE to submit the copy. by contractor as per programme submitted has been certified by JE/AE and reviewed by EE/SE? ft @__ [Any notice under clause 3(a), (b), or (c) for | No inordinate delays has been issued or not. If yes, the action taken by EE. 2 (c)1 Olo CE (Works cum TLQA) SDG, PR, Chandigarh Building wise progress of work as on 02.11.2021 g : : : z z| Z : z| $ z & 9 5 Fleet ag ELE] Ball Gaia = | § | a3] 8 ze 2 | 2) 28s | 8 | eel sl 2) e888 F S.N o m ez 2 23| 23 2B 2) 2 | #8) @ | 3s) 8283 2) F2lea| 218 2/8) 3s] ae] 8 °§ &) “$e a ig 5 a 2 zg 6 US 2 2 2 5 8 g 3 1 | Hostel Blocks FF & SF comp aa 12 | HosteLa| 100% | 100% | excludi | 50% | 100% | 100% | 90% | - | 100%| so% | 4 ng toilet FF, SF& 100% | 1.2 | HOsTEL2 | 100% come | 50% | 100% | 100% | 90% | 50% | 100%) - excludi ; (7a | 78 for) | toilet 50% of 100% | FF 13 | HosTeL3 | 100% comp | - | 95% | 95% | 90% : 7 - excludi (25a | me 72021) |_ toilet FE, SF air 14 | Hostera| 100% | 100% | SMP | 60% | 100% | 95% | 90% 100% | - excludi ng toilet SECOND THIRD name or | PUNTA] coypyy | GROUND | FiRsTFLOOR | FLOOR | THRO sno | Siping | BEAM | GUNN | FLOOR SLAB slaB ane SLAB (asTsias) | @ND | (yan Shap) Stas) 2 | ACADEMIC BLOCK 2a_| PARTI 75% column 2aa| icress | NA 100% 100% | complete, Slab - shuttering (75% Comp 100% Column 22 | part2 | 100% | 100% NA 100% 200% | ce am Slab Shutt 100% Rein comp & 23 | parts | 100% | 100% NA 100% 100% 70% Column Casted 100% Rein 24 | arta | room | 1o% Ke NA 100% 85% Rein, 25 | parts | 100% | 100% NA 100% Comp & 95% | Comp. 70% Column 26 | parTé | 100% | 100% NA 100% Casted & 100% Rein. 27 | part7 | 80% | 70%Casted| NA ameee lt progress ae | PARTS 95% Dea reson NA 100% 100% eee beled reinforcement in progress. BLOCK WORK ‘ BR ' : 3 External Plastering 5 § ge Wall conducting 883° x PARAPET WALL ' g 3 _ < SECOND FLOOR Column Rein, 100% , < < : < SLAB(2ND SLAB) 34% Column Casted 2 = FIRST FLOOR SLAB x g g z Es z (AST SLAB) g g g s3g\ 3 x x COLUMN/ WALL . s s . 8 De-shuttering of ot g Rein. In en Floor Slab is balance 8 Progress x z z 2 PLINTH BEAM s 8 3 Res |Z g g g 5 FOUNDATION x 3 8 3 s (RCC) a 3 a a 3 g zx Zu ¥ 238 zs 3 a z NAME OF BUILDING Ze gg 3 E 8 z 62 sO =o 8 2 2 ° + » © 5 COLUMN unite Ge coLumnn SNO | DUnpING EXCAVATION FOUNDATION PTO fon eeeve PuNTH iv, | BEAM | PLINTH BEAM PROF. ; 8 100% 100% 100% reese RESIDENCE Progress 2 Excavation of 2 Block comp upto astr/asso. | pac Tevet | 200% for 1 Block is 9 PROFF. | completed & Over | Completed. PCC - 7 7 RESIDENCE | Burden Excavation | @YOut for 2 Block is for 1 Block in | under Process Progress EXECUTIVE 95% PCC comp, rft 10 100% one 7 HOSTEL BLOCK in progress. z H TYPE B SATFE At ea ae Rein, & shut : RESIDENCE progress + TYPE C STAFF ee RESIDENCE ae 100% id : : 1B ESS01 100% 100% ao Progress -10- EARTH WORK su. 8 | ic REMAR Ao | ROAD om | ane cs Pac KS BURDEN a) AM High 30 M- 100% ccimpited Completed. | 'b)2M High 20 M 4 f : 4 | Mewor | except at patie z fa COMPLETED, ee Rein.& Shut 10M Comp. | 2) | mow-02 - 7 7 Cee : | 3) | MCW-03 ‘completed completed - - - . 7 4) | mew.0a 95% - 7 pee |e : 5) | mow-05 80% : - pee eee see . 8) | Mcw.06 60% : - Sea : 7) MCWw-07 85% a : - - - - 8) MCW-08 - + - - - - 9) | mew-09 - : : See eee lee 10) | mew.20 : : - Gee [eee ee leet : aie 4.84 4.8.2 48.3 484 48.5 486 48.7 488 Annexure ‘A’ (Civil) (Process Control Aspects} ‘As per schedule F clause 7A at page 26, No running account bill shall be paid til submission of EPFO, ESIC and BOCW welfare board. EE to submit compliance. ‘As per schedule F clause 32 at page 31, requirement of Technical staff to be deployed by the contractor is mentioned. The list of the staff deployed by agency on the work has been provided. EE to submit credentials of technical staff deployed at site with their consent letter. Initially programme chart was prepared using Primavera software. After non- achievement of desired progress revised programme chart was prepared keeping date of completion same as stipulated. Out of 24 months time 13 months time already lapsed and only 22% progress is achieved. How 78% progress will be achieved in 11 months. EE to ensure that the progress of work is as per revised programme. The agency has not appointed 3D Building Information modeling (BIM) as per agreement condition 19 at page 106/544, EE to explain the reason and action taken. ‘As per agreement additional condition 36 at page 116/554, the cost of testing of all building material samples shall be borne by the contractor. EE to confirm compliance. This project is proposed for obtaining at least “Green Plus” rating and academic block for “Super Green” rating as per green rating manual 2019 issue by CPWD. EE to intimate whether the project has been registered online for the rating ‘As per agreement condition 38 at page 118/556, agency has to sign escrow ‘agreement and open escrow account.EE to intimate compliance. As per condition for steel reinforcement , the Special Director General of project Region Chandigarh to approve the steel manufacturer. EE to submit the copy of approval -12- Aa—_— 48.9 4.8.10 4.8.11 48.11 4.8.12 4.8.13 48.14 4.8.15 As per 4" milestone, preparation of sample of one toilet block in academic Block and Student Hostel i/c sample submission for approval of all flooring, finishing, fixtures, door, window, sanitary fittings etc. was to be completed within 12 months from date of start. More than 13 months have been lapsed and this is not achieved. EE to intimate the reason and action taken, As per additional conditions for civil work 29 at page 112/550, conditions of national Green Tribunal have been mentioned for compliance by the agency. EE to certify the compliance Ultrasonic Pulse Velocity tests of RCC members in each category i.e. beam, column, slab and footing to be carried out as per technical circular no. 18 of CE(CSQ) dated 12.02.2013. The UPV test register was not available at site during inspection, it seems UPV test not done .EE to carry out the UPV tests and submit copy of UPV test register. Reports of tests got conducted from outside labs( except cement, water and cubes ) not entered in master test register. EE to got it entered in master test register. In site order book, compliance of entries made at sr. no. 2, 7 & 13 not done. EE to submit the copy after recording compliance. Hindrance register not maintained for the work. EE to clarify how hindrance is being accounted for. EE to submit the record of upto date hindrance. This work is being executed at large pace and large quantities of cement and steel received and issued frequently. EE to ensure and certify that the material is being used in the work only after satisfactory testing EE to prepare and implement check list system for every item of work for proper ato (c)4 O/o CE (Works cum TLQA) SDG, PR, Chandigarh quality management and accuracy in execution. -13- 48.1 4.8.2 48.3 48.4 4.8.5 Annexure ‘A’ (Electrical) (Process control Aspects) In the Academic Block on 2™! floor roof , laying of conduit work was in progressed, as per Part C of NIT “General Commercial & Technical Condition for Internal & External Works” of 26.13 at page 338, the work shall be carried out according to GEC drawing approved by the Engineer-in-charge and agency get approval from Engineer-in-charge before laying the conduits. However laying of conduit works were executed by agency without approval of Engineer-in-charge. EE may explain why the drawings have not been approved till date, The Site Order Book is not being maintained at site and found NIL, as per Part C of NIT “General Commercial & Technical Condition for Internal & External Works” of point 26.16 at page 338, Contractor shall have to check the Site Order Book for any instructions of the Engineer-in-charge or his authorized representative and sign the site order book, EE may explain why Site order book has not been maintained whereas it is required. As per Part C of NIT “Table of Milestone for E&M Works (reference of clause 5) “at Page- 252, Submission of GFC drawings, Technical data sheets, Samples for approval should be submitted by agency within 03 month from award of work. But, from approval register only 02 make (Conduit & FRLS Cu Wire) could be approved so far, EE may explain why delay is in approval of makes of different items and also intimate the steps taken to approve the make and drawings. As per E&M associate PQ criteria (Page no. 263 of NIT), if the EPC contractor is not eligible to carry out work himself then he shall associate eligible agency, which satisfy the condition for having experience of similar nature of work. But it is observed from agency approval register only 06 agencies have been finalized so far. EE may explain why associate agency approval for other works has not being finalized till the date. ‘The GI Switch box of Honeywell make are fixing in Hostels Blocks, however approval of these boxes has not been noticed in Sample approval register, EE may explain the reason, exec beraier (c)1 Olo CE (Works cum TLQA) SDG, PR, Chandigarh -14- Annexu Observations on_site mater 6.1.1 AAC block of Birla Aerocon G-1 in use. EE to submit test report of AAC blocks. 6.1.2. Polymer modified adhesive mortar used for AAC masonry. EE to submit the receipt/issue record of the same. 6.1.3 EE to submit some test reports of cement and steel 6.1.4 EE to submit test report and approval of coupler. 6.1.5 EE to submit test reports of hub less epoxy coated soil waste & vent pipe and fittings. 6.1.6 Some reinforcement bars were stacked behind hostel block 3 are stacked over wooden alli and touching the ground below. EE is instructed to store the reinforcement bars on platform, Test Conducted at Site 1. Ultrasonic Pulse Velocity Test: , i) Col C-48 (600x600mm) at grid WKIW8 of academic block Reading = 154.80, Result= 3.88 (Good > 3.50) ii) Col C-1 (600x600mm) at grid WJ/W10 of academic block Reading = 160.50, Result=3.74 (Good > 3.50) 2. 7-day compressive strength test of cube at site lab i) M-30 at sr. no, 616, result = 20.06 Nisqmm ji) M-28 at sr. no. 617, result = 21.92 Nisqmm ili) M-25 at sr. no. 618, result = 24.22 Nisqmm iv) M-10atsr.no. 619, result = 13.65 Nisqmm v) _M-18 at sr. no. 620, result = 17.89 Nisqmm All the samples passed the test. 0 f a -15- Site inspection: Academic Block Building 1 Part 5 at 1" floor slab, reinforcement checked at following places: ) Beam B-84 at ES/ES to EW (600x800 mm) il) Beam B-71 at EV/E-2 to E-8 (600x800 mm) iil) Slab $-8 grid EU/E2 v) Column C-54 at grid EW/E2 (600x900 mm) ¥) Part 4 Auditorium at ground floor, Column C-23 at NC/N3 Observations: 74.1 In Beam 8-71 at EVIE-2 to E-8 of size 600x800 mm, some precast cover blocks Placed at bottom got crushed due to heavy weight of the reinforcement. Field staff was instructed to all the beams and to provide additional cover blocks to ensure proper cover. EE to submit compliance. 71.2 In overlap portion of beams reinforcement bars, binding wire not tied at 2d interval Field staff was instructed to check and rectify the same. EE to submit compliance. 7.1.3 Rings ends generally bent at 135 degree but in staircase beam rings ends found unbent in central portion. 71.4 Shuttering oil applied on the shuttering plate. As per agreement Reebole Chemical Mould release agent of FOSROC or equivalent to be used as shuttering oil. EE to confirm the compliance. 74.8 Some gap between shuttering plates of slab was visible. Field staff assured filing of gap with foam before casting. EE to submit compliance. 7.1.6 At first floor in lif well, some honeycombing is visible on RCC surface at the shuttering joint. 71.7 Hacking of RCC surface of celing of slab and beams not done in the ground floor slab of part 5 area, -16- a 7.4.10 7AM 7AA2 7.4.13 Hacking of columns is not proper. More effort required with proper hacking tool. Some pieces of shuttering plates can be seen stuck in part § ground floor slab, These pieces of shuttering plates to be removed carefully without causing any damage to RCC members. Back filling of excavated earth under floor is in progress in part § area. EE to ensure proper compaction before starting sub floor activities. In auditorium area in Part 4, reinforcement binding in progress and reinforcement of columns got bent and twisted due to double height. EE to ensure verticality, proper alignment and proper cover during fixing of column shuttering and before casting of columns. In Column C-48 at grid WKIW8 of Part 2 at ground floor of academic block, column is out of plumb. Checked and found 7-8 mm eccentric. Slab over the column already casted. Ultra sonic pulse velocity test of the column has been done and result found good. EE is instructed’to issue instruction to field staff to be extra careful in maintaining verticality of the columns in the future. : In part 1 of academic block near lift pit , the depth of foundation is more than 2.00 metre. Back filling of excavated soil was in progress. EE is instructed to ensure proper compaction of back filled earth to avoid any settlement in the future Hostel Blocks _ Hostel Block no. 1,2,3 & 4 TANG TAB On 4th floor of block no. 1, on 4th floor lift well, raking of joints not done after filling with mortar in brick masonry wall. EE to issue instruction to field staff for the same. On 4th floor of block no. 1, in toilet area brick work in progress. It is necessary to regulate thickness of joints as thickness of joints is more than 10 mm at some places in WC/bath partition walls.

You might also like