General - Power Transfomer Commissioning Test
General - Power Transfomer Commissioning Test
ARB
Insulation Test 5kv:
Power Transformer
Hv Side Lv Side
Rp – E = Rs – E =
Yp – E = Ys – E =
Bp – E = Bs – E =
N–E=
Rp – Rs =
Yp – Ys =
Bp – Bs =
Apply voltage
(b) = Secondary voltage
Ratio rated
ARB
Ratio check:
Connection to test equipment.
Power Transformer
Hv Side Lv Side
R
Y
B
N
MCCB
R Y B N r y b Test Block
ARB
Ratio check:
Measure voltage at Hv side between: Measure voltage at Lv side between:
Y-B = y-b =
B-R = b-r =
R-N = r-n =
Y-N = y-n =
B-N = b-n =
Apply voltage
X Lv rated voltage = Secondary voltage
Hv rated voltage
410v A/C
X 240v A/C = 8.94v A/C
Hv 11000 v A/C
ARB
Ratio check:
Measure voltage at Hv side between: Measure voltage at Lv side between:
Y-B = y-b =
B-R = b-r =
R-N = r-n =
Y-N = y-n =
B-N = b-n =
132.1 v
= 76.27 v nilai voltan fasa (a – n )
1.732
ARB
VECTOR GROUP CHECK:
Connection to test equipment.
Power Transformer
Hv Side Lv Side
R
Y
B
N
6mm cable
MCCB
LOOP
R Y B N r y b Test Block
ARB
VECTOR GROUP CHECK FORMAT:
A-B B-C C-A A-a A-b A-c A-n B-a B-b B-c B-n
420 421 418 - 140 139.6 81.1 421 306.1 306.4 339.1
C-a C-b C-c C-n a-b b-c c-a a-n b-n c-n
418 441 305.0 384.0 139.7 139.7 139.7 81.1 81.1 80.7
Vector Group Diagram A
a
Scale 1cm= 43v 3.5cm 3.5cm x 43v = 150v
3.5cm n b
9.8cm c
C 9.8cm B
ARB
VECTOR GROUP Dyn11:
n
Jam 11 A1 a2
A1
B1 b2
0
60
C1 c2
Dyn11 Rajah 1
0 0 12
60 11 1
60
10 2
C1 B1 0
90 9 3
Dyn11
8 4
7 5
Sudut fasa jam 11 6
ARB
D)Lilitan pertama disambungkan secara delta, yn)Lilitan kedua disambungkan star
VECTOR GROUP Dyn1:
Jam 1 n
A1 a2
A1
B1 b2
0
60
C1 c2
Dyn11 Rajah 2
0 0 12
60 11 1
60
10 2
0 C1 B1
90
9 3
Dyn1
8 4
7 5
Sudut fasa jam 1 6
ARB
D)Lilitan pertama disambungkan secara delta, yn)Lilitan kedua disambungkan star
Impedence Test ( Positive Sequence):
Power Transformer
Hv Side Lv Side
ARB
Impedance Test ( Positive Sequence):
415 750
15.72% = x X 100
11000 180
15.72%
-11.58%
4.14 % perbizaan peratus
Power Transformer
Hv Side Lv Side
L
Open circuit
Fomula:- V / I 240v
= 3.69 Impedance
65A
Galangan semasa berlakunya arus kerosakkan pada transformer ARB
Secondary injection of winding temperature meter:-
ARB
Secondary injection of winding temperature meter:-
Ct’c 1
Temperature Hv
Temperature Lv
Ct’c 2
ARB
Temperature Control Circuit For Cost Resin Transformer (ABB)
TS-01
L N 5 6 7 8 11 12 14 21 22 24 31 32 34 41 42 44
L N
Cast Resing
PTC Alarm Warning
Transformer
PTC Trip
ARB
Transfomer Differential Relay,Operation and Stability Test
(Transformer Protection)
Primary test set
VCB VCB
Terminal block Terminal block
E
Differential
Relay
Figure 1 ARB
Transfomer Differential Relay,Operation and Stability Test
ARB
Operation check from Lv side:-
(Transformer Protection)
Primary test set
VCB VCB
Terminal block Terminal block
E
Differential
Relay
Figure 2 ARB
Operation check from Lv side:-
ARB
Operation check from Lv side:-
ARB
Out zone fault:- (Transformer Protection)
VCB VCB
Terminal block
E
Differential
MCCB 100A
Relay
Figure 3
ARB
In zone fault:- (Transformer Protection)
VCB VCB
Terminal block
E
Differential
MCCB 100A
Relay
Figure 4
ARB
(Transformer Protection)
Power Transformer 15000KVA
33kv 11kv
Hv Side Lv Side
400/5A 1000/5A
Operation coil
4
E
Suppression coil
87T
1 2
Diffrential relay
ARB
(Transformer Protection)
rated current of transformer
33Kv
input primary current
400/5
1 15000KVA
87R Ip= x =262.432A
4 2 3 x 33 KV
1
87S
4 2 input secondary current
1
87T 15000KVA
2 Is= x =787.296A
4
3 x 11 KV
11Kv
1000/5
(Transformer Protection)
By ‘ Y ‘ Conection
33Kv
Relay input primary current
400/5
1 15000KVA 5
87R Irp= x =3.28A
4 2 3 x 33 KV 400
1
87S
4 2 Relay input secondary current
1
87T 15000KVA 5
2 Irs= x =3.936A
4
3 x 11 KV 1000
11Kv
1000/5
(Transformer Protection)
By ‘ ‘ Conection
33Kv
Relay input primary current
400/5
1 15000KVA 5 3
87R Irp= x =5.682A
4 2 3 x 33 KV 400
1
87S
4 2 Relay input secondary current
1 15000KVA 5 3
87T
2 Irs= x =6.818A
4 3 x 11 KV 1000
11Kv
1000/5
(Transformer Protection)
By ‘ Y-Y ‘ Conection
33Kv
Relay input current ratio
400/5
1 3.28A
87R nr= = 0.481
4 2 6.818A
1
87S
4 2
1
87T
2
4
11Kv
1000/5
HV REF OPERATION CHHECK PROCEDURE
P2 P1 Power Transformer
S2 S2
R
Y
B
Bypass
R Y B N
P1
S1
HV REF RELAY
NCT
ICT
S2
P2
At Diagram 1
HV REF OPERATION CHHECK PROCEDURE
P2 P1 Primary Test
Power Transformer
S2 S2 Set
R
Y
B
R Y B N
P1
S1
HV REF RELAY
NCT
ICT
S2
P2
Diagram 2 Ground
HV REF OPERATION CHHECK PROCEDURE
1- Check the wiring as per procedure circuit diagram. Ensure that all the terminal
point are in circuit
2- Connect the test equipment as above.
3- Inject red phase current transformer, about 10% of a rated current
4- Measure secondary current at R,Y,B,N terminal. Then take a reading. Also
check a secondary current at Neutral CT terminal input.
5- Bypass a sliding resistor, check an operated current through relay coil. We
should have a current reading I,c REF relay is operated.
6- Repeat the test procedure for yellow, blue and neutral CT.
At Diagram 2
HV REF DIAGRAM 33KV / 11KV
(Transformer Protection)
Mains Bus bar
Hv 33Kv Hv 11Kv
1259A VCB
P1 P2
1000/5A
CL X
P1 Vkp:125v
REF
MCAG14 Rct:0.44
P2
P1 1000/1A
SBEF MCGG14
CL 5P10
P2 15VA
HV REF OPERATION CHHECK PROCEDURE
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
T2 T2
E – T1 = 7G, ohm
pintaskan
B E – T2 = 7G, ohm
A T1 – T2 = 3G, ohm
b)Langkah ujian dilakukan antara T1 dan T2 di sebelah zon 1, manakala pada zon
2 T1 dan T2 di-pintaskan.
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
Menguji kabel pilot dengan multimeter untuk mendapat nilai loopping resistence
Lihat gambar rajah di-bawah
Nilai rintangan antara T1 dan T2 hasil ujian mendapati 12.8 ohm.
Zon 1 Zon 2
T1 T1
T2 T2
PANDDING RESISTENCE
pintaskan
35 65 130 260 500 Test Plug
A
out -
In +
Operating Coil
Current mA
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
Solkor Primary Test Certificate
Make: reyrolle Type:solkor Rf Rated current: 1A Trip coil voltage: 110v D/C
Indication type:Flag Wiring insulation test:__________Cts Ratio:600/1A
X
VA:______ Class:________ Meggar: 5 Kv
1- Insulation Pilot Cable:
Phasse Meggar ohms Loop Resistence Ohms Setting Ohms
T1 7G
T2 7G 12.8 990
T1 – T2 3G
12.8 - 2000
=993.6
2
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
Cara pengiraan Panding Resistance seperti berikut
nilai rintangan pilot 12.8 ohm
Formula:-
(SV – RP) SV= Standard Value From Table 2
2T RP= Pilot Loop Resistence
T = Isolating Transformer Tap
12.8 - 2000
=993.6
2
In +
Operating Coil
Current mA
Remove link di-ambil keluar dan di-masukkan dua punca uji pada (+) dan (-) yang
di-sambung pada multimeter untuk ukuran D/C mA
Untuk persediaan menjalankan ujian secondary & primary.
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
Secondary test at relay solkor RF
/1A
/5A
/1A
/5A
/5A /1A
Bacaan D/C mA
Relay Solkor RF
R Y B
Buat ujian fasa merah,kuning,biru.
Arus inject 10% dari nilai CTs 600/1A ( 0.1A)
Bacaan A/C Amp
Secondart test set
Semasa membuat ujian secondary pilot kabel sentiasa ada sambungan antara zon
1 dan zon 2. Relay zon 1 trip awal kemudian naikkan arus 0.25A atau 2.5 dari ratio
CTs 10% barulah Relay zon 2 trip. Bacaan perlu di-ambil pada relay zon1&zon2.
SATABILITY PILOT CABLE TEST (FEDEER PROTECTION)Relay Solkor Rf
Secondary zon 1 & zon 2 Test Certificate
B
Zon 1 Clammeter 20A A/C Zon 2
7 Stable
10 9 8 12
Solkor Rf Solkor Rf
5
Stable Unstable
Injection Phase R-N Y-N B-N R-Y Y-B B-R
Stability status Stable Stable Stable Unstable Unstable Unstable
Primary current (A)
Secondary current ( A/C mA)
Pilot current (A/C mA)
Relay D/C current (D/C mA)