You are on page 1of 85

PHILIPPINE

ENVIRONMENTAL
IMPACT STATEMENT
SYSTEM (PEISS)
Re i ed P oced al Man al fo DAO 2003-30
(Implemen ing R le and Reg la ion of PD 1586)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

OUTLINE OF PRESENTATION
1.0 O e ie of he Phil. EIS S em
2.0 P oced al eq i emen of he EIA p oce
3.0 Moni o ing P o ocol
3.1 Compliance Moni o ing Repo
4.0 Upda e DAO 2017-15
4.1 M l i-pa i e Moni o ing Team (MMT)
4.2 En i onmen al Moni o ing F nd (EMF)
4.3 En i onmen al G a an ee F nd (EGF)
4.4 Compliance Moni o ing Valida ion Repo (CMVR)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

BASIC POLICY AND OPERATING


PRINCIPLES OF THE PEISS
To en e a a ional balance be een
ocio-economic de elopmen and
en i onmen al p o ec ion fo he
benefi of p e en and f e
gene a ion.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EMB MANDATES
Sec. 34, RA 8749, manda ed o implemen
on a na ion ide cale he aid Ac
and o he en i onmen al la o i:

RA 8749 (Clean Ai Ac of 1999)


RA 9275 (Philippine Clean Wa e Ac )
PD 1586 (En i onmen al Impac S a emen S em)
RA 6969 (To ic S b ance and Ha a do Wa e Con ol Ac )
RA 9003 (Ecological Solid Wa e Managemen Ac )
RA 9512 (En i onmen al A a ene and Ed ca ion Ac )
RA 9729 (Clima e Change Ac )
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ENVIRONMENTAL IMPACT
STATEMENT SYSTEM (PD 1586)
Ra ionali ing he
Implemen a ion of he EIS
1

S em

Gi ing a ho i ,
2
in addi ion o he DENR
Sec e a , o he Di ec o and
Regional Di ec o of he EMB
o g an o den he i ance
of ECC .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ENVIRONMENTAL IMPACT
STATEMENT SYSTEM (PD 1586)
Req i e ALL go e nmen agencie , go e nmen -
o ned o con olled co po a ion and p i a e
companie o p epa e an en i onmen al impac
a e men fo an p ojec ha ill ignifican l
affec he q ali of he en i onmen .
Thi a e men i e en ial in ob aining an
En i onmen al Compliance Ce ifica e (ECC)
i ed b DENR.
EIA PROCESS WITHIN THE PROJECT CYCLE
PROJECT CONCEPTUALIZATION
IMPROVEMENT
Site selection, en ironmental screening,
initial assessment, scoping

OPERATIONS
MAINTENANCE PRE FEASIBILITY
Monitoring, Validation Detailed Assessment,
and E aluation/Audit of Identification of
En ironmental Mitigation needs, Inputs
Compliance and O er-all to CBA
Performance

PROJECT CONSTRUCTION FEASIBILITY


DEVELOPMENT Finding and
Implementation of recommendations of EIA
Mitigation measures considered in arious
permits and licenses
needed
DETAILED ENGINEERING DESIGN
Detailed design of Mitigation measures
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

1. P edic ing he likel


en i onmen al
con eq ence of
implemen ing a
p ojec on he
en i onmen
Con c ion
Commi ioning
Ope a ion
Abandonmen
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ENVIRONMENTAL IMPACT ASSESSMENT (EIA)

2. De igning app op ia e
P e en i e Mi iga ing and
Enhancemen Mea e o
p o ec he en i onmen and he
comm ni elfa e
(DAO 2003-30)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

WHAT IS THE EIS REPORT?


En i onmen al Impac S a emen (EIS) i he fo mal official
doc men of die of he en i onmen al impac of a p ojec
incl ding he di c ion on di ec and indi ec con eq ence
pon h man elfa e and ecological and en i onmen al in eg i .

The EIS a f om p ojec o p ojec b hall con ain in e e ca e


all ele an info ma ion and de ail abo he p opo ed p ojec o
nde aking, incl ding he en i onmen al impac of he p ojec
and he app op ia e mi iga ing and enhancemen mea e .

The EIS all follo an o line p e c ibed b la o i


implemen ing g ideline
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

En i onmen al Impac Ca ego ie :


GEOPHYSICAL
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

En i onmen al Impac Ca ego ie :


GEOPHYSICAL

A g 3, 1999 af e 3 da of con in o ain and


500 mm of ainfall:
60 killed, 39 inj ed, 379 ho e de o ed;
A ib ed o o e eepening of lope d ing
con c ion ;
Compo nd fail e mechani m in of ock in ol ing
a ional and an la ional componen
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

En i onmen al Impac Ca ego ie :


GEOPHYSICAL
DENR Admini a i e O de No. 2000-28
Ma ch 14, 2000
Implemen ing G ideline on Enginee ing Geological and
Geoha a d A e men a addi ional eq i emen fo ECC
applica ion co e ing S bdi i ion, Ho ing and o he Land
De elopmen and Inf a c e P ojec
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

En i onmen al Impac Ca ego ie :


BIOLOGICAL
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

En i onmen al Impac Ca ego ie :


SOCIO-CULTURAL

The D maga ibe Economic


in L on
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

REVIEW OF THE EIA REPORTS


Tha en i onmen al con ide a ion a e in eg a ed
in o o e all p ojec planning and he a e men i
echnicall o nd and p opo ed en i onmen al
mi iga ing mea e a e effec i e
P ojec p oponen a e e pon ible fo de e mining
and di clo ing all ele an info ma ion nece a fo
a me hodical a e men of he en i onmen al
impac on hei p ojec
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EIA REPORT AND GENERIC CONTENT


EIS P og amma ic
EPRMP IEE PDR
EIS Checkli

E i e a P ga a ic EIS E i e a P Environmental
Initial ga a ic P jec De c i i
I ac S a e e Pe f a ce Re Examination
EPRMP Re
Ma age e P a

Ne p ojec Ne p ojec Fo p oj ope a ing Fo ne p ojec Fo


falling nde falling nde i h p e io ECC belo h e hold of Enhancemen /
ca ego A & B ca ego A & B, Ca ego B Mi iga ion
PROGRAMMATIC
b a e i hin P ojec & do no
EPRMP fo co-loca ed
con ig o a ea fall in he P ojec
p ojec ope a ing
h e hold
i h p e io ECC

CATEGORY A / B
PROGRAMMATIC CATEGORY A / BELOW CAT B CATEGORY
PROJS B THRESHOLD C/ D
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

PROJECTS THAT WERE OPERATIONAL


PRIOR TO 1982
(No co e ed b he Phil. EIS S em (Ca ego D) p o ided:

The e i ing p oce o E . An Old S ga Mill


ope a ion p io o 1982 (e abli hed p io o 1982)
a no e panded in
e m in e m of deciding o p p ga
p od c ion capaci efine plan o
( ol me o o p ; an Alcohol di ille plan a
n mbe of p od c line o pa of i e pan ion
a ea) he a ea of p og am hall no q alif
e pan ion i loca ed in an nde hi Non-Co e age.
En i onmen all C i ical
A ea).
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

PROJECTS THAT WERE OPERATIONAL


PRIOR TO 1982
(No co e ed b he Phil. EIS S em (Ca ego D) p o ided:

The p ojec had no E . A f i p oce ing plan


opped ope a ion fo ha a ed ope a ion
a con in o pe iod of p io o 1982 b clo ed in
mo e han o (2) 2009,i e mp ion of
ea ince 1982. e ice o ope a ion in
2012 hall be co e ed b
he EIS S em
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

PROJECTS THAT WERE OPERATIONAL


PRIOR TO 1982
(No co e ed b he Phil. EIS S em (Ca ego D) p o ided:

Technolog /p od c ion E . Di man ling of


me hod o man fac ing facili ie (pa o en i e)
p oce /ope a ion ed and con c ing ne
p io o 1982 a no i h ame capaci , i e
modified. and echnolog i
The e i ing p ojec co e ed b he EIS
facili ie o c e p io S em.
o 1982 e e no change,
ehabili a ed o added o.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

COVERAGE OF THE PEISS

En i onmen all C i ical P ojec (ECP)


Non-ECP in En i onmen all C i ical A ea
(ECA)
P og amma ic P ojec
Ca ego C P ojec
Ca ego D P ojec
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

EC CA EG IE

Environmentally Critical Projects (ECP) are projects or industries that


have critical environmental impacts and therefore need to undergo
environmental impact assessments and need to acquire Environmental
Compliance Certificates (ECC) prior to implementation.
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

CATEGORY A
ENVIRONMENTALLY CRITICAL PROJECTS ECPS
HEAVY INDUSTRIES Iron steel mills, Non ferrous metal
industries, Smelting plants, Petroleum and petrochemical
industries
proponents of these projects implemented from
on ards are req ired o sec re ECC

I &S M
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

2. INFRASTRUCTURE PROJECTS Majo dam , majo eclama ion


p ojec , majo oad & b idge & majo po e plan
p oponen of he e p ojec implemen ed f om 1982
on a d a e eq i ed o ec e ECC
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

3. RESOURCE EXTRACTIVE INDUSTRIES - majo mining


and q a ing, logging, fi he p ojec & fo e p ojec
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

4. GOLF COURSE PROJECT


P oclama ion 803, i e in 1996
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

FOR ALL EN IRONMEN ALL


CRI ICAL PROJEC (CA EGOR A)

P blic pa icipa ion


eq i emen a
embodied in he
P oced al Man al
fo DAO 2003-30.

GREENING PROGRAM
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

CATEGORY B- Non ECP loca ed in ECA

In acco dance i h P e iden ial P oclama ion


No 2146, e ie of 1981, he e a e el e (12)
main ca ego ie of ECA.
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

All a ea decla ed b la a
12 ECA CA EG IE na ional pa k, a e hed e e e,
(A pe P e iden ial P oclama ion 2146) ildlife p e e e and anc a ie
COVERAGE OF THE PEISS
ECA ECP PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

WATER BODIES ( apped fo dome ic p po e i hin


Co al eef he p o ec ed a ea decla ed b app op ia e a ho i ie ).

Habi a of indigeno flo a and fa na Recha ge a ea of aq ife


COVERAGE OF THE PEISS
ECA ECP PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

A ea i h hi ic a chae gica A ea c a ified a P i e


cie ific i e e Ag ic a a d

T adi i a cc ied b c a
Ma g eF e
c i ie ibe
Ma g a i Mi d Mangro e area
COVERAGE OF THE PEISS
ECA ECP PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

Fe
(ge
e ed a d/ ha d-h b a
g c ha a d, f d & ca c ac
a ca a
)
e A ea i h c i ica e

A ea e a ide a ae he ic P e ia i
COVERAGE OF THE PEISS
ECA ECP PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

P en ial T i
( Bale in I land)
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

Co-Loca ed p ojec
o
PROGRAMMATIC
i hin economic
one o ind ial
pa k.
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

CATEGORY C
P ojec no falling nde ca ego A & B
In ended o di ec l enhance he q ali of he
en i onmen o di ec l add e e i ing
en i onmen al p oblem .
CNC ma be i ed.

ENVIRONMENTAL ENHANCING
1.Sea all 5. Ri e bank S abili a ion
2.Refo e a ion p ojec 6. Poll ion Con ol de ice o
3.A ificial Reef facili ie
4.Embankmen 7. O e pa p ojec
COVERAGE OF THE PEISS
ECP ECA PROGRAMMATIC PROJECTS CAT. C CAT. D
CAT. A CAT. B

1. P ojec ha e e ope a ional p io o 1982

CATEGORY D 2. Facili ie fo he Ba anga Mic o-B ine


En e p i e (BMBE) P ojec

The e p ojec a e 3. T an po a ion facili ie

no co e ed b he 4. Impo a ion o p cha e of eq ipmen


5. Comme cial e abli hmen ha ell onl
Philippine EIS S em non-pe i hable good and/o ho oom fo
and a e no eq i ed mo o ehicle and imila p od c
can een o food all
i ho

o ec e an ECC. 6. C -flo e ind /p ojec

Hence , CNC ma be 7. En i onmen al enhancemen /imp o emen


p ojec ch a ee plan ing in fo e o
i ed. loping a ea
8. Ga men Man fac ing ( i ho d ing)
9. Ma e ial Reco e Facili
10. Food and Rela ed Ind
11. Famil D elling /Apa men pe
12. Heal h Ca e Wa e Managemen
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

WHAT IS AN ECC?
En i onmen al Compliance Ce ifica e (ECC)
i he doc men i ed b he DENR Sec e a h he EMB, o he
Regional Di ec o
ce if ing ha ba ed on he ep e en a ion of he p oponen and
he p epa e , a e ie ed and alida ed b he e ie commi ee
(EIARC) he p opo ed p ojec o nde aking:
ill no ca e a ignifican nega i e en i onmen al impac ,
ha he p oponen ha complied i h all he eq i emen of
he EIS em; and
ha he p oponen i commi ed o implemen i app o ed
En i onmen al Managemen Plan in he En i onmen al Impac
S a emen (EIS) o mi iga ing mea e .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

WHAT S IN AN ECC?
Scope of p ojec o nde aking
- in e m of a ea, capaci echnolog o p oce

Condi ion a confo med b he P ojec P oponen


o implemen mi iga ing mea e fo po en iall nega i e
impac and/o

Enhancemen mea e fo po en iall po i i e impac a


iden ified in he EIA P oce

NON COMPLIANCE TO ANY OF THE CONDITIONS MAY BE


IMPOSED A CORRESPONDING PENALTY .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

WHAT IS A CNC?
Ce ifica e of Non-Co e age (CNC)
ce ifie ha , ba ed on he bmi ed P ojec De c ip ion
Repo :
he p ojec i no co e ed b he EIS S em and i no
eq i ed o ec e an ECC
F he , he CNC ad i e he P oponen on co e age o
o he eq i emen b o he DENR office , LGU o o he
go e nmen agencie .
I i mini e ial pon DENR-EMB o i e he CNC pon
applica ion b a P oponen .
CNC applica ion i op ional on he pa of he p oponen
En i onmen al Compliance Ce ifica e of
Ce ifica e (ECC) Non-Co e age (CNC)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ECC VALIDITY AND EXPIRY


Once he p ojec i implemen ed,
he ECC/CNC emain alid and ac i e fo he
LIFETIME of he p ojec

The ECC a oma icall e pi e if a p ojec ha no been


implemen ed i hin fi e (5) ea f om ECC i ance

o if he ECC a no eq e ed fo e en ion i hin


h ee (3) mon h f om he e pi a ion of he alidi
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

SUSPENSION OF ECC
1. ECC ma be pended fo iola ion of
p oponen o compl i h ECC condi ion .

2. I i no ed ha he ECC pen ion doe no


nece a il mean he p oponen i ab ol ed of i
e pon ibili in implemen ing EMP.
3. PD 1586 doe no p ecl de he fac ha DENR
ma eq i e he p oponen o in i e
en i onmen al afeg a d / mea e o p e en
f he h ea / damage o en i onmen .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

SUSPENSION OF ECC

The EMB Di ec o o
he EMB-Regional Di ec o
ma i e a Cea e and
De i O de (CDO) ba ed
on iola ion nde he Phil
EIS em.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

MONITORING PROTOCOLS
PROCEDURAL MANUAL (DAO 2003-30)

DENR-EMB ha he p ima manda e


of moni o ing
1
nde he Philippine EIS S em,
he o he akeholde (e.g. p oponen ) ha eq all
ignifican ole in he moni o ing em.

I enco age ol n a and elf- eg la ion


a ell a p omo e elf-moni o ing and
2

compliance i h en i onmen al anda d among


e abli hmen .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

OBJECTIVES OF MONITORING, VALIDATION


& EVALUATION AUDIT

1 Moni o p ojec compliance i h he condi ion e in


he ECC;

2 Moni o compliance i h he EMP and he applicable


la , le and eg la ion

Con in al pda ing of EMP fo ained


e pon i ene o p ojec ope a ion and impac
ROLES & RESPONSIBILITIES
of he PROPONENT / PCO
P e en a anda di ed Semi-
ann al ECC Compliance moni o ing
epo , hich a p oponen ,
h o gh i En i onmen al
ni /Office i eq i ed o bmi o
he de igna ed moni o ing EMB
office on a emi-ann al f eq enc

De ailed epo on compliance o


en i onmen al anda d pecific o
en i onmen al la hall be
bmi ed h o gh elf moni o ing
epo a eq i ed b DAO 2003-27
on a q a e l ba i .

P epa e and bmi CMVR fo ECP .


ROLES & RESPONSIBILITIES
of he PROPONENT / PCO

The fi CMR hall be bmi ed


mid ea af e he a of p ojec
implemen a ion, e cep fo ECC
commi men / condi ion , hich
need o be bmi ed p io o
p ojec a - p
The p oponen /compan hall
no if EMB on he a p of
p ojec implemen a ion

SMR S em hall be implemen ed


na ion ide incl ding a ea nde he
j i dic ion of LLDA.
ALL fi m a i f ing he c i e ia a
en ncia ed in Anne A a e eq i ed o
bmi eg la Self-Moni o ing Repo
(SMR).
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

P ojec En i onmen al Moni o ing & A di P io i i a ion


Scheme (PEMAPS)

PEMAPS i an in e nal
a eg of EMB fo
elec ing and
p io i i ing p ojec
o be bjec fo
compliance
moni o ing
UPDATES
(DAO 2017-15: Moni o ing b MMT)

A M l i-pa i e Moni o ing Team (MMT) hall be


fo med immedia el af e he i ance of an ECC
p an o an EIS.

Done h o gh a Memo and m of Ag eemen (MOA)


among akeholde
MMT Compo i ion

•In he ca e of e i ing MMT fo Mining P ojec , he EMB ep e en a i e


hall like i e be emo ed a membe of he MMT. The MMT hall
eg la l bmi o EMB CMVR fo ma epo incl ding epo on
compliance i h he EPEP (ba ed on EMB-app o ed EMP) and he EMB
hall imila l cond c i moni o ing ac i i ie independen of he MMT.

•A an independen en i ho e membe hip ep e en he akeholde


I p blic, he MMT i e pec ed o add c edibili b being open and
an pa en in moni o ing en i onmen al impac and compliance i h
he Philippine EIS S em eq i emen . The MMT hall ha e he
follo ing pecific f nc ion :
MMT
Ra ionali a ion of he MMT E i ence, Compo i ion and Leade hip

MMT hall onl be fo ECP


All o he MMT incl ding cl e ed
MMT hall be deemed a oma icall
di ol ed.
ECC condi ion on he c ea ion of MMT
fo non-ECP hall be deemed in alid
MMT F nc ion

T c d c a e ie ii a ida e
e c ia ce i h he ECC
c di i a d he E i e a
Ma age e a d M i i g P a
P e a ea d b i i e EMB
Regi a Office a d Ce a ffice
c ce ed i g he EMB e c ibed
f a a ea e i a a
I i ea e i e a e e ge c a d
c ai ecei i g a d a age e
echa i
MMT Fo mali a ion & Ope a ionali a ion

Man al of Ope a ion (MOO) hall be


fo m la ed/ pda ed ba e on he
Polic pda e .
Indi id al MMT membe ho iola e
he Code of E hic hall be bjec o
pen ion/ emo al/ eplacemen b
he chai man of he MMT.
MOA be een EMB CO and
P oponen hall be e ec ed i h
confo mi of he MMT membe
MMT REPORTING
All moni o ing ac i i ie of he MMT hall eq i e he
comple ion of a finding epo called he Compliance
Moni o ing Valida ion Repo (CMVR)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EMF & EGF


ENVIRONMENTAL
MONITORING FUND (EMF)

&
ENVIRONMENTAL
GUARANTEE FUND (EGF)
En i onmen al Moni o ing F nd (EMF)
Sec ion 1.0 of A icle V:
ENVIRONMENTAL
MONITORING FUND
The EMF hall be e abli hed
b he p oponen no la e han
he ini ial con c ion pha e of i
p ojec o nde aking.
The c i e ia on hen ch p ojec hall be eq i ed o e abli h an
EMF/MMT a e he follo ing:
Po ible di cha ge of o ic o ha a do ma e ial ;
Significan amo n of di cha ge ha eq i e ca ef l moni o ing;
Significan p blic oppo i ion.
En i onmen al G a an ee F nd (EGF)
Sec ion 4.0 of A icle V:
ENVIRONMENTAL GUARANTEE
FUND
An En i onmen al G a an ee F nd (EGF)
hall be e abli hed fo all p ojec o
nde aking ha ha e been
de e mined b he DENR o po e a Ear h pro ides eno gh o sa isf e er
man s need b no e er man s
ignifican p blic i k a he ein defined greed
Maha a Ga dhi
o he e he p ojec o nde aking
eq i e ehabili a ion o e o a ion.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

SCOPE EXAMPLES OF VIOLATION


1. P ojec hich a e E abli hed and/o Ope a ing i ho an
ECC
2. P ojec Viola ing ECC Condi ion , EMP, R le and
Reg la ion
3. Mi ep e en a ion in he IEE/EIS o an O he Doc men
4. P ojec i h o i ho ECC hich po e g a e and/o
i epa able dange o en i onmen , life and p ope .

FINES / PENALTIES
• PhP 50,000.00 ope a ing i ho ECC
• PhP 50,000.00 fo e e ECC iola ion
EMB POLICIES IMPLEMENTED IN
COMPLIANCE MONITORING
PD 1586 Viola ion of ECC condi ion
No mo e han P50,000.00 pe iola ion.

ISSUANCE of NOV
Wi ho ECC manda o o e ol e pa men of penal

E ample :
Non- bmi ion of PCO epo ;
Non-po ing of pe mi ;
Non-de igna ion of PCO;
Fail e o bmi po ECC eq i emen , e c.
Non compliance on he fo ma ion/c ea ion of MMT
E ceedance of emi ion/effl en anda d ;
T an po of THWM i ho T an po Pe mi ;
Di cha ge of emi ion/effl en e l ed in o poll ion and h ea o p blic heal h
and afe ;
Negligence
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EMB POLICIES IMPLEMENTED IN


COMPLIANCE MONITORING
Adop feedback mechani m o
info m p oponen of he
finding d ing in pec ion;
IF WITH VIOLATIONS
Technical confe ence ill be
called fo b DENR-EMB i h
commi men f om he
p oponen o compl i h he
eg la ion in a gi en g ace
pe iod.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

APPEALING
Recei ing No ice of Viola ion (NOV)

Filing a mo ion fo econ ide a ion i hin


15 da of eceip of he ca e deci ion doc men .
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

SCHEDULE OF PENALTY REDUCTION


Viola ion of ECC Condi ion
CRITERIA PENALTY
1ST offen e 2ND Offen e 3 d Offen e 4 h offen e
Mino PhP 10,000.00 PhP 25,000.00 PhP 50,000.00 PhP 50,000.00 pl ECC
Offen e pen ion i h op ion
of DENR-EMB o cea e
ope a ion if deemed
nece a b ih
co e ponding
eq i emen fo
con in ed EMP.
Majo PhP 25,000.00 PhP 50,000.00 PhP 50,000.00pl ECC pen ion i h
Offen e op ion of DENR-EMB o cea e
ope a ion if deemed nece a b ih
co e ponding eq i emen fo
con in ed EMP.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ECC AMENDMENTS
MINOR MAJOR
1. T pog aphical e o 1. E pan ion of p ojec a ea
2. E en ion of deadline 2. Inc ea e in p od c ion
fo bmi ion of po - capaci
ECC eq i emen 3. Change in p oce flo
3. Change in compan 4. Addi ion of ne p od c
name/o ne hip
5. Re i ion/ efo ma ing of
4. Dec ea e in land/ ECC Condi ion .
p ojec a ea o
p od c ion capaci 6. In eg a ion of ECC fo
imila p ojec b
con ig o p ojec .
No.
De c i ion Re i emen fo ECC Amendmen
1 C P L (
N /T );
B N S E C (SEC) R
D T I (DTI) C B
N R / /
2 C P / L / ;
C N A SEC R DTI R

3 T /C L / .T ECC
O ,
/ ECC (G );
SEC R N ECC / DTI
R B R ;
L / ( . .,
D S ,D A ,C L ); ,
N A S N ECC
(G ).
4 T L
ECC
No. De c i ion Re i emen fo ECC Amendmen
5 E en i n f L ECC
deadline f ( );
bmi i n f S
ECC Re i emen ECC
(i.e., bmi i n f
MMT MOA, Ca b n
Sink P g am)
6 E en i n f ECC L ECC
alidi (EMB MC ECC;
2020-31) . J :
.
(5)- ;

.O
( )

;
. ( - )

;
E M
M P
;
S S A P ;
S S A
P , ;
R I P G C -
D P MGB
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ECC VALIDITY
P ojec ha ha e S opped Ope a ion fo > 5 Yea
P ojec ha ha e opped ope a ion fo mo e han (5) ea a e
no eq i ed o ob ain a ne ECC p o ided all of he follo ing
condi ion a e me :
CMR/CMVR had con in o l bmi ed o an official eq e
fo pen ion of he CMR/CMVR had been app o ed b he
EMB
No eq e fo elief and /o cancella ion of ECC had been
app o ed
The e mp ion of ope a ion ill no in ol e e pan ion in
e m of p od c ion capaci ( ol me of o p ; n mbe of
p od c line o a ea)
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

ECC VALIDITY
P ojec ha e e no implemen ed i hin ECC Effec i i

The ECC i ed ill be con ide ed no alid if he


p ojec a no implemen ed i hin fi e ea .
The p oponen i eq i ed o appl fo ne ECC if
he ha in en ion o implemen he p ojec .
EMB con ide ed ha he p ojec i implemen ed
once i e de elopmen o clea ing ope a ion i
a ed ( e . demoli ion / e e lemen of Info mal
Se le a ed
CSR/ SDP ac i i ie and he like ill no be
con ide ed a p ojec implemen a ion.
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EMB MC 2015-003
Polic Upda e

Implemen a ion of:

Online P oce ing of CNC Applica ion


fo non-co e ed p ojec nde he Philippine
En i onmen al Impac S a emen S em.

Online P oce ing and I ance of ECC fo


Ca ego B p ojec eq i ing IEE Checkli
Repo
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

EMB MC 2015-003
FEES and CHARGES fo EIA Se ice
EIA SERVICES FEES &
CHARGES
1.1 ECC applica ion eq i ing
1.1.1 P og amma ic EIS 15,000.00
1.1.2 EIS 10,000.00
1.1.3 P og amma ic EPRMP 10,000.00
1.1.4 EPRMP 5,000.00
1.1.5 Checkli 5,000.00
1.2 CNC Applica ion
Ca . C 1,000.00
Ca . D 1, 210.00
1.3 Po ECC P oce ing Se ice
1.3.1 Majo amendmen 2,000.00
1.3.2 Mino amendmen 1,000.00
1.4 O he Se ice
1.4.1 Req e fo Mi cellaneo Ce ifica ion 200.00
1.4.2 Req e fo Ce ified T e Cop of 200.00
doc men
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION S a on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PROJECT THRESHOLDS FOR COVERAGE
SCREENING AND CATEGORIZATION Sa on page 29
PHILIPPINE ENVIRONMENTAL
IMPACT STATEMENT SYSTEM (PEISS)

You might also like