Final Set Calculation By Modified Hiley's Formula

Final Set Table is prepared in accordance with PIL1.D390.8 of HKHA Specification Librarary 2018 and Code of Practice for Foundation 2017

Modified Hiley Formula s = 0.5 x [Kh x E / Q - (C1 + C2 + C3)]

WEIGHT OF HAMMER, Wh = 16000 kg


DROP HEIGHT OF HAMMER, H = 0.8 m
DRIVING ENERGY OF THE HAMMER IMMEDIATELY BEFORE IMPACT E=W h x H = 125.57 kN-m
TEMPORARY COMPRESSION ALLOWANCE FOR PILE HEAD AND CAP c1 = 2.5 mm (Plastic cushion)
ELASTIC REBOUND OF PILE c2 + c3 = cp + cq mm
HYDRAULIC HAMMER FACTOR Kh = 0.6
SAFE COMPRESSIVE LOAD CARRYING CAPACITY (F.O.S = 2.0) Q = Q kN (See below set table)

For Q = 2000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - - - - - - - - - - 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26
10mm

For Q = 2200 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - - - - - - 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29 - - - -
10mm

For Q = 2400 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - - - 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29 - - - - - - -
10mm

For Q = 2600 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27 - - - - - - - - -
10mm

For Q = 2800 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27 - - - - - - - - - - -
10mm

For Q = 3000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - 50 50 50 50 50 50 50 50 50 50 48 43 38 33 28 - - - - - - - - - - - - -
10mm
Final Set Calculation By Modified Hiley's Formula
Final Set Table is prepared in accordance with PIL1.D390.8 of HKHA Specification Librarary 2018 and Code of Practice for Foundation 2017

Modified Hiley Formula s = 0.5 x [Kh x E / Q - (C1 + C2 + C3)]

WEIGHT OF HAMMER, Wh = 16000 kg


DROP HEIGHT OF HAMMER, H = 0.7 m
DRIVING ENERGY OF THE HAMMER IMMEDIATELY BEFORE IMPACT E=W h x H = 109.87 kN-m
TEMPORARY COMPRESSION ALLOWANCE FOR PILE HEAD AND CAP c1 = 2.5 mm (Plastic cushion)
ELASTIC REBOUND OF PILE c2 + c3 = cp + cq mm
HYDRAULIC HAMMER FACTOR Kh = 0.6
SAFE COMPRESSIVE LOAD CARRYING CAPACITY (F.O.S = 2.0) Q = Q kN (See below set table)

For Q = 2000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - - - - - 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27 - - - - -
10mm

For Q = 2200 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - - - 50 50 50 50 50 50 50 50 50 50 47 42 37 32 27 - - - - - - - -
10mm

For Q = 2400 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - 50 50 50 50 50 50 50 50 50 50 50 45 40 35 30 - - - - - - - - - - -
10mm

For Q = 2600 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29 - - - - - - - - - - - - -
10mm

For Q = 2800 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- 50 50 50 50 50 50 50 50 50 50 45 40 35 30 25 - - - - - - - - - - - - - -
10mm

For Q = 3000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
50 50 50 50 50 50 50 50 50 47 42 37 32 27 - - - - - - - - - - - - - - - -
10mm
Final Set Calculation By Modified Hiley's Formula
Final Set Table is prepared in accordance with PIL1.D390.8 of HKHA Specification Librarary 2018 and Code of Practice for Foundation 2017

Modified Hiley Formula s = 0.5 x [Kh x E / Q - (C1 + C2 + C3)]

WEIGHT OF HAMMER, Wh = 16000 kg


DROP HEIGHT OF HAMMER, H = 0.6 m
DRIVING ENERGY OF THE HAMMER IMMEDIATELY BEFORE IMPACT E=W h x H = 94.18 kN-m
TEMPORARY COMPRESSION ALLOWANCE FOR PILE HEAD AND CAP c1 = 2.5 mm (Plastic cushion)
ELASTIC REBOUND OF PILE c2 + c3 = cp + cq mm
HYDRAULIC HAMMER FACTOR Kh = 0.6
SAFE COMPRESSIVE LOAD CARRYING CAPACITY (F.O.S = 2.0) Q = Q kN (See below set table)

For Q = 2000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - - - 50 50 50 50 50 50 50 50 50 50 49 44 39 34 29 - - - - - - - - - -
10mm

For Q = 2200 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- - - 50 50 50 50 50 50 50 50 50 50 46 41 36 31 26 - - - - - - - - - - - -
10mm

For Q = 2400 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
- 50 50 50 50 50 50 50 50 50 50 45 40 35 30 25 - - - - - - - - - - - - - -
10mm

For Q = 2600 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
50 50 50 50 50 50 50 50 50 46 41 36 31 26 - - - - - - - - - - - - - - - -
10mm

For Q = 2800 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
50 50 50 50 50 50 50 48 43 38 33 28 - - - - - - - - - - - - - - - - - -
10mm

For Q = 3000 kN

cp + cq 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Set per
50 50 50 50 50 50 47 42 37 32 27 - - - - - - - - - - - - - - - - - - -