Professional Documents
Culture Documents
This document contains information which are proprietary of CNH Global N.V. Neither this document
nor the information contained herein shall be used, duplicated nor communicated by any means to
any third party, in whole or in part, except with the prior written consent of CNH Global N.V
JIT &
1st Revision
Cost Deployment
MRP_P_26012012:
Focused Improvement
Autonomous Activity
Professional Maintenance
Quality Control
Environment
Logistics / Customer Service Pillar
2
Training Objectives
After this training the attendees will:
• The MRP (Material Requirement Planning) systems define the necessary materials and
the moment when an order mut be put in process using previsional data, with the aim
of guaranteeing the abvailabitliy of the products at the moment and in the ways desired
by the customer. MRP systems represent a way to make the palanning and of the
materials for the production.
• In this way of working the control of the progress of production is done only at the end,
by comparision of the plannes vs. the output.
• JIT system , like kanban with suppliers, JIT/JIS deliveries, kanban with machining
processes, etc., the production order is transferred upstream from downstream in a pull
logic. The kanban for example provides in each takt or multiple takts the instruction for
production and displacement of the parts in the plant where they are exactly needed,
giving the possibility of a detailed control of any abnormality in the production or
supplying process.
• The use of both previsional systems and Lean system such as kanban, allow the
management of the downstream production and guarantee the synchronization of the
supply chian customer-supplier from downstream upstream. We can say that MRP and
JIT systems do not exclude one than other.
JIT &
World Class Manufacturing
MRP_P_26012012: 4
1st Revision For Internal Use Only
Comparison between JIT and MRP
Planning
• Production planning of capacity and load
JIT &
World Class Manufacturing
MRP_P_26012012: 5
1st Revision For Internal Use Only
Comparison between JIT and MRP
N
A S+1 S+2 S+3 S+4
N+1 N+2 N+3 N+4 N+5 N+6
Months
Programmazione mesi (rolling)
Monthly schedule Rolling plan
N+1 N+2 ----- MRP
A 20 20 30 30
B 15 30 26 25 C
C 28 40 38 45
S+3
L M M G V
(meta mese N-1)
Weeklysettimanale
Programmazione schedulemese N
S+1 S+2 S+3 S+4 Days/ hrs
A 4 5 4 5 Kanban
B 4 6 5 6 B
C 6 7 5 8
JIT &
World Class Manufacturing
MRP_P_26012012: 6
1st Revision For Internal Use Only
Comparison between JIT and MRP
MRP
MRP
supplier
customer
supplier
customer
JIT &
World Class Manufacturing
MRP_P_26012012: 7
1st Revision For Internal Use Only
Comparison between JIT and MRP
JIT &
World Class Manufacturing
MRP_P_26012012: 8
1st Revision For Internal Use Only
Comparison between JIT and MRP
JIT MRP
Pulls the production Pushs the production
Schedules only the last phase of the process, from
Schedules every department of the entire process.
this the orders go back upstream.
It’s quite easy to manage It’s a complex and integrated system
Enphasys is on the physical processes Enphasys is on the IT processes
Ideal in repetitive productions, well balanced and Ideal in production with a very high variety of
with relatively stable programs. finished goods and a very instable mix.
MRP+JIT: JIT tools (Kanban, FIFO, Heijunka…) are used in the single unit of time (a multiple of
the takt), previously schedukled by the MRP.
Time unit: daily or multiple of takts Time unit: weekly and beyond
Moves material and informations Moves only informations
It’s useful for the daily control of the production and It’s useful for random orders and for the weekly
for the supplier of parts with a constant usage. and monthly control of the production.
MRP+ JIT: MRP can provide a control about the constancy of the requiremetns of the items
required through JIT systems.
JIT &
World Class Manufacturing
MRP_P_26012012: 9
1st Revision For Internal Use Only
Bibliographic
JIT &
World Class Manufacturing
MRP_P_26012012: 10
1st Revision For Internal Use Only