Professional Documents
Culture Documents
26 Integrated and Enclosed Stations
26 Integrated and Enclosed Stations
Enclosed stations
Wi-Fi
Categorization
DEUX-MONTAGNES
GRAND-MOULIN
Stations are integrated into
SAINTE-DOROTHÉE
a route that is ground level,
ÎLE-BIGRAS
elevated and underground
ROXBORO-
PIERREFONDS
BOIS-FRANC DU RUISSEAU
SUNNYBROOKE
MONTPELLIER
CORRESPONDANCE A40
SAINTE-ANNE- DES SOURCES
MONT-ROYAL
DE-BELLEVUE
KIRKLAND POINTE-CLAIRE
TECHNOPARC CANORA
MONTRÉAL
ÉDOUARD-MONTPETIT
AÉROPORT MCGILL
MONTRÉAL-TRUDEAU
BONAVENTURE
GARE CENTRALE
BASSIN PEEL
ÎLE-DES-SOEURS
PANAMA
LÉGENDE
15
Connected Trench station
by tunnel
5 5
Architecture
Materials and design principles
Glass
Wood
Movement
Riverain
6.1
I N T E R I O R S - C O LO U R VA R I AT I O N C O N C E P T
A P P L I CAT I O N I N STAT I O N S
FOR APPROVAL Riverain
Forestier
Colour strategy
Urbain Techno
So as to represent the passenger’s journey, each branch of the network may be identified by a particular colour that
would be visible in the stations, furniture and vegetation.
R VA R I AT I O N C O N C E P T
I N STAT I O N S
Mixed urban
Rivers
zones
Rural
Rural urbanisé
Coloured surfaces will be visible Forestier
throughout the stations (tiles, for the most part) R.E.M. | 123
Techno
Architecture
Signature stations
Vertical screens will be used to integrate the stations into their surroundings
while highlighting their distinctive characteristics. This will facilitate:
1 T
he creation of a 2 T
he creation of 3 he creation of
T 4 B
etter integration
filter for the light depth perception movement that of the stations into
effects that passengers can the neighourhoods
align with the see while the train
architectural is in motion
language
Deux-Montagnes
Île-des-Sœurs
Main entrance
Parking:
± 9500 spaces
Bicycle racks:
± 1400 racks
Bus terminal
User routes
Support 6 places
Support 8 places
Type 4 Type 5
Long bench Long bench + backrest
Vegetation
Placement of the
vegetation:
– Main entrance
– Between the site and
the tracks
– Parking zone and
pedestrian walkway
26 universally
accessible stations
Glass elevator shafts
located beside the stairs
are visible from a distance
Statio n
Canora
1238
Chemin Dunkirk
Rive- Sud
1238 Entrée
Chemin Dunkirk
Consultation is
underway with
partners and citizens
to ensure that REM
signage is integrated
into that of the metro,
bus and commuter
train networks