Professional Documents
Culture Documents
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11. l 00-900
X FIELD 'DOC
~ 6 0 9 5 5 1E I 19948
Schindler ESP
E-50013 Zaragoza
Schindler Smart MRL 001&002 FIELD DOC
INSTALLATION TRAVEL SET-UP ~ 6 0 9 5 5 1E I 19948
~ e a~
df f i c e : MRL Competence Group: 1-1 1.l00-900 0-GENERAL OVERVIEW
After traction rope installation between car and counterweight, we can't anymore use the elevation tool to
continue the installation works.
For this reason, the BIONIC control includes an installation travel to permits electrical car displacements.
Simplicity: Only ECU, ADDU, Traction gear and Travelling cable are used
Car movements are controlled by the ADDU inspection panel
It uses the FA motor coil (1U-1V-1W) -even on A C N elevators-
* JHC. KBV and KF contacts (at least) must be actives on the safety chain
THMH is active and controlled by software
The whole car door subsystem is ignored
KS and KSE signals are ignored
Schindler ESP
E-5001 3 Zaragoza
'
Schindler Smart MRL 001&002
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.l00-900
I
X FIELD SDOC
~ 6 0 9 5 5 1E
1 -PREVIOUS REQUISITES
I 19948
1-PREVIOUS REQUISITES
1.l
-MECHANICAL REQUISITES
I_\
WARNING! If the car is not totally assembled (typically: no wall panels, no door operator, no dc
panels, no mirror...), put into the counterweight only 3/4 of the filling material. Otherwise, traction ro,
slippage problems can appear
1-2-ELECTRICAL REQUISITES
Schindler ESP
E-50013 Zaragoza
Schindler Smart MRL 001&002
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.00-900
l
, 1 ~609551E 1 19948
-Connect the FA motor coil (1U-1V-1W) to the SFA main contactor (1-3-5)
2.1.2-ACVF traction
Wire the MVE fan (if it exist) according to the electrical diagrams
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.l
00-900
X FlEm DOC
K609551 E
A WARNING: Check the main switches and protections are switched off in order to prevent electrical
risk!
, Verify all the fuses included on the main SMlC main print:
[7] to ground
[8] to L phase
l
Version sh-: SMIC 1.a for 001 m o d ' [g] to N neutral
Plug the brake MGB cable on the XMGB[I-21 socket
-
A WARNING! Observe the correct polarity! Otherwise, the diode protection can burns...
-
D Brown cable to the positive terminal XMGB(2)
:: Blue cable to the negative terminal ,-*"""'"*.
XMGB(1)
P
z
Plug the thermal protection THMH on the XMTH (1-2) 1
socket
Schindler ESP
E-50013 Zaragoza
..
Schindler Smart MRL 001&002
Leadoffice:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.l00-900
, X @lE.Lo3D0C
~609551E I19948
RESET
I N F M D PORT:
X 232 PORT:
XCAN-CAR
XCAN-EXT
XCAN TERMINATION
-
SCIC print on ECU
Schindler ESP
E-50013 Zaragoza
Schindler Smart MRL 001&002
Lead ofice:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.l00-900
X .FIEbDDOC
~ 6 0 9 5 5 1E
Connect the 7, 8 and 9 travelling cable wires to the light terminal strip (car lighting and car socket) under
the SDlC print
Schindler ESP
E-5001 3 Zaragoza
neLD~ ~ o
Schindler Smart MRL 001&002
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence Group: 1-11.l00-900
X K609551 E I 19948
Schindler ESP
E-5001 3 Zaragoza
Schindler Smart MRL
Lead office:
INSTALLATION TRAVEL SET-UP
MRL Competence
001 8~002
Group: 1-11.l00-900
X 'FIE ~ .;&)C
~ D
~ 6 0 9 5 5 1E
- 0
__ _ _1:.__1__., .
WARNING!: Be sure that JHC and JREC are
m
After about 15 seconds, check the following on
the SClC print:
'W-DOOG,"DRNE" and "ERR LED'S blinks
together once per second (JREC active)
SERVICE lit ( micro switch Nr. 8 in ON position)
Schindler ESP
E-5001 3 Zaragoza