Professional Documents
Culture Documents
1. A line of LRT with five (5) stations will be constructed in a city. A forecast passenger
demand is given below.
(a) Compute the number of passengers between each pair of the stations for both
directions.
Boarding Depart
1 2 3 4 5
(b) In this LRT project, headway must not be less than 120 seconds and must not be
greater than 300 seconds. All stations are designed to cater a train of 6 couches. The
capacity of each couch is 280 passengers. Based on the computed maximum
passengers in (a), compute headway possibilities and corresponding number of
couches per train. You may use rail utilisation factor of 0.75 and load factor of 0.9.
This study source was downloaded by 100000839033514 from CourseHero.com on 12-24-2021 12:06:06 GMT -06:00
𝐶𝑝
https://www.coursehero.com/file/36772176/Task-1-Public-Transport-A155202pdf/
3600 × 𝛼 × 𝜎 × 𝑛 × 𝑆 ℎ
=
3600 × 0.75 × 0.9 × 𝑛 × 280
26550 = ℎ
ℎ = 25.627𝑛
Computing into a form of table,
n (veh/train) h (headway, sec)
1 25.627
2 51.254
3 76.881
4 102.508
5 128.135
Possible
6 153.762 Headwa
y
2. Kuala Lumpur city administrator plans to restraint private car usage. The restraint is
expected to increase the demand for public transport service. You are required to
examine the following two routes:
(a) The demand for LRT service from Ampang to Masjid Jamek Kuala Lumpur is
expected to increase during peak hours to 41,000 passengers per hour per
direction. The headway must not be less than 120 seconds and must not be
greater than 300 seconds. The station design is adequate for 10 coaches and the
capacity of each coach is 280 passengers. Compute headway possibilities and
corresponding number of coaches per train. You may use rail utilisation factor of
0.75 and load factor of 0.9.
This study source was downloaded by 100000839033514 from CourseHero.com on 12-24-2021 12:06:06 GMT -06:00
𝐶𝑝 = 3600 × 𝛼 × 𝜎 × 𝑛 × 𝑆
ℎ
3600 × 0.75 × 0.9 × 𝑛 × 280
41000 = ℎ
https://www.coursehero.com/file/36772176/Task-1-Public-Transport-A155202pdf/
ℎ = 16.59512𝑛
Computing into a form of table,
n (veh/train) h (headway, sec)
1 16.595
2 33.190
3 49.785
4 66.380
5 82.975
6 99.570
7 116.165
8 132.760
9 149.356 Possible
10 155.951 Headwa
y
b) Bus service between Bandar Baru Bangi and Kuala Lumpur City Center (KLCC)
is one of the services that has to be studied. One-way travel time has been
decided to be not greater than 50 minutes. Expected peak hour demand is
3,800 passengers per hour per direction. The bus has 45 sitting and 20
standing capacity. Headway shall not be greater than 5 minutes and waiting
time at terminal shall not be less than 5 minutes.
This study source was downloaded by 100000839033514 from CourseHero.com on 12-24-2021 12:06:06 GMT -06:00
https://www.coursehero.com/file/36772176/Task-1-Public-Transport-A155202pdf/
Expected demand = 3800 passengers
Maximum one-way travel time = 50 mins
Sitting capacity = 45 passengers
Standing capacity = 20 passengers
Maximum headway = 5 mins
Minimum headway = 5 mins
(ii) 𝐶𝑦𝑐𝑙𝑒 𝑡𝑖𝑚𝑒, 𝑇 = 𝐵𝑜𝑡ℎ 𝑑𝑖𝑟𝑒𝑐𝑡𝑖𝑜𝑛 × (𝑀𝑎𝑥. 𝑜𝑛𝑒 − 𝑤𝑎𝑦 𝑡𝑟𝑎𝑣𝑒𝑙 𝑡𝑖𝑚𝑒 +
𝑀𝑖𝑛. 𝑤𝑎𝑖𝑡𝑖𝑛𝑔 𝑡𝑖𝑚𝑒)
( )
𝑇 = 2 50 + 5 = 110 𝑚𝑖𝑛𝑠
𝐶𝑦𝑐𝑙𝑒 𝑡i𝑚𝑒, 𝑇
(iii) 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑏𝑢𝑠𝑒𝑠 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 𝑓𝑜𝑟 𝑡ℎ𝑒 𝑠𝑒𝑟𝑣𝑖𝑐𝑒, 𝑁 =
𝐻𝑒𝑎𝑑r𝑎𝑦, s
𝑁 = ttO = 110 𝑏𝑢𝑠𝑒𝑠
t
This study source was downloaded by 100000839033514 from CourseHero.com on 12-24-2021 12:06:06 GMT -06:00