10KW Hybrid Off-Grid

Hillcrest Farm, Chiangmai


18 Oct 2021
Inputs & Design
Inputs Design

● Average electricity consumption 900 ● Optimized for initial investment


● 10KW Off-grid Hybrid
units/month (kWh) ● Why Off-grid - so do not have to deal with
● Existing electricity source is only from PEA PEA
● Power outage aprox 2 times/month ● Use PEA as backup, last source
● Utilize lithium LiFePO4 batteries at night time
and cloudy/rainy days
● Automatic Switch to grid/PEA when batteries
are low at certain threshold
● Batteries dimensioned for 1.25KW/h for 16
hrs
● Solar panel - 1 string, 8 x 450W panels, can
expand up to 24 panels if load increases
Hybrid Off-grid 10KW (preliminary design)

450W x 8 Panels

Power sources priority


1. Solar panel
2. Batteries
3. PEA
10KW
High Volt
Hybrid Inverter
(Custom/BTO)

Output:
Power: 10KW Cont
PEA Voltage: 220Vac
LiFePO4 Batteries (2) Current: 45A
48V 200A
w/ Active Balance
and BMS
System requirement

● Installation of solar panels (on-ground or


roof-top)
● 8 panels required approx 16 Sqm
● If roof-top, roof need to support weight
about 10Kg/Sqm
● On-ground required civil works
● Room for equipments and batteries
Additional inputs
Input Additional inputs:

● Average electricity consumption 900 ● Number of Aircon, size, inverter?


units/month (kWh) ● Number of Fridge, size
● Existing electricity source is only from PEA ● Water heater size
● Power outage aprox 2 times/month ● Kitchen Appliances, microwave, toaster
● others

Farm tools

● Water pump (HP)


● Welding machine
● Field Lighting