MAINTENANCE
MANUAL
QM Approach :
3. Quality Maintenance
Type of Defects:
NOT OK
Action taken by
operator
LSL OK USL
OK
NOT OK
No Action
taken by
operator
Action taken
OK by operator
LSL OK USL
Defect Modes
202
Procedure for Implementing Quality Maintenance :
•For the most serious problems in the preceding step, clarify the actual
phenomena
• Investigate using techniques such as P-M analysis and propose
countermeasures
PM - Analysis
1. To be used for most difficult and challenging problems
2. Carefully analyze and understand the phenomena in terms of
physical principles
3. Begin by stratifying the phenomena in terms of their type &
mode of occurrence identify the conditions that produce them
4. Uncover & consider all necessary conditions that produce them
5. List all conditions that produce them regardless of their
magnitude
Data Collection:
Data Collection on defects is by stratifying the data. It may start with
customer complaints, rejection at final stage and in-process rejection.
Customer Complaints:
• Customer end line rejection
• Field complaints
In house rejections-
• Severity of the defect and its contribution – major/minor
• Location of the defect with reference to the layout
• Magnitude and frequency of its occurrence at each stage of measurement
• Occurrence trend in beginning and the end of each
• production/process/changes. (Like pattern change, Tundish change,
ladle/furnace lining etc.)
• Occurrence trend with respect to restoration of
breakdown/ modifications/ periodical replacement of quality components.
3M Analysis:
Sl.N Ja Fe Ma Ap Ma
o Activity n b r r y
1 Set Reduction/ elimination plan for zero defect & zero
customer complaints- based on prioritization for elimination of
defects as per business needs
9 Confirm effects