Professional Documents
Culture Documents
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
QUALITY:
a) Poking rod (Length- 3.5 to 4.2 mtr, Dia -
24/25mm) a) Check the condition of poking rod whether
b) in working condition /not working condition
b) 5 kg hammer for hammering before stating the job. Length of the rod should
be as per requirement of PG bed.
c) Man cooling fan for poking activity.
c) Check the condition of 5 K.G hammer handle to
d) Hook for holding the poking rod. be used for hammering.
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
ENVIRONMENT: No Hazard
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
ENVIRONMENT: No Hazard
QUALITY:
a) Proper positioning of poking rod. a) Never lift the rod alone. Minimum two
fireman should be available for handling
the rod.
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
QUALITY:
a) Proper opening of poke hole a) After removing the cap from the poke
hole, place the cap next to the poke hole so
that poke hole can be closed quickly after
work.
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
Signature : Signature:
STANDARD OPERATING PROCEDURE
SOP No. MEC-OPR-SOP-2 Effective Date 27.07.2021 REVISION No 00
SOP DESCRIPTION POKING ACTIVITY Section OPERATION
8. While pulling out the rod, always keep the fan in front of the poke hole to keep out the emitted gas from working area. Operator
9. Always ensure the working of installed CO detector on Poke hole platform. Use calibrated CO detector during poking activity Shift Incharge (MEC)
If anyone feels headache or vomiting, then he should immediately inform his colleague & leave the workplace. He
10. Operator
should move to open area & inform his Shift Incharge.
2. When a fireman drives a hammer, there should be no one in the vicinity of swing of hammer. Operator
While closing the Poke hole, keep your face away from it. Always maintain distance while placing the Poke hole cap to
3. Operator
avoid hot gas & fumes.
PREPARED BY APPROVED BY
Name and Designation: Mr. Rajeev Kumar (Site Incharge) Name and Designation: Mr. Rajeev Kumar (Manager)
Signature : Signature: