Professional Documents
Culture Documents
MDR500A: Mobile X-Ray Machine Installation Manual
MDR500A: Mobile X-Ray Machine Installation Manual
Installation manual
Edition:A2
Document No:
Release date:
Please read the user manual and pay attention to all safety precautions before operation;
Please make full use of the content on the basis of full understanding。
Document No -
iRay 奕瑞 Edition A2
Revision date 2020.1.30
MDR500 Installation manual Page number 2 / 7
Version record
Version Organization Review Approval Date Explain
3 Cantilever buckle
4 Air spring
5 Cantilever lock
8 Cantilever
Document No -
iRay 奕瑞 Edition A2
Revision date 2020.1.30
MDR500 Installation manual Page number 4 / 7
10 Cantilever handrail
11 Protable lock
12 Protable x-ray
15 PC support
16 Storage box
17 Foot brake
Operation steps:
1. Remove the screws on the top cover of the packing case and remove the top cover of the packing
case.
2. Remove block 1 and block 2.
3. 2-3 people lift the machine out of the packing box.
Safety
Step 3 : Front wheel bracket landing
considerations
1. Unlock 12. Press down the
front wheel support lock 7.
When the front wheel
supports, the machine will
dump forward about 10 °,
please pull 14. Push the
armrest.
Operation steps:
1. Unlock 6. Front wheel support lock.
2. Unlock with one hand (pull towards the frame) 13. Front wheel support lock, press down with
one hand 7. Front wheel support.
Operation steps:
1. Step on 17. Push the foot brake forward and backward slightly to step on the brake.
2. Lock 17. Foot brake
Operation steps:
1. Unlock 3. Cantilever buckle.
2. Unlock (rotate counterclockwise) 1. Air spring lock.
3. Press both hands firmly on 10. Cantilever handrail, unlock (press down) 5. Cantilever lock,
pull out the cantilever to 45 ° angle.
4. Lock (clockwise rotation) 1. Air spring lock.
Document No -
iRay 奕瑞 Edition A2
Revision date 2020.1.30
MDR500 Installation manual Page number 7 / 7
Operation steps:
1. Installation 12. Protable x-ray.
2. Lock 11. Protable lock.
3. Use the fixing screws on both sides of 9. Combined head pan to fix the head pan.
4. Now the mechanical part of the combined head has been installed.
Operation steps:
1. Connect the hand brake switch to exposure.
2. Connect the power plug to power.
3. Connect the communication line to PC.
4. The wiring is now completed