erformed as a result of a preventive inspection. Preventive inspection man hours is work performed that originates from equ
###
###
###
###
###
###
###
###
sed price and the total floor area. The square metre price is only calculated for new builds and refurbishment projects. The sq
###
###
n period of time. A positive balance of trade is known as a trade surplus and consists of exporting more than is imported
###
means material transformation. In traditional facilities, a value ratio of .01 or less is not uncommon
f this procedure was that the BRI for a building system is affected by the following three parameters: (1) the actual performanc
or a measure of same within any defined time period to all prospects enterprise wide. [Note: Individual messages are isolated
ormed that originates from equipment maintenance strategies
efurbishment projects. The square metre price includes the client’s costs for contractors, consultants, architects, hauliers, e
g more than is imported
ters: (1) the actual performance score of each component in that system
ndividual messages are isolated by the software tracking and reporting on these KPIs.] Example: A Manager may want to know
nsultants, architects, hauliers, etc. It includes costs for dismantling and demolition, if any, of existing structures and site develop
A Manager may want to know, on an enterprise-wide basis, how many prospects were exposed to corporate messaging on a g
ting structures and site development, if these works are being carried out in connection with the other construction contracts.
d to corporate messaging on a given day
e other construction contracts. It also includes costs for establishing the shell, exterior and interior fitting-out, heating and plu
rior fitting-out, heating and plumbing, electrical installations and costs for client-supplied materials and equipment supplies
ials and equipment supplies