5 Almost Certain 5 10 15
4 Likely 4 8 12
3 Possible 3 6 9
2 Unlikely 2 4 6
1 Rare 1 2 3
Probability ( Likelihood of an
Weightage occurrence of a hazardous exposure) INTERPRETATION
HIERARCHY OF CONTROLS
D Administrative
C Engineering Control
B Substitution
TYPES OF HAZARDS
Physical Chemical
Application of high hand force Hit by falling overloaded trolley Consumption of expired medicine
Contact with hot objects Hit by sharp edge Contact with chemical
Exposure to excessive cold Inhalation of contaminated air Exposure to oil mist/ coolant mis
Hit against the parts in the machine Walking in poorly illuminated walkway Exposure to trap zone between two t
Hit by broken hand tools Walking in slippery floor Exposure to trap zone in energized ma
Hit by falling concrete Walking over unsecured pit Hit against the moving object
Hit by falling imbalanced trolley Overloading of racks Hit by flying broken tool/ cutter
Working at height (>1.8 Meter) Hoists, cranes, ropes, chains not main
properly
Working at height (>1.8 Meter) Hoists & lifting devices not marked with
Workers working below elevated workers Exposure to bare live wires in electrical
16 20
12 15
8 10
4 5
Level Actions
be likely that an injury Controls will need to be in place before the activity is
would result. undertaken.
likely that a permanent, Consider alternatives to doing the activity. Significant control
esult. Or severity =5 measures will need to be implemented to ensure safety.
INTERPRETATION Explanation
isited OHC/First aid and returned to the job First Aid Case (FAC)
INTERPRETATION Explanation
year or more but not monthly Once a year or more but not monthly
month or more but not weekly Once a month or more but not weekly
HY OF CONTROLS
Description
Signage, warnings, SOPs, OCPs, Work Instructions, Motivational prog., Trg. Etc.
S OF HAZARDS
Chemical Biological
Consumption of expired medicine Consumption of infected food
Ergonomic Fire
osure to trap zone between belt and pulley in High accumulation of flammable gas/ vapor in
motion sparking zones
posure to trap zone in energized machinery Hot work in fire prone zone
Leakage of flammable gas/ vapor in sparking
Hit against the moving object
zones
Hit by flying broken tool/ cutter Leakage of flammable liquids on hot surface
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
OH& S Category of
Operation Activities RISK Source Existing Control Measures Measures Plan /Risk and
Hazard hazard (OH/S)
Required opportunities/
Emergency Condition
(A/B/C/D/E) Other Controls
Legal Requirement
Probability
Probability
Severity
Severity
Medical /physical fitness certify shall be deploy for this activity.
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Inspection of the Vehicle with monitoring checklist. (Break, horn,
mirror, seat belt, first aid, fire extinguisher etc.)
All documents verified like ( fitness / Insurance / PUC )
Use appropriate PPE like safety shoes, helmet, hand gloves etc.
Slip trip Hazard Handle carefully drill rod as per manual handling ergonomics.
Unloading & fitting Lifting & Uneven ground
5 Physical Fall of Personal Injury N N N 3 4 12 A 2 2 4 A
drilling rod shifting level Attached drilling rod to machine properly by only trained and health
material worker.
Use proper hand tools.
Stand away from the rod while threading automatically with machine.
Flying Particles Do not allow any unauthorized person nearby drilling work.
Eye Injury Unsafe work N N N 2 2 4 A 2 2 4 A
and dust hazard
Provide water sprinkling arrangement before starting the drilling work.
Use wet rug sack around the drilling rod to minimize the flying dust
particles.
Oil splash
Damage Hyd. Hose Before start the work check all hydraulic oil , Air pressure Hose visually
hazard
Noise Hazard Personal Injury Noise N N N 3 3 9 A Inspect all hose fittings, 2 2 4 A
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
5 Almost Certain 5 10 15 20 25
4 Likely 4 8 12 16 20
3 Possible 3 6 9 12 15
2 Unlikely 2 4 6 8 10
1 Rare 1 2 3 4 5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
JOB SAFETY ANYLIZE REPORT Rev. No. : 00
Department: - Execution Team
ACTIVITY : EXCAVATION FOR CABLE TRENCH, EARTH PIT
Routine Activities Supportive Documents and Activity
1 Mobilization of Man Power 1. Work Permit – Excavation Work Permit
4 Manual Excavation 4. Inspection check list of Hand tools and Power tools
8 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Emergency Condition
Legal Requirement opportunities/
(A/B/C/D/E)
Other Controls
Probability
Severity
Severity
Medical /physical fitness certify shall be deploy for this activity.
Safety Induction & information of Site rules & regulation prior to enter
work site.
Manual Flying Particles Use without hole & undamaged basket for lifting soil from trench.
Excavation and dust hazard,
4 Excavation Physical Eye Injury Unsafe work N N N 2 2 4 A 2 1 2 A
(Pickax, Cow White finger
Hazard Ensure the good condition wooden Handle is available for Pickax and
Bar) Spread.
Provide rubber grip for crow bar.
Do not allow unauthorized person at work location.
Develop proper access and moving space for excavator at the work
Use of Excavator / Excavation By location.
5 Physical
JCB JCB
Do not allow other vehicles at excavator moving area.
Property Ground Level / Maintain the Road condition for the smooth movement.
Toppling Hazard Damage / Pot hole / N N N 1 4 4 A 1 3 3 A
Personal Injury Loose Soil Barricades to the all excavated areas and openings in the site area.
7 Manual Back filling Soil filling Physical Deploy trained and Healthy Worker.
Slip trip Hazard Body Pain Unsafe work N N N 2 3 6 A 2 2 4 A
Barricade the trench area.
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost 5
5 Certain 10 15 20 25
4 Likely 4 8 12 16 20
3 Possible 3 6 9 12 15
2 Unlikely 2 4 6 8 10
1 Rare 1 2 3 4 5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
JOB SAFETY ANYLIZE REPORT Rev. No. : 00
Department: - Execution Team
ACTIVITY : TRAY SUPPORT FABRICATION & FIXING
Routine Activities Supportive Documents and Activity
1 Mobilization of Man Power 1. Work Permit – Hot Work Permit / Work at Height Permit
4 Fabrication Yard Set up 4. Inspection check list of Hand tools and Power tools
5 Lifting & Shifting Steel Angle & Channels
6 Support Cutting & Grinding work
9 Fixing of Support
10 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Category of Emergency
Operation Activities OH& S Hazard RISK Source Existing Control Measures Measures
hazard (OH/S) Plan /Risk and
Emergency Condition
Required
opportunities/
Legal Requirement
(A/B/C/D/E)
Other Controls
Probability
Severity
Severity
Medical /physical fitness certify shall be deploy for this activity.
Safety Induction & information of Site rules & regulation prior to
enter work site.
Fabrication Yard Electric supply to the fabrication yard is routed through ELCB
4 rating 30 MA.
Set up
Use better condition electrical power supply cables (having no
joints).
Fall of Material /
Lifting & Shifting Fall of Person / Unsafe Material
5 Manual
Steel Angle & Physical Hitting Hazard / Bodily Injury Handling / Miss N N N 2 3 6 A 1 3 3 A
Handling
Channels Ergonomic Communication
hazard
Maintain well communication while lifting heavy material by more
than one worker.
Fall of Material /
Lifting & Shifting Fall of Person / Unsafe Material Use appropriate PPE (Helmet, safety shoes, Hand gloves,
5 Manual shoulder Pad etc.)
Steel Angle & Physical Hitting Hazard / Bodily Injury Handling / Miss N N N 2 3 6 A 1 3 3 A
Handling
Channels Ergonomic Communication
Provide Manual Handling Safety to all worker
hazard
Do not allow to lift & carry heavy & long material by single person.
Check All Power supply cable of Power tools are without joint &
damage.
Damage supply
Electrical Electrical fire / cable /
N N N 3 4 12 A Ensure all power tools are inspected as per safety check list. 2 2 4 A
Hazard Shock Faulty
Equipment
Provide rubber mat front of distribution board.
Flying Chips / Stand drilling machine should be earthed and provide suitable
Bodily Injury Sharp Pieces N N N 2 4 8 A 2 2 4 A
Sharp edge guard for belt.
Failure of
providing
Electrical earthing/
Shock Leads damaged N N N 3 4 12 A 2 2 4 A
Hazard
Damaged
Power connection to be taken from 30 ma rated RCCB.
8 Support welding Welding Work Physical Welding PPE’s such as welding hand gloves, welding face shield,
work Welding Apron to be used.
Fire Hazard Burn / heat Without PPE N N N 3 3 9 A Avoid cables lying on wet ground. 2 2 4 A
Earthing to be provided to body of Welding machine
Tie the support with proper rope or chain until its not fitted tightly.
9 Fixing of Support Scaffolds should be inspected before use and should have green
tag.
Lifting Support Bodily injury/ Anchoring of double harness safety belt should be to the lifeline.
Fall of person / Working at
for fixing at Physical Fall of material Property height N N N 3 2 6 A 2 2 4 A
height damage Use good condition rope for lifting support incase its not heavy.
Tie the support with proper rope or chain until its not fitted tightly.
After completion Cut pinch Unsafe work Do not left any tools or material at height.
10 Housekeeping Physical Bodily injury N N N 2 3 6 A 2 2 4 A
the work hazard method
10 After completion Cut pinch Unsafe work
Housekeeping Physical Bodily injury N N N 2 3 6 A 2 2 4 A
the work hazard method
Balance material like support, angle or channels are shift at
fabrication yard return.
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB S
2 Area clearance
10 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident
Man Power workers Workers
workers
4 Fabrication Yard
Set up
Faulty
Power supply
Electrical shock Property connection /
provision /
Physical Hazard / Cut Damage / Unsafe
Machine &
Pinch Hazard Personal Injury Material
Tools setting
Faulty
Power supply
Electrical shock Property connection /
provision /
Physical Hazard / Cut Damage / Unsafe
Machine &
Pinch Hazard Personal Injury Material
Tools setting
handling
Faulty Breaks /
Default Vehicle / indicators /
Accident
Unskilled Driver. mirrors / horn /
unskilled driver
Movement of
the Vehicle
Physical
inside the work
premises
Property
Damage / Ground Level /
Toppling Hazard Personal Pot hole /
Loose Soil
Injury
Unloading cable
5 tray from vehicle
and shifting
Unsafe
Fall of Material /
Material
Fall of Person /
Manual Handling /
Physical Hitting Hazard / Bodily Injury
Handling Miss
Ergonomic
Communicatio
hazard
n
Damage
Electrical Electrical fire / supply cable /
Hazard Shock Faulty
Equipment
Cable Tray
6 Cutting &
Cutting & Grinding Physical
Grinding steel
work
Short circuit /
Fire Hazard / Burn Injury /
Combustible
Flying Particles Eye Injury
Material
Flying Chips /
Bodily Injury Sharp Pieces
Sharp edge
Faulty
Electrical
Shock Equipment /
Hazard
connection
Failure of
providing
earthing/
Electrical
Shock Damaged
Hazard
Equipment’s /
damaged
Leads
earthing/
Electrical
Shock Damaged
Hazard
Equipment’s /
damaged
Leads
Fumes / Ultra-
Eye injury Without PPE
violet rays
Cut Pinch
Nut bolt fixing hazard / Fall of Bodily injury Improper tools
material
Bodily injury/
Lifting Tray for Fall of Person / Working at
Property
fixing at height Fall of Material height
damage
After completion Cut pinch Unsafe work
10 Housekeeping Physical Bodily injury
the work hazard method
Severity
Probability Minor Moderate Major Critical
1 2 3 4
Almost Certain 5 5 10 15 20
Likely 4 4 8 12 16
Possible 3 3 6 9 12
Unlikely 2 2 4 6 8
Rare 1 1 2 3 4
JOB SAFETY ANYLIZE REPORT
Body Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N N 2 2 4 A
N N N 2 2 4 A
N N N 2 2 4 A
N N N 2 3 6 A
N N N 5 2 10 A
N N N 2 3 6 A
N N N 3 3 9 A
N N N 3 3 9 A
N N N 3 4 12 A
N N N 1 4 4 A
N N N 2 3 6 A
N N N 2 3 6 A
N N N 2 3 6 A
N N N 3 4 12 A
N N N 3 4 12 A
N N N 2 4 8 A
N N N 3 2 6 A
N N N 3 4 12 A
N N N 3 4 12 A
N N N 3 3 9 A
N N N 2 3 6 A
N N N 2 3 6 A
N N N 3 2 6 A
N N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
2 2 4 A
Gate pass for all worker & staff shall be providing. 2 2 4 A
Tool Box talk should be conducted before starting the activity.
All wooden packing scrap material carefully remove from the site and 2 2 4 A
keep it designated scrap yard.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
2 2 4 A
Ensure that all staff have signed on to the permit.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Remove all the unwanted cutting pieces from the yard periodically. 2 2 4 A
Use Nose Mask, Hand gloves, safety shoes, Helmet while developing
area.
2 2 4 A
Inspect all power tools as per check list.
Barricades to the all excavated areas and openings in the site area. 1 3 3 A
Do not allow to lift & carry heavy & long material by single person.
Carefully handle the material to the worksite & stack the material
proper way.
Check All Power supply cable of Power tools are without joint &
damage.
2 2 4 A
Ensure all power tools are inspected as per safety check list.
Inspect Welding rectifier and all accessories as per safety check list.
Do not stand or seat wind apposite while welding work is carrying out.
Tie the support with proper rope or chain until its not fitted tightly.
Scaffolds should be inspected before use and should have green tag.
Tie the support with proper rope or chain until it’s not fitted tightly.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SAF
2 Area clearance
8 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria fo
Significant Hazard
Sr. No.
OH & S Category of
Operation Activities RISK Source
Hazard hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Slip & Trip Uneven ground
Physical Bodily Injury N
Hazard level,
Inspection of
2 Area Clearance
Area
Failure to
Equipment
obtain correct
Isolation and isolated, locked
3 Physical work permit or Accident Electrical Shock N
Permits and tagged. /
lock off
Permit Issued
procedure
Overhead
Tying tool & Hitting Hazard / Heavy chain
tackles ( Lifting Physical Cut Pinch Bodily Injury Block / N
Belt) Hazard Lifting Rod and
Lifting & Shifting
4 Tools tackles
Cable Drum
Overhead
Tying tool & Hitting Hazard / Heavy chain
tackles ( Lifting Physical Cut Pinch Bodily Injury Block / N
Belt) Hazard Lifting Rod and
Lifting & Shifting
4 Tools tackles
Cable Drum
Jerk of
Hit Hazard /
Physical Bodily Injury Suspended N
Fall of material
load
Lifting &
Shifting load
Electrical Overhead
Physical hazard / Bodily Injury power cable / N
Hit hazard Structure
Uneven jack
Keep the drum
Lowering the Fall of cable level /
7 on the cable Physical Bodily Injury N
drum on jack. drum Poor tools &
jack/shaft
tackles
Uneven jack
Keep the drum
Lowering the Fall of cable level /
7 on the cable Physical Bodily Injury N
drum on jack. drum Poor tools &
jack/shaft
tackles
After
Cut pinch Unsafe work
8 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 3 6 A
N N 5 2 10 A
N N 3 4 12 A
N N 4 2 8 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 3 3 9 A
N N 2 3 6 A
N N 3 3 9 A
N N 3 3 9 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
LIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
All wooden packing scrap material carefully remove from the site and 2 2 4 A
keep it designated scrap yard.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure ‘Third Party Test report’ is available with all lifting tools and
tackle.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Barricades to the all excavated areas and openings in the site area. 1 3 3 A
Carefully handle the material at the worksite & stack the material
proper way. .
Ensure ground level is not sloppy where stored cable durm stacking.
Maintain safe distance between two drum for moving perosn for
handling.
After lowering the drum on ground apply the wheel stopper / Stopper
to cable drum.
Ensure cable drum storage area is barricated.
2 2 4 A
Ensure Centre shaft length is sufficient between to jack.
2 2 4 A
After lowering the drum on jack check stability of drum and then
remove from the hydra hook.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB S
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident
Man Power workers Workers
workers
Failure to
Equipment
obtain correct
Isolation and isolated, locked
3 Physical work permit or Accident Electrical Shock
Permits and tagged. /
lock off
Permit Issued
procedure
Slip trip
Unsafe Material
Removing cable Hazard /
4 Cable removing Physical Bodily Injury Handling / Miss
from drum Ergonomic
Communication
Hazard
Unstable
Fall of person Bodily Injury
scaffold
Cable Laying
6 (Use of Cable pulling Physical
Scaffolding)
Ergonomic
Body Pain Heavy cables
hazard
unsafe Cable
Fall of Person Bodily Injury rack /
Without FBH
Working on
Cable laying on
7 Pipe rack / Physical
Cable rack
Cable rack
Caught
Cut & Pinch
Personal Injury between cable
Hazard
and Tray
Cut Pinch Improper tools
Cable dressing Bodily injury
hazard / Sharp edge
After
Cut pinch Unsafe work
10 Housekeeping completion the Physical Bodily injury
hazard method
work
Severity
Probability Minor Moderate Major Critical
1 2 3 4
Almost Certain 5 5 10 15 20
Likely 4 4 8 12 16
Possible 3 3 6 9 12
Unlikely 2 2 4 6 8
Rare 1 1 2 3 4
JOB SAFETY ANYLIZE REPORT
Body Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N N 2 2 4 A
N N N 2 2 4 A
N N N 2 2 4 A
N N N 2 3 6 A
N N N 5 2 10 A
N N N 2 3 6 A
N N N 4 3 12 A
N N N 4 3 12 A
N N N 3 4 12 A
N N N 2 4 8 A
N N N 2 3 6 A
N N N 4 3 12 A
N N N 2 3 6 A
N N N 2 3 6 A
N N N 4 3 12 A
N N N 2 3 6 A
N N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
LIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure over head power cable or structure & maintain safe distance
2 2 4 A
form hazard.
All wooden packing scrap material carefully remove from the site and 2 2 4 A
keep it designated scrap yard.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
2 2 4 A
Ensure that all staff have signed on to the permit.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Ensure over head power cable or structure & maintain safe distance
form hazard.
Provide life line rope (wire rope sling) for anchoring the safety
harness.
Provide life line rope (wire rope sling) for anchoring the safety
harness.
Before standing on the cable tray inspect the tray is fixed with tray
support by nut bolt.
All workers working on height will be trained in the use of full body
harness. 2 2 4 A
Provide proper access and emergency egress.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SAF
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Unsafe
Slip trip
Cable Pulling Physical Bodily Injury Material N
Hazard
Handling
Cable Setting
4
for Termination
Cut Pinch
Cable lugs
Using crimping Hazard /
5 crimping & Physical Bodily Injury Improper tools N
machine Ergonomic
Termination
Hazard
Using crimping Hazard /
5 crimping & Physical Bodily Injury Improper tools N
machine Ergonomic
Termination
Hazard
Faulty
Electrical Electrical equipment /
N
Hazard Shock unsafe
connection
Use of Hot
6 Cable Insulation Gun or Blow Physical
lamp
Burn Injury /
Fire Hazard Property Hot gun N
Damage
Hi-pot testing
and insulation Electrical Electrical Electrical
7 Testing work Physical N
resistant testing Hazard Shock equipment
work.
Insulation
Resistance
Resistance Electrical Electrical Faulty
8 testing for LT & Physical N
Testing Hazard Shock equipment
HT
cable(meager)
Insulation
Resistance
Resistance Electrical Electrical Faulty
8 testing for LT & Physical N
Testing Hazard Shock equipment
HT
cable(meager)
Electrical
Testing and Electrical Unsafe testing
9 Testing Physical shock / Fire N
commissioning Shock / Fire work
Hazard
After
Cut pinch Unsafe work
10 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
Probability
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
ody Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 3 9 A
N N 3 3 9
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure over head power cable or structure & maintain safe distance
2 2 4 A
form hazard.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Check & inspect the hand tools before start the activity.
Job specific and Mandatory pep’s should be wear before starting the
activity.
Check All Power supply cable of Power tools are without joint &
damage.
Job specific and mandatory PPE’S should be wear before starting the
job.
After heating keep the gun away from the working area.
Before the starting testing work Hi-pot kit proper visually checked and
have calibration certificate.
After finish the job lock the panel door and display caution board on
panel.
Job specific and Mandatory ppe’s should be wear before starting the
activity.
Meager for HT cable 5KVA use power after power discharge proper
use earthing.
Make sure all switches are block out and mark properly.
After finish the job lock the panel door and display caution board on 2 2 4A
panel.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
ACTIVITY : HT / LT CABLE JOINT WORK
Routine Activities
1 Mobilization of Man Power
2 Area clearance
3 Isolation and Permit system
4 Cable Setting for Termination or Joint
5 Cable lugs crimping & Termination
6 Cable Insulation
7 Use Of Cable Joint Kit
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria f
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Failure to
Equipment
obtain correct
Isolation and isolated, locked
3 Physical work permit or Accident Electrical Shock N
Permits and tagged. /
lock off
Permit Issued
procedure
Unsafe Material
Cable Pulling Physical Slip trip Hazard Bodily Injury N
Handling
Cable Setting
4 for Termination /
joint
Cable & Cable Improper tools /
Cut Pinch
Insulation Physical Bodily Injury Unsafe work N
hazard
cutting Method
Cut Pinch
Cable lugs
Using crimping Hazard /
5 crimping & Physical Bodily Injury Improper tools N
machine Ergonomic
Termination
Hazard
Faulty
Electrical equipment /
Electrical Shock N
Hazard unsafe
connection
Burn Injury /
Fire Hazard Property Hot gun N
Damage
Use of Cable Electrical Electrical
7 Joint work Physical Electrical Shock N
Joint Kit Hazard equipment
Insulation
Resistance
Resistance Electrical Faulty
8 testing for LT & Physical Electrical Shock N
Testing Hazard equipment
HT
cable(meager)
After
Cut pinch Unsafe work
10 Housekeeping completion the Physical Bodily injury N
hazard method
work
After
Cut pinch Unsafe work
10 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 3 9 A
N N 3 3 9
N N 5 3 15 A
N N 5 3 12 A
N N 4 3 12 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
LIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
9 Housekeeping
10
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria f
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Failure to
Equipment
obtain correct
Isolation and isolated, locked Electrical
3 Physical work permit or Accident N
Permits and tagged. / Shock
lock off
Permit Issued
procedure
Follow of
Material / Fall
Unsafe
Manual of Person /
Physical Bodily Injury Material N
Handling Hitting Hazard /
Handling
Ergonomic
hazard
Fallow of
Stacking
Physical Material / Bodily Injury Sharp edge N
material
Fall of Person
Fallow of
Stacking
Physical Material / Bodily Injury Sharp edge N
material
Fall of Person
Damage supply
Electrical Electrical fire /
Physical cable / Faulty N
Hazard Shock
Equipment
Flying Chips /
Bodily Injury Sharp Pieces N
Sharp edge
Drilling By
Drilling holes on
6 Hand drill / Physical
Strip
stand Drill
Faulty
Electrical
Shock Equipment / N
Hazard
connection
Strip
stand Drill
Faulty
Electrical
Shock Equipment / N
Hazard
connection
Failure of
providing
Electrical earthing /
Shock N
Hazard Damaged
Leads ,
Equipment’s
Earthing Strip
7 Welding Work Physical
welding work
Fumes / Ultra-
Eye injury Without PPE N
violet rays
Cut Pinch
Nut bolt fixing Physical hazard / Fall of Bodily injury Improper tools N
material
Laying Strip on
8
cable tray
Laying Strip on
8
cable tray
Bodily injury /
Fall of person / Working at
Lifting strip Physical Property N
Fall of material height
damage
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 2 3 6 A
N N 5 2 10 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 3 3 9 A
N N 2 4 8 A
N N 3 2 6 A
N N 3 2 6 A
N N 3 4 12 A
N N 3 3 9 A
N N 2 3 6 A
N N 2 3 6 A
N N 4 3 12 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure over head power cable or structure & maintain safe distance
2 2 4 A
form hazard.
All wooden packing scrap material carefully remove from the site and 2 2 4 A
keep it designated scrap yard.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Do not allow to lift & carry heavy & long material by single person.
Carefully handle the material to the worksite & stack the material
proper way.
Check All Power supply cable of Power tools are without joint &
damage.
Ensure all power tools are inspected as per safety check list. 2 2 4 A
Provide rubber mat front of distribution board.
Ensure use of face shield while cutting & grinding work practically
work time.
Inspect Welding rectifier and all accessories as per safety check list.
Do not stand or seat wind apposite while welding work is carrying out.
Ensure toe guard is available for scaffold, which is use for height
work.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
6 Working On roof
10 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria f
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S) Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Failure to
Equipment
obtain correct
Isolation and isolated, locked Electrical
3 Physical work permit or Accident N
Permits and tagged. / Shock
lock off
Permit Issued
procedure
Follow of
Material / Fall
Unsafe
Manual of Person /
Physical Bodily Injury Material N
Handling Hitting Hazard /
Handling
Ergonomic
hazard
Fallow of
Stacking
Physical Material / Fall Bodily Injury Sharp edge N
material
of Person
Fallow of
Stacking
Physical Material / Fall Bodily Injury Sharp edge N
material
of Person
5 Climbing on roof
Damage supply
Electrical Electrical fire /
cable / Faulty N
Hazard Shock
Equipment
Flying Chips /
Bodily Injury Sharp Pieces N
Sharp edge
Drilling By
Drilling holes on
8 Hand drill / Physical
Strip
stand Drill
Electrical Faulty
Shock N
Hazard Equipment
After
Cut pinch Unsafe work
10 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
AYING ON ROOF.
Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 4 12 A
N N 5 3 15 A
N N 5 3 15 A
N N 3 4 12 A
N N 3 4 12 A
N N 3 3 9 A
N N 3 3 9 A
N N 2 4 8 A
N N 3 2 6 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Ensure over head power cable or structure & maintain safe distance
form hazard.
Ensure weather condition is safe for work at height ( wind / rain / over
heat )
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure staff are aware of the risk from induced voltages and to use
working earths as required.
Do not allow to lift & carry heavy & long material by single person.
Carefully handle the material to the worksite & stack the material
proper way.
While using ‘A’ type ladder height safety precaution must be taken
(Use full body safety harness) if work approach is above 1.2 meters.
One person shall be providing for holding the ladder all the time.
Maintain 3points contact & 1/4 ratio when using the ladder.
2 2 4A
Ensure ladder is inspected before using as per safety check list.
Do not lain & work on ladder ( ladder is only for Access & egress )
Do not carry material or person in boom or scissor lift more than SWL.
Only full body harnesses (Double lanyard) are to be used
Set and maintain the lanyard length to prevent the person from
reaching the edge.
Isolate areas below roof work where people may be struck by falling
material, debris, or tools
Use safety belts and anchor them properly with the anchorage points
on the roof.
Do not run on roof and through the tools for giving purpose.
Check All Power supply cable of Power tools are without joint &
damage. 2 2 4A
Ensure all power tools are inspected as per safety check list.
Tie the Arrestor rod with proper rope until its not fitted tightly.
Balance material like earthing strip, angle or channels etc. are shift at
fabrication yard return.
F-20-v1.0-04-02-2019
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Faulty Breaks /
Default Vehicle
indicators /
/ Unskilled Accident N
mirrors / horn /
Driver.
unskilled driver
Movement of
the Vehicle
Physical
inside the work
premises
Overhead
Lifting & Shifting Tying tool & Hitting Heavy chain
5 tackles ( Lifting Physical Hazard / Cut Bodily Injury Block / N
Panel / DB
Belt) Pinch Hazard Lifting Tools
tackles
Lifting &
Shifting load
Overhead
Electrical
Physical Bodily Injury power cable / N
hazard
Structure
Bodily Injury /
Fall of Panel / Lifting Height /
Physical Property N
Fall of Person Floor Opening
Damage
Bodily Injury /
Fall of Panel / Lifting Height /
Physical Property N
Fall of Person Floor Opening
Damage
Lifting panel on
6 more than 1st Lifting Panel
floor Height.
Bodily Injury / Failure of
Physical Fall of Panel Property lifting tools & N
Damage tackles
Bodily Injury /
Suspended
Physical Property Swing the load N
Load
Damage
Slip Trip
hazard /
Bodily injury Ground level N
Ergonomic
hazard
Slip Trip
hazard /
Bodily injury Ground level N
Ergonomic
hazard
Cut Pinch
Physical Bodily Injury Panel weight N
Hazard
Bodily Injury
Toppling Property Heavy Panel N
damage
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 3 4 12 A
N N 4 2 8 A
N N 4 2 8 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 3 4 12 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 3 9 A
N N 3 3 9 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure over head power cable or structure & maintain safe distance
form hazard.
2 2 4 A
Ensure weather condition is safe for work at height ( wind / rain )
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure ‘Third Party Test report’ is available with all lifting tools and
tackle
1 3 3A
Barricades to the all excavated areas and openings in the site area. 1 3 3A
Ensure the human body away from Edge of the load while position
the load
Carefully handle the material to the worksite & stack the material
proper way. .
Pre inspect lifting location and Height and use proper Machine
( Crane / Farana )
Use FBH while standing near the floor opening for pulling Panel
on platform,
Ensure the human body away from Edge of the load and roller.
Check the foundation steel base frame or concrete plinth for strong,
Care for fingers not to pinch between board & foundation or tools.
2 2 4A
Carefully alignment the panel / transformer board.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
ACTIVITY : BUS DUCT INSTALLATION
Routine Activities
1 Mobilization of Man Power
2 Area clearance
3 Isolation and Permit system
4 Removing Wooden Packing
5 Lifting & Shifting Bus Duct
6 Shifting the manually
7 Fixing the support by Anchor Fastner
8 Fixing the Bus Duct on support
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria f
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Faulty Breaks /
Default Vehicle
indicators /
/ Unskilled Accident N
mirrors / horn /
Driver.
Movement of unskilled driver
the Vehicle
Physical
inside the work
premises
Property Ground Level /
Toppling Damage / Pot hole /
Hazard N
Personal Injury Loose Soil
Overhead
Tying tool & Hitting Hazard / Heavy chain
Lifting & Shifting
5 tackles ( Lifting Physical Cut Pinch Bodily Injury Block / N
Bus Duct
Belt) Hazard Lifting Tools
tackles
Overhead
Electrical
Physical Bodily Injury power cable / N
hazard
Structure
Bodily Injury /
Fall of Panel / Lifting Height /
Physical Property N
Fall of Person Floor Opening
Damage
Lifting on more
6 than 1st floor Lifting Panel
Height.
Bodily Injury / Failure of
Physical Fall of Panel Property lifting tools & N
Damage tackles
Bodily Injury /
Suspended
Physical Property Swing the load N
Load
Damage
Shifting Shifting by
7
manually roller
Slip Trip
hazard /
Bodily injury Ground level N
Ergonomic
hazard
Cut Pinch
Physical Bodily Injury Panel weight N
Fixing on Mounting and Hazard
8
Support Position
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 3 4 12 A
N N 4 2 8 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 3 4 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 3 4 12 A
N N 2 3 6 A
N N 3 3 9 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
2 2 4 A
Ensure over head power cable or structure & maintain safe distance
form hazard. 2 2 4 A
Inspect roof condition before start the work
Provide proper access towards work location.
Check position & size of Bus Duct and plan for lift.
Maintain contact with Issuing Officer.
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure approved Line diagram is available.
Prepared Lifting & shifting plan.
2 2 4 A
Ensure that all staff have signed on to the permit.
Follow LOTO Procedure if required
Ensure all legal documents is available with Hydra / Farana
Ensure ‘Third Party Test report’ is available with all lifting tools and
tackle
Use cut resistance hand gloves.
Use Proper hand tools.
Use crow bar proper way for removing planks. 2 2 4 A
Remove or bend the nails of Plank.
Shift or store packing plank safe distance from work location.
Inspection of the vehicle with monitoring checklist. (Break, horn,
mirror, seat belt, first aid, fire extinguisher etc.)
Ensure all Documents are verified by the safety person
Driver should be Trained and License Holder. 1 4 4 A
While reversing the vehicle flagman must be stand or walk at the
driver site and min 10 ft away from the vehicle.
Follow the Speed Limit Rule 10 km/hr inside the premises
Vehicle movement through only identified roads
Maintain the Road condition for the smooth movement.
1 3 3 A
Barricades to the all excavated areas and openings in the site area.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
8 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Faulty Breaks /
Default Vehicle
indicators /
/ Unskilled Accident N
mirrors / horn /
Driver.
unskilled driver
Movement of
the Vehicle
Physical
inside the work
premises
Overhead
Shifting Tying tool & Hitting Heavy chain
5 tackles ( Lifting Physical Hazard / Cut Bodily Injury Block / N
Tansformer
Belt) Pinch Hazard Lifting Tools
tackles
Lifting &
Shifting load
Overhead
Electrical
Physical Bodily Injury power cable / N
hazard
Structure
Bodily Injury /
Fall of Panel / Lifting Height /
Physical Property N
Fall of Person Floor Opening
Damage
Fall of Person Floor Opening
Damage
Lifting
Transformer Bodily Injury / Failure of
6 Lifting Panel Physical Fall of Panel Property lifting tools & N
foundation
Height. Damage tackles
Bodily Injury /
Suspended
Physical Property Swing the load N
Load
Damage
Slip Trip
hazard /
Bodily injury Ground level N
Ergonomic
hazard
Cut Pinch
Physical Bodily Injury Panel weight N
Hazard
Fixing
Mounting and
8 Transformer on
Cut Pinch
Physical Bodily Injury Panel weight N
Hazard
Fixing
Mounting and
8 Transformer on
Position
foundation
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 3 4 12 A
N N 4 2 8 A
N N 4 2 8 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 3 4 12 A
N N 2 3 6 A
N N 3 3 9 A
N N 3 3 9 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Safety Induction & information of Site rules & regulation prior to enter
work site.
Ensure over head power cable or structure & maintain safe distance
form hazard.
2 2 4 A
Ensure weather condition is safe for work at height ( wind / rain )
Ensure all staff understand the permit conditions and are aware of the
boundaries of the working area.
Ensure ‘Third Party Test report’ is available with all lifting tools and
tackle
1 3 3A
Barricades to the all excavated areas and openings in the site area. 1 3 3A
Ensure the human body away from Edge of the load while position
the load
Carefully handle the material to the worksite & stack the material
proper way. .
Pre inspect lifting location and Height and use proper Machine
( Crane / Farana )
Check the foundation steel base frame or concrete plinth for strong,
2 2 4A
Check the balance of boards for proper standing.
Care for fingers not to pinch between board & foundation or tools. 2 2 4A
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria fo
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Faulty Breaks /
Default
indicators /
Vehicle / Accident N
mirrors / horn /
Unskilled Driver
unskilled driver
Movement of
Material shifting the Vehicle
4 Physical
by vehicle inside the work Property Ground Level /
premises Toppling
Damage / Pot hole / N
Hazard
Personal Injury Loose Soil
Poor Battery
Burn injury /
condition /
Fire Hazard Property N
Engine over
damage
heat.
Fall of
Lifting & Shifting
Material / Unsafe
Street Pole / Manual
5 Physical Fall of Person/ Bodily Injury Material N
High Mast Handling
Ergonomic Handling
Accessories
hazard
Overhead
Tying tool & Hit Hazard /
Heavy chain
tackles ( Lifting Cut Pinch Bodily Injury N
Block /
Belt) Hazard
Tools tackles
Use of Farana /
6 Crane for Lifting Physical
& Shifting.
Jerk of
Hit Hazard /
Bodily Injury Suspended N
Fall of material
load
Lifting &
Shifting load
Electrical Overhead
Bodily Injury N
hazard power cable
Bodily Injury /
Suspended
Physical Fall of Material Property N
load
Damage
Fixing High
8 Mast
accessories
Fall of Person/
Fall of Bodily Injury / Improper
Use of Boom /
Physical Material / Property Lifting N
Scissor lift
Toppling of Damage Equipment
Equipment
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 3 4 12 A
N N 1 4 4 A
N N 3 3 9 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 4 12 A
N N 3 4 12 A
N N 2 4 8 A
N N 3 2 6 A
N N 3 4 12 A
N N 5 3 15 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Barricades to the all excavated areas and openings in the site area. 1 3 3 A
Maintain 3points contact & 1/4 ratio when using the ladder.
2 2 4 A
Ensure ladder is inspected before using as per safety check list.
Do not lain and work on ladder (ladder is only for Access & egress )
Do not carry material or person in boom or scissor lift more than SWL.
2 2 4 A
Refill the soil arround the foundation area.
2 2 4 A
Removed all guide rope or support carefully.
Balance material like support, angle or channels are shift at
fabrication yard return.
PP rope & lifting bag shall be used for lifting of lighting material.
All hand tools should be tie-up properly to avoid slip/fall from height
during working period.
Use inspected tools and choose write tools for write work.
2 2 4 A
Do not throw or catch any tools for receiving and giving purpose.
Use boxes for carrying hand tools and nut bolt ( fitting accessories)
F-20-v1.0-04-02-2019
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Improper
Fall of person. Accident N
scaffold
Installation of
Light fixtures By Using
5 Physical
using mobile Scaffolding
Scaffolding.
Installation of
Light fixtures By Using
5 Physical
using mobile Scaffolding
Scaffolding.
Overhead
Electrical
Bodily Injury power cable / N
hazard
Structure
Bodily Injury /
Fall of Person / Improper
Physical Property N
Slip trip Hazard ladder
damage
Installation of
6 Light fixtures By Work on ladder
Using Ladder.
Bodily Injury /
Electrical Overhead
Physical Property N
Hazard power cable
damage
Fall of Person
Bodily Injury / Improper
or Material /
Physical Property Lifting N
Equipment
damage Equipment
toppling
Installation of
Use of Boom /
7 Light fixtures By
Scissor lift
Using Boom lift
Fall of Person
Bodily Injury / Improper
or Material /
Physical Property Lifting N
Equipment
damage Equipment
toppling
Installation of
Use of Boom /
7 Light fixtures By
Scissor lift
Using Boom lift
Electrical Overhead
Electrical
Physical hazard / Hit power cables N
shock
hazard & structure
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 4 3 12 A
N N 4 3 12 A
N N 2 3 6 A
N N 3 3 9 A
N N 4 3 12 A
N N 5 3 15 A
N N 5 3 15 A
N N 5 3 15 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Do not throw material from height for receiving and giving purpose.
While using ‘A’ type ladder Use full body safety harness if work
approach is above 1.2 meters.
‘A’ type aluminium ladder shall be providing with proper locking
arrangement & bottom rubber pad.
One person shall be providing for holding the ladder all the time.
Maintain 3points contact & 1/4 ratio when using the ladder.
Do not lain and work on ladder (ladder is only for Access & egress ) 2 2 4 A
Ensure all power tools are inspected by as per Safety check list.
Do not carry material or person in boom or scissor lift more than SWL.
Do not throw or catch any tools for receiving and giving purpose.
Use boxes for carrying hand tools and nut bolt ( fitting accessories)
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Burn injury /
Storage of Paint Flammable
4 Store Physical Fire Hazard Property N
& Thinner material
damage
Spillage of Unsafe
Environmental Earth Pollution N
Material handling
Fall of person / Improper
Physical Accident N
Fire Hazard scaffold
Painting By
Using
6 using mobile
Scaffolding
Scaffolding.
Electrical Overhead
hazard / Hit Bodily Injury / power cable /
Physical N
hazard / Health Health issue Structure /
Hazard paint fumes
Bodily Injury /
Improper
Physical Fall of Person Property N
ladder
damage
Painting work
7 By Using Lifting Panel
Ladder.
After
Cut pinch Unsafe work
8 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 4 3 12 A
N N 2 3 6 A
N N 2 2 4 A
N N 4 3 12 A
N N 4 3 12 A
N N 2 3 6 A
N N 3 3 9 A
N N 4 3 12 A
N N 4 3 12 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Maintain 3points contact & 1/4 ratio when using the ladder.
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
8 Cable Pulling
9 Housekeeping
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Legal Requirement
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Shifting Conduit
Shifting Cut Pinch Bodily injury / Unsafe
Pipe and
4 material Physical Hazard / Fall Property manually N
accessories at
Manually of material Damage shifting
work location
Improper
Physical Fall of person. Accident N
scaffold
Using
Scaffolding
Slab Conduit by
5
manually
Bodily Injury /
Improper
Use of Ladder Physical Fall of Person Property N
ladder
damage
Overhead
Electrical Electrical
power cables N
hazard shock
& structure
8 Cable Pulling Cable pulling Physical Slip Trip Bodily Injury Cable Pulling N
After
Cut pinch Unsafe work
9 Housekeeping completion the Physical Bodily injury N
hazard method
work
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
Acceptable /
Emergency
Probability
Condition
Severity
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 2 3 6 A
N N 4 3 12 A
N N 4 3 12 A
N N 4 3 12 A
N N 2 3 6 A
N N 3 3 9 A
N N 2 3 6 A
N N 2 3 6 A
N N 3 3 9 A
N N 4 3 12 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Unacceptable Hazard
Assessment
Acceptable /
Probability
2 2 4 A
Removed all unwanted material or from area.
Ensure over head power cable or structure & maintain safe distance
form hazard.
Check all location and plan use of equipment ( Ladder / Scaffold / 2 2 4 A
Boom lift / Scissor Lift )
Ensure ground surface is in level and not obstacle there.
Do not throw material from height for receiving and giving purpose.
While using ‘A’ type ladder height safety precaution must be taken if
work approach is above 1.2 meters.
‘A’ type aluminium ladder shall be providing with proper locking
arrangement & bottom rubber pad.
One person shall be providing for holding the ladder all the time.
Maintain 3points contact & 1/4 ratio when using the ladder.
2 2 4 A
Keep the machine plain surface for operate.
2 2 4 A
Use the machine by only trained person.
Check the hacksaw fitting, handle and bled condition before use.
Removed all debris from work location and clean work area.
2 2 4 A
Collect all packing (cardboard / plastic) material and should be place
at designated scrap yard.
Barricade the area of stacked material or machinery which has left at
work location.
F-20-v1.0-04-02-2019
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls
JOB SA
2 Area clearance
6 Oil Filtration
7 Oil Leveling
Mandatory PPE : Safety Helmet , Safety Shoes, Safety google, Welding Apron, Full Body Harness, Hand Gloves
HIRA Member: Site In charge. Safety Officer, Engineers, Supervisor.
Overriding Criteria for
Significant Hazard
Sr. No.
Category of
Operation Activities OH& S Hazard RISK Source
hazard (OH/S)
Legal Requirement
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Deployment of
Mobilization of Unskilled Unskilled
1 Unskilled Physical Accident N
Man Power workers Workers
workers
Equipment Failure to
isolated, obtain correct
Isolation and Electrical
3 locked and Physical work permit or Accident N
Permits Shock
tagged. / lock off
Permit Issued procedure
Faulty Breaks /
Default Vehicle
indicators /
Physical / Unskilled Accident N
mirrors / horn /
Driver
unskilled driver
Position of Movement of
Property Ground Level /
Vehicle. the Vehicle Toppling
4 Physical Damage / Pot hole / N
Filtration Van inside the work Hazard
Personal Injury Loose Soil
and Attachment premises
Poor Battery
Burn injury / condition or
Physical Fire Hazard Property connection / N
damage Engine over
heat.
Over Head
Electrical Electrical fire /
Physical Power line / N
Hazard Shock
electrical pole
Slippery
Slip Trip Bodily Injury N
surface
Eye strain /
Harmful Harmful Fumes
Breathing N
fumes, Noise difficulty & Noise
Physical
Uneven
Fall of person Bodily injury/ surfaces/ Work N
5 Oil Filtration Filtration of Oil
at height
Improper
Electrical electrical
Physical Electrocution N
hazard source or
equipment
Burn Injury/
Combustible
Physical Fire Loss of N
material
property
Severity
Probability Minor Moderate Major Critical Insignificant
1 2 3 4 5
Almost Certain 5 5 10 15 20 25
Likely 4 4 8 12 16 20
Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Rare 1 1 2 3 4 5
JOB SAFETY ANYLIZE REPORT
y Harness, Hand Gloves, Nose Mask, Face Shield, welding Helmet, PPE Rope,
N N 2 2 4 A
N N 2 2 4 A
N N 2 2 4 A
N N 5 2 10 A
N N 3 4 12 A
N N 1 4 4 A
N N 1 4 4 A
N N 3 4 12 A
N N 3 2 6 A
N N 2 2 4 A
N N 3 2 6 A
N N 4 3 12 A
N N 3 3 9 A
N N 3 2 6 A
N N 3 3 9 A
N N 3 3 9 A
N N 2 3 6 A
N N 2 3 6 A
Insignificant
5
25
20
15
10
5
Doc No. : EHS-F-20-v1.0-04-02-2019
Issue No. : 00
YLIZE REPORT Rev. No. : 00
Department: - Execution Team
Final Risk
Assessment
Barricades to the all excavated areas and openings in the site area. 1 3 3 A
Scaffolds should be inspected before use and should have green tag.
Check all oil couplings are tight, secured and leak free.
2 2 4A
Ensure correct valves are open on the transformer.
ution Team
Ref. of
Additional
Objective/ WI /
Control
Emergency
Measures
Plan /Risk and
Required
opportunities/
(A/B/C/D/E)
Other Controls