Professional Documents
Culture Documents
TABLE OF CONTENT
INTRODUCTION .............................................................................................................................................................. 3
1 OVERVIEW .............................................................................................................................................................. 4
2.1 DIMENSION............................................................................................................................................................. 4
2.2 CONNECTION DIAGRAM AND INTERFACES ........................................................................................................... 5
2.3 LIGHT INDICATORS ............................................................................................................................................... 6
3 DEBUGGING AT SITE-FAQ.................................................................................................................................. 8
Introduction
Range of validity
The present installation manual applies to the product specified on the title
page.
Purpose
The installation manual contains all the information required for application of
the meters for installation and maintenance.
Target group
The contents of this installation manual are intended for qualified personnel of
energy supply companies responsible for installation and maintenance of the
meter.
1 Overview
2.1 Dimension
Two RS485 terminals can be connected to the concentrator. 1A1B is for RS485-1, 2A2B is for
RS485-2.
Interface: 6-core PS/2 socket is installed in the concentrator as communication port for RS232. The
electrical level complies with requirement of RS232. The pins are defined as below:
pin signal
1, 2 earth
3, 5 Txd
4, 6 Rxd
Communication baud rate: 2400bps. Even parity check, one stop bit.
Power indicator, red. When the concentrator is powered on, the light is on
Power
all the time.
Running indicator, red. When the concentrator is powered on, the light
Run
will blink. It means the concentrator is working normally.
Data Concentrator Installation Manual 7 / 12
Event alarm indicator, red. When it is on all the time, it means the
Alarm
concentrator has events to be reported to the master station.
RS485 data receiving and transmitting indicator, red and green. When the
red light is always on, it means the concentrator receives data from 485-1.
485-1
When the green light is always on, it means the concentrator sends data to
485-1.
RS485 data receiving and transmitting indicator, red and green. When the
red light is always on, it means the concentrator receives data from 485-2.
485-2
When the green light is always on, it means the concentrator sends data to
485-2.
PLC data receiving and transmitting indicator, red and green. When the
red light is always on, it means the concentrator receives data from PLC.
PLC
When the green light is always on, it means the concentrator sends data to
PLC.
GPRS data receiving and transmitting indicator, red and green. When the
online.
Data Concentrator Installation Manual 8 / 12
After Concentrator is connected with voltage Ua,Ub,Uc,Un, the corresponding indicator light
Ua,Ub,Uc will be lightened, and Power light will also be lightened. If anyone voltage light is not
lightened, it means the voltage of this phase is not connected correctly. Check it at once.
After Concentrator was connected to system master station, the running indicator light will blink
normally. If it does not blink, it means concentrator was not connected to system master station
successfully. Then need to check if communication parameters are correct and if SIM card or
antennas are installed correctly. If everything goes on well, it means the concentrator has been
successfully installed.
3 Debugging At Site-FAQ
This refers to master station cannot receive the data from concentrator, or master station cannot
communicate with concentrator. The reasons can be: installation problem, ISP fault, parameter
Installation Fault SIM Card poor contact Concentrator cannot log on. Its Power off at site, reinstall
with concentrator.
with concentrator.
Not powered on Concentrator running light is not on. Make sure the power supply
is powered on.
Data Concentrator Installation Manual 9 / 12
ISP Fault No network coverage Concentrator cannot log on. Its Contact ISP
with concentrator.
Poor signal in the local Concentrator indicates that signal Replace external antenna,
intermitted.
SIM Card damaged or Concentrator cannot log on. Its Change SIM Card
with concentrator.
SIM card doesn’t open Network indication and signal Inform ISP to open the
relevant service or has strength are normal. But master relevant service and charge
Incorrect(APN, Master
Station IP etc)
Data Concentrator Installation Manual 10 / 12
concentrator’s logical
This refers to that concentrator cannot read meter data successfully. The reasons can be installation
Meter address setting error Concentrator can’t read meter’s Meter protocol type or
data. The sent load data are all address setting is wrong.
Baud rate setting error Concentrator can’t read meter’s After confirming meter
data. The sent load data are all baud rate, set correct baud
During the transportation and packing process, the products shall not be dramatically shocked. And
shall be transported and stored according to the regulations. Inventory and storage should be made in
a shelf with original package. The piling height should be not more than eight layers. The storage
place shall be clean, in which the ambient temperature shall be - 20℃ ~ 80 ℃ and relative humidity
not more than 85%. And there are no harmful substances in the air that might cause corrosion.
NOTE: Information in this document is subject to change without notice. The information is
accurate at the time of printing (March, 2013) © Hexing Electrical
Data Concentrator Installation Manual 12 / 12
Hexing Electrical