STRUCTURAL ANALYSIS

PROJECT-NO.: 15257 REVISION 01


STAGEROOF
PROJECT:
MPT-ROOF 12x10, 10x8m
CUSTOMER/ PROLYTE GROUP
AUFTRAGGEBER:
Industriepark 9
9531 PA Leek
The Netherlands

PREPARED/AUFGESTELLT: DATE/DATUM:
21.12.2015
PAGES/SEITEN:
1 – 287
DIPL.-ING. OLIVER SPORYS

THE STRUCTURAL ANALYSIS IS ONLY PREPARED FOR THE AFOREMENTIONED CUSTOMER. IF THIS CALCULATION SHOULD BE
PASSED TO A THIRD PARTY A PERMISSION OF THE ORIGINATOR IS NEEDED. ANY PUPLICATION OF THIS REPORT IS NOT ALLOWED.
DIE STATISCHE BERECHNUNG IST AUSSCHLIESSLICH AUFGESTELLT FÜR DEN OBEN GENANNTEN AUFTRAGGEBER. EINE
WEITERGABE AN DRITTE IST NUR MIT VORHERIGER GENEHMIGUNG DES AUFSTELLERS MÖGLICH. EINE VERÖFFENTLICHUNG
JEGLICHER ART IST NICHT GESTATTET.

KRASENBRINK+BASTIANS - INGENIEURE GMBH & Co. KG SPARKASSE AACHEN


LOTHRINGERSTR. 37 IBAN: DE90 3905 0000 0000 0234 08
52062 AACHEN BIC: AACSDE33
GERMANY
FON: +49 (0)241 98096-250 FAX:+49 (0)241 98096-251
INFO@KRASENBRINK-BASTIANS.DE WWW.KRASENBRINK-BASTIANS.DE
HANDELSREGISTER AACHEN ■ HRA 8099 ■ AMTSGERICHT AACHEN ■ UST-ID-NR.: DE 283641951
GESCHÄFTSFÜHRER: KRASENBRINK + BASTIANS VERWALTUNGSGESELLSCHAFT MBH
PERSÖNLICH HAFTENDE GESELLSCHAFTER: KRASENBRINK+BASTIANS VERWALTUNGSGESELLSCHAFT MBH ■ LOTHRINGERSTR. 37 ■
52062 AACHEN ■ HANDELSREGISTER AACHEN ■ HRB 17597 ■ AMTSGERICHT AACHEN
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 2/287

CONTENTS

1 Preamble 3

1.1 Standards 3

1.2 Supporting documents 4

1.3 Construction elements 5

1.4 General preliminary remarks 6

1.5 Termms of use 7

1.6 Loading assumption 9

1.7 Drawings 13

1.8 Permissible payloads 27

1.9 Necessary ballast loads 31

2 System 12x10 38

2.1 Structural system – 4 columns 38

2.2 Loading 42

2.3 Calculation 74

2.4 Proofs 116

2.5 Support loads, ballast 217

3 Layher podium 230


4 Increase of payloads using additional towers 240
5 Side-Wings 254
6 Roof canopies with keders on each rafter 261
7 Supporting documents 282

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 3/287

1 PREAMBLE

1.1 STANDARDS

EN 1990 / Eurocode 0
Basis of structural design

EN 1991 / Eurocode 1
Actions on structures

EN 1992 / Eurocode 2
Design of concrete structures

EN 1993 / Eurocode 3
Design of steel structures

EN 1993 / Eurocode 5
Design of timber structures

EN 1997 / Eurocode 7
Geotechnical design

EN 1999 / Eurocode 9
Design of aluminium structures

EN 13782
Temporary structures – Tents - Safety

EN 13814
Fairground and amusement park machinery and structures - safety

EN 12385-4
steel wires

ISO 17842-1
safety of amusement rides and amusement devices – Part 1: design and
manufacture

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 4/287

1.2 SUPPORTINGS DOCUMENTS

Technical data of the used truss system


PROLYTE H30D
H30V
H40V

Technical data of the used scaffolding system


LAYHER-ALLROUND K2000+

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 5/287

1.3 CONSTRUCTION ELEMENTS

roof girder: Prolyte H30D, H40V


alloy: EN AW-6082 T6 (AlMgSi1 F31)

columns: Prolyte H30V


alloy: EN AW-6082 T6 (AlMgSi1 F31)

compression strut roof: telescope pipe Ø60x5mm + insert profile


alloy: EN AW-6082 T6 (AlMgSi1 F31)

guy wires: roof: Ø 8 mm


steel 1770 N/mm²

side wall, rear wall: Ø 10 mm


steel 1770 N/mm²

The specifications of the steel wires are examples


only. Equal constructions are possible.

In case of setting up the stage with additional towers


in the side wall and the guy wires only in the rear side
wall area: Ø 12 mm
Stahl 1770 N/mm²

podium: Layher-Allround K2000+


steel S235JR, S320JR, S355JR

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 6/287

1.4 GENERAL PRELIMINARY REMARKS

This report covers a stage roof structure for Prolyte Group.

The roof can be assembled in the sizes 12x10m and 10x8m.


The maximum height is approx. 10,30m.

The stage roof is considered to be a temporarily demountable structure and not


a permanent building.

The whole structural framework consists of aluminium trusses made by the


company Prolyte and are made from aluminium AlMgSi1 F31/ EN AW 6082 T6.

The roof area is enclosed with canopy, rear and side walls can be closed with
canopy as well.

The wall canopies are fixed at the horizontal roof truss as well as on the towers.

The structure is stiffened by means of guy wires in the roof, rear and side walls.
Guy wires need to be adequately tensioned before use.

The roof is build up upon a layher-podium with system heigths of either 1,0m or
1,50m. (perm. payload 500 kg/m²) The overall height of the roof will not be
changed in these cases.

Alternatively the roof is set up with an circulating base frame connection made
from Prolyte H30V trusses.

The security against sliding and overturning is ensured by maens of balast loads
(see chapter 1.9)

To increase the permissible payloads of the roof 12x10m optionally additional


towers may be used in the side walls and/ or in the rear wall. (see chapter 4)

Optionally the roof may be set up with side-wings with a maximum width of
3,0m. (see chapter 5)

Alternativley the roof canopy can be fixed on each rafter using keder profiles.
(see chapter 6)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 7/287

1.5 TERMS OF USE

WIND MANAGEMENT

The construction is calculated to withstand peak gust wind speed up to 20 m/s


(wind force 8).
Above peak gust wind speed of 20 m/s measured in a heigth of 10m the wall
canopies must be removed. If the peak gust wind speed is measured in a
height less than 10m the wall canopies must be removed at peak gust wind
speed of 18 m/s.
The wind speed has to be measured at the top of the structure in an
unobstructed surrounding area.

LOAD CASE " OUT OF SERVICE"

The construction with removed wall canopies and enclosed roof is calculated
according to DIN EN 13814. It is calculated with a wind pressure of 0,625
kN/m².

SNOWLOAD
Snow loads are not taken into account.
The set up of the structure shall only be made in appropriate weather conditions
or the roof shall be kept free of snow ( e.g. heating).

PAYLOADS
The construction may be used with the payloads shown in chapter 1.8.

BALLAST
To secure the construction against overturning, sliding and lifting there has to
be ballast positioned on the construction.
The necessary ballast is shown in chapter 1.9.
The ballast has to be locked to the construction in such a way that it can not
slide or fall off.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 8/287

TIMBER SPREADER

drivable surface: timber spreader 300x300x20mm

In the case of softened soil there have to be chosen appropriate timber


spreaders. (Proof in individual case)
Possible execution according to the required friction coefficient:

friction coefficient μ
1: Spindle on timber spreader μ = 0,40
2: Spindle on timber spreader, embeded μ = 0,60
3: Spindle on timber spreader, screwed μ = 0,60
4: Spindle on rubber mat μ = 0,60

The timber spreader is laying on asphalt, concrete, paving, sand, gravel

Attention: if there is one timber spreader mounted on one another, they have
to be screwed when a friction coefficient of 0,6 is required.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 9/287

1.6 LOADING ASSUMPTIONS

1.6.1 WINDLOADS

load assumption according to DIN EN 13814 and DIN EN 1991-4

wind speed according to DIN EN 13814:

average wind vref = vb = 15 m/s

for the terrain III follows wind speed of:

h < 8m vp = 1,27 x 15 x (8/10)0,155 = 18,40 m/s


8 < h < 20m vp = 1,27 x 15 x (20/10)0,155 = 21,21 m/s
20 < h < 35m vp = 1,27 x 15 x (35/10)0,155 = 23,13 m/s
35 < H < 50m vp = 1,27 x 15 x (50/10)0,155 = 24,44 m/s

in due to this there could be calculated the following velocity pressures:

h < 8m qp = 18,40²/1600 = 0,21 kN/m²


8 < h < 20m qp = 21,21²/1600 = 0,28 kN/m²
20 < h < 35m qp = 23,13²/1600 = 0,33 kN/m²
35 < h < 50m qp = 24,44²/1600 = 0,38 kN/m²

the following wind pressures are be required:

Table out of DIN EN 13814

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 10/287

Load case „in service“:

h = 0 ≤ 8m: q = 0,20 kN/m²


h = 8 ≤ 20m: q = 0,30 kN/m²

Load case „out of service“:

Column 3 of table 1 - DIN EN 13814:

The factor ctem = 0,80 according to DIN EN 13814 is recalculated, therefore there
aren't planned any additional reinforcements .

h = 0 ≤ 8 m: qp = 0,35/ 0,8 = 0,44 kN/m²


h = 8 ≤ 20 m:qp = 0,50/ 0,8 = 0,625 kN/m²

Valid for areas with vb,0 = 28m/s / category III

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 11/287

BEAUFORT SCALE
BEAUFORT WIND SPEED WIND DESCRIPTION EFFECTS FROM WIND
NUMBER [m/s] PRESSURE
[BEAUFORT] Q [kN/m²]

0 0-0.2 0 Calm Calm. Smoke rises vertically.

Direction of wind shown by smoke drift


1 0.3-1.5  0.001 Very light
but not by wind vanes.
Wind felt on face. Leaves
2 1.6-3.3  0.007 Light breeze rustle.Ordinary wind vane moved by
wind.
Leaves and smaller twigs in constant
3 3.4-5.4  0.02 Gentile breeze
motion, wind extends light flag.

Dust and loose paper raised. Small


4 5.5-7.9  0.04 Moderate breeze
branches begin to move.

5 8.0-10.7  0.07 Fresh breeze Small trees in leaves start to sway.

Large branches in motion. Whistling


6 10.8-13.8  0.12 Strong breeze heard in overhead wires. Umbrella use
becomes difficult.
Whole trees in motion. Inconvenient to
7 13.9-17.1  0.18 Near gale
walk against winst.

Twigs break from trees. Difficult to


8 17.2-20.7  0.27 Gale
walk.

Slight structural damage. Chimney pots


9 20.8-24.4  0.37 Strong gale
and slates removed.

Trees uprooted. Considerable


10 24.5-28.4  0.50 Storm
structural damage.

Widespread structural damage.


11 28.5-32.6  0.67 Violent storm
(seldomly in inland)

Massive and widespread structural


12 32.7-36.9  0.85 Hurricane
damage.
V [m/s] = v[km/h] / 3.6 q[kN/m²] = V² / 1600

Note:
Beaufort scale is based on average wind speed. Measures at the structure shall be
executed according gust wind speed.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 12/287

1.6.2 MEMBRANE TENSION

By applying a dynamic loading q = 0.50 KN/m 2 with its aerodynamic coefficient


cf = 0.40 and regarding a span of l = 5.00 m a resulting membrane tension of
Z = 0.80 kN/m is derived.

Z=(Zy 2+Zz 2 )1/2 = 0.80 kN/m

with Zz =0.5*0.4*5.0/2=0.50 kN/m

Zy=(Z2-Zz 2 )1/2 =(0.802-0.50 2 )1/2 =0.624

Zy/Zz=0.624/0.50=1.25 = 1 / 0.8

1.6.3 SNOW LOADING

Snow loads are not taken into account.


Building up of th structure shall only be made in appropriate weather conditions
or the roof shall be kept free from snow.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 13/287

1.7 DRAWINGS
12x10m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 14/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 15/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 16/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 17/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 18/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 19/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 20/287

10x8m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 21/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 22/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 23/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 24/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 25/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 26/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 27/287

1.8 PERMISSIBLE PAYLOADS

On following pages allowable pay loads of the structure and different possible
configurations for equipment such as illumination(spots) and sounding are
displayed. If the preparing loading configuration differ from these set ups, please
inform Prolyte or the Engineering office Krasenbrink+Bastians.

Loads up to 100 kg can be fastened at any position of the chord. Loads more
than 100 kg have to be positioned at the node or adequate proofs have to be
carried out. Loads shall be equally distributed over the trusses main chords.

All given values are static loads. To consider dynamic affecting the loads have
to be decreased with a factor of minimum 1,2.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 28/287

KIND OF LOADING:

distributed load (UDL)

[kN/m]

0,10 kN/m = 10 kg/m

UDL front truss rear truss ridge truss side truss

roof 12x10 100 kg/m 50 kg/m 100 kg/m 50 kg/m

roof 10x8 140 kg/m 70 kg/m 140 kg/m 70 kg/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 29/287

OVERVIEW:

center point load:


CPL front truss rear truss ridge truss side truss

roof 12x10 620 kg 310 kg 520 kg 260 kg

roof 10x8 740 kg 370 kg 650 kg 320 kg

third point load:


TPL front truss rear truss ridge truss side truss

roof 12x10 460 kg 230 kg 390 kg 190 kg

roof 10x8 550 kg 270 kg 490 kg 240 kg

quarter point load:


QPL front truss rear truss ridge truss side truss

roof 12x10 300 kg 150 kg 260 kg 130 kg

roof 10x8 360 kg 180 kg 320 kg 160 kg

fifth point load:


FPL front truss rear truss ridge truss side truss

roof 12x10 250 kg 125 kg 210 kg 100 kg

roof 10x8 300 kg 150 kg 260 kg 130 kg

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 30/287

SINGLE LOADS NEXT TO TOWERS

Single loads of 1200 kg with a distance to the towers of 1,20m may be placed on the
front and on the rear truss.

SIDE-WING LOAD + PA-SURFACE

PA-load: 1000 kg (in center of side wing, dynamic load increase is already
taken into account) (see chpt. 5)

The side wing may be closed completely with canopies.


alternatively: PA-surface = 4,0 m²

LOAD INCREASE WITH ADDITIONAL TOWERS FOR ROOF SIZE 12x10m

The uniformly distributed payload on the side trusses can be increased from 50 kg/m
to 150 kg/m with an additional tower. (see chpt. 4)

The uniformly distributed payload on the rear truss can be increased from 50 kg/m to
150 kg/m with two additional towers. (see chpt. 4)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 31/287

1.9 NECESSARY BALLAST LOADS

Preamble

The roof is build up upon a layher-podium or with a circulating base frame connection
H30V.

The ballast loads must be place force-fitted within the layher structure or on the
ballast frames.

Possible execution according to the required friction coefficient:

friction coefficient μ
1: Spindle on timber spreader μ = 0,40
2: Spindle on timber spreader, embeded μ = 0,60
3: Spindle on timber spreader, screwed μ = 0,60
4: Spindle on rubber mat μ = 0,60

The timber spreader is laying on asphalt, concrete, paving, sand, gravel

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 32/287

ballast load labels

setup without additional towers

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 33/287

OVERVIEW BALLAST LOADS

SETUP WITHOUT ADDITIONAL TOWERS

roof 12x10m

supports A B

base point 3800 3800


connection (3050) (3050)
ballast

Layher- 2400 2000


podium (2400) (2000)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

roof 10x8m

supports A B

base point 3300 3300


connection (2600) (2600)
ballast

Layher- 2100 1700


podium (2100) (1700)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 34/287

SETUP WITH ADDITIONAL TOWERS IN THE SIDE WALLS

roof 12x10m

support A B E

base point 2000 2800 2800


connection (2000) (2000) (2100)
ballast
Layher- 1400 2200 1900
podium (1400) (2200) (1900)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 35/287

SETUP WITH ADDITIONAL TOWERS IN THE SIDE WALLS AND REAR WALL

roof 12x10m

support A B E F

base point 2000 3000 2600 1600


connection (2000) (2200) (1900) (1600)
ballast

Layher- 1400 2200 1900 1800


podium (1400) (2200) (1900) (1800)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 36/287

SETUP WITH SIDE-WINGS

Necessary additional ballast with guy wire in complete side wall:

support A B D

1000 1000 700


ballast
(700) (700) (450)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 37/287

Necessary additional ballast with guy wire only in rear side wall area:

support B E D

1100 1100 700


ballast
(850) (850) (450)

(all values in kg, values in brackets for friction coefficient μ = 0,60

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 38/287

2 SYTEM 12x10

2.1 STRUCTURAL SYSTEM - 4 Tower

Isometric:

black: Prolyte H40V


green: Prolyte H30D
blue: Prolyte H30V
red: guy wires
pink: telescope pipe Ø60x5 (+ insert profile)
light blue: vertical connection

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 39/287

top view:

12,42
6,21 6,21
3,47
10,42
3,48
3,47

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 40/287

front view:
1,60
9,00
7,40

6,21 6,21
12,42

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 41/287

side view:
1,60
9,00
7,40

3,47 3,48 3,47


10,42

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 42/287

2.2 LOADING

load case 1: dead weight truss

H30D: g1 = 0,05 kN/m


H30V: g2 = 0,06 kN/m
H40V: g3 = 0,07 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 43/287

load case 2: distributed payload (UDL)

UDL front truss rear truss ridge truss side truss

roof 12x10 100 kg/m 50 kg/m 100 kg/m 50 kg/m

roof 10x8 140 kg/m 70 kg/m 140 kg/m 70 kg/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 44/287

In the following different kinds of payloads are calculated for each span length.

distributed load (UDL): M = q x l² / 8

center point load (CPL): M=Pxl/4

third point load (TPL): M=Pxl/3

quarter point load (QPL): M=Pxl/2

fifth point load (FPL): M = P x l x 3/ 5

12x10m:
span: 12,42m, distributed load = 0,50 kN/m

M = 0,50 x 12,42²/ 8 = 9,64 kNm

CPL: P = 9,64 x 4/ 12,42 = 3,10 kN (310 kg)


TPL: P = 9,64 x 3/ 12,42 = 2,32 kN (230 kg)
QPL: P = 9,64 x 2/ 12,42 = 1,55 kN (150 kg)
FPL: P = 9,64 x (5/3)/ 12,42 = 1,29 kN (125 kg)

span: 12,42m, distributed load = 1,00 kN/m

M = 1,0 x 12,42²/ 8 = 19,28 kNm

CPL: P = 19,28 x 4/ 12,42 = 6,20 kN (620 kg)


TPL: P = 19,28 x 3/ 12,42 = 4,64 kN (460 kg)
QPL: P = 19,28 x 2/ 12,42 = 3,10 kN (300 kg)
FPL: P = 19,28 x (5/3)/ 12,42 = 2,58 kN (250 kg)

span: 10,42, distributed load = 0,50 kN/m

M = 0,50 x 10,42²/ 8 = 6,78 kNm

CPL: P = 6,78 x 4/ 10,42 = 2,60 kN (260 kg)


TPL: P = 6,78 x 3/ 10,42 = 1,95 kN (190 kg)
QPL: P = 6,78 x 2/ 10,42 = 1,30 kN (130 kg)
FPL: P = 6,78 x (5/3)/ 10,42 = 1,08 kN (100 kg)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 45/287

span: 10,42m, distributed load = 1,00 kN/m

M = 1,0 x 10,42²/ 8 = 13,57 kNm

CPL: P = 13,57 x 4/ 10,42 = 5,20 kN (520 kg)


TPL: P = 13,57 x 3/ 10,42 = 3,90 kN (390 kg)
QPL: P = 13,57 x 2/ 10,42 = 2,60 kN (260 kg)
FPL: P = 13,57 x (5/3)/ 10,42 = 2,17 kN (210 kg)

10x8m:

For the smaller roof size of 10x8m the payloads are calculated over the ratio of the
span lengths. The factors are directly regarded within the tables.

front truss + rear truss:

distributed loads: 12,42²/ 10,42² = 1,42


single loads: 12,42/ 10,42 = 1,19

side truss+ ridge truss:

distributed loads: 10,42²/ 8,42² = 1,53


single loads: 10,42/ 8,42 = 1,24

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 46/287

CPL front truss rear truss ridge truss side truss

roof 12x10 620 kg 310 kg 520 kg 260 kg

roof 10x8 740 kg 370 kg 650 kg 320 kg

TPL front truss rear truss ridge truss side truss

roof 12x10 460 kg 230 kg 390 kg 190 kg

roof 10x8 550 kg 270 kg 490 kg 240 kg

QPL front truss rear truss ridge truss side truss

roof 12x10 300 kg 150 kg 260 kg 130 kg

roof 10x8 360 kg 180 kg 320 kg 160 kg

FPL front truss rear truss ridge truss side truss

roof 12x10 250 kg 125 kg 210 kg 100 kg

roof 10x8 300 kg 150 kg 260 kg 130 kg

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 47/287

load case 10: wind roof

q = 0,30 kN/m cpe = 1,00

qw1 = 0,30 x 1,0 x 5,40 = 1,62 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 48/287

load case 11: membrane tension roof

qp1 = 1,62/ 0,8 = 2,03 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 49/287

load case 12: wind gable front

q = 0,30 kN/m cpe= 1,00

qw1 = 0,30 x 0,50/2 = 0,075 kN/m


qw2 = 0,30 x 2,0/2 = 0,30 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 50/287

load case 13: membrane tension gable front

qp1 = 0,30 x 1,70/2/ 0,8 = 0,31 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 51/287

load case 14: wind gable rear

q = 0,30 kN/m cpe = 1,00

qw1 = 0,30 x 0,50/2 = 0,075 kN/m


qw2 = 0,30 x 2,0/2 = 0,30 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 52/287

load case 15: membrane tension gable rear

qp1 = 0,30 x 1,70/2/ 0,8 = 0,31 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 53/287

load case 16: wind rear wall

q = 0.20 kN/m² (h ≤ 8,00m) cpe = 1.00

The canopy is fixed to the roof and the columns.

The exact distribution of the load will be calculated with a FEM-analysis of the
canopy.

grid: 50x50 cm
wire cross section: 500 x 5 mm (5 mm Plane)
E-Modul: 5 MN/m²

system:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 54/287

0,20 x 0,5/2 = 0,05 kN/m


0,20 x 0,5 = 0,10 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 55/287

supports:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 56/287

columns:

qw1 = 0,92 kN/m (as uniform load)

roof girder:

qw2 = 0,40 kN/m (as triangular load)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 57/287

The canopy is fixed to the roof and the columns.

0,40 x 2 = 0,80 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 58/287

load case 17: membrane tension rear wall

qp1 = 0,80/ 0,8 = 1,00 kN/m


qp2 = 0,92/ 0,8 = 1,15 kN/m

reaction force due to membrane tension roof (inner forces)

Qp1 = 3,125 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 59/287

load case 18: wind side wall left

q = 0.20 kN/m² (h ≤ 8,00m) cpe = 1.00

The canopy is fixed to the roof and the columns.

The exact distribution of the load will be calculated with a FEM-analysis of the
canopy.

grid: 50x50 cm
wire cross section: 500 x 5 mm (5 mm Plane)
E-Modul: 5 MN/m²

system:

7,50

10,50

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 60/287

0,20 x 0,5/2 = 0,05 kN/m


0,20 x 0,5 = 0,100 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 61/287

supports:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 62/287

columns:

qw1 = 0,81 kN/m (as uniform load)

roof girder:

qw2 = 0,34 kN/m (as triangular load)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 63/287

The canopy is fixed to the roof and the columns.

0,34 x 2 = 0,68 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 64/287

load case 19: membrane tension side left

qp1 = 0,81/ 0,8 = 1,01 kN/m


qp2 = 0,68/ 0,8 = 0,85 kN/m

reaction force due to membrane tension roof (inner forces)

Qp1 = 2,21 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 65/287

load case 20: wind side right

see LC 18

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 66/287

load case 21: membrane tension side right

see LC 19

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 67/287

load case 24: wind on construction y-dir

columns - 50% permeable:

q = 0,50 kN/m cpe = 1,30 b ~ 0,30 m

qw1 = 1,30 x 0,50 x 0,30 x 0,50 = 0,0975 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 68/287

load case 25: wind on construction x-dir

columns - 50% permeable:

q = 0,50 kN/m cpe = 1,30 b ~ 0,30 m

qw1 = 1,30 x 0,50 x 0,30 x 0,50 = 0,0975 kN/m

roof:

qw2 = 1,30 x 0,50 x 0,40 = 0,26 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 69/287

To regard various wind directions, each single wind loading scenario will be multiplied
with a factor based on the weighting c f – value according to the direction of wind:

1. roof, back wall and sides enclosed with fully closed canvas wall
LC 101-103

2. roof enclosed with fully closed canvas wall, back wall and sides removed
LC 301-303

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 70/287

1. roof, back wall and sides enclosed: fully closed canvas wall for roof and walls

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 71/287

Loading scenario 101 Wind ß = 0°


Load-11 1,4/ 1,0 = 1,40
Load 14-17 1,3/ 1,0 = 1,30
Load 18-21 1,5/ 1,0 = 1,50

Loading scenario 102 Wind ß = 90°


Load 10-11 0,1/ 1,0 = 0,10
Load 14-15 0,2/ 1,0 = 0,20
Load 18 -1,3/ 1,0 = -1,30
Load 19 1,3/ 1,0 = 1,30
Load 20-21 =0

Loading scenario 103 Wind ß = 180°


Load 10 -0,1/ 1,0 = -0,10
Load 11 0,1/ 1,0 = 0,10
Load 14 -1,3/ 1,0 = -1,30
Load 15 1,3/ 1,0 = 1,30
Load 16 -1,3/ 1,0 = -1,30
Load 17 1,3/ 1,0 = 1,30
Load 18-21 0,2/ 1,0 = 0,20

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 72/287

2. roof closed, wall canopy removed

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 73/287

Loading scenario 301 Wind ß = 0° roof only

load 10-11 0,625 x 0,60/ (1,0x0,30) = 1,25


load 12 0,625 x -1,30/ (1,0x0,30) = -2,71
load 13 0,625 x 1,30/ (1,0x0,30) = 2,71
load 24 1,0/ 1,0 = 1,00

Loading scenario 302 Wind ß = 90° roof only

load 10-11 0,625 x 0,60/ (1,0x0,30) = 1,25


load 12-15 =0
load 25 1,0/ 1,0 = 1,00

Loading scenario 303 Wind ß = 180° roof only

load 10-11 0,625 x 0,60/ (1,0x0,30) = 1,25


load 14 0,625 x -1,30/ (1,0x0,30) = -2,71
load 15 0,625 x 1,30/ (1,0x0,30) = 2,71
load 24 -1,0/ 1,0 = -1,00

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 74/287

2.3 CALCULATION

load case combination

LCC 81 load case 1+ (2) + (101-103)

LCC 83 load case 1+ (2) + (301-303)

NOTICE:

Load case combinations 91-93 with incorporate partial safety factors gG = 1,1 for
steady loads and gQ = 1,35 for variable loads.
The values for the partial safety factors are given in the DIN EN 13814 for fairground
and amusement park machinery and structures.

LCC 91 load case 1,10 x 1 + 1,35 x (2) + 1,35 x (101-103)

LCC 93 load case 1,10 x 1 + 1,35 x (2) + 1,35 x (301-303)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 75/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 76/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 77/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 78/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 79/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 80/287

internal forces

decisive LCC 91 + 93

For reasons of clarity the internal forces are shown section-wise.

rafters H30D: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 81/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 82/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 83/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 84/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 85/287

rafters H30D: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 86/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 87/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 88/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 89/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 90/287

roof girder H40V: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 91/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 92/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 93/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 94/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 95/287

roof girder H40V: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 96/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 97/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 98/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 99/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 100/287

telescope pipe 60x5 (+ insert profile): LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 101/287

telescope pipe 60x5 (+ insert profile): LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 102/287

vertical connections roof: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 103/287

vertical connections roof: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 104/287

columns H30V: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 105/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 106/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 107/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 108/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 109/287

columns H30V: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 110/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 111/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 112/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 113/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 114/287

guy wires: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 115/287

guy wires: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 116/287

2.4 PROOFS

beam numbers:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 117/287

rafter H30D:

double chord:
NEd = 0,27/ (2x0,207) + 1,72/ 0,239 + 8,80/ 2 = 12,25 kN < 50,22 kN
(connection of the inner rafters only with two chords)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 118/287

double chord:
NEd = 2,92/ (2x0,207) + 4,02/ 0,239 + 35,03/ 3 = 35,55 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 119/287

double chord:
NEd = 1,86/ (2x0,207) + 4,86/ 0,239 + 34,15/ 3 = 36,21 kN < 50,22 kN
NEd = 2,31/ (2x0,207) + 0,94/ 0,239 + 42,63/ 3 = 20,17 kN < 50,22 kN

proof against buckling:

Lcr = 5,00 m iy,z = 9,11 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 500/(9,11x3,14) x √(250/70000) = 1,044

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(1,044 – 0,10) + 1,044²) = 1,139

χ = 1/ (θ + √( θ² – λ²))
= 1/(1,139 + √(1,139² – 1,044²)) = 0,627
with:
ω0 = 1,00 (already regarded in truss calculation)
ψc = 0,80

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 120/287

NRd = 3 x 50,22 = 150,66 kN


My,Rd = 10,39 kNm
Mz,Rd = 12,00 kNm

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= (42,63/ (0,627 x 150,66))0,8 + [(2,31/ 10,39)1,7+(0,94/ 12,00)1,7]0,6


= 0,529 + 0,237 = 0,766 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 121/287

roof girder, H40V:

chord:
NEd = 16,41/ (2x0,339) + 2,03/ 4 = 24,71 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 122/287

roof rider, H40V:

chord:
NEd = (1,66+21,37)/ (2x0,339) + 36,96/ 4 = 43,21 kN < 50,22 kN

M+Q-Interaction:

QEd,res = (3,45²+4,28²)1/2 = 5,50 kN


ΔMQ,res = 5,50/ 4 x 0,05 = 0,069 kN

equation 6.43: DIN EN 1999-1-1

ψ = 1,30
My,,z,Rd = 1,25 x W el x 0,80 x 0,64 x 290/ 1,25
= 1,25 x 4,493 x 0,80 x 0,64 x 290/ 1,25 x 10-3= 0,667 kNm

h = (43,21/ 50,22)1,3 + [(0,069/ 0,667)1,7]0,6 = 0,822 + 0,099 = 0,921 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 123/287

proof against buckling:

Lcr = 0,6 x 12,00 m = 7,20m iy,z = 15,70 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 720/(15,70x3,14) x √(250/70000) = 0,872

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(0,872 – 0,10) + 0,872²) = 0,957

χ = 1/ (θ + √( θ² – λ²))
= 1/(0,957 + √(0,957² – 0,872²)) = 0,74
with:
ω0 = 1,00 (already regarded in truss calculation)
ψc = 0,80

NRd = 4 x 50,22 = 200,86 kN


My,Rd = 34,05 kNm
Mz,Rd = 34,05 kNm

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= (33,79/ (0,74 x 200,86))0,8 + [(2,16/ 34,05)1,7+(20,68/ 34,05)1,7]0,6


= 0,306 + 0,609 = 0,915 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 124/287

side girder, H40V:

chord:
NEd = (24,44+4,96)/ (2x0,339) + 9,78/ 4 = 45,81 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 125/287

column, H30V:

chord:
NEd = (9,37+11,0)/ (2x0,239) + 12,73/4 = 45,80 kN < 50,22 kN

M+Q-Interaction:

QEd,res = (0,50²+0,81²)1/2 = 0,95 kN


ΔMQ,res = 0,95/ 4 x 0,05 = 0,012 kN

equation 6.43: DIN EN 1999-1-1

ψ = 1,30
My,,z,Rd = 1,25 x W el x 0,80 x 0,64 x 290/ 1,25
= 1,25 x 4,493 x 0,80 x 0,64 x 290/ 1,25 x 10-3= 0,667 kNm

h = (45,80/ 50,22)1,3 + [(0,012/ 0,667)1,7]0,6 = 0,887 + 0,017 = 0,904 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 126/287

chord:
NEd = (10,25+10,11)/ (2x0,239) + 20,75/4 = 47,78 kN < 50,22 kN

proof against buckling:

Lcr = 7,00 m iy,z = 11,12 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 700/(11,12x3,14) x √(250/70000) = 1,197

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(1,197 – 0,10) + 1,197²) = 1,326

χ = 1/ (θ + √( θ² – λ²))
= 1/(1,326 + √(1,326² – 1,197²)) = 0,527

with:
ω0 = 1,00 (already regarded in truss calculation)
ψc = 0,80

NRd = 4 x 50,22 kN = 200,86 kN


My,Rd = 24,00 kNm
Mz,Rd = 24,00 kNm

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 127/287

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= (20,75/ (0,527 x 200,86))0,8 + [(10,25/ 24,0)1,7+(10,11/ 24,0)1,7]0,6


= 0,272 + 0,632 = 0,904 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 128/287

guy wires:

max. NEd = 17,20 kN

usage number: γ = 3,0

sides:
NEd = 17,20/1,35 x 3,0 = 38,22 kN < 58,80 kN = NRd

steel Ø 10 mm
1770 N/mm² DIN EN 12385-4
roof:
NEd = 9,95/1,35 x 3,0 = 22,11 kN < 37,60 kN = NRd

steel Ø 8 mm
1770 N/mm² DIN EN 12385-4

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 129/287

compression strut – telescope pipe Ø60x5 (+ insert profile)

NEd = -8,53 kN

buckling length: ~ 3,20 m

The connection of the compression struts is placed near the nodes of the rafters
H30D.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 130/287

The length of the used strut in this case is 3,20m.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 131/287

A calculation for theory 2nd order is done to estimate the buckling of the
compression strut.

system:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 132/287

Loading:

load case 1: dead weight

Is regarded within the software over the cross section.

load case 2: pressure, unit load

A unit load of 1,0 kN is calculated for an easier factorizing in later load cases.
A predeformation of l/300 in x- and y-direction is taken into account.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 133/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 134/287

calculation:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 135/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 136/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 137/287

internal forces:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 138/287

stresses:

< σRd = 250 N/mm² (EN AW 6082 T6)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 139/287

The compression strut is able to take up a pressure force of N Ed = 9,7/ 1,1 = 8,80
kN

η = 8,53/ 8,80 = 0,97 < 1,0

The connection of the compression struts is placed near the nodes of the rafters
H30D.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 140/287

Box corner H40V:

max. MEd = 10,91 kNm – 6,89 x (0,387/2) = 9,58 kNm (moment in cut end)

The proof is done for a maximal bending moment in the corner of M Ed = 9,83 kNm.

each chord:
NEd,chord = 9,83/ (2x0,339) = 14,50 kN

system:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 141/287

front view:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 142/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 143/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 144/287

My,Ed

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 145/287

NEd

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 146/287

stress:

σEd, < σRd,HAZ = 185 x 0,8 / 1,25 = 118,40 MN/m² [stress in heat affected zone]

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 147/287

gable rafter on top of H30D to boxcorner:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 148/287

The proof is done for maximum forces on the connection point.


(Actual values are smaller)

load case 1: min NEd + related Vy,zEd – front

NEd = -37,85/ 3 = 12,70 kN


Vy,Ed = 0,49/ 3 = 0,16 kN
Vz,Ed = 1,08/ 3 = 0,36 kN

load case 2: max NEd + relatted Vy,zEd – front

NEd = 33,76/ 3 = 11,25 kN


Vy,Ed = 6,99/ 3 = 2,33 kN
Vz,Ed = 4,13/ 3 = 1,38 kN

load case 3: min NEd + related Vy,zEd – rear

NEd = -42,20/ 3 = 14,10 kN


Vy,Ed = 1,43/ 3 = 0,48 kN
Vz,Ed = 2,04/ 3 = 0,68 kN

load case 4: max NEd + related Vy,zEd – rear

NEd = 16,31/ 3 = 5,44 kN


Vy,Ed = 6,05/ 3 = 2,02 kN
Vz,Ed = 3,30/ 3 = 1,10 kN

The load cases are combined exclusively in a load cade combination 91.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 149/287

black: Ø48,3x3mm (EN AW 6082 T6)


green, blue: Ø16x2mm (EN AW 6082 T6)
orange: 50x50x4mm (EN AW 6082 T6)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 150/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 151/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 152/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 153/287

internal forces:

LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 154/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 155/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 156/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 157/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 158/287

stresses:

< σRd,HAZ = 0,80 x 185/ 1,25 = 118,40 N/mm²

Points with exceedance are on the frame 50x50x4mm and are not completely within
the HAZ. Exceedance is acceptable.

no further proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 159/287

gable rafter bottom H30D: (MPR-005R/L)

The gable rafter is being connected with the use of 6 couplers to the lower gable girder
H40V.
The proof is done for maximum forces. (Actual forces are smaller)

load case 1:
min. NEd = -43,17 kN
45,0/ 3 = 15,0 kN

load case 2:
max. NEd = 35,10 kN
37,5/ 3 = 12,50 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 160/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 161/287

Both load cases are combined exclusively in a LCC 91.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 162/287

black: 48x3mm
red: 25x3mm
green: 30x3mm
blue: 50x50x4mm

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 163/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 164/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 165/287

intenal forces:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 166/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 167/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 168/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 169/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 170/287

stresses:

< σRd,WEZ = 0,80 x 185/ 1,25 = 118,40 N/mm²


< σRd = 250/ 1,1 = 227,27 N/mm²

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 171/287

diagonals: (Ø25x3mm, i = 0,785, A = 2,073 cm²)

NRd,WEZ = 2,073 x 113,63 = 23,55 kN > 11,22 kN

proof against buckling:

Lcr = 0,75 x 39,5 cm = 29,63 cm


λ = Lcr / (i x π) x √((Aeff x f0)/A x E)) = 29,63/(0,785x3,14)x√(250/70000) = 0,718
θ = 0,5 x (1+α x (λ – λ0) + λ²) = 0,5 x (1+0,2x(0,718 – 0,10) + 0,718²) = 0,820
χ = 1/ (θ + √( θ² – λ²)) = 1/(0,82 + √(0,82² – 0,718²)) = 0,822

Nb,Rd = 0,822 x 2,073 x 25,0/ 1,1 = 38,73 kN > 13,46 kN

no further proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 172/287

Top section MPT-009s

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 173/287

top view:

46
148
240
46
70 174 36 240 36 174 70
800

Two load cases are being calculated:

1. Lifting of the roof


2. Securing the roof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 174/287

load case 1: dead weight

Taken into account within the software

load case 2: Lifting of the roof

The proof is done for a unit load of F 1,k = 10 kN (> 1,2 x 1,69 = 2,0 kN)

Due to the redirection:

F2,k = 10 / sin (45°) = 14,14 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 175/287

load case 3: Securing the roof

The proof is done for a unit load of F 3,k = 2 x 20 = 40 kNt:

Due to the redirection:

F3,k = 20 / sin (45°) = 28,28 kN

notice:
The single elements are given as „steel“ but the material properties are those of
aluminium.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 176/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 177/287

stresses sv,Ed:

sv,Ed / sv,haz,Rd = 116,72 / (0,8x185/1,25) = 0,986 < 1,0

→ max NEd / NRd = 29,10 / (1,5 x 40) = 0,485 < 1,0

(Exceedance acceptable due to element not completely in HAZ and the forces could
be calculated for the cut edge as well. Actual force is smaller)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 178/287

proof of bolt:

bolt Ø30, 9SMn28: fub = 600 N/mm², fyb = 375 N/mm²

single span girder: l = 97 + 8 = 105 mm

MEd = 1,5 x 28,28 x 105 x10-3 / 4 = 1,113 kNm


Fv,Ed = 1,5 x 28,28 / 2 = 21,21 kN

bearing capacity:

Mpl,Rd = 1,5 x p/4 x 153 x 375/1,1 x 10-6 = 1,355 kNm


Fv,Rd = 0,6 x p x 152 x 600/1,25 x 10-3 = 203,58 kN

Fb,Rd = 1,5 x 8 x 30 x 250/1,1 x10-3 = 81,82 kN

h1 = Fv,Ed / Fb,Rd = 21,21 / 81,82 = 0,259 < 1,0

h2 = (MEd / Mpl,Rd)2 + (FV,Ed / Fv,Rd)2


= (1,113 / 1,355)2 + (21,21 / 203,58)2 = 0,686 < 1,0

no futher proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 179/287

sleeveblock – MPT-010

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 180/287

proof for bearing of the hole:

plate t = 8mm EN AW 5083 H111

e1 ≥ 40mm e2 > max e2 = 4 x 8 + 40 = 72mm

ad = 40 / (3 x 22) = 0,606
Fb,Rd = 2,5 x 0,606 x 275 x 20 x 8 / 1,25 x10 -3 = 53,33 kN
→ h = 29,10/ (2 x 53,33) = 0,273 < 1,0 (securing of the roof)

no futher proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 181/287

base point restraint (Standard-MPT-Base)

In case of setup with base point connection standard MPT-bases are used.
The ballast is placed on special ballast frames.
The proof is done for most adverse combination of lifting forces and restraint moment
on one support as well as for a maximum pressure force.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 182/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 183/287

system:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 184/287

top view:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 185/287

Loading

load case 1: max. NEd

NEd < 50,0 kN


50/ 4 = 12,50 kN

Additionally a min. ballast load of 3050 kg (μ=0,60) is taken into aacount.


1,35 x 30,50/ 4 = 10,30 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 186/287

load case 2: max. MEd

NEd = -27,21 kN
Mx,Ed = 6,74 kNm
My,Ed = 4,13 kNm

Additionally a min. ballast load of 3050 kg (μ=0,60) is taken into aacount.


1,35 x 30,50/ 4 = 10,30 kN

P1 = -27,21/4 – 6,74/(2x0,239) – 4,13/(2x,0239) = -6,80 – 14,04 - 8,60 = -29,44 kN


P2 = -6,80 – 14,04 + 8,60 = -12,24 kN
P3 = -6,80 + 14,04 – 8,60 = -1,36 kN
P4 = -6,80 + 14,04 + 8,60 = 15,84 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 187/287

Calculation

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 188/287

The proof is done within the software as steel checks regarding plastic bearing
capacities of the elements.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 189/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 190/287

< 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 191/287

< 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 192/287

base point restraint (Layher-base)

In case of setup with Layher podium the columns are placed on special bases made
from steel.
The proof is done for bases with the outer measurements of 1,036x1,036m (1,00 x
1,00m metric system) for system heights of 1,0m or 1,50m.

An adverse load in the middle as well as two positions near the edge are taken into
account.
The proof is done for most adverse combination of lifting forces and restraint moment
on one support as well as for a maximum pressure force.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 193/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 194/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 195/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 196/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 197/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 198/287

system:

red: ReRo 150x50x5mm (S235JR)


green: ReRo 100x50x5mm (S355JR)
light blue: QRo 40x40x4mm (S235JR)
yellow, grey, blue: Ø48,3x3,2mm (S235JR)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 199/287

top view:

7
24

24
40
1,04

1,04

1,04
24

73

73
40

40 24 40 7 24 72 40 24 40
1,04 1,04 1,04

front view:
50
1,70
1,00 20

1,04 1,04 1,04

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 200/287

Loadings

load case 1: max. NEd

NEd < 50,0 kN


50/ 4 = 12,50 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 201/287

load case 2: max. MEd

NEd = -27,21 kN (Rz,d); Rx,d = 7,22 kN; Ry,d = 25,33 kN


Mx,Ed = 6,74 kNm
My,Ed = 4,13 kNm

P1 = -27,21/4 – 6,74/(2x0,239) – 4,13/(2x,0239) = -6,80 – 14,04 - 8,60 = -29,44 kN


P2 = -6,80 – 14,04 + 8,60 = -12,24 kN
P3 = -6,80 + 14,04 – 8,60 = -1,36 kN
P4 = -6,80 + 14,04 + 8,60 = 15,84 kN

7,22/ 4 = 1,81 kN
25,33/ 4 = 6,33 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 202/287

Calculation

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 203/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 204/287

The proof is done within the software as steel checks

The proof is done within the software as steel checks regarding elastic (if necessary
plastic) bearing capacities of the elements.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 205/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 206/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 207/287

< 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 208/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 209/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 210/287

< 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 211/287

proof of Layher-Coupler

Only the decisive load cases are shown.

< 26,40 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 212/287

< 10,0 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 213/287

< 31,0 kN

no further proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 214/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 215/287

supports:

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 216/287

base point connection H30V

NEd < 25,0 kN

iy,z = 11,12 cm

buckling length: 12,0 m

Nb,Rd = χ x Aeff x f0 / γM1

λ = Lcr / (i x π) x √((Aeff x f0)/A x E)) = 1200/(11,12x3,14) x √(250/70000) = 2,053


Φ = 0,5 x (1+α x (λ – λ0) + λ²) = 0,5 x (1+0,2x(2,053 – 0,10) + 2,053²) = 2,803
χ = 1/ (Φ + √(Φ² – λ²)) = 1/(2,803 + √(2,083² – 2,053²)) = 0,212

Nb,Rd = 0,212 x 4 x 48,19 = 40,86 kN > 25,0 kN

no further proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 217/287

2.5 SUPPORT ING LOADS, BALLAST

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 218/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 219/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 220/287

All lifting and displacing loads have to be secured locally by ballast.

safety factor 1,20

Possible execution according to the required friction coefficient:

friction coefficient μ
1: Spindle on timber spreader μ = 0,40
2: Spindle on timber spreader, embeded μ = 0,60
3: Spindle on timber spreader, screwed μ = 0,60
4: Spindle on rubber mat μ = 0,60

The timber spreader is laying on asphalt, concrete, paving, sand, gravel

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 221/287

Lifting forces are secured on every support, proof against sliding is done on the
system as a whole.

front supports, nodes 85+73

Rz, deadweight = 2,12 kN


Rz, Wind = -21,47 kN (decisive LC101)

erf. Aufl. = 1,20 x 21,47 – 2,12 = 23,64 kN (2400 kg) (*)

*ballast see proof against sliding: (μ = 0,40: 3800 kg)


(μ = 0,60: 3050 kg)

rear supports, nodes 83+56

Rz, deadweight = 2,12 kN


Rz, Wind = -18,06 kN (decisive LC 302)

erf. Aufl. = 1,20 x 18,06 – 2,12 = 19,56 kN (2000 kg) (*)

*ballast see proof against sliding: (μ = 0,40: 3800 kg)


(μ = 0,60: 3050 kg)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 222/287

proof against sliding, whole system

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 223/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 224/287

setup with base point connection

(Groof + GBallast – 1,2 x W roof ) x μ / W horizontal > 1,20

dead weight roof: Groof = 8,49 kN

W roof = - 56,58 kN

W horizontal = 30,31 kN

values see previous pages.


ballast – with wall canopies (without wall canopies not decisive)

µ = 0,40: 4 x 38,0 GBallast = 152,0 kN

(8,49 + 152,0 – 1,2 x 56,58) x 0,4


------------------------------------------------------- = 1,22 > 1,20
30,31

µ = 0,60: 4 x 30,50 GBallast = 122,0 kN

(8,49 + 122,0 – 1,2 x 56,58) x 0,6


------------------------------------------------------- = 1,24 > 1,20
30,31

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 225/287

setup with layher-podium: 13x11m

ballast – with wall canopies

(GDach + GBallast – 1,2 x W Dach ) x μ / W horizontal > 1,20

dead weight roof: Groof = 8,49 kN

dead weight layher: 0,45 x 13,0 x 11,0


Gpodium = 64,35 kN

W roof = - 56,58 kN

W horizontal = 30,31 kN

wind on podium: 0,80x0,20x13x11


W podium = 22,88 kN

wind hor. on podium: 1,3 x 0,20 x 13,0 x 1,30


W podium = 4,06 kN

values see previous pages.

µ = 0,40: 2 x 24,0 + 2 x 20,0 Gballast = 88,0 kN

(8,49+ 64,35 + 88,0 + 22,88 – 1,2 x 56,58) x 0,4


----------------------------------------------------------------- = 1,34 > 1,20
(30,31+4,06)

µ = 0,60: 2 x 24,0 + 2 x 20,0 Gballast = 88,0 kN

(8,49+ 64,35 + 88,0 + 22,88 – 1,2 x 56,58) x 0,6


---------------------------------------------------------------- = 2,02 > 1,20
(30,31+4,06)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 226/287

ballast – without wall canopies

dead weight roof:: Groof = 8,49 kN

dead weight layher: 0,45 x 13,0 x 11,0


Gpodium = 64,35 kN

W roof = - 50,39 kN

W horizontal = 15,78 kN

wind hor. on podium: 1,3 x 0,50 x 13,0 x 1,30


W podium = 10,99 kN

values see previous pages.

µ = 0,40: 2 x 24,0 + 2 x 20,0 GBallast = 88,0 kN

(8,49 + 64,35 + 88,0 – 1,2 x 50,39) x 0,4


------------------------------------------------------- = 1,50 > 1,20
(15,78+10,99)

µ = 0,60: 2 x 24,0 + 2 x 20,0 GBallast = 88,0 kN

(8,49 + 64,35 + 88,0 – 1,2 x 50,39) x 0,6


------------------------------------------------------- = 2,25 > 1,20
(15,78+10,99)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 227/287

Estimation of ballast loads for roof size 10x8m

A detailed calculation is being abstained from. The following estimation is done.

factor rear wall: 10,75/12,75 = 0,84

factor side wall: 8,75/10,75 = 0,81

factor roof: 10,75x8,75/ (12,75x10,75) = 0,69

The supporting loads consist of three parts:

1. horizontal load factor 0,84

2. lifting load from roof Faktor 0,69

3. lifting load from overturning Faktor 1,00

This part remains the same as with the reduction of the wall area the depth of
the stage is reduced.

The lifting part from wind on roof to the total lifting load is as follows:

load case 101: Rz = 21,47 kN

suction roof area: 0,30 x 1,4 x 12,75 x 10,75 /4 = 14,39 kN (= 67%)

The following factor can be taken into account for the lifting loads:

0,33 x 1,00 + 0,67 x 0,69 = 0,79

All calculated ballast loads can be multiplied on the safe side with a factor of
0,85 for a stage size of 10x8.

The factor is directly introduced into the following table.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 228/287

OVERVIEW BALLAST

12x10m

supports A B

base point 3800 3800


connection (3050) (3050)
ballast

Layher- 2400 2000


podium (2400) (2000)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

10x8m

supports A B

base point 3300 3300


connection (2600) (2600)
ballast

Layher- 2100 1700


podium (2100) (1700)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 229/287

check for setup with Layher-podium: 9x7m

ballast – with wall canopies

(Groof + GBallast – 1,2 x W roof ) x μ / W horizontal > 1,20

dead weight roof: Groof = 0,43x8,49 = 3,65 kN

dead weight Layher: 0,45 x 9,0 x 7,0


Gpodium = 28,35 kN

W roof = 0,43 x – 56,58 = -24,33 kN

W horizontal= 0,68 x 30,31 = 20,60 kN

wind on podium: 0,80x0,20x9,0x7,0


W podium = 10,08 kN

wind hor. on podium: 1,3 x 0,20 x 9,0 x 1,30


W podium = 3,04 kN

values see previous pages.

µ = 0,40: 2 x 17,0 + 2 x 14,0 GBallast = 62,0 kN

(3,65+ 28,35 + 62,0 + 10,08 – 1,2 x 24,33) x 0,4


----------------------------------------------------------------- = 1,27 > 1,20
(20,60+3,04)

µ = 0,60: 2 x 17,0 + 2 x 14,0 GBallast = 62,0 kN

(3,65+ 28,35 + 62,0 + 10,08 – 1,2 x 24,33) x 0,6


---------------------------------------------------------------- = 1,90 > 1,20
(20,60+3,04)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 230/287

3 LAYHER PODIUM

The roof can be build up on Layher-podium with system heights of 1,0m or


1,50m.

diagonals:

horizontal loads: wind + V/ 10

wind on podium: 1,3 x 0,50 x 13,0 x 1,80 = 15,21 kN


wind on rear wall: 30,31 kN (see chpt .2)

stabilizing load: V = 5,0 x 13,0 x 11,0 = 715 kN


V/ 10 = 715/ 10 = 71,50 kN

sum horizontal loads:


15,21+30,21+71,50 = 117,02 kN

force each diagonal:


N = 117,02/ cos 36,8° = 146,14 kN
< 14,70/ 1,50 = 9,80 kN

number of diagonals:
146,14/ 9,80 = 14,91
each direction > 15

in axis of towers:

from wind:
max. FH,Stütze,1 = 19,36 kN

payload podium:
FH,Nutzlast,2 = 11,0 x 1,036/2 x 5,0/ 10 = 2,849 kN

wind on podium:
FH,Wind,3 = 1,036/ 2 x 0,20 = 0,1036 kN

19,36 + 2,849 + 0,1036 = 22,31 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 231/287

angle a: arc tan (1,0 / 2,072) = 25,8°

max NV,Ed = 1,35 x 22,31 / (2 x cos(25,8°)) = 16,73 kN

NV,Rd = 16,8 kN

h = 16,73 / 16,8 = 0,996 < 1,0

maximum spindle height: (Layher spindle 60)

max H = 22,31/ 8 = 2,79 kN ≙ 3,0 kN

max V = 33,30 / 1,35 + 1,036/ 2 x 1,036/ 2 x 5,0 = 29,85 kN ~ 29 kN

HSpindel ≤ 15 cm

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 232/287

columns:

buckling is decisive:

b = 0,90

Lcr = 0,9 x 1,50 = 1,35 m

Ncr = (p2 x 210000 x 1,16 x105) / (1,35 x103)2 x 10-3 = 178,09 kN

l = √((454,4 x 320 x 10-3) / 178,09) = 0,904

KSL a: a = 0,21

f = 0,5 x [1 + 0,21 x (0,904 - 0,2) + 0,904 2] = 0,983

k = 1 / (0,983 + √(0,9832 - 0,9042) = 0,73

Nb,Rd = 0,73 x 454,4 x 320/1,1 x 10-3 = 96,50 kN

max NEd = 1,35 x 2,0722 x 5,0 = 28,97 kN

h = 28,97/ 96,50 = 0,30 < 1,0

no further proof

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 233/287

drawings:

Alternatively the soundwing towers can be placed on seperate bases and the Layher
structures is not build to the sides then. Diagonals arranged optionally.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 234/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 235/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 236/287

Bearing capacities Layher system

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 237/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 238/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 239/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 240/287

4 INCREASE OF PAYLOADS USING ADDITIONAL TOWERS

Optionally the roof 12x10m can be setup with additional towers to increase the
permissible payloads.

1. Additional tower in the middle of the side walls:

The towers are build as passiv towers and are connected on top over a
special connection frame.

The guy wire may be inserted over the whole depth or only in the rear
sidewall area.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 241/287

Increase of payload on side truss from 50 kg/m to 150 kg/m

side truss, H40V:

chord:
NEd = (10,28+0,61)/ (2x0,339) + 6,62/ 4 = 17,72 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 242/287

Increase of normal force in guy wire if only inserted in rear sidewall area.

NEd = 23,42 kN (from comparative calculation)

set up with side wings:

NEd = 1,35 x 1,3 x 0,74 x 3,40/ cos 55° = 7,70 kN

23,42 + 7,70 = 31,12 kN

31,12/ 1,35 x 3,0 = 69,16 kN < 84,60 kN = NRd

steel Ø 12 mm
1770 N/mm² DIN EN 12385-4

The guy wires in the side walls are done with Ø12mm when setting up the stage
with additional towers in the side walls and the guy wires only in the rear side
wall areas.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 243/287

Necessary ballast with additional towers:

12x10m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 244/287

support front: (Pt. A)


erf. B = 1,20 x 13,14 - 1,73 = 14,04 kN (1400 kg) (**)

support rear: (Pt. B)


erf. B = 1,20 x 19,95 - 1,73 = 22,21 kN (2200 kg) (**)

support center: (Pt. E)


erf. B = 1,20 x 16,51 - 1,23 = 18,58 kN (1900 kg) (**)

(**) proof on whole system


sum nec. Ballast = 152 kN (122 kN) (base point connection)
sum nec. Ballast = 82 kN (82 kN) (Layher-podium)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 245/287

12x10m

support A B E

base point 2000 2800 2800


connection (2000) (2000) (2100)
ballast

Layher- 1400 2200 1900


podium (1400) (2200) (1900)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 246/287

2. Additional towers in the rear wall:

The towers are build as passiv towers and are connected on top over a
special connection frame.

The guy wire may be inserted over the whole width or only in the outer
rear all areas.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 247/287

Increase of payload on rear truss from 50 kg/m to 150 kg/m

gable truss, H40V:

chord:
NEd = (8,67+12,20)/ (2x0,339) + 13,07/ 4 = 34,05 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 248/287

chord:
NEd = (2,64+22,03)/ (2x0,339) + 3,99/ 4 = 37,38 kN < 50,22 kN

Increase of normal force in guy wire if only inserted in outer rear wall area.

NEd = 18,63 kN (from comparative calculation)

18,63/ 1,35 x 3,0 = 41,40 kN < 58,80 kN = NRd

steel Ø 10 mm
1770 N/mm² DIN EN 12385-4

The guy wires in the rear wall are done using Ø10mm as usually when inserting
the guy wires only in the outer areas of the rear wall.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 249/287

rear columns:

proof against buckling:

Lcr = 7,00 m iy,z = 11,12 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 700/(11,12x3,14) x √(250/70000) = 1,197

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(1,197 – 0,10) + 1,197²) = 1,326

χ = 1/ (θ + √( θ² – λ²))
= 1/(1,326 + √(1,326² – 1,197²)) = 0,527

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= ((11,30+6,31)/ (0,527 x 200,86)) 0,8 + [(10,24/ 24,0)1,7+(9,84/ 24,0)1,7]0,6


= 0,238 + 0,623 = 0,861 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 250/287

Necessary ballast with additional towers:

12x10m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 251/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 252/287

support front: (Pt. A)


erf. B = 1,20 x 13,15 - 1,73 = 14,04 kN (1400 kg) (**)

support rear: (Pt. B)


erf. B = 1,20 x 18,63 - 1,0 = 21,36 kN (2200 kg) (**)

support middle: (Pt. E)


erf. B = 1,20 x 16,48 - 1,23 = 18,55 kN (1900 kg) (**)

support rear inside: (Pt. F)


erf. B = 1,20 x 15,88 - 1,18 = 17,87 kN (1800 kg) (**)

(**) proof on whole system


sum nec. Ballast = 152 kN (122 kN) (base point connection)
sum nec. Ballast = 82 kN (82 kN) (Layher-podium)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 253/287

12x10m

support A B E F

base point 2000 3000 2600 1600


connection (2000) (2200) (1900) (1600)
ballast

Layher- 1400 2200 1900 1800


podium (1400) (2200) (1900) (1800)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 254/287

5 SIDE-WINGS

Optionally the roof can be build up with side wings.

The maximum width of the side wings is 3,0m (truss piece)

The side wings may be closed completely with canopies up to wind speeds of 20
m/s. At wind speeds above 20 m/s the canopies (+ PA-load) must be removed.

from PA-load:

10,0 kN = 1000 kg (dynamic load increase is taken into account)

from wind:

1,0 x 0,20 x 7,40/ 2 = 0,74 kN/m (or PA-surface max. 4,0 m²)

from membrane tension:

0,74/ 0,80 = 0,925 kN/m

proof H40V:

My,Ed = 1,10 x 0,069 x 3,40²/8


+ 1,35 x (1,2 x 10,0 x 3,40/ 4 + 1,3 x 0,925 x 3,40²/ 8)
= 15,68 kNm

Mz,Ed = 1,35 x 1,3 x 0,74 x 3,40²/ 8 = 1,88 kNm

NEd,Gurt = (15,68+1,88)/ (2x0,339) = 25,90 kN < 50,22 kN

Vz,Ed = 1,10 x 0,069 x 3,40/ 2 + 1,35 x (1,2 x 10,0/2 + 1,3 x 0,925 x 3,40/ 2)
= 10,99 kN < 18,94 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 255/287

substitution to the back:

NEd = 1,35 x 1,3 x 0,74 x 3,40/ 2 / sin 57° = 2,63 kN

The substitution to the back is done using a truss H30V.

The substitution alternatively can be lead either to the back tower or in can
of setup with additional towers in the sides to the middle of the side truss.

no further proof

increase of normal force in guy wire (side wall):

NEd = 1,35 x 1,3 x 0,74 x 3,40 = 4,42 kN

4,42/ cos 35° = 5,40 kN

16,72 + 5,40 = 22,12 kN

NEd = 22,12/1,35 x 3,0 = 49,16 kN < 58,80 kN = NRd

steel Ø 10 mm
1770 N/mm² DIN EN 12385-4

increase of normal force in column H30V:

NEd,Wind = 4,42 x tan 35° = 3,09 kN (from wind)

NEd,PA = 1,35 x (1,20 x 10/ 2 + 1,30 x 0,925 x 3,40/ 2) = 10,86 kN


(from PA+membrane tension)

NEd = 10,86 + 3,09 = 13,95 kN

A proof for a front tower is done for additional force from wind, membrane
tension and PA-load.

A proof for a rear tower is done for additional force from wind only.

The proof of the base is done for enough of a normal force of N Ed = 50,0 kN.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 256/287

column front:

proof against buckling:

Lcr = 7,00 m iy,z = 11,12 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 700/(11,12x3,14) x √(250/70000) = 1,197

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(1,197 – 0,10) + 1,197²) = 1,326

χ = 1/ (θ + √( θ² – λ²))
= 1/(1,326 + √(1,326² – 1,197²)) = 0,527

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= ((29,34+13,95)/ (0,527 x 200,86)) 0,8 + [(1,22/ 24,0)1,7+(2,20/ 24,0)1,7]0,6


= 0,489 + 0,105 = 0,594 < 1,0

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 257/287

column rear:

proof against buckling:

Lcr = 7,00 m iy,z = 11,12 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 700/(11,12x3,14) x √(250/70000) = 1,197

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(1,197 – 0,10) + 1,197²) = 1,326

χ = 1/ (θ + √( θ² – λ²))
= 1/(1,326 + √(1,326² – 1,197²)) = 0,527

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= ((20,75+3,09)/ (0,527 x 200,86)) 0,8 + [(10,25/ 24,0)1,7+(10,11/ 24,0)1,7]0,6


= 0,303 + 0,632 = 0,935 < 1,0

= ((20,75+6,31)/ (0,527 x 200,86)) 0,8 + [(10,25/ 24,0)1,7+(10,11/ 24,0)1,7]0,6


= 0,336 + 0,632 = 0,968 < 1,0 (guy wire in rear side wall area)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 258/287

ballast calculation:

lifting force:

(guy wire side wall without additional towers


Rz = 1,3 x 0,74 x 3,40 x tan 35° = 2,30 kN

(guy wires rear side area + towers)


Rz = 1,3 x 0,74 x 3,40 x tan 55° = 4,67 kN

displacing force:

Ry = 1,3 x (0,74 x 3,40 + 0,74 x 3,40/ 2 + 0,20 x 1,30 x 3,40/ 2) = 5,48 kN

µ = 0,40:

nec. B = 1,2 x (5,48/ 0,4 + 2,30) = 19,20 kN


nec. B = 1,2 x (5,48/ 0,4 + 4,67) = 22,04 kN

19,20/ 2 = 9,60 kN (1000 kg) Pt. A u. B


22,04/ 2 = 11,02 kN (1100 kg) Pt. E u. B

µ = 0,60:

nec. B = 1,2 x (5,48/ 0,6 + 2,30) = 13,72 kN


nec. B = 1,2 x (5,48/ 0,6 + 4,67) = 16,56 kN

13,72/ 2 = 6,86 kN (700 kg) Pt. A u. B


16,56/ 2 = 8,28 kN (850 kg) Pt. E u. B

column outside side wings:

displacing force:

Ry = 1,3 x (0,74 x 3,40/ 2 + 0,20 x 1,30 x 3,40/ 2) = 2,21 kN

µ = 0,40:

nec. B = 1,2 x (2,21/ 0,4) = 6,63 kN (700 kg)

µ = 0,60:

nec. B = 1,2 x (2,21/ 0,6) = 4,42 kN (450 kg)

Deadweight of layher being neglected.

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 259/287

Necessary additional ballast with guy wire in complete side wall:

support A B D

1000 1000 700


ballast
(700) (700) (450)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 260/287

Necessary additional ballast with guy wire only in rear side wall area:

support B E D

1100 1100 700


ballast
(850) (850) (450)

(all values in kg, values in brackets for friction coefficient μ = 0,60)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 261/287

6 ROOF CANOPY WITH KEDERS ON EACH RAFTER

Alternatively the roof canopies can be fixed on the rafters using keder profiles
connected in equal distances.

Only the different load cases are shown and the internal forces.
Necessary proofs are shown as well.

load case 10: wind roof

q = 0,30 kN/m cpe = 1,00

qw1 = 0,30 x 1,0 x 3,50 = 1,05 kN/m


qw2 = 0,30 x 1,0 x 3,50/2 = 0,53 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 262/287

load case 11: membrane tension roof

qp1 = 0,53/ 0,8 = 0,66 kN/m

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 263/287

internal forces

decisive LCC 91 + 93

For reasons of clarity the internal forces are shown section-wise.

rafters H30D: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 264/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 265/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 266/287

rafters H30D: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 267/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 268/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 269/287

roof girder H40V: LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 270/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 271/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 272/287

roof girder H40V: LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 273/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 274/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 275/287

telescope pipe 60x5 (+ insert profile): LCC 91

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 276/287

telescope pipe 60x5 (+ insert profile): LCC 93

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 277/287

proofs:

rafter H30D:

double chord:
NEd = 9,94/ (2x0,207) + 0,18/ 0,239 + 5,91/ 2 = 27,72 kN < 50,22 kN
(connection of the inner rafters only with two chords)

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 278/287

roof girder, H40V:

chord:
NEd = 30,83/ (2x0,339) + 4,58/ 4 = 46,62 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 279/287

roof girder, H40V:

chord:
NEd = (0,14+27,06)/ (2x0,339) + 28,02/ 4 = 47,12 kN < 50,22 kN

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 280/287

proof against buckling:

Lcr = 0,60 x 12,00 m = 7,20m iy,z = 15,70 cm

λ = Lcr / (i x π) x √((Aeff x f0)/A x E))


= 720/(15,70x3,14) x √(250/70000) = 0,872

θ = 0,5 x (1+α x (λ – λ0) + λ²)


= 0,5 x (1+0,2x(0,872 – 0,10) + 0,872²) = 0,957

χ = 1/ (θ + √( θ² – λ²))
= 1/(0,957 + √(0,957² – 0,872²)) = 0,74
with:
ω0 = 1,00 (already regarded in truss calculation)
ψc = 0,80

NRd = 4 x 50,22 = 200,86 kN


My,Rd = 34,05 kNm
Mz,Rd = 34,05 kNm

proof:

(NEd/ (χmin x NRd))ψc + [(My,Ed/ My,Rd)1,7 + (Mz,Ed/ Mz,Rd)1,7]0,6 ≤ 1,0

= (28,02/ (0,74 x 200,86))0,8 + [(0,14/ 34,05)1,7+(27,06/ 34,05)1,7]0,6


= 0,263 + 0,792 = 1,05 ~ 1,03

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 281/287

side girder, H40V:

chord:
NEd = (24,16+4,94)/ (2x0,339) + 9,97/ 4 = 45,41 kN < 50,22 kN

no further proofs

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 282/287

7 SUPPORTING DOCUMENTS

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 283/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 284/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 285/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 286/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015
KRASENBRINK + BASTIANS INGENIEURE

SEITE: 287/287

PROJECT: PROJECT-NO.:
MPT-ROOF 12x10, 10x8m 15257 - REV 01
CUSTOMER/AUFTRAGGEBER: DATE/DATUM:
Prolyte Group 21.12.2015