Risk Category Inherent Likelihood Inherent Impact

Risk Rating
Strategic 4 - Likely 4 - Major

Root Causes
Pre-Event Mitigations

Root cause or contributing factor number


one goes here
Pre-event mitigation goes here (measure to
avoid event)
Click here to try building bow ties in a 30-d

Strategic Objectives Affected:

Strategic objectives affected by this risk

Action Plans:
Action Plan Description Due Date Status
Sample action 31-Mar-19 In Progress
Rank # 1

Insert Risk Name Here

Inherent Risk Velocity Control Effectiveness Residual Likelihood

16 Low Partially Effective 2 - Unlikely

Pre-Event Mitigations

Risk Event

Pre-event mitigation goes here (measure to


avoid event)

Description of the risk event, where it to


materialize
ere to try building bow ties in a 30-day free trial of the Essential ERM system

Business Areas Affected:

Departments and or functions affected by this risk

Action Plan Owner Status Update


Karen Jones A longer text update can go in here
Residual Impact Residual Risk

3 - Moderate 6

Consequences

Root cause or contributing factor number


one goes here
ffected by this risk