ORGANIZATIONAL RISK ASSESSMENT

ID # RISK RISK PROBABILITY RISK RISK MITIGATING ACTIONS FREQUENCY OWNER


(1) (2) IMPACT PRIORITY (5) OF CONTROL (7)
(3) (4) (6)
Determine the process /
Identify the activities / actions to reduce Determine Identify the
Ensure to Identify likelihood that the Determine Compute for exposure of the region and how often Functional
number the potential risk will happen. the the rank of likelihood of the risk to happen will the Division / Office
risks problems/issue Refer to the priority the risk mitigating / Unit in charge
identified. s in attaining Probability/Impac status identified, actions be of the
the objectives. t Matrix based on using the controlled. implementatio
the computation n of the
impact. : Mitigating
Refer to Factors
the Risk
Probabilit Probability X
y / Impact Risk Impact
Matrix (2) x (4)

1 16 16 Strengthen the collaboration Monthly DRRM, Physical


Loss of lives Unlikely Severe Very High with LGU, MGB, partner reporting to Facilities Unit ,
01 due to partial agencies and School DRRM Top SGOD
or complete Coordinators ensuring safety Managemen
collapse of measures to mitigate the t
ground surface impact of collapsed surface
(sinkhole) (sinkholes) to learners, Regular
personnel, and school facilities. monitoring
of Chief
ID # RISK RISK PROBABILITY RISK RISK MITIGATING ACTIONS FREQUENCY OWNER
(1) (2) IMPACT PRIORITY (5) OF CONTROL (7)
(3) (4) (6)
Determine the process /
Identify the activities / actions to reduce Determine Identify the
Ensure to Identify likelihood that the Determine Compute for exposure of the region and how often Functional
number the potential risk will happen. the the rank of likelihood of the risk to happen will the Division / Office
risks problems/issue Refer to the priority the risk mitigating / Unit in charge
identified. s in attaining Probability/Impac status identified, actions be of the
the objectives. t Matrix based on using the controlled. implementatio
the computation n of the
impact. : Mitigating
Refer to Factors
the Risk
Probabilit Probability X
y / Impact Risk Impact
Matrix (2) x (4)