Professional Documents
Culture Documents
1 4 7
690
987 987
GROUND BEAM ON GRIDLINE 1-1/A-J FIRST FLOOR BEAM ON GRIDLINE 4-4/A-I ROOF BEAM ON GRIDLINE 4-4/A-I
1 No. ONLY 1 No. ONLY 1 No. ONLY
1 4 5 7 8 9 1 4 6 8
T1402
T1402
T1402
T1214
T1214
T1214
T1202
T1202
T1202
(3-R1205) (3-R1206) (3-T1405) (3-T1406)
150
751
150
5 1021
(R1
(R1
450
350
2
(R1
00
350
00
00
7)
4)
1)
300
200
T1404
T1404
T1216
T1216
T1204
T1204
150 150 150
5
2
927
577
(4-R1207) (4-R1208) (4-T1407) (4-T1408)
R1206
R1206
R1206
T1405
T1405
T1405
150
150
GROUND BEAM ON GRIDLINE 1-9/I-I FIRST FLOOR BEAM ON GRIDLINE 1-8/E-E
(R1
(R1
450
350
00
00
2)
5)
1 No. ONLY 1 No. ONLY
200
300
R1208
R1208
T1407
T1407
rev. date of revision deatils initials
ravision
3 PROJECT:
6 PROPOSED FIVE (5) BEDROOM STOREY BUILDING PLAN
LOCATED AT ATUNSU, ASANTE AKIM CENTRAL.
R1209
R1209
R1209
R1409
R1409
R1409
LOCATION:
23+11+29-R1003 @ 200 c/c 2(20)-R1006 @ 200 c/c
ATUNSU,ASANTE AKIM CENTRAL
150
150
ASHANTI REGION
(R1
(R1
350
450
6
00
00
3)
6)
200
300
3
client:
R1211
R1211
R1411
R1411
690 700
MAVIS AKUFFOBIA - ESSILFIE
(4-R1211) (4-R1212) (4-R1411) (4-R1412) 150 150
drawing title:
SECTION 3-3 SECTION 6-6
DESIGNED BY : scale:
1:100
E.A SIAW
date: DEC. 2021
BEAM TYPES DETAILS DRAWING FILE: Sheet no.
0145 - ARCH-2B-08 STR-12