True or False: Ladder rails should extend at least 1 m (3 ft) above the platform
7 16 level to facilitate getting on and off.
8 17 The main reasons why workers fall from scaffold platforms is:
True or False: The Walk-Through (Masonry) Frame Scaffold has easier movement
5 9 and distribution of materials on platforms.
6 13 Select all that apply: Which of the following are types of rolling scaffold:
The Castor Type Scaffold should be erected so that its height-to-width ratio is no
7 14 greater than:
True or False: Mast-climbing work platforms can be used as a single tower or as
8 29 multiple towers braced together.
Select all that apply: When erectig scaffolds, which of the following statements
2 6 should be kept in mind.
True or False: Where mudsills must be placed on sloping ground, levelling the
3 7 area should be done, wherever possible, by backfilling.
Modul 3
4 10 Select all that apply: The following are requirements concerning mudsills:
True or False: You should not use blocking or packing such as bricks, short pieces
5 11 of lumber, or other scrap materials under scaffold feet or under mudsills.
6 19 Loads lifted by a well wheel should normally be no more than:
7 19 True or False: Wood planks may be reinforced with metal nailer strips or plates.
The ladder must be properly erected with rails projecting ___ above the platform
8 25 of the scaffold.
True or False: Where it is impractical for workers to climb down, and the scaffold
is over 3 m (10 ft) in height, each worker must be tied off with a full body harness
5 17 and lanyard.
6 19 When inspecting a scaffold, look out for:
1
Base plates or castors
aluminum
1
0.5m above ground level
1
fear of heights
Cantilever Scaffold
Cherry Type
2 to 1
100 m
ground conditions
1
50 kg
An externally applied clamp to connect two tubes end-
to-end.
Travel restraint system
2m
2 kn/ m2
1
1
3m
1
3 metres (10 feet) for 150,001 to 250,000 volts
1
damage to hooks on manufactured platforms
0
Mudsills Adjustable screw jacks
plywood wood planks
0
1.5m above ground level 3 m above ground level
0
failure to install and use guardrails bad weather
A toeboard at least 89 mm (3
A mid-rail about halfway between the platform and the top 1/2 in) high at the platform
rail. level if made from wood.
4 to 1 3 to 1
a work platform mounted on jacks that bear on both the side the ladder rungs of two
rails extension ladders
500 m 6m
obstructions overhead electrical wires
To support scaffolds, always install mudsills and ensure Mud and soft soil doesn’t have
backfilled soils are well-compacted and levelled. to be replaced.
10m 2 cm
at each working level as the scaffold is erected at the top level of the scaffold
0
0
20m 1m
make sure the ladder is not
always use three-point contact locked into place
tools wires
Type of work that will be done
Height or heights to which the scaffold may be erected from the scaffold
proximity of the scaffold to overhead power lines instability or overloading
0
6 metres (20 feet) for 150,001
6 metres (20 feet) for over 250,000 volts to 250,000 volts
0
de-lamination in laminated veneer lumber planks compatibility of components
slippery conditions 8
Patented Scaffold
Patented Type
5 to 1
1m
All of the above
80 kg
A clamp used for connecting tubes at right angles. They maintain the
right-angled orientation providing rigidity to the structure.
Fall arrest system
10 cm
8 kn/m2
difficult to replace
10m
unbalanced
tip-overs loading