CONTENT PAGE
2.1.4 Applewatta….……...……………………………………………………………………………. 16
2.1.4.1 Preliminary Work ………………………………………………………………………….. 16
2.1.4.2 Design work …………………………………………………………………………….. 16
2.1.4.3 Sub structure …………………………………………………………………………….… 17
2.1.4.4 Super structure……………………………………………………………………………... 17
2.1.4.5 Overall progress of site – Scheduled Vs. Achieved …………………………………………17
2.1.6 Madampitiya……………………………………………………………………………………...22
2.1.6.1 Preliminary Work …………………………………………………………………………..22
2.1.6.2 Design work….………………………………………………………………………………22
2.1.6.3 Sub structure ………………………………………………………………………………..23
2.1.6.4 Super structure………………………………………………………...……………………23
2.3 Approvals…………...……………………………..………………………...………………………37
2.3.1 Material Approval Summary…………..……………………………..……………………..……37
2.3.1.1 Stadumgama………………………………………………………………..……………..….37
2.3.1.2 Colombage Mawatha………………………..……………………………..……………..…..44
2.3.1.3 Obesekarapura……...………………………..……………………………..……………..….50
2.3.1.4 Applewatta…………………………………..……………………………..…. ………….….53
2.3.1.5 Furgusion…………..………………………..……………………………..……………..…..57
2.3.1.6 Madampitiya……….…………………...…..……………………………..……………........59
2.3.1 Drawings Approval Summary…………..…..………………………..……………………..……63
2.3.2.1 Stadumgama………………………………………………………………..……………..….63
2.3.2.2 Colombage Mawatha………………………..……………………………..……………..…..66
2.3.2.3 Obesekarapura……...………………………..……………………………..……………..….71
2.3.2.4 Applewatta…………………………………..……………………………..…. ………….….75
2.3.2.5 Furgusion…………..………………………..……………………………..……………..…..79
2.3.2.6 Madampitiya……….………………………….…………………………..………………....83
2.5 Progress of Health and safety provision and Implementation of Environmental provision......103
Funded by - AIIB
Employer - Ministry of
Urban Development &
Housing
Implementing Agency
- Urban Development
Authority
Engineer - PMU of
SCURP (AIIB)
Engineer’s Representative
- State Engineering Contractor
Corporation (SEC)
1
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
North – Canal
No. 40/100, 5th Lane,
East – Canal
COLOMBAGE Colombage Mawatha,
South – HRL Site (Another low-income
MAWATHA Kiruolpone.
housing project)
West – 5th Lane, Colombage Mw.
3
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
4
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Furgusion Road Accepted Contract Price LKR. 1,569,011,564.00 and USD 12,788,394.77
5
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2. PROGRESS OF WORK
2.1 Physical & Design Progress
2.1.1 Stadiumgama
2.1.1.1 Preliminary Work
Total preliminary work progress is 53.34% which is tabulated in below table. All the
preliminaries have been implemented. But it includes Running cost and Final payment. Hence,
percentage of the progress increases with the time and 100% shall be achieved at the completion
of the project.
Item Progress
Insurance & Securities 100.00%
Engineer’s facilities 47.93%
Contractor’s facilities 59.41%
Contractor’s management and supervision 50.00%
Quality, Standards and Progress 71.58%
Health, Safety & Environment 54.48%
Security, Fencing & Protection 47.50%
Services and Facilities 42.49%
Miscellaneous 94.98%
Total 53.34%
2.1.1.2 Design Work
Total design progress is 82.50% which is tabulated in below table.
No Design / Drawing Preparation Progress
1 Architectural Services
i Concept Designs 100.00%
ii Council 70.00%
iii Construction Drawings 90.00%
2 Sub Structure
i Piles 100.00%
ii Pile caps & plinth beams 100.00%
iii Ground floor slab 100.00%
3 Super Structure 96.00%
4 Sump 90.00%
5 Plumbing
i Water supply 100.00%
ii Waste water 60.00%
6 Electrical 80.00%
7 Fire and LPG 86.00%
8 External 27.00%
CARRIED TO GRAND SUMMARY 82.50%
6
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
7
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Block A 43.67%
Block B 48.33%
Block C 93.75%
Block D 94.33%
Total 70.02%
Block A 0%
Block B 0%
Block C 11.67%
Block D 17.00%
Total 7.17%
8
Monthly Progress Report No. 07 (Month of January, 2022)
PROGRESS(%)
0
10
20
30
40
50
60
70
80
90
100
0.51
0.15
2.34
0.56
4.24
1.26
4.84
1.53
5.8
2.66
6.86
4.17
7.94
4.87
9.58
5.72
10.81
6.87
11.54
8.87
12.15
11.92
12.81
13.04
14.89
16.41
17.49
17.73
Scheduled
20.58
20.61
23.22
23.45
25.56
26.91
28.24
29.38
Actual
Support To Colombo Urban Regeneration Project (SCURP – AIIB)
31.02
31.38
52.14
STADIUMGAMA PROJECT
57.23
SCHEDULED VS ACHIEVED
62.46
68.68
74.05
Actual Series
78.78
82.44
85.95
88.86
91.16
93.14
Urban Development Authority, Sri Lanka
94.39
9
97.04
98.69
99.33
99.63
99.87
100
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
10
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
11
Monthly Progress Report No. 07 (Month of January, 2022)
PROGRESS
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
0.00%
2020-Jun1.56% 1.68%
2020-Jul 1.95% 2.04%
2020-Aug 2.72% 2.60%
2020-Sep 3.48% 3.18%
2020-Oct 4.12% 3.75%
2020-Nov 4.94% 4.31%
Scheduled Progress
2021-Jun
2021-Jul 12.32% 12.78%
Actual Progress
2022-Jan 19.94% 26.82%
2022-Feb 29.86%
2022-Mar 33.64%
2022-Apr 37.16%
41.08%
Colombage Mawatha
TIME (MONTH/YEAR)
2022-May
2022-Jun 45.28%
2022-Jul 49.97%
Scheduled Series 54.81%
2022-Aug
2022-Sep 59.56%
Scheduled Progress Vs. Achieved Progress
2022-Oct 63.06%
2022-Nov 66.30%
2022-Dec 69.53%
2023-Jan 72.77%
Actual Sereis
2023-Feb 75.77%
2023-Mar 78.61%
2023-Apr 81.47%
Urban Development Authority, Sri Lanka
2023-May 84.90%
12
2023-Jun 88.54%
2023-Jul 91.76%
2023-Aug 94.68%
2023-Sep 97.44%
2023-Oct 99.50%
2023-Nov 100.00%
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.1.3 Obeysekarapura
2.1.3.1 Preliminary Work
Total preliminary work progress is 52.53% which tabulated in below table. All the preliminaries
have been implemented. But it includes Running cost and Final payment. Hence, percentage of
the progress increases with the time and 100% shall be achieved at the completion of the project.
Item Progress
Insurance & Securities 93.25%
Engineer’s facilities 57.25%
Contractor’s facilities 63.26%
Contractor’s management and supervision 68.89%
Quality, Standards and Progress 34.92%
Health, Safety & Environment 43.68%
Security, Fencing & Protection 49.87%
Services and Facilities 15.57%
Miscellaneous 77.56%
Total 52.53%
13
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Progress Details
Scheduled
Description Average
Master Mitigation program Delay
Achieved Labor
program submitted on (Days)
Count
02/10/2021
Overall
Cumulative 59.2 %
33.0 %
(Program not 11.9% 235 25
progress as of 31st
approved yet)
January 2022
14
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
SCHEDULED VS ACHIEVED
OBESEKARAPURA PROJECT
Schedule Series4 Schedule Series3
100
100 97.0
90 86.0
79.4
80 75.7
72.2
68.6
70 66.3
62.5
59.2
60 55.3
PROGRESS(%)
50.6
50
44.9
40 38.1
31.0
30
24.0
20.2
20 18.0
14.0
12.0 11.5 11.9
8.0 9.07 8.1 8.2 8.3 8.3 8.4 8.5 9.5 10.2 10.5
10
5.04.5 6.05.5 6
2.0 3.0 3.02 4.03
0 0 1.00.2 0.5 1
0
TIME (MONTHS)
15
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.1.4 Applewatta
2.1.4.1 Preliminary Work
Total preliminary work progress is 79% which tabulated in below table. All the preliminaries
have been implemented.
Item Progress
Providing Site Office with facilities for the Engineers Representatives 100%
Total 79%
16
Monthly Progress Report No. 06 (Month of December 2021)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Progress Details
* As per the UDA approved recovery programme effective from 18.01.2022 (DOC/354R1)
17
Monthly Progress Report No. 06 (Month of December 2021)
No. of Labours
0%
20%
40%
60%
80%
100%
120%
Oct-20 1%
Nov-20 1.49%
0% 1.31%
Dec-20 2.39%
Jan-21 4.19%
2% 3.87%
Feb-21 5.59%
Mar-21 8.09%
Apr-21 10.19%
5.70%6.70%7.06%
May-21 11.73%
Jun-21 12.78%
Jul-21 13.72%
8.60% 10%11.10%
Aug-21 15.72%
18.51%
11.41%
Sep-21
12.52%
Oct-21 25.52%
Forecasted
Nov-21 30.00%
Dec-21 35.13%
Jan-22 38.49%
13.58%
Actual
Support To Colombo Urban Regeneration Project (SCURP – AIIB)
Feb-22 41.80%
13.25%13.27% 14.48%
Apr-22 48.70%
Applewatta Project
Month
May-22 50.49%
51.87%
Forecasted Vs. Actual Progress
Jun-22
Forecasted Series
Jul-22 54.03%
Aug-22 58.49%
Sep-22 62.48%
Oct-22 65.28%
Nov-22 67.90%
Actual Series
Dec-22 72.19%
Jan-23 79.88%
Feb-23 82.32%
Mar-23 86.43%
Apr-23 89.16%
Urban Development Authority, Sri Lanka
May-23 92.13%
18
Jun-23 94.22%
Jul-23 96.63%
99.49%
Aug-23
Sep-23 99.96%
Oct-23
100.00%
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Item Progress
Insurance & Securities 0.00%
Engineer’s facilities 29.03%
Contractor’s facilities 41.18%
Contractor’s management and supervision 19.67%
Quality, Standards and Progress 24.81%
Health, Safety & Environment 24.40%
Security, Fencing & Protection 42.69%
Services and Facilities 25.97%
Miscellaneous 71.37%
Total 21.24%
19
Monthly Progress Report No. 07 (Month of January, 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Progress Details
Scheduled Planned
Description (Rev. 2.0 (Rev. 2.1
Achieved
Baseline program – Not
program) approved)
Overall Cumulative progress as of
19.54 % 14.36 % 6.59 %
31st January 2022
Delay days 186 days
Average labour count 4
20
Monthly Progress Report No. 07 (Month of January, 2022)
Progress (%)
100
0
10
20
30
40
50
60
70
80
90
Jan-21 0.32
0.35
Feb-21 1.82
0.90
Mar-21 3.56
1.58
Apr-21 4.81
2.44
May-21 5.77
3.28
Jun-21 7.13
4.26
Jul-21 9.36
5.21
Aug-21 11.40
5.82
Sep-21 12.98
6.29
Oct-21 15.43
6.45
Nov-21 18.59
6.50
19.10
Scheduled
Dec-21 6.50
Jan-22 19.54
6.59
Feb-22 20.72
Mar-22 21.95
Apr-22 24.12
Support To Colombo Urban Regeneration Project (SCURP – AIIB)
May-22 27.32
Jul-22 37.79
Aug-22 45.13
Time (Month-Year)
Sep-22 55.11
Oct-22 63.64
Scheduled
Nov-22 70.24
750 Housing units at Ferguson Road
Dec-22 76.61
Scheduled Progress Vs Achieved Progress
Jan-23 83.15
Feb-23 87.69
Mar-23 91.24
Achieved
Apr-23 93.05
May-23 94.37
Jun-23 95.48
Jul-23 95.98
Urban Development Authority, Sri Lanka
Aug-23 96.24
21
Sep-23 97.25
Oct-23 98.23
Nov-23 99.18
Dec-23 99.94
Jan-24 100.00
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.1.6 Madampitiya
Note: All the progress percentages were calculated according to revised construction program
(Submittal No: MADM/TBL/DOC 16 R2) which approved on 10.12.2021.
2.1.6.1 Preliminary Work
Total preliminary work progress is 30.64% which tabulated in below table
Item Progress
Insurance & Securities 100.00%
Engineer’s facilities 24.34%
Contractor’s management and supervision 22.57%
Quality, Standards and Progress 20.58%
Health, Safety & Environment 22.98%
Security, Fencing & Protection 22.79%
Services and Facilities 22.73%
Miscellaneous 9.09%
Total 30.64%
22
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
4 Plumbing
i Water supply system 0%
ii Sewer and waste water disposal system 6%
5 Electrical
i Electrical system 0%
ii Lift system 0%
iii Generator system 0%
iv Lighting protection system 75%
6 Fire
i Fire protection detection and sprinkler 0%
system
ii LP gas system 0%
7 External
i Storm water discharge system 0%
ii Landscape details 0%
CARRIED TO GRAND SUMMARY 37.8%
23
Monthly Progress Report No. 07 (Month of January 2022)
PROGRESS %
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
May/21 0.63
0.63
Jun/21 0.95
0.92
Jul/21 1.62
1.34
Aug/21 2.69
2.55
Sep/21 4.15
3.95
Oct/21 7.04
6.88
Nov/21 8.41
8.14
Dec/21 10.80
8.59
Jan/22 12.16
9.78
Feb/22 13.40
Scheduled Progress %
Mar/22 14.33
Apr/22 15.20
May/22 16.48
Jun/22 18.07
Jul/22 19.98
Aug/22 21.93
Actual Progress %
Sep/22 24.21
Support To Colombo Urban Regeneration Project (SCURP – AIIB)
26.71
Axis Title
Dec/22 32.76
Jan/23 36.52
Feb/23 40.09
Mar/23 44.31
Scheduled Progress %
Apr/23 47.21
May/23 51.49
Jun/23 55.71
Jul/23 60.96
Aug/23 66.52
Sep/23 71.95
Oct/23 77.88
Actual Progress %
Nov/23 84.39
Dec/23 88.73
Scheduled Progress Vs Actual Progress of Madampitiya Housing Project
Jan/24 93.08
Feb/24 97.77
Urban Development Authority, Sri Lanka
Mar/24 99.16
24
Apr/24 99.81
May/24 100.00
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Month
294,450 96,272
25
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
16 QS Monitoring 1
17 HR/Admin officer 1
18 Assistant Engineer 6
19 MEP Engineer 1 3
20 Assistant MEP Engineer 2
21 MEP Technical Officer 1
22 MEP Storekeeper 1
23 MEP Draftsman 1
24 MEP Supervisor 3
25 Surveyor 1
26 Assistant Surveyor 1
27 Technical Officer 4
28 HR Assistant 1
29 Accountant 1
30 Account. Assistant 1
31 Purchasing officer 1
32 Asst. Purchasing officer 1
33 Environmental officer 1
34 Safety Officer 2
35 Draftsman 1 1
36 Supervisor 8
37 QA/QC technical officer 1
38 Store keeper 1
39 Asst. store keeper 1
40 Welfare officer 1
41 Document controller 1
42 Data Entry operator 1
43 Lab technician 1
44 Foreman 1
26
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
203
200
173
Number of Labors
150 132
140
114
99
100 90 99 105
83
72 85 91 88
67 80
52 58 58 58 58
50 57
34 36 46 49
39 42 40
12 14 18
11 20
13 15 15 12 16
0 0
Month/Year
Total Scheduled man dated for whole Actual man dated up to 31st January
project 2022
** 244,373 32,218
**Labor histogram has been forecasted as per the master programme with 1080+176 days. 100 additional
days were granted after the EOT evaluation. However revised labor histogram is still to be
submitted by MAGA after finalizing the master program.
27
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
12 Civil Engineer 1 4
13 Engineer Assistant - 1
14 Construction Superintendent - Rebar 1 -
15 Foreman - Carpentry work 1 2
16 Foreman - General Work - 2
17 Foreman Finishing work - -
18 Technical Officer - 2
19 Supervisor 1 3
20 Engineer Assistant (MEP) - 1
21 Forman - Electrical Work 1 1
22 Forman - Services Work - 1
23 Draft Person 1 2
24 Assistant Draft Person - -
25 HES Officer 1 1
26 Account Assistant 1 1
27 Time Keeper - -
28 Store Keeper 1 1
29 Admin & ERP DPO 1 1
30 ERP Data Processing - -
Key Personnel of the Project
28
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.2.3 Obesekarapura
2.2.3.1 Labor Histogram
120
110
100 95
80 75
60
36 36 39
40
30
25 2725 26 27 25 25
17 20 2121 2117 2223 2220 23 20 19 22
18 21
20 1312 14 16
10 12 10
78 7 8
-
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
56,436 12,531
29
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
14 Site Engineer 1 2
15 Site Manager
16 QS Monitoring
17 HR/Admin officer 1
18 Assistant Engineer
19 MEP Engineer 1
20 Assistant MEP Engineer
21 MEP Technical Officer
22 MEP Store Keeper
23 MEP Draftsman
24 MEP Supervisor
25 Surveyor
26 Assistant Surveyor
27 Technical Officer 1
28 HR Assistant
29 Accountant 1
30 Account. Assistant
31 Purchasing officer
32 Asst. Purchasing officer
33 Environmental officer
34 Safety Officer
35 Draftsman 1
36 Supervisor
37 QA/QC technical officer
38 Store keeper 1
39 Asst. store keeper
40 Welfare officer
41 Document controller
42 Data Entry operator
43 Lab technician
44 Foreman
Key Personnel of the Project
30
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.2.4 Applewatta
2.2.4.1 Labor Histogram
120
95
100 83
80 64
60 53
43 57 53
36 36 36 47 44
40 25 27 40 37 43
20 22 31 35 36
20 20 23
12 15
0 6
Month
Forecasted Actual Forecasted Series Actual Series
Total Scheduled Man Dated for Whole Actual man Dated up to 31st January
Project 2022
171,960 14,970
31
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
19 MEP Engineer 1 1
20 Assistant MEP Engineer
21 MEP Technical Officer 1
22 MEP Store Keeper 1
23 MEP Draftsman
24 MEP Supervisor
25 Surveyor 1
26 Assistant Surveyor 1
27 Technical Officer 1
28 HR Assistant 1
29 Accountant
30 Account. Assistant 1
31 Purchasing officer 2
32 Asst. Purchasing officer
33 Environmental officer 1 1
34 Safety Officer 1 1
35 Draftsman 1 1
36 Supervisor 2
37 QA/QC technical officer
38 Store keeper 1
39 Asst. store keeper
40 Welfare officer
41 Document controller 2
42 Data Entry operator
43 Lab technician
44 Foreman 1
Key Personnel of the Project
32
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
231
229
240
208
220
200
Number of Labours
180
155
160
140
120
87
100
64
80
51
60
40
40
23
20
20
17
17
16
15
13
13
12
12
12
10
10
11
20
7
4
0
Feb-21
Mar-21
May-21
Jun-21
Sep-21
Jan-21
Jul-21
Oct-21
Dec-21
Jan-22
Apr-21
Aug-21
Nov-21
Planned Actual Planned Actual
Total scheduled man dated for Actual man dated upto 31th
whole project January 2022
214,419 4,895
33
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
15 Site Manager
16 QS Monitoring
17 HR/Admin officer
18 Assistant Engineer
19 MEP Engineer 1 1
20 Assistant MEP Engineer
21 MEP Technical Officer
22 MEP Store Keeper
23 MEP Draftsman
24 MEP Supervisor
25 Surveyor 1
26 Assistant Surveyor
27 Technical Officer 1
28 HR Assistant
29 Accountant
30 Account. Assistant
31 Purchasing officer
32 Asst. Purchasing officer
33 Environmental officer
34 Safety Officer 1
35 Draftsman 1 1
36 Supervisor 2
37 QA/QC technical officer
38 Store keeper
39 Asst. store keeper
40 Welfare officer
41 Document controller 1
42 Data Entry operator
43 Lab technician
44 Foreman
Key Personnel of the Project
34
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.2.6 Madampitiya
2.2.6.1 Labor Histogram
80
84 54 55
60
40 64
49 52 53 58 64 58
20
25
0 15 15 32
Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 Jan-22
Month
35
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
36
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3 APPROVALS
2.3.1 Material Approval Summary
2.3.1.1 Stadiumgama
Project: Construction of 1000 Housing
Consultant: State Engineering Corporation
units at Stadiumgama
No of floors : G+14 Contractor:Access Engineering PLC
Warran
Country ty/ Material Submission Approved Remark
Sr Trade Name (if of Origin Guaran for Approval (Y-Yes/N-N0) Date s
Item Description Manufacture / Local Supplier
No relevant) ty
Specs Sample Date
B Base Materials
B5 Reinforcment Steel
B5.1 Tor steel Ceylon
reinforcement Sri Lanka Ceylon steel cooporation Limited Y 10/9/2020 6/10/2020
steel
Captain steel Sri Lanka Captai steel (pvt) Ltd Y 19/08/2020 1/9/2020
Melwa Sri Lanka Melwire Rolling (pvt) Ltd Y 10/9/2020 24/09/2020
GTB Sri Lanka GTB Steel Corporation (pvt) Ltd Y 23/11/2020 4/1/2021
B5.2 Mild steel Ms water bar Y 4/1/2021 19/01/2021
37
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
38
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
M1 Door Shutters
M1.1 Main door - D1 Superwood Sri Lanka Superwood Exports (Pvt) Ltd. 10 Yrs Y Y 29/07/2021 27/01/2022
Lanka
Aluminium
M1.2 Toliet Door -D3 sri lanka Lanka Aluminium Industries PLC Y Y 9/9/2021 16/11/2021
Romet
Engineering
M1.3 Fire door ASP Enterprises China ASP Enterprises Y Y 29/03/2021 13/05/2021
M2.1 Main Door - D1 Superwood Sri Lanka Superwood Exports (Pvt) Ltd. 10 Yrs Y Y 29/07/2021 27/01/2022
M2.2 Bed Room - D2 Superwood Sri Lanka Superwood Exports (Pvt) Ltd. 5 Yrs Y Y 29/07/2021 27/01/2022
San Trading Sri Lanka San trading Enterprises (Pvt) Ltd. 5 Yrs Y Y 28/10/2021 26/01/2022
Lanka
Aluminium
M2.3 Toliet Door -D3 sri lanka Lanka Aluminium Industries PLC Y Y 9/9/2021 16/11/2021
Romet
Engineering
39
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
M3 Aluminum Window
Lanka
Powder Coated Aluminium - Aluminium
M3.1 sri lanka Lanka Aluminium Industries PLC Y Y 9/9/2021 16/11/2021
Fan Light Romet
Engineering
Lanka
Powder coated Aluminium Aluminium
M3.2 sri lanka Lanka Aluminium Industries PLC Y Y 9/9/2021 16/11/2021
windows Romet
Engineering
M3.5 Window accessories Kinglong China Romet Engineering pvt ltd 5Yrs Y Y 10/1/2022 20/1/2022
M4 Aluminium Door Sealent Fittings
M4.1 Guangdong Archie Hardware Co.
Tower Bolt Bob Hardware China Y Y 3/11/2021 16/11/2021
Ltd
M4.2 Guangdong Archie Hardware Co.
Hinges Bob Hardware China Y Y 3/11/2021 16/11/2021
Ltd
M4.3 Guangdong Archie Hardware Co.
door lock Bob Hardware China Y Y 3/11/2021 16/11/2021
Ltd
M4.4 Silicone Masense 801 China Gunuo Tianjin Industrial Co.Ltd Y Y 9/12/2021 16/12/2021
M5 Bath Room
M5.1 Foshan Jiexia Sanitory ware Co.
Wall hung wash basin GISMO China 5 Yrs Y Y 22/03/2021 5/9/2021
Ltd
M5.2 Foshan Jiexia Sanitory ware Co.
Water closet GISMO China 5 Yrs Y Y 22/03/2021 5/9/2021
Ltd
M5.3 Shower rose ONIDA India IBIBO Metal master (pvt) ltd 5 Yrs Y Y 28/09/2021 13/10/2021
M5.4 Pillar tap ONIDA India IBIBO Metal master (pvt) ltd 5 Yrs Y Y 28/09/2021 13/10/2021
M5.5 Bib tap ONIDA India IBIBO Metal master (pvt) ltd 5 Yrs Y Y 28/09/2021 13/10/2021
M6 Paint Materials
M6.1 N. Chandrarathna Decorators pvt
Skim coat ENDMIX sri lanka Y 14/09/2021 10/11/2021
ltd
SK sri lanka St.Anthany's Coatings pvt ltd Y 22/07/2021 26/08/2021
Aero flex sri lanka Colouright Industries (Pvt) Ltd Y 19/07/2021 26/08/2021
Singhe sri lanka Fair Mate Y 3/12/2021 9/12/2021
M7 Tiles
40
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
41
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
D
D1 Drainage systems
D2 Floor Gully ERA China Yanggao Co. Ltd Y Y 10/12/2020 1/1/2021
D3 Manhole covers EDNA EDNA Engineering pvt ltd Y 11/5/2021 21/05/2021
Auscar Engineering services pvt
Auscar(C250) Y 16/06/2021 8/1/2021
ltd
D4 Gully trap ERA China ERA Piping systems Y Y 2/7/2021 27/7/2021
D5 PVC puddle collar … sri lanka Maaz lanka industries Y 21/09/2021 12/10/2021
S
S1 Sanitary ware
S2 Kitchen sink Mascons Sri Lanka Mascons(pvt) Ltd Y 16/07/2021
S3 Bottled Trap- Kitchen Sink Pakai A300 Malaysia Pakai Industries Berhad Y Y 4/10/2021 1/11/2021
Pakai A301 Malaysia Pakai Industries Berhad Y Y 4/10/2021 1/11/2021
E
E1 Electrical System
E2 Electrical Cable Orange Sri Lanka Orange Electric Y 29/09/2021 12/11/2020
sierra Sri Lanka sierra cables PLC Y 21/09/2021 22/10/2021
E3 Cable Tray/ Trunking/ Ladder Obo Bettermann German Saw Engineering pvt ltd Y 5/3/2021 12/3/2021
E4 Polycrome Electrical Industries
Conduit Polycrome Sri Lanka (pvt) ltd Y Y 25/01/2021 2/2/2021
Polycrome Electrical Industries
Polycrome Sri Lanka (pvt) ltd Y 26/03/2021 30/03/2021
S-Lon Sri Lanka S-Lon lanka pvt ltd Y Y 19/07/2021 28/07/2021
Kevilton Electrical products pvt
Kevilton Sri Lanka ltd Y Y 19/07/2021 28/07/2021
E5 Flexible conduit material S-Lon Sri Lanka S-Lon lanka pvt ltd Y 12/8/2021 8/9/2021
E6 Polycrome Electrical Industries
Junction Box Polycrome Sri Lanka (pvt) ltd Y Y 25/01/2021 2/2/2021
E7 Switch boxes Polycrome Electrical Industries
Polycrome Sri Lanka (pvt) ltd Y Y 25/01/2021 2/2/2021
E8 Switches & Socket outlets CHINT China Chint Energy (pvt) ltd lifetime Y 4/12/2020
ACL Sri Lanka ACL Cables PLC 20Yrs Y Y 19/04/2021 23/04/2021
42
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Chech
E9 Electrical Door bell Bonega Bonega, spol.s r o 3Yrs Y 16/11/2020 4/1/2021
Republic
ACL Sri Lanka ACL Cables PLC 20Yrs Y Y 15/12/2020 22/01/2021
Kevilton Electrical products pvt
Kevilton Sri Lanka Y 18/01/2022 26/01/2022
ltd
Polycrome Electrical Industries
E10 Light fittings/ holders Polycrome Sri Lanka Y Y 25/01/2021 2/2/2021
(pvt) ltd
Kevilton Electrical products pvt
Kevilton Sri Lanka Y Y Y 29/03/2021 5/4/2021
ltd
Polycrome Electrical Industries
E11 Ceiling roses Polycrome Sri Lanka Y Y 25/01/2021 2/2/2021
(pvt) ltd
Kevilton Electrical products pvt
Kevilton Sri Lanka Y Y Y 29/03/2021 5/4/2021
ltd
Polycrome Electrical Industries
E12 Pendent holders Polycrome Sri Lanka Y Y 25/01/2021 2/2/2021
(pvt) ltd
Polycrome Electrical Industries
E13 Enclosure Polycrome Sri Lanka Y Y 25/01/2021 22/02/2021
(pvt) ltd
E14 Breakers (MCB, RCCB) CHINT China Chint Energy (pvt) ltd lifetime Y 4/12/2020
E15 Elevator Mitsubishi Japan Mitsubishi elevator Asia Co.Ltd 1 Year Y 28/10/2021 1/12/2021
E16 Lightning Protection System Wallis UK A.N.Wallis & Co. Ltd Y Y 29/03/2021 5/4/2021
E17 Earth Electrode (Earth rod) Kingsmill UK Kingsmill Industries (UK) Ltd Y 18/09/2021 29/9/2021
E18 Insulation board Insutech … … Y Y 4/1/2022 18/01/2022
E19 LP Gas system
E19.
Heavy duty pipes Surya India Surya Roshni Ltd Y 26/11/2021 3/12/2021
1
43
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Draft Past
Country SLSI Test SUBMITTAL
Material BRAND SUPPLIAR Warranty Project Samples STATUS
of Origin Certificates reports NO.
certificate References
Reinforcement Material
Cement
Ordinary Portland
India - EMSF/030 Approved.
Cement (OPC) Ultra Tech Ultra Tech Cement
Portland Fly Ash Cement Lanka Accepted with
India - EMSF/031
Cement (PFC/PPC) comments
Waterproofing Material
44
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Formwork
Plumbing Material
EMSF/006
S-LON Lanka (Pvt)
S-LON Sri Lanka EMSF/023 Approved
Ltd.
PVC Pipes & Fittings EMSF/026
Central Industries
NATIONAL Sri Lanka - EMSF/007 Approved
PLC
S-LON Lanka (Pvt) EMSF/008
Solvent Cement S-LON Sri Lanka Approved
Ltd. EMSF/023
Brass Valves (Gate
Valves, Pressure
PEX UK PEX, UK - - - - EMSF/50 Approved
reducing Valves and
Ball Float Valves)
uPVC Balcony Floor
YONGGAO.CO.LTD,
Trap Gully with SS ERA China - - - - EMSF/51 Approved
China
Grating
uPVC Trap Floor
S-LON Lanka (Pvt)
Gully (For S-LON Sri Lanka - - - - EMSF/52 Approved
Ltd., Sri Lanka
Bathrooms)
Hanging Pipe Locally DJ Fabricators, Sri
Sri Lanka - - - EMSF/53 Approved
Brackets Fabricated Lanka
uPVC Pipes fitted
with Collars - Locally
made Puddle Collars S-LON Sri Lanka Shanko, Colombo - - - - EMSF/063 Approved
for Balcony with
PVC welding
45
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Electrical Material
Earthing Materials
Bare Cu Tape,
Copperbond Earth
Rod, Coupler, Diving
Stud, Non-Metalic DC - EMSF/027 Approved
Clip, Rod to Tape
Clamp, Squre Clamps,
Non-Metalic DC Clip KINGSMILL
(Circular Wrap Over KINGSMILL UK
Indestries (UK) Ltd.
Type)
Test clamp, 16mm
Gunmetal Air
Terminal Base, Earth
pit with cover,
- EMSF/058 Approved
16mm*10000mm
Copper elevation rod
& Copper air terminal
(Multi point)
S-LON Lanka (Pvt) Accepted with
PolyconPRO Sri Lanka EMSF/028
Conduits & Ltd. comments.
Accessories Polycrome Electrical
Polycrome Sri Lanka - EMSF/032 Approved
Industries
The Supreme
Supreme, India India - - - - EMSF/035 Approved
Industris, India
uPVC Pipe Fittings
China ERA Group,
ERA, China China - - - - EMSF/036 Approved
Yonggao, China
Cable Solutions,
Fire Resistant Cables Cable Solutions Sri Lanka - - - EMSF/041 Approved
Kadawatha, Sri Lanka
46
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Wilson Cables,
Wilson Singapore - - - - - EMSF/042 Approved
Singapore
Switch Boxes (Sunk Polycrome Electrical
Polycrome Sri Lanka - - - - EMSF/067 Approved
Boxes) Industries
Cables - 1x1.5mm2
Cu/PVC/PVC, 1x2.5mm2 ACL Cables PLC, Sri
Cu/PVC/PVC, 1x2.5mm2 ACL Cable Sri Lanka - - EMSF/068 Approved
Lanka
Cu/PVC/ (E.W)
Cables -
1.5mm27/.53mm
Cu/PVC/PVC Single
Core,
Sierra Cables PLC, Sri Accepted with
2.5mm27/.67mm Sierra Cables Sri Lanka - - EMSF/70
Lanka comments.
Cu/PVC/PVC Single
Core, 2.5mm2
7/0.67mm Cu/PVC/
(E.W)
Construction Materials
MIXGROUT
UAE N Chandraratne - - - - EMSF/015 Approved
NS20
Decorators (Pvt) Ltd.
Conbextra GP2 India - - - - EMSF/016 Approved
Construction Grouts FINEX
Finex Engineering
Construction Sri Lanka - - - - EMSF/017 Approved
(Pvt) Ltd
Grout GP
Finex Engineering Accepted with
Mapefill GP Singapore - - - EMSF/029
(Pvt) Ltd comments.
Concure WB India - - - - EMSF/018 Resubmission
N Chandraratne
Decorators (Pvt) Ltd. Accepted with
Curing Agents MIXCURE AC UAE - - - - EMSF/019
comments
47
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Cement Blocks
ICC PRE CAST
(390*190*100 hollow Sri Lanka - - EMSF/066 Resubmission
PRODUCTION
& 390*190*150 solid)
48
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
49
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.1.3 Obesekarapura
Project: Design & Construction of 300 housing units
Consultant: State Engineering Corporation
at Obesekarapura
No of floors : G+15 Contractor: Subhasinghe Contractors
Warranty
Country Manufacture Material Submission
Sr Trade Name / Approved Date Remarks
Item Description of Origin / Local for Approval (Y-Yes/N-N0)
No (if relevant) Guaranty
Supplier
Specs Sample Date
Soil stabilizing
S
material
Pileman- AMRFEO
S1 Bentonite Y N 4/9/2020 22/10/2020
B.H. pvt.ltd
B Base Materials
B5 Reinforcement
Steel
B5.
Melwa Melwa Y N 4/9/2020 24/09/2020
1
B5. Lanwa (for
2 Lanwa Y N 4/9/2020 24/09/2020
piles)
B5. CN-Confab 20/10/202 Rejected
4 CN Y N
Ribbed steel steel(pvt ltd) 0 (22/10/2020)
B5. Lanwa (for 15/07/202
Lanwa Y N 19/07/2021
5 pile caps) 1
B5. GTB steel
6 29/11/202
GTB corporation Y N 23/12/2021
1
pvt ltd
Ready mix
B6
concrete
Acceess eng.
B6. Grade 40 (for
Access Readymix Y N 7/9/2020 9/9/2020
1 piling)
plant
Acceess eng.
B6. Grade 35 (for
Access Readymix Y N 10/9/2020 11/9/2020
2 piling)
plant
50
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Acceess eng.
B6.
Grade 30 Access Readymix Y N 4/9/2020 9/9/2020
3
plant
INSEE
B6.
INSEE readymix Y N 4/12/2020 24/12/2020
4
plant
SAN
B6. SAN
readymix Y N 4/12/2020 24/12/2020
5 readymix
plant
Acceess eng.
B6.
Access Readymix Y N 7/12/2020 24/12/2020
6
plant
B6. Concrete batching Tokyo super Tokyo super 20/02/202
Y N 30/03/2021
8 plant mix mix 1
B7 Masonary
ultratech
B7. Ultratec 17/03/202
Cement cement lanka Y N 26/03/2021
1 OPC 1
pvt ltd
Ultratec
ultratech
B7. portland fly 17/03/202
Fly ash Cement cement lanka Y N 26/03/2021
2 ash cement 1
pvt ltd
(PFC)
B8 Cement Blocks
light weight
B8. Lanka AAC 14/10/202
blocks(600x150x20 AAC Y N 15/10/2020
1 pvt ltd 0
0)
51
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
CONBEXTR constructive
B12 Non Shrink Grout Y N 5/3/2021 10/3/2021
A solutions
Estogrout
20/04/202
B13 Shrink grout MP60&MP5 Estop group Y N 23/04/2021
1
0
M Finishing Material
F Fire system
P Plumbing System
D Drainage systems
S Sanitary ware
E Electrical System
52
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.1.4 Applewatta
Project: Design & Construction of 700
Consultant: State Engineering Corporation
Housing Units at Applewatta
Country
Material Submission
Sr Trade Name of Manufacture / Warranty/ Approved
Item Description for Approval (Y-Yes/N-N0) Remarks
No (if relevant) Origin Local Supplier Guaranty Date
Specs Sample Date
B Base Materials
B5 Reinforcment Steel
B5.1 Ceylon steel
Sri
Tor steel Lanwa cooporation Y Y 21.05.2021 09.07.2021
Lanka
Limited
Sri Melwire Rolling
Melwa Y Y 11.08.2021 27.08.2021
Lanka (pvt) Ltd
B5.2 Mild steel
B5.3 Ribbed steel
Sri Capital RMC (Pvt)
B6 Ready mix concrete Capital
Lnaka Ltd
Sri Detong Lanka
Detong
Lanka Concrete (Pvt) Ltd.
Sri Tudawe Brothers
Tudawe
Lnaka (Pvt) Ltd
Sri Tokyo Supermix
Tokyo
Lanka (Private) Limited
Sri Access
Access
Lnaka Engineering PLC
B7 Masonary
Sri Siam City Cement
B7.1 Cement INSEE 25.08.2021 06.10.2021
Lanka (Lanka) Limited
B7.2 River Sand
B7.3 Sea sand Y
53
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
B7.4 Metal
B8 Cement Blocks
B8.1 Ct.Sand Solid block 150x190x390mm Y Y
B9 Pre-Cast concrete items
GIM General
Sri Trading and
B10 Borrowed soil for filling RED Soil Y Y 08.08.2021 27.08.2021
Lanka Construction (Pvt)
Ltd
B11 DPC Tar
Mix Grout
B12 Construction Grout UAE HE Engineering Y 08.10.2021 27.10.2021
NS 20
B13 Water Proofing chemicals
B13.1 for lift
External Penetron USA HE Engineering Y 20.08.2021 13.10.2021
Internal
B13.2 Roof slab Rockal Plus Egypt HE Engineering Y 05.01.2022
B13.3 Toilet /Balcony Mixguard-AC UAE HE Engineering Y 20.08.2021 13.10.2021
N.Chandraratne
Brushbond
Toilet /Balcony Malaysia Decorators (Pvt) Y 15.09.2021 06.10.2021
FLX-III
Ltd
B13.4 Over Head water tank Mixguard-AC UAE HE Engineering Y 20.08.2021 13.10.2021
B13.5 Sump
Internal Penetron USA HE Engineering Y 20.08.2021 13.10.2021
54
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
M1 Door Shutters
Timber /Polynorm/ Aluminium Door
M2
Frame-size/slashes
Aluminum Window ( check
withstand to wind pressure
M4
certificate for frames & glass) -
frame sizes to be finalised
M5 Type of glass
M6 Aluminium Door Sealent Fittings
M7 Bath Room Fittings
M8 Paint Materials
M9 Hand rail bars
M11 Concrete Curb (for road)
M12 Tiles
F Fire system
P Items for Plumbing System
S Sanitary ware
E Electrical System
E40 Lightning Protection System
55
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
56
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
57
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
58
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.1.6 Madampitiya
Project: Design & Construction of 700 housing units
Consultant: State Engineering Corporation
at No 320, Madampitiya Road, Colombo 14
No of floors : Fifteen (G+15) stories Contractor: Tudawe Brothers (Pvt.) Ltd
Warr
Material Submission
Country of anty / Approved
Sr Trade Name (if Manufacture / for Approval (Y-Yes/N- Remarks
Item Description Origin Guar Date
No relevant) Local Supplier N0)
anty
Sam
Specs Date
ple
B Base Materials
Reinforcment Steel
Tor steel Cylone Steel Cylone Steel
Corporation pvt Corporation pvt 20.03.2012
MADM/TBL/MAT/001 ltd ltd
MADM/TBL/MAT/002 Tor steel GTB GTB Steel 05.08.2021
MADM/TBL/MAT/003 Tor steel Melwa Melwa steel
MADM/TBL/MAT/004 Tor steel Melwa Captain steel
Thudawe brothers Thudawe brothers
Ready mix concrete 08.09.2021
MADM/TBL/DOC/39 Pvt Ltd Pvt Ltd
M Masonary
MADM/TBL/MAT/005 Cement INSEE cement
MADM/TBL/MAT/006 Cement Ultratech cement
C Cement Blocks
Pennsylvani
Bilex TC United
Bilex TC a
MADM/TBL/MAT/009 R1 Termiticide/Insecticide(A professionalAgen
Termiticide (Philadelphi
nti termite material) cies (pvt)ltd.
a) 09.12.2021
Mixbond SBR(Pychem)- Mixbond SBR N Chandrarathne
MADM/TBL/MAT/014 bonding agent NCD (pychem) UAE Decorators 01.11.2021
Mixcure AC (Pychem)- Mixcure AC N Chandrarathne
MADM/TBL/MAT/015 curing agent NCD (pychem) UAE Decorators 01.11.2021
Mixrelease WB(Pychem)- Mixrelease WB N Chandrarathne
MADM/TBL/MAT/016 mould oil NCD (pychem) UAE Decorators 01.11.2021
Conbextra GP2- N Chandrarathne
MADM/TBL/MAT/017 Construction grout NCD Conbextra India Decorators 01.11.2021
59
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Expansion Joint
E
Material
M1 Finishing Material
Timber /Polynorm/
M2 Aluminium Door
Frame-size
Aluminum Window (
check withstand to wind
M4 pressure certificate for
frames & glass) - frame
sizes to be finalised
M5 Aluminium Door
Sealent Fittings
M6 Bath Room
60
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
M7 Paint Materials
M8 Hand rail bars
M10 Tiles
F Fire system
P Plumbing System
S lon PVC multi trapped S-Lon
MADM/TBL/MAT/025R1
floor gully S-Lon Sri lanka lanka(pvt)ltd. 20.12.2021
ERA drinage pipe fittings Central industries
MADM/TBL/MAT/026 for waste water and storm PLC & S lon
water disposal system ERA Group China lanka (pvt)ltd 05.11.2021
National PVC pipes and
fittings for waste water
MADM/TBL/MAT/027
and storm water disposal National PVC Central industries
system pipe & fittings Srilanka PLC 01.11.2021
S lon solvent cement for S-Lon
MADM/TBL/MAT/029R1
PVC pipes and fittings S-Lon Sri lanka lanka(pvt)ltd. 28.12.2021
For all blocks and
buildings- Kitchen/Pantry Sealcore stainless
MADM/TBL/MAT/034
Sink- single bowl Kitchen sink- steel industries Pending
draining board sealcore Srilanka (pvt)ltd. Y From UDA
Close couple,floor
MADM/TBL/MAT/035 mounted water closet - Sona Field Krisho multi Pending
Sona Ceramic India trades (pvt)ltd. Y From UDA
For all blocks and
MADM/TBL/MAT/036 buildings-full pedestal Sona Field Krisho multi Pending
wash basin-Sona Field Ceramic India trades (pvt)ltd. Y From UDA
Close couple,floor
MADM/TBL/MAT/037 mounted water closet - ROCA Bathroom Krisho multi Pending
Parryware products (pvt)ltd India trades (pvt)ltd. Y From UDA
Full pedestal washing
basin for level 1
MADM/TBL/MAT/038
bathrooms in each tower- ROCA Bathroom Krisho multi Pending
Parryware products (pvt)ltd India trades (pvt)ltd. Y From UDA
61
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
S Sanitary ware
E Electrical System
Electrical Juction Boxes
MADM/TBL/MAT/010-R1
For entire project PPI Srilanka Bandara Brothers Y 03.12.2021 10.01.2022
PVC conduits and
MADM/TBL/MAT/011 accessories for entire S-Lon lanka
project Polycon Srilanka (pvt)ltd Y 01.12.2021 13.12.2021
Polycrome
MADM/TBL/MAT/012 Electric industries
Switch mounting boxes Polycrome Srilanka (pvt)ltd. Y 01.12.2021 13.12.2021
62
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
SEC UDA
Submitted
Drawing Subject Submittal No Commented Comment Commented Comment
Date
Date Date
STRUCTURAL
Accepted with comments as Accepted with
1. Pile
STDM/ACCESS/DRG/015R2 21/9/2020 24/09/2020 noted 1/2/2021 comments as noted
Accepted with comments as Accepted with
STDM/ACCESS/DRG/022R1 21/9/2020 24/09/2020 noted 1/2/2021 comments as noted
2. Pile cap
STDM/ACCESS/DRG/26R4 21/12/2020 31/12/2020 Accepted 25/02/2021 Accepted
3. GA Drawings
STDM/ACCESS/DRG/28R3 21/12/2020 31/12/2020 Accepted 29/01/2021 Accepted
Accepted with comments as Accepted with
STDM/ACCESS/DRG/31R4 25/02/2021 8/3/2021 noted 17/03/2021 comments as noted
63
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
SEWAGE AND
WASTE WATER
DISPOSAL
SYSTEM Accepted with comments as
STDM/ACCESS/DRG/23R3 26/01/2022 27/01/2022 noted Pending
STORM WATER
DISPOSAL
SYSTEM
STDM/ACCESS/DRG/25R2 26/01/2021 Pending
ELECTRICAL
64
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Drawing Approval
for Lighting & Small
Power Arrangement
Utility Area - Ground
Floor Block A, B, C, Accepted with comments as Accepted with
D STDM/ACCESS/DRG/38R1 10/2/2021 15/02/2021 noted 11/3/2021 comments as noted
MECHANICAL
Fire Protection
Drawings-
Construction Accepted with
drawings STDM/ACCESS/DRG/91R2 3/12/2021 8/12/2021 Accepted 5/1/2022 comments as noted
Accepted with comments as
To be resubmitted
Fire Detection STDM/ACCESS/DRG/68R1 3/11/2021 26/11/2021 noted 7/12/2021
Accepted with comments as
LP Gas system
STDM/ACCESS/DRG/107R1 7/1/2022 21/01/2022 noted Pending
65
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
66
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
STRUCTURAL
469M / WD / ST / 001 GENERAL NOTES DRSF/007 30/11/2020
469M / WD / ST / 002 PILE LAYOUT & DETAILS DRSF/011 11/2/2021
469M / WD / ST / 003 PILE CAP LAYOUT DRSF/006R2 12/3/2021
469M / WD / ST / 004 Pile Cut-Off Levels & Details DRSF/011R1 23/3/2021
469M / WD / ST / 005 DETAILS OF PILE CAPS DRSF/006R2 12/3/2021
469M / WD / ST / 006-1 DETAILS OF SUMP (SHEET-1) DRSF/104 9/12/2021
469M / WD / ST / 006-2 DETAILS OF SUMP (SHEET-2) DRSF/104 9/12/2021
469M / WD / ST / 007-1 COLUMN LAYOUT & DETAILS DRSF/022 6/3/2021
469M / WD / ST / 007-2 COLUMN LAYOUT & DETAILS DRSF/36R1 28/6/2021
469M / WD / ST / 008 GENERAL ARRANGEMENT OF GROUND FLOOR DRSF/98 23/11/2021
469M / WD / ST / 009 GENERAL ARRANGEMENT OF FIRST FLOOR DRSF/99 23/11/2021
GENERAL ARRANGEMENT OF SECOND FLOOR (2nd Floor to 5th Floor
469M / WD / ST / 010 DRSF/109 20/1/2022
Similar)
469M / WD / ST / 012 GENERAL ARRANGEMENT OF FIFTH TO 11TH FLOOR DRSF/36R1 28/6/2021
469M / WD / ST / 014 DETAILS OF GROUND FLOOR SLAB DRSF/016 4/3/2021
469M / WD / ST / 015 DETAILS OF FIRST FLOOR SLAB DRSF/107 21/12/2021
469M / WD / ST / 016 DETAILS OF SECOND TO ELEVENTH FLOOR SLAB DRSF/111 21/1/2022
469M / WD / ST / 017 DETAILS OF ROOF TERRACE SLAB DRSF/013 4/3/2021
469M / WD / ST / 019 DETAILS OF GROUND FLOOR BEAMS DRSF/98 23/11/2021
469M / WD / ST / 020-1 DETAILS OF FIRST FLOOR BEAMS DRSF/99 23/11/2021
469M / WD / ST / 020-2 DETAILS OF FIRST FLOOR BEAMS DRSF/100 23/11/2021
469M / WD / ST / 020-3 DETAILS OF FIRST FLOOR BEAMS DRSF/100 23/11/2021
469M / WD / ST / 020-4 DETAILS OF FIRST FLOOR BEAMS DRSF/100 23/11/2021
469M / WD / ST / 021-1 DETAILS OF SECOND FLOOR BEAMS DRSF/109 20/1/2022
469M / WD / ST / 021-2 DETAILS OF FIRST FLOOR BEAMS DRSF/109 20/1/2022
469M / WD / ST / 021-3 DETAILS OF FIRST FLOOR BEAMS DRSF/109 20/1/2022
469M / WD / ST / 022-1 DETAILS OF ROOF TERRACE BEAMS DRSF/012 4/3/2021
469M / WD / ST / 022-2 DETAILS OF ROOF TERRACE BEAMS DRSF/012 4/3/2021
469M / WD / ST / 022-3 DETAILS OF ROOF TERRACE BEAMS DRSF/012 4/3/2021
469M / WD / ST / 025 DETAILS OF STAIRCASES DRSF/060 6/5/2021
67
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
PLUMBING SYSTEM - Water Supply, Waste Water & Rain Water Layout
469M/PL/SW/L/01 Single Line Diagram Block - 01 (Typical Block 02) Sewer & Waste Water DRSF/83 22/10/2021
469M/PL/SW/GFL/02 Soil & Waste Water Layout - Ground Floor DRSF/83 22/10/2021
469M/PL/SW/TFL/03 Sewer & Waste Water Layout - Typical Floor (From 1st Floor to 11th Floor) DRSF/83 22/10/2021
469M/PL/SW/RL/04 Sewer & Waste Water Layout - Roof Level DRSF/83 22/10/2021
469M/PL/SW/TD/01 Sewer & Waste Water Layout - Toilet Detail - Typical DRSF/83 22/10/2021
469M/PL/RW/EX/01 External Storm Water Layout DRSF/83 22/10/2021
469M/PL/SW/EX/01 External Soil & Waste Water Layout DRSF/83 22/10/2021
469M/PL/RW/L/01 Single Line Diagram Block - 01 (Typical Block 02) Rain Water DRSF/83 22/10/2021
469M/PL/RW/GFL/02 Rain Water Layout - Ground Floor DRSF/83 22/10/2021
469M/PL/RW/TFL/03 Rain Water Layout - Typical Floor (From 1st Floor to 11th Floor) DRSF/83 22/10/2021
469M/PL/RW/RL/04 Rain Water Layout - Roof Floor DRSF/83 22/10/2021
469M/PL/BW/GFL/01 Builders Work Layout & Detail, Ground Floor DRSF/83 22/10/2021
469M/PL/BW/GFL/02 Builders Work Layout & Detail, First Floor DRSF/102R1 24/12/2021
469M/PL/BW/2FL/03 Builders Work Layout & Detail, Second Floor DRSF/108 31/12/2021
469M/PL/WS/PR/01 Water Pump & Fire Pump Room Layout & Detail, Ground Floor DRSF/83 22/10/2021
ELECTRICAL SYSTEM - Lighting, Power & Conduit Layout and Lightning Protection
ELECTRICAL LIGHTING & POWER LAYOUT GROUND FLOOR (BLOCK
469M / EL/G/LP-001 DRSF/073 6/8/2021
01 & 02)
469M / SL/COM/SLD-001 SINGLE LINE DIAGRAM-1 DRSF/103 8/12/2021
469M / EL/FAC/PL-001 ELECTRICAL LIGHTING & POWER LAYOUT FACILITY BUILDING DRSF/090 2/11/2021
68
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
469M / EL/1F/LP-002 ELECTRICAL LIGHTING LAYOUT FIRST FLOOR LEVAL (BLOCK 01 & 02) DRSF/079 6/8/2021
469M / EP/1F/LP-002 ELECTRICAL POWER LAYOUT FIRST FLOOR LEVEL (BLOCK 01 & 02) DRSF/079 6/8/2021
ELECTRICAL CABLE TRAY & TV CONDUIT LAYOUT FIRST FLOOR
469M / EC/1F/LP-002 DRSF/079 6/8/2021
(BLOCK 01& 02)
469M / SL/COM/SLD-003 SINGLE LINE DIAGRAM-3 DRSF/092 3/11/2021
ELECTRICAL LIGHTING LAYOUT 2nd TO 10th TYPICAL FLOOR LEVEL
469M / EL/2F/LP-003 DRSF/078 6/8/2021
(BLOCK 01& 02)
ELECTRICAL POWER LAYOUT 2nd TO 10th TYPICAL FLOOR LEVEL
469M / EP/2F/LP-003 DRSF/078 6/8/2021
(BLOCK 01 & 02)
ELECTRICAL CABLE TRAY & TV CONDUIT LAYOUT 2nd to 10th
469M / EC/2F/LP-003 DRSF/078 6/8/2021
TYPICAL FLOOR LEVEL (BLOCK01& 02)
469M / EL/11F/LP-004 ELECTRICAL LIGHTING LAYOUT 11th FLOOR LEVAL (BLOCK 01& 02) DRSF/075 6/8/2021
469M / EP/11F/LP-004 ELECTRICAL POWER LAYOUT 11th FLOOR LEVEL (BLOCK 01 & 02) DRSF/075 6/8/2021
ELECTRICAL CABLE TRAY & TV CONDUIT LAYOUT 11th FLOOR
469M / EC/11F/LP-004 DRSF/075 6/8/2021
(BLOCK 01& 02)
469M / EL/RF/LP-005 ELECTRICAL LIGHTING LAYOUT ROOF SLAB LEVEL BLOCK (01 & 02) DRSF/077 6/8/2021
469M/EP/RF/LP-005 ELECTRICAL POWER LAYOUT ROOF SLAB LEVEL (BLOCK (01 & 02) DRSF/077 6/8/2021
469M/ER/EX/001 EARTHING ARRANGEMENT DRSF/085 2/11/2021
469/EL/SCH/001 Block - 1 & 2 Common Area & Facility Building, Power Distribution Schematic DRSF/039 28/4/2021
469/EL/SCH/002 Shematic Diagram for Typical Housing Unit, Power Distribution System DRSF/039 28/4/2021
469/EL/SCH/003 Main Earthing Schematic (Block 01 & Block 02) DRSF/039 28/4/2021
69
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
469/SH/EL/TH/001 Electrical Lighting & Power layout, Typical Housing Unit (Block 01 & 02) DRSF/080 2/8/2021
70
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.2.3 Obesekarapura
SEC UDA
Drawing Subject Submittal No Submitted Date Commented Commented Comment Type
Date Date
ARCHITECTURAL
1.Finalized Architectural Drawings
Architectural drawings -construction issue OBE300/DWG/02R1 5/5/2021 1/6/2021 accepted
accepted with comments as
Zone 1 plan (G.7) part section a-a , part b section b-b OBE300/DWG/64 17/12/2021 23/12/2021 30/12/2021
noted and need resubmission
Architectural Setting Out Plan OBE300/DWG/68R1
Architectural proposed level for filling and landscape
OBE300/DWG/69R1
layout
Architectural unit layout OBE300/DWG/70R1
Architectural gas supply system OBE300/DWG/71R1
Architectural wall sizes OBE300/DWG/72R1
18/01/2022 21/01/2022
Architectural floor plan OBE300/DWG/73R1
Architectural sections OBE300/DWG/74R1
Architectural elevations OBE300/DWG/75R1
Architectural door and windows details OBE300/DWG/76R1
Architectural toilets details OBE300/DWG/77R1
Architectural finishing schedule OBE300/DWG/78R1
Non structural
Accepted with comments as
tower crane pile layout OBE300/DWG/15 29/04/2021
noted.
shoring details (sump) OBE300/DWG/83 28/01/2021
STRUCTURAL
1. Pile
Submission incomplete and
Control points drawing- Revision 01 OBE300/DWG/06 12/11/2020 12/11/2020 need resubmission with
missing details.
Finite model analysis OBE300/DWG/07 R6 23/12/2020 4/1/2021 accepted
Structural piling Drawing-R5 and Structural Design accepted with comments as
OBE300/DWG/09 23/12/2020 4/1/2021
Report of the pile noted
71
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
72
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
15. Sump
accepted with comments as
Submission of layout of water sump. OBE300/DWG/24 4/10/2021 7/10/2021
noted and need resubmission
Water sump structural drawing OBE300/DWG/47R1 28/01/2022
COLD WATER SUPPLY SYSTEM
submission incomplete and
Water supply and drainage drawings- construction issue
OBE300/DWG/19 26/07/2021 28/07/2021 18/08/2021 need resubmission with
(Ground floor commercial use water supply layout.)
missing details
submission incomplete and
Water supply and Drainage drawings- Construction issue OBE300/DWG/16 6/5/2021 21/05/2021 need resubmission with
missing details
submission incomplete and
Ground floor domestic use water supply layout OBE300/DWG/26 13/10/2021 21/10/2021 need resubmission with
missing details
submission incomplete and
1st floor to 15th floor domestic use water supply layout OBE/DWG/27 13/10/2021 21/10/2021 need resubmission with
missing details
73
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
74
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.2.4 Applewatta
SEC UDA
Submitted
Drawing Subject Submittal No Commente Comment Commented Comment
Date
d Date Date
ARCHITECTURAL
STRUCTURAL
Select the test pile closer to
a borehole so as to verify
1.Submission of the drawing of test piling CR25G/APPLEWATTA/DRA
17.01.2021 19.01.2021 the pile design 19.01.2021 Accepted
location /006
parameters.borehole layout
is not submitted
CR25G/APPLEWATTA/DRA
2.Submission of design cordinates of piles 15.03.2021 15.03.2021 noted,forwarded to UDA 15.03.2021 Accepted
/014
CR25G/APPLEWATTA/DRA
3. General arrangement of pile caps - R2 19.05.2021 21.05.2021 Drawings can be accepted 21.05.2021
/026R2
4.Submission of the general arrangement of
ground floor(Block A,B,C) - Construction CR25G/APPLEWATTA/DRA 12.07.2021 14.07.2021 Drawings can be accepted 05.08.2021 Accepted
Issue /023R4
5. Submission of the lift pile cap -design CR25G/APPLEWATTA/DRA Construction
13.07.2021 21.07.2021 Drawings can be accepted 05.08.2021
drawings-Construction issue /034R1 Issue
6. The Revised General Arrangement &
Construction
Beam Details of Ground Floor(Block - CR25G/APPLEWATTA/DRA 03.10.2021 08.10.2021 Drawings can be accepted 15.10.2021
Issue
A)-Construction Issue /041R1
7.The Revised General Arrangement &
Construction
Beam Details of Ground Floor(Block -B)- CR25G/APPLEWATTA/DRA 05.12.2021 07.12.2021 Drawings can be accepted 21.12.2021
Issue
Construction Issue /043R1
75
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
76
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Drawings can be
accepted.Drawing need to
CR25G/APPLEWATTA/DRA be checked,sump drwaing Need
1. The water supply system - R3 12.11.2021 22.11.2021 03.12.2021
/016R3 no.has been given Resubmission
to ......drwaings ( Block A
& Block B)
SEWAGE AND WASTE WATER
DISPOSAL SYSTEM
Drawings can be
accepted,MH support detail
to prevent settlement need
to be submitted
separately.Under ground
pipe laying detail,Hume
1. Submission of the drawing of the plumbing CR25G/APPLEWATTA/DRA pipe connection
06.12.2021 09.12.2021 22.12.2021 Accepted
system(A,B,C) /010S3R5 detail,Hume pipe
connection to canal details
need to be submitted
separatelyu.Strom water
Mhs need to bw
incorporated with latest
architectural drawings
77
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
3.Submission of gas districbution and CR25G/APPLEWATTA/DRA See the comments in the Need
03.05.2021 05.05.2021 27.09.2021
detection system Block A,B,C /10S1-R2 drawings Resubmission
4.Submission of LP Gas distribution system CR25G/APPLEWATTA/DRA See the comments in the Need
03.05.2021 05.05.2021 27.09.2021
for typical Arrangement (Block A,B,C) /030 drawings Resubmission
78
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
1. Pile
Submission of the location of test pile 1R1 8/4/2021 9/4/2021 A - Accepted 6/5/2021 A - Accepted
79
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
3. GA Drawings
80
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Submission of water sump and pump B - Accepted with comments. B - Accepted with comments.
11 6/7/2021 8/7/2021 21/07/2021
room arrangement for all three blocks Need resubmission. Need resubmission.
Submission of Water Supply System B - Accepted with comments. B - Accepted with comments.
26 20/12/2021 22/12/2021 28/12/2021
(Block A) Need resubmission. Need resubmission.
81
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Submission of sewer and waste water B - Accepted with comments. B - Accepted with comments.
27 20/12/2021 22/12/2021 31/12/2021
disposal system (Block A) Need resubmission. Need resubmission.
STORM WATER DISPOSAL SYSTEM
Submission of rain water disposal C - Submission incomplete. Need C - Submission incomplete. Need
25 20/12/2021 22/12/2021 30/12/2021
system (Block A) resubmission with missing details. resubmission with missing details.
ELECTRICAL
Submission of lightning protection
21 14/12/2021 16/12/2021 B - Accepted with comments. 22/12/2021 B - Accepted with comments.
system drawings (Block A)
Submission of lightning protection
22 14/12/2021 16/12/2021 B - Accepted with comments. 22/12/2021 B - Accepted with comments.
system drawings (Block B)
Submission of lightning protection
23 14/12/2021 16/12/2021 B - Accepted with comments. 22/12/2021 B - Accepted with comments.
system drawings (Block C)
MECHANICAL
ROAD DETAIL
Submission of site layout internal B - Accepted with comments. B - Accepted with comments.
10R1 19/11/2021 25/11/2021 7/12/2021
roadways R1 (Master plan with DPC) Need resubmission. Need resubmission.
SETTING OUT
Submission of Setting Out Drawing R2 9R3 30/6/2021 2/7/2021 B - Accepted with comments.
82
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.3.2.6 Madampitiya
SEC UDA
Drawing Subject Submittal No Submitted Date Commented Comment Commented Comment
Date Date
ARCHITECTURAL
Architectural drawings for B-Accepted with comments as noted
construction issue MADA/TBL/DRG/002-R2 07.12.2021 15.12.2021 and need resubmission Pending
STRUCTURAL
83
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
84
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
85
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
B-Accepted with
Reinforcement details-Typical B-Accepted with comments as noted comments as noted
MADM/TBL/DRG/024 15.10.2021 02.11.2021 15.11.2021
floor slabs Tower A ,B ,C and need resubmission and need
resubmission
C-Submission
Reinforcement details-Typical C-Submission incomplete and need incomplete and need
MADM/TBL/DRG/025 15.10.2021 02.11.2021 15.11.2021
floor beam, Tower A resubmission with missing details resubmission with
missing details
C-Submission
General Arrangement of B- Acceptance with comments as incomplete and need
MADM/TBL/DRG/026 15.10.2021 02.11.2021 15.11.2021
Typical floor Tower A noted resubmission with
missing details
C-Submission
General Arrangement of B- Acceptance with comments as incomplete and need
MADM/TBL/DRG/027 15.10.2021 03.11.2021 15.11.2021
Typical floor Tower B noted resubmission with
missing details
C-Submission incomplete and need
Lightning protection system MADM/TBL/DRG/028 R1 18.12.2022 19.01.2022
resubmission with missing details
Architectural, Structural
MADM/TBL/DRG/029 14.12.2021 15.12.2021 A-Acceptance 21.12.2021 A-Acceptance
softcopy drawings
C-Submission
Building work details Tower A C-Submission incomplete and need incomplete and need
MADM/TBL/DRG/030 R1 10.01.2022 10.01.2022 19.01.2022
ground floor resubmission with missing details resubmission with
missing details
C-Submission
Building work details Tower B C-Submission incomplete and need incomplete and need
MADM/TBL/DRG/031 29.12.2021 31.12.2021 10.01.2022
ground floor resubmission with missing details resubmission with
missing details
B- Acceptance with comments as B- Acceptance with
Typical sump Rungs Detail MADM/TBL/DRG/032 05.01.2022 06.01.2022 19.01.2022
noted comment as noted
R/F Details of Lift Pit Level
MADM/TBL/DRG/033 20.01.2022 26.01.2022 A-Acceptance
Slab - Tower B
Builders work details Tower A
C-Submission incomplete and need
Sump and pump room area MADM/TBL/DRG/034 24.01.2022 25.01.2022
resubmission with missing details
below ground floor
Builders work details Tower C C-Submission incomplete and need
MADM/TBL/DRG/035 24.01.2022 25.01.2022
Ground floor resubmission with missing details
86
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
PLUMBING
C-Submission
Building work details Tower A C-Submission incomplete and need incomplete and need
MADM/TBL/DRG/030 R1 10.01.2022 10.01.2022 19.01.2022
ground floor resubmission with missing details resubmission with
missing details
C-Submission
Building work details Tower B C-Submission incomplete and need incomplete and need
MADM/TBL/DRG/031 30.12.2021 31.12.2021 10.01.2022
ground floor resubmission with missing details resubmission with
missing details
MEP
Lightning protection system MADM/TBL/DRG/028 R1 18.12.2022 Pending Pending
87
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
4 Financial Progress
2.4.1 Work done certification
2.4.1.1 Stadiumgama
IPA No SEC Received Issued Date Claimed amount Certified amount Remarks
Date (LKR-Mn) (LKR-Mn)
Not issued work
done certificate.
2 24/07/2020 24/07/2020 84.590
Approved only
percentage
3 10/9/2020 20/11/2020 153.11 134.66
4 7/10/2021 20/10/2021 132.99 158.19
5 5/11/2020 11/11/2021 365.86 210.38
6 17/12/2020 30/12/2020 186.34 113.41
7 8/1/2021 20/1/2021 61.72 55.24
8 11/2/2021 23/02/2021 133.84 63.79
9 11/3/2021 31/3/2021 150.48 103.37
10 10/4/2021 4/5/2021 53.84 63.76
11 7/5/2021 25/5/2021 65.02 59.03
12 8/6/2021 18/6/2021 118.11 74.37
13 5/7/2021 16/7/2021 128.11 120.17
14 5/8/2021 18/8/2021 169.42 115.17
15 7/9/2021 17/9/2021 158.13 114.35
16 6/10/2021 21/10/2021 262.81 200.87
17 6/11/2016 26/11/2021 171.24 106.87
18 01/12/202 03/12/2021 280.34 118.29
19 05/01/2021 13/01/2022 253.20 206.07
Total 2,929.15 2,017.99
88
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
89
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.1.3 Obesekarapura
IPA No SEC Received Issued Date Claimed amount Certified amount Remarks
Date (LKR-Mn) (LKR-Mn)
1 7/12/2020 16/12/2020 50.83 25.75
2 5/2/2021 11/2/2021 82.27 29.33
3 22/3/2021 5/4/2021 58.71 25.70
4 9/4/2021 29/4/2021 76.58 31.69
5 17/5/2021 7/6/2021 50.94 30.20
6 5/8/2021 10/8/2021 37.11 25.79
7 17/9/2021 14/10/2021 26.18 4.10
8 18/10/2021 3/11/2021 11.62 5.20
9 2/11/2021 8/11/2021 59.31 11.62
10 9/12/2021 10/12/2021 43.58 21.22
11 4/01/2022 12/01/222 33.99 6.59
Total 531.12 217.19
90
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.1.4 Applewatta
IPA No SEC Received Issued Date Claimed amount Certified amount Remarks
Date (LKR-Mn) (LKR-Mn)
1 9/4/2021 29/4/2021 135.37 69.00
2 6/5/2021 8/6/2021 148.40 43.50
3 6/6/2021 25/6/2021 161.50 87.50
4 4/7/2021 30/7/2021 179.80 58.00
5 6/8/2021 7/9/2021 142.30 42.00
6 5/9/2021 30/9/2021 116.60 11.60
7 7/10/2021 2/11/2021 133.80 22.10
8 6/11/2021 26/11/2021 83.3 4.4
9 6/12/2021 21/12/2021 65.4 3.8
Note- Please note that the Contractor prepared some IPAs based on the Contractors previous amount when they did not receive the copy of previous bill.
91
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.1.5 Furgusion
IPA No SEC Received Issued Date Claimed amount Certified amount Remarks
Date (LKR-Mn) (LKR-Mn)
2.4.1.6 Madampitiya
IPA No SEC Received Issued Date Claimed amount Certified amount Remarks
Date (LKR-Mn) (LKR-Mn)
1 23/9/2021 25/10/2021 208.10 155.40
92
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.2.1 Stadiumgama
VO No Description SEC Status of the SEC Issued Claimed Recommended Remarks
Received submission Date Amount (Rs) Amount (Rs)
Date
DPC level Evaluation
VO1 18/11/2020 17/12/2020 18,860,477.88
Change completed 34,818,665.74
Demolition Evaluation
VO2 16/12/2020 18/12/2020 665,270.00
Work completed 1,603,800.00
Additional
VO3 Surveying
Work and plot 01/09/2021 Evaluation 02/09/2021
108,000.00 88,000.00
a new completed
surveying plan
Evaluation
09/12/2020
VO1 MLT Test 12/11/202021/01/2021 completed 134,233,215.44 36,527,089.01
01/02/2021
93
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.2.3 Madampitiya
VO No Description SEC Status of the SEC Issued Claimed Recommended Remarks
Received submission Date Amount (Rs) Amount (Rs)
Date
Cost of the Temporary fence
3m high 27/08/2021 Evaluation 29/10/2021 2,226,704.40 - is considered with the
V01 additional completed preliminary item no.36 until
fence the site possession is cleared
by the Employer. Once the
site possession will clear cost
is considered as lump sum
adjustment.
94
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.3.1 Stadiumgama
SEC Received Status of the Certified
Events Issued Date Remarks
Date submission amount
Covid 19 related
expenses 14/07/2021 Not evaluated - -
05/08/2021 25/10/2021 -
Not yet finalized and under
Evaluated
review, sent a letter to UDA on
27/09/2021 25/10/2021 -
25/10/2021
95
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.4.1 Stadiumgama
EOT Events SEC Status of the SEC Requested Recommended
Nr Received submission issued Dates Dates Remarks
Date Date
96
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
97
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
98
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.4.3 Obesekarapura
EOT Nr Events SEC Status of SEC issued Requested Recommended Remarks
Received the Date Dates Dates
Date submission
COVID 19 lock down from 20th
EOT 01 March 2020 to 28th June 2020 22/3/2021 Evaluation 23/4/2021 118 36
COVID 19 post curfew effect completed
from 28th June 2020 to 12th July
2020
COVID 19 lock down from 25th
Oct to 29th Oct 2020
Curfew effect from 04th Oct 2020
to 25th Oct 2020
Extended curfew for Western
province from 30th Oct 2020 to
9th Nov 2020
Post curfew effect from 09th Nov
2020 to 29th Nov 2020
EOT 2R1 Post Curfew effect of COVID 19 11/11/2021 Evaluation 144 81 Further
Post COVID 19 effect completed 23/11/2021 evaluation
of EOT 02
99
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.4.4.4 Applewatta
EOT Nr Events SEC Status of SEC issued Requested Recommended Remarks
Received the Date Dates Dates
Date submission
Due to non availability of
EOT 01 COVID- 19 20/07/2021 Rejected 22/7/2021 26 - documentary evidence
lock down evaluation is not done.
Requested to re-submit the
claim.
Due to non availability of
EOT 01 COVID- 19 29/12/2021 Need 31/12/2021 43 - documentary evidence
lock down resubmission evaluation is not done.
Requested to re-submit the
claim.
100
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
30.00% 26.82%
19.94% 19.54%
20.00% 11.90% 14.48% 12.10% 9.78%
10.00% 6.59%
0.00%
Stadiumgama Colambage Mawatha Obesekarapura Applewatta Furgusion Road Madampitiya
101
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
1 Stadiumgama -
5 Ferguson Road -
6 Madampitiya -
102
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
Environme
Project Health & Safety Checklists ntal & Remarks
Social
General Work at Piling Hot Excavation
Safety Height Safety work
Construction
works were not
progressing during
the inspection day.
Periodic awareness
to the Muwadora
uyana dwellers to
be conducted for
safety. Proper
dewatering method
Ferguson Road 68% - - - - 46.5% to be executed.
Interim monitoring
has to be
conducted when
started work.
Housekeeping to
be improved. Fire
training to be
conducted and fire
extinguishers to be
kept at site.
Poor progress and
labours observed
Obeysekarapura 76.5% - - - - 67.5% during the visit.
Housekeeping,
waste water
103
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
discharge method
at canteen, safe
pathways within
the construction
site and store
rooms have to be
properly improved.
Public complaints
to be addressed.
Fire training to be
done.
Dewatering pond
to be properly
maintained.
Fuel/oil to be
stored without
leakage. Proper
shoring to be done
Apple Watta at sump excavation
79% - - - 86% 77%
area as per the
method statement.
Safe electrical
practices to be
implemented.
Adequate fire
extinguishers to be
provided.
Housekeeping to
be improved.
Safety notice
boards/ barricades
around open to sky
Colombage
91.5% 86% - - - 88% areas to be
Mawatha
practiced within
the buildings under
construction.
Contamination of
oil to the ground at
104
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
105
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
106
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
107
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.6.3 Obeysekarapura
108
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.6.4 Applewatta
109
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
110
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
2.6.6 Madampitiya
111
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
112
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
113
Monthly Progress Report No. 07 (Month of January 2022)
Support To Colombo Urban Regeneration Project (SCURP – AIIB) Urban Development Authority, Sri Lanka
114
Monthly Progress Report No. 07 (Month of January 2022)