DISTRICT IRRIGATION PLAN

UPPER SUBANSIRI
ARUNACHAL PRADESH
2016-2021

NABARD
1|Page CONSULTANCY SERVICES PVT. LTD.
District Irrigation Plan
2016-2021
Upper Subansiri
Arunachal Pradesh

NABARD CONSULTANCY SERVICES PVT. LTD.


Corporate Office : 24, Rajendra Place, NABARD Building, New Delhi – 110125
Reg. Office : Plot No. C24, G Block, 3rd Floor, NABARD Building
Bandra Kurla Complex, Bandra East, Mumbai-400051

2|Page
Foreword

3|Page
Table of Contents
INTRODUCTION .................................................................................................................................... 21
Background ..................................................................................................................................... 21
Vision ............................................................................................................................................... 27
Objective .......................................................................................................................................... 27
Strategy/approach.......................................................................................................................... 28
Programme Components .............................................................................................................. 29
1. Accelerated Irrigation Benefit Programme (AIBP)............................................................ 29
2. PMKSY (Har Khet ko Pani) .................................................................................................. 29
3. PMKSY (Per Drop More Crop) ............................................................................................. 30
4. PMKSY (Watershed Development) ..................................................................................... 31
Rationale/ Justification ................................................................................................................. 31
Methodology ................................................................................................................................... 31
Chapter 1 General Information of the District .................................................................................... 32
1.1 District Profile ............................................................................................................................. 33
Administrative setup of Upper Subansiri ................................................................................... 34
1.2 Demography.............................................................................................................................. 35
1.3 Biomass and Livestock ............................................................................................................ 36
1.4 Agro-Ecology, Climate, Hydrology and Topography .......................................................... 39
1.4.1 Climate .................................................................................................................................... 39
1.4.2 Hydrology............................................................................................................................... 40
1.4.3 Topography ............................................................................................................................ 41
1.5 Soil Profile ................................................................................................................................. 43
1.6 Soil Erosion and runoff status ................................................................................................ 48
1.7 Land Use Pattern ...................................................................................................................... 48
Chapter 2 District Water Profile .......................................................................................................... 51
2.1 Area Wise, Crop-Wise Irrigation Status ................................................................................ 51
2.2 Production and Productivity of Major Crops ....................................................................... 56
2.3 Irrigation Based Classification ............................................................................................... 58
Chapter 3 District Water Availability ................................................................................................... 60
3.1 Status of Water Availability .................................................................................................... 60
3.2 Status of Ground Water Availability ..................................................................................... 63
3.2.1 Ground water Quality ........................................................................................................... 63
3.3 Status of Command Area ........................................................................................................ 64
3.4 Existing Type of Irrigation ..................................................................................................... 67

4|Page
Chapter 4 Water Requirement/Demand ............................................................................................. 71
4.1 Domestic Water Demand ........................................................................................................ 71
4.2 Crop Water Requirement ....................................................................................................... 72
4.3 Livestock Water Requirement ............................................................................................... 74
4.4 Industrial water Requirement ............................................................................................... 75
4.5 Water Demand for Power Generation .................................................................................. 75
4.6 Total Water Demand for various sector ............................................................................... 75
4.7 Water Budget ............................................................................................................................ 78
Chapter 5 Strategic Action Plan for Irrigation in District Upper Subansiri under PMKSY ..................... 80
5.1 Block wise Total Plan of District ............................................................................................ 80
5.2 Component Wise plan ............................................................................................................. 85
5.3 Year Wise Plan.......................................................................................................................... 87
5.4 Expected Outcome ................................................................................................................... 89
5.5 Suggestions ............................................................................................................................... 90
5.5.1 Water User’s Association (Participatory Governance) ............................... 92
5.6 Strategic Action Plan for irrigation in respect of District Upper Subansiri,
AP under Pradhan Mantri Krishi Sinchayee Yojna (PMKSY) ................................ 94
Annexure ............................................................................................................................................ 166
1. Water Resource Department...................................................................................... 166
2. Agriculture Department ............................................................................................... 868
3. Horticulture Department ............................................................................................ 895
4. DRDA.................................................................................................................................... 956
Daporijo DRDA .................................................................................................................... 956
Dumporijo DRDA ................................................................................................................ 999
Giba & Chetam DRDA ...................................................................................................... 1007
Limeking DRDA ................................................................................................................. 1079
Nacho DRDA........................................................................................................................ 1107
Puchigeko DRDA ............................................................................................................... 1162
Siyum DRDA........................................................................................................................ 1196
Taliha DRDA........................................................................................................................ 1312

5|Page
List of Tables
Table 1-1: General profile of the district ...................................................................... 34
Table 1-2 Demography of Upper Subansiri ................................................................. 35
Table 1-3 Population of Small and Large animals in Upper Subansiri ....................... 36
Table 1-4 Hydrogeology of the valley areas in Upper Subansiri District .................... 41
Table 1-5 Agro Ecology Climate, Hydrology, And Topography ................................... 42
Table 1-6 Variation in temperature of Upper Subansiri District ................................. 42
Table 1-8 land use Pattern in Upper Subansiri District ..............................................48
Table 2-1 Area wise, crop wise irrigation status .......................................................... 51
Table 2-2 Area under Horticulture & Plantation Crop in the District ........................ 53
Table 2-3 Area, Production and Yield of major crops in the district .......................... 56
Table 2-4 Irrigation based classification ..................................................................... 58
Table 3-1 Summarise hydrogeology of the valley areas in upper Subansiri District .. 62
Table 3-2 Status of ground water Availability of water in Upper Subansiri ............... 62
Table 3-3 Ground Water Availability ........................................................................... 64
Table 3-4 Command area development ....................................................................... 64
able 3-5 Existing Surface Irrigation ............................................................................. 67
Table 3-6 Existing Ground Water irrigation ................................................................68
Table 3-7 Water extraction Devices in District ............................................................ 69
Table 4-1 Domestic Water Demand ............................................................................. 71
Table 4-2 Crop Water requirement .............................................................................. 73
Table 4-3 Livestock Water Requirement ..................................................................... 74
Table 4-4 Industrial water Requirement ..................................................................... 75
Table 4-5 Water Demand for Power Generation ......................................................... 75
Table 4-6 (a) Present Water Demand of the district for various sectors .................... 76
Table 4-7 Water Budget of the district ......................................................................... 78
Table 5-1 Block Wise Total Outlay of District Rs in Lakhs ......................................... 80
Table 5-2 Component wise total outlay of the district (Amount in Rs. lakhs) ............ 85
Table 5-3 Year wise share of total outlay in the district (Amount in Rs. Lakhs) ....... 88

6|Page
List of Figures

Figure 1-1 Administrative setup of Upper Subansiri District ...................................... 35


Figure 1-2 Block-wise population of male and females in district ............................. 36
Figure 1-3 Block wise small animals population ........................................................ 38
Figure 1-4 Block wise large animals population .......................................................... 38
Figure 1-5 Block wise Large animals population ........................................................ 39
Figure 1-6 Variation in Temperature in Upper Subansiri District ............................. 43
Figure 1-7 Area under Agriculture in the District ........................................................ 49
Figure 1-8 Area under Forest and Westland in the district ......................................... 49
Figure 2-1 Rainfed area under cultivation in Kharif and Rabi Season........................ 52
Figure 2-2 Irrigated area under cultivation in Kharif and Rabi Season ..................... 52
Figure 2-3 Horticulture and Plantation crop area under rainfed and irrigated
condition ....................................................................................................................... 53
Figure 2-4 Percentage area under Kharif and Rabi ..................................................... 54
Figure 2-5 Area under rainfed and irrigated under each block ................................... 54
Figure 2-6 Block wise area under irrigated and rainfed (%) ....................................... 55
Figure 2-7 Block wise production under irrigated and rainfed ................................... 57
Figure 2-8 Area Vs Productivity in the District ........................................................... 57
Figure 2-9 Irrigation Base Classification in ha ............................................................ 59
Figure 3-1 Percentage of Canal command and other services command ................... 65
Figure 3-2 Percentage of developed and undeveloped command area ....................... 65
Figure 3-3 Block wise percentage of government canals in the district ...................... 69
Figure 3-4Block wise percentage of government Reservoir ........................................ 70
Figure 4-1 Domestic water Demand of Upper Subansiri District ............................... 72
Figure 4-2 Crop water requirement ............................................................................. 73
Figure 4-3 Livestock Water Demand Present Vs Projected. ....................................... 74
Figure 4-4 Sector Wise Water Requirement in the District ........................................ 77
Figure 4-5 Water Budget of Upper Subansiri .............................................................. 79
Figure 5-1 Block wise Percentage Share of outlay Under WRD .................................. 81
Figure 5-2 Block wise Percentage Share of outlay Under Agriculture Department ... 82
Figure 5-3 Block wise Percentage Share of outlay Under Horticulture Department . 82
Figure 5-4 Block wise Percentage Share of outlay Under DRDA ................................ 83
Figure 5-5 Block wise Percentage Share of outlay Under RWD .................................. 83
Figure 5-6 Block wise Percentage Share of outlay Under ATMA ................................ 84
Figure 5-7 Block wise percentage share of outlay ........................................................ 84
Figure 5-8 Component wise percentage allocation of total outlay .............................. 86
Figure 5-9 Sub-component wise percentage outlay of the district .............................. 87
Figure 5-10 Year wise percentage share of total outlay of the district ........................ 88

7|Page
List of Maps

Map 1 Location map of Upper Subansiri District ........................................................ 33


Map 2: Soil Map and Soil legends ................................................................................ 47
Map 3: Land Use Pattern in the district ...................................................................... 50
Map 4: Pre-Monsoon drainage in Upper Subansiri district ........................................ 66
Map 5: Post Monsoon drainage map of Upper Subansiri ........................................... 66

8|Page
Abbreviations

NDC : National Development Council

GoI : Government of India

C-DAP : Comprehensive District Agriculture Plan

ICT : information and communications technology

BCM : Billion Cubic Metres

GDP : Gross Domestic Product

AIBP : Accelerated Irrigation Benefits Programme

CADWM : Command Area Development and Water Management

MI : Micro Irrigation

SWMA : Supplementary Water Management Activities

NITI Aayog : National Institution for Transforming India Aayog

NRM : Natural resource Management

IWMP : Integrated Watershed Management Programme

PRI : Panchayati Raj Institutions

DRDA : District Rural Development Agencies

NRLM : National Rural Livelihoods Mission

C.D. Blocks : Community development block

BPL : Below Poverty Line

SC/ST : Scheduled Caste/ Scheduled Tribe

Nos. : Number

ATMA : Agriculture Technology Management Agency

MSL : Mean Sea Level

mm : Millimetre

ha : Hectare

9|Page
TGA : Total Geographical Area

GCA : Gross Cropped Area

GIA : Gross Irrigated Area

NSA : Net Sown Area

AIBP : Accelerated Irrigation Benefits Programme

MGNREGA : Mahatma Gandhi National Rural Employment Gurantee


Act

CI : Cropping Intensity

Qtl/yr : Quintal per year

GIA : Gross Irrigated Area

MCM : million cubic metres

Bgl : Below ground Level

CCA : Culturable Command Area

LPD : Liter Per Day

CAD : Command Area Development

DIP : District Irrigation Plan

SIP : State Irrigation Plan

DLIC : District Level Implementation Committee

STP : Sewage Treatment Plant

WRD : Water Resource Department

RWD : Rural Work Department

DRDA : Department of Rural Development Agency

ATMA : Agricultural Technology and Management Agency

10 | P a g e
Executive Summary
Out of about 141 million ha of net area sown of the country, only 65 million hectare
(46%) is focused manner, with end-to-end solution on source creation, distribution,
management, and field currently covered under irrigation. Substantial dependence on
rainfall makes cultivation in remaining areas a high risk and less productive
profession. Empirical evidences suggest that assured/protective irrigation/in-situ
moisture conservation encourages farmers to invest more in farming technology and
inputs leading to productivity enhancement and increased farm income. Government
has conceived the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) with the
objective of extending the coverage of irrigation in an application and extension
activities.

Further, Pradhan Mantri Krishi Sinchayee Yojana incentivizes states to enhance


expenditures on irrigation and water resources management by making the access to
PMKSY funds to states conditional i.e., state will have access only if the expenditure in
water resource development for agriculture sector in the year under consideration is
not less than the baseline expenditure, which is defined as the average of the
expenditure in irrigation sector irrespective of the department in the state plan in three
years prior to the year under consideration.

PMKSY will be implemented in area development mode only by adopting a


‘decentralized state level planning and projectised execution’ structure that will allow
states to draw up their own irrigation development plans based on DIPs and SIPs with
a horizon of 5-7 years. A three tier structure at national, state and district level will
oversee implementation and coordination of the program. The District Level
Implementation Committee will form the third tier of the PMKSY. The DLIC will be
chaired by the Deputy Commissioner, Upper Subansiri and comprises of the
Department of Agriculture, Horticulture, District Rural Development Agency (DRDA),
Irrigation and Public Health Department, Forest Department, Lead bank of the
District and any other line Departments in the District. The DLIC will oversee the
implementation and inter-departmental coordination at district level.

District Water Profile


The population of Upper Subansiri district is predominantly dependent on agriculture
and allied activities for their livelihood. The gross cropped area in the district is
13327.59 ha. About 7192 ha of the area under crop is grown under kharif season while

11 | P a g e
1843.85 ha. of crop area is under rabi season. Cereals are the major agricultural crops
grown in the district. Paddy is the major cereal grown in the district and constitutes
about 60% of the gross cropped area in the district. The 10% percent of the gross
cropped area shared among oilseeds and pulses. The rest of 30% of the gross cropped
area in the district is grown under various coarse cereals like maize, barley etc. and
various horticultural crops which constitute fruits and vegetable crops. Mash, moong,
lentil and gram are major pulses grown in the district. Sesamum and Mustard are the
major oilseeds of the district. Under vegetables, potato is grown all the year round
along with other vegetables like tomato, capsicum, cabbage and cauliflower. Some
exotic varieties of vegetables like Capsicum (Red and Green), Asparagus, Broccoli, etc.
Nearly 40 per cent of the area is irrigated under Kharif while it is mere 3 per cent under
Rabi. Considering the topography of Upper Subansiri, where land is an inelastic
resource increasing the irrigation potential further is the key to increasing the
production and productivity of crops.

Crop Diversification
In Upper Subansiri there are four major objectives of agricultural diversification. First
to increase the income of the small households, second to attain the fuller employment
in the farm household, third to stabilize the farm income over the seasons, and fourth
conservation and enhancement of natural resources specially irrigation sources.
Irrigation plays a decisive role in cropping pattern, cropping intensity, crop
combinations, and the extent of yield and to a certain extent the season of sowing. This
process ensures that farmer receive decent income while the existing food grain
production takes care of the food security needs of the households. In the district,
about 76.56 percent of the area lies under rainfed cultivation while only 23.44 percent
of the total gross cropped area has irrigation facilities. The majority of the farmers in
the district are engaged in traditional cultivation of food grains (65% of the area under
agricultural crops is grown under cereals and millets), not being able to divert to more
profitable commodities such as vegetables and fruits. In order to boost the agricultural
development and enhance the farm income in the rural areas, it is therefore important
to increase the productivity of the existing cultivated area, through shifting from self-
subsistence crop cultivation to diversified agriculture, by adopting cash crops such as
vegetables cultivation suitable in hilly and highland areas and the same can be
achieved by providing assured irrigation sources all the year round to different parts
of the district.

12 | P a g e
Yield per Hectare of Major Crops

The yield levels of major crops in the district are higher in irrigated conditions than
under rainfed conditions. The average yield of the agricultural crops in rainfed
condition was found to be 3200 kg/ha while under irrigated condition it was found to
be 3400 kg/ha. Further, the absolute levels of yields reported in the district are slightly
lesser than the state average yields or potential yields as per the package of practices
recommended by the state agricultural university. By enhancing the water resources
availability for irrigation purpose through rainwater harvesting, soil & water
conservation measures, the productivity of crops can be enhanced further and the
more areas can be brought under assured irrigation, thus enhancing the overall farm
production and hence the farm income for various crops.

Availability of water sources


The perennial river subansiri has intersect the Upper Subansiri district. The district
constitutes principally a hilly terrain covered by thick forests. The hill ranges are
generally aligned in NE-SW and NW-SE directions with moderate to steep slopes and
narrow valleys and it occupies the lesser and inner Himalayan zones of the Great
Himalayan Range. The hills are separated by rivers which flow mostly towards south
and have deep gorges. Subansiri river originating from Tibet and its tributaries form
the main drainage system of the district. It flows in N-S direction. The Siken river flow
westerly while Singen and Kamla river have easterly flow direction. All these join
Subansiri river in the southern part of the district. The other streams and Nalahs
namely Chukkro, Siaskro etc. also meets Subansiri river.
Groundwater is available in all geological formations in the district depending upon
their primary or secondary porosities, geomorphologic and hydro geologic set up.
Groundwater investigations carried out in the district revealed that springs which form the
main source of water supply for drinking water supply belongs to gravitational category.
Mostly topographic and fracture springs are seen to occur in all hydro geological units in the
district. The discharge of the main water supplying springs varies from 10,290 lpd to 34,600
lpd. The annual replanishable ground water resource of the district is estimated as
332.64Ham. Net ground water availability of the district is 299.38Ham. Projected
demand for domestic and industrial uses up to 2025 is 27.30Ham. Ground water
availability for future irrigation use is 272.08Ham. Stage of ground water development
is thus negligible and the district can be categorized as safe.

13 | P a g e
The district has rich source of water availability with 28.47 MCM through various
sources which includes surface and ground water sources in the district. The major
surface irrigation sources in the district are canal and reservoirs or dams as sources of
irrigation which constitutes about 93.76% and 6.24% of the total water available
through surface irrigation while compared to the total water availability (surface and
others) in the district it has a share of 88.41% and 5.88% respectively. The rest is
constituted by open wells and traditional sources which constitutes about 3.74% and
1.96% respectively. The large number of springs and rivulets in the district provide a
good source of water for irrigation and domestic purposes.

Existing Type of Irrigation

Under existing type of irrigation in the district, various sources of irrigation has been
identified which includes both government and private based. The total number of
government based canal structure in the district are 496 where number of private
based canal structure are not developed in the district. There was no information
regarding community based canal during the field survey in the district. There are also
33 government based reservoir and dams and constitutes i.e., 24 in Daporijo block,3
in Giba block, 4 in Dumporijo block and remaining 2 are in Baririjo block. Among
blocks, Daporijo has the highest percentage of government based canal structure and
accounts for 73% of the total canal based structure in the district followed by
Dumporijo block 12%. Baririjo and Giba blocks has 9 % and 6 % of the government
based canal structure as compared to the total district.

Under the ground water resource existing structures are available with only
government based and the Daporijo has highest open wells in the district with 12 and
constitute 57% of the total district open well structures followed by Siyum constitutes
33% and remaining 10% constitute by Dumporijo Block. In the district no ETP plants
are installed also there is only 6 units of electricity pumps and Diesel engine pumps
are installed in the Daporijo Block. As per water resources available in the district there
is huge potential for lift irrigation.

The entire district is occupied by rugged terrain and it is having hilly and valley
portion. There is a limited scope of ground water development in hilly terrain and the
scope of recharge in hilly terrain requires a rigorous study. Rainwater can be harvested
for drinking water supply. There is no such problem related to groundwater. At some

14 | P a g e
locations iron content in groundwater is more than the permissible limit, otherwise
groundwater is fresh and may be used for domestic, irrigation and industrial needs.

Demand for water sources


The present water demand of the district has been assessed to be 93.61 MCM annually.
Out of the total water demand, 89.51 MCM (95.62 per cent) is required for crop
production. Nearly 3.23 MCM is required for domestic and drinking purposes (3.45
per cent) and another 0.87 MCM (0.93 per cent) is required for livestock water
requirement purpose. Among the blocks, Dumporijo has highest water requirement
with 25.24 MCM (26.96 per cent), followed by Daporijo with 29.04 MCM (17.77 per
cent).

Water budget in the district


The water budget shows wide gaps between water availability and water demand in
the district. While the availability at present is 28.40 MCM, the present water demand
is 93.61 MCM, thus exceeding the given water availability in the district. It is also
projected that with growth in urbanisation and subsequent growth in food grain
requirement the water demand is likely to increase to 94.52 MCM by the year 2021
leaving an unmet demand of 66.12 MCM which needs to be further addressed. The
water budget analysis suggest that urgent efforts are required to meet the water
requirements of the district as the gap is likely to increase in future. Utilizing the
surface & ground water potential in the district, activities that promote ground water
re-charge and soil moisture and water conservation etc. are proposed in the Strategic
Action plan, 2016-21 that will address the challenge. The scope to tap ground water in
the district is feasible as the district falls in safe category.

Component wise planned coverage of area

The strategic action plan envisages providing assured irrigation in a command area of
231282 ha. It is assumed that the irrigation infrastructure will benefit a command area
of at least 138769 ha (60 per cent). The Har Khet Ko Pani component will develop a
command area of 59885 ha. The Watershed component under DRDA is projected to
achieve a culturable command area of 81343 ha by creation of 2457 new water
harvesting structures along with carrying activities such as soil and moisture
conservation and land development. The watershed component will also be carried out
by Soil & Moisture Conservation Department under RWD which proposed to develop

15 | P a g e
1195 ha through various activities such as Ridge Area Treatment, drainage line
treatment, waste land development etc.

Under the component Per Drop More Crop, efficient water conveyance and precision
water application by drip irrigation system for wide spaced crop 5939.15 ha and
narrow spaced crops 6154.88 ha through application of 6787 drip irrigation system in
the district has been proposed. While Sprinklers has been proposed to develop an area
of 8567.51 ha through 5368 different sprinkler system in the district. Secondary
storage structures like farm ponds, water storage tanks and bore-wells under
supplementary water management activities proposed to develop an area of 60988 ha
through activities such as drought proofing structures, rain water harvesting structure,
etc. ATMA envisages providing training to 22000 farmers to imbibe various
technologies available for the enhancement of production and efficient usage of
irrigation water at the farm land.

Department wise planned coverage of area

Under department wise development of command area or irrigation potential, the


Water Resource Departments which will develop an area of 59885 ha by creation of
various irrigation structures, renovation and rejuvenation of traditional and current
water resources in the district. Agriculture Department and Horticulture Department
under Per Drop More Crop will develop an area of 49015 ha and 41037 ha respectively,
through various drip and sprinkler irrigation system and secondary storage structures
under supplementary water management activities. The watershed component under
DRDA will develop an irrigation potential of 81343 ha through its various activities
proposed such as Land Development, Soil and Moisture Conservation, developing new
water harvesting structure and renovating existing one, etc. The Soil and Water
Conservation Department under RWD will develop an area of 2400 ha under 143
micro-watershed of the district.

Block wise planned financial outlay

The total outlay of the district is about Rs.236931.36 lakhs distributed among different
blocks. The Daporijo and Dumporijo block has the maximum share of total outlay and
constitutes about 16.47% and 14.21% respectively, followed by Taliha block with
13.07%.

Amount in Rs. Lakhs

16 | P a g e
Agricultu
re Horticulture
Block WRD DRDA RWD ATMA Total
Departm Department
ent
Baririjo 7563.50 1310.82 6275.70 2098.22 2011.21 14.45 19273.90
Daporijo 27435.43 1638.26 1264.55 6777.82 1862.23 49.64 39027.93
Dumporijo 19873.43 1868.03 6635.93 4342.83 893.87 43.04 33657.12
Giba 11545.75 1259.18 5261.10 3706.60 1117.3395 48.66 22938.63
Chetam 10841.50 1168.15 3138.10 2241.88 3.40 17393.03
Limeking 1613.00 1276.97 3138.10 1436.92 819.38 13.48 8297.86
Nacho 6384.10 1160.69 3138.10 2094.51 744.89 14.16 13536.44
Puchi Geko 4234.92 1180.55 5050.38 3152.98 1564.28 10.44 15193.54
Siyum 5189.25 1193.60 3138.10 3422.30 893.87 7.47 13844.59
Taliha 6465.67 1177.69 3770.38 18799.37 744.89 7.47 30965.47
Paying 3732.00 1275.42 3138.10 14649.87 7.47 22802.86
Grand
104878.53 14509.37 43948.53 62723.29 10651.97 219.67 236931.36
Total

Component wise planned financial outlay


The component wise total outlay of the district constitutes about Rs.236931.36 lakhs.
AIBP and Hark Khet Ko Pani components are to be executed mainly by Water
Resource Department. Per drop more crop component will be executed by Agriculture
and Horticulture Department. Water shed component will be taken care of by Rural
Development Department and Extension & Training component will be executed by
ATMA under Agriculture department. However, all the stakeholders need to have
coordination among them to have the maximum irrigation efficiency and to avoid
duplicity. WRD being the major irrigation department in the district, has the onus to
execute schemes or projects included under Har Khet Ko Pani in the district. Further,
the watershed component is to be executed under two different departments which
include DRDA with an outlay of Rs.62723.29 lakhs as the major department for
executing watershed activities along with Soil & Water Conservation Department
under RWD which has a total outlay of Rs.10651.97 lakhs.

Amount in Rs. lakhs

17 | P a g e
Component
2016-17 2017-18 2018-19 2019-20 2020-21 Total
wise
Accelerated
Irrigation
Benefited
Programme
(AIBP) 0.00 0.00 0.00 0.00 0.00 0.00
PMKSY-Har
Khet Ko Pani
(HKKP) 20975.71 31463.56 26219.63 15731.78 10487.85 104878.53
PMKSY- Per
Drop More
Crop (PDMC) 11735.51 17603.27 14669.39 8801.64 5867.76 58677.57
i) Micro-
irrigation 1986.40 2979.60 2483.00 1489.80 993.20 9932.00
ii)
Supplementa
ry Water
Management
activities 9705.18 14557.77 12131.48 7278.89 4852.59 48525.90
iii) Extension
And Training
Under ATMA 43.93 65.90 54.92 32.95 21.97 219.67
PMKSY -
Watershed 14675.05 22012.58 18343.82 11006.29 7337.53 73375.26
Grand Total 59232.8
47386.27 71079.41 4 35539.70 23693.14 236931.36

Year wise Plan


The strategic action plan proposed under different departments has been further
divided based on year wise allocation of the total outlay. The projects proposed under
Strategic Action Plan have been divided into five phases starting from project initiation
and planning. Under this stage resource allocation will be done by each department
for different projects running under their purview. An allocation of 20% of the total
outlay under each department has been assumed under this stage. The second phase
is the implementation stage when the projects will be executed at the ground level and
an assumption of 30% of the total outlay under each department has been assumed at
this stage. It is assumed that the implementation would be continued in the third stage
and hence an allocation of 25% is to be kept under this stage. The fourth stage being
monitoring and evaluation, where an assumption of 15% has been proposed to
determine if the proposed activities are meeting the objectives of PMKSY and also to
complete the ongoing projects. The final stage is of review, under which each project
executed under different departments will be scrutinised for any lacunae and the same

18 | P a g e
will be completed under this stage. 10% of the total outlay is to be distributed under
this stage.

Amount in Rs. Lakhs


Department
2016-17 2017-18 2018-19 2019-20 2020-21 Total
wise
WRD 20975.71 31463.56 26219.63 15731.78 10487.85 104878.53
Agriculture
2901.87 4352.81 3627.34 2176.41 1450.94 14509.37
Department
Horticulture
8789.71 13184.56 10987.13 6592.28 4394.85 43948.53
Department
DRDA 12544.66 18816.99 15680.82 9408.49 6272.33 62723.29
RWD 2130.39 3195.59 2662.99 1597.80 1065.20 10651.97
ATMA 43.93 65.90 54.92 32.95 21.97 219.67
Grand Total 59232.8 35539.7
47386.27 71079.41 23693.14 236931.36
4 0

Implementation Time Period

The planned activities and outlay will be spent between 2016-17 and 2020-21 period.
Some of the activities may require 5 to 7 years and some other activities relating to
extension, small irrigation works etc., are recurring and hence will have a period of
implementation less than a year.

Monitoring and evaluation


The Strategic Action Plan of PMKSY will be monitored by the respective departments
through the regular reporting system and component wise progress will be monitored
by the District Level Irrigation Committee. Further, the activities, outputs and
outcomes will be reported in web based MIS of PMKSY for review at state and national
level.

Expected Outcome
In terms of economic benefit, the assured water supply to the farm land will result in
enhancement of production and productivity of the crops. This is likely to generate an
additional income of Rs.55507.63 lakhs to the farmers of the district. This is based on
the assumption of at least 60% of potential utilised and Rs. 40,000 per ha per annum
of incremental income from rainfed to irrigated farming will be generated. This is also
likely to create 202.36 lakhs of maydays of non-recurring employment and 115641 jobs
will be created annually on recurring basis.

19 | P a g e
This intervention may result into increased acreage under crops thereby contributing
to both agricultural and horticultural production. At the same time, it will create
livelihood opportunities for the local population and contribute in generating direct
and indirect employment.

Suggestions

Land productivity and agricultural production can be improved significantly by


launching measures such as:

1. Formulating district and block specific land water use policy in the district.
2. Improving and expanding agricultural extension service network significantly
to demonstrate and transfer technology. There should be region specific
technology to be developed in the district so that it should not only match with
the agro-ecological zones of the district but also should be easily imbibed
among the farmers or the ultimate beneficiaries.
3. Promoting SHGs, FPOs and community action towards making small farm
holding economically viable and profitable.
4. The public investment and institutional credit should enhance to enable
farmers to access technology and achieve expected growth
5. Promoting integrated agriculture model in the district to enhance the
productivity and farm income.

20 | P a g e
INTRODUCTION
Background
Preparation of decentralized area specific district planning process visualized in
various plans took concrete shape through the years and initiatives like specific
guidelines on methodologies and processes for preparation of district plans;
framework for preparation of perspective plan, medium term and annual plans by then
planning commission in 1969 and the 73rd and 74th constitutional amendments
conferring constitutional status to Panchayats at district and sub district level; local
self-government in urban areas; constitution of district planning committee to
consolidate the plans prepared at Panchayats and municipalities and prepare a draft
development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by


planning commission on preparation of district level plans and making it an integral
part of the process of preparation of the states 11th five year plan. The Planning
commission issued guidelines in August 2006 for preparation of the district plans. The
guidelines define the District Planning as ‘the process of preparing an integrated plan
for the local government sector in a district taking into account the resources (natural,
human and financial) available and covering the sectoral activities and schemes
assigned to the district level and below and those implemented through local
governments in a state. The document that embodies this statement of resources and
their allocation for various purposes is known as the District Plan”.

Government of India through a resolution in National Development Council on 29 th


May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to
address the slow growth of agriculture and allied sectors by incentivizing states to draw
up plans for their agriculture sectors more comprehensively. The NDC resolution
states "GoI introduced a new Additional Central Assistance Scheme to incentivize
states to draw up plans for their agriculture sector more comprehensively, taking agro-
climatic conditions, natural resource issues and technology into account, and
integrating livestock, poultry and fisheries, etc. This involved a new scheme for
Additional Central Assistance (ACA) to State Plans, administered by the Union
Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to
supplement the State-specific strategies including special schemes for beneficiaries of

21 | P a g e
land reforms. The newly created National Rainfed Area Authority on request, was to
assist States in planning for rainfed areas".

The NDC in its resolution advised the states to prepare a comprehensive district
agriculture plans (C-DAP) that will fully utilize available resources and include allied
agriculture sectors. Further, GOI issued a manual on preparation of comprehensive
district agriculture plans to help the states prepare C-DAP. As per these guidelines, the
objective of district planning is ‘to design an integrated and participatory action plan
for the development of local area in general and agriculture and allied sectors in
particular’. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:

 To prepare a Comprehensive District Agriculture Plan (C-DAP) through


participatory process involving various organisations and stakeholders.
 To enable optimum utilisation of scarce natural, physical & financial
resources.
 To assess and plan for the infrastructure required to support the agriculture
development.
 To establish linkages with the required institutional support services, like
credit, technology transfer, ICT, research etc.
 To evolve an action plan for achieving sustainable agricultural growth with
food security and cropping system that will improve farmers’ income.
The guidelines required the state/district authorities to (i) ensure that the
agricultural plans are prepared for the district and then integrated into the
agricultural plans of the State based on the agro-climatic conditions, availability of
technology, trained manpower and natural resources; (ii) local needs / crops / feed
and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the
plan; (iii) productivity gaps for important crops and livestock and fisheries are
reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was
the Government of India guidelines issued in 2015 in the form of a template for the
preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of
the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the
preparation of DIP and SIP mandatory for the states to receive funds from the
program. The present report is a product of these long drawn efforts of Government of

22 | P a g e
India to strengthen the decentralized planning process in the country focusing on the
vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological
balance and promotion of developmental activities. Considering its vital importance
and ever increasing demand for water, in the face of population growth, urbanization
& industrialization and considerations of climatic change, making water, an
increasingly a scarce resource, available to multiple uses, planning and management
of this vital resources, utilization of water economically, optimally and equitably
assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of
Water Resources suggests an availability of 1123 billion cubic meters (BCM) against a
current estimated demand of 710 BCM. The Standing Committee of the Ministry of
Water Resources estimates that this water demand will rise to 1093 BCM by 2025.
Though the existing water availability in the immediate future seems to be adequate,
with the near constant supply of water resources in the face of increasing demand on
account of population growth, urbanisation and industrialization will strain the water
supply-demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced
to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic
meters. The projected per capita availability of water is 1341 cubic meters in 2025 and
1140 cubic meters in 2050 suggesting shortage of water in the medium term1. Further,
the all India water balance estimates does not reflect the variations in water balance
across time and space- certain areas having a positive water balance and the others
facing acute shortage. The problem is further accentuated by water quality related
issues.

With the abundant surface and ground water supply in the first five decades since
independence, more than 80 percent of the total available water resources were
allocated for irrigation purposes and the rest meeting the domestic and industrial
demands. In a recent study2on the demand for water from agriculture, domestic and

1
Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New
Delhi.
2
Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025-

23 | P a g e
industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34
BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM
in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance
water available while agriculture demand for water will be (605 BCM in 2000, 675
BCM in 2025 and 637 BCM in 2050). This change is partly because of the changing
sectoral contributions of India’s GDP and also partly because of dynamics of irrigation
development in the country where the initial expansion in area under irrigation is
propelled by the availability of abundant water resources and availability of good
quality land. This is no longer the case in many of the states where the availability of
land and water are serious constraints for further expansion of irrigation. Further, as
per the erstwhile planning commission up to March 2012 out of 141 million hectares
of net sown area in the country 114 (or 81%) million hectares is Irrigation Potential
Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilised (IPU)
leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the net
sown area in the country dependent on rainfall which makes farming a high risk and
less productive.

The competing demands for water resources and the emerging issues and concerns
were to be addressed through certain basic principles and commonality in approaches
in dealing with planning, development and management of water resources 3 under an
Integrated Water Resource Management framework. The main objectives of water
resource management as delineated in National Water Policy 2012 are:

a) Planning, development and management of water resources need to be


governed by common integrated perspective considering local, regional, State
and national context, having an environmentally sound basis, keeping in view
the human, social and economic needs.
b) Principle of equity and social justice must inform use and allocation of water.
c) Good governance through transparent informed decision making is crucial to
the objectives of equity, social justice and sustainability. Meaningful intensive
participation, transparency and accountability should guide decision making
and regulation of water resources.

2050:Business-as-usual scenario and deviations. Research Report 123, International Water


Management Institute, Colombo.
3
Ministry of Water Resources, National Water Policy, 2012, Government of India, New Delhi.

24 | P a g e
d) Water needs to be managed as a common pool community resource held, by the
state, under public trust doctrine to achieve food security, support livelihood,
and ensure equitable and sustainable development for all.
e) Water is essential for sustenance of eco-system, and therefore, minimum
ecological needs should be given due consideration.
f) Safe Water for drinking and sanitation should be considered as pre-emptive
needs, followed by high priority allocation for other basic domestic needs
(including needs of animals), achieving food security, supporting sustenance
agriculture and minimum eco-system needs. Available water, after meeting the
above needs, should be allocated in a manner to promote its conservation and
efficient use.
g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation,
runoff, river, lakes, soil moisture, and ground water, sea, etc., are
interdependent and the basic hydrological unit is the river basin, which should
be considered as the basic hydrological unit for planning.
h) Given the limits on enhancing the availability of utilizable water resources and
increased variability in supplies due to climate change, meeting the future
needs will depend more on demand management, and hence, this needs to be
given priority, especially through (a) evolving an agricultural system which
economizes on water use and maximizes value from water, and (b) bringing in
maximum efficiency in use of water and avoiding wastages.
i) Water quality and quantity are interlinked and need to be managed in an
integrated manner, consistent with broader environmental management
approaches inter-alia including the use of economic incentives and penalties to
reduce pollution and wastage.
j) The impact of climate change on water resources availability must be factored
into water management related decisions. Water using activities need to be
regulated keeping in mind the local geo climatic and hydrological situation.

Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to


address the constraints in providing assured irrigation as well as increasing efficiency
and productivity of current water use to bring more prosperity to the rural areas.
Priorities of Government of India were reflected in the Hon’ble President’s address to
the joint Session of the Parliament of 16th Lok Sabha where he indicated that “Each

25 | P a g e
drop of water is precious. Government is committed to giving high
priority to water security. It will complete the long pending irrigation
projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee
Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously
considering all options including linking of rivers, where feasible; for
ensuring optimal use of our water resources to prevent the recurrence of
floods and drought. By harnessing rain water through ‘Jal Sanchay’ and
‘Jal Sinchan’, we will nurture water conservation and ground water
recharge. Micro irrigation will be popularised to ensure ‘Per drop-More
crop”.

PMKSY has been approved with an indicative outlay of Rs.50,000 crore over a period
of five years from 2015-16 to 2019-20. The programme is an amalgamation of on-going
schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation,
Ministry of Agriculture & Cooperation and Ministry of Rural Development. The
existing schemes AIBP, CADWM, MI, SWMA, Watershed & Convergence with
MGNREGA were brought together under the umbrella program of PMKSY. Further
the scheme seeks convergence with scheme likeMahatma Gandhi National Rural
Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY),
Jawaharlal Nehru National Solar Mission and Rural Electrification programmes
(JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of
Parliament Local Area Development Scheme (MPLAD), Members of Legislative
Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF),
Working Plan of State Forest Department (WPSFD) etc. The PMKSY will be
implemented in an area development mode only by adopting a decentralized state level
planning and projectised execution structure that will allow the state to draw up their
own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years.
The program will be implemented as part of Rashtriya Krishi Vikas Yojana (RKVY)
with state agriculture department acting as the State Nodal Agency. However, the
implementing departments for the four components like AIBP, PMKSY (Har Khet Ko
Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be
decided by the respective program ministry/department.

The funds under this program would be provided to the states as per the pattern of
assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance

26 | P a g e
and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme
was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The
financial assistance provided to the state governments from this centrally sponsored
scheme is subject to fulfilment of certain conditions. Firstly, a state will become
eligible to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP)
and State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in
water resource development for agriculture sector in the year under consideration is
not less than the baseline expenditure, which is defined as the average of the
expenditure in irrigation sector irrespective of the department in the state plan in three
years prior to the year under consideration. Secondly, States will be given additional
weightage for levying charges on water and electricity for irrigation purposes, so as to
ensure sustainability of the programme. Thirdly, interstate allocation of PMKSY fund
will be decided based on

 Share of percentage of unirrigated area in the state vis-à-vis national average


including prominence of areas classified under Desert Development
Programme (DDP) and Drought Prone Area Development Programme (DPAP)
 Increase in percentage share of expenditure on water resource development for
agriculture sector in State Plan expenditure in the previous year over three
years prior to it and
 Improvement in irrigation efficiency in the state.
Vision
The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be
to ensure access to some means of protective irrigation to all agricultural farms in the
country, to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

Objective
The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation


of district level and, if required, sub district level water use plans).
b) Enhance the physical access of water on the farm and expand cultivable area
under assured irrigation (Har Khet Ko Pani),
c) Integration of water source, distribution and its efficient use, to make best use
of water through appropriate technologies and practices.

27 | P a g e
d) Improve on-farm water use efficiency to reduce wastage and increase
availability both in duration and extent,
e) Enhance the adoption of precision-irrigation and other water saving
technologies (More crop per drop).
f) Enhance recharge of aquifers and introduce sustainable water conservation
practices
g) Ensure the integrated development of rainfed areas using the watershed
approach towards soil and water conservation, regeneration of ground water,
arresting runoff, providing livelihood options and other NRM activities.
h) Promote extension activities relating to water harvesting, water management
and crop alignment for farmers and grass root level field functionaries.
i) Explore the feasibility of reusing treated municipal waste water for peri-urban
agriculture, and
j) Attract greater private investments in irrigation.

Strategy/approach
To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct


water sources; construction of water harvesting structures, secondary & micro
storage, groundwater development, enhancing potentials of traditional water
bodies at village level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo
(Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and
M.P.) etc.
b) Developing/augmenting distribution network where irrigation sources (both
assured and protective) are available or created;
c) Promotion of scientific moisture conservation and run off control measures to
improve ground water recharge so as to create opportunities for farmers to
access recharged water through shallow tube/dug wells;
d) Promoting efficient water conveyance and field application devices within the
farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and
other application devices etc.;
e) Encouraging community irrigation through registered user groups/farmer
producers’ organisations/ NGOs; and

28 | P a g e
f) Farmer oriented activities like capacity building, training and exposure visits,
demonstrations, farm schools, skill development in efficient water and crop
management practices (crop alignment) including large scale awareness on
more crop per drop of water through mass media campaign, exhibitions, field
days, and extension activities through short animation films etc.
Programme Components
PMKSY has following four components:

1. Accelerated Irrigation Benefit Programme (AIBP)


To focus on faster completion of ongoing Major and Medium Irrigation including
National Projects.
2. PMKSY (Har Khet ko Pani)
This component focuses on-

a) Creation of new water sources through Minor Irrigation (both surface and
ground water)
b) Repair, restoration and renovation of water bodies; strengthening carrying
capacity of traditional water sources, construction rain water harvesting
structures (Jal Sanchay);
c) Command area development, strengthening and creation of distribution
network from source to the farm;
d) Ground water development in the areas where it is abundant, so that sink is
created to store runoff/ flood water during peak rainy season.
e) Improvement in water management and distribution system for water bodies
to take advantage of the available source which is not tapped to its fullest
capacity (deriving benefits from low hanging fruits). At least 10% of the
command area to be covered under micro/precision irrigation.
f) Diversion of water from source of different location where it is plenty to nearby
water scarce areas, lift irrigation from water bodies/rivers at lower elevation to
supplement requirements beyond IWMP and MGNREGS irrespective of
irrigation command.
g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl
etc. at feasible locations.

29 | P a g e
3. PMKSY (Per Drop More Crop)
a) Programme management, preparation of State/District Irrigation Plan,
approval of annual action plan, Monitoring etc.
b) Promoting efficient water conveyance and precision water application devices
like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan);
c) Topping up of input cost particularly under civil construction beyond
permissible limit (40%), under MGNREGS for activities like lining inlet, outlet,
silt traps, distribution system etc.
d) Construction of micro irrigation structures to supplement source creation
activities including tube wells and dug wells (in areas where ground water is
available and not under semi critical/ critical/ over exploited category of
development) which are not supported under AIBP, PMKSY (Har Khet Ko
Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation
plan.
e) Secondary storage structures at tail end of canal system to store water when
available in abundance (rainy season) or from perennial sources like streams
for use during dry periods through effective on-farm water management;
f) Water lifting devices like diesel/ electric/ solar pumpsets including water
carriage pipes, underground piping system.
g) Extension activities for promotion of scientific moisture conservation and
agronomic measures including cropping alignment to maximise use of available
water including rainfall and minimise irrigation requirement (Jal Sarankchan);
h) Capacity building, training and awareness campaign including low cost
publications, use of pico projectors and low cost films for encouraging potential
use water source through technological, agronomic and management practices
including community irrigation.
i) The extension workers will be empowered to disseminate relevant technologies
under PMKSY only after requisite training is provided to them especially in the
area of promotion of scientific moisture conservation and agronomic measures,
improved/ innovative distribution system like pipe and box outlet system, etc.
Appropriate Domain Experts will act as Master Trainers.
j) Information Communication Technology (ICT) interventions through NeGP-A
to be made use in the field of water use efficiency, precision irrigation

30 | P a g e
technologies, on farm water management, crop alignment etc. and also to do
intensive monitoring of the Scheme.
4. PMKSY (Watershed Development)
a) Effective management of runoff water and improved soil & moisture
conservation activities such as Ridge Area Treatment, drainage line treatment,
rain water harvesting, in-situ moisture conservation and other allied activities
on watershed basis.
b) Converging with MGNREGS for creation of water source to full potential in
identified backward rainfed blocks including renovation of traditional water
bodies
Rationale/ Justification
In reference to the status and need of irrigation, the water resource management
including irrigation related priorities was identified for Upper Subansiri district by the
peoples’ representatives of district with support from administration and technical
experts. For instance the reports of Strategic Research and Extension Plan (SREP)
prepared under ATMA program, Comprehensive District Agriculture Plan (C-DAP)
prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit
Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified
number of irrigation related issues for Upper Subansiri district including (i)
promoting water use efficiency through sprinkler and drip irrigation; (iii) promoting
protected polyhouse cultivation to minimize risk factors and enhance quality and
productivity; (iv) Improvement of on-farm water delivery and efficiency of existing
irrigation systems; (v) promotion of soil conservation of arable & non-arable land
through engineering measures; (vi) creation of new water harvesting structures, check
dams, ponds, tanks, etc. (vii) increase the forest cover in the district and (viii) land
improvement measures.

Methodology
During the course of preparation of District Irrigation Plan (DIP) the team visited
Upper Subansiri district to collect data and have interaction with all the stakeholders.
Methodology adopted to prepare DIP is outlined in brief as under:
a) Collection of primary and secondary data from field from various sources
including published documents and websites.

31 | P a g e
b) Various meetings were held to obtain ground level realities and data from key
personnel/stakeholders through structured, unstructured interviews,
focused group discussions etc.
c) Meetings with various State Government departments and related
institutions were held
d) Meeting through VC was also held with State Level authorities.
e) GIS maps of the area’s/clusters were studied to understand the land
morphology, topography of the district.
f) Focused group discussions and interaction with of agriculture officers,
horticulture officers, soil conservation officers, extension officers, rural
development department, animal husbandry department, irrigation officers
both at blocks and district level for identifying the key issues and focus areas
of the region.
g) Discussion with NABARD officer of Upper Subansiri district was also held
during the visit.
h) Team members also participated in the State Level workshop and held active
discussions with GoI officers, State Level officers and scientists of various
institutions
i) In the district at Panchayat level schemes were identified as per the need and
potential and resolutions were passed by the Panchayat to include the
schemes in PMKSY. The Panchayat resolutions were then consolidated and
put up in the Block Development Committee and a block plan was put up in
the Zila Parishad along with the programme of other line departments
participating in implementation of PMKSY.

On the basis of detailed discussion and analysis of data, the team arrived at the
projections of various components of PMKSY and Department wise plan for four
years from 2016-17 to 2019-20 as detailed in the plan.

Chapter 1
General Information of the District

32 | P a g e
1.1 District Profile
Upper Subansiri district is a mountainous tract in Arunachal Pradesh which covers
approximately between 7032 sq. km. of area, at latitude between 27.45"N and 28.13"N
and longitude 93.13"E and 94.36"E. it is bounded Tibet in the north, West Siang in the
east, West Siang and Lower Subansiri district in the south and Lower Subansiri district
in the west. The MacMohan line border is China at north. The scenic town of Daporijo
is situated in the Upper Subansiri district of Arunachal Pradesh. Located at an altitude
of 600 meters above sea-level, the town is known for its rich variety of flora and fauna
and its ethnic diversity. The town is known for being home to different tribal
communities of the region, and the culture here is a unique mix of the different tribal
groups with their own unique culture and tradition.

Map 1 Location map of Upper Subansiri District


The main river of the district is the Subansiri originating from the Tibet (China)
besides innumerable rivulets. The Upper Subansiri district derives its name from the
Subansiri River which meanders through the entire length of the district. For a long
period it was a part of Subansiri district with headquarter at Ziro. A circle head quarter
was established at Daporijo, in early 1953 under Subansiri frontier division. Later in
1957 additional political officer was put in-charge of the Daporijo sub-division. In
1965, the additional political officer was redesigned as additional deputy

33 | P a g e
commissioner. In 1980, this sub-division of Daporijo was declared a full-fledged
district under the charge of a deputy commissioner. The district was further bifurcated
into two districts: Upper Subansiri and Lower Subansiri. Ziro which was the district
head quarter of erstwhile Subansiri district has remained as head quarter of newly
constituted Lower Subansiri district. Daporijo has been declared as the head quarter
of Upper Subansiri district. Daporijo is beautiful with greenery all around and a variety
of flora and fauna. The winter months, especially October and November, are
considered to be a good time to visit the place since the weather during this time is
pleasant and ideal for walking around and venturing out on treks.
Upper Subansiri District with its HQ at Daporijo, bounded on the North by China, on
the East by West Siang districts, on the South by Lower Subansiri districts (Partly) and
West Siang District (Partly) and West by Lower Subansiri district of Arunachal
Pradesh, the homeland of various tribes, form a natural abode for very many species
of orchids, diverse flora; fauna endowed with a dense vegetation, and a wide range of
climatic and geographical variations, the district enjoys a moderate and comfortable
climate.

Table 1-1: General profile of the district


Name of District Code Latitude Longitude
the
District
Upper 249
Subansiri 27043’ - 29020’ N 94042’ - 95035’ E
Source: Census of India, 2011

Administrative setup of Upper Subansiri

The district is located in the north part of Arunachal Pradesh. Presently, it has two sub
divisions and nine block viz. Limeking, Nacho, Siyum, Taliha, Giba, Daporijo, Puchi
Geko, Dumporijo, Baririjo and fifteen circles under this nine CD blocks .The
headquater of the district is situated at Daporijo. The district covers 553 villages.

The district has been further divided into nine development blocks for the purpose of
development, viz. Limeking, Nacho, Siyum, Taliha, Giba, Daporijo, Puchi Geko,
Dumporijo, and Baririjo. For administrative purposes, the Deputy Commissioner is
administrative head of the district and is responsible for general administration and
maintenance of law and order. DC is assisted by one Additional Deputy Commissioner
and Assistant Commissioner and other District Officers. For administrative
convenience the district has been divided into four sub-divisions and each sub-division

34 | P a g e
is headed by Sub-Divisional Officer (Civil) Each block is under the charge of Tehsildar
while the incharge of sub-Tehsil is Naib-Tehsildar assisted by Office Upper Subansiri
( As depicted in Fig. 1.1).

Deputy
Commissioner

Additional
Deputy
Commissioner

AC deputy
commissioner

Limking Nacho Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo

under 36 under 51 under 49 under 106 under 94 under 47 under 50 under 78 under 42
Villages Villages Villages Villages Villages villages villages villages villages

Figure 1-1 Administrative setup of Upper Subansiri District

1.2 Demography

As per 2011 census, the total population of the district is 83448 out of which there are
41690 female and 41758 are male. The districts of the state with a sex ratio of 998
female per 1000 male as compared to 972 females per 1,000 males of state average.
The literacy rate of the district for male population is 70.02%, while for female it is
57.59%. The male and female literacy rate has increased by 11.21% and 14.85%
respectively, as compared to census 2001.

The population density of the district as recorded under 2011 census is 13 people per
sq. km. which is 50% increase as compared to 8 people per sq. km as per 2001 census.
Compared to the population density of the state (17 person per sqkm), the current
population density of district is on lower side.

Table 1-2 Demography of Upper Subansiri

Population ST General Total


Blocks CH* (0-6 No. of No. of No. of No. of
M F Total
yrs) Member Member household Member
Limeking 1508 1470 365 2978 2717 261 540 2978

35 | P a g e
Nacho 2586 2565 862 5151 5094 57 1045 5151
Siyum 3434 3432 1006 6866 6846 20 1278 6866
Taliha 7713 7832 2476 15545 15281 264 3171 15545
Giba 5686 5930 1550 11616 11567 49 2006 11616
Daporijo 10002 9697 2912 19699 16218 3481 3866 19699
Puchi
2181 2237 621 4418 4173 245 820 4418
Geko
Dumporijo 5763 5784 1863 11547 11003 544 2207 11547
Baririjo 2885 2743 820 5628 5424 204 936 5628
Total 41758 41690 12475 83448 78323 5125 15869 83448
Source:- Census of India 2011

25.00% 23.95%23.26%
23.34%
19.85%
20.00% 18.79%
18.47%
14.22% 13.80%
14.93%
15.00% 13.62% 13.87%
12.42%
Male
8.22%
10.00% 6.19% 8.23% 6.91% Female
6.91% 8.06%
6.15% 5.37%
5.22% 6.58%6.57% Children
3.61% 4.98%
5.00% 3.53%
2.93%

0.00%

Figure 1-2 Block-wise population of male and females in district


The total number of household in the district is 15869, out of which 24% is in Daporijo
block, 20% in Taliha block, 14 % Dumpaorijo block, 13 % in Giba, 8% in Siyum
remaining block contributes 21% households in the district. The total ST population in
the district is 82% of total population. Daporijo block is the most populated block in
the district followed by Taliha. In Daporijo block, the number of ST population is
which is 17 % of total population in the block (refer table 1.2).

1.3 Biomass and Livestock


As per Livestock census 2012, a total of 1, 17,833 livestock was recorded in the district.

Table 1-3 Population of Small and Large animals in Upper Subansiri

Block Large Mithun


Small Animals Total
Animal s

36 | P a g e
Poultry Pigs Goats Sheep Indigenous Cow
(No.) (Nos.) (Nos.) (Nos.) (Nos.)
Limking 2218 995 928 406 246 1048 5841
Nacho 2091 1967 1476 0 593 2568 8695
Siyum 2947 1159 1045 0 1005 1480 7636
Taliha 2314 2441 2135 0 1503 2783 11176
Giba 8351 5095 2392
4098 0 3748 2628
0
Daporijo 6928 4692 3423 0 3858 3378 22279
Puchi 2958 1636
1044 0 591 2647 8876
Geko
Dumporijo 6882 3167 2062
3997 0 2933 3644
3
Baririjo 2186 1806 1385 0 1654 1756 8787
Total 36875 22958 11783
19531 406 16131 21932
3
Source: - Livestock census report, 2012

Small Animals
Sheep (Nos.), 406,
1%
Goats (Nos.),
19531, 24%

Poultry (No.),
36875, 46%

Pigs (Nos.), 22958,


29%

Figure 1. 1: Small animal proportion in the district


It is clearly shown from above figure that farmers are interested in poultry farming
because their basic food pattern adds more no of non-vegetarians due the climatic
conditions and the vegetable production is less in that district because the plain land
holding and due to lack of irrigation facilities farmers are doing seasonal farming .

37 | P a g e
Small animals
Baririjo, 5377, 7% Limking, 4547, 6%
Nacho, 5534, 7%
Dumporijo,
14046, 17% Siyum, 5151, 6%

Taliha, 6890, 9%

Puchi Geko, 5638,


7%

Giba, 17544, 22%


Daporijo, 15043,
19%

Figure 1-3 Block wise small animals population


As per livestock census report, the population of small animal in the district is 79770.
Poultry population accounts for 46 % of the total number of small animals in the
district followed by pigs (29%) and Goats (24%). Among the blocks, Giba has highest
population with 22% of the total population of small animals followed by Daporijo
(19%) and Dumporijo (17%). Taliha contributes 9% to the total small animal’s
population.

LARGE ANIMALS

Indigenous Cow
(Nos.), 16131, 42%

Mithuns, 21932,
58%

Figure 1-4 Block wise large animals population

The total large animals in the district is found to be 38063 and comprises mainly of
indigenous cows and mithuns. The mithuns contributes 58% of total population of
large animals while remaining 42% is contributed by indigenous cows.

38 | P a g e
LARGE ANIMALS
Baririjo, 3410, 9% Limking, 1294, 3%
Nacho, 3161, 8%
Dumporijo, 6577, Siyum, 2485, 7%
17%
Taliha, 4286, 11%

Puchi Geko, 3238,


9%

Giba, 6376, 17%

Daporijo, 7236,
19%

Figure 1-5 Block wise Large animals population


As per livestock census 2012, population of large animals in the district is 38063.
Indigenous cows’ population accounts for 42% of the total number of large animals in
the district followed by mithuns which constitutes about 58%. Among different blocks,
Daporijo has the highest large animal population with 19% followed by Giba and
Dumporijo which constitutes about 17% of total large animal population.

1.4 Agro-Ecology, Climate, Hydrology and Topography

Upper Subansiri is fourth largest district in Arunachal Pradesh with 7032 square
kilometre of land forming 8% of total geographical area of state. The district comes
under humid and subtropical, temperate sub-alpine (AZ-49), Alpine (AZ-48), climate
with maximum and minimum temperature recorded as 390 C and 4.50 C in the month
of July and January, respectively. The average relative humidity was recorded at 75%
to 90%. Remote localities in the district experience snowfall. Maximum and minimum
rain fall was recorded in the months of July and December, respectively. The average
annual rainfall of the district is 1515.70 mm.

1.4.1 Climate
Climate in the district is varied, as rainfall and temperature differs from place to place.
The district experiences temperate and sub-tropical humid set of climatic condition
with maximum and minimum temperature recorded in the months of June and
December respectively.

39 | P a g e
1.4.2 Hydrology
The district is underlain by rock formations of Recent to Precambrian age. The
Precambrian rocks comprise high grade gneisses and Schists of Sela Group, followed
by quartzite, phyllite, conglomerate, Shales, Biotite gneiss, Calc and Graphite Schist of
Bomdila, Buxa and Miri quartzite Groups of Paleozoic epoch. The Sela Group of rocks
of Precambrian age consists of high grade gneisses, lit-per-lit gneisses and schists. It
occurs in the central part of the district, around Daporijo extending towards north.
Beyond the Subansiri river the rocks have higher grade of metamorphism up to the
grade of sillimanite.The overlying Buxa and Miri formations of lower Paleozoic age
constitutes mainly quartzite with shale and phyllite association,in the southern part of
the district.

Hydro-geologically the area incorporated in the district can be broadly subdivided into
two units 1. Consolidated formations 2. Unconsolidated formations.

1. Consolidated Formations: These formations are underlain in the areas


covered by the hills and mountains and occupy an area of 7025 sq.km. which is
about 99% of the total geographical area of the district. The hills comprise
phyllite, gneisses, quartzite and Calc gneiss. These rocks are highly jointed and
fractured with high degree of weathering. Ground water occurs in weathered
zone as also in the fractured zones which form the zones of secondary porosity
in these formations. Since there is no ground water development structures
tapping all these water yielding horizons in the form of dugwells ,dug-cum-bore
wells or bore wells, ground water is discharged in the topographic lows in the
form of springs. Rainfall forms the main source of recharge which gets
recharged through the weathered mantle and finally reaches the fractures and
openings through percolation. Because of high and steep slopes of the hill
surfaces good amount of rainwater flows down as surface run-off while a
meager portion of precipitation seeps inside to vitalize the shallow weathered
and deeper fractured horizons in the consolidated formations. Groundwater
investigations carried out in the district revealed that springs which form the
main source of water supply for drinking water supply belongs to gravitational
category. Mostly topographic and fracture springs are seen to occur in all hydro
geological units in the district. The discharge of the main water supplying
springs varies from 10,290 lpd to 34,600 lpd. The discharge of the springs

40 | P a g e
reported to emanate through the weathered horizon has been observed to yield
high than those are seen to ooze through fractures. The yield of the springs seen
to dwindle in the lean period. However, in the areas where spring discharge
show significant decline and cause a shear crisis in the water supply in summer,
needful measures of artificial recharge technique is to be adopted to augment
the yield and sustainability of discharge.

2) Unconsolidated Formations: These formations comprise sand of various


textures, silt, clay and pebbles with boulders occurring in the limited valley
areas of Daporizo and Sippi occur in the southern part of the district.
Approximately 400 hectares of land is available for cultivation in the former
while 150 hectares are cultivable in the latter valley areas. An average thickness
of 3-4m of alluvial veneer could be seen in the valleys while average thickness
of weathering in the underlain consolidated formations may vary from 5-10m
as estimated during the studies carried out by CGWB. These valley areas could
be fully developed through portable DTH-Percussion combined rig for
augmentation of water supply and irrigation.

Table 1-4 Hydrogeology of the valley areas in Upper Subansiri District


Formation District Name & Type of Area Rock Types Ground water
Valley (sq.km) potential
Consolidated formations
Fissured upper Intermontane Phyllite, Low yield upto 5-
formation subansiri valley Schist,Slate,Qu 15 m3/hr
a. Daporijo 5.0 atzite in the areas having
Metasedi b. Sippi 2.0 Gneissic lineament and
ment complex with structural
acid and basic weak planes, the
intrusives yield may go upto
25-30 m3/hr
Source:- Central ground water board

1.4.3 Topography
The maximum area of district falls under the category of AES-2 which is medium
altitude sandy clay loam.

Rainfall & Temperature

The district experiences temperate and sub-tropical humid set of climatic condition
with maximum and minimum temperature recorded in the months of June and
December respectively. Winter temperature varies between 4.50c to 21.90c and in
summer 13.80 to 390c.The minimum temperature during winter generally goes down

41 | P a g e
below freezing point. Remote localities in the district experience snowfall. Tasking
circle of Nacho subdivision remains snow bound throughout the year. Besides the
Tasking area, the areas around round Nacho, Siyum has also Taliha circles remain
snow clad. The total snow cover in the District was 1250 sq.km. As revealed through
Satellite imagery studies (CGWB, 1993). However, the figure is in the decline due to
the global warming phenomena and consequent retreat of glacier. Relative humidity
in the district varies from 75 to 91%. Rainfall mainly occurs during the period of April
to October. Average annual rainfall at Daporijo was recorded as 1644mm (1985-88).
While the average rainfall recorded during the period of 2012-13 was 1515.70 mm.

Table 1-5 Agro Ecology Climate, Hydrology, And Topography

Block Agro Type of Block Normal Average No of


Ecological Terrain Area Annual Monthly Rainy
Zone (000' Rainfall Rainfall Days
Type Ha) (mm) (mm)

Limeking Temperate Hilly 164646 1250 126.5 228


Nacho Sub- 130466 1350 127.5 232
Siyum tropical 59310 1350 127.5 232
Taliha 95695 1460 128.6 242
Giba 75445 1450 128.5 241
Daporijo 34639 1300 127 230
Puchi Geko 32266 1340 126.9 231
Dumporijo 55042 1400 127 230
Baririjo 52669 1300 128 240
Source: Agriculture Contingency Plan 2013-14

The district topography falls under hilly terrains. The district agro ecological zone
consists of Temperate and Sub-tropical. The Limeking block comes under Temperate
zone while the rest of blocks come under Sub-tropical Zone. The average rainy days in
the district is 234 and the average monthly rainfall is 127.5 mm.

Table 1-6 Variation in temperature of Upper Subansiri District


Block Average Weekly Temperature (0C)
Period
Summer (Apr-May) Winter (Oct- Mar) Rainy (Jun-Sep)
Min Max Mean Min Max Mean Min Max Mean
Limeking 15 29 22 5 15 10 15 21 18
Nacho 17 32 24.5 8 14 11 17 26 21.5
Siyum 17 32 24.5 8 14 11 17 26 21.5

42 | P a g e
Taliha 16.5 30 23.25 7.5 13 10.25 16 24 20
Giba 18 37 27.5 9 18 13.5 18 27 22.5
Daporijo 21 39 30 11 21 16.5 21 32 26.5
Puchi Geko 18 31 24.5 10 27 18.5 19 29 24
Dumporijo 22 38 30 10 20 15 19 28 23.5
Baririjo 20 38 29 10 20 15 20 30 25
Source: SREP

Variation in Temperature
Temperature in Degree Celcius

35
30
25
20
15
10
5
0
Limeking Nacho Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Summer Winter Rainy

Figure 1-6 Variation in Temperature in Upper Subansiri District

1.5 Soil Profile

The district constitutes principally a hilly terrain covered by thick forests. The hill
ranges are generally aligned in NE-SW and NW-SE directions with moderate to steep
slopes and narrow valleys and it occupies the lesser and inner Himalayan zones of the
Great Himalayan Range. The hills are separated by rivers which flow mostly towards
south and have deep gorges. The hills are comparatively higher in the northern side
than the southern parts. The elevation, in general varies from 1,100 to more than
4000m above mean sea level. The maximum elevation of 5,664m above mean sea level
exists in the north western side of the district and the lowest one is at the District
Headquarter, Daporijo located in the southern part of the district at an altitude of
305m above mean sea level.
Physiographically, the district can be broadly subdivided into two divisions 1. Hilly
terrain, underlain by gneisses and schists with subordinate quartzite and phyllite etc
and 2. Limited alluvial deposits in the valleyfill. Majority of the district area is occupied
by hills underlain by gneisses and Schists barring the restricted valley fills the Daporijo
and Sippi.

43 | P a g e
Based upon the geomorphic elements such as relief, drainage, lithology etc. the district
has been divided into two major units namely denude-structural hills and valley fill
areas.
a) Denudo-structural hills are covering major parts of the district and composed
of Phyllites,quartzites,biotite gneiss,Calc-gneiss and occasional Sillimanite
bearing rock formations. The denudation processes were earlier active in the
hills and remnants of original structural features like deep facets,strike trends
could be seen in the formations. On the basis of elevations, this unit has been
further subdivided as follows.
i) High denudo-structural hills : These are elevated hills ranging in
height from 1800 to more than 5000 m above mean sea level and
occurring in major parts of the district.It occupies an area of around
6,325 sq.km(about 90% of the total geographical area).The unit has
steep slopes and the hills are separated by ‘v’ shaped narrow valleys. It
comprises high grade gneisses of Sela Group and Mica Schist,Calc-
gneisses of Bomdila Group of rocks. The drainage pattern is mostly
dendritic with coarse drainage density.
ii) Moderate Denudo-structural Hills: These occur in the southern part
of the district and the unit is characterized by moderate hills with
elevation ranging between 1100 to 1800 m above mean sea level, having
an area of about 700 sq km. (about 10% of the total geographical area).
The unit has flat tops and moderate to steep slopes. It comprises
phyllite,quartzite,and Shales of Miri Quratzite and Buxa formation of rocks.
The hills are separated by ‘U’ shaped valleys. The drainage pattern is dendritic
to sub-parallel with medium drainage density.
b) Valley fills:
Valley fills comprise thin veneer of alluvial deposits occurring around Daporijo
and Sippi towns in the southern part of the district. It is spreading over about 7
sq.km. (Less than one percent of the total area).These alluvial sediments
comprising sand,silt,clay ,silt and pebbles have been deposited by the rivers and
also constitute weathered materials from surrounding hills. The valleys range
in altitude from 305 to 320 m above mean sea level.
Soils of the district have been derived from the country rocks of schists, gneisses in
hilly areas and form alluvial and colluvial materials in the valleys. The soils in the

44 | P a g e
valley areas are sandy loam in texture with high acidic content. The pH values range
between 4.6 and 6.5. The carbon content is high with medium phosphorous and
potassium concentrations. The soils are good for paddy and wheat, maize, pulses sown
in the valleys and in the hilly areas. No data is available for land slopes as it has not
been measured till date. So the slope values are not applicable.

45 | P a g e
46 | P a g e
Map 2: Soil Map and Soil legends

47 | P a g e
1.6 Soil Erosion and runoff status

Rainfall forms the main source of recharge which gets recharged through the
weathered mantle and finally reaches the fractures and openings through percolation.
Because of high and steep slopes of the hill surfaces good amount of rainwater flows
down as surface run-off while a meager portion of precipitation seeps inside to vitalize
the shallow weathered and deeper fractured horizons in the consolidated formations.

1.7 Land Use Pattern

The land use pattern of the district describes about the total cultivable and non-
cultivable land. The total geographical area of the district is 700178 ha out of which
Limeking block has the maximum geographical area and constitutes about 23.51% of
the total area. The Nacho block has an area of 18.63% of the total geographical area of
the district followed by Taliha with 13.67 %, Giba with 10.78% and Siyum with 8.47 %,
Dumporijo with 7.86%, Baririjo with 7.52%, Daporijo with 4.95% and Puchi Geko with
4.61% of the total geographical area of the district.

Table 1-7 land use Pattern in Upper Subansiri District


Sl/ Blocks Number Total Area under Agriculture Area Area
of the Geographical under under
villages Area (ha.) Gross Net Sown Area sown Cropping forest wasteland
covered Cropped Area (2) more than intensity (ha.) (ha.)
Area (1) (ha.) once (1-2) (%)
(ha.) (ha.)
Limeking 36 164646 980.64 937.6 43.04 105% 473.45 2426
Nacho 51 130466 187.12
Siyum 49 59310 760.23 681.6 78.63 112% 427 1617
Taliha 106 95695 1909.55 1490.4 419.15 128% 788.5 3917.6
Giba 94 75445 1358.02 1103.85 254.17 123% 424 2295.5
Daporijo 47 34639 2315.78 1431.9 883.88 162% 808 3353.25
Puchi Geko 50 32266 881.93 512.15 369.78 172% 744.5 1619.5
Dumporijo 78 55042 3397.71 2114.05 1283.66 161% 752.6 2521.2
Baririjo 42 52669 1536.61 764.8 771.81 201% 151.75 4275.55
Total 553 700178 13327.59 9036.35 4104.12 4569.8 22025.6
Source: Agriculture Department, 2014-15

48 | P a g e
Area Under Agriculture
35%
31%
30%
25%
25% 23%
22%
20% 19%
16% 17%
16%
14%
15% 12% 12%
10% 10% 10%
9% 9% 8%
10% 8%
6% 6% 7% 6%
5% 2%
1%
0%
Limeking Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo

Gross Cropped Area (1) Net Sown Area (2) Area sown more than once (1-2)

Figure 1-7 Area under Agriculture in the District

Area under Forest and Westland


25%
19%
20% 17%18% 18%
16% 16%
15%
15%
10%11% 10% 11%
9% 9%
10% 7% 7%

5% 3%

0%
Limeking/ Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo
Nacho

Area under forest Area under wasteland

Figure 1-8 Area under Forest and Westland in the district

The cultivable area consists of area under agriculture. The gross cropped area of the
district is 13327.59 ha while the net sown area of the district was found to be 9036.35
ha. Area sown more than once which is the difference between the gross cropped area
and the net sown area, comes out to be 4104.12 ha. It implies that large number of
farmers in the district generally have one crop cycle in a year which may be due to the
lack of irrigation structures or absence of any irrigation facility to their farm. Among
the blocks, Dumporijo has the maximum area under cultivation and constitutes about
25.49% of the gross cropped area in the district, though the total geographical area
contribution is only 7.86% of the district, followed by Daporijo and Taliha with a share

49 | P a g e
of 17.38% and 14.33% respectively. Baririjo and Giba block has 11.53 and 10.19% of
area under cultivation. The area under forest is 4569.8 ha. The area under forest is less
than 1% of total geographical area and the area under waste land is 3.15% of total
geographical area. There is much greater scope to convert the waste land in to the
cultivable area. The cropping intensity of the district was found to be 145%.

Map 3: Land Use Pattern in the district

50 | P a g e
Chapter 2
District Water Profile

Due to undulating soil and lack of surface water source, ground water has sufficient
base for irrigation as well as for drinking purpose in every village. Lack of irrigation
source forces the majority of the farmers to migrate to ensure their livelihood or work
as a wage labour in another farmer’s field. The major crops in the project area
cultivated by the farmers are paddy, maize, millet in kharif season. Some of the farmers
take up wheat, potato, vegetables & mustard in rabi if rainfall is good. The land
conservation measures such as channel in the villages help them to take up a rabi crop
in the residual moisture. But other soil and water conservation structures like farm
bunding, nala plug, check dam, gully plug and new pond will also help the farmers to
take up other crops like sugarcane, irrigated wheat, vegetables crops etc. Agriculture
primarily depends upon water; the district have perennial source of water but the
reason for poor agriculture development is because of poor retention of water
resources as the area is hilly with mild slopes. All this can change with the integrated
land and water management during the watershed project. The planned micro
irrigation channels will provide uninterrupted water to the farm land which will
enhance agriculture productivity in the area. This will also help the farmers can take
more than one season of crops.

2.1 Area Wise, Crop-Wise Irrigation Status

Irrigation and drinking water supply facility constitutes the basic needs of the rural
agricultural economy of Upper Subansiri. Despite heavy precipitation, the soils of
district remain thirsty to a larger extent because of its undulating topography, stiff
slops shallow depth and coarse texture.

Table 2-1 Area wise, crop wise irrigation status

Block Kharif (Area in ha.) Rabi (Area in ha.)


Irrigated Rainfed Total Irrigated Rainfed Total

Limeking 114.50 676.05 790.55 19.20 127.85 147.05


Nacho 0.00 0.00 0.00 0.00 0.00 0.00
Siyum 126.15 412.30 538.45 30.40 112.75 143.15

51 | P a g e
Taliha 246.60 904.10 1150.70 93.60 246.05 339.65
Giba 199 589.4 788.40 67.5 247.75 315.25
Daporijo 338 760 1098.00 94.15 239.05 333.20
Puchi Geko 158.45 219 377.45 25.4 109.6 135.00
Dumporijo 476.55 1307 1783.55 48.6 282.5 331.10
Baririjo 221.65 443.7 665.35 15.75 83.7 99.45
Total 1880.9 5311.55 7192.45 394.6 1449.25 1843.85
Source: Agriculture Department, 2014-15

Kharif Vs Rabi Rainfed Crop


25%
25% 19%

20% 17%17% 17% 16%


14%
13%
15% 9% 11%
8% 8% 8% 8% 6%
10%
4%
5%
0%
Limeking Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Kharif Rainfed Rabi Rainfed

Figure 2-1 Rainfed area under cultivation in Kharif and Rabi Season

Kharif Vs Rabi Irrigated Irrigated


30%
25%
24% 24%
25%
20% 17% 18%

15% 13% 12%


11% 12%
8%
10% 6% 5% 7% 8% 6%
4%
5%
0%
Limeking Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo

Kharif Irrigated Area in ha Rabi Irrigated Area in ha

Figure 2-2 Irrigated area under cultivation in Kharif and Rabi Season
Under Kharif season the Dumporijo block has highest irrigated area in the district, it
constitutes 25% of the total irrigated area. In rabi season Taliha and Daporijo has
highest area under irrigation and it constitutes 24%.

52 | P a g e
Table 2-2 Area under Horticulture & Plantation Crop in the District

Block Horticulture & Plantation Crops (Area in Grand Total


ha)
Irrigated Rainfed Total
Limeking 13.04 30.00 43.04 980.64
Nacho 85.82 101.30 187.12 187.12
Siyum 27.63 51.00 78.63 760.23
Taliha 184.15 235.05 419.2 1909.55
Giba 111.45 142.92 254.37 1358.02
Daporijo 106.08 778.50 884.58 2315.78
Puchi Geko 131.98 237.50 369.48 881.93
Dumporijo 131.81 1151.25 1283.06 3397.71
Baririjo 56.31 715.50 771.81 1536.61
Total 848.27 3443.02 4291.29 13327.6
Source: Agriculture Department, 2014-15

Horticulture and Plantation crop area under


Rainfed and Irrigated Condition
40%
35% 33%

30%
25% 22% 23%
21%
20%
16% 16%
15% 13% 13%
10%
10% 7% 7% 7%
3% 3% 4%
5% 2% 1% 1%
0%
Limeking Nacho Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Irrigated Rainfed

Figure 2-3 Horticulture and Plantation crop area under rainfed and irrigated condition

From the above figure the Dumporijo block has highest area under rainfed condition
with 33% of the total horticulture and plantation area followed by Daporijo Block with
23%, Baririjo Block has 21% area under rainfed condition. Under the irrigated
condition Taliha block has highest area under irrigation with 22% of total horticulture
and plantation crop area followed by Dumporijo block with 16%.

53 | P a g e
18%
30%
18%

18%

24.80%
17%
30.00%

8%
25.00%

21%

18%
8%

16.00%

15.27%
0%
20.00%

5%
Area in ha

10.99%

10.96%

7%
10%

9%
15.00%

9.25%
6%
7.49%

2%

5.25%
10.00%
4%
0.00%

5.00%
1%

0.00%

Kharif (Area in ha.) Rabi (Area in ha.) Horticulture & Plantation Crops (Area in ha)

Figure 2-4 Percentage area under Kharif and Rabi

Percentage area under irrigated and rainfed condition under


each block

85.74%
90.00%
77.03% 77.17% 75.85% 75.17%
80.00%
69.81% 68.96%
70.00% 64.12%

60.00%

50.00%
35.88%
40.00%
30.19% 31.04%
30.00% 22.97% 22.83% 24.15% 24.83%

20.00% 14.26%

10.00%

0.00%
Limeking Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo

Rainfed Irrigated

Figure 2-5 Area under rainfed and irrigated under each block

54 | P a g e
The major crops grown in the district comprises of paddy, pulses, wheat and many
fruits and vegetables. The cultivation is mainly done in Kharif and Rabi season while
in some blocks, summer or Zaid is also prevalent for crop cultivation. The total area
under Kharif season is 7192.45 ha. Paddy is the major crop of Kharif season and almost
cultivated in every farm of the district. Rainfed cultivation is the major form of
cultivation in the district and 74% of the total area under Kharif season falls under
rainfed cultivation while remaining 26% is under irrigated condition. The Rabi season
crops is cultivated in 1843.85 ha of area under which majority of cultivation is under
rainfed condition. It constitutes about 79% of the total area under rabi while the a mere
21% of the area is under irrigated conditions. The figure explains that due to the lack
of any irrigation infrastructure in the district, farmers has to depend only on the
rainfall. The district has available perennial sources of water but due to absence of any
infrastructure, the water is not made available to the farm gate. Due to lack of
irrigation facilities in the district, farmers are compelled to take only one crop in a year
which not only result in low marketable surplus but also very low farm income. This is
why subsistence agriculture is more prevalent in the most of the region of the district.

Block wise percentage area under irrigated and rainfed


23.51%
23.08%
25.00%
18.99%
20.00% 17.01%
14.95% 14.78%
15.00% 11.89% 12.38%
11.71% 10.43%
7.77%
6.88% 8.08% 7.80%
10.00% 5.88% 4.86%
5.00%
0.00%
Limeking Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Irrigated % Rainfed %

Figure 2-6 Block wise area under irrigated and rainfed (%)

76.56% of the gross cropped area in the district is under rainfed cultivation and
constitutes about 10203.82 ha while only 23.44 % of the area in the district is under
irrigated condition and constitutes about 3123.78 ha of the gross cropped area. Of the
total area under irrigation Puchi Geko has the maximum irrigated area and constitutes
about 23.088 % followed by Giba and Siyum which constitutes about 18.99% and

55 | P a g e
14.95% of the total area under irrigation. Total area under rainfed cultivation,
Dumporijo constitutes about 23.51% followed by Siyum and Giba which constitutes
about 14.78 % and 12.38% of the total area under rainfed cultivation.

2.2 Production and Productivity of Major Crops

Jhum, Paddy, Maize and soybean are the three major cereals crops in district. The
other food crops which are grown in the district are fruits and vegetable crops. Area
under cereal production is 7109.85 ha. It is 53.34% of gross cropped area and rank 1st
in the all crop production with total production of 458949.8 MT and average
productivity is 3399.65 kg/ha. Pulses contribute 4.067% of gross cropped area with a
production of 829 tons with average productivity is 151.23 kg/ha.

Table 2-3 Area, Production and Yield of major crops in the district

Block Gross Rainfed Irrigated Total Averag


Croppe Area Productio Yield Area Producti Yield Produc e Yield
d Area (ha.) n (Qtl/yr.) (Kgs/h (ha.) on (Kgs/h tion (Kgs/h
a) (Qtl/yr.) a) (Qtl./yr a)
.)
Limeking 981 834 31064 3725.12 147 5004 3409.90 36067 3567.51
Nacho 187 101 3370 3327.00 86 4207 4902.00 7577 4114.50
Siyum 760 576 17544 3045.55 184 5580 3029.57 23124 3037.56
Taliha 1910 1385 43476 3138.60 524 18517 3531.47 61993 3335.03
Giba 1358 980 29754 3035.88 378 11505 3043.94 41258 3039.91
Daporijo 2316 1778 60045 3377.99 538 16979 3154.53 77024 3266.26
Puchi Geko 882 566 19620 3465.80 316 11287 3573.76 30907 3519.78
Dumporijo 3398 2741 78324 2857.77 657 19353 2945.78 97677 2901.78
Baririjo 1537 1243 42884 3450.35 294 8829 3005.91 51713 3228.13
Total 13327.59 10203.82 326081.75 3269.34 3123.77 101259.2 3399.65 427340.94 3334.50

Source: - District Agriculture Department 2014-15

56 | P a g e
24%
25%

18% 19%
20% 18%
17%

15% 13% 13%


11% 11%
10% 9% 9%
10%
5% 6% 6%
5%
4%
5%
1%

0%
Limeking Nacho Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Rainfed Crop Irrigated Crop

Figure 2-7 Block wise production under irrigated and rainfed

Area Vs Productivity
3000 2741 6000.00

2500 5000.00

Productivity in kg/ha
2000 1778 4000.00
Area In ha

1500 1385 3000.00


1243
980
1000 834 2000.00
576 657
524 538 566
500 378 316 294 1000.00
147 101 86 184

0 0.00

Rainfed Area Irrigated Rainfed Crop Productivity kg/ha Irrigated Crop Productivity kg/ha

Figure 2-8 Area Vs Productivity in the District


The total production under different crops in the district comes out to be 427340.94
MT out of which the production under rainfed condition is 326081.75 MT and
production under irrigated condition is 101259.2 MT. The production under irrigated
condition is 23.69% while under rainfed, it is 76.30% of the total production in the

57 | P a g e
district. However, due to lesser area under irrigated condition (23.69%) in the district
the average productivity of the district comes out to be 3334.50 kg/ha. The average
productivity under rainfed is about 3269.34 kg/ha and under irrigated condition it is
3399.65 kg/ha. the lower productivity under irrigated condition is only due the fact
that large amount of area under cultivation falls under rainfed condition which results
in large production as compared to the irrigated condition but the per ha effective
production under irrigated condition is more as compared under rainfed condition
due to year round availability of water to the farm and taking of more than one crop in
a year.

2.3 Irrigation Based Classification

As discussed earlier, the district is primarily rainfed. Area under rainfed condition is
10302.82 ha and constitutes about 76.56% of gross cropped area, while the extent of
irrigated land is only 3123.78 ha, i.e. mere 23.44% of gross cropped area.

Table 2-4 Irrigation based classification


Blocks Irrigated (Area in ha) Rainfed (Area in ha)

Gross Irrigated Area Net Irrigated Area Un-Irrigated or Gross cropped area
Totally Rainfed
Limeking 146.74 146.74 833.90 980.64
Nacho 85.82 85.82 101.30 187.12
Siyum 184.18 184.18 576.05 760.23
Taliha 524.35 524.35 1385.20 1909.55
Giba 377.95 377.95 980.07 1358.02
Daporijo 538.23 538.23 1777.55 2315.78
Puchi Geko 315.83 315.83 566.10 881.93
Dumporijo 656.96 656.96 2740.75 3397.71
Baririjo 293.71 293.71 1242.90 1536.61
Total 3123.77 3123.77 10203.82 13327.59
Source: Agriculture Department, 2014-15

58 | P a g e
2740.75
3000

1777.55
2500

1385.2

1242.9
2000

980.07
1500 833.9

656.96
576.05

538.23
524.35

566.1
377.95

315.83

293.71
1000

184.18
146.74

101.3
85.82
500

Net Irrigated Area Un-Irrigated or Totally Rainfed

Figure 2-9 Irrigation Base Classification in ha


Considering the block-wise data, percentage of net irrigated land to net cropped area
is maximum in Dumporijo followed by Daporijo block, and Taliha block, i.e 25%, 17%
and 14% respectively.

The partially irrigated area is the area which falls under micro irrigation facilities. The
total partially irrigated area is 3123.77 ha while the total rainfed area in the district is
10203.82 ha.

The irrigation based classification of the district emphasises the need of intervention
that is required under rainfed condition to bring the partially rainfed area under
complete irrigation while supporting and implementing activities to bring the rainfed
areas under assured irrigation or partially irrigation facilities.

59 | P a g e
Chapter 3
District Water Availability

The river Subansiri has intersected the area. Snow-clad mountain ranges of height
from 7000 ft. to 18000 ft. (above sea level) stand like barrier in the north. Most of the
land area is barren and inhabitation is scanty. The region is mostly covered by dense
forest consisting Alpine, moist temperature tropical pine and temperate wet evergreen
forests in upper, upper middle, middle and lower region respectively Subansiri river
originating from Tibet and its tributaries form the main drainage system of the district.
It flows in N-S direction.The Siken river flow westerly while Singen and Kamla River
have easterly flow direction. All these join Subansiri River in the southern part of the
district. The other streams ans nalas namely Chukkro,Siaskro etc. also meets Subansiri
river. The drainage pattern is dendritic to subparallel and follow the general
geomorphological trend of the hills and structural lineaments.

Main occupation of indigenous people is agriculture. Shifting cultivation is practiced


in hilly areas. About 2634 Hectares of land is utilized by the Jhumia families in the
district. Jhum cultivation has been significantly reduced now a days in the district with
the adaptation of settled cultivation by the people. The settled cultivation has emerged
as more productive and reliable. Agriculture is mainly rainfed.

3.1 Status of Water Availability

The perennial river subansiri has intersect the upper subansiri district. The district
constitutes principally a hilly terrain covered by thick forests. The hill ranges are
generally aligned in NE-SW and NW-SE directions with moderate to steep slopes and
narrow valleys and it occupies the lesser and inner Himalayan zones of the Great
Himalayan Range. The hills are separated by rivers which flow mostly towards south
and have deep gorges. Subansiri river originating from Tibet and its tributaries form
the main drainage system of the district. It flows in N-S direction.The Siken river flow
westerly while Singen and Kamla river have easterly flow direction. All these join
Subansiri river in the southern part of the district. The other streams ans nalas namely
Chukkro,Siaskro etc. also meets Subansiri river. The drainage pattern is dendritic to

60 | P a g e
sub parallel and follow the general geomorphological trend of the hills and structural
lineaments.

Ground Water Scenario: Groundwater is available in all geological formations in


the district depending upon their primary or secondary porosities, geomorphologic
and hydro geologic set up.

Hydro-geologically the area incorporated in the district can be broadly subdivided into
two units 1. Consolidated formations 2. Unconsolidated formations.
1. Consolidated Formations: These formations are underlain in the areas
covered by the hills and mountains and occupy an area of 7025 sq.km. Which is about
99% of the total geographical area of the district. The hills comprise phyllite, gneisses,
quartzite and Calc gneiss. These rocks are highly jointed and fractured with high
degree of weathering. Ground water occurs in weathered zone as also in the fractured
zones which form the zones of secondary porosity in these formations. Since there is
no ground water development structures tapping all these water yielding horizons in
the form of dugwells, dug-cum-bore wells or bore wells, ground water is discharged in
the topographic lows in the form of springs. Rainfall forms the main source of recharge
which gets recharged through the weathered mantle and finally reaches the fractures
and openings through percolation. Because of high and steep slopes of the hill surfaces
good amount of rainwater flows down as surface run-off while a meager portion of
precipitation seeps inside to vitalize the shallow weathered and deeper fractured
horizons in the consolidated formations.
Groundwater investigations carried out in the district revealed that springs which form
the main source of water supply for drinking water supply belongs to gravitational
category. Mostly topographic and fracture springs are seen to occur in all hydro
geological units in the district. The discharge of the main water supplying springs
varies from 10,290 lpd to 34,600 lpd. The discharge of the springs reported to emanate
through the weathered horizon has been observed to yield high than those are seen to
ooze through fractures. The yield of the springs seen to dwindle in the lean period.
However, in the areas where spring discharge show significant decline and cause a
shear crisis in the water supply in summer, needful measures of artificial recharge
technique is to be adopted to augment the yield and sustainability of discharge.
2. Unconsolidated Formations: These formations comprise sand of
various textures, silt, clay and pebbles with boulders occurring in the limited valley

61 | P a g e
areas of Daporizo and sippi occur in the southern part of the district. Approximately
400 hectares of land is available for cultivation in the former while 150 hectares are
cultivable in the latter valley areas. An average thickness of 3-4m of alluvial veneer
could be seen in the valleys while average thickness of weathering in the underlain
consolidated formations may vary from 5-10m as estimated during the studies carried
out by CGWB. These valley areas could be fully developed through portable DTH-
Percussion combined rig for augmentation of water supply and irrigation. The
following table (Table-3-1) summarizes the hydro-geological outlines in the valleys.

Table 3-1 Summarise hydrogeology of the valley areas in upper Subansiri District

Formation District Name & Area Rock Ground water


Type of (Sq.K Type Potential
valley m)
Consolidated formation
Fissured Upper Intermonta Phyllite, Low yield upto
formation Subansiri ne valley Schist , 5-15 cum/hr
a. Daporijo 5.0 Slate, Yield upto 5
Metasedime b.Sippi 2.0 Quatzite cum/hr. In areas
nt having
Gneissic lineament and
complex structural weak
with acid planes, the yield
basic may go upto 25-
intrysives 30 cum/hr
Table 3-2 Status of ground water Availability of water in Upper Subansiri

3.1 Status of Water Availability (MCM)


Sl. Sources Kharif Rabi Summer Total
No.
1 Surface Irrigation
(i) Canal (Major & Medium Irrigation)
(ii) Minor Irrigation Tanks
(iii) Lift Irrigation/ Diversion 1050.02
(iv) Various water bodies including Rain 0.030
Water Harvesting
(v) Treated Effluent received from STP
(vi) Untreated Effluent
(vii Perennial sources of water 30507.45
)
2 Ground Water
(i) Open Well 0.056
(ii) Deep Tube Well -

62 | P a g e
(iii) Medium Tube Well -
(iv) Shallow Tube Well -
Source: - WRD, 2015-16

3.2 Status of Ground Water Availability

The annual replanishable ground water resource of the district is estimated as


332.64Ham. Net ground water availability of the district is 299.38Ham. Projected
demand for domestic and industrial uses up to 2025 is 27.30Ham. Ground water
availability for future irrigation use is 272.08Ham. Stage of ground water development
is thus negligible and the district can be categorized as safe.

3.2.1 Ground water Quality

The quality of ground water in the district is ascertained as per the chemical analysis
done at the chemical laboratory of the water samples collected from various spring
sources during the investigations carried out by CGWB.

It has been observed that the ground water in the district is slightly alkaline having pH
value ranging within 7.33 to 8.15.Electrical conductivity values range within 41-122
micro-Siemens/cm barring few locations. Carbonate content in ground water is nil.
Concentration of bicarbonate ranges from 18-153 ppm. Concentrations of Ca, Mg is
ranging from 6-15 ppm and 1-7 ppm. Total hardness values of ground water vary
between 20-58 ppm .Sodium and potassium values ranges within 2-8 and 1-4 ppm.
Total dissolved solid which is a measure of quality of ground water ranges between 30-
170 ppm. Concentrations of other constituents like Chloride range from 4-11 ppm,
nitrate and fluoride vary between 0.39-0.71 and 0.1-1.2 ppm respectively. Range of
concentration of iron fluctuates between 0.05-0.3 ppm excepting few high values
found at Bui and Lida village where concentration values found a bit higher as 0.7 and
0.75 ppm.

Therefore, based on the above chemical analysis data, ground water in the district can
be designated as fresh, potable and it is suitable for domestic, irrigation and any future
industrial uses.

To adjudge the chemical quality of drinking water, PHED of Govt. of Arunachal


Pradesh has established one chemical laboratory at Daporijo. The chemical analysis

63 | P a g e
done by PHED has also not so far reported occurrence of any toxic constituents or
higher concentration of chemical constituents beyond permissible limit.

Table 3-3 Ground Water Availability


Block Status of Block as per Central Ground Water (MCM)
Ground Water Board Notification
Critical Semi- Safe Draft Recharge Gap
Critical MCM MCM MCM
Upper Subansiri NA NA NA NA NA NA
Source: - Central Ground water board, 2013

District ground water resource are fall under safe zone.

3.3 Status of Command Area

The district has a total of 29000.2 ha under canal command area out of which 2463
ha of the area has been developed through various major and medium canal channels
while 26794.7 ha of the area still lies under undeveloped area. The other services
command includes command area under other sources of irrigation in the district like
lift irrigation, perennial sources or ground water sources, etc. Under the other services
command, stilling waiting for development and total area under is still undeveloped.
The total developed command area in the district is 2463 ha while 26948.7 ha is under
undeveloped command area and requires to be developed so that the area under
rainfed can be brought under the ambit of irrigation sources.

Table 3-4 Command area development

Blocks Information of Canal Information on the other Total Area


Command Services Command
Total Devel Undeve Total Deve Unde Develo Undevelop
Area oped loped Area lope velop ped ed
(ha.) Area Area (ha.) d ed Comm Command
(ha.) (ha.) Area Area and (ha.)
(ha.) (ha.) (ha.)
Limeking 426 43 416 10 0 10 43 426
Nacho 1647.00 105.00 1647.00 0.00 0.00 0.00 105.00 1647.00
Siyum 1257.50 51.00 1247.00 10.50 0.00 10.50 51.00 1257.50
Taliha 2680.00 89.00 2670.00 20.00 0.00 20.00 89.00 2690.00
Giba 6500.50 385.00 6115.50 0.00 0.00 0.00 385.00 6115.50
Daporijo 6436.00 850.00 5586.00 108.00 0.00 108.00 850.00 5694.00
Puchi Geko 2618.00 220.00 2398.00 0.00 0.00 0.00 220.00 2398.00
Dumporijo 5355.2 370 4985.2 5 0 5 370 4990.2
Baririjo 2080.00 350.00 1730.00 0.00 0.00 0.00 350.00 1730.00
Total 29000.2 2463 26794.7 153.5 0 153.5 2463 26948.2
Source: - WRD, 2015-16

64 | P a g e
Percentage of Canal command and other services command

80%
70%
70%

60%

50%

40%

30% 22% 22%


18%
20% 13%
7% 9% 9% 7%
7% 6% 4%
10% 1% 3%
0% 0% 0% 0%
0%
Limeking Nacho Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

% of Canal Command Area % of Other Services Comand Area

Figure 3-1 Percentage of Canal command and other services command

Block wise percentage of developed and undeveloped canal


command area
35%
35%
30%
23%
25% 21%
19%
20% 16% 15% 14%
15% 10% 9% 9%
10% 6% 6%
4% 5% 4%
5% 2% 2% 2%

0%

% of developed canal commad area % of undeveloped canal commad area

Figure 3-2 Percentage of developed and undeveloped command area


The drainage maps given below shows the area of land where monsoon drains
downhill into water bodies. The comparison of both the maps, can help in determining
where the rainfall naturally flows over the land and downstream to a particular
watercourse. It can be used in identifying the command area for a point along a river,
stream, reservoir, lake or pond.

65 | P a g e
Map 4: Pre-Monsoon drainage in Upper Subansiri district

Map 5: Post Monsoon drainage map of Upper Subansiri

66 | P a g e
3.4 Existing Type of Irrigation
Under existing type of irrigation in the district, various sources of irrigation has been
identified which includes both government and private based. The total number of
government based canal structure in the district are 496 where number of private
based canal structure are not developed in the district. There was no information
regarding community based canal during the field survey in the district. There are also
33 government based reservoir and dams and constitutes i.e., 24 in Daporijo block,3
in Giba block, 4 in dumporijo block and remaining 2 are in Baririjo block. Among
blocks, Daporijo has the highest percentage of government based canal structure and
accounts for 73% of the total canal based structure in the district followed by
Dumporijo block 12%. Baririjo and Giba blocks has 9 % and 6 % of the government
based canal structure as compared to the total district.

Under the ground water resource existing structures are available with only
government based and the Daporijo has highest open wells in the district with 12 and
constitute 57% of the total district open well structures followed by siyum constitutes
33% and remaining 10% constitute by Dumporijo Block. In the district no ETP plants
are installed also there is only 6 units of electricity pumps and Diesel engine pumps
are installed in the Daporijo Block. As per water resources available in the district there
is huge potential for lift irrigation.

The entire district is occupied by rugged terrain and it is having hilly and valley
portion. There is a limited scope of ground water development in hilly terrain and the
scope of recharge in hilly terrain requires a rigorous study. Rainwater can be harvested
for drinking water supply. There is no such problem related to groundwater. At some
locations iron content in groundwater is more than the permissible limit, otherwise
groundwater is fresh and may be used for domestic, irrigation and industrial needs.

Table 3-5 Existing Surface Irrigation

67 | P a g e
Blocks Comma Surface Irrigation (1) (in No.) Total
nd Area
(ha.) Canal Based Tanks/ Ponds/
Reservoirs
Govt. Commu Comm Individ Govt.
Canal nity/ unity ual/ Pvt. Reser
Pvt. Ponds Ponds voir/
Canal Dams
Limeking 469.00 38.00 NA NA NA NA 38.00
Nacho 1752.00 40.00 NA NA NA NA 40.00
Siyum 1308.50 17.00 NA NA NA NA 17.00
Taliha 2778.00 45.00 NA NA NA NA 45.00
Giba 6500.50 81.00 NA NA NA 3.00 84.00
Daporijo 6544.00 72.00 NA NA NA 24.00 96.00
Puchi 2618.00 58.00 NA NA NA NA 58.00
Geko
Dumporij 5345.20 79.00 NA NA NA 4.00 83.00
o
Baririjo 2080.00 66.00 NA NA NA 2.00 68.00
Total 29395 496 0 0 0 33 529
Source: - WRD, 2015-16

Table 3-6 Existing Ground Water irrigation


Blocks Ground Water (2) (in No.) Other Treated Total
Sources Effluent
Tube Open Wells Bore Wells including discharged
Wells Traditional from STP
WHS (3) (in No.)
(in No.)
Govt. Pvt. Govt. Pvt. Govt. Pvt. 1
2
3
Limeking NA NA NA NA NA NA NA NA NA
Nacho NA NA NA NA NA NA NA NA NA
Siyum NA NA 7.00 NA NA NA 1.00 NA 8
Taliha NA NA NA NA NA NA NA NA NA
Giba NA NA NA NA NA NA 1.00 NA 1
Daporijo NA NA 12.00 0.00 NA NA 7.00 NA 19
Puchi Geko NA NA NA NA NA NA NA NA NA
Dumporijo NA NA 2.00 NA NA NA 2.00 NA 4
Baririjo NA NA NA NA NA NA NA NA NA
Total NA NA 21 0 NA NA 10 NA 32
Source: - WRD, 2015-16

68 | P a g e
Table 3-7 Water extraction Devices in District

Blocks Water Extraction Devices/ Lift Total (in No.)


(in No.)
Electricity Diesel Others Irrigation Water
Pump (4) Pump (6) Sources Extracting
(5) (1+2+3) Units
(4+5+6)

Limeking NA NA NA 38.00 NA
Nacho NA NA NA 40.00 NA
Siyum NA NA NA 25.00 NA
Taliha NA NA NA 45.00 NA
Giba NA NA NA 85.00 NA
Daporijo 6.00 6.00 NA 127.00 12.00
Puchi Geko NA NA NA 58.00 NA
Dumporijo NA NA NA 87.00 NA
Baririjo NA NA NA 68.00 NA
Total 6 6 NA 573.00 12
Source: - WRD, 2015-16

Government Canals
13% 8%
8%
3%
16%
9%

12%
16%

15%

Limeking Nacho Siyum Taliha Giba Daporijo Puchi Geko Dumporijo Baririjo

Figure 3-3 Block wise percentage of government canals in the district


The Government based canals are located maximum in Giba and Dumporijo block
with 16% followed by Daporijo with 15%, Puchi Geko block with 12%, Baririjo with
13% and the rest blocks are constitutes individually less than 10%.

69 | P a g e
Govt. Reservoir
Baririjo Giba
Dumporijo 6% 9%
12%

Daporijo
73%

Giba Daporijo Dumporijo Baririjo

Figure 3-4Block wise percentage of government Reservoir


Only four CD blocks are contributes for water reservoir in the Upper Subansiri district.
The Daporijo has highest reservoir in the district with 73% contribution followed by
Dumporijo constitute 12%, Baririjo constitute 6% and Giba constitute 9%.

70 | P a g e
Chapter 4
Water Requirement/Demand

The earlier Chapters deal with the general profile, water profile and water availability
of Upper Subansiri district. The present chapter deals with the current (2016) and
projected (2021) demand of water for various sectors. The demand for water has been
assessed on the basis of data obtained from different departments.

4.1 Domestic Water Demand

Data of Census 2011 and 2001 has been considered to arrive at the growth rate of
population of the district. As per Census 2011, the district has shown a decadal growth
rate of 50.78 %. Table 4.1 below indicates the block-wise population of the district. The
per annum population growth has been assessed to be 5.08%. Current population (in
2016) has been calculated by assuming a growth of 25.4% (5.08%*4) over a period of
five years (from 2011-2016). Projected population has been calculated in similar way
by assuming a growth of 25.40% (5.08%*5) over the period of five years (from 2016-
2021). The population has been further compounded for the assessment of current and
projected growth.

It has been assumed that per capita daily water requirement of people residing in
urban areas of the district is 150 L and for population in rural areas, the daily per capita
daily water requirement is 70 L Using the same norms domestic water supply demand
has been worked out and given in table 4.1 below.

Table 4-1 Domestic Water Demand


Blocks 2011 2016 Gross Projected Gross
water Population water
demand 2021 demand
in MCM in MCM
(2016) (2021)
Limeking 2978 3815 0.097 4887 0.12
Nacho 5151 6599 0.169 8453 0.22
Siyum 6866 8796 0.225 11267 0.29
Taliha 15545 19914 0.509 25510 0.65
Giba 11616 14880 0.380 19062 0.49
Daporijo 19699 25235 1.146 32327 1.47
Puchi Geko 4418 5660 0.145 7250 0.19
Dumporijo 11547 14792 0.378 18949 0.48

71 | P a g e
Baririjo 5628 7210 0.184 9236 0.24
Total 83448 106899 3.2327 136941 4.1412

Domestic Water Demand- Current vs Projected

1.47
1.600

1.146
1.400
Water demand in mcm

1.200
1.000

0.65
0.800

0.509

0.49

0.48
0.380

0.378
0.600 0.29
0.225

0.184
0.24
0.169
0.22

0.145
0.19
0.400
0.097
0.12

0.200
0.000
Limeking Nacho Siyum Taliha Giba Daporijo Puchi Dumporijo Baririjo
Geko

Gross water demand in MCM (2016) Gross water demand in MCM (2021)

Figure 4-1 Domestic water Demand of Upper Subansiri District


It can be observed from the table that considering the growth rate of population of the
district, the quantity of water required in 2021 for domestic consumption shall
be approximately 4.14 MCM which is 0.9085 MCM more than the present water
requirement.

4.2 Crop Water Requirement


As discussed in Chapter 2, cereals are cultivated on major part of the gross cropped
area in the district. Hence, the crop water requirement for major cereals viz. Maize,
Paddy, as assumed by State Agricultural University has been taken. The assumptions
are as under:

 For paddy: 0.6 m per ha,


 for Maize: 0.06 m per ha,
 Vegetables: 0.18 m per ha and
 for Horticulture crops: 0.06 m per ha
 The small portion of area under other crops has been taken in category of
vegetables and same assumption has been made.

72 | P a g e
Table 4-2 Crop Water requirement

Block Area Irrigated Crop Water Existing Water


sown area (ha) Water Potential Water Potential
(Ha) Demand Required Potential to be
in MCM in MCM MCM created
MCM
Limeking 980.64 146.74 4.64 4.64 0.74 3.90
Nacho 187.12 85.82 2.25 2.25 1.03 1.22
Siyum 760.23 184.18 3.78 3.78 0.19 3.59
Taliha 1909.55 524.35 11.15 11.15 2.56 8.59
Giba 1358.02 377.95 7.31 7.31 1.38 5.93
Daporijo 2315.78 538.23 16.47 16.47 3.03 13.44
Puchi Geko 881.93 315.83 6.49 6.49 2.39 4.10
Dumporijo 3397.71 656.96 24.71 24.71 4.00 20.71
Baririjo 1536.61 293.71 12.71 12.71 1.79 10.91
Total 13328 3124 89.51 89.51 17.12 72.38

25.00
20.71
Water demand In MCM

20.00

15.00 13.44
10.91
10.00 8.59
5.93
3.90 3.59 4.10
5.00
0.00
0.00

Existing Water Potential Water Potential to be created Crop Water Demand

Figure 4-2 Crop water requirement


Water potential required has been derived from water required by crops cultivated
under rainfed conditions. Therefore, the existing water potential represents the water
requirement of crops cultivated in irrigated areas. The existing water potential
available in the district is 17.12 MCM. The projected water demand for crop irrigation
is 89.51 MCM. It can be concluded from the table that a total water potential of 72.38
MCM is to be created in the district to fulfil the requirement of crops.

73 | P a g e
4.3 Livestock Water Requirement
The requirement of water by livestock in the district has been derived from two
livestock census (2007 & 2012), as discussed in second chapter. The table below
represents the animal wise water requirement as well as total water requirement of the
district for livestock.

Table 4-3 Livestock Water Requirement

Water
Present water Potential
Tehsil/Sub Water Demand In
Animals Demand in to be
tehsil 2021 in MCM
MCM created in
MCM
Limeking 5841 0.034 0.034 0.001
Nacho 8695 0.078 0.079 0.001
Siyum 7636 0.057 0.057 0.001
Taliha 11176 0.099 0.100 0.001
Giba 23920 0.141 0.143 0.002
Daporijo 22279 0.158 0.159 0.002
Puchi Geko 8876 0.079 0.080 0.001
Dumporijo 20623 0.149 0.150 0.002
Baririjo 8787 0.074 0.074 0.001
Total 117833 0.868 0.875 0.012

Livestock Water Demand


0.159
0.157

0.150
0.148
0.143
0.141

0.160
0.140
Water Demand In MCM

0.100
0.098

0.120
0.080
0.079

0.079
0.078

0.074
0.073

0.100
0.057
0.056

0.080
0.034
0.034

0.060
0.040
0.020
0.000

2012 2020

Figure 4-3 Livestock Water Demand Present Vs Projected.

74 | P a g e
4.4 Industrial water Requirement
There is micro and small scale industries exist in the district as per MSME report 2014
there were 34 industries were registered but as per report only 17 industries are
working remaining were shutdown and there water demand has not calculated
because there is no scope in short future for industrialization. So water requirement
in this sector is almost negligible.

Table 4-4 Industrial water Requirement

Tehsil/ Sub- Water


Present Water Existing
tehsil potential
No. of water demand water
to be
Industries demand in 2020 potential
created
(MCM) (MCM) (MCM)
(MCM)
Upper Subansiri NA NA NA NA NA

4.5 Water Demand for Power Generation

Power is not generated in the district and hence, water requirement has been indicated
to be zero. The power requirement of district is met through common grid system of
the state.

Table 4-5 Water Demand for Power Generation

Water Water
Water Existing
Power deman potentia
deman water
Block requiremen d in l to be
d potentia
t (MW) 2020 created
(BCM) l (BCM)
(BCM) (BCM)
Upper NA NA NA NA NA
Subansiri

4.6 Total Water Demand for various sector

This sections presents the total water demand of the district and has been calculated
by summing up all major sectors consuming water. The current water demand has
been indicated in Table 4.6 (a) and the projected water demand has been depicted in
Table 4.6 (b).

75 | P a g e
Table 4-6 (a) Present Water Demand of the district for various sectors

ge Block Sector-wise water demand (2016) Total


Domestic Crop Livestock Industries (MCM)
(MCM) (MCM) (MCM) (MCM)
1 Limeking 0.097 4.638 0.034 NA 4.77
2 Nacho 0.169 2.245 0.078 NA 2.49
3 Siyum 0.225 3.783 0.057 NA 4.06
4 Taliha 0.509 11.152 0.099 NA 11.76
5 Giba 0.380 7.313 0.141 NA 7.83
6 Daporijo 1.146 16.469 0.158 NA 17.77
7 Puchi Geko 0.145 6.488 0.079 NA 6.71
8 Dumporijo 0.378 24.711 0.149 NA 25.24
9 Baririjo 0.184 12.708 0.074 NA 12.97
Total 3.233 89.508 0.868 0.000 93.61

Present Water Demand for Various Blocks of


Upper Subansiri

5%
Limeking
14% 3%
Nacho
Siyum
4%
Taliha
Giba
27% 13% Daporijo
Puchi Geko
8% Dumporijo
Baririjo
7%
19%

Figure 4-7 Present water demand for various blocks of Upper Subansiri district

76 | P a g e
Sector wise percentage of water demand
0.93% 3.45%

Domestic
Crop
Livestock

95.62%

Figure 4-4 Sector Wise Water Requirement in the District

The present water demand of the district has been assessed at 93.61 MCM annually.
Among the blocks, the demand of water at present is maximum in Dumporijo block
which shares about 27% of the total present water demand in the district followed by
Daporijo and Baririjo block which has a share of 19% and 14% respectively to the total
present water demand in the district.

The projected water demand in the district is given below in the table.

Table 4-6 (b) Water Demand for various blocks projected for 2021

Sr. Block Sector-wise water demand (2021) Total


No. (MCM)
Domestic Crop Livestock Industries
(MCM) (MCM) (MCM) (MCM)
1 Limeking 0.125 4.638 0.034 NA 4.80
2 Nacho 0.216 2.245 0.079 NA 2.54
3 Siyum 0.288 3.783 0.057 NA 4.13
4 Taliha 0.652 11.152 0.100 NA 11.90
5 Giba 0.487 7.313 0.143 NA 7.94
6 Daporijo 1.468 16.469 0.159 NA 18.10
7 Puchi Geko 0.185 6.488 0.080 NA 6.75
8 Dumporijo 0.484 24.711 0.150 NA 25.35
9 Baririjo 0.236 12.708 0.074 NA 13.02
Total 4.141 89.508 0.875 0.000 94.52

77 | P a g e
During 2021, the demand shall be proportionate to the current water demand and total
water requirement has been assessed at 94.52 MCM. The demand will rise maximum
in Dumporijo block which will be 26.81% of the total projected water demand in the
district followed by Daporijo and Baririjo with 19.14% and 14% respectively.

Block wise percentage of projected water


demand
5.08% 2.69%
4.37% Limeking
13.77%
Nacho
12.59% Siyum

26.81% Taliha
8.40%
Giba
Daporijo
7.14% 19.14%
Puchi Geko
Dumporijo
Baririjo

Figure 4-8 Block wise Projected Water demand for Upper Subansiri District

4.7 Water Budget

From the above estimation of water requirement and the present water demand, a
water budget is prepared. A water budget reflects the relationship between input and
output of water through a region. Thus we have a direct comparison of supply of water
and the natural demand for water. The following data provides current water gap and
projected water gap for the year 2016 and 2021 respectively. The water budget has
been estimated based on the assumption and figures arrived from the tables listed
above in various components.

Table 4-7 Water Budget of the district

78 | P a g e
Block Existing water Total Water Demand Water
availability (MCM) (MCM) (MCM) Gap
Surface Ground Present Projected (MCM)
Water Water (2016) (2020)
Limeking 6.68 NA 6.68 4.77 4.80 -1.88
Nacho 5.29 NA 5.29 2.49 2.54 -2.75
Siyum 2.41 NA 2.41 4.06 4.13 1.72
Taliha 3.88 NA 3.88 11.76 11.90 8.02
Giba 3.06 NA 3.06 7.83 7.94 4.88
Daporijo 1.41 NA 1.41 17.77 18.10 16.69
Puchi Geko 1.31 NA 1.31 6.71 6.75 5.44
Dumporijo 2.23 NA 2.23 25.24 25.35 23.11
Baririjo 2.14 NA 2.14 12.97 13.02 10.88
Total 28.40 0.00 28.40 93.61 94.52 66.12

Water Budget of Upper Subansiri

40% 35%
35%
24%
30% 27%
25%
25% 19%
19%
20% 16%
14% 13% 12% 14%
15% 11%
8% 8% 7%
10% 5% 7%8% 8% 8%
3% 4% 5% 5%
3%
5%
0%
-5%
-3% -4%

Existing water availability (MCM) Projected (2020) (MCM) Water Gap (MCM)

Figure 4-5 Water Budget of Upper Subansiri


The total water availability or the water supply in the district is about 28.40 MCM
while the current water demand in the district stands at 93.61 MCM. As projected the
water demand will be 94.52 MCM which is 0.92 MCM more than the current water
demand. Among the blocks, the largest water gap exists in Dumporijo block with 35%
followed by Daporijo block with a gap of 25% of the total water gap in the district. In
addition the Upper Subansiri district has excess water available with Limeking and
Nacho Block with 2.649 MCM and 3.827 MCM which is 7.05% of total water
availability.

79 | P a g e
Chapter 5
Strategic Action Plan for Irrigation in District Upper
Subansiri under PMKSY
The water supplied in Upper Subansiri district is mainly by tapping surface water
sources. The poor ground water development in this district is mainly due to lack of
agricultural practices using modern techniques and also due to excessive dependence
on surface water for drinking water supply or locally by tapping springs. Moreover,
construction of ground water structure like tube wells in this hilly terrain is difficult
and in most of the places of the district it is impossible due to approachability problem
till date. There is immense scope for the same in the valley and foothill areas, which
will boost agriculture and ultimately the state economy.

The District’s Strategic Plan is a guide or roadmap for how the District will respond to
current and future challenges. The plan provides the District with overall direction on
how to achieve future success. It does not, however, describe all of the specific actions
we will need to take in order to achieve our objectives. These actions are spelled out in
a series of master plans, business plans, and a rehabilitation and betterment plan; each
plan outlining the tasks, milestones, and key dates for the various objectives contained
in the Strategic Plan.
5.1 Block wise Total Plan of District
The total outlay of the district is about Rs.236931.36 lakhs distributed among different
blocks. The Daporijo and Dumporijo block has the maximum share of total outlay and
constitutes about 16.47% and 14.21% respectively, followed by Taliha block with
13.07%. The block wise share of the total outlay in the district is given in the table
below:

Table 5-1 Block Wise Total Outlay of District Rs in Lakhs


Agricultu
re Horticulture
Block WRD DRDA RWD ATMA Total
Departm Department
ent
Baririjo 7563.50 1310.82 6275.70 2098.22 2011.21 14.45 19273.90
Daporijo 27435.43 1638.26 1264.55 6777.82 1862.23 49.64 39027.93
Dumporijo 19873.43 1868.03 6635.93 4342.83 893.87 43.04 33657.12
Giba 11545.75 1259.18 5261.10 3706.60 1117.3395 48.66 22938.63

80 | P a g e
Agricultu
re Horticulture
Block WRD DRDA RWD ATMA Total
Departm Department
ent
Chetam 10841.50 1168.15 3138.10 2241.88 3.40 17393.03
Limeking 1613.00 1276.97 3138.10 1436.92 819.38 13.48 8297.86
Nacho 6384.10 1160.69 3138.10 2094.51 744.89 14.16 13536.44
Puchi Geko 4234.92 1180.55 5050.38 3152.98 1564.28 10.44 15193.54
Siyum 5189.25 1193.60 3138.10 3422.30 893.87 7.47 13844.59
Taliha 6465.67 1177.69 3770.38 18799.37 744.89 7.47 30965.47
Paying 3732.00 1275.42 3138.10 14649.87 7.47 22802.86
Grand
Total 104878.53 14509.37 43948.53 62723.29 10651.97 219.67 236931.36

The percentage share of each department under different blocks has been shown in
the figure below:

WRD
6.16% 3.56% Baririjo
4.95% 7.21%
4.04% Daporijo
Dumporijo
26.16%
6.09%
1.54% Giba
Chetam
10.34%
Limeking
11.01% 18.95% Nacho
Puchi Geko
Siyum
Taliha

Figure 5-1 Block wise Percentage Share of outlay Under WRD

81 | P a g e
Agriculture Department
Baririjo
Daporijo
8.79% 9.03%
8.12% 11.29% Dumporijo
8.23% Giba
12.87% Chetam
8.14%
Limeking
8.00% 8.68% Nacho
8.80% 8.05% Puchi Geko
Siyum
Taliha
Paying

Figure 5-2 Block wise Percentage Share of outlay Under Agriculture Department

Horticulture Department

Baririjo
7.14% 14.28%
8.58% 2.88% Daporijo
Dumporijo
7.14%
Giba
15.10%
11.49% Chetam
Limeking

7.14% 11.97% Nacho

7.14% Puchi Geko


7.14%
Siyum
Taliha
Paying

Figure 5-3 Block wise Percentage Share of outlay Under Horticulture Department

82 | P a g e
DRDA
3.35% Baririjo
10.81% Daporijo
23.36%
6.92% Dumporijo
Giba
5.91%
Chetam
Limeking

29.97% 3.57% Nacho


5.46% 2.29% Puchi Geko
3.34% Siyum
5.03% Taliha
Paying

Figure 5-4 Block wise Percentage Share of outlay Under DRDA

RWD

0.00%
Baririjo
6.99%
8.39% 18.88% Daporijo
Dumporijo
14.69% Giba
17.48% Chetam
Limeking
6.99%
Nacho
7.69% 8.39%
Puchi Geko
10.49%
Siyum
Taliha

0.00% Paying

Figure 5-5 Block wise Percentage Share of outlay Under RWD

83 | P a g e
ATMA
3.40% 3.40% 3.40% Baririjo
4.75% 6.58%
Daporijo

6.44% 22.60% Dumporijo


Giba
6.14%
Chetam
Limeking
1.55% Nacho
22.15% 19.59%
Puchi Geko
Siyum
Taliha
Paying

Figure 5-6 Block wise Percentage Share of outlay Under ATMA

Percentage share of total outlay

Baririjo
9.62% 8.13%
Daporijo
13.07% 16.47% Dumporijo
Giba
5.84%
Chetam
6.41% 14.21% Limeking
5.71% Nacho
9.68% Puchi Geko
7.34%
Siyum
Taliha
3.50%
Paying

Figure 5-7 Block wise percentage share of outlay

84 | P a g e
5.2 Component Wise plan

The component wise total outlay of the district constitutes about Rs.236931.36 lakhs.
AIBP and Hark Khet Ko Pani components are to be executed mainly by Water
Resource Department. Per drop more crop component will be executed by Agriculture
and Horticulture Department. Water shed component will be taken care of by Rural
Development Department and Extension & Training component will be executed by
ATMA under Agriculture department. However, all the stakeholders need to have
coordination among them to have the maximum irrigation efficiency and to avoid
duplicity. WRD being the major irrigation department in the district, has the onus to
execute schemes or projects included under Har Khet Ko Pani in the district. Further,
the watershed component is to be executed under two different departments which
include DRDA with an outlay of Rs.62723.29 lakhs as the major department for
executing watershed activities along with Soil & Water Conservation Department
under RWD which has a total outlay of Rs.10651.97 lakhs.

Table 5-2 Component wise total outlay of the district (Amount in Rs. lakhs)

Component
2016-17 2017-18 2018-19 2019-20 2020-21 Total
wise
Accelerated
Irrigation
Benefited
Programme
(AIBP) 0.00 0.00 0.00 0.00 0.00 0.00
PMKSY-Har
Khet Ko Pani
(HKKP) 20975.71 31463.56 26219.63 15731.78 10487.85 104878.53
PMKSY- Per
Drop More
Crop (PDMC) 11735.51 17603.27 14669.39 8801.64 5867.76 58677.57
i) Micro-
irrigation 1986.40 2979.60 2483.00 1489.80 993.20 9932.00
ii)
Supplementa
ry Water
Management
activities 9705.18 14557.77 12131.48 7278.89 4852.59 48525.90
iii) Extension
And Training
Under ATMA 43.93 65.90 54.92 32.95 21.97 219.67
PMKSY -
Watershed 14675.05 22012.58 18343.82 11006.29 7337.53 73375.26

85 | P a g e
Grand Total 59232.8
47386.27 71079.41 4 35539.70 23693.14 236931.36

It is observed that maximum share of 44.27% is for Har Khet Ko Pani component
followed by PMKSY Watershed component with a share of 30.97% to the total outlay.
The Per Drop More Crop component has a share of 24.77%. There were no major or
medium irrigation projects under AIBP running in the district. Whereas, Har Khet Ko
Pani is entitled to connect source of water to the farm land by constructing or
renovating various water harvesting structures. It also focuses on the rejuvenation of
traditional water sources in the district. Per Drop More Crop focuses on the efficient
application of water in the farm land so that the yield and hence the production of the
farm land increases. Transfer of technology from lab to farm through various
extension activities under ATMA should be taken up along with amalgamation of
scientific technologies, eco-friendly techniques of conservation and traditional
practices which can help in accomplishing a systematic approach to resource
management with economic viability in the district.

Component wise percentage share of the total


outlay

PMKSY-Har Khet Ko Pani (HKKP)


30.97%
44.27%
PMKSY- Per Drop More Crop
(PDMC)
24.77%
PMKSY -Watershed

Figure 5-8 Component wise percentage allocation of total outlay


Further the Per Drop More Crop has been divided into three sub component on the
basis of activities performed. It consists of

(a.) Micro-Irrigation (16.93%)


(b.) Supplementary Water Management Activities (82.70%)
(c.) Extension and Training Component (0.37%)

86 | P a g e
Percentage share
0.37%

16.93%
Micro Irrigation

Supplementary Water
Management Activities
82.70%
Extension and Training under
ATMA

Figure 5-9 Sub-component wise percentage outlay of the district under Per Drop
More Crop

5.3 Year Wise Plan

The strategic action plan proposed under different departments has been further
divided based on year wise allocation of the total outlay. The projects proposed under
Strategic Action Plan have been divided into five phases starting from project initiation
and planning. Under this stage resource allocation will be done by each department
for different projects running under their purview. An allocation of 20% of the total
outlay under each department has been assumed under this stage. The second phase
is the implementation stage when the projects will be executed at the ground level and
an assumption of 30% of the total outlay under each department has been assumed at
this stage. It is assumed that the implementation would be continued in the third stage
and hence an allocation of 25% is to be kept under this stage. The fourth stage being
monitoring and evaluation, where an assumption of 15% has been proposed to
determine if the proposed activities are meeting the objectives of PMKSY and also to
complete the ongoing projects. The final stage is of review, under which each project
executed under different departments will be scrutinised for any lacunae and the same
will be completed under this stage. 10% of the total outlay is to be distributed under
this stage.

87 | P a g e
Table 5-3 Year wise share of total outlay in the district (Amount in Rs. Lakhs)
Department 2016-17 2017-18 2018-19 2019-20 2020-21 Total
wise
WRD 20975.71 31463.56 26219.63 15731.78 10487.85 104878.53
Agriculture
Department 2901.87 4352.81 3627.34 2176.41 1450.94 14509.37
Horticulture
Department 8789.71 13184.56 10987.13 6592.28 4394.85 43948.53
DRDA 12544.66 18816.99 15680.82 9408.49 6272.33 62723.29
RWD 2130.39 3195.59 2662.99 1597.80 1065.20 10651.97
ATMA 43.93 65.90 54.92 32.95 21.97 219.67
Grand Total 59232.8 35539.7
47386.27 71079.41 4 0 23693.14 236931.36

The total outlay for the district is Rs.236931.36 lakhs. The Water Resource
Department of the district constitutes maximum allocation of about 44.27% of the
total outlay followed by DRDA with a share of 26.47% and Agriculture Department
with a share of 18.55%. The percentage share of each department to the total outlay is
given in the figure below.

Percentage Share
4.50% 0.09% WRD

Agriculture Department
26.47%
44.27%
Horticulture Department

DRDA
18.55%
6.12%
Soil & Water Conservation
Department (RWD)
ATMA

Figure 5-10 Year wise percentage share of total outlay of the district

88 | P a g e
5.4 Expected Outcome
The strategic action plan envisages providing assured irrigation in a command area of
231282 ha. It is assumed that the irrigation infrastructure will benefit a command area
of at least 138769 ha (60 per cent). The Har Khet Ko Pani component will develop a
command area of 59885 ha. The Watershed component under DRDA is projected to
achieve a culturable command area of 81343 ha by creation of 2457 new water
harvesting structures along with carrying activities such as soil and moisture
conservation and land development. The watershed component will also be carried out
by Soil & Moisture Conservation Department under RWD which proposed to develop
1195 ha through various activities such as Ridge Area Treatment, drainage line
treatment, waste land development etc.

Under the component Per Drop More Crop, efficient water conveyance and precision
water application by drip irrigation system for wide spaced crop 5939.15 ha and
narrow spaced crops 6154.88 ha through application of 6787 drip irrigation system in
the district has been proposed. While Sprinklers has been proposed to develop an area
of 8567.51 ha through 5368 different sprinkler system in the district. Secondary
storage structures like farm ponds, water storage tanks and bore-wells under
supplementary water management activities proposed to develop an area of 60988 ha
through activities such as drought proofing structures, rain water harvesting structure,
etc. A training programme will also be scheduled under PMKSY to enhance the better
knowledge of efficient use of water through drip and other micro irrigation structures.
ATMA envisages providing training to 22000 farmers to imbibe various technologies
available for the enhancement of production and efficient usage of irrigation water at
the farm land.

Under department wise development of command area or irrigation potential, the


Water Resource Departments which will develop an area of 59885 ha by creation of
various irrigation structures, renovation and rejuvenation of traditional and current
water resources in the district. Agriculture Department and Horticulture Department
under Per Drop More Crop will develop an area of 49015 ha and 41037 ha respectively,
through various drip and sprinkler irrigation system and secondary storage structures
under supplementary water management activities. The watershed component under
DRDA will develop an irrigation potential of 81343 ha through its various activities
proposed such as Land Development, Soil and Moisture Conservation, developing new

89 | P a g e
water harvesting structure and renovating existing one, etc. The Soil and Water
Conservation Department under RWD will develop an area of 2400 ha under 143
micro-watershed of the district.

In terms of economic benefit, the assured water supply to the farm land will result in
enhancement of production and productivity of the crops. This is likely to generate an
additional income of Rs.55507.63 lakhs to the farmers of the district. This is based on
the assumption of atleast 60% of potential utilised and Rs. 40,000 per ha per annum
of incremental income from rainfed to irrigated farming will be generated. This is also
likely to create 202.36 lakhs of maydays of non-recurring employment and 115641 jobs
will be created annually on recurring basis.

This intervention may result into increased acreage under crops thereby contributing
to both agricultural and horticultural production. At the same time, it will create
livelihood opportunities for the local population and contribute in generating direct
and indirect employment.

5.5 Suggestions

Upper Subansiri is slowly developing its economy with the aim of improving the
quality of life of its people. The task ahead is uphill, available resources are many, but
the ways and means to achieve the goal through the successful use of resources are not
well defined.

Strategic planning and Implementation is necessary to develop agriculture and make


marginally, if not significantly, surplus in food production by integrating research,
extension and education duly supported by a time bound reforms in agricultural
practises and institutions. Harnessing agricultural potential would generate surplus to
support the secondary sector, create demand for goods in the rural areas, increase
disposable income that could enhance purchasing power of some 1.01 lakhs people in
the district and bring socio-economic development.

Agricultural development strategy has to be evolved depending on resources,


conditions and people's needs and priorities. Private industry participation can
provide additional resources and environment to create job opportunities, better
utilization of resources and credit flow which will have direct impact on farm
development sector. With Appropriately defined targets, clear outcomes, strategies
and co-ordinated planning, the district can become increasingly self-reliant in food

90 | P a g e
output. Effective computer-based monitoring and management information system
can facilitate timely implementation of programs with improved quality and service
delivery cost. It will avoid time over run and yield envisioned results.

Land productivity and agricultural production can be improved significantly by


launching measures such as:

1. Formulating district and block specific land water use policy in the district.
2. Improving and expanding agricultural extension service network significantly
to demonstrate and transfer technology. There should be region specific
technology to be developed in the district so that it should not only match with
the agro-ecological zones of the district but also should be easily imbibed
among the farmers or the ultimate beneficiaries.
3. Promoting SHGs, FPOs and community action towards making small farm
holding economically viable and profitable.
4. The public investment and institutional credit should enhance to enable farmers to
access technology and achieve expected growth
5. Promoting integrated agriculture model in the district to enhance the productivity and
farm income.
6. Providing technical and financial support to the Agriculture Department as the nodal
agency in the district for monitoring and evaluation of the projects proposed under
PMKSY in the district.

The district should emphasis more on the use of drip and sprinkler irrigation system.
It ensures optimal delivery of water and nutrient directly to the plant’s active zone. It
helps in lower evaporation rate which saves water, prevents run off, prevents deep
percolation and leaching of nutrient reserves. It results in increased yield and
production. The cost is saved in labour due to minimal hand on involvement in
irrigation. As per the study conducted by National Mission on Micro Irrigation NMMI
was conducted by Global Agri. System and their Impact Evaluation Study report (June
2014) brings-forth that following benefits have accrued on adoption of Micro
Irrigation (Drip and Sprinkler):

a. Irrigation cost is reduced by 20%-50% with average of 32.3%.


b. Reduction in electricity consumption after installation of MI system. The
average electricity consumption reduces by about 31% after using the micro
irrigation system.

91 | P a g e
c. Saving of fertilizers with averages reduction of about 28% in total fertilizer
consumption. Fertilizer saving vary from 7%- 42%.
d. The average productivity of fruits and vegetables increases by about 42.3% and
52.8%, respectively mainly because of crop spacing, judicious use of water and
other inputs etc.
e. The application of micro irrigation system like drip and sprinkler results in
increase in farmer’s income in the range of 20% to 68% with an average increase
of 48.5%.
5.5.1 Water User’s Association (Participatory Governance)

Farmers' participation is generally looked upon as a means of reducing the operation


costs. This is no doubt that, farmers’ participation can leads to improvement in
irrigation management. Response to any deterioration of the conveyance system (in
charge of the farmers) is much faster. This means that any reduction in conveyance
capacity at the minor level or damage to structures will be remedied quickly. Stealing
(or unauthorized use) of water is easily countered, as the water now belongs to the
group rather than Government. Waste of water is minimized, within the constraints of
the main system, irrigation water distribution can, therefore, improve considerably.
The benefits of Participatory Governance of Irrigation in the district:

a. There will be increase in the irrigated area as more number of farmers will have
the access to year round source of water.
b. Reduction in in-equity of head-tail irrigation as the water distribution under
irrigation system will be mutually decided and monitored.
c. There will be an improvement in the maintenance work through utilization of
indigenous know how, community supervision and local wisdom.
The Water User’s Association in the district can be formed through identification of
cluster of villages with homogenous requirements. The Association can be formed
through:
a. Selection of site
b. Creation of right atmosphere
c. Meeting of promoter members
d. Registration and agreement
e. Bringing the distribution system to a proper shape and condition before
handing over to the respective Water User’s Association in the district.

92 | P a g e
f. Handing over the distribution system.
The lone efforts of government might not bring the desired results as envisaged under
PMKSY, it requires peoples active participation to the programme and policy. It will
not only result in increased income but also high productivity in the farm land. It will
also help in monitoring of the ongoing schemes under PMKSY and reduce the wastage
of money and resources through effective utilization.

93 | P a g e
5.6 Strategic Action Plan for irrigation in respect of District Upper Subansiri, AP under Pradhan Mantri Krishi
Sinchayee Yojna (PMKSY)
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Upper MoWR/ Major 0.00 0.00 0 0.00
1
Subansiri WRD Irrigation 0.00 0.00 0.00 0.00 0.00

Sub Sub 0.00 0.00 0 0.00


Total 0.00 0.00 0.00 0.00 0.00
2 Baririjo 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daporijo 0.00 48.00 3 Years 32.93 6.59 9.88 8.23 4.94 3.29
Dumporijo 0.00 48.00 3 Years 32.93 6.59 9.88 8.23 4.94 3.29

Giba 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00

Chetam 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00

Limeking MoWR/ AIBP Medium 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00
WRD Irrigation
Nacho 0.00 66.00 3 Years 45.28 9.06 13.58 11.32 6.79 4.53

Puchi Geko 0.00 49.00 3 Years 33.62 6.72 10.08 8.40 5.04 3.36

Siyum 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00

Taliha 0.00 38.00 3 Years 26.07 5.21 7.82 6.52 3.91 2.61
Paying 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00

Sub Total 0.00 249.00 0.00 170.81 34.16 51.24 42.70 25.62 17.08

94 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Baririjo 918.00 3476.00 5 Years 6083.00 1216.60 1824.90 1520.75 912.45 608.30
Daporijo 1406.00 12900.00 5 Years 22575.00 4515.00 6772.50 5643.75 3386.25 2257.50
Dumporijo 1102.00 10028.40 5 Years 17549.70 3509.94 5264.91 4387.43 2632.46 1754.97
Giba 1122.00 6541.00 5 Years 11446.75 2289.35 3434.03 2861.69 1717.01 1144.68
Chetam Surface 1098.00 6074.00 5 Years 10629.50 2125.90 3188.85 2657.38 1594.43 1062.95
MoWR/ Har Khet
3 Limeking Minor 134.00 848.00 5 Years 1484.00 296.80 445.20 371.00 222.60 148.40
WRD Ko Pani
Nacho Irrigation 744 3302 5 Years 5778.50 1155.70 1733.55 1444.63 866.78 577.85
Puchi Geko 280 2186 5 Years 3825.5 765.10 1147.65 956.38 573.83 382.55
Siyum 712.00 2823.00 5 Years 4940.25 988.05 1482.08 1235.06 741.04 494.03
Taliha 890.00 3310.00 5 Years 5792.5 1158.50 1737.75 1448.13 868.88 579.25
Paying 618.00 2096.00 5 Years 3668.00 733.60 1100.40 917.00 550.20 366.80
Sub Sub
9024.00 53584.40 93772.70 18754.54 28131.81 23443.18 14065.91 9377.27
Total
Baririjo 0.00 0.00 0.00 0.00 0.00
Daporijo 10 70 5 Years 110.00 22.00 33.00 27.50 16.50 11.00
Dumporijo 2 84 5 Years 147 29.40 44.10 36.75 22.05 14.70
Giba 0.00 0.00 0.00 0.00 0.00
Chetam MoWR/ Har Khet Lift 0.00 0.00 0.00 0.00 0.00
4
Limeking WRD Ko Pani Irrigation 0.00 0.00 0.00 0.00 0.00
Nacho 0.00 0.00 0.00 0.00 0.00
Puchi Geko 0.00 0.00 0.00 0.00 0.00
Siyum 0.00 0.00 0.00 0.00 0.00
Taliha 0.00 0.00 0.00 0.00 0.00

95 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Paying 0.00 0.00 0.00 0.00 0.00
Sub Sub
12.00 154.00 257.00 51.40 77.10 64.25 38.55 25.70
Total
Baririjo 6 134 5 Years 167.50 33.50 50.25 41.88 25.13 16.75
Daporijo 74 1050 5 Years 1831.5 366.30 549.45 457.88 274.73 183.15
Dumporijo 14 324 5 Years 405 81.00 121.50 101.25 60.75 40.50
Giba 4 32 5 Years 40 8.00 12.00 10.00 6.00 4.00
Chetam Ground 8 78 5 Years 97.5 19.50 29.25 24.38 14.63 9.75
MoWR/ Har Khet Water
5 Limeking 4 34.00 5 Years 118.50 23.70 35.55 29.63 17.78 11.85
WRD Ko Pani Developme
Nacho nt 16 104 5 Years 124 24.80 37.20 31.00 18.60 12.40
Puchi Geko 14 116 5 Years 145 29.00 43.50 36.25 21.75 14.50
Siyum 18 90 5 Years 112.5 22.50 33.75 28.13 16.88 11.25
Taliha 19 168.50 5 Years 303.10 60.62 90.93 75.78 45.47 30.31
Paying 6 28 5 Years 35.00 7.00 10.50 8.75 5.25 3.50
Sub Sub
183.00 2158.50 3379.60 675.92 1013.88 844.90 506.94 337.96
Total
Baririjo 35 689.00 5 Years 1212.50 242.50 363.75 303.13 181.88 121.25
Daporijo 72 1202.00 5 Years 2103.50 420.70 631.05 525.88 315.53 210.35
Dumporijo 40.00 798.00 5 Years 1396.50 279.30 418.95 349.13 209.48 139.65
Giba RRR of 2 20.00 5 Years 35.00 7.00 10.50 8.75 5.25 3.50
MoWR/ Har Khet
6 Water
Chetam WRD Ko Pani 4 32.00 5 Years 56.00 11.20 16.80 14.00 8.40 5.60
Bodies
Limeking 5 Years 0.00 0.00 0.00 0.00 0.00
Nacho 12 41.00 5 Years 41.00 8.20 12.30 10.25 6.15 4.10
Puchi Geko 3 28.00 5 Years 28.00 5.60 8.40 7.00 4.20 2.80

96 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Siyum 11 69.00 5 Years 69.00 13.80 20.70 17.25 10.35 6.90
Taliha 8 107.00 5 Years 107.00 21.40 32.10 26.75 16.05 10.70
Paying 2 8.00 5 Years 8.00 1.60 2.40 2.00 1.20 0.80
Sub Sub
189.00 2994.00 5056.50 1011.30 1516.95 1264.13 758.48 505.65
Total
7 Construction of field channel 0.00 0.00 0.00 0.00 0.00
Baririjo 3 67 5 Years 100.50 20.10 30.15 25.13 15.08 10.05
Daporijo 29 455 5 Years 682.50 136.50 204.75 170.63 102.38 68.25
Dumporijo 7 162 5 Years 243.00 48.60 72.90 60.75 36.45 24.30
Giba 2 16 5 Years 24.00 4.80 7.20 6.00 3.60 2.40
Chetam 4 39 5 Years 58.50 11.70 17.55 14.63 8.78 5.85
7.1 Limeking 1 7 5 Years 10.50 2.10 3.15 2.63 1.58 1.05
Lined Field Channels ( CAD)
Nacho 8 52 5 Years 78.00 15.60 23.40 19.50 11.70 7.80
Puchi Geko MoWR/ Har Khet 7 58 5 Years 87.00 17.40 26.10 21.75 13.05 8.70
WRD Ko Pani
Siyum 9 45 5 Years 67.50 13.50 20.25 16.88 10.13 6.75
Taliha 9 79 5 Years 118.50 23.70 35.55 29.63 17.78 11.85
Paying 3 14 5 Years 21.00 4.20 6.30 5.25 3.15 2.10
Un-Lined
Field
7.2 Channels
0.00 0.00 0.00 0.00 0.00
(CAD)
Micro-
8 0.00 0.00 0.00 0.00 0.00
Irrigation
Sub Total 82.00 994.00 1491.00 298.20 447.30 372.75 223.65 149.10

97 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
10395.6
Total 9490.00 59884.90 0.00 103956.80 20791.36 31187.04 25989.20 15593.52
8
Baririjo 54.00 130.95 5 Years 18.31 3.66 5.49 4.58 2.75 1.83
Daporijo 87.00 210.975 5 Years 29.49 5.90 8.85 7.37 4.42 2.95
Dumporijo 82.00 198.85 5 Years 27.80 5.56 8.34 6.95 4.17 2.78
Giba 73.00 177.025 5 Years 24.75 4.95 7.42 6.19 3.71 2.47
MOA &
Chetam Per drop 72.00 174.6 5 Years 24.41 4.88 7.32 6.10 3.66 2.44
FWDAC&
more crop
9 Limeking FW/ DPAP Drip 72.00 174.6 5 Years 24.41 4.88 7.32 6.10 3.66 2.44
(Micro
Nacho Agriculture 75.00 181.875 5 Years 25.43 5.09 7.63 6.36 3.81 2.54
Irrigation)
Department
Puchi Geko 71.00 172.175 5 Years 24.00 4.80 7.20 6.00 3.60 2.40
Siyum 73.00 177.025 5 Years 24.75 4.95 7.42 6.19 3.71 2.47
Taliha 76.00 184.3 5 Years 25.76 5.15 7.73 6.44 3.86 2.58
Paying 73.00 177.025 5 Years 24.75 4.95 7.42 6.19 3.71 2.47
Sub Total 808.00 1959.40 0.00 273.84 54.77 82.15 68.46 41.08 27.38
Baririjo 24 48.00 5 Years 20.45 4.09 6.13 5.11 3.07 2.04
Daporijo 65 130.00 5 Years 55.38 11.08 16.61 13.85 8.31 5.54
Dumporijo 52 104.00 5 Years 44.30 8.86 13.29 11.08 6.65 4.43
MOA &
Giba Per drop 62 124.00 5 Years 52.82 10.56 15.85 13.21 7.92 5.28
FWDAC&
more crop DPAP
10 Chetam FW/ 58 116.00 5 Years 49.42 9.88 14.82 12.35 7.41 4.94
(Micro Sprinkler
Limeking Agriculture 59 118.00 5 Years 50.27 10.05 15.08 12.57 7.54 5.03
Irrigation)
Department
Nacho 59 118.00 5 Years 50.27 10.05 15.08 12.57 7.54 5.03
Puchi Geko 59 118.00 5 Years 50.27 10.05 15.08 12.57 7.54 5.03
Siyum 59 118.00 5 Years 50.27 10.05 15.08 12.57 7.54 5.03

98 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Taliha 62 124.00 5 Years 52.82 10.56 15.85 13.21 7.92 5.28
Paying 62 124.00 5 Years 52.82 10.56 15.85 13.21 7.92 5.28
Sub Total 621.00 1242.00 529.09 105.82 158.73 132.27 79.36 52.91
Baririjo 175 424.375 5 Years 41.125 8.23 12.34 10.28 6.17 4.11
Daporijo 197 477.725 5 Years 46.295 9.26 13.89 11.57 6.94 4.63
Dumporijo 197 477.725 5 Years 146.295 29.26 43.89 36.57 21.94 14.63
Giba 185 448.625 5 Years 43.475 8.70 13.04 10.87 6.52 4.35
MOA &
Chetam Per drop Non-DPAP 182 441.35 5 Years 42.77 8.55 12.83 10.69 6.42 4.28
FWDAC&
more crop Drip (Wide
11 Limeking FW/ 180 436.5 5 Years 42.3 8.46 12.69 10.58 6.35 4.23
(Micro Spaced
Nacho Agriculture 180 436.5 5 Years 42.3 8.46 12.69 10.58 6.35 4.23
Irrigation) crop)
Department
Puchi Geko 188 455.9 5 Years 44.18 8.84 13.25 11.05 6.63 4.42
Siyum 179 434.075 5 Years 42.065 8.41 12.62 10.52 6.31 4.21
Taliha 185 448.625 5 Years 43.475 8.70 13.04 10.87 6.52 4.35
Paying 182 441.35 5 Years 42.77 8.55 12.83 10.69 6.42 4.28
Sub Total 2030.00 4922.75 577.05 115.41 173.12 144.26 86.56 57.71
Baririjo 150.00 363.75 5 Years 128.10 25.62 38.43 32.03 19.22 12.81
Daporijo 210.00 509.25 5 Years 179.34 35.87 53.80 44.84 26.90 17.93
Dumporijo MOA & Non-DPAP 176.00 426.80 5 Years 150.30 30.06 45.09 37.58 22.55 15.03
Per drop
Giba FWDAC& Drip 212.00 514.10 5 Years 181.05 36.21 54.31 45.26 27.16 18.10
11. more crop
FW/ (Closed
a Chetam (Micro 209.00 506.83 5 Years 178.49 35.70 53.55 44.62 26.77 17.85
Agriculture spaced
Limeking Irrigation) 205.00 497.13 5 Years 175.07 35.01 52.52 43.77 26.26 17.51
Department crop)
Nacho 211.00 511.68 5 Years 180.19 36.04 54.06 45.05 27.03 18.02
Puchi Geko 201.00 487.43 5 Years 171.65 34.33 51.50 42.91 25.75 17.17

99 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Siyum 211.00 511.68 5 Years 180.19 36.04 54.06 45.05 27.03 18.02
Taliha 212.00 514.10 5 Years 181.05 36.21 54.31 45.26 27.16 18.10
Paying 210.00 509.25 5 Years 179.34 35.87 53.80 44.84 26.90 17.93
Sub Total 2207.00 5351.98 1884.78 376.96 565.43 471.19 282.72 188.48
Baririjo 165 330 5 Years 97.19 19.44 29.16 24.30 14.58 9.72
Daporijo 188 376 5 Years 110.732 22.15 33.22 27.68 16.61 11.07
Dumporijo 178 356 5 Years 104.842 20.97 31.45 26.21 15.73 10.48
Giba 177 354 5 Years 104.253 20.85 31.28 26.06 15.64 10.43
MOA &
Chetam Per drop Non-DPAP 176 352 5 Years 103.664 20.73 31.10 25.92 15.55 10.37
FWDAC&
more crop Sprinkler
12 Limeking FW/ 172 344 5 Years 101.308 20.26 30.39 25.33 15.20 10.13
(Micro (micro
Nacho Agriculture 173 346 5 Years 117.282 23.46 35.18 29.32 17.59 11.73
Irrigation) sprinkler)
Department
Puchi Geko 178 356 5 Years 104.842 20.97 31.45 26.21 15.73 10.48
Siyum 176 352 5 Years 119.46 23.89 35.84 29.87 17.92 11.95
Taliha 177 354 5 Years 104.253 20.85 31.28 26.06 15.64 10.43
Paying 176 352 5 Years 103.664 20.73 31.10 25.92 15.55 10.37
Sub Total 1936.00 3872.00 1171.49 234.30 351.45 292.87 175.72 117.15
Baririjo 50.00 100.00 5 Years 42.60 8.52 12.78 10.65 6.39 4.26
Daporijo 84.00 168.00 5 Years 71.57 14.31 21.47 17.89 10.74 7.16
MOA &
Dumporijo Per drop Non-DPAP 68.00 136.00 5 Years 57.94 11.59 17.38 14.48 8.69 5.79
FWDAC&
12. more crop Sprinkler
Giba FW/ 90.00 180.00 5 Years 76.68 15.34 23.00 19.17 11.50 7.67
a (Micro (mini
Chetam Agriculture 80.00 160.00 5 Years 68.16 13.63 20.45 17.04 10.22 6.82
Irrigation) sprinkler)
Department
Limeking 84.00 168.00 5 Years 71.57 14.31 21.47 17.89 10.74 7.16
Nacho 86.00 172.00 5 Years 73.27 14.65 21.98 18.32 10.99 7.33

100 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Puchi Geko 78.00 156.00 5 Years 66.46 13.29 19.94 16.61 9.97 6.65
Siyum 85.00 170.00 5 Years 72.42 14.48 21.73 18.11 10.86 7.24
Taliha 90.00 180.00 5 Years 76.68 15.34 23.00 19.17 11.50 7.67
Paying 87.00 174.00 5 Years 74.12 14.82 22.24 18.53 11.12 7.41
Sub Total 882.00 1764.00 751.46 150.29 225.44 187.87 112.72 75.15
Baririjo 45.00 180 5 Years 108.00 21.60 32.40 27.00 16.20 10.80
Daporijo 66.75 267 5 Years 160.20 32.04 48.06 40.05 24.03 16.02
Dumporijo 62.25 249 5 Years 149.40 29.88 44.82 37.35 22.41 14.94
Per drop
Giba 62.75 251 5 Years 150.6 30.12 45.18 37.65 22.59 15.06
MOA & more crop
Chetam Topping up 62.75 251 5 Years 150.60 30.12 45.18 37.65 22.59 15.06
FWDAC& (Supplemnt
of
13 Limeking FW/ ary water 62.50 250 5 Years 140.80 28.16 42.24 35.20 21.12 14.08
MGNREG
Nacho Agriculture manageme 62.75 251 5 Years 150.60 30.12 45.18 37.65 22.59 15.06
A
Department nt
Puchi Geko 64.50 258 5 Years 154.80 30.96 46.44 38.70 23.22 15.48
activities)
Siyum 62.25 249 5 Years 149.40 29.88 44.82 37.35 22.41 14.94
Taliha 62.75 251 5 Years 150.60 30.12 45.18 37.65 22.59 15.06
Paying 61.75 247 5 Years 146.20 29.24 43.86 36.55 21.93 14.62
Sub Total 676.00 2704.00 1611.20 322.24 483.36 402.80 241.68 161.12
Baririjo Per drop Drought 55 220 5 Years 110.00 22.00 33.00 27.50 16.50 11.00
Daporijo MOA & more crop proofing 66.25 265 5 Years 132.50 26.50 39.75 33.13 19.88 13.25
Dumporijo FWDAC& (Supplemnt through 58.75 235 5 Years 116.00 23.20 34.80 29.00 17.40 11.60
14 FW/ ary water index
Giba Agriculture manageme check 55 220 5 Years 109.50 21.90 32.85 27.38 16.43 10.95
Chetam Department nt Dams/ 54.25 217 5 Years 108.50 21.70 32.55 27.13 16.28 10.85
Limeking activities) RWHS 54 216 5 Years 105.00 21.00 31.50 26.25 15.75 10.50

101 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Nacho 54.5 218 5 Years 107.50 21.50 32.25 26.88 16.13 10.75
Puchi Geko 54.25 217 5 Years 108.50 21.70 32.55 27.13 16.28 10.85
Siyum 54.25 217 5 Years 107.00 21.40 32.10 26.75 16.05 10.70
Taliha 55 220 5 Years 109.50 21.90 32.85 27.38 16.43 10.95
Paying 54.25 217 5 Years 107.00 21.40 32.10 26.75 16.05 10.70
Sub Total 615.50 2462.00 1221.00 244.20 366.30 305.25 183.15 122.10
Baririjo 567 1020.60 5 Years 458.10 91.62 137.43 114.53 68.72 45.81
Daporijo 602 1083.60 5 Years 541.80 108.36 162.54 135.45 81.27 54.18
Dumporijo 568 1022.40 5 Years 661.20 132.24 198.36 165.30 99.18 66.12
Per drop
Giba Secondary 382 687.60 5 Years 343.80 68.76 103.14 85.95 51.57 34.38
MOA & more crop
Chetam Storage 351 631.80 5 Years 315.90 63.18 94.77 78.98 47.39 31.59
FWDAC& (Supplemnt
Structures
15 Limeking FW/ ary water 388 698.40 5 Years 349.20 69.84 104.76 87.30 52.38 34.92
(Water
Nacho Agriculture manageme 249 448.20 5 Years 235.80 47.16 70.74 58.95 35.37 23.58
Harvesting
Department nt
Puchi Geko Tanks) 342 615.60 5 Years 307.80 61.56 92.34 76.95 46.17 30.78
activities)
Siyum 302 543.60 5 Years 279.90 55.98 83.97 69.98 41.99 27.99
Taliha 247 444.60 5 Years 222.30 44.46 66.69 55.58 33.35 22.23
Paying 401 721.80 5 Years 360.90 72.18 108.27 90.23 54.14 36.09
Sub Total 4399.00 7918.20 4076.70 815.34 1223.01 1019.18 611.51 407.67
Baririjo On Farm 994 1789.2 5 Years 286.95 57.39 86.09 71.74 43.04 28.70
MOA & Per drop
Daporijo Developme 1156 2080.8 5 Years 310.95 62.19 93.29 77.74 46.64 31.10
FWDAC& more crop
nt
16 Dumporijo FW/ (Supplemnt 1163 2093.4 5 Years 409.95 81.99 122.99 102.49 61.49 41.00
(distributio
Giba Agriculture ary water 763 1373.4 5 Years 172.25 34.45 51.68 43.06 25.84 17.23
n pipe/raise
Department manageme
Chetam bed and 715 1287 5 Years 126.25 25.25 37.88 31.56 18.94 12.63

102 | P a g e
Period of
Sub Command Implemn
Concerned
Name of the Total Area/Irrig tation (5 Estimated
Sl. Ministry/D Componen Year Year Year Year Year
Blocks/Sub Activity Number/ ation yrs) from cost (Rs. in
No. epartmane t 2016-17 2017-18 2018-19 2019-20 2020-21
Districts Capacity Potential 2016-17 lacs)
t
(cum) (Ha) to 2020-
21
Limeking nt furrow 696 1252.8 5 Years 217.05 43.41 65.12 54.26 32.56 21.71
Nacho activities) system 771 1387.8 5 Years 178.05 35.61 53.42 44.51 26.71 17.81
etc.in
Puchi Geko 759 1366.2 5 Years 148.05 29.61 44.42 37.01 22.21 14.81
RMT)
Siyum 744 1339.2 5 Years 168.15 33.63 50.45 42.04 25.22 16.82
Taliha 854 1537.2 5 Years 211.25 42.25 63.38 52.81 31.69 21.13
Paying 729 1312.2 5 Years 183.85 36.77 55.16 45.96 27.58 18.39
Sub Total 9344.00 16819.20 0.00 2412.75 482.55 723.83 603.19 361.91 241.28
Grand
23518.50 49015.53 0.00 14509.37 2901.87 4352.81 3627.34 2176.41 1450.94
Total

Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
District Water
17 Baririjo Watershed Harvesting
Development Structures

103 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Agency, (Newly to be
Upper created)
17.1 Subansiri Farm Ponds 100.00 30000.00 2000.00 5 Years 47.70 9.54 14.31 11.93 7.16 4.77
(MoRD)
17.2 Check Dams 200.00 2000.00 5 Years 30.00 6.00 9.00 7.50 4.50 3.00
17.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
17.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00
Other ground
17.5 water recharge
structure 0.00 0.00 0.00 0.00 0.00
Fishry
17.6 Pond/Cattel
Ponds 150.00 15000.00 0.00 5 Years 23.85 4.77 7.16 5.96 3.58 2.39
Others 0.00 0.00 0.00 0.00 0.00
Sub Total 450.00 45000.00 4000.00 101.55 20.31 30.47 25.39 15.23 10.16
Water
Harvesting
18
Structures ( to
be Renovated) 0.00 0.00 0.00 0.00 0.00
18.1 Farm Ponds 50.00 5 Years 7.50 1.50 2.25 1.88 1.13 0.75
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge
structure 0.00 0.00 0.00 0.00 0.00
Fishry
18.6 Pond/Cattel
Ponds 100.00 15000.00 5 Years 23.85 4.77 7.16 5.96 3.58 2.39
Others 0.00 0.00 0.00 0.00 0.00

104 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 150.00 15000.00 0.00 31.35 6.27 9.41 7.84 4.70 3.14
18.7( Land
A) Development 0.00 0.00 0.00 0.00 0.00
i) Afforestation 10.00 5000.00 5 Years 750.00 150.00 225.00 187.50 112.50 75.00
ii) Horticulture 8.00 4000.00 5 Years 600.00 120.00 180.00 150.00 90.00 60.00
iii) Agriculture 4.00 2000.00 5 Years 300.00 60.00 90.00 75.00 45.00 30.00
iv) Pasture 10.00 500.00 5 Years 75.00 15.00 22.50 18.75 11.25 7.50
Sub Total 32.00 11500.00 1725.00 345.00 517.50 431.25 258.75 172.50
18.7( Soil & Moisture
B) Conservation 0.00 0.00 0.00 0.00 0.00
Staggered
i) Trenchin
g 0.00 0.00 0.00 0.00 0.00
Contour
ii)
Bunding 0.00 0.00 0.00 0.00 0.00
Graded
iii)
Bunding 0.00 0.00 0.00 0.00 0.00
Bench
iv)
terrracing 200.00 1000.00 5 Years 150.00 30.00 45.00 37.50 22.50 15.00
v) Others 0.00 0.00 0.00 0.00 0.00
Crate
vi)
Wire 0.00 0.00 0.00 0.00 0.00
Land
vii)
leveling 0.00 0.00 0.00 0.00 0.00
Sub Total 200.00 0.00 1000.00 150.00 30.00 45.00 37.50 22.50 15.00
18.7( District Vegetative & Engg.
C) Watershed Structure 0.00 0.00 0.00 0.00 0.00
Baririjo
Development Earthen
viii)
Agency, Checks 0.00 0.00 0.00 0.00 0.00

105 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Upper Brush
ix) Subansiri Wood
(MoRD) Checks 100.00 1000.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Gully
x)
plugs 0.00 0.00 0.00 0.00 0.00
Loose
xi)
boulders 100.00 1000.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Gabion
xii)
structures 0.00 0.00 0.00 0.00 0.00
xiii) Others 0.00 0.00 0.00 0.00 0.00
Dry
xiv) check
dam 0.00 0.00 0.00 0.00 0.00
xv) Drainage 0.00 0.00 0.00 0.00 0.00
Bunds
xvi)
repair 0.00 0.00 0.00 0.00 0.00
Sub Total 5 Years 30.00 6.00 9.00 7.50 4.50 3.00
Total 832.00 60000.00 16500.00 2037.90 407.58 611.37 509.48 305.69 203.79
18.7
(D) Entry Point Activities 0.00 0.00 0.00 0.00 0.00 0.00
18.7
(E) DPR 0.00 0.00 0.00 0.00 0.00 0.00
18.7
(F) I & CB 0.00 0.00 0.00 0.00 0.00
18.7(
G) Livelihood 100.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
18.7( Activities No. Beneficiar -
H) Prod. Sys. & Mirco -wise ies 0.00 0.00 0.00 0.00 0.00
Enter. Sericulutr
e 50.00 0.00 0.00 5 Years 7.58 1.52 2.27 1.90 1.14 0.76

106 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Bee
Keeping 50.00 0.00 0.00 5 Years 7.58 1.52 2.27 1.90 1.14 0.76
Poultry 50.00 0.00 0.00 5 Years 7.58 1.52 2.27 1.90 1.14 0.76
Fishry 50.00 0.00 0.00 5 Years 7.58 1.52 2.27 1.90 1.14 0.76
Bio fuel
Plantation 100.00 0.00 0.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Others 0.00 0.00 0.00 0.00 0.00 0.00
Sub 300.00 0.00 0.00 45.32
Total 9.06 13.60 11.33 6.80 4.53
18.7(
I) Monitoring 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7(
J) Evaluation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7(
K) Consolidation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7(
L) Administration 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Grand Total 1232.00 60000.00 16500.00 2098.22 419.64 629.47 524.56 314.73 209.82
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
17.1 Farm Ponds 15.00 0.00 0.00 5 Years 55.50 11.10 16.65 13.88 8.33 5.55
District
17.2 Check Dams 15.00 0.00 0.00 5 Years 17.25 3.45 5.18 4.31 2.59 1.73
Watershed
17.3 Development Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.4 Daporijo Agency, Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper
Other ground water 0.00 0.00 0.00
17.5 Subansiri
recharge structure
(MoRD) 0.00 0.00 0.00 0.00 0.00 0.00
Fishry Pond/Cattel 0.00 0.00 0.00
17.6
Ponds 0.00 0.00 0.00 0.00 0.00 0.00

107 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Others 15.00 0.00 0.00 5 Years 55.50 11.10 16.65 13.88 8.33 5.55
Sub Total 45.00 0.00 0.00 128.25 25.65 38.48 32.06 19.24 12.83
18 Water Harvesting Structures ( to be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground 0.00 0.00 0.00
18.5 water recharge
structure 0.00 0.00 0.00 0.00 0.00 0.00
Fishry 0.00 0.00 0.00
18.6 Pond/Cattel
Ponds 0.00 0.00 0.00 0.00 0.00 0.00
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land Development
A)
i) Afforestation 0.00 0.00 1680.00 5 Years 252.00 50.40 75.60 63.00 37.80 25.20
ii) Horticulture 0.00 0.00 1848.00 5 Years 277.20 55.44 83.16 69.30 41.58 27.72
iii) Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Pasture 0.00 0.00 2184.00 5 Years 327.60 65.52 98.28 81.90 49.14 32.76
Sub Total 0.00 0.00 5712.00 856.80 171.36 257.04 214.20 128.52 85.68
18.7( Soil & Moisture Conservation
B) 0.00 0.00 0.00 0.00 0.00
Staggered 0.00 0.00 0.00
i)
Trenching 0.00 0.00 0.00 0.00 0.00 0.00
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

108 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 0.00 0.00 2740.00 5 Years 147.38 29.48 44.21 36.84 22.11 14.74
v) Others 0.00 0.00 660.00 5 Years 99.00 19.80 29.70 24.75 14.85 9.90
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 3400.00 246.38 49.28 73.91 61.59 36.96 24.64
18.7( Vegetative & Engg. Structure
C) 0.00 0.00 0.00 0.00 0.00
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Brush Wood 0.00 0.00 0.00
ix)
Checks 0.00 0.00 0.00 0.00 0.00 0.00
x) Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xi) Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
District
xiii) Watershed Others 0.00 0.00 0.00 5 Years 28.58 5.72 8.57 7.14 4.29 2.86
xiv) Development Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Daporijo Agency,
xv) Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper
xvi) Subansiri Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(MoRD) Sub Total 0.00 0.00 0.00 28.58 5.72 8.57 7.14 4.29 2.86
Total 45.00 0.00 9112.00 1260.00 252.00 378.00 315.00 189.00 126.00
18.7 Entry Point
57.00 0.00 0.00 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
(D) Activities
18.7
DPR 3.00 0.00 0.00 5 Years 22.50 4.50 6.75 5.63 3.38 2.25
(E)
18.7
I & CB 18.00 0.00 0.00 5 Years 112.50 22.50 33.75 28.13 16.88 11.25
(F)

109 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.7(
Livelihood 30.00 0.00 0.00 5 Years 202.50 40.50 60.75 50.63 30.38 20.25
G)
18.7( Prod. Sys. & Beneficiar
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. ies
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Poultry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 453.00 0.00 0.00 5 Years 225.00 45.00 67.50 56.25 33.75 22.50
Sub Total 453.00 0.00 0.00 225.00 45.00 67.50 56.25 33.75 22.50
18.7(
Monitoring 0.00 0.00 0.00 5 Years 22.50 4.50 6.75 5.63 3.38 2.25
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 22.50 4.50 6.75 5.63 3.38 2.25
J)
18.7(
Consolidation 0.00 0.00 0.00 5 Years 67.50 13.50 20.25 16.88 10.13 6.75
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 225.00 45.00 67.50 56.25 33.75 22.50
L)
Grand Total 606.00 0.00 9112.00 2250.00 450.00 675.00 562.50 337.50 225.00
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
District
17.1 Watershed Farm Ponds 80.00 12600.00 350.00 5 Years 72.00 14.40 21.60 18.00 10.80 7.20
17.2 Dumporijo Development Check Dams 0.00 0.00 0.00 0.00 0.00
17.3 Agency, Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
Upper
17.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00

110 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Subansiri Other ground
17.5 (MoRD) water recharge 0.00 0.00 0.00 0.00 0.00
structure
Fishry
17.6 Pond/Cattel 82.00 12915.00 380.00 5 Years 73.80 14.76 22.14 18.45 11.07 7.38
Ponds
Others M/P 5.00 20.00 5 Years 25.00 5.00 7.50 6.25 3.75 2.50
Sub Total 167.00 25515.00 750.00 170.80 34.16 51.24 42.70 25.62 17.08
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 11.00 1732.50 55.00 5 Years 9.90 1.98 2.97 2.48 1.49 0.99
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 61.00 9607.50 305.00 5 Years 54.90 10.98 16.47 13.73 8.24 5.49
Ponds
Others 0.00 0.00 0.00 0.00 0.00
Sub Total 72.00 11340.00 360.00 64.80 12.96 19.44 16.20 9.72 6.48
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 1300.00 1300.00 5 Years 234.00 46.80 70.20 58.50 35.10 23.40
ii) Horticulture 1400.00 1600.00 5 Years 352.00 70.40 105.60 88.00 52.80 35.20
iii) Agriculture 826.00 826.00 5 Years 148.68 29.74 44.60 37.17 22.30 14.87

111 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
iv) Pasture 0.00 0.00 0.00 0.00 0.00
Sub Total 3526.00 0.00 3726.00 734.68 146.94 220.40 183.67 110.20 73.47
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 493.00 493.00 5 Years 88.74 17.75 26.62 22.19 13.31 8.87
v) Others 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 0.00 0.00 0.00 0.00 0.00
Sub Total 493.00 0.00 493.00 88.74 17.75 26.62 22.19 13.31 8.87
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00
District Checks
x) Watershed Gully plugs 0.00 0.00 0.00 0.00 0.00
xi) Development Loose boulders 75.00 75.00 5 Years 13.50 2.70 4.05 3.38 2.03 1.35
Dumporijo Agency,
xii) Upper Gabion structures 20.00 20.00 5 Years 3.60 0.72 1.08 0.90 0.54 0.36
xiii) Subansiri Others R/Well 0.00 0.00 0.00 0.00 0.00
xiv) (MoRD) Dry check dam 0.00 0.00 0.00 0.00 0.00
xv) Drainage 0.00 0.00 0.00 0.00 0.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00
Sub Total 95.00 0.00 95.00 17.10 3.42 5.13 4.28 2.57 1.71

112 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Total 4353.00 36855.00 5424.00 1076.12 215.22 322.84 269.03 161.42 107.61
18.7 Entry Point
0.00 0.00 0.00 0.00 0.00
(D) Activities
18.7
DPR 0.00 0.00 0.00 0.00 0.00
(E)
18.7
I & CB 0.00 0.00 0.00 0.00 0.00
(F)
18.7(
Livelihood 0.00 0.00 0.00 0.00 0.00
G)

18.7( Beneficiar
Activities-wise No. -
H) ies
Sericulutre 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00
Prod. Sys. & Poultry 327.00 5 Years 58.86 11.77 17.66 14.72 8.83 5.89
Mirco Enter. Fishry 100.00 5 Years 18.00 3.60 5.40 4.50 2.70 1.80
Bio fuel
500.00 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
Plantation
Others 0.00 0.00 0.00 0.00 0.00
Sub Total 927.00 0.00 0.00 166.86 33.37 50.06 41.72 25.03 16.69
18.7(
Monitoring 5 Years 44.72 8.94 13.42 11.18 6.71 4.47
I)
18.7(
Evaluation 5 Years 5.00 1.00 1.50 1.25 0.75 0.50
J)
18.7(
Consolidation 5 Years 4.00 0.80 1.20 1.00 0.60 0.40
K)
18.7(
Administration 5 Years 33.72 6.74 10.12 8.43 5.06 3.37
L)
Grand Total 5280.00 36855.00 5424.00 1330.42 266.08 399.13 332.60 199.56 133.04

113 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
17.1 Farm Ponds 0.00 46345.92 0.00 5 Years 66.00 13.20 19.80 16.50 9.90 6.60
17.2 Check Dams 1.00 16457.50 0.00 5 Years 62.00 12.40 18.60 15.50 9.30 6.20
17.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground
17.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
17.6 Pond/Cattel 0.00 8426.88 0.00 5 Years 12.00 2.40 3.60 3.00 1.80 1.20
District Ponds
Watershed Others 0.00 119790.79 0.00 5 Years 194.40 38.88 58.32 48.60 29.16 19.44
Development Sub Total 1.00 191021.09 0.00 334.40 66.88 100.32 83.60 50.16 33.44
Giba Agency,
Water
Upper
Harvesting
18 Subansiri 0.00 0.00 0.00 0.00 0.00
Structures ( to
(MoRD)
be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ponds

114 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 0.00 0.00 1245.31 5 Years 206.30 41.26 61.89 51.58 30.95 20.63
ii) Horticulture 0.00 0.00 1995.49 5 Years 299.10 59.82 89.73 74.78 44.87 29.91
iii) Agriculture 0.00 0.00 1146.64 5 Years 190.00 38.00 57.00 47.50 28.50 19.00
iv) Pasture 0.00 0.00 1173.31 5 Years 194.00 38.80 58.20 48.50 29.10 19.40
Sub Total 0.00 0.00 5560.75 889.40 177.88 266.82 222.35 133.41 88.94
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 0.00 0.00 0.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
v) Others 0.00 4213.44 0.00 5 Years 73.00 14.60 21.90 18.25 10.95 7.30
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 0.00 18258.24 0.00 5 Years 46.00 9.20 13.80 11.50 6.90 4.60
Sub Total 0.00 22471.68 0.00 134.00 26.80 40.20 33.50 20.10 13.40
18.7( District Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Watershed Engg. Structure
viii) Giba Development Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Agency,
Brush Wood
ix) Upper 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks

115 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
x) Subansiri Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(MoRD)
xi) Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiii) Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiv) Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 1.00 213492.77 5560.75 1357.80 271.56 407.34 339.45 203.67 135.78
18.7 Entry Point
0.00 0.00 0.00 5 Years 96.00 19.20 28.80 24.00 14.40 9.60
(D) Activities
18.7
DPR 0.00 0.00 0.00 5 Years 24.00 4.80 7.20 6.00 3.60 2.40
(E)
18.7
I & CB 0.00 0.00 0.00 5 Years 120.00 24.00 36.00 30.00 18.00 12.00
(F)
18.7(
Livelihood 0.00 0.00 0.00 5 Years 216.00 43.20 64.80 54.00 32.40 21.60
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Poultry 0.00 16453.00 2740.00 5 Years 43.50 8.70 13.05 10.88 6.53 4.35
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 0.00 351.00 113.00 5 Years 196.50 39.30 58.95 49.13 29.48 19.65

116 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 0.00 16804.00 2853.00 240.00 48.00 72.00 60.00 36.00 24.00
18.7(
Monitoring 0.00 0.00 0.00 5 Years 24.00 4.80 7.20 6.00 3.60 2.40
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 24.00 4.80 7.20 6.00 3.60 2.40
J)
18.7(
Consolidation 0.00 0.00 0.00 5 Years 72.00 14.40 21.60 18.00 10.80 7.20
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 240.00 48.00 72.00 60.00 36.00 24.00
L)
Grand Total 1.00 230296.77 8413.75 2413.80 482.76 724.14 603.45 362.07 241.38
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
17.1 Farm Ponds 0.00 18959.04 0.00 5 Years 27.00 5.40 8.10 6.75 4.05 2.70
17.2 Check Dams 0.00 524.40 0.00 5 Years 12.00 2.40 3.60 3.00 1.80 1.20
17.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
District Other ground
17.5 Watershed water recharge 0.00 0.00 0.00 5 Years 18.00 3.60 5.40 4.50 2.70 1.80
Development structure
Chetam Agency, Fishry
17.6 Upper Pond/Cattel 4.00 0.00 0.00 5 Years 21.53 4.31 6.46 5.38 3.23 2.15
Subansiri Ponds
(MoRD) Others 6.00 40699.03 0.00 5 Years 148.65 29.73 44.60 37.16 22.30 14.87
Sub Total 10.00 60182.47 0.00 227.18 45.44 68.15 56.79 34.08 22.72
18 Water Harvesting Structures ( to be Renovated) 0.00 0.00 0.00 0.00 0.00
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

117 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ponds
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 0.00 0.00 978.97 5 Years 151.58 30.32 45.47 37.89 22.74 15.16
ii) Horticulture 0.00 0.00 1761.14 5 Years 264.18 52.84 79.25 66.04 39.63 26.42
iii) Agriculture 0.00 0.00 806.65 5 Years 143.60 28.72 43.08 35.90 21.54 14.36
iv) Pasture 0.00 0.00 1063.33 5 Years 163.85 32.77 49.16 40.96 24.58 16.39
Sub Total 0.00 0.00 4610.09 723.20 144.64 216.96 180.80 108.48 72.32
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 0.00 0.00 375.00 5 Years 62.25 12.45 18.68 15.56 9.34 6.23
v) Others 0.00 0.00 185.00 5 Years 78.75 15.75 23.63 19.69 11.81 7.88
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

118 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 0.00 0.00 560.00 141.00 28.20 42.30 35.25 21.15 14.10
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks
x) Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xi) Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiii) Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiv) District Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) Watershed Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xvi) Development Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Chetam Agency,
Upper Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Subansiri Total 10.00 60182.47 5170.09 1091.38 218.28 327.41 272.84 163.71 109.14
(MoRD)
18.7 Entry Point
16.00 0.00 0.00 5 Years 78.00 15.60 23.40 19.50 11.70 7.80
(D) Activities
18.7
DPR 1.00 0.00 0.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
(E)
18.7
I & CB 9.00 0.00 0.00 5 Years 97.50 19.50 29.25 24.38 14.63 9.75
(F)
18.7(
Livelihood 10.00 0.00 0.00 5 Years 175.50 35.10 52.65 43.88 26.33 17.55
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

119 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Poultry 0.00 5846.00 1290.00 5 Years 21.00 4.20 6.30 5.25 3.15 2.10
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 151.00 138.00 42.00 5 Years 174.00 34.80 52.20 43.50 26.10 17.40
Sub Total 151.00 5984.00 1332.00 195.00 39.00 58.50 48.75 29.25 19.50
18.7(
Monitoring 0.00 0.00 0.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
J)
18.7(
Consolidation 0.00 0.00 0.00 5 Years 58.50 11.70 17.55 14.63 8.78 5.85
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 187.50 37.50 56.25 46.88 28.13 18.75
L)
Grand Total 197.00 66166.47 6502.09 1941.88 388.38 582.56 485.47 291.28 194.19
0.00 0.00 0.00 0.00 0.00

17 Water Harvesting Structures (Newly to be created)


17.1 District Farm Ponds 21.00 0.00 7.50 5 Years 45.50 9.10 13.65 11.38 6.83 4.55
17.2 Watershed Check Dams 15.00 0.00 6.00 5 Years 32.74 6.55 9.82 8.18 4.91 3.27
Development
17.3 Limeking Agency, Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.4 Upper Percolation Tanks 3.00 0.00 1.50 5 Years 13.05 2.61 3.92 3.26 1.96 1.31
Subansiri Other ground
17.5 (MoRD) water recharge 24.00 0.00 0.00 5 Years 83.90 16.78 25.17 20.98 12.59 8.39
structure

120 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Fishry
17.6 Pond/Cattel 12.00 0.00 0.00 5 Years 53.03 10.61 15.91 13.26 7.95 5.30
Ponds
Others 12.00 0.00 3.00 5 Years 38.81 7.76 11.64 9.70 5.82 3.88
Sub Total 87.00 0.00 18.00 267.03 53.41 80.11 66.76 40.05 26.70
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Ponds
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 580.55 0.00 0.00 5 Years 143.10 28.62 42.93 35.77 21.46 14.31
ii) Horticulture 699.67 0.00 0.00 5 Years 135.12 27.02 40.54 33.78 20.27 13.51
iii) Agriculture 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Pasture 252.51 0.00 0.00 5 Years 49.94 9.99 14.98 12.48 7.49 4.99

121 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 1532.72 0.00 0.00 328.16 65.63 98.45 82.04 49.22 32.82
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 533.43 0.00 0.00 5 Years 102.28 20.46 30.68 25.57 15.34 10.23
v) Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 503.33 0.00 0.00 5 Years 159.29 31.86 47.79 39.82 23.89 15.93
Sub Total 1036.76 0.00 0.00 261.57 52.31 78.47 65.39 39.24 26.16
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) District 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks
x) Watershed Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Development
xi) Limeking Agency, Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Upper Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiii) Subansiri Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(MoRD)
xiv) Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

122 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Total 2656.48 0.00 18.00 856.75 171.35 257.03 214.19 128.51 85.68
18.7 Entry Point
11.00 0.00 0.00 5 Years 20.70 4.14 6.21 5.18 3.11 2.07
(D) Activities
18.7
DPR 1.00 0.00 0.00 5 Years 5.18 1.04 1.55 1.29 0.78 0.52
(E)
18.7
I & CB 24.00 0.00 0.00 5 Years 43.83 8.77 13.15 10.96 6.57 4.38
(F)
18.7(
Livelihood 62.25 0.00 0.00 5 Years 135.47 27.09 40.64 33.87 20.32 13.55
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Poultry 33.00 0.00 0.00 5 Years 64.08 12.82 19.22 16.02 9.61 6.41
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
6.00 0.00 0.00 5 Years 18.73 3.75 5.62 4.68 2.81 1.87
Plantation
Others 37.00 0.00 0.00 5 Years 73.20 14.64 21.96 18.30 10.98 7.32
Sub Total 76.00 0.00 0.00 156.00 31.20 46.80 39.00 23.40 15.60
18.7(
Monitoring 0.00 0.00 0.00 5 Years 13.59 2.72 4.08 3.40 2.04 1.36
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 12.93 2.59 3.88 3.23 1.94 1.29
J)
18.7(
Consolidation 0.00 0.00 0.00 5 Years 54.21 10.84 16.26 13.55 8.13 5.42
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 138.27 27.65 41.48 34.57 20.74 13.83
L)
Grand Total 2830.73 0.00 18.00 1436.92 287.38 431.08 359.23 215.54 143.69

123 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
0.00 0.00 0.00 0.00 0.00

17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00

17.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.2 Check Dams 0.00 917.70 0.00 5 Years 21.00 4.20 6.30 5.25 3.15 2.10
17.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
District Other ground
17.5 Watershed water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Development structure
Nacho Agency, Fishry
17.6 Upper Pond/Cattel 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Subansiri Ponds
(MoRD) Others 0.00 28019.38 0.00 5 Years 39.90 7.98 11.97 9.98 5.99 3.99
Sub Total 0.00 28937.08 0.00 60.90 12.18 18.27 15.23 9.14 6.09
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 0.00 6320.16 0.00 5 Years 9.00 1.80 2.70 2.25 1.35 0.90
18.2 Check Dams 0.00 1442.10 0.00 5 Years 33.00 6.60 9.90 8.25 4.95 3.30
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

124 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 2106.72 0.00 5 Years 3.00 0.60 0.90 0.75 0.45 0.30
Ponds
Others 0.00 64184.74 0.00 5 Years 104.90 20.98 31.47 26.23 15.74 10.49
Sub Total 0.00 74053.72 0.00 149.90 29.98 44.97 37.48 22.49 14.99
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 0.00 30.00 1467.85 5 Years 224.68 44.94 67.40 56.17 33.70 22.47
ii) Horticulture 0.00 95.67 2226.72 5 Years 349.67 69.93 104.90 87.42 52.45 34.97
iii) Agriculture 0.00 81.67 1504.93 5 Years 236.28 47.26 70.88 59.07 35.44 23.63
iv) Pasture 0.00 0.00 200.01 5 Years 30.00 6.00 9.00 7.50 4.50 3.00
Sub Total 0.00 207.34 5399.51 840.62 168.12 252.19 210.16 126.09 84.06
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
v) Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 65694.55 41468.27 0.00 5 Years 152.60 30.52 45.78 38.15 22.89 15.26
Sub Total 65694.55 41468.27 0.00 152.60 30.52 45.78 38.15 22.89 15.26

125 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks
x) Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xi) Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiii) Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiv) Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) District Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Watershed
xvi) Development Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Nacho Agency, Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper Total 65694.55 144666.40 5399.51 1204.02 240.80 361.21 301.01 180.60 120.40
Subansiri
18.7 (MoRD) Entry Point
0.00 0.00 0.00 5 Years 19.20 3.84 5.76 4.80 2.88 1.92
(D) Activities
18.7
DPR 0.00 0.00 0.00 5 Years 4.50 0.90 1.35 1.13 0.68 0.45
(E)
18.7
I & CB 0.00 0.00 0.00 5 Years 111.99 22.40 33.60 28.00 16.80 11.20
(F)
18.7(
Livelihood 0.00 0.00 0.00 5 Years 195.09 39.02 58.53 48.77 29.26 19.51
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

126 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Poultry 23210.83 741.99 39.00 5 Years 47.94 9.59 14.38 11.99 7.19 4.79
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 343.00 124.00 10.00 5 Years 170.52 34.10 51.16 42.63 25.58 17.05
Sub Total 23553.83 865.99 49.00 218.46 43.69 65.54 54.62 32.77 21.85
18.7(
Monitoring 0.00 0.00 0.00 5 Years 22.37 4.47 6.71 5.59 3.36 2.24
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 22.97 4.59 6.89 5.74 3.45 2.30
J)
18.7(
Consolidation 0.00 0.00 0.00 5 Years 71.55 14.31 21.47 17.89 10.73 7.16
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 224.36 44.87 67.31 56.09 33.65 22.44
L)
Grand Total 89248.38 145532.39 5448.51 2094.51 418.90 628.35 523.63 314.18 209.45
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
17.1 Farm Ponds 50.00 94.00 5 Years 300.00 60.00 90.00 75.00 45.00 30.00
17.2 Check Dams 0.00 0.00 0.00 0.00 0.00
District
17.3 Watershed Nalla Bandhs 20.00 2100.00 5 Years 991.20 198.24 297.36 247.80 148.68 99.12
17.4 Development Percolation Tanks 0.00 0.00 0.00 0.00 0.00
Payeng Agency, Other ground
17.5 Upper water recharge 0.00 0.00 0.00 0.00 0.00
Subansiri structure
(MoRD) Fishry
17.6 Pond/Cattel 175.00 326.00 5 Years 1050.00 210.00 315.00 262.50 157.50 105.00
Ponds
Others M/P 25.00 2690.00 5 Years 1239.00 247.80 371.70 309.75 185.85 123.90

127 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 270.00 0.00 5210.00 3580.20 716.04 1074.06 895.05 537.03 358.02
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 0.00 0.00 0.00 0.00
Ponds
Others 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 45.00 4950.00 5 Years 2227.50 445.50 668.25 556.88 334.13 222.75
ii) Horticulture 720.00 6650.00 5 Years 2507.50 501.50 752.25 626.88 376.13 250.75
iii) Agriculture 0.00 0.00 0.00 0.00 0.00
iv) Pasture 0.00 0.00 0.00 0.00 0.00
Sub Total 765.00 0.00 11600.00 4735.00 947.00 1420.50 1183.75 710.25 473.50
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation

128 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Staggered
i) 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 0.00 0.00 0.00 0.00 0.00
v) Others 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00
vii) Land leveling 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00
Checks
x) Gully plugs 0.00 0.00 0.00 0.00 0.00
xi) District Loose boulders 0.00 0.00 0.00 0.00 0.00
Watershed
xii) Development Gabion structures 0.00 0.00 0.00 0.00 0.00
xiii) Payeng Agency, Others R/Well 0.00 0.00 0.00 0.00 0.00
xiv) Upper Dry check dam 0.00 0.00 0.00 0.00 0.00
Subansiri
xv) (MoRD) Drainage 0.00 0.00 0.00 0.00 0.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1663.0 1247.2
Total 25.00 0.00 2690.00 8315.20 2494.56 2078.80 831.52
4 8
18.7 Entry Point
0.00 0.00 0.00 0.00 0.00
(D) Activities

129 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.7
DPR 0.00 0.00 0.00 0.00 0.00
(E)
18.7
I & CB 0.00 0.00 0.00 0.00 0.00
(F)
18.7(
Livelihood 90.00 5 Years 1208.27 241.65 362.48 302.07 181.24 120.83
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00
Poultry 0.00 0.00 0.00 0.00 0.00
Fishry 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00
Plantation
Others (Vermi
Composition and 0.00 0.00 0.00 5 Years 842.52 168.50 252.76 210.63 126.38 84.25
Mithun Rearing
Sub Total 0.00 0.00 0.00 842.52 168.50 252.76 210.63 126.38 84.25
18.7(
Monitoring 0.00 0.00 0.00 5 Years 84.25 16.85 25.28 21.06 12.64 8.43
I)
18.7(
Evaluation 0.00 0.00 0.00 5 Years 84.25 16.85 25.28 21.06 12.64 8.43
J)
18.7(
Consolidation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
K)
18.7(
Administration 0.00 0.00 0.00 5 Years 842.52 168.50 252.76 210.63 126.38 84.25
L)
2275.4 1706.5 1137.7
Grand Total 115.00 0.00 2690.00 11377.01 3413.10 2844.25
0 5 0

130 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Water
Harvesting
17 Structures 0.00 0.00 0.00 0.00 0.00
(Newly to be
created)
675cum/no
17.1 Farm Ponds 360.00 100.00 5 Years 512.73 102.55 153.82 128.18 76.91 51.27
s

17.2 Check Dams 131.00 30mtr/nos 100.00 5 Years 189.94 37.99 56.98 47.48 28.49 18.99

675cum/no
17.3 Nalla Bandhs 85.00 100.00 5 Years 121.06 24.21 36.32 30.27 18.16 12.11
s
17.4 District Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Watershed
Development Other ground
17.5 Puchigeko Agency, water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper structure
Subansiri Fishry
675cum/no
17.6 (MoRD) Pond/Cattel 570.00 100.00 5 Years 1731.38 346.28 519.41 432.84 259.71 173.14
s
Ponds
Others M/P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 1146.00 0.00 400.00 2555.10 511.02 766.53 638.78 383.27 255.51
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 0.00 0.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00

131 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 0.00 0.00 0.00 0.00 0.00
Ponds
Others 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 0.00 0.00 130.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
ii) Horticulture 0.00 0.00 130.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
iii) Agriculture 0.00 0.00 130.00 5 Years 19.50 3.90 5.85 4.88 2.93 1.95
iv) Pasture 0.00 0.00 380.00 5 Years 57.00 11.40 17.10 14.25 8.55 5.70
Sub Total 0.00 0.00 770.00 115.50 23.10 34.65 28.88 17.33 11.55
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 4150.00 72cum/nos - 5 Years 5.69 1.14 1.71 1.42 0.85 0.57
v) Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
100sqm/no
vii) Land leveling 1360.00 0.00 5 Years 6.40 1.28 1.92 1.60 0.96 0.64
s

132 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Sub Total 5510.00 0.00 0.00 12.09 2.42 3.63 3.02 1.81 1.21
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 27.00 30mtr/nos 200.00 5 Years 39.15 7.83 11.74 9.79 5.87 3.91
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks
x) Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xi) Loose boulders 32.00 30mtr/nos 200.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Gabion structures 0.00 0.00 0.00 5 Years 46.40 9.28 13.92 11.60 6.96 4.64
xiii) Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
200mtr/eac
xiv) District Dry check dam 72.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
h
xv) Watershed Drainage 0.00 0.00 0.00 5 Years 50.98 10.20 15.29 12.74 7.65 5.10
Development
xvi) Puchigeko Agency, Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper Sub Total 131.00 0.00 400.00 136.52 27.30 40.96 34.13 20.48 13.65
Subansiri Total 6787.00 0.00 1570.00 2819.21 563.84 845.76 704.80 422.88 281.92
(MoRD)
18.7 Entry Point
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(D) Activities
18.7
DPR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(E)
18.7
I & CB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(F)
18.7(
Livelihood 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 100.00 0.00 0.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50

133 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Bee Keeping 100.00 0.00 0.00 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Poultry 325.00 0.00 0.00 5 Years 48.75 9.75 14.63 12.19 7.31 4.88
Fishry 325.00 0.00 0.00 5 Years 48.75 9.75 14.63 12.19 7.31 4.88
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 850.00 0.00 0.00 127.50 25.50 38.25 31.88 19.13 12.75
18.7(
Monitoring 0.02 0.00 0.00 5 Years 58.93 11.79 17.68 14.73 8.84 5.89
I)
18.7(
Evaluation 0.02 0.00 0.00 5 Years 58.93 11.79 17.68 14.73 8.84 5.89
J)
18.7(
Consolidation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
K)
18.7(
Administration 0.03 0.00 0.00 5 Years 88.40 17.68 26.52 22.10 13.26 8.84
L)
Grand Total 7637.07 0.00 1570.00 3152.98 630.60 945.89 788.24 472.95 315.30
0.00 0.00 0.00 0.00 0.00
17 Water Harvesting Structures (Newly to be created) 0.00 0.00 0.00 0.00 0.00
17.1 District Farm Ponds 21.00 20648.60 196.00 5 Years 29.40 5.88 8.82 7.35 4.41 2.94
17.2 Watershed Check Dams 21.00 1867.60 284.90 5 Years 42.70 8.54 12.81 10.68 6.41 4.27
Development
17.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Siyum Agency,
Upper Percolation
17.4 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Subansiri Tanks
(MoRD) Other ground
17.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure

134 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Fishry
17.6 Pond/Cattel 14.00 13148.80 126.00 5 Years 18.90 3.78 5.67 4.73 2.84 1.89
Ponds
Others M/P 14.00 18193.00 172.90 5 Years 34.30 6.86 10.29 8.58 5.15 3.43
Sub Total 70.00 53858.00 779.80 125.30 25.06 37.59 31.33 18.80 12.53
18 Water Harvesting Structures ( to be Renovated) 0.00 0.00 0.00 0.00 0.00
18.1 Farm Ponds 16.00 14326.60 136.00 5 Years 20.40 4.08 6.12 5.10 3.06 2.04
18.2 Check Dams 23.00 1342.60 7204.90 5 Years 1080.70 216.14 324.21 270.18 162.11 108.07
18.3 Nalla Bandhs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.4 Percolation Tanks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure
Fishry
18.6 Pond/Cattel 4.00 3756.80 36.00 5 Years 11.40 2.28 3.42 2.85 1.71 1.14
Ponds
Others 9.00 13978.00 132.90 5 Years 28.30 5.66 8.49 7.08 4.25 2.83
Sub Total 52.00 33404.00 7509.80 1140.80 228.16 342.24 285.20 171.12 114.08
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 42.00 0.00 591.50 5 Years 88.76 17.75 26.63 22.19 13.31 8.88
ii) Horticulture 42.00 0.00 644.00 5 Years 98.70 19.74 29.61 24.68 14.81 9.87
iii) Agriculture 49.00 0.00 639.10 5 Years 95.69 19.14 28.71 23.92 14.35 9.57
iv) Pasture 35.00 0.00 310.10 5 Years 46.55 9.31 13.97 11.64 6.98 4.66
Sub Total 168.00 0.00 2184.70 329.70 65.94 98.91 82.43 49.46 32.97

135 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trenching
ii) Contour Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 14.00 17208.80 161.00 5 Years 24.50 4.90 7.35 6.13 3.68 2.45
v) Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 7.00 7373.80 70.00 5 Years 10.50 2.10 3.15 2.63 1.58 1.05
vii) Land leveling 7.00 9835.00 91.00 5 Years 14.00 2.80 4.20 3.50 2.10 1.40
Sub Total 28.00 34417.60 322.00 49.00 9.80 14.70 12.25 7.35 4.90
18.7( Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Engg. Structure
viii) Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Checks
District
x) Watershed Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xi) Development Loose boulders 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xii) Siyum Agency, Gabion structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper
xiii) Subansiri Others R/Well 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xiv) (MoRD) Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) Drainage 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 318.00 121679.60 10796.30 1644.80 328.96 493.44 411.20 246.72 164.48

136 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
18.7 Entry Point
12.00 0.00 240.00 5 Years 36.00 7.20 10.80 9.00 5.40 3.60
(D) Activities
18.7
DPR 0.00 0.00 0.00 5 Years 10.50 2.10 3.15 2.63 1.58 1.05
(E)
18.7
I & CB 42.00 0.00 0.00 5 Years 52.50 10.50 15.75 13.13 7.88 5.25
(F)
18.7(
Livelihood 42.00 0.00 0.00 5 Years 94.50 18.90 28.35 23.63 14.18 9.45
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bee Keeping 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Poultry 0.00 0.00 0.00 5 Years 10.50 2.10 3.15 2.63 1.58 1.05
Fishry 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Bio fuel
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Plantation
Others 21.00 0.00 0.00 5 Years 94.50 18.90 28.35 23.63 14.18 9.45
Sub Total 21.00 0.00 0.00 105.00 21.00 31.50 26.25 15.75 10.50
18.7(
Monitoring 7.00 0.00 0.00 5 Years 15.75 3.15 4.73 3.94 2.36 1.58
I)
18.7(
Evaluation 7.00 0.00 0.00 5 Years 15.75 3.15 4.73 3.94 2.36 1.58
J)
18.7(
Consolidation 7.00 0.00 0.00 5 Years 31.50 6.30 9.45 7.88 4.73 3.15
K)
18.7(
Administration 21.00 0.00 0.00 5 Years 105.00 21.00 31.50 26.25 15.75 10.50
L)
Grand Total 477.00 121679.60 11036.30 2111.30 422.26 633.39 527.83 316.70 211.13
0.00 0.00 0.00 0.00 0.00

137 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Water
Harvesting
17 Structures 0.00 0.00 0.00 0.00 0.00
(Newly to be
created)
17.1 Farm Ponds 12.00 14730.00 45.00 5 Years 168.00 33.60 50.40 42.00 25.20 16.80
17.2 Check Dams 45.00 3644.00 331.00 5 Years 857.50 171.50 257.25 214.38 128.63 85.75
17.3 Nalla Bandhs 22.00 28595.00 135.00 5 Years 370.00 74.00 111.00 92.50 55.50 37.00
17.4 Percolation Tanks 4.00 1524.00 0.00 5 Years 46.00 9.20 13.80 11.50 6.90 4.60
Other ground
17.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
District structure
Watershed Fishry
17.6 Development Pond/Cattel 72.00 518881.00 2000.00 5 Years 843.00 168.60 252.90 210.75 126.45 84.30
Taliha Agency, Ponds
Upper Others M/P 56.00 302211.00 6323.00 5 Years 905.00 181.00 271.50 226.25 135.75 90.50
Subansiri
(MoRD) Sub Total 211.00 869585.00 8834.00 3189.50 637.90 956.85 797.38 478.43 318.95
Water
Harvesting
18 0.00 0.00 0.00 0.00 0.00
Structures ( to
be Renovated)
18.1 Farm Ponds 0.00 0.00 0.00 5 Years 10.00 2.00 3.00 2.50 1.50 1.00
18.2 Check Dams 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18.3 Nalla Bandhs 7.00 29272.00 104.00 5 Years 93.80 18.76 28.14 23.45 14.07 9.38
18.4 Percolation Tanks 1.00 400.00 2.00 5 Years 25.00 5.00 7.50 6.25 3.75 2.50
Other ground
18.5 water recharge 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
structure

138 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Fishry
18.6 Pond/Cattel 14.00 17200.00 20.00 5 Years 52.00 10.40 15.60 13.00 7.80 5.20
Ponds
Others 3.00 23000.00 20.00 5 Years 44.00 8.80 13.20 11.00 6.60 4.40
Sub Total 25.00 69872.00 146.00 224.80 44.96 67.44 56.20 33.72 22.48
18.7( Land
0.00 0.00 0.00 0.00 0.00
A) Development
i) Afforestation 48.00 0.00 1912.00 5 Years 960.00 192.00 288.00 240.00 144.00 96.00
ii) Horticulture 56.00 0.00 1223.00 5 Years 850.00 170.00 255.00 212.50 127.50 85.00
iii) Agriculture 49.00 0.00 1236.00 5 Years 852.00 170.40 255.60 213.00 127.80 85.20
iv) Pasture 36.00 0.00 245.00 5 Years 541.00 108.20 162.30 135.25 81.15 54.10
Sub Total 189.00 0.00 4616.00 3203.00 640.60 960.90 800.75 480.45 320.30
18.7( Soil & Moisture
0.00 0.00 0.00 0.00 0.00
B) Conservation
Staggered
i) 10.00 0.00 2.00 5 Years 30.00 6.00 9.00 7.50 4.50 3.00
Trenching
ii) Contour Bunding 1.00 24.00 3.00 5 Years 7.00 1.40 2.10 1.75 1.05 0.70
iii) Graded Bunding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
iv) Bench terrracing 68.00 0.00 603.00 5 Years 837.00 167.40 251.10 209.25 125.55 83.70
v) Others 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
vi) Crate Wire 2.00 0.00 10.00 5 Years 20.00 4.00 6.00 5.00 3.00 2.00
vii) Land leveling 11.00 0.00 36.00 5 Years 135.00 27.00 40.50 33.75 20.25 13.50
Sub Total 92.00 24.00 654.00 1029.00 205.80 308.70 257.25 154.35 102.90
18.7( District Vegetative &
0.00 0.00 0.00 0.00 0.00
C) Taliha Watershed Engg. Structure
viii) Development Earthen Checks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

139 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Agency, Brush Wood
ix) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Upper Checks
x) Subansiri Gully plugs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
(MoRD)
xi) Loose boulders 4.00 0.00 4.00 5 Years 26.00 5.20 7.80 6.50 3.90 2.60
xii) Gabion structures 4.00 25.00 0.00 5 Years 15.20 3.04 4.56 3.80 2.28 1.52
xiii) Others R/Well 50.00 0.00 314.00 5 Years 885.00 177.00 265.50 221.25 132.75 88.50
xiv) Dry check dam 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
xv) Drainage 8.00 250.00 16.00 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
xvi) Bunds repair 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Sub Total 66.00 275.00 334.00 1016.20 203.24 304.86 254.05 152.43 101.62
1732.5 1299.3
Total 583.00 939756.00 14584.00 8662.50 2598.75 2165.63 866.25
0 8
18.7 Entry Point
0.00 0.00 0.00 5 Years 279.50 55.90 83.85 69.88 41.93 27.95
(D) Activities
18.7
DPR 0.00 0.00 0.00 5 Years 136.00 27.20 40.80 34.00 20.40 13.60
(E)
18.7
I & CB 7.00 2.00 0.00 5 Years 377.00 75.40 113.10 94.25 56.55 37.70
(F)
18.7(
Livelihood 24.00 0.00 0.00 5 Years 1180.00 236.00 354.00 295.00 177.00 118.00
G)
18.7( Prod. Sys. & Beneficiari
Activities-wise No. - 0.00 0.00 0.00 0.00 0.00
H) Mirco Enter. es
Sericulutre 0.00 0.00 0.00 5 Years 10.00 2.00 3.00 2.50 1.50 1.00
Bee Keeping 0.00 0.00 0.00 5 Years 30.00 6.00 9.00 7.50 4.50 3.00
Poultry 71.00 0.00 3.00 5 Years 962.65 192.53 288.80 240.66 144.40 96.27
Fishry 65.00 0.00 42.00 5 Years 692.00 138.40 207.60 173.00 103.80 69.20
Bio fuel
0.00 0.00 0.00 5 Years 50.00 10.00 15.00 12.50 7.50 5.00
Plantation

140 | P a g e
Comman
Period
d Estimate
Concerned of Year Year Year
Sr.N Name of Capacity Area/Irrig d Cost Year Year
Ministry/ Component Activities-wise No. Imple 2016- 2019- 2020-
o. Block (cum) ation (Rs in 2017-18 2018-19
Department mentat 17 20 21
Potential lac)
ion
(ha)
Others 11.00 20.00 0.00 5 Years 1900.00 380.00 570.00 475.00 285.00 190.00
Sub Total 147.00 20.00 45.00 3644.65 728.93 1093.40 911.16 546.70 364.47
18.7(
Monitoring 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I)
18.7(
Evaluation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
J)
18.7(
Consolidation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
K)
18.7(
Administration 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
L)
2855.9
Grand Total 761.00 939778.00 14629.00 14279.65 4283.90 3569.91 2141.95 1427.97
3
0.00 0.00 0.00 0.00 0.00
Grand Total 8897.3
108385.18 1600308.22 81343.65 44486.68 13346.00 11121.67 6673.00 4448.67
DRDA 4

Command Period of
Name of
Concerned Sub Total Area/Irrigat Implemntatio Estimated Year Year Year
Sl. the Year Year
Ministry/De Component Activity Number/Capa ion n (5 yrs) from cost (Rs. in 2016- 2018- 2019-
No. Blocks/Su 2017-18 2020-21
partmanet city (cum) Potential 2016-17 to lacs) 17 19 20
b Districts
(Ha) 2020-21

141 | P a g e
19 Newly Created
Water
19.1
Conservation
19.2 Water Harvesting
Creation of
19.3 DolR- Convergenc Irrigation canals
MoRD/ e with & Drains
DRDA MGNREGA Providing
19.4 Infrastructure for
Irrigation
Land
19.5
Development
DolR- Renovation
20
MoRD
DolR- Renovation of
MoRD water bodies
20.1
including
desiltig:
DolR- Renovation &
MoRD Maintenance of
20.2
Irrigation Canals
& Drains:

21 State Planned Scheme of Irrigation


State Irrigation Name of Major Irrigation
21.1 Department Scheme
State Irrigation Name of Medium
21.2 Department Scheme Irrigation
State Irrigation Name of Surface
21.3 Department Scheme Irrigation
Scheme

142 | P a g e
Irrigation Scheme Name of
of State Scheme
22
Agriculture
Department

23 Irrigation Scheme of Line Department.


23.1
Baririj
200.00 67.80
o 285 5 Years 13.56 20.34 16.95 10.17 6.78
Dapori
jo 50 71.25 5 Years 16.95 3.39 5.09 4.24 2.54 1.70
Dump
175.00 59.33
orijo 249.375 5 Years 11.87 17.80 14.83 8.90 5.93
Giba 100.00 142.5 5 Years 33.90 6.78 10.17 8.48 5.09 3.39
Cheta MOA & Per drop
100.00 33.90
m FWDAC&FW/ more crop 142.5 5 Years 6.78 10.17 8.48 5.09 3.39
a DPAP Drip
Limek Horticulture (Micro
100.00 33.90
ing Department Irrigation) 142.5 5 Years 6.78 10.17 8.48 5.09 3.39
Nacho 100.00 142.5 5 Years 33.90 6.78 10.17 8.48 5.09 3.39
Puchi
125.00 42.38
Geko 178.125 5 Years 8.48 12.71 10.60 6.36 4.24
Siyum 100.00 142.5 5 Years 33.90 6.78 10.17 8.48 5.09 3.39
Taliha 125.00 178.125 5 Years 42.38 8.48 12.71 10.59 6.36 4.24
Paying 100.00 142.5 5 Years 33.90 6.78 10.17 8.48 5.09 3.39
Sub Total 1275.00 1816.88 432.23 86.45 129.67 108.06 64.83 43.22
Baririj
200 400.00 170.40
o 5 Years 34.08 51.12 42.60 25.56 17.04
Dapori
MOA & Per drop 100.00
jo 50 5 Years 42.6 8.52 12.78 10.65 6.39 4.26
Dump FWDAC&FW/ more crop
b DPAP Sprinkler 175 350.00 149.10
orijo Horticulture (Micro 5 Years 29.82 44.73 37.28 22.37 14.91
Giba Department Irrigation)
100 200.00 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Cheta
100 200.00 85.20
m 5 Years 17.04 25.56 21.30 12.78 8.52

143 | P a g e
Limek
100 200.00 85.20
ing 5 Years 17.04 25.56 21.30 12.78 8.52
Nacho 100 200.00 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Puchi
125 250.00 106.50
Geko 5 Years 21.30 31.95 26.63 15.98 10.65
Siyum 100 200.00 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Taliha 125 250.00 5 Years 106.50 21.30 31.95 26.63 15.98 10.65
Paying 100 200.00 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Sub Total 1275.00 2550.00 1086.30 217.26 325.89 271.58 162.95 108.63
Baririj
200 159.44 47
o 5 Years 9.40 14.10 11.75 7.05 4.70
Dapori
39.86
jo 50 5 Years 11.75 2.35 3.53 2.94 1.76 1.18
Dump
175 139.51 41.125
orijo 5 Years 8.23 12.34 10.28 6.17 4.11
Giba 100 79.72 5 Years 23.5 4.70 7.05 5.88 3.53 2.35
Cheta MOA & Per drop
Non-DPAP 100 79.72 23.5
m FWDAC&FW/ more crop 5 Years 4.70 7.05 5.88 3.53 2.35
c Drip (Wide
Limek Horticulture (Micro
Spaced crop) 100 79.72 23.5
ing Department Irrigation) 5 Years 4.70 7.05 5.88 3.53 2.35
Nacho 100 79.72 5 Years 23.5 4.70 7.05 5.88 3.53 2.35
Puchi
125 99.65 29.375
Geko 5 Years 5.88 8.81 7.34 4.41 2.94
Siyum 100 79.72 5 Years 23.5 4.70 7.05 5.88 3.53 2.35
Taliha 125 99.65 5 Years 29.375 5.88 8.81 7.34 4.41 2.94
Paying 100 79.72 5 Years 23.5 4.70 7.05 5.88 3.53 2.35
Sub Total 1275.00 1016.40 299.63 59.93 89.89 74.91 44.94 29.96
Baririj 200.00 256.93 170.80
o 5 Years 34.16 51.24 42.70 25.62 17.08
Dapori MOA & Per drop 64.23
Non-DPAP
jo FWDAC&FW/ more crop 50 5 Years 42.7 8.54 12.81 10.68 6.41 4.27
d Drip (Closed
Dump Horticulture (Micro 175.00 224.81 149.45
spaced crop)
orijo Department Irrigation) 5 Years 29.89 44.84 37.36 22.42 14.95
Giba 100.00 128.47 5 Years 85.40 17.08 25.62 21.35 12.81 8.54

144 | P a g e
Cheta 100.00 128.47 85.40
m 5 Years 17.08 25.62 21.35 12.81 8.54
Limek 100.00 128.47 85.40
ing 5 Years 17.08 25.62 21.35 12.81 8.54
Nacho 100.00 128.47 5 Years 85.40 17.08 25.62 21.35 12.81 8.54
Puchi 125.00 160.58 106.75
Geko 5 Years 21.35 32.03 26.69 16.01 10.68
Siyum 100.00 128.47 5 Years 85.40 17.08 25.62 21.35 12.81 8.54
Taliha 125.00 160.58 5 Years 106.75 21.35 32.03 26.69 16.01 10.68
Paying 100.00 128.47 5 Years 85.40 17.08 25.62 21.35 12.81 8.54
Sub Total 1275.00 802.91 1088.85 217.77 326.66 272.21 163.33 108.89
Baririj
200 229.88 117.8
o 5 Years 23.56 35.34 29.45 17.67 11.78
Dapori
57.47
jo 50 5 Years 29.45 5.89 8.84 7.36 4.42 2.95
Dump
175 201.14 103.075
orijo 5 Years 20.62 30.92 25.77 15.46 10.31
Giba 100 114.94 5 Years 58.9 11.78 17.67 14.73 8.84 5.89
Cheta MOA & Per drop Non-DPAP
100 114.94 58.9
m FWDAC&FW/ more crop Sprinkler 5 Years 11.78 17.67 14.73 8.84 5.89
e
Limek Horticulture (Micro (micro
100 114.94 58.9
ing Department Irrigation) sprinkler) 5 Years 11.78 17.67 14.73 8.84 5.89
Nacho 100 114.94 5 Years 58.9 11.78 17.67 14.73 8.84 5.89
Puchi
125 143.67 73.625
Geko 5 Years 14.73 22.09 18.41 11.04 7.36
Siyum 100 114.94 5 Years 58.9 11.78 17.67 14.73 8.84 5.89
Taliha 125 143.67 5 Years 73.625 14.73 22.09 18.41 11.04 7.36
Paying 100 114.94 5 Years 58.9 11.78 17.67 14.73 8.84 5.89
Sub Total 1275.00 1465.46 750.98 150.20 225.29 187.74 112.65 75.10
Baririj MOA & Per drop 200.00 229.97 170.40
Non-DPAP
o FWDAC&FW/ more crop 5 Years 34.08 51.12 42.60 25.56 17.04
f Sprinkler (mini
Dapori Horticulture (Micro 57.49
sprinkler)
jo Department Irrigation) 50 5 Years 42.6 8.52 12.78 10.65 6.39 4.26

145 | P a g e
Dump 175.00 201.22 149.10
orijo 5 Years 29.82 44.73 37.28 22.37 14.91
Giba 100.00 114.98 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Cheta 100.00 114.98 85.20
m 5 Years 17.04 25.56 21.30 12.78 8.52
Limek 100.00 114.98 85.20
ing 5 Years 17.04 25.56 21.30 12.78 8.52
Nacho 100.00 114.98 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Puchi 125.00 143.73 106.50
Geko 5 Years 21.30 31.95 26.63 15.98 10.65
Siyum 100.00 114.98 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Taliha 125.00 143.73 5 Years 106.50 21.30 31.95 26.63 15.98 10.65
Paying 100.00 114.98 5 Years 85.20 17.04 25.56 21.30 12.78 8.52
Sub Total 1275.00 1466.05 1086.30 217.26 325.89 271.58 162.95 108.63
Baririj
300 180.00
o 75 5 Years 36.00 54.00 45.00 27.00 18.00
Dapori
jo 13 50 5 Years 30 6.00 9.00 7.50 4.50 3.00
Dump
400 240.00
orijo 100 5 Years 48.00 72.00 60.00 36.00 24.00
Giba Per drop 150 90
38 5 Years 18.00 27.00 22.50 13.50 9.00
more crop
Cheta MOA &
(Supplemnt 150 90.00
m FWDAC&FW/ Topping up of 38 5 Years 18.00 27.00 22.50 13.50 9.00
g ary water
Limek Horticulture MGNREGA
manageme 150 90.00
ing Department 38 5 Years 18.00 27.00 22.50 13.50 9.00
nt
Nacho activities) 38 150 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
Puchi
250 150.00
Geko 63 5 Years 30.00 45.00 37.50 22.50 15.00
Siyum 38 150 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
Taliha 44 175 5 Years 105.00 21.00 31.50 26.25 15.75 10.50
Paying 38 150 5 Years 90.00 18.00 27.00 22.50 13.50 9.00
Sub Total 519 2075.00 1245.00 249.00 373.50 311.25 186.75 124.50
Baririj MOA & Per drop Drought
h 500 250.00
o FWDAC&FW/ more crop proofing 125 5 Years 50.00 75.00 62.50 37.50 25.00

146 | P a g e
Dapori Horticulture (Supplemnt through index
jo Department ary water check Dams/ 13 50 5 Years 25 5.00 7.50 6.25 3.75 2.50
Dump manageme RWHS
750 375.00
orijo nt 188 5 Years 75.00 112.50 93.75 56.25 37.50
Giba activities) 63 250 5 Years 125.00 25.00 37.50 31.25 18.75 12.50
Cheta
250 125.00
m 63 5 Years 25.00 37.50 31.25 18.75 12.50
Limek
250 125.00
ing 63 5 Years 25.00 37.50 31.25 18.75 12.50
Nacho 63 250 5 Years 125.00 25.00 37.50 31.25 18.75 12.50
Puchi
500 250.00
Geko 125 5 Years 50.00 75.00 62.50 37.50 25.00
Siyum 63 250 5 Years 125.00 25.00 37.50 31.25 18.75 12.50
Taliha 69 275 5 Years 137.50 27.50 41.25 34.38 20.63 13.75
Paying 63 250 5 Years 125.00 25.00 37.50 31.25 18.75 12.50
Sub Total 894 3575.00 0.00 1787.50 357.50 536.25 446.88 268.13 178.75
Baririj
950 855.00
o 475 5 Years 171.00 256.50 213.75 128.25 85.50
Dapori
jo 50 100 5 Years 90 18.00 27.00 22.50 13.50 9.00
Dump
1425 1282.50
orijo 713 5 Years 256.50 384.75 320.63 192.38 128.25
Giba Per drop 475 427.50
Secondary 238 5 Years 85.50 128.25 106.88 64.13 42.75
more crop
Cheta MOA & Storage
(Supplemnt 475 427.50
m FWDAC&FW/ Structures 238 5 Years 85.50 128.25 106.88 64.13 42.75
i ary water
Limek Horticulture (Water
manageme 475 427.50
ing Department Harvesting 238 5 Years 85.50 128.25 106.88 64.13 42.75
nt
Nacho Tanks) 238 475 5 Years 427.50 85.50 128.25 106.88 64.13 42.75
activities)
Puchi
950 855.00
Geko 475 5 Years 171.00 256.50 213.75 128.25 85.50
Siyum 238 475 5 Years 427.50 85.50 128.25 106.88 64.13 42.75
Taliha 263 525 5 Years 472.50 94.50 141.75 118.13 70.88 47.25
Paying 238 475 5 Years 427.50 85.50 128.25 106.88 64.13 42.75
Sub Total 3400 6800.00 6120.00 1224.00 1836.00 1530.00 918.00 612.00

147 | P a g e
Baririj 1061.6
2560 4246.50
o 5 Years 849.30 1273.95 3 636.98 424.65
Dapori
jo 750 5 Years 933.5 186.70 280.05 233.38 140.03 93.35
Dump 1021.8
2625 4087.25
orijo 5 Years 817.45 1226.18 1 613.09 408.73
Giba Per drop On Farm 1061.6
2560 4246.50
more crop Development 5 Years 849.30 1273.95 3 636.98 424.65
Cheta MOA &
(Supplemnt (distribution 1280 2123.50
m FWDAC&FW/ 5 Years 424.70 637.05 530.88 318.53 212.35
j ary water pipe/raise bed
Limek Horticulture
manageme and furrow 1280 2123.50
ing Department 5 Years 424.70 637.05 530.88 318.53 212.35
nt system etc.) (in
Nacho activities) RMT) 1280 5 Years 2123.50 424.70 637.05 530.88 318.53 212.35
Puchi
2085 3330.25
Geko 5 Years 666.05 999.08 832.56 499.54 333.03
Siyum 1280 5 Years 2123.50 424.70 637.05 530.88 318.53 212.35
Taliha 1655 5 Years 2590.25 518.05 777.08 647.56 388.54 259.03
Paying 1280 5 Years 2123.50 424.70 637.05 530.88 318.53 212.35
Sub Total 0.00 18635.00 30051.75 6010.35 9015.53 7512.94 4507.76 3005.18
23.2 0.00 0.00 0.00 0.00 0.00
WATERSHED HARVESTING STRUCTURES 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 61.24 12.25 18.37 15.31 9.19 6.12
Nala bund 14 5 Years 47.36 9.47 14.21 11.84 7.10 4.74
DoLR-MoRD/ Soil Boulder check
Baririj & Conservation PMKSY dam 24 5 Years 115.08 23.02 34.53 28.77 17.26 11.51
o Department Watershed Gabion Check
(RWD) Dam 25 5 Years 187.38 37.48 56.21 46.85 28.11 18.74
Farm pond with
poly linning 5 5 Years 94.57 18.91 28.37 23.64 14.19 9.46
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

148 | P a g e
Brush wood
check dam in
upper reaches 21 5 Years 61.24 12.25 18.37 15.31 9.19 6.12
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 95.90 19.18 28.77 23.98 14.39 9.59
Gabion check
da,m in lower
reaches 15 5 Years 112.43 22.49 33.73 28.11 16.86 11.24
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 151.20 30.24 45.36 37.80 22.68 15.12
Afforestation 15 5 Years 230.24 46.05 69.07 57.56 34.54 23.02
Pasture
development 5 5 Years 33.75 6.75 10.13 8.44 5.06 3.38
Horticulture
development 16 5 Years 224.64 44.93 67.39 56.16 33.70 22.46
Agroforestry 14 5 Years 314.31 62.86 94.29 78.58 47.15 31.43
Mulching 5 5 Years 24.30 4.86 7.29 6.08 3.65 2.43
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 84.04 16.81 25.21 21.01 12.61 8.40
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 109.35 21.87 32.81 27.34 16.40 10.94
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 34.02 6.80 10.21 8.51 5.10 3.40

149 | P a g e
RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 30.16 6.03 9.05 7.54 4.52 3.02
SUB-TOTAL 240 2011.21 402.24 603.36 502.80 301.68 201.12
WATERSHED
HARVESTIN
G
STRUCTURE
S 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 56.70 11.34 17.01 14.18 8.51 5.67
Nala bund 14 5 Years 43.86 8.77 13.16 10.96 6.58 4.39
Boulder check
dam 24 5 Years 106.56 21.31 31.97 26.64 15.98 10.66
Gabion Check
Dam 25 5 Years 173.50 34.70 52.05 43.38 26.03 17.35
Farm pond with
DoLR-MoRD/ Soil poly linning 5 5 Years 87.56 17.51 26.27 21.89 13.13 8.76
Dapori & Conservation PMKSY DRAINAGE
jo Department Watershed LINE
(RWD) TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 56.70 11.34 17.01 14.18 8.51 5.67
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 88.80 17.76 26.64 22.20 13.32 8.88
Gabion check
da,m in lower
reaches 15 5 Years 104.10 20.82 31.23 26.03 15.62 10.41

SOIL AND
MOISTURE 0.00 0.00 0.00 0.00 0.00 0.00

150 | P a g e
CONSERVAT
ION

Composite
nursery raising 14 5 Years 140.00 28.00 42.00 35.00 21.00 14.00
Afforestation 15 5 Years 213.19 42.64 63.96 53.30 31.98 21.32
Pasture
development 5 5 Years 31.25 6.25 9.38 7.81 4.69 3.13
Horticulture
development 16 5 Years 208.00 41.60 62.40 52.00 31.20 20.80
Agroforestry 14 5 Years 291.03 58.21 87.31 72.76 43.65 29.10
Mulching 5 5 Years 22.50 4.50 6.75 5.63 3.38 2.25
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 77.81 15.56 23.34 19.45 11.67 7.78
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 101.25 20.25 30.38 25.31 15.19 10.13
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 31.50 6.30 9.45 7.88 4.73 3.15

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 27.93 5.59 8.38 6.98 4.19 2.79
SUB-TOTAL 240 5 Years 1862.23 372.45 558.67 465.56 279.33 186.22
WATERSHED
DoLR-MoRD/ Soil
HARVESTIN
Dump & Conservation PMKSY
G
orijo Department Watershed
STRUCTURE
(RWD)
S 0.00 0.00 0.00 0.00 0.00 0.00

151 | P a g e
Brush wood
check dam 21 5 Years 27.22 5.44 8.16 6.80 4.08 2.72
Nala bund 14 5 Years 21.05 4.21 6.32 5.26 3.16 2.11
Boulder check
dam 24 5 Years 51.15 10.23 15.34 12.79 7.67 5.11
Gabion Check
Dam 25 5 Years 83.28 16.66 24.98 20.82 12.49 8.33
Farm pond with
poly linning 5 5 Years 42.03 8.41 12.61 10.51 6.30 4.20
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 27.22 5.44 8.16 6.80 4.08 2.72
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 42.62 8.52 12.79 10.66 6.39 4.26
Gabion check
da,m in lower
reaches 15 5 Years 49.97 9.99 14.99 12.49 7.50 5.00
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 67.20 13.44 20.16 16.80 10.08 6.72
Afforestation 15 5 Years 102.33 20.47 30.70 25.58 15.35 10.23
Pasture
development 5 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Horticulture
development 16 5 Years 99.84 19.97 29.95 24.96 14.98 9.98
Agroforestry 14 5 Years 139.69 27.94 41.91 34.92 20.95 13.97
Mulching 5 5 Years 10.80 2.16 3.24 2.70 1.62 1.08

152 | P a g e
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 37.35 7.47 11.21 9.34 5.60 3.74
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 48.60 9.72 14.58 12.15 7.29 4.86
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 15.12 3.02 4.54 3.78 2.27 1.51

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 13.41 2.68 4.02 3.35 2.01 1.34
SUB-TOTAL 240 5 Years 893.87 178.77 268.16 223.47 134.08 89.39
WATERSHED
HARVESTIN
G
STRUCTURE
S 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 34.02 6.80 10.21 8.51 5.10 3.40
DoLR-MoRD/ Soil
& Conservation PMKSY Nala bund 14 5 Years 26.31 5.26 7.89 6.58 3.95 2.63
Giba Boulder check
Department Watershed
(RWD) dam 24 5 Years 63.94 12.79 19.18 15.98 9.59 6.39
Gabion Check
Dam 25 5 Years 104.10 20.82 31.23 26.03 15.62 10.41
Farm pond with
poly linning 5 5 Years 52.54 10.51 15.76 13.13 7.88 5.25
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

153 | P a g e
Brush wood
check dam in
upper reaches 21 5 Years 34.02 6.80 10.21 8.51 5.10 3.40
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 53.28 10.66 15.98 13.32 7.99 5.33
Gabion check
da,m in lower
reaches 15 5 Years 62.46 12.49 18.74 15.62 9.37 6.25
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 84.00 16.80 25.20 21.00 12.60 8.40
Afforestation 15 5 Years 127.91 25.58 38.37 31.98 19.19 12.79
Pasture
development 5 5 Years 18.75 3.75 5.63 4.69 2.81 1.88
Horticulture
development 16 5 Years 124.80 24.96 37.44 31.20 18.72 12.48
Agroforestry 14 5 Years 174.62 34.92 52.38 43.65 26.19 17.46
Mulching 5 5 Years 13.50 2.70 4.05 3.38 2.03 1.35
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 46.69 9.34 14.01 11.67 7.00 4.67
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 60.75 12.15 18.23 15.19 9.11 6.08
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 18.90 3.78 5.67 4.73 2.84 1.89

154 | P a g e
RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 16.76 3.35 5.03 4.19 2.51 1.68
Sub Total 240 0 1117.3395 223.47 335.20 279.33 167.60 111.73
WATERSHED
HARVESTIN
G
STRUCTURE
S 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 24.95 4.99 7.48 6.24 3.74 2.49
Nala bund 14 5 Years 19.30 3.86 5.79 4.82 2.89 1.93
Boulder check
dam 24 5 Years 46.89 9.38 14.07 11.72 7.03 4.69
Gabion Check
Dam 25 5 Years 76.34 15.27 22.90 19.09 11.45 7.63
Farm pond with
DoLR-MoRD/ Soil poly linning 5 5 Years 38.53 7.71 11.56 9.63 5.78 3.85
Limek & Conservation PMKSY DRAINAGE
ing Department Watershed LINE
(RWD) TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 24.95 4.99 7.48 6.24 3.74 2.49
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 39.07 7.81 11.72 9.77 5.86 3.91
Gabion check
da,m in lower
reaches 15 5 Years 45.80 9.16 13.74 11.45 6.87 4.58

SOIL AND
MOISTURE 0.00 0.00 0.00 0.00 0.00 0.00

155 | P a g e
CONSERVAT
ION

Composite
nursery raising 14 5 Years 61.60 12.32 18.48 15.40 9.24 6.16
Afforestation 15 5 Years 93.80 18.76 28.14 23.45 14.07 9.38
Pasture
development 5 5 Years 13.75 2.75 4.13 3.44 2.06 1.38
Horticulture
development 16 5 Years 91.52 18.30 27.46 22.88 13.73 9.15
Agroforestry 14 5 Years 128.05 25.61 38.42 32.01 19.21 12.81
Mulching 5 5 Years 9.90 1.98 2.97 2.48 1.49 0.99
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 34.24 6.85 10.27 8.56 5.14 3.42
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 44.55 8.91 13.37 11.14 6.68 4.46
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 13.86 2.77 4.16 3.47 2.08 1.39

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 12.29 2.46 3.69 3.07 1.84 1.23
SUB-TOTAL 5 Years 819.38 163.88 245.81 204.85 122.91 81.94
WATERSHED
DoLR-MoRD/ Soil
HARVESTIN
& Conservation PMKSY
Nacho G
Department Watershed
STRUCTURE
(RWD)
S 0.00 0.00 0.00 0.00 0.00 0.00

156 | P a g e
Brush wood
check dam 21 5 Years 22.68 4.54 6.80 5.67 3.40 2.27
Nala bund 14 5 Years 17.54 3.51 5.26 4.39 2.63 1.75
Boulder check
dam 24 5 Years 42.62 8.52 12.79 10.66 6.39 4.26
Gabion Check
Dam 25 5 Years 69.40 13.88 20.82 17.35 10.41 6.94
Farm pond with
poly linning 5 5 Years 35.03 7.01 10.51 8.76 5.25 3.50
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 22.68 4.54 6.80 5.67 3.40 2.27
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 35.52 7.10 10.66 8.88 5.33 3.55
Gabion check
da,m in lower
reaches 15 5 Years 41.64 8.33 12.49 10.41 6.25 4.16
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 56.00 11.20 16.80 14.00 8.40 5.60
Afforestation 15 5 Years 85.28 17.06 25.58 21.32 12.79 8.53
Pasture
development 5 5 Years 12.50 2.50 3.75 3.13 1.88 1.25
Horticulture
development 16 5 Years 83.20 16.64 24.96 20.80 12.48 8.32
Agroforestry 14 5 Years 116.41 23.28 34.92 29.10 17.46 11.64
Mulching 5 5 Years 9.00 1.80 2.70 2.25 1.35 0.90

157 | P a g e
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 31.13 6.23 9.34 7.78 4.67 3.11
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 40.50 8.10 12.15 10.13 6.08 4.05
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 12.60 2.52 3.78 3.15 1.89 1.26

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 11.17 2.23 3.35 2.79 1.68 1.12
SUB-TOTAL 5 Years 744.89 148.98 223.47 186.22 111.73 74.49
WATERSHED
HARVESTIN
G
STRUCTURE
S 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 47.63 9.53 14.29 11.91 7.14 4.76
DoLR-MoRD/ Soil
Puchi & Conservation PMKSY Nala bund 14 5 Years 36.84 7.37 11.05 9.21 5.53 3.68
Geko Department Watershed Boulder check
(RWD) dam 24 5 Years 89.51 17.90 26.85 22.38 13.43 8.95
Gabion Check
Dam 25 5 Years 145.74 29.15 43.72 36.44 21.86 14.57
Farm pond with
poly linning 5 5 Years 73.55 14.71 22.07 18.39 11.03 7.36
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

158 | P a g e
Brush wood
check dam in
upper reaches 21 5 Years 47.63 9.53 14.29 11.91 7.14 4.76
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 74.59 14.92 22.38 18.65 11.19 7.46
Gabion check
da,m in lower
reaches 15 5 Years 87.44 17.49 26.23 21.86 13.12 8.74
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 117.60 23.52 35.28 29.40 17.64 11.76
Afforestation 15 5 Years 179.08 35.82 53.72 44.77 26.86 17.91
Pasture
development 5 5 Years 26.25 5.25 7.88 6.56 3.94 2.63
Horticulture
development 16 5 Years 174.72 34.94 52.42 43.68 26.21 17.47
Agroforestry 14 5 Years 244.46 48.89 73.34 61.12 36.67 24.45
Mulching 5 5 Years 18.90 3.78 5.67 4.73 2.84 1.89
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 65.36 13.07 19.61 16.34 9.80 6.54
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 85.05 17.01 25.52 21.26 12.76 8.51
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 26.46 5.29 7.94 6.62 3.97 2.65

159 | P a g e
RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 23.46 4.69 7.04 5.87 3.52 2.35
SUB-TOTAL 5 Years 1564.28 312.86 469.28 391.07 234.64 156.43
WATERSHED
HARVESTIN
G
STRUCTURE
S 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam 21 5 Years 27.22 5.44 8.16 6.80 4.08 2.72
Nala bund 14 5 Years 21.05 4.21 6.32 5.26 3.16 2.11
Boulder check
dam 24 5 Years 51.15 10.23 15.34 12.79 7.67 5.11
Gabion Check
Dam 25 5 Years 83.28 16.66 24.98 20.82 12.49 8.33
Farm pond with
DoLR-MoRD/ Soil poly linning 5 5 Years 42.03 8.41 12.61 10.51 6.30 4.20
& Conservation PMKSY DRAINAGE
Siyum LINE
Department Watershed
(RWD) TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 27.22 5.44 8.16 6.80 4.08 2.72
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 42.62 8.52 12.79 10.66 6.39 4.26
Gabion check
da,m in lower
reaches 15 5 Years 49.97 9.99 14.99 12.49 7.50 5.00

SOIL AND
MOISTURE 0.00 0.00 0.00 0.00 0.00 0.00

160 | P a g e
CONSERVAT
ION

Composite
nursery raising 14 5 Years 67.20 13.44 20.16 16.80 10.08 6.72
Afforestation 15 5 Years 102.33 20.47 30.70 25.58 15.35 10.23
Pasture
development 5 5 Years 15.00 3.00 4.50 3.75 2.25 1.50
Horticulture
development 16 5 Years 99.84 19.97 29.95 24.96 14.98 9.98
Agroforestry 14 5 Years 139.69 27.94 41.91 34.92 20.95 13.97
Mulching 5 5 Years 10.80 2.16 3.24 2.70 1.62 1.08
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 37.35 7.47 11.21 9.34 5.60 3.74
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 48.60 9.72 14.58 12.15 7.29 4.86
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 15.12 3.02 4.54 3.78 2.27 1.51

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 13.41 2.68 4.02 3.35 2.01 1.34
SUB-TOTAL 5 Years 893.87 178.77 268.16 223.47 134.08 89.39
WATERSHED
DoLR-MoRD/ Soil
HARVESTIN
& Conservation PMKSY
Taliha G
Department Watershed
STRUCTURE
(RWD)
S 0.00 0.00 0.00 0.00 0.00 0.00

161 | P a g e
Brush wood
check dam 21 5 Years 22.68 4.54 6.80 5.67 3.40 2.27
Nala bund 14 5 Years 17.54 3.51 5.26 4.39 2.63 1.75
Boulder check
dam 24 5 Years 42.62 8.52 12.79 10.66 6.39 4.26
Gabion Check
Dam 25 5 Years 69.40 13.88 20.82 17.35 10.41 6.94
Farm pond with
poly linning 5 5 Years 35.03 7.01 10.51 8.76 5.25 3.50
DRAINAGE
LINE
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00
Brush wood
check dam in
upper reaches 21 5 Years 22.68 4.54 6.80 5.67 3.40 2.27
Loose bolder
check dam with
vegetative
support in
middle reaches 20 5 Years 35.52 7.10 10.66 8.88 5.33 3.55
Gabion check
da,m in lower
reaches 15 5 Years 41.64 8.33 12.49 10.41 6.25 4.16
SOIL AND
MOISTURE
CONSERVAT
ION 0.00 0.00 0.00 0.00 0.00 0.00
Composite
nursery raising 14 5 Years 56.00 11.20 16.80 14.00 8.40 5.60
Afforestation 15 5 Years 85.28 17.06 25.58 21.32 12.79 8.53
Pasture
development 5 5 Years 12.50 2.50 3.75 3.13 1.88 1.25
Horticulture
development 16 5 Years 83.20 16.64 24.96 20.80 12.48 8.32
Agroforestry 14 5 Years 116.41 23.28 34.92 29.10 17.46 11.64
Mulching 5 5 Years 9.00 1.80 2.70 2.25 1.35 0.90

162 | P a g e
SOIL
HEALTH
MANAGEME
NT 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 5 5 Years 31.13 6.23 9.34 7.78 4.67 3.11
(pucca bin) 0.00 0.00 0.00 0.00 0.00 0.00
Vermicomposti
ng 9 5 Years 40.50 8.10 12.15 10.13 6.08 4.05
(low cost) 0.00 0.00 0.00 0.00 0.00 0.00
In-situ green
manuring 6 5 Years 12.60 2.52 3.78 3.15 1.89 1.26

RIDGE AREA
TREATMENT 0.00 0.00 0.00 0.00 0.00 0.00

Countour/Stagg
ered trenching 6 5 Years 11.17 2.23 3.35 2.79 1.68 1.12
SUB-TOTAL 744.89 148.98 223.47 186.22 111.73 74.49
23.2
IWMP 45 330.00 5 Years 450.00 90.00 135.00 112.50 67.50 45.00
IWMP 49 110.00 5 Years 150.00 30.00 45.00 37.50 22.50 15.00
IWMP XVIII 385.00 5 Years 380.45 76.09 114.13 95.11 57.07 38.04
IWMP XXV 330.00 5 Years 383.12 76.62 114.94 95.78 57.47 38.31
IWMP V 346.39 5 Years 349.44 69.89 104.83 87.36 52.42 34.94
IWMP XII 392.15 5 Years 387.26 77.45 116.18 96.82 58.09 38.73
Dapori DolR-MoRD/ PMKSY
a IWMP XXI 440.00 5 Years 594.75 118.95 178.43 148.69 89.21 59.48
jo DRDA Watershed
IWMP XXXI 263.56 5 Years 359.41 71.88 107.82 89.85 53.91 35.94
IWMP XIX 171.16 5 Years 233.34 46.67 70.00 58.34 35.00 23.33
IWMP XVII 225.39 5 Years 307.26 61.45 92.18 76.82 46.09 30.73
IWMP VI 152.57 5 Years 207.94 41.59 62.38 51.99 31.19 20.79
IWMP II 91.63 5 Years 124.85 24.97 37.46 31.21 18.73 12.49
IWMP 40 220.00 5 Years 600.00 120.00 180.00 150.00 90.00 60.00

163 | P a g e
Sub total 3457.85 4527.82 905.56 1358.35 1131.96 679.17 452.78
IWMP 48 3500.00 5 Years 525.00 105.00 157.50 131.25 78.75 52.50
IWMP IX /10-
Dump 11 4496.6 5 Years 866.550 173.31 259.97 216.64 129.98 86.66
b
orijo IWMP X/11-12 994 5 Years 531.765 106.35 159.53 132.94 79.76 53.18
IWMP XI/11-
12 1497.29 5 Years 1089.099 217.82 326.73 272.27 163.36 108.91
Sub total 10487.89 3012.41 602.48 903.72 753.10 451.86 301.24
IWMP-IV 1735 5 Years 427.707 85.54 128.31 106.93 64.16 42.77
c IWMP-XXIII 480 5 Years 447.3 89.46 134.19 111.83 67.10 44.73
Giba
IWMP-XIII 2550 5 Years 417.79 83.56 125.34 104.45 62.67 41.78
Sub total 4765.00 1292.80 258.56 387.84 323.20 193.92 129.28
Cheta
d IWMP 47 2000.00 300.00
m 5 Years 60.00 90.00 75.00 45.00 30.00
Sub total 2000.00 300.00 60.00 90.00 75.00 45.00 30.00
IWMP-VIII 1100 5 Years 49.5 9.90 14.85 12.38 7.43 4.95
IWMP-VIII 1073 5 Years 48 9.60 14.40 12.00 7.20 4.80
IWMP-XIV 2000 5 Years 204 40.80 61.20 51.00 30.60 20.40
IWMP-XXVII 1100 5 Years 49.5 9.90 14.85 12.38 7.43 4.95
IWMP XXVII 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXVII 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
e Siyum
IWMP-XXVII 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXXVI 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXXVI 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXXVI 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXXVI 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
IWMP-XXXVI 1000 5 Years 120 24.00 36.00 30.00 18.00 12.00
Sub total 13273.00 1311.00 262.20 393.30 327.75 196.65 131.10
IWMP 46 500.00 5 Years 75.00 15.00 22.50 18.75 11.25 7.50
f Taliha
IWMP-XXVIII 5600 5 Years 840 168.00 252.00 210.00 126.00 84.00

164 | P a g e
IWMP-XXXIII 1600 5 Years 288.525 57.71 86.56 72.13 43.28 28.85
IWMP-XXXIV 2400 5 Years 432.785 86.56 129.84 108.20 64.92 43.28
IWMP-XX 3680 5 Years 449.19 89.84 134.76 112.30 67.38 44.92
IWMP-XIII 1600 5 Years 223.4385 44.69 67.03 55.86 33.52 22.34
IWMP-VII 800 5 Years 213.92 42.78 64.18 53.48 32.09 21.39
IWMP-XXXIX 2500 5 Years 825 165.00 247.50 206.25 123.75 82.50
IWMP-XXIX 800 5 Years 192 38.40 57.60 48.00 28.80 19.20
IWMP-XV 2720 5 Years 325.92 65.18 97.78 81.48 48.89 32.59
IWMP-XVI 4800 5 Years 653.94 130.79 196.18 163.49 98.09 65.39
Sub total 27000.00 4519.72 903.94 1355.92 1129.93 677.96 451.97
IWMP-XXVIII 801 5 Years 840.00 168.00 252.00 210.00 126.00 84.00
IWMP-XXXIII 220 5 Years 288.53 57.71 86.56 72.13 43.28 28.85
IWMP-XXXIV 330 5 Years 432.79 86.56 129.84 108.20 64.92 43.28
Payen
g IWMP-XX 506 5 Years 449.19 89.84 134.76 112.30 67.38 44.92
g
IWMP-XIII 220 5 Years 223.44 44.69 67.03 55.86 33.52 22.34
IWMP-VII 219 5 Years 213.92 42.78 64.18 53.48 32.09 21.39
IWMP-XXXIX 605 5 Years 825.00 165.00 247.50 206.25 123.75 82.50
Sub total 2901.01 3272.86 654.57 981.86 818.21 490.93 327.29
Baririj
23.3 Nil 14.45
o 5 Years 2.89 4.34 3.61 2.17 1.45
Dapori Moisture
Nil 49.64
jo conservation & 5 Years 9.93 14.89 12.41 7.45 4.96
Dump cropping
MOA & Nil 43.04
orijo alignment, 5 Years 8.61 12.91 10.76 6.46 4.30
FWDAC&FW/ PMKSY
Giba Efficient use of 22000.00 Nil 48.66
Agriculture ATMA 5 Years 9.73 14.60 12.17 7.30 4.87
water and Water
Cheta Department
requirement Nil 3.40
m 5 Years 0.68 1.02 0.85 0.51 0.34
based on
Limek cropping plan Nil 13.48
ing 5 Years 2.70 4.04 3.37 2.02 1.35
Nacho Nil 5 Years 14.16 2.83 4.25 3.54 2.12 1.42

165 | P a g e
Puchi
Nil 10.44
Geko 5 Years 2.09 3.13 2.61 1.57 1.04
Siyum Nil 5 Years 7.47 1.49 2.24 1.87 1.12 0.75
Taliha Nil 5 Years 7.47 1.49 2.24 1.87 1.12 0.75
Paying Nil 5 Years 7.47 1.49 2.24 1.87 1.12 0.75
Sub Total 22000.00 219.67 43.93 65.90 54.92 32.95 21.97
Dapori
20.00 100.00 111.60
jo 5 Years 22.32 33.48 27.90 16.74 11.16
Dump
22.00 100.00 100.00
orijo Har Khet Surface Minor 5 Years 20.00 30.00 25.00 15.00 10.00
23.4 MoWR/WRD 38 253 317.32
Nacho Ko Pani Irrigation 5 Years 63.46 95.20 79.33 47.60 31.73
Puchi 32 98.5 103.5
Geko 5 Years 20.70 31.05 25.88 15.53 10.35
Taliha 42.00 120.00 5 Years 118.5 23.70 35.55 29.63 17.78 11.85
Sub Sub Total 154.00 671.50 750.92 150.18 225.28 187.73 112.64 75.09
Externally aided Name of
24
project the scheme 0.00 0.00 0.00 0.00 0.00
Other loan projects Name of
25
like NABARD the scheme 0.00 0.00 0.00 0.00 0.00

Annexure

1. Water Resource Department

CAD for Rain water Harvesting

166 | P a g e
Sl.No Name of Concerned Componen Activity (CAD for Rain water Total Comman Catchmen Period of Estimate Remarks
. the Ministry / t harvesting from) Numbe d area / t area implementatio d cost in
District/ Departmen r Irrigation (Sq.Km.) n (year) Lakhs
Block t (ha)

1 Daporijo MOA&FW Har Khet Tablerijo ,Kardarijo & Sippi 1 30 7 3 30.00


Block ko Pani rijo at Sippi village.
(Rain
water
Harvesting

2 Daporijo MOA&FW Har Khet Rahkrijo at Migdong village 1 10 1 10.00 Circle


Block ko Pani level.
(Rain
water
Harvesting
3 Daporijo MOA&FW Har Khet Tadik sukrijo at Dakpe 1 5 1 5.00 Circle
Block ko Pani village level.
(Rain
water
Harvesting
4 Daporijo MOA&FW Har Khet 5 5.00 Circle
Block ko Pani level.
(Rain
water 1
Harvesting
Gichrijo at Dek Dakpe 1

167 | P a g e
5 Daporijo MOA&FW Har Khet 5 5.00 Circle
Block ko Pani level.
(Rain
water 1
Harvesting
Sikarijo at Sika Babla vill 1
6 Daporijo MOA&FW Har Khet 5 5.00 Circle
Block ko Pani level.
(Rain
water 1
Harvesting
Kachrijo at Lilidong village 1
7 Daporijo MOA&FW Har Khet 5 5.00 Circle
Block ko Pani level.
(Rain
water 1
Harvesting
Madrijo at Mona Baja 1
8 Daporijo MOA&FW Har Khet 5 5.00 Circle
Block ko Pani level.
(Rain
water 1
Harvesting
Sui rijo at Kamle Baja vill. 1
9 MOA&FW Har Khet 10 10.00 Circle
ko Pani level.
(Rain
water 1
Harvesting
Limeking Nava village 1

168 | P a g e
10 MOA&FW Har Khet 10.5 10.50 Circle
ko Pani level.
(Rain
water 1
Harvesting
Taliha Telijaring 1

CAD for LIFT IRRIGATION


Sl.No. Name of Concerned Component Activity (CAD Total Command Catchment Period of Estimated Remarks
the Ministry / for Lift Number area / area implementation cost in
District/ Department irigation from) Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

1 Gepen MOA&FW Har Khet ko Tump rijo at 1 10 1 10 Circle


circle Pani ( Lift Lily Dong level.
/Daporijo Irrigation) village from
Block Subansiri river

2 Gepen MOA&FW Har Khet ko 1 5 1 5


circle Pani ( Lift Tagli rijo at Lily
/Daporijo Irrigation) Dong vill from
Block Subansiri river
3 Gepen MOA&FW Har Khet ko Lirum rijo at 1 5 1 5
circle Pani ( Lift Mona village
/Daporijo Irrigation) from Subansiri
Block river

169 | P a g e
4 Gepen MOA&FW Har Khet ko Gitu rijo at 1 10 1 10
circle Pani ( Lift Gitu rijo village
/Daporijo Irrigation) from Subansiri
Block river
5 Gepen MOA&FW Har Khet ko Tayakrijo at 1 5 1 5
circle Pani ( Lift Gigi village
/Daporijo Irrigation) from Subansiri
Block river
6 Dumporijo MOA&FW Har Khet ko Rukrijo at 1 42 3 42
Pani ( Lift Mechi Marde
Irrigation) village from
Subansiri river

CAD NEW SCHEMES


Sl.No Name of Concerned Component Activity (CAD for C/O MIP from) Total Comman Catchmen Period of Estimate Remark
. the District/ Ministry / Numbe d area / t area implementatio d cost in s
Block Departmen r Irrigation (Sq.Km.) n (year) Lakhs
t (ha)

1 U/ MOA&FW Har Khet Ging Seko To Gelejing At Bodok 1 7.00 6 1 7.00 ZPM
Subansari ko Pani
Limeking

2 U/ MOA&FW Har Khet Kacha nallah to kacha Horti. Field at Kacha Vill 1 5.00 4 1 5.00 MLA
Subansari ko Pani
Limeking

170 | P a g e
3 U/ MOA&FW Har Khet Bidak stream to redding A/F at Redding camp Vill 1 15.00 9 1 15.00 ZPM
Subansari ko Pani
Limeking
4 U/ MOA&FW Har Khet Esmi nallah to gumsing Tayeng H/Field at G/Taying 1 5.00 5 1 5.00 MLA
Subansari ko Pani
Limeking
5 U/ MOA&FW Har Khet Kahong river to sapnarang at Nava Vill 1 9.00 8 1 9.00
Subansari ko Pani
Limeking
6 U/ MOA&FW Har Khet Esnia Nallah to Isnia Horti Field at Taksing Vill 1 3.00 3 1 3.00 MLA
Subansari ko Pani
Limeking
7 U/ MOA&FW Har Khet Redding stream to redding jobe at Redding camp 1 6.00 6 1 6.00 MLA
Subansari ko Pani
Limeking
8 U/ MOA&FW Har Khet Redding Nallah to redding Horti.Field at Redding Vill 1 6.00 6 1 6.00 ZPM
Subansari ko Pani
Limeking
9 U/ MOA&FW Har Khet Nyare stream to Nyare A/Field at Nyare Vill 1 12.00 9 1 12.00
Subansari ko Pani
Limeking
10 U/ MOA&FW Har Khet Tree nallah to chi-haring at Nava Vill 1 5.00 3 1 5.00
Subansari ko Pani
Limeking
11 U/ MOA&FW Har Khet Yaza nallah to Yaza horti./field at kacha Vill 1 6.00 6 1 6.00 MLA
Subansari ko Pani
Limeking
12 U/ MOA&FW Har Khet Lingbing nallah to Lingbing H/Field at Lingbing Vill 1 6.00 6 1 6.00 MLA
Subansari ko Pani
Limeking
13 U/ MOA&FW Har Khet Harak nallah to gebak at Ngoju Vill 1 5.00 6 1 5.00
Subansari ko Pani
Limeking

171 | P a g e
14 U/ MOA&FW Har Khet Esmi nallah to Doloring Jobe at Doloring Vill 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
15 U/ MOA&FW Har Khet Esmi stream to gelemo at Gelemo Vill 1 15.00 6 1 15.00 ZPM
Subansari ko Pani
Limeking
16 U/ MOA&FW Har Khet Radingngo Nallah to Reding H/Field at Reddy Vill. 1 8.00 6 1 8.00 MLA
Subansari ko Pani
Limeking
17 U/ MOA&FW Har Khet Esim seko to doloring at Doloring 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
18 U/ MOA&FW Har Khet Water Harvesting structures for Nava-Haring at Nava 1 12.00 8 1 12.00
Subansari ko Pani vill
Limeking
19 U/ MOA&FW Har Khet Bojuk nallah to bojuk haring at Nava vill 1 5.00 6 1 5.00
Subansari ko Pani
Limeking
20 U/ MOA&FW Har Khet Ging seko to joki at Bodok 1 5.00 4 1 5.00 ZPM
Subansari ko Pani
Limeking
21 U/ MOA&FW Har Khet Badok seko to badok at Bodok 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
22 U/ MOA&FW Har Khet Sousu Jachar-ne to Sapna jobe at Nilo Vill 1 3.00 3 1 3.00 ASM
Subansari ko Pani
Limeking
23 U/ MOA&FW Har Khet Gajne nallah to lingrine at Bogum 1 5.00 4 1 5.00
Subansari ko Pani
Limeking
24 U/ MOA&FW Har Khet Dania nallah to bogum at Bogum 1 7.00 6 1 7.00
Subansari ko Pani
Limeking

172 | P a g e
25 U/ MOA&FW Har Khet Gejne nallah to lingrime at Bogong 1 4.00 5 1 4.00
Subansari ko Pani
Limeking
26 U/ MOA&FW Har Khet MIP at Orak Under Orak anchal segment. 1 4.00 3 1 4.00
Subansari ko Pani
Limeking
27 U/ MOA&FW Har Khet Yackte river to Darjing 1 2.00 2 1 2.00 MLA
Subansari ko Pani
Limeking
28 U/ MOA&FW Har Khet Ojugo Nallah to Ojugo Horti./Field at Ojugo Vill 1 3.00 2 1 3.00 MLA
Subansari ko Pani
Limeking
29 U/ MOA&FW Har Khet Tave chung stream to leso jerbay at Tama chung vill 1 8.00 4 1 8.00 ZPM
Subansari ko Pani
Limeking
30 U/ MOA&FW Har Khet Ging seko to ging at Ging Vill 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
31 U/ MOA&FW Har Khet Ging nallah to julaying at Ging Vill 1 4.00 3 1 4.00 ZPM
Subansari ko Pani
Limeking
32 U/ MOA&FW Har Khet Tave chung stream to tave chung at Tama chung 1 10.00 3 1 10.00
Subansari ko Pani
Limeking
33 U/ MOA&FW Har Khet Esmi stream to jebok jobe at Gelemo 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
34 U/ MOA&FW Har Khet Esmi nallah to Gelomo jobe at Gelomo 1 5.00 3 1 5.00
Subansari ko Pani
Limeking
35 U/ MOA&FW Har Khet Gelemo to Modergo Nallah at Gelemo 1 5.00 2 1 5.00
Subansari ko Pani
Limeking

173 | P a g e
36 U/ MOA&FW Har Khet Esmi stream to hokrio at Gelemo 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
37 U/ MOA&FW Har Khet Badok seko to kelu at Bodok 1 8.00 6 1 8.00 ZPM
Subansari ko Pani
Limeking
38 U/ MOA&FW Har Khet Jitak Nallah to Jitak moring Taying 1 4.00 5 1 4.00
Subansari ko Pani
Limeking
39 U/ MOA&FW Har Khet Kacha nallah to kacha jobe at Kacha 1 5.00 5 1 5.00
Subansari ko Pani
Limeking
40 U/ MOA&FW Har Khet Mekedu stream to mekedu at Limeking 1 8.00 5 1 8.00 ZPM
Subansari ko Pani
Limeking
41 U/ MOA&FW Har Khet Kofer nallah to sarava at Limeking 1 10.00 6 1 10.00 ZPM
Subansari ko Pani
Limeking
42 U/ MOA&FW Har Khet Lingbing vill. 1 2.00 2 1 2.00
Subansari ko Pani
Limeking
43 U/ MOA&FW Har Khet Muri sream to guching at Muri 1 8.00 3 1 8.00 ZPM
Subansari ko Pani
Limeking
44 U/ MOA&FW Har Khet Gedak seko to muri at Muri 1 6.00 4 1 6.00 ZPM
Subansari ko Pani
Limeking
45 U/ MOA&FW Har Khet Gedak nallah to chandi at Muri Vill 1 5.00 3 1 5.00 ZPM
Subansari ko Pani
Limeking
46 U/ MOA&FW Har Khet Mepu stream to mepu at Mepu Vill 1 9.00 6 1 9.00 ZPM
Subansari ko Pani
Limeking

174 | P a g e
47 U/ MOA&FW Har Khet Kemsi nallah to orak at orak Vill 1 8.00 6 1 8.00 ZPM
Subansari ko Pani
Limeking
48 U/ MOA&FW Har Khet Teru nallah to nava at Nava Vill 1 5.00 2 1 5.00 MLA
Subansari ko Pani
Limeking
49 U/ MOA&FW Har Khet Tree nallah to nava haring at Nava Vill 1 10.00 6 1 10.00
Subansari ko Pani
Limeking
50 U/ MOA&FW Har Khet Oro nallah to mukang jobe at sere Vill 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
51 U/ MOA&FW Har Khet Raw seko to hejing at Raw 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
52 U/ MOA&FW Har Khet Peyi jobe to kapi nallah at Nilo 1 5.00 2 1 5.00 ASM
Subansari ko Pani
Limeking
53 U/ MOA&FW Har Khet Libi nallah to nilo agri-field at Nilo 1 3.00 3 1 3.00 MLA
Subansari ko Pani
Limeking
54 U/ MOA&FW Har Khet zingkongi to zing nallah at Ngoju 1 3.00 3 1 3.00
Subansari ko Pani
Limeking
55 U/ MOA&FW Har Khet Kofer nallah to yapong yaching 1 12.00 6 1 12.00 ZPM
Subansari ko Pani
Limeking
56 U/ MOA&FW Har Khet Doniongpu jobe to sousu kaumg nallah at Nilo vill 1 5.00 3 1 5.00 ASM
Subansari ko Pani
Limeking
57 U/ MOA&FW Har Khet Pakme seku to pakme seku jobe at Redding camp 1 6.00 3 1 6.00 ZPM
Subansari ko Pani
Limeking

175 | P a g e
58 U/ MOA&FW Har Khet Haa nallah to mebri at Ngoju 1 10.00 6 1 10.00
Subansari ko Pani
Limeking
59 U/ MOA&FW Har Khet Bidak stream to bidak rango at Redding camp 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
60 U/ MOA&FW Har Khet Lingbing nallah to singling jobe at Lingbing 1 4.00 3 1 4.00
Subansari ko Pani
Limeking
61 U/ MOA&FW Har Khet Kete sream to kete jobe at orak 1 7.00 6 1 7.00 ZPM
Subansari ko Pani
Limeking
62 U/ MOA&FW Har Khet Kemsi nallah to kemshi jobe at orak 1 5.00 3 1 5.00 ZPM
Subansari ko Pani
Limeking
63 U/ MOA&FW Har Khet Keme nallah to oda jobe at Orak 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
64 U/ MOA&FW Har Khet Tachono Nallah to Bate Hort. Area at Nilo 1 8.00 3 1 8.00
Subansari ko Pani
Limeking
65 U/ MOA&FW Har Khet Bate agri field to nilo at Nilo 1 2.00 3 1 2.00
Subansari ko Pani
Limeking
66 U/ MOA&FW Har Khet Raw seko to raw at Raw 1 3.00 3 1 3.00 ZPM
Subansari ko Pani
Limeking
67 U/ MOA&FW Har Khet Raw seko to kochi at Raw 1 3.00 4 1 3.00 ZPM
Subansari ko Pani
Limeking

CAD NEW SCHEMES

176 | P a g e
Sl.No Name of the Concerned Componen Activity (CAD for C/O MIP from) Total Comman Catchmen Period of Estimate Remarks
. District/ Block Ministry / t Numbe d area / t area implementatio d cost in
Departmen r Irrigation (Sq.Km.) n (year) Lakhs
t (ha)

1 upper MOA&FW Har Khet CC Linning of Keo Nallah MIP to keojaring at 1 7.00 6 1 7.00
subansari/Nach ko Pani Meyaba Vill
o Block

2 upper MOA&FW Har Khet Gunong nallah to Ebya at Ebya vill 1 6.00 4 1 6.00 MLA
subansari/Nach ko Pani
o Block

3 upper MOA&FW Har Khet CC Linning of Keo nallah MIP at keojaring vill 1 6.00 4 1 6.00
subansari/Nach ko Pani
o Block
4 upper MOA&FW Har Khet Sejo nallah to ririjobe at Charu-1 1 10.00 6 1 10.00 MLA/GC
subansari/Nach ko Pani
o Block
5 upper MOA&FW Har Khet Reno.of MIP Bate nallah under at keojaring 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block
6 upper MOA&FW Har Khet Nacho to WRD Complex under Nacho Hqtr. 1 3 3 1 3.00
subansari/Nach ko Pani
o Block
7 upper MOA&FW Har Khet CC Linning of Gonung Nallah MIP at Ebya Vill 1 7.00 4 1 7.00
subansari/Nach ko Pani
o Block
8 upper MOA&FW Har Khet CC linning Paktungmoring MIP at Meyaba Vill 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block
9 upper MOA&FW Har Khet Rite Nallah to gongrak jobe at Gingba Vill 1 2.00 2 1 2.00 MLA
subansari/Nach ko Pani
o Block

177 | P a g e
10 upper MOA&FW Har Khet Sato nallah at Dingsar 1 3.00 3 1 3.00 ZPM
subansari/Nach ko Pani
o Block
11 upper MOA&FW Har Khet Rungdo Nallah to Koduk at Keojaring 1 3 6 1 3.00
subansari/Nach ko Pani
o Block
12 upper MOA&FW Har Khet Kio nallah to anong agri field at Aying Muri vill 1 2.00 2 1 2.00 MLA/GP
subansari/Nach ko Pani M
o Block
13 upper MOA&FW Har Khet Keo stream to keojaring at keojaring vill 1 4.00 2 1 4.00 MLA
subansari/Nach ko Pani
o Block
14 upper MOA&FW Har Khet Talo Nalah to sikin joring at yeba Vill 1 4.00 2 1 4.00 MLA
subansari/Nach ko Pani
o Block
15 upper MOA&FW Har Khet Khud Nallah to tage seriu at Chetam Vill 1 3.00 2 1 3.00 MLA
subansari/Nach ko Pani
o Block
16 upper MOA&FW Har Khet Sejo nallah to byatok at Charu-1 Vill 1 5.00 2 1 5.00 MLA/GC
subansari/Nach ko Pani
o Block
17 upper MOA&FW Har Khet Ramde nallah under Neing village 1 2.00 5 1 2.00 ZPM
subansari/Nach ko Pani
o Block
18 upper MOA&FW Har Khet Pario nallah MIP Under Doginalo vill 1 5.00 2 1 5.00 ZPM
subansari/Nach ko Pani
o Block
19 upper MOA&FW Har Khet Epo sikio to kiamsok rongo at Cheke Vill 1 1.00 1 1 1.00 ASM
subansari/Nach ko Pani
o Block

20 upper MOA&FW Har Khet Taro nallah to Ringmi at Cheke Vill 1 3.00 2 1 3.00 MLA
subansari/Nach ko Pani
o Block
21 upper MOA&FW Har Khet Aying Anong nallah to aying agri field Aying Muri 1 4.00 3 1 4.00 GPM
subansari/Nach ko Pani vill
o Block

178 | P a g e
22 upper MOA&FW Har Khet Ramde Nallah under Neing vill 1 4.00 3 1 4.00 ZPM
subansari/Nach ko Pani
o Block
23 upper MOA&FW Har Khet Kepe Nallah to Ayingjori at Jibaying Vill 1 10.00 8 1 10.00 Ex-ZPM
subansari/Nach ko Pani /ASM
o Block
24 upper MOA&FW Har Khet Singkinne Nallah to Ringmi Rimgte at Kojin vill 1 3.00 3 1 3.00
subansari/Nach ko Pani
o Block

25 upper MOA&FW Har Khet Joying nallah to joying ringo at Doilingdi 1 10.00 9 1 10.00 ASM
subansari/Nach ko Pani
o Block

26 upper MOA&FW Har Khet Takini Nallah to Chalinringo at Chalin Vill 1 3.00 1 1 3.00 MLA
subansari/Nach ko Pani
o Block

27 upper MOA&FW Har Khet Aying Nallah to heting sikiring at Aying Moring 1 3.00 5 1 3.00
subansari/Nach ko Pani
o Block

28 upper MOA&FW Har Khet Nguduk Nallah to Tading-Ringo at Kargam 1 2.00 2 1 2.00 MLA/AS
subansari/Nach ko Pani M
o Block
29 upper MOA&FW Har Khet Aying Anong nallah to Aying Anong A/F at Aying 1 3.00 8 1 3.00
subansari/Nach ko Pani muri
o Block

30 upper MOA&FW Har Khet Segiumtam to Ragiajobe at Kyamdo Vill 1 2.00 6 1 2.00
subansari/Nach ko Pani
o Block

179 | P a g e
31 upper MOA&FW Har Khet Medu nallah to merliring-jobe at Medamba Rai 1 8.00 8 1 8.00 MLA/AS
subansari/Nach ko Pani M
o Block

32 upper MOA&FW Har Khet Kow nallah to ringu agri field at Aying Muri 1 3.00 6 1 3.00 GPM
subansari/Nach ko Pani
o Block

33 upper MOA&FW Har Khet khud Nallah to Ringte at Daying vill 1 9.00 7 1 9.00 MLA/GC
subansari/Nach ko Pani
o Block

34 upper MOA&FW Har Khet Tikre Nallah to Tikrerijo at Aying Muri Vill 1 2.00 6 1 2.00 GB
subansari/Nach ko Pani
o Block

35 upper MOA&FW Har Khet Koduk river to keojaring 1 4.00 2 1 4.00 MLA
subansari/Nach ko Pani
o Block

36 upper MOA&FW Har Khet Gereh nallah to kupak jobe at loke vill 1 4.00 1 1 4.00 MLA
subansari/Nach ko Pani
o Block

37 upper MOA&FW Har Khet Khud Nallah to ringmi at Daying vill 1 8.00 4 1 8.00 MLA/GC
subansari/Nach ko Pani
o Block

38 upper MOA&FW Har Khet Pumpa nallah to ringu agri field at Aying Muri 1 3.00 3 1 3.00 GPM
subansari/Nach ko Pani
o Block

180 | P a g e
39 upper MOA&FW Har Khet Yolu nallah to loke at loke 1 5.00 2 1 5.00 MLA
subansari/Nach ko Pani
o Block

40 upper MOA&FW Har Khet Niami Nallah Kodongharing and Jokpeparingo at 1 6.00 5 1 6.00 MLA
subansari/Nach ko Pani Mosing vill.
o Block

41 upper MOA&FW Har Khet Gonung Nallah to Ringmi at Ebya vill 1 4.00 2 1 4.00 MLA
subansari/Nach ko Pani
o Block

42 upper MOA&FW Har Khet Sato nallah to sato-2 at Aying muri 1 2.00 5 1 2.00 GPM
subansari/Nach ko Pani
o Block

43 upper MOA&FW Har Khet Gonung Nallah under WRC land at Ebya vill 1 3.00 2 1 3.00 MLA
subansari/Nach ko Pani
o Block

44 upper MOA&FW Har Khet Mabin nallah to Taging-ne at Chingring vill. 1 2.00 3 1 2.00 ZPM
subansari/Nach ko Pani
o Block

45 upper MOA&FW Har Khet Sopin Nallah to Sopinrengo at Nacho 1 3.00 6 1 3.00 Ex-ZPM
subansari/Nach ko Pani
o Block

46 upper MOA&FW Har Khet Jiba nallah to jiba ringo at jebaying 1 12.00 6 1 12.00 ASM
subansari/Nach ko Pani
o Block

181 | P a g e
47 upper MOA&FW Har Khet Dogi Konsin Nallah To Dogi Konsinb at Dogi 1 2 3 1 2.00
subansari/Nach ko Pani nalo
o Block

48 upper MOA&FW Har Khet Gio nallah to Aying moring at Aying moring 1 2.00 2 1 2.00 MLA
subansari/Nach ko Pani
o Block

49 upper MOA&FW Har Khet Charung sikio to Bepia jobe at Kyamdo 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

50 upper MOA&FW Har Khet Lingruk nallah to singruk ne at nacho Hq 1 8.00 5 1 8.00 ASM
subansari/Nach ko Pani
o Block

51 upper MOA&FW Har Khet Pate nallah to kupen ringho at nacho Hq 1 8.00 5 1 8.00
subansari/Nach ko Pani
o Block

52 upper MOA&FW Har Khet Lingbar nallah to pakha ringo at Aki 1 5.00 5 1 5.00
subansari/Nach ko Pani
o Block

53 upper MOA&FW Har Khet Selungso nallah to byania at Byania 1 5.00 3 1 5.00 ASM
subansari/Nach ko Pani
o Block

54 upper MOA&FW Har Khet Nyomi nallah to bos rai i jobe at Bosi Rai 1 3.00 2 1 3.00 GC
subansari/Nach ko Pani
o Block

182 | P a g e
55 upper MOA&FW Har Khet Kobit Nallah to Dumpujobe at Dingsar vill 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

56 upper MOA&FW Har Khet Kubu nallah to kubo ringjo at Bosi Rai 1 3.00 3 1 3.00 GC
subansari/Nach ko Pani
o Block

57 upper MOA&FW Har Khet Tagopu Nallah To Singime Moba At Doilingdi 1 7.00 5 1 7.00
subansari/Nach ko Pani
o Block

58 upper MOA&FW Har Khet Reno.of MIP Bite nallah to Taktring under Rava vill 1 2.00 1 1 2.00 ZPM
subansari/Nach ko Pani
o Block

59 upper MOA&FW Har Khet CC lining pugpu nallah to pugpu yorbe at Chaklik 1 10.00 9 1 10.00
subansari/Nach ko Pani
o Block

60 upper MOA&FW Har Khet Ringu nallah to ringu agri field at Aying Muri 1 3.00 5 1 3.00 ASM
subansari/Nach ko Pani
o Block

61 upper MOA&FW Har Khet Sejo nallah to pashane at Charu-1 1 5.00 1 1 5.00 GC
subansari/Nach ko Pani
o Block

62 upper MOA&FW Har Khet Nilallso Nallah to amchok rizyo at Diri 1 7.00 4 1 7.00 ASM
subansari/Nach ko Pani
o Block

183 | P a g e
63 upper MOA&FW Har Khet Kujin river to Jojo WRC agril field at Diri vill 1 2.00 3 1 2.00 MLA
subansari/Nach ko Pani
o Block

64 upper MOA&FW Har Khet Dori nallah to sete lengpe at Charu-1 1 10.00 9 1 10.00 GC
subansari/Nach ko Pani
o Block

65 upper MOA&FW Har Khet Hopen nallah to sihaba at Charu-1 1 5.00 1 1 5.00 GC
subansari/Nach ko Pani
o Block

66 upper MOA&FW Har Khet Jitak Nallah to Jitakmoring at Kidulingdi 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block

67 upper MOA&FW Har Khet Hopen nallah to Napak moha at Charu-1 1 5.00 3 1 5.00 GC
subansari/Nach ko Pani
o Block

68 upper MOA&FW Har Khet Ngulo nallah to Gloring at Charu 1 5.00 2 1 5.00 MLA
subansari/Nach ko Pani
o Block

69 upper MOA&FW Har Khet Niami stream to kodom haring at Chingring 1 6.00 5 1 6.00 ASM
subansari/Nach ko Pani
o Block

70 upper MOA&FW Har Khet Sirung nallah to mokam ringo at Cheke 1 2.00 1 1 2.00 ASM
subansari/Nach ko Pani
o Block

184 | P a g e
71 upper MOA&FW Har Khet Ringte ringo to Singku sikio at Cheke 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

72 upper MOA&FW Har Khet Korkiso to Baba yorbe at Charu-2 1 8.00 8 1 8.00 GC
subansari/Nach ko Pani
o Block

73 upper MOA&FW Har Khet Hepo Nallah to Pakring village Cheke vill 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

74 upper MOA&FW Har Khet Kobit Nallah MIP at Dape under Dingsar vill 1 3.00 3 1 3.00 ZPM
subansari/Nach ko Pani
o Block

75 upper MOA&FW Har Khet Hepong Sekio to Rebirengo at Cheke vill 1 2.00 4 1 2.00
subansari/Nach ko Pani
o Block

76 upper MOA&FW Har Khet Korkiso to Lokba jobe at Charu-2 1 4.00 4 1 4.00 GC
subansari/Nach ko Pani
o Block

77 upper MOA&FW Har Khet Chokar nallah to chokar ringo at Chokar 1 8.00 3 1 8.00 ASM
subansari/Nach ko Pani
o Block

78 upper MOA&FW Har Khet Nyomi nallah to nyomi jobe at Bosi Rai 1 3.00 1 1 3.00 GC
subansari/Nach ko Pani
o Block

185 | P a g e
79 upper MOA&FW Har Khet Kubu nallah to singloring jobe at Bosi Rai 1 4.00 2 1 4.00 GC
subansari/Nach ko Pani
o Block

80 upper MOA&FW Har Khet Pungda nallah to Rakin jobe at Cheke 1 5 3 1 5.00
subansari/Nach ko Pani
o Block

81 upper MOA&FW Har Khet Kubu nallah to jojo jobe at Bosi Rai 1 5.00 2 1 5.00 GC
subansari/Nach ko Pani
o Block

82 upper MOA&FW Har Khet Sogak nallah at Chingring 1 2.00 1 1 2.00


subansari/Nach ko Pani
o Block

83 upper MOA&FW Har Khet Khot nallah to sars rengo at Chetam 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

84 upper MOA&FW Har Khet Talik song nallah to lingpine at Chetam 1 3.00 1 1 3.00
subansari/Nach ko Pani
o Block

85 upper MOA&FW Har Khet Giji nallah to dedar at Chokar 1 10.00 6 1 10.00
subansari/Nach ko Pani
o Block

86 upper MOA&FW Har Khet Singyer yurange to singyer yurange at ragmi 1 10.00 6 1 10.00
subansari/Nach ko Pani
o Block

186 | P a g e
87 upper MOA&FW Har Khet Joki nallah to chokar ringo at Chokar 1 8.00 6 1 8.00
subansari/Nach ko Pani
o Block

88 upper MOA&FW Har Khet Kud nallah to papi seriu at Chetam 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

89 upper MOA&FW Har Khet Tonyi nallah to toniyer ringo at Doilingdi 1 10.00 6 1 10.00 ASM
subansari/Nach ko Pani
o Block

90 upper MOA&FW Har Khet Kobu nallah to kobu jaring at Cheke 1 1.00 1 1 1.00
subansari/Nach ko Pani
o Block

91 upper MOA&FW Har Khet Dogi Nallah to Dogi koksin at Doginalo vill 1 3.00 3 1 3.00
subansari/Nach ko Pani
o Block

92 upper MOA&FW Har Khet Rakle nallah to rakle yaya at nacho hq. 1 7.00 4 1 7.00 ASM
subansari/Nach ko Pani
o Block

93 upper MOA&FW Har Khet Singku sikio to taniogingdo at Cheke 1 2.00 2 1 2.00 ASM
subansari/Nach ko Pani
o Block

94 upper MOA&FW Har Khet Zingpu nallah to cheke ringo at Cheke 1 12.00 9 1 12.00 ASM
subansari/Nach ko Pani
o Block

187 | P a g e
95 upper MOA&FW Har Khet Poying Jaring at Loke 1 2.00 2 1 2.00 GPM
subansari/Nach ko Pani
o Block

96 upper MOA&FW Har Khet MIP at Aying under Ayingmuri Vill 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

97 upper MOA&FW Har Khet Korkiso to Geloring at Charu-2 1 11.00 6 1 11.00 GC


subansari/Nach ko Pani
o Block

98 upper MOA&FW Har Khet Korkiso to Emen harcha at Charu-2 1 6.00 6 1 6.00 GC
subansari/Nach ko Pani
o Block

99 upper MOA&FW Har Khet Hepo Nallah to Pakring village Cheke vill 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

100 upper MOA&FW Har Khet Tajum nallah to Tajum agri field at Aying Muri 1 2.00 4 1 2.00 GPM
subansari/Nach ko Pani
o Block

101 upper MOA&FW Har Khet Dapo nallah to ringte ringo at Cheke 1 10.00 7 1 10.00 ASM
subansari/Nach ko Pani
o Block

102 upper MOA&FW Har Khet Kow nallah to jorong agr.field at Aying Muri 1 3.00 6 1 3.00 GPM
subansari/Nach ko Pani
o Block

188 | P a g e
103 upper MOA&FW Har Khet Jimi nallah to jimi ringo at Doilingdi 1 10.00 7 1 10.00 ASM
subansari/Nach ko Pani
o Block

104 upper MOA&FW Har Khet Khud nallah to khud jobe at Daying 1 12.00 8 2 12.00 GC
subansari/Nach ko Pani
o Block

105 upper MOA&FW Har Khet Khud nallah to khud ringjo at Daying 1 12.00 8 2 12.00 GC
subansari/Nach ko Pani
o Block

106 upper MOA&FW Har Khet Korkiso to Rakya at Charu-2 1 6.00 6 1 6.00 GC
subansari/Nach ko Pani
o Block

107 upper MOA&FW Har Khet Aying Anong Nallah to Tajum Agri Field Aying Muri 1 6.00 6 1 6.00 GPM
subansari/Nach ko Pani
o Block

108 upper MOA&FW Har Khet Ringmi nallah to daying jobe at Daying 1 10.00 6 1 10.00 GC
subansari/Nach ko Pani
o Block

109 upper MOA&FW Har Khet Ringmi nallah to ringte jobe at Daying 1 10.00 6 1 10.00 GC
subansari/Nach ko Pani
o Block

110 upper MOA&FW Har Khet Kering nallah to mepung rizyo at Diri 1 10.00 7 1 10.00 ASM
subansari/Nach ko Pani
o Block

189 | P a g e
111 upper MOA&FW Har Khet Kite stream to taling haring at mosing village 1 5.00 1 1 5.00 ASM
subansari/Nach ko Pani
o Block

112 upper MOA&FW Har Khet Namde nallah to jojo rizyo at Diri 1 9.00 8 1 9.00 ASM
subansari/Nach ko Pani
o Block

113 upper MOA&FW Har Khet Baming nallah to Bamiringo at Kidulingdi vill 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block

114 upper MOA&FW Har Khet Jojibu Sekio to Pungmi Rengo at Diri village 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block

115 upper MOA&FW Har Khet Jojbu nallah to puzgte rizyo at Diri 1 7.00 8 1 7.00 ASM
subansari/Nach ko Pani
o Block

116 upper MOA&FW Har Khet Paisozy nallah to lorompa rizyo at Diri 1 8.00 8 1 8.00 ASM
subansari/Nach ko Pani
o Block

117 upper MOA&FW Har Khet Hopen nallah to siha at Charu-1 1 5.00 1 1 5.00 GC
subansari/Nach ko Pani
o Block

118 upper MOA&FW Har Khet Khot nallah to ampering at Chetam 1 10.00 8 1 10.00
subansari/Nach ko Pani
o Block

190 | P a g e
119 upper MOA&FW Har Khet Khot nallah to lingpine at Chetam 1 6.00 5 1 6.00
subansari/Nach ko Pani
o Block

120 upper MOA&FW Har Khet Pega lingne to Pega rengo at old Gingba Vill 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

121 upper MOA&FW Har Khet Sangku nallah to tanio gingdo at Cheke 1 2.00 1 1 2.00 ASM
subansari/Nach ko Pani
o Block

122 upper MOA&FW Har Khet Zingpu nallah to tanio ringo at Cheke 1 5.00 9 1 5.00
subansari/Nach ko Pani
o Block

123 upper MOA&FW Har Khet Dapo nallah to ringte ringo at Cheke 1 4.00 9 1 4.00
subansari/Nach ko Pani
o Block

124 upper MOA&FW Har Khet Jitak nallah to jatak moring at Kidulingdi Vill 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

125 upper MOA&FW Har Khet Kud nallah to aupering Rijo at Diri vill 1 7.00 3 1 7.00 ASM
subansari/Nach ko Pani
o Block

126 upper MOA&FW Har Khet Singho Nallah to Taya-Chechungrongo at 1 1.00 1 1 1.00
subansari/Nach ko Pani Ayingmuri vill
o Block

191 | P a g e
127 upper MOA&FW Har Khet Kuth Nallah to Sarsimoring at Chetam vill 1 6.00 3 1 6.00
subansari/Nach ko Pani
o Block

128 upper MOA&FW Har Khet Kojab Nallah to haktak rengo at Kidulingdi vill 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

129 upper MOA&FW Har Khet Rigodak Nallah to Giyak Rongo at Ayingmuri 1 3.00 1 1 3.00
subansari/Nach ko Pani vill
o Block

130 upper MOA&FW Har Khet Ningpo stream to kudukring at keojaring vill 1 3.00 1 1 3.00 ASM
subansari/Nach ko Pani
o Block

131 upper MOA&FW Har Khet Bebo Nallah to Sehurikching agro field at Ringling 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

132 upper MOA&FW Har Khet Bale nallah to bale ringo at Ringling vill 1 6.00 2 1 6.00 ASM
subansari/Nach ko Pani
o Block

133 upper MOA&FW Har Khet Pumpa nallah to pukyaube at Ebya vill 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block

134 upper MOA&FW Har Khet Dogi Konsin Nallah To Dogi Konsin 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block
135 upper MOA&FW Har Khet Ruw nallah to under Dingsi vill 1 1.00 4 1 1.00 GPM
subansari/Nach ko Pani
o Block

192 | P a g e
136 upper MOA&FW Har Khet Gonung nallah to seal jube at Ebya vill 1 5.00 1 1 5.00 ASM
subansari/Nach ko Pani
o Block

137 upper MOA&FW Har Khet Ruw nallah to chaging agri field at Dingsi 1 2.00 2 1 2.00 GPM
subansari/Nach ko Pani
o Block
138 upper MOA&FW Har Khet Goyu nallah to lengpatebyio at Ebya 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block
139 upper MOA&FW Har Khet Taro nallah to Paprijo at Tabe namching 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block
140 upper MOA&FW Har Khet Lepaso Nallah to Pakjoin agro field at Koba village 1 6.00 3 1 6.00
subansari/Nach ko Pani
o Block

141 upper MOA&FW Har Khet Talu seko to lingbing at koba 1 8.00 4 1 8.00
subansari/Nach ko Pani
o Block

142 upper MOA&FW Har Khet Goyu nallah to lengpatebyio at Ebya village 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

143 upper MOA&FW Har Khet Gyeda nallah to gyamu at Jibaying 1 3.00 1 1 3.00 ASM
subansari/Nach ko Pani
o Block

144 upper MOA&FW Har Khet Pumpa nallah to pukjube at Ebya 1 5.00 1 1 5.00
subansari/Nach ko Pani
o Block

193 | P a g e
145 upper MOA&FW Har Khet Mampi nallah to kopin agri field at Dingsi 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

146 upper MOA&FW Har Khet Taruha nallah to taruha ringo at kyamdo 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

147 upper MOA&FW Har Khet Biokium po nallah to bio kium at kurungba 1 8.00 3 1 8.00
subansari/Nach ko Pani
o Block

148 upper MOA&FW Har Khet Joki nallah to Jokuring at Mederopu vill 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

149 upper MOA&FW Har Khet Renba nallah to sapene jobe ringo at Neing 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

150 upper MOA&FW Har Khet Kang nallah to jorung agri field at Dingsi 1 5.00 6 1 5.00 GPM
subansari/Nach ko Pani
o Block

151 upper MOA&FW Har Khet Dapo nallah to dapo ringo at Dingsi 1 3.00 1 1 3.00
subansari/Nach ko Pani
o Block

152 upper MOA&FW Har Khet Kobit nallah at Dape at Dingsi 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

194 | P a g e
153 upper MOA&FW Har Khet Bite nallah to lingrine at keojaring 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block

154 upper MOA&FW Har Khet Dapo nallah to paying rizyo at payingmoring VILL 1 5.00 1 1 5.00 GC
subansari/Nach ko Pani
o Block

155 upper MOA&FW Har Khet Ringu nallah to kaya agri field at Aying muri 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

156 upper MOA&FW Har Khet Chaklik po nallah to chaklik at kurungba 1 9.00 5 1 9.00 ASM
subansari/Nach ko Pani
o Block

157 upper MOA&FW Har Khet Kuo nallah to Dide at Doginalo Vill 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

158 upper MOA&FW Har Khet Dog nallah to ringu agri field at Dingsi 1 1.00 2 1 1.00 GPM
subansari/Nach ko Pani
o Block

159 upper MOA&FW Har Khet Kuo nallah to yakra pongchok at Doginalo 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

160 upper MOA&FW Har Khet Kuo nallah to dogi yorbe at Doginalo 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

195 | P a g e
161 upper MOA&FW Har Khet Kuo nallah to yorbe ringo at Doginalo 1 6.00 3 1 6.00 ASM
subansari/Nach ko Pani
o Block

162 upper MOA&FW Har Khet Sejing nallah to digium at Digium 1 5.00 5 1 5.00 ASM
subansari/Nach ko Pani
o Block

163 upper MOA&FW Har Khet Jampu kayang nallah to jampu at Ragmi 1 20.00 15 2 20.00
subansari/Nach ko Pani
o Block

164 upper MOA&FW Har Khet Gonung nallah to ringmi at Ebya 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

165 upper MOA&FW Har Khet Gunong nallah to Sebiya at Ebya 1 3.00 5 1 3.00
subansari/Nach ko Pani
o Block

166 upper MOA&FW Har Khet Dapo nallah to Dape ringo at Dingsar 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

167 upper MOA&FW Har Khet Rat nallah to gozujube at Ebya 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

168 upper MOA&FW Har Khet Retaning nallah to gonung at Ebya 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

196 | P a g e
169 upper MOA&FW Har Khet No nallah to seal jube at Ebya 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block

170 upper MOA&FW Har Khet Kali nallah to wang agri field at Dingsi 1 2.00 4 1 2.00 GPM
subansari/Nach ko Pani
o Block

171 upper MOA&FW Har Khet Dombin nallah to seal jube at Ebya 1 5.00 1 1 5.00 ASM
subansari/Nach ko Pani
o Block

172 upper MOA&FW Har Khet Ninge stream to tawne at Rava 1 7.00 4 1 7.00
subansari/Nach ko Pani
o Block

173 upper MOA&FW Har Khet Gonung nallah to ringmi at Ebya 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

174 upper MOA&FW Har Khet Lingbar nallah to jampu ringo at Ragmi 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

175 upper MOA&FW Har Khet Bam nallah to bameroko agri field to dingsi 1 5.00 6 1 5.00
subansari/Nach ko Pani
o Block

176 upper MOA&FW Har Khet Ruw nallah to gumpa agri field at Dingsi 1 1.00 3 1 1.00 GPM
subansari/Nach ko Pani
o Block

197 | P a g e
177 upper MOA&FW Har Khet Medeba nallah to janangring at medamba Rai 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

178 upper MOA&FW Har Khet Gonung nallah to seal jobe at Ebya 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

179 upper MOA&FW Har Khet Dombia nallah to sede jobe at Ebya 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

180 upper MOA&FW Har Khet Tobil nallah to chokar ringo at Chokar 1 15.00 6 2 15.00
subansari/Nach ko Pani
o Block

181 upper MOA&FW Har Khet Gonung Nallah at Ebiya village 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

182 upper MOA&FW Har Khet Sibia WRC land at Ebiya 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

183 upper MOA&FW Har Khet Lingdarso to pegiyasi at neing-1 1 6.00 6 1 6.00 ASM
subansari/Nach ko Pani
o Block

184 upper MOA&FW Har Khet Neging tachok nallah to neging tachok at Jibaying 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

198 | P a g e
185 upper MOA&FW Har Khet Tariha nallah to Tariha rengo at Gingba 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

186 upper MOA&FW Har Khet Rite nalo to bongrak ringo at gingba 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

187 upper MOA&FW Har Khet Tasam nallah to tamchi rengo at gingba 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

188 upper MOA&FW Har Khet Singyeryurange nallah to singyeryurange at Ragmi 1 11.00 6 2 11.00 ASM
subansari/Nach ko Pani
o Block

189 upper MOA&FW Har Khet Rakle nallah to rakle tapong at nacho hq 1 8.00 7 1 8.00
subansari/Nach ko Pani
o Block

190 upper MOA&FW Har Khet Retaning nallah to gonung at Ebya 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block

191 upper MOA&FW Har Khet No nallah to sebea jube at Ebya 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block

192 upper MOA&FW Har Khet Hapung sekio to rebi rango at Cheke 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

199 | P a g e
193 upper MOA&FW Har Khet Gyeda nallah to geda rengo at Jibaying 1 3.00 1 1 3.00 ASM
subansari/Nach ko Pani
o Block

194 upper MOA&FW Har Khet Kepe nallah to kakar at Jibaying 1 3.00 4 1 3.00 ASM
subansari/Nach ko Pani
o Block

195 upper MOA&FW Har Khet Kepe nallah to ayingsong at Jibaying 1 4.00 4 1 4.00 ASM
subansari/Nach ko Pani
o Block

196 upper MOA&FW Har Khet Kepe nallah to ziba yorlo at Jibaying 1 5.00 4 1 5.00 ASM
subansari/Nach ko Pani
o Block

197 upper MOA&FW Har Khet Aying anong nallah to tajum agri field at Dingsi 1 1.00 5 1 1.00 ASM
subansari/Nach ko Pani
o Block

198 upper MOA&FW Har Khet Gada siko to kadapipo rongo at Jibaying 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

199 upper MOA&FW Har Khet Talsipa kayang nallah to talsipa at kurungba 1 8.00 5 1 8.00 ASM
subansari/Nach ko Pani
o Block

200 upper MOA&FW Har Khet Rungdo stream to kodok jaring at keojaring 1 5.00 4 1 5.00 ASM
subansari/Nach ko Pani
o Block

200 | P a g e
201 upper MOA&FW Har Khet Kud nallah to Tage seriu at Chetam 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

202 upper MOA&FW Har Khet Bite nallah to lingrine at keojaring 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

203 upper MOA&FW Har Khet Keo stream to keojaring at keojaring 1 5.00 3 1 5.00 ASM
subansari/Nach ko Pani
o Block

204 upper MOA&FW Har Khet Bame nallah to bami rengo at Kidulingdi 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

205 upper MOA&FW Har Khet Rite nallah to Gongrak jobe at Gingba vill 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

206 upper MOA&FW Har Khet Akia sikio to namah at keojaring 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

207 upper MOA&FW Har Khet Digo nallah to digo ringo at Keojaring 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

208 upper MOA&FW Har Khet keo Sekio to talinkom at keojaring 1 3.00 3 1 3.00
subansari/Nach ko Pani
o Block

201 | P a g e
209 upper MOA&FW Har Khet Rek nallah to Rek Rango at Aying muri 1 2.00 4 1 2.00
subansari/Nach ko Pani
o Block

210 upper MOA&FW Har Khet Byamang kayang nallah to byamangdai at 1 5.00 1 1 5.00
subansari/Nach ko Pani kurungba
o Block

211 upper MOA&FW Har Khet Opin nallah to opin ringo at kargam 1 6.00 1 1 6.00 ASM
subansari/Nach ko Pani
o Block

212 upper MOA&FW Har Khet Chachi nallah to chada lingni at kargam 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

213 upper MOA&FW Har Khet Piya kotom lingram nallah to piya at kurungba 1 9.00 3 1 9.00
subansari/Nach ko Pani
o Block

214 upper MOA&FW Har Khet Raik kising nallah to piya at kurungba 1 9.00 1 1 9.00
subansari/Nach ko Pani
o Block

215 upper MOA&FW Har Khet Ribi sekio to rebi jobe rongo at koba 1 3.00 1 1 3.00
subansari/Nach ko Pani
o Block

216 upper MOA&FW Har Khet Leme peri nallah to kupen ringo at koba 1 11.00 6 2 11.00
subansari/Nach ko Pani
o Block

202 | P a g e
217 upper MOA&FW Har Khet Chego nallah to cheyong Jobe at Dingsar 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

218 upper MOA&FW Har Khet Lengtak so to rakle ringo at koba 1 11.00 6 2 11.00
subansari/Nach ko Pani
o Block

219 upper MOA&FW Har Khet Dori nallah to lingione jobe at neing -1 1 5.00 5 1 5.00
subansari/Nach ko Pani
o Block

220 upper MOA&FW Har Khet Kow nallah to chaging agri field at Aying muri 1 2.00 6 1 2.00 GPM
subansari/Nach ko Pani
o Block

221 upper MOA&FW Har Khet Rakle nallah to rakle ringo at ringling 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

222 upper MOA&FW Har Khet Popara under Ringling village 1 3.00 4 1 3.00
subansari/Nach ko Pani
o Block

223 upper MOA&FW Har Khet Kowso nallah to singriyor at Ragmi vill 1 6.00 6 1 6.00
subansari/Nach ko Pani
o Block

224 upper MOA&FW Har Khet Chigo sekio to derong jobe at kobit 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

203 | P a g e
225 upper MOA&FW Har Khet Paying rengio at kobit 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

226 upper MOA&FW Har Khet Tabing nallah to ngodo jote at Kyamdo 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

227 upper MOA&FW Har Khet Singkin nallah to ringte ringme at kyamdo 1 4.00 4 1 4.00
subansari/Nach ko Pani
o Block

228 upper MOA&FW Har Khet Niakne Pin to Sene nallah to Tachiring village 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

229 upper MOA&FW Har Khet Taruha nallah to ngodo at kyamdo 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

230 upper MOA&FW Har Khet Tasibihr nallah to badolingne at kyamdo 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

231 upper MOA&FW Har Khet Kade nallah to Naying moring at Kiidulingdi 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

232 upper MOA&FW Har Khet Chingrong soo nallah to Bipia 1 5.00 4 1 5.00
subansari/Nach ko Pani
o Block

204 | P a g e
233 upper MOA&FW Har Khet Meniaki nallah at Kodung Haring 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

234 upper MOA&FW Har Khet Dori sekio to neing jobe at Neing -1 1 4.00 2 1 4.00 ASM
subansari/Nach ko Pani
o Block

235 upper MOA&FW Har Khet Chalin nallah to ring agri field at Dingsi 1 2.00 4 1 2.00 GPM
subansari/Nach ko Pani
o Block

236 upper MOA&FW Har Khet Genio nallah to pirak at Loke 1 4.00 5 1 4.00
subansari/Nach ko Pani
o Block

237 upper MOA&FW Har Khet Genio nallah to changdi at Loke 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

238 upper MOA&FW Har Khet Bang nallah to pumpa agri field at Aying muri 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

239 upper MOA&FW Har Khet Bang nallah to gato agri field at Aying muri 1 2.00 2 1 2.00 GPM
subansari/Nach ko Pani
o Block

240 upper MOA&FW Har Khet Gereh nallah to juring at Loke 1 5.00 1 1 5.00
subansari/Nach ko Pani
o Block

205 | P a g e
241 upper MOA&FW Har Khet Nyacha-rikha at Loke 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

242 upper MOA&FW Har Khet Poying Jaring at Loke 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

243 upper MOA&FW Har Khet WRC field at Loke village 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

244 upper MOA&FW Har Khet Rari nallah to poying ringo at Loke 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

245 upper MOA&FW Har Khet Singkingne Sekio to Lingrine Jobe 1 3.00 3 1 3.00
subansari/Nach ko Pani
o Block

246 upper MOA&FW Har Khet Keo nallah to paktung jori at Mayabai 1 4.00 6 1 4.00
subansari/Nach ko Pani
o Block

247 upper MOA&FW Har Khet Gele nallah to gele jobe at meyaba Rai 1 5.00 1 1 5.00 ASM
subansari/Nach ko Pani
o Block

248 upper MOA&FW Har Khet Lele nallah to patage jobe at meyaba Rai 1 10.00 6 1 10.00
subansari/Nach ko Pani
o Block

206 | P a g e
249 upper MOA&FW Har Khet Medu nallah to meliring jobe at meyaba Rai 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

250 upper MOA&FW Har Khet Medeba nallah to janangring at meyaba Rai 1 5.00 3 1 5.00 ASM
subansari/Nach ko Pani
o Block

251 upper MOA&FW Har Khet Ramde stream to ramde at meyaba Rai 1 12.00 8 1 12.00 ASM
subansari/Nach ko Pani
o Block

252 upper MOA&FW Har Khet Keo stream to keoring at meyaba Rai 1 5.00 1 1 5.00 ASM
subansari/Nach ko Pani
o Block

253 upper MOA&FW Har Khet Meddu nallah to ringkar at medamba Rai 1 10.00 8 1 10.00
subansari/Nach ko Pani
o Block

254 upper MOA&FW Har Khet Kali nallah to harang agri field at Dingsi 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

255 upper MOA&FW Har Khet Mampi nallah to ringu agri field at Dingsi 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

256 upper MOA&FW Har Khet Sejing nallah to taying at Taying vill 1 10.00 8 1 10.00 ASM
subansari/Nach ko Pani
o Block
257 upper MOA&FW Har Khet Dog nallah to yuopon agri field at Dingsi 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

207 | P a g e
258 upper MOA&FW Har Khet Ribi nallah to lakrong ringo at nacho hq. 1 9.00 5 1 9.00 ASM
subansari/Nach ko Pani
o Block

259 upper MOA&FW Har Khet Lintak nallah sd nallah to dibi ringo at nacho hq. 1 9.00 3 1 9.00 ASM
subansari/Nach ko Pani
o Block

260 upper MOA&FW Har Khet Kow nallah to sackving agri field at Aying muri 1 5.00 4 1 5.00 GPM
subansari/Nach ko Pani
o Block

261 upper MOA&FW Har Khet Pate yeba to dibi ringho at nacho hq. 1 3.00 3 1 3.00
subansari/Nach ko Pani
o Block

262 upper MOA&FW Har Khet Rakhae nallah to ope rongo at medamba Rai 1 6.00 7 1 6.00
subansari/Nach ko Pani
o Block

263 upper MOA&FW Har Khet Kaying nallah to talusipa at Ragmi vill 1 5.00 3 1 5.00 ASM
subansari/Nach ko Pani
o Block

264 upper MOA&FW Har Khet Sars Nalah to Tage selu at Ragmi village 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

265 upper MOA&FW Har Khet Lingtakso to lingtak yading at nacho hq 1 8.00 8 1 8.00 ASM
subansari/Nach ko Pani
o Block

208 | P a g e
266 upper MOA&FW Har Khet Uuzg nallah to pungmi rizyo at Diri 1 7.00 4 1 7.00 ASM
subansari/Nach ko Pani
o Block

267 upper MOA&FW Har Khet Suha nallah to dordufha at Rava 1 6.00 6 1 6.00
subansari/Nach ko Pani
o Block

268 upper MOA&FW Har Khet Riyir sekio to ramdi jobe at neing-1 1 3.00 3 1 3.00 ASM
subansari/Nach ko Pani
o Block

269 upper MOA&FW Har Khet Hop sekio to neing jobe at neing -1 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

270 upper MOA&FW Har Khet Kyoso to banya jobe at neing-1 1 4.00 1 1 4.00 ASM
subansari/Nach ko Pani
o Block

271 upper MOA&FW Har Khet Ngolo sekio to gamring jobe neing-1 1 5.00 4 1 5.00 ASM
subansari/Nach ko Pani
o Block

272 upper MOA&FW Har Khet Ringu nallah to Ringu agri field at Aying muri 1 2.00 2 1 2.00 GPM
subansari/Nach ko Pani
o Block

273 upper MOA&FW Har Khet Ngolo sekio to sapene jobe at neing -1 1 4.00 4 1 4.00
subansari/Nach ko Pani
o Block

209 | P a g e
274 upper MOA&FW Har Khet Nilam nalo to rite at Tabe Namsing Vill 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

275 upper MOA&FW Har Khet Sato nallah to sato agri field at Dingsi 1 2.00 1 1 2.00 GPM
subansari/Nach ko Pani
o Block
276 upper MOA&FW Har Khet Rat nallah to guzujube at Ebya vill 1 4.00 1 1 4.00
subansari/Nach ko Pani
o Block
277 upper MOA&FW Har Khet Jampu kayang nallah to jampu at Ragmi 1 11.00 6 1 11.00 ASM
subansari/Nach ko Pani
o Block
278 upper MOA&FW Har Khet Genio nallah to poying at piba 1 10.00 8 1 10.00
subansari/Nach ko Pani
o Block

279 upper MOA&FW Har Khet Genio nallah to sehu at piba 1 8.00 8 1 8.00 GC
subansari/Nach ko Pani
o Block

280 upper MOA&FW Har Khet Kipa nallah to terepoing at piba 1 10.00 6 1 10.00 GC
subansari/Nach ko Pani
o Block

281 upper MOA&FW Har Khet Kipa nallah to akingpiba & taso tanio at piba 1 10.00 5 1 10.00 GC
subansari/Nach ko Pani
o Block
282 upper MOA&FW Har Khet Paniu nallah to poba ringo at poba 1 6.00 6 1 6.00 GC
subansari/Nach ko Pani
o Block

283 upper MOA&FW Har Khet Riching nallah to poba ringo at poba 1 2.00 2 1 2.00 GC
subansari/Nach ko Pani
o Block

210 | P a g e
284 upper MOA&FW Har Khet Poging nallah to poba ringo at poba 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

285 upper MOA&FW Har Khet Kangkia nallah to pochak at pochak 1 6.00 6 1 6.00 ASM
subansari/Nach ko Pani
o Block

286 upper MOA&FW Har Khet Mip ho sekio sekio to takiong at payingmoring 1 4.00 1 1 4.00 GC
subansari/Nach ko Pani
o Block

287 upper MOA&FW Har Khet Chalin nallah to joku agri field at Dingsi 1 1.00 4 1 1.00 GPM
subansari/Nach ko Pani
o Block

288 upper MOA&FW Har Khet Dapo nallah to paying rizyo at payingmoring 1 4.00 2 1 4.00
subansari/Nach ko Pani
o Block

289 upper MOA&FW Har Khet Bebo nallah to topu ringo at Ringling 1 5.00 2 1 5.00 ASM
subansari/Nach ko Pani
o Block

290 upper MOA&FW Har Khet Badi Nallah to Bale agro field at Ringling 1 3.00 2 1 3.00
subansari/Nach ko Pani
o Block

291 upper MOA&FW Har Khet Meli nallah to meli ringo at Ringling 1 5.00 3 1 5.00 ASM
subansari/Nach ko Pani
o Block

211 | P a g e
292 upper MOA&FW Har Khet Ringdo nallah to giane taktring at Rava 1 2.00 1 1 2.00 ASM
subansari/Nach ko Pani
o Block

293 upper MOA&FW Har Khet Rille nallah to taw ne at Rava 1 3.00 1 1 3.00 ASM
subansari/Nach ko Pani
o Block

294 upper MOA&FW Har Khet Dori sekio to rinba at Neing -1 1 4.00 6 1 4.00 ASM
subansari/Nach ko Pani
o Block

295 upper MOA&FW Har Khet Hodo sekio to nibe rikha at Neing-1 1 4.00 5 1 4.00 GC
subansari/Nach ko Pani
o Block

296 upper MOA&FW Har Khet Bebo nallah to bebo ringo at Ringling vill 1 12.00 6 1 12.00
subansari/Nach ko Pani
o Block

297 upper MOA&FW Har Khet Heling nalo to hate moring at Ragmi vill 1 5.00 3 1 5.00
subansari/Nach ko Pani
o Block

298 upper MOA&FW Har Khet Sato nallah to chaging agri field a Dingsi 1 2.00 1 1 2.00 GPM
subansari/Nach ko Pani
o Block

299 upper MOA&FW Har Khet Pate seko to sow lingtak at koba vill 1 11.00 6 1 11.00
subansari/Nach ko Pani
o Block

212 | P a g e
300 upper MOA&FW Har Khet Baming nallah to jumpo agri field at Dingsi 1 1.00 5 1 1.00 GPM
subansari/Nach ko Pani
o Block

301 upper MOA&FW Har Khet Kochiso nallah to jeke ringo at Ragmi 1 6.00 6 1 6.00
subansari/Nach ko Pani
o Block

302 upper MOA&FW Har Khet Aying Anong Nallah to Tajum field at Ayingmuri vill 1 5.00 6 1 5.00
subansari/Nach ko Pani
o Block

303 upper MOA&FW Har Khet Raji nallah to Singchibia at Aying moring 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

304 upper MOA&FW Har Khet MIP under Mede Vill under Nacho 1 1.00 3 1 1.00
subansari/Nach ko Pani
o Block

305 upper MOA&FW Har Khet Remi At Limi Padding Vill 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block

306 upper MOA&FW Har Khet Rava sakio stream to taktering at Rava 1 3.00 5 1 3.00 ASM
subansari/Nach ko Pani
o Block
307 upper MOA&FW Har Khet Bimi steam to taling kyamding at Rava 1 3.00 4 1 3.00 ASM
subansari/Nach ko Pani
o Block
308 upper MOA&FW Har Khet Mip ningde steam to tawne at Rava vill 1 2.00 3 1 2.00 ASM
subansari/Nach ko Pani
o Block
309 upper MOA&FW Har Khet Sua nallah to dorduka at Rava 1 3.00 2 1 3.00 ASM
subansari/Nach ko Pani
o Block

213 | P a g e
310 upper MOA&FW Har Khet Kaw Joring to Kane Sikio at Gingba 1 2.00 3 1 2.00
subansari/Nach ko Pani
o Block

311 upper MOA&FW Har Khet Kam nallah to dong agri field at Dingsi 1 2.00 3 1 2.00 GPM
subansari/Nach ko Pani
o Block

312 upper MOA&FW Har Khet Mip kudomha nallah to Rava 1 6.00 6 1 6.00
subansari/Nach ko Pani
o Block
313 upper MOA&FW Har Khet Mip leya nallah to Rava 1 2.00 2 1 2.00 ASM
subansari/Nach ko Pani
o Block
314 upper MOA&FW Har Khet Sirom nallah to Rava 1 2.00 2 1 2.00
subansari/Nach ko Pani
o Block
315 upper MOA&FW Har Khet Amirha at uper Rava 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block
316 upper MOA&FW Har Khet Kow nallah to Ringu field 1 3.00 1 1 3.00
subansari/Nach ko Pani
o Block
317 upper MOA&FW Har Khet Sumbuko Nallah nto Kelering Raiku village 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block
318 upper MOA&FW Har Khet Mede Nallah to Lukarijo at Rungba vill 1 2.00 1 1 2.00
subansari/Nach ko Pani
o Block
319 upper MOA&FW Har Khet Seppe nallah to Rava 1 5.00 2 1 5.00
subansari/Nach ko Pani
o Block

320 upper MOA&FW Har Khet Mip sirom nallah to Rava 1 4.00 3 1 4.00
subansari/Nach ko Pani
o Block

214 | P a g e
321 upper MOA&FW Har Khet Baming nallah to gorung agri field at Dingsi 1 2.00 5 1 2.00 GPM
subansari/Nach ko Pani
o Block

322 upper MOA&FW Har Khet Baming nallah to Baming agri field at Dingsi 1 2.00 4 1 2.00 GPM
subansari/Nach ko Pani
o Block

323 upper MOA&FW Har Khet Pario Nallah under Dogi-Nalo Vill 1 3.00 3 1 3.00 ZPM
subansari/Nach ko Pani
o Block

324 upper MOA&FW Har Khet Ropu Nallah To Kichane Jaring At Mederopu 1 3.00 3 1 3.00
subansari/Nach ko Pani vill
o Block

325 -do- MOA&FW Har Khet Radara To Ripin Sikio At Pading 1 2.00 2 1 2.00
ko Pani
326 -do- MOA&FW Har Khet Rite Nallah To Ambin Dursen At Pading 1 2.00 3 1 2.00
ko Pani
327 -do- MOA&FW Har Khet Ngoo Nallah To Gebang and Ngoying 1 3.00 2 1 3.00
ko Pani
328 -do- MOA&FW Har Khet Hoho Nallah To Lingpung Tachi Jaring at Yeba 1 2.00 3 1 2.00
ko Pani vill
329 -do- MOA&FW Har Khet Duri Sikio Nallah To Sete Lingpe Rengo At Neing 1 2.00 2 1 2.00
ko Pani
330 -do- MOA&FW Har Khet Neing Sikio Nallah To Neing Jobe At Neing 1 2.00 2 1 2.00
ko Pani
331 -do- MOA&FW Har Khet Renba Nallah to Sapane jobe Rengo at Neing 1 2.00 2 1 2.00
ko Pani
332 -do- MOA&FW Har Khet Singcho-Kogo To Singlok Moring at Kyamdo 1 2.00 2 1 2.00
ko Pani
333 -do- MOA&FW Har Khet Tanap -pu Nallah to Yingso-Nipung At Kyamdo 1 2.00 2 1 2.00
ko Pani

215 | P a g e
334 -do- MOA&FW Har Khet Chandi Nallah To Chada Lingu At Kargam 1 2.00 3 1 2.00
ko Pani
335 -do- MOA&FW Har Khet Bod Lingnee Rengo Joring to lingnee sikio at 1 2.00 3 1 2.00
ko Pani Gingba vill
336 -do- MOA&FW Har Khet Rimi to Rimi Sikio Nallah at Dengsar 1 2.00 3 1 2.00
ko Pani
337 -do- MOA&FW Har Khet Gio Nallah To Ngoduk at Gingba 1 2.00 3 1 2.00
ko Pani
338 -do- MOA&FW Har Khet Kang Nallah To Sacring Agri Field At Dingsi 1 2.00 2 1 2.00
ko Pani
339 -do- MOA&FW Har Khet Bameto Suruha Rengo At Dindsi 1 2.00 2 1 2.00
ko Pani
340 -do- MOA&FW Har Khet Bame Nallah To Sedong Rungbung At Dingsi 1 2.00 2 1 2.00
ko Pani
341 -do- MOA&FW Har Khet Kut Nallah To Talom Rungo At Dingsi 1 2.00 2 1 2.00
ko Pani
342 -do- MOA&FW Har Khet Taki Nallah To Baki Rigyar At Dingsi 1 2.00 2 1 2.00
ko Pani
343 -do- MOA&FW Har Khet Hampering Rengo To Kut Sekio At Diri 1 3.00 2 1 3.00
ko Pani
344 -do- MOA&FW Har Khet Pungmi Sekio to Ningporing at Diri 1 2.00 2 1 2.00
ko Pani
345 -do- MOA&FW Har Khet Beri Sekio to Ringmi at Diri 1 2.00 2 1 2.00
ko Pani
346 -do- MOA&FW Har Khet Pungmi Sekio to Mimpung Rengo at Diri 1 2.00 2 1 2.00
ko Pani
347 -do- MOA&FW Har Khet Chejo Nallah to Sapana Ringo at Duilangdi 1 3.00 3 1 3.00
ko Pani
348 -do- MOA&FW Har Khet Taking Nallah To Ringte At Ebiya 1 2.00 2 1 2.00
ko Pani
349 -do- MOA&FW Har Khet Daching Haring Ringo to Gikding Nallah to Ebiya 1 3.00 2 1 3.00
ko Pani
350 -do- MOA&FW Har Khet Sibiya Ringo to Ganung Nallah at Ebiya 1 2.00 2 1 2.00
ko Pani

216 | P a g e
351 -do- MOA&FW Har Khet Taraba Jobe to Chandi siko at Doginalo 1 2.00 3 1 2.00
ko Pani
352 -do- MOA&FW Har Khet Ngulo Nallah To Ngulo Rengo At Charu 1 2.00 2 1 2.00
ko Pani
353 -do- MOA&FW Har Khet Dur Nallah To Ngulo Rengo At Charu 1 2.00 2 1 2.00
ko Pani
354 -do- MOA&FW Har Khet Yatop Nallah To Yatop Rungo At Aying muri 1 2.00 2 1 2.00
ko Pani
355 -do- MOA&FW Har Khet Lining Yenngte Nallah To Aying Muri 1 2.00 2 1 2.00
ko Pani
356 -do- MOA&FW Har Khet Pongyi Naching Nallah To Aying Sikio at Aying 1 2.00 3 1 2.00
ko Pani Muri
357 -do- MOA&FW Har Khet Dawnee Nallah to Gio Sikio at Aying Muri vill 1 2.00 3 1 2.00
ko Pani
358 -do- MOA&FW Har Khet Jirniakar Nallah To Jirniakar Moring At Doilingdi Vill 1 5.00 5 1 5.00
ko Pani
359 -do- MOA&FW Har Khet Ko-Sikio To Jekey -Ring At Ragmi Vill 1 1.00 3 1 1.00
ko Pani
360 -do- MOA&FW Har Khet Epyo Sikio To Talam Yurbe At Ragmi 1 1.00 3 1 1.00
ko Pani
361 -do- MOA&FW Har Khet Ko Sikio To Sora At Ragmi Vill 1 1.00 2 1 1.00
ko Pani
362 -do- MOA&FW Har Khet Mimpak Sikio To Jampu At Ragmi 1 1.00 2 1 1.00
ko Pani
363 -do- MOA&FW Har Khet Keode Soko To Tabongna At Kidulingdi 1 3.00 2 1 3.00
ko Pani
364 -do- MOA&FW Har Khet Khadin Soko To Aying jobong At Aying Rigia 1 3.00 4 1 3.00
ko Pani
365 -do- MOA&FW Har Khet Khadin Soko To Putung Moring 1 3.00 4 1 3.00
ko Pani
366 -do- MOA&FW Har Khet Khadin Soko To Momo Moring 1 3.00 4 1 3.00
ko Pani
367 -do- MOA&FW Har Khet Khadin Soko To Gay Moring 1 3.00 4 1 3.00
ko Pani

217 | P a g e
368 -do- MOA&FW Har Khet Gada Nallah to Kelaring at Duilangdi 1 2.00 3 1 2.00
ko Pani
369 MOA&FW Har Khet 1 2.00 3 1 2.00
-do- ko Pani
Habung nallah to Lingione Agri-field at Cheke
370 MOA&FW Har Khet 1 2.00 5 1 2.00
-do- ko Pani
Reno.Sato nallah to Sato agri-field at Cheke
371 MOA&FW Har Khet 1 2.00 4 1 2.00
-do- ko Pani
Rete nallah at Gingba Vill
MOA&FW Har Khet 1 10.00
372 -do- ko Pani Rib nallah to chingiam at Cheke 1 10.00 3

CAD NEW SCHEMS


S.No. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated Remarks
the Ministry / Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
1 Upper MOA&FW Har Khet CC lining of Kojok Nallah MIP at Sindak Vill 1 12.00 9 2 12.00 MLA &
Subansiri ko Pani Ex-ASM
siyum
2 Upper MOA&FW Har Khet Darsi - Darne Nallah to Seren at Dui vill 1 10.00 9 1 10.00 ASM
Subansiri ko Pani
siyum
3 Upper MOA&FW Har Khet CC Linning Giamchi nallah to Giadu lengdi at Dui 1 8.00 6 1 8.00 ASM
Subansiri ko Pani
siyum
4 Upper MOA&FW Har Khet Sikiu Nallah to Rai at Jingba Rai vill 1 15.00 8 2 15.00 MLA &
Subansiri ko Pani ASM
siyum
5 Upper MOA&FW Har Khet Saato Nallah to Bugia at Kajiring vill 1 10.00 8 1 10.00 MLA
Subansiri ko Pani
siyum
6 Upper MOA&FW Har Khet Selam nallah to aying Agri-field at Ekke 1 8.00 9 1 8.00 MLA
Subansiri ko Pani
siyum

218 | P a g e
7 Upper MOA&FW Har Khet Lingke nallah to Janering at Linke Vill 1 10.00 8 1 10.00 MLA
Subansiri ko Pani
siyum
8 Upper MOA&FW Har Khet Sepong Nallah to Sarta A/F at Sarta vill 1 15.00 9 1 15.00 MLA
Subansiri ko Pani
siyum
9 Upper MOA&FW Har Khet Riote Sikiu to Akingseku at zingmuring vill 1 3.00 3 1 3.00 MLA
Subansiri ko Pani
siyum
10 Upper MOA&FW Har Khet CC Linning of Zode nallah to Pakring at Riaku Vill 1 8.00 5 1 8.00 MLA
Subansiri ko Pani
siyum
11 Upper MOA&FW Har Khet CC Linning of Koh nallah at Takiopuring Vill 1 6.00 5 1 6.00
Subansiri ko Pani
siyum
12 Upper MOA&FW Har Khet Erung nallah to Bame rengio(Tapa) at Tayum Vill 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
13 Upper MOA&FW Har Khet Sejing nallah to Gyaling bong at Mosu vill 1 6.00 5 1 6.00 ASM
Subansiri ko Pani
siyum
14 Upper MOA&FW Har Khet Archu nallah to Engbajobe at Dagu vill 1 5.00 5 1 5.00 MLA &
Subansiri ko Pani ASM
siyum
15 Upper MOA&FW Har Khet Sepung nallah to sepung jobe at sarta 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
16 Upper MOA&FW Har Khet Pogo nallah to singo-ne at Kampung 1 3.00 3 1 3.00 ASM
Subansiri ko Pani
siyum
17 Upper MOA&FW Har Khet Ragmi to motung -mobia at Kampung 1 3.00 3 1 3.00 ASM
Subansiri ko Pani
siyum
18 Upper MOA&FW Har Khet Hote nallah to zimba agri-field at Rai village 1 5.00 1 1 5.00 MLA
Subansiri ko Pani
siyum

219 | P a g e
19 Upper MOA&FW Har Khet Debia nallah to taking puring at Takiong puring 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
siyum
20 Upper MOA&FW Har Khet Pugru sikio Nallah Sinamching vill Takiongpuring 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
21 Upper MOA&FW Har Khet Sappe ne sikio to lingtung rongo at Takiong puring 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
22 Upper MOA&FW Har Khet Rigu sotu to Takiong puring 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
23 Upper MOA&FW Har Khet Lingte Nallah to Dilling rongo at Dilling 1 2.00 2 1 2.00 MLA &
Subansiri ko Pani ASM
siyum
24 Upper MOA&FW Har Khet Otte nallah to mosu agri-field at Mosu Vill 1 4.00 5 1 4.00 MLA
Subansiri ko Pani
siyum
25 Upper MOA&FW Har Khet Durguso nallah to bogia at Bogia Vill 1 1.00 3 1 1.00 ASM
Subansiri ko Pani
siyum
26 Upper MOA&FW Har Khet Sikit nallah to ringji jobe at jingaba Rai 1 10.00 9 1 10.00 ASM
Subansiri ko Pani
siyum
27 Upper MOA&FW Har Khet Tasulungru to tikdo rongo at Atte Vill 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
28 Upper MOA&FW Har Khet CC Linning Ribisekio to Ribijobe at Dui vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
29 Upper MOA&FW Har Khet Biro nallah to gyai at bogia Bogia 1 5.00 5 1 5.00 ASM
Subansiri ko Pani
siyum
30 Upper MOA&FW Har Khet Ching-ching nallah to Lingdurong at Byaching 1 4.00 6 1 4.00
Subansiri ko Pani
siyum

220 | P a g e
31 Upper MOA&FW Har Khet Kepin kete nallah to Longliba at Byaaching 1 4.00 6 1 4.00
Subansiri ko Pani
siyum
32 Upper MOA&FW Har Khet Eyo nallah to hoching A/F at jenering vill 1 4.00 4 1 4.00 MLA
Subansiri ko Pani
siyum
33 Upper MOA&FW Har Khet CC linning Row nallah to sungba at Eru vill 1 4.00 4 1 4.00
Subansiri ko Pani
siyum
34 Upper MOA&FW Har Khet Nibu pakio sekio to topu rengo at Byamar 1 3.00 7 1 3.00
Subansiri ko Pani
siyum
35 Upper MOA&FW Har Khet Hoo nallah sekio to lengren rengo at Byamar 1 3.00 8 1 3.00
Subansiri ko Pani
siyum
36 Upper MOA&FW Har Khet Sejing nallah to gyalingbong at Ering 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
37 Upper MOA&FW Har Khet Sejing nallah to gyarine at Ering 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
38 Upper MOA&FW Har Khet Dole Nallah to Epe-Lingne at Talingha Vill 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
39 Upper MOA&FW Har Khet Lingia Nallah to Jakar A/F at Eyum Vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
siyum
40 Upper MOA&FW Har Khet Magi sekio to Ate renglo at Atte Vill 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
41 Upper MOA&FW Har Khet Mip Tamo nallah to bichugki jobe at Dagu vill 1 4.00 3 1 4.00
Subansiri ko Pani
siyum
42 Upper MOA&FW Har Khet Yaktak to Yaktakrongo at Page Nalo vill 1 3.00 4 1 3.00
Subansiri ko Pani
siyum

221 | P a g e
43 Upper MOA&FW Har Khet Sik Nanching to Tabam at Page Nalo Vill 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
44 Upper MOA&FW Har Khet Ote nallah to Kitche Rai at kiche Rai Vill 1 8.00 4 1 8.00 MLA
Subansiri ko Pani
siyum
45 Upper MOA&FW Har Khet Pego Nallah to Pegoringo at Kampong vill 1 3.00 4 1 3.00 MLA
Subansiri ko Pani
siyum
46 Upper MOA&FW Har Khet Lengi sekio nallah to Takiong puring Byamar 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
47 Upper MOA&FW Har Khet Koo sekio nallah to janering rengo at Byamar 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
48 Upper MOA&FW Har Khet Row nallah to row lingbe at Baki 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
49 Upper MOA&FW Har Khet Hapin Nallah to Ghai-Ne (Panam) at Ering vill 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
50 Upper MOA&FW Har Khet Bengking sekio to harubalong at Dui 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
51 Upper MOA&FW Har Khet Kete siko to keba at Dui 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
52 Upper MOA&FW Har Khet Singruba nallah to bogia Bogia 1 2.00 5 1 2.00 GCP
Subansiri ko Pani
siyum
53 Upper MOA&FW Har Khet Hote nallah to Gikom Jobe at Ekke village 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
54 Upper MOA&FW Har Khet Boma Sikio to Kaungring at Kaungring vill 1 3.00 2 1 3.00
Subansiri ko Pani
siyum

222 | P a g e
55 Upper MOA&FW Har Khet Ningpolingru to Lingi-ne at Kaungring vill 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
56 Upper MOA&FW Har Khet Gingri nallah to sirin at Dui Vill 1 6.00 4 1 6.00
Subansiri ko Pani
siyum
57 Upper MOA&FW Har Khet Se-nallah to peileriing at Dui vill 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
siyum
58 Upper MOA&FW Har Khet Segiam nallah to tongyring muri at dui 1 2.00 4 1 2.00 GPM
Subansiri ko Pani
siyum
59 Upper MOA&FW Har Khet Singruba nallah to bogia at Bogia Vill 1 5.00 2 1 5.00 GCP
Subansiri ko Pani
siyum
60 Upper MOA&FW Har Khet Seriu Nallah to Lingya-Ne at Nyogin vill 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
61 Upper MOA&FW Har Khet Noh Sikio to Nohjobe at Dilling vill 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
62 Upper MOA&FW Har Khet Hambine nallah to juring at Dui 1 5.00 1 1 5.00
Subansiri ko Pani
siyum
63 Upper MOA&FW Har Khet Kette nallah to sike jobe at Dui 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
64 Upper MOA&FW Har Khet Lingdam Seriu to Daterijo at Dilling vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
65 Upper MOA&FW Har Khet Siri Nallah to siri jobe at Duku vill 1 2.00 2 1 2.00 MLA &
Subansiri ko Pani ASM
siyum
66 Upper MOA&FW Har Khet Koji Nallah to Jakarjobe at Eyum Vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum

223 | P a g e
67 Upper MOA&FW Har Khet Karam sikio to lingrine rongo at karam Vill 1 3.00 3 1 3.00 MLA
Subansiri ko Pani
siyum
68 Upper MOA&FW Har Khet Makpia nallah to nonging moring at Duku 1 7.00 6 1 7.00 MLA
Subansiri ko Pani
siyum
69 Upper MOA&FW Har Khet Kango nallah to Agung A/field at Duku 1 3.00 1 1 3.00
Subansiri ko Pani
siyum
70 Upper MOA&FW Har Khet Singriney to TabioRiko A/Field at Duku 1 3.00 1 1 3.00
Subansiri ko Pani
siyum
71 Upper MOA&FW Har Khet Mip asing nallah to yingan rengo at Dingdopa 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
72 Upper MOA&FW Har Khet Mip singruba nallah to singri rengo at dingdopa 1 5.00 1 1 5.00 ASM
Subansiri ko Pani
siyum
73 Upper MOA&FW Har Khet Perong nallah to dendo rengo at Dingdopa vill 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
74 Upper MOA&FW Har Khet Selungso nallah to singlokring at singlokring vill 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
75 Upper MOA&FW Har Khet Rebi nallah to Rebi jobe at Dui village 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
76 Upper MOA&FW Har Khet Darsi nallah to (Sekio) Sirin at Dui vill 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
77 Upper MOA&FW Har Khet Omi nallah to omijobe at Dui vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
siyum
78 Upper MOA&FW Har Khet Gokar Nallah at Kicherai vill 1 3.00 3 1 3.00 MLA
Subansiri ko Pani
siyum

224 | P a g e
79 Upper MOA&FW Har Khet Mip archu nallah to sepering jobe at dagu 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
80 Upper MOA&FW Har Khet Lingi Nallah to Sora at Takionpuring vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
81 Upper MOA&FW Har Khet Lingte sikio to boona jobe at dilling 1 2.00 2 1 2.00 ASM
Subansiri ko Pani
siyum
82 Upper MOA&FW Har Khet Ho-sikio to hagong at duku 1 4.00 3 1 4.00 ASM
Subansiri ko Pani
siyum
83 Upper MOA&FW Har Khet Liyu nallah to liyu agri field at chapcha 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
siyum
84 Upper MOA&FW Har Khet Mip hap nallah to bame rangio at Tayum 1 1.00 2 1 1.00
Subansiri ko Pani
siyum
85 Upper MOA&FW Har Khet Ningpoko Nallah to Lumtak at Baki vill 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
86 Upper MOA&FW Har Khet Lumak sikio to lumak rongo at Dilling 1 3.00 4 1 3.00 ASM
Subansiri ko Pani
siyum
87 Upper MOA&FW Har Khet Kodumha Nallah to Soringha at Chep rai 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
88 Upper MOA&FW Har Khet Beying sikio to namching rongo at Dilling 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
89 Upper MOA&FW Har Khet Bengking sekio to harubalong at Dui 1 6.00 5 1 6.00
Subansiri ko Pani
siyum
90 Upper MOA&FW Har Khet Sirin nallah to ribe jobe at Dui 1 3.00 4 1 3.00 asm
Subansiri ko Pani
siyum

225 | P a g e
91 Upper MOA&FW Har Khet Osing nallah to yingam rengo at Dingdopa 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
92 Upper MOA&FW Har Khet Lingte sikio to Beying rongo at Dilling 1 3.00 2 1 3.00 ASM
Subansiri ko Pani
siyum
93 Upper MOA&FW Har Khet Patin nallah to tayur at sarta 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
94 Upper MOA&FW Har Khet Rukpi nallah to mokum at sarta 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
95 Upper MOA&FW Har Khet Tumlingne nallah to tumya at sarta 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
96 Upper MOA&FW Har Khet Pogo Nallah to Pogo ringo at Kampong vill 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
97 Upper MOA&FW Har Khet Rakmi nallah to motung mobia at kampung 1 6.00 6 1 6.00
Subansiri ko Pani
siyum
98 Upper MOA&FW Har Khet Mokam Nallah to Pakring at Sarta vill 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
99 Upper MOA&FW Har Khet CC Linning old Sikiu to Engba at Dagu vill 1 6.00 6 1 6.00
Subansiri ko Pani
siyum
100 Upper MOA&FW Har Khet Talidsong nallah to doma raktak jobe at ekke 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
101 Upper MOA&FW Har Khet Ore nallah to ore jobe at ekke village 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
102 Upper MOA&FW Har Khet Pia sikio to langyone at pirong 1 10.00 6 1 10.00 ASM
Subansiri ko Pani
siyum

226 | P a g e
103 Upper MOA&FW Har Khet Pira nallah to pirong at pirong 1 1.00 2 1 1.00 ASM
Subansiri ko Pani
siyum
104 Upper MOA&FW Har Khet Tatum-ne to Moboklengne at Sarta 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
105 Upper MOA&FW Har Khet Sipia nallah to giamering at pakling riaku 1 4.00 3 1 4.00
Subansiri ko Pani
siyum
106 Upper MOA&FW Har Khet Singruwa nallah to perung moring at kajiring 1 9.00 6 1 9.00
Subansiri ko Pani
siyum
107 Upper MOA&FW Har Khet Kuj nallah to jukar at Eyum 1 10.00 6 1 10.00 AC
Subansiri ko Pani
siyum
108 Upper MOA&FW Har Khet Longkerong to Tabinpurong at Eyum vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
109 Upper MOA&FW Har Khet Daw sikio to Jakar Jobe agril field at Eyum vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
110 Upper MOA&FW Har Khet Mip sure paga sekio to kawngring at kawngring 1 13.00 9 1 13.00 ASM
Subansiri ko Pani
siyum
111 Upper MOA&FW Har Khet Lingkurang to tabinpomlo at eyum 1 5.00 2 1 5.00 AC
Subansiri ko Pani
siyum
112 Upper MOA&FW Har Khet Row nallah to tayin abe at Eru 1 4.00 3 1 4.00 ASM
Subansiri ko Pani
siyum
113 Upper MOA&FW Har Khet Chinba nallah to sedemsi at Eru 1 4.00 1 1 4.00 ASM
Subansiri ko Pani
siyum
114 Upper MOA&FW Har Khet Pinging nallah to Nina at papi village 1 4.00 1 1 4.00 ASM
Subansiri ko Pani
siyum

227 | P a g e
115 Upper MOA&FW Har Khet Limak sikio to tate yorda nallah at ketha 1 3.00 1 1 3.00
Subansiri ko Pani
siyum
116 Upper MOA&FW Har Khet Motung nallah to sungba at Eru 1 4.00 4 1 4.00 ASM
Subansiri ko Pani
siyum
117 Upper MOA&FW Har Khet Tayor Nallah to Lingirongo at Sarta vill. 1 4.00 4 1 4.00
Subansiri ko Pani
siyum
118 Upper MOA&FW Har Khet Pinging nallah to rapke rengo at papi village 1 5.00 3 1 5.00 ASM
Subansiri ko Pani
siyum
119 Upper MOA&FW Har Khet Biro sekio to chiyor sebia rango at kajiring 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
120 Upper MOA&FW Har Khet Oching nallah to kajiring moring at kajiring 1 9.00 9 1 9.00
Subansiri ko Pani
siyum
121 Upper MOA&FW Har Khet Pogo nallah to talitsung at kampung vill 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
122 Upper MOA&FW Har Khet Pogo nallah to pogo mode at kampung Vill 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
123 Upper MOA&FW Har Khet Oching nallah to Kamrak Rengo at Eba 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
124 Upper MOA&FW Har Khet Rigu so Sorarijo to Takiong puring vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
125 Upper MOA&FW Har Khet Modi Lingtene to Sora at Takionpuring vill 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
126 Upper MOA&FW Har Khet Rime nallah to akang rime at jenering 1 5.00 1 1 5.00
Subansiri ko Pani
siyum

228 | P a g e
127 Upper MOA&FW Har Khet Eba nallah to gumnaring nallah at jenering 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
128 Upper MOA&FW Har Khet Now nallah to jarling at Gyate Vill 1 4.00 4 1 4.00 ASM
Subansiri ko Pani
siyum
129 Upper MOA&FW Har Khet Lingkorung to Yarchum Koro at Gyate village 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
130 Upper MOA&FW Har Khet Ling kurong to yorchum at gyate 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
131 Upper MOA&FW Har Khet Ling kurong to lingra at gyate 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
132 Upper MOA&FW Har Khet Longkerong to Yarchun at Gyate vill 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
133 Upper MOA&FW Har Khet Ling kurong to sppering at gyate 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
134 Upper MOA&FW Har Khet Lingte sikio to sappe rongo at dilling 1 3.00 4 1 3.00 ASM
Subansiri ko Pani
siyum
135 Upper MOA&FW Har Khet Noh nallah to bame at Garam 1 5.00 6 1 5.00
Subansiri ko Pani
siyum
136 Upper MOA&FW Har Khet Hatum nallah to hoching rango at jenering 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
137 Upper MOA&FW Har Khet Janering nallah to lingpung nallah at jenering 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
138 Upper MOA&FW Har Khet Selho nallah to ruying taaging tam at jingba rai 1 5.00 3 1 5.00
Subansiri ko Pani
siyum

229 | P a g e
139 Upper MOA&FW Har Khet Ago nallah to mengke at jingaba rai 1 6.00 8 1 6.00
Subansiri ko Pani
siyum
140 Upper MOA&FW Har Khet Hoching nallah to hakang mingpiring at jenering 1 4.00 4 1 4.00
Subansiri ko Pani
siyum
141 Upper MOA&FW Har Khet Janering nallah to ningporing at jenering 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
142 Upper MOA&FW Har Khet Loying nallah to loying rijo at jimbarai 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
143 Upper MOA&FW Har Khet Rakni nallah to cheprai at jingba rai 1 5.00 4 1 5.00
Subansiri ko Pani
siyum
144 Upper MOA&FW Har Khet Simba nallah to Saring Jobe at Jingba Rai 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
145 Upper MOA&FW Har Khet Silloh Nallah to Tachiring At Jingba Rai 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
146 Upper MOA&FW Har Khet Hinba Rongo at Dagu 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
147 Upper MOA&FW Har Khet Mip tapo nallah to pungteyor jobe at dagu 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
148 Upper MOA&FW Har Khet Tagosho Nallah at Jingbarai vill 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
149 Upper MOA&FW Har Khet Ruyng nallah to syaled okra at jingba rai 1 3.00 6 1 3.00
Subansiri ko Pani
siyum
150 Upper MOA&FW Har Khet Sua nallah to dorduka at Raba 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum

230 | P a g e
151 Upper MOA&FW Har Khet Lingpune nallah to giayine at linke 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
152 Upper MOA&FW Har Khet Sikiu Nallah to Jingba Rai 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
153 Upper MOA&FW Har Khet Rakni nallah to cheprai at jingaba rai Vill 1 4.00 1 1 4.00
Subansiri ko Pani
siyum
154 Upper MOA&FW Har Khet Kojok Nallah to kojenjobe at Singdak Vill 1 3.00 4 1 3.00
Subansiri ko Pani
siyum
155 Upper MOA&FW Har Khet Durdu nallah to bongia at bogia 1 10.00 8 1 10.00 GCP
Subansiri ko Pani
siyum
156 Upper MOA&FW Har Khet Mip durgusu nallah to dorgusu at bogia 1 3.00 2 1 3.00 ASM
Subansiri ko Pani
siyum
157 Upper MOA&FW Har Khet Makpiya to nongying muri at duku 1 5.00 1 1 5.00 asm
Subansiri ko Pani
siyum
158 Upper MOA&FW Har Khet Ratung Nallah to Ratungrongo at Sarta 1 8.00 6 1 8.00
Subansiri ko Pani
siyum
159 Upper MOA&FW Har Khet Sejing koro to puyu rega at Laklam 1 4.00 6 1 4.00
Subansiri ko Pani
siyum
160 Upper MOA&FW Har Khet Ko nallah to Amriya rengo at Lingi 1 4.00 6 1 4.00
Subansiri ko Pani
siyum
161 Upper MOA&FW Har Khet Selungso to peyu rega at laklam 1 5.00 3 1 5.00 ASM
Subansiri ko Pani
siyum
162 Upper MOA&FW Har Khet Ramya nallah to ramya jobe at ketha 1 7.00 5 1 7.00
Subansiri ko Pani
siyum

231 | P a g e
163 Upper MOA&FW Har Khet Kojok Nallah to Daying jobe agril field at Eyum 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
164 Upper MOA&FW Har Khet Tate nallah to tate jobe at ketha 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
165 Upper MOA&FW Har Khet Janering nallah to lower janering rongo at yebe 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
166 Upper MOA&FW Har Khet Yahoo nallah to upper bochung rongo at yebe 1 8.00 6 1 8.00 AB
Subansiri ko Pani
siyum
167 Upper MOA&FW Har Khet Lower jamring sikio to reme take rongo at yebe 1 8.00 6 1 8.00 ASM
Subansiri ko Pani
siyum
168 Upper MOA&FW Har Khet Mip namding nallah to bame rangio at Tayum 1 1.00 2 1 1.00
Subansiri ko Pani
siyum
169 Upper MOA&FW Har Khet Karam sikio to lingrine rongo at karam 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
170 Upper MOA&FW Har Khet Karam sikio to kuhak rongo at karam 1 2.00 1 1 2.00
Subansiri ko Pani
siyum
171 Upper MOA&FW Har Khet Karam sikio to sebe lingpik rongo at karam 1 2.00 1 1 2.00
Subansiri ko Pani
siyum
172 Upper MOA&FW Har Khet Karam sikio to tahi lingpik rongo at karam 1 2.00 3 1 2.00 AB
Subansiri ko Pani
siyum
173 Upper MOA&FW Har Khet Motung nallah to sungba at Eru 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
174 Upper MOA&FW Har Khet Karam sikio to dano rongo at karam 1 2.00 2 1 2.00 AB
Subansiri ko Pani
siyum

232 | P a g e
175 Upper MOA&FW Har Khet Karam sikio to harak rongo at karam 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
176 Upper MOA&FW Har Khet Tagung Tam Nallah to Topulengne at Pakring vill 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
177 Upper MOA&FW Har Khet Ngo nallah to pilu maying jobe at rungba 1 12.00 6 2 12.00 ASM
Subansiri ko Pani
siyum
178 Upper MOA&FW Har Khet Karam sikio to dago rongo at karam 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
179 Upper MOA&FW Har Khet Karam sikio to ngotum rongo at karam 1 2.00 6 1 2.00
Subansiri ko Pani
siyum
180 Upper MOA&FW Har Khet Karam sikio to kopin rongo at karam 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
181 Upper MOA&FW Har Khet Yoo river to Kamrak Rongo 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
182 Upper MOA&FW Har Khet Gokar Nallah at Kicherai vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
183 Upper MOA&FW Har Khet Tapo nallah to namme moring at kajiring 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
184 Upper MOA&FW Har Khet Tapo sekio to gyai singrit at kajiring 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
185 Upper MOA&FW Har Khet Singruba nallah to singri rengo at Dingdopa 1 5.00 1 1 5.00 ASM
Subansiri ko Pani
siyum
186 Upper MOA&FW Har Khet Tangte nallah to tangte romgo at Rungba 1 5.00 4 1 5.00 ASM
Subansiri ko Pani
siyum

233 | P a g e
187 Upper MOA&FW Har Khet Karam sikio to niamo rongo at karam 1 2.00 3 1 2.00 AB
Subansiri ko Pani
siyum
188 Upper MOA&FW Har Khet Pera nallah to perung moring at kajiring 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
189 Upper MOA&FW Har Khet Tapo sikio to Sapering at Dagu 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
190 Upper MOA&FW Har Khet Hiyo nallah to Eche at Eba 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
191 Upper MOA&FW Har Khet Togeo nallah to linkgke rongo at LinKe 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
192 Upper MOA&FW Har Khet Lingke nallah to tagio nallah at Linke 1 5.00 5 1 5.00
Subansiri ko Pani
siyum
193 Upper MOA&FW Har Khet Lingke seko to paka rega at Linke 1 7.00 4 1 7.00
Subansiri ko Pani
siyum
194 Upper MOA&FW Har Khet Atum Sokio To Jumnering At Eba 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
195 Upper MOA&FW Har Khet selungso to laklam at Laklam 1 5.00 3 1 5.00 ASM
Subansiri ko Pani
siyum
196 Upper MOA&FW Har Khet Oching nallah to kamrak koi rongo at yebe 1 7.00 4 1 7.00
Subansiri ko Pani
siyum
197 Upper MOA&FW Har Khet Yarik siko to pakring at Linke 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
198 Upper MOA&FW Har Khet Selum Nallah to Lumtak 1 2.00 5 1 2.00
Subansiri ko Pani
siyum

234 | P a g e
199 Upper MOA&FW Har Khet Linke nallah to Jorung jorbe at Linke 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
200 Upper MOA&FW Har Khet Sosar rongo art Linke 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
201 Upper MOA&FW Har Khet Tomin nallah to charu lingne at Linke 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
202 Upper MOA&FW Har Khet Hoching nallah to row lingbe at Baki 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
203 Upper MOA&FW Har Khet Hiyo Nallah to Eche at Eba 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
204 Upper MOA&FW Har Khet Linke nallah to Siberrijo at Byaching 1 4.00 6 1 4.00
Subansiri ko Pani
siyum
205 Upper MOA&FW Har Khet Rakte nallah to chakerring at Byaching 1 4.00 6 1 4.00
Subansiri ko Pani
siyum
206 Upper MOA&FW Har Khet Ho sikio to Siki Namching 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
207 Upper MOA&FW Har Khet Seru nallah to lingyane at Neogin 1 9.00 8 1 9.00
Subansiri ko Pani
siyum
208 Upper MOA&FW Har Khet Zode Nallah to Pakring village 1 5.00 5 1 5.00
Subansiri ko Pani
siyum
209 Upper MOA&FW Har Khet Yaling nallah to yacharikpa at pakling Riaku Vill 1 4.00 4 1 4.00
Subansiri ko Pani
siyum
210 Upper MOA&FW Har Khet Yaling nallah to tadung at pakling Riaku 1 3.00 2 1 3.00 AB
Subansiri ko Pani
siyum

235 | P a g e
211 Upper MOA&FW Har Khet Omiu nallah to sogi at pakling Riaku 1 4.00 1 1 4.00 AB
Subansiri ko Pani
siyum
212 Upper MOA&FW Har Khet Bempung belung nallah to laklek ringo at talingha 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
siyum
213 Upper MOA&FW Har Khet Kamchoko nallah to kozingba at pakling Riaku 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
siyum
214 Upper MOA&FW Har Khet CC lining to zode nallah at pakling Riaku 1 10.00 8 1 10.00 AB
Subansiri ko Pani
siyum
215 Upper MOA&FW Har Khet Hoching nallah to tapum jobe at pakling Riaku 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
216 Upper MOA&FW Har Khet Ningpoko Nallah to Petak at Riaku vill 1 5.00 5 1 5.00
Subansiri ko Pani
siyum
217 Upper MOA&FW Har Khet Sumbuko nallah to kelering at Riaku 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
218 Upper MOA&FW Har Khet Lingke nallah to yaruk nallah at Linke 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
219 Upper MOA&FW Har Khet Eyo-sekio to Giummering at Eba 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
siyum
220 Upper MOA&FW Har Khet Tangoring nallah to dungi at Papi 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
221 Upper MOA&FW Har Khet Atum Koro To Papi Kubong At Papi 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
222 Upper MOA&FW Har Khet Row to Biyana at Eru village 1 2.00 5 1 2.00
Subansiri ko Pani
siyum

236 | P a g e
223 Upper MOA&FW Har Khet Janering nallah to lower janering at Eba 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
224 Upper MOA&FW Har Khet Oyu nallah to pirong at pirong 1 2.00 2 1 2.00 ASM
Subansiri ko Pani
siyum
225 Upper MOA&FW Har Khet Okin nallah to mokum jobe at Ekke 1 4.00 1 1 4.00
Subansiri ko Pani
siyum
226 Upper MOA&FW Har Khet Riaga nallah to budlingne jobe at Ekke 1 6.00 8 1 6.00 AC
Subansiri ko Pani
siyum
227 Upper MOA&FW Har Khet Karam sikio to karam rongo at karam 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
228 Upper MOA&FW Har Khet Karam sikio to kaha rongo at karam 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
229 Upper MOA&FW Har Khet Sirom nallah to rava village 1 2.00 2 1 2.00 GC
Subansiri ko Pani
siyum
230 Upper MOA&FW Har Khet Suha nallah to dordukha at Rava 1 4.00 2 1 4.00 GC
Subansiri ko Pani
siyum
231 Upper MOA&FW Har Khet Kudamha nallah to Rava 1 2.00 5 1 2.00 GPM
Subansiri ko Pani
siyum
232 Upper MOA&FW Har Khet Taw Tajo to Lecharpung at Row vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
233 Upper MOA&FW Har Khet Kamchogi Nallah to Komi at Row Vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
234 Upper MOA&FW Har Khet Tango sikio to Dagi Lingtum at Row 1 2.50 6 1 2.50
Subansiri ko Pani
siyum

237 | P a g e
235 Upper MOA&FW Har Khet Nime Siriu Nallah To Pirung Rengo At Dingdopa 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
236 Upper MOA&FW Har Khet Kojok Nallah to Singlok Jobe at Sindak village 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
237 Upper MOA&FW Har Khet Ahte Nallah to Chokneng Yobe under Sindak vill 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
238 Upper MOA&FW Har Khet Hate nallah to chukmin jobe at Sindak 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
239 Upper MOA&FW Har Khet Hate nallah to chukmin at Sindak 1 10.00 11 1 10.00
Subansiri ko Pani
siyum
240 Upper MOA&FW Har Khet Takiung puring to pugru sikio at Sinamching 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
241 Upper MOA&FW Har Khet Chokmin Jobe to Hate Nallah Sindak vill 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
242 Upper MOA&FW Har Khet Tapo Nallah To Sapering Rengo At Dingdopa 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
243 Upper MOA&FW Har Khet Kyapung nallah to laklik rango Talingha 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
244 Upper MOA&FW Har Khet Binpung bilung nallah to opii-lengne rengo Talingha 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
245 Upper MOA&FW Har Khet Kiampung Nallah to Pelengna at Talingha 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
246 Upper MOA&FW Har Khet Seru nallah to tado singring at Taring 1 10.00 11 1 10.00
Subansiri ko Pani
siyum

238 | P a g e
247 Upper MOA&FW Har Khet Lingi sekio to sura at Takionpuring 1 6.00 8 1 6.00 AB
Subansiri ko Pani
siyum
248 Upper MOA&FW Har Khet Ho sekio to sura at takiong puring 1 8.00 7 1 8.00
Subansiri ko Pani
siyum
249 Upper MOA&FW Har Khet No nallah to hap rongo at Tayem 1 1.00 3 1 1.00 AB
Subansiri ko Pani
siyum
250 Upper MOA&FW Har Khet Talam riktak rongo to hopin sikio at Zingmuring 1 2.00 6 1 2.00
Subansiri ko Pani
siyum
251 Upper MOA&FW Har Khet Oching sekio to mingporing at Eba 1 2.00 6 1 2.00 ASM
Subansiri ko Pani
siyum
252 Upper MOA&FW Har Khet Now nallah to byana at Gyate 1 5.00 6 1 5.00
Subansiri ko Pani
siyum
253 Upper MOA&FW Har Khet Now nallah to now chabiya at Gyate 1 5.00 2 1 5.00
Subansiri ko Pani
siyum
254 Upper MOA&FW Har Khet Now nallah to chalin at Gyate 1 4.00 5 1 4.00
Subansiri ko Pani
siyum
255 Upper MOA&FW Har Khet Bikiak sikio to lingbe rongo at Tayum vill 1 1.00 4 1 1.00
Subansiri ko Pani
siyum
256 Upper MOA&FW Har Khet Bikiak sikio to lingdi lingtum rongo at Tayum vill 1 1.00 5 1 1.00
Subansiri ko Pani
siyum
257 Upper MOA&FW Har Khet Bikiak sikio to bakap rongo at Tayum vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
258 Upper MOA&FW Har Khet Bikiak sikio to pinging rongo at Tayum 1 2.00 4 1 2.00
Subansiri ko Pani
siyum

239 | P a g e
259 Upper MOA&FW Har Khet Karam sikio to biake rongo at karam 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
260 Upper MOA&FW Har Khet Karam sikio to lingdi rongo at karam 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
261 Upper MOA&FW Har Khet Kodamha Nallah To Namah Rengo At Dingdopa 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
262 Upper MOA&FW Har Khet Bikiak sikio to singrit namching rongo at Tayum 1 2.00 6 1 2.00
Subansiri ko Pani
siyum
263 Upper MOA&FW Har Khet Bikiak sikio to namching rongo at Tayum 1 1.00 1 1 1.00
Subansiri ko Pani
siyum
264 Upper MOA&FW Har Khet Mip erung nallah to bame rangio at Tayum 1 1.00 1 1 1.00
Subansiri ko Pani
siyum
265 Upper MOA&FW Har Khet Lingte sikio to heeche rongo at Dilling 1 2.00 1 1 2.00 ASM
Subansiri ko Pani
siyum
266 Upper MOA&FW Har Khet Lingte sikio to hape rongo at Dilling 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
267 Upper MOA&FW Har Khet Lingte sikio to Beying rongo at Dilling 1 3.00 1 1 3.00
Subansiri ko Pani
siyum
268 Upper MOA&FW Har Khet Chenper Chingni To Pailering Rongo At Dui 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
269 Upper MOA&FW Har Khet Mip Noh Nallah to Erung at Tayum Vill 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
270 Upper MOA&FW Har Khet Mip kiute nallah to nyachu jobe at dagu 1 4.00 1 1 4.00
Subansiri ko Pani
siyum

240 | P a g e
271 Upper MOA&FW Har Khet Mip kiopen nallah to sepe jobe at dagu 1 4.00 4 1 4.00 ASM
Subansiri ko Pani
siyum
272 Upper MOA&FW Har Khet Akia Sokio to Namha at Kajiring -2 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
273 Upper MOA&FW Har Khet Horo nallah to dindo rengo at Dingdopa 1 1.00 3 1 1.00 GC
Subansiri ko Pani
siyum
274 Upper MOA&FW Har Khet Oching nallah to yengnu rengo at Dingdopa 1 1.00 3 1 1.00 GC
Subansiri ko Pani
siyum
275 Upper MOA&FW Har Khet Yoo nallah to akeng jamering at yebe 1 3.00 5 1 3.00
Subansiri ko Pani
siyum
276 Upper MOA&FW Har Khet Jamering nallah to lower jamering a yebe 1 3.00 6 1 3.00
Subansiri ko Pani
siyum
277 Upper MOA&FW Har Khet Yahoo nallah to reme at yebe 1 7.00 4 1 7.00
Subansiri ko Pani
siyum
278 Upper MOA&FW Har Khet Yahoo nallah to lower remeat at yebe 1 5.00 3 1 5.00 ASM
Subansiri ko Pani
siyum
279 Upper MOA&FW Har Khet Yoo nallah to kamra rongo at yebe 1 2.00 4 1 2.00
Subansiri ko Pani
siyum
280 Upper MOA&FW Har Khet Lower yoo nallah to Taching rongo at Yebe 1 7.00 3 1 7.00
Subansiri ko Pani
siyum
281 Upper MOA&FW Har Khet Hoching sikio to lower mengporing tali rongo at yebe 1 8.00 2 1 8.00
Subansiri ko Pani
siyum
282 Upper MOA&FW Har Khet Haki nallah to haki jobe at Ekke village 1 4.00 2 1 4.00
Subansiri ko Pani
siyum

241 | P a g e
283 Upper MOA&FW Har Khet Hote nallah to gikam jobe at Ekke 1 4.00 2 1 4.00
Subansiri ko Pani
siyum
284 Upper MOA&FW Har Khet Perong Nallah To Pakluk Rengo At Pirong 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
285 Upper MOA&FW Har Khet Eba nallah to lower eba bochung rongo at yebe 1 5.00 1 1 5.00 ASM
Subansiri ko Pani
siyum
286 Upper MOA&FW Har Khet Singburing Nallah to Pamtak yorbe 1 4.00 3 1 4.00
Subansiri ko Pani
siyum
287 Upper MOA&FW Har Khet at Sato Nallah to Yinyu 1 6.00 6 1 6.00
Subansiri ko Pani
siyum
288 Upper MOA&FW Har Khet Biyline rongo to hopin sikio at Zingmuring 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
siyum
289 Upper MOA&FW Har Khet Kosing nallah to kichu riga at Zingmuring 1 1.00 3 1 1.00 ASM
Subansiri ko Pani
siyum
290 Upper MOA&FW Har Khet Patik lingpin nallah to kopin at Zingmuring 1 2.00 2 1 2.00 ASM
Subansiri ko Pani
siyum
291 Upper MOA&FW Har Khet Kow nallah to zingporing at Zingmuring 1 1.00 2 1 1.00 ASM
Subansiri ko Pani
siyum
292 Upper MOA&FW Har Khet Kosing nallah to yapam signe at Zingmuring 1 1.00 1 1 1.00 ASM
Subansiri ko Pani
siyum
293 Upper MOA&FW Har Khet Sartum nallah to korpu rongo at Zingmuring 1 2.00 1 1 2.00 GCP
Subansiri ko Pani
siyum
294 Upper MOA&FW Har Khet Aking seko nallah to niakrim sung at Zingmuring 1 1.00 1 1 1.00
Subansiri ko Pani
siyum

242 | P a g e
295 Upper MOA&FW Har Khet Ruomi siku nallah to riote siku at Zingmuring 1 1.00 1 1 1.00
Subansiri ko Pani
siyum
296 Upper MOA&FW Har Khet Riote siku nallah to aking seku at Zingmuring 1 1.00 3 1 1.00
Subansiri ko Pani
siyum
297 Upper MOA&FW Har Khet Zingpake rongo to hopin sikio at Zingmuring 1 1.00 3 1 1.00
Subansiri ko Pani
siyum
298 Upper MOA&FW Har Khet Doli lingne rongo to hopin sikio at Zingmuring 1 1.00 4 1 1.00
Subansiri ko Pani
siyum
299 Upper MOA&FW Har Khet Pintung rongo to hopin sikio at Zingmuring 1 1.00 5 1 1.00 GC
Subansiri ko Pani
siyum
300 Upper MOA&FW Har Khet Pirak lingpik rongo to hopin sikio at Zingmuring 1 2.00 6 1 2.00 GC
Subansiri ko Pani
siyum
301 Upper MOA&FW Har Khet Kyampung nallah to ape lingne rengo at Talingha 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
302 Upper MOA&FW Har Khet Yoh nallah to rime at Eba 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
303 Upper MOA&FW Har Khet Osing nallh to dool rengo Talingha 1 2.00 3 1 2.00 GC
Subansiri ko Pani
siyum
304 Upper MOA&FW Har Khet Mada lingia nallah to talengga rengo at Talingha 1 9.00 10 1 9.00 GC
Subansiri ko Pani
siyum
305 Upper MOA&FW Har Khet Horo nallah to tumroba rengo at Talingha 1 9.00 10 1 9.00
Subansiri ko Pani
siyum
306 Upper MOA&FW Har Khet Talumha nawa to songba at Eru 1 4.00 3 1 4.00
Subansiri ko Pani
siyum

243 | P a g e
307 Upper MOA&FW Har Khet Yimending nallah to chinba at Eru 1 4.00 11 1 4.00
Subansiri ko Pani
siyum
308 Upper MOA&FW Har Khet Bikiak sikio to joki rongo at Tayum 1 1.00 4 1 1.00
Subansiri ko Pani
siyum
309 Upper MOA&FW Har Khet Bikiak sikio to takia hamching rongo at Tayum 1 1.00 5 1 1.00
Subansiri ko Pani
siyum
310 Upper MOA&FW Har Khet Ramya nallah to seber jobe at Ketha 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
311 Upper MOA&FW Har Khet Karam sikio to rakle rongo at Karam 1 5.00 5 1 5.00
Subansiri ko Pani
siyum
312 Upper MOA&FW Har Khet Birek nallah to Zingmoring jobe at Zingmoring vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
313 Upper MOA&FW Har Khet Atum nallah to linke mori at Linke 1 3.00 1 1 3.00
Subansiri ko Pani
siyum
314 Upper MOA&FW Har Khet Parik lingpik to kopin sakio at Zingmoring vill 1 2.00 5 1 2.00
Subansiri ko Pani
siyum
315 Upper MOA&FW Har Khet Lingi Nallah To Renuso At Takiong Puring 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
316 Upper MOA&FW Har Khet Bame yoridum rongo to hopin sikio at Zingmoring 1 1.00 5 1 1.00
Subansiri ko Pani
siyum
317 Upper MOA&FW Har Khet Ringpa rongo to hopin sikio at Zingmoring 1 1.00 4 1 1.00
Subansiri ko Pani
siyum
318 Upper MOA&FW Har Khet Nialo rongo to hopin sikio at Zingmoring 1 2.00 3 1 2.00
Subansiri ko Pani
siyum

244 | P a g e
319 Upper MOA&FW Har Khet Kahi tarka rongo to hopin sikio at Zingmoring 1 1.00 4 1 1.00
Subansiri ko Pani
siyum
320 Upper MOA&FW Har Khet Ojju rigyi rongo to hopin sikio at Zingmoring 1 2.00 6 1 2.00
Subansiri ko Pani
siyum
321 Upper MOA&FW Har Khet Sinyu-Siku Nallah to Biki Rongo at Gingba 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
322 Upper MOA&FW Har Khet Lumak nallah to Bame Yordum at Garam 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
323 Upper MOA&FW Har Khet Simba Nallah to Saring Jobe at Jingba Rai 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
324 Upper MOA&FW Har Khet Silloh Nallah to Tachiring at Jingba Rai 1 3.00 3 1 3.00
Subansiri ko Pani
siyum
325 Upper MOA&FW Har Khet Siching Nallah to Digo Liyo at Kiche Rai 1 2.00 3 1 2.00
Subansiri ko Pani
siyum
326 Upper MOA&FW Har Khet Linke Nallah to Jorung Jorbe at Linke 1 5.00 3 1 5.00
Subansiri ko Pani
siyum
327 Upper MOA&FW Har Khet Lingpa Sikio To Togio Rengo At Linke 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
328 Upper MOA&FW Har Khet Tanium Sikio To Kepen Rengo At Linke 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
329 Upper MOA&FW Har Khet Si-Nallah to Gyamo Ringo at Pakring 1 3.00 2 1 3.00
Subansiri ko Pani
siyum
330 Upper MOA&FW Har Khet Atum Koro to Papi Kubong at Papi 1 2.00 3 1 2.00
Subansiri ko Pani
siyum

245 | P a g e
331 Upper MOA&FW Har Khet Mangam Nallah To Dapo Rengo At Papi 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
332 Upper MOA&FW Har Khet Togio Nallah To Borong Rengo At Papi 1 2.00 2 1 2.00
Subansiri ko Pani
siyum
333 Upper MOA&FW Har Khet 1 3.00
Subansiri ko Pani
siyum CC lining Sigiam nallah to Tonging moring at Duku 1 3.00 4
334 Upper MOA&FW Har Khet 1 2.00
Subansiri ko Pani
siyum Seka Sikio to Tapu Rijo at Lingi 1 2.00 2
335 Upper MOA&FW Har Khet 1 3.00
Subansiri ko Pani
siyum Omi nallah to Digo-Liyo agri-field at Kitche Rai 1 3.00 3
336 Upper MOA&FW Har Khet Row nallah to Beburing at Eru,(seg-1) 1 3.00
Subansiri ko Pani
siyum 1 3.00 5
337 Upper MOA&FW Har Khet 1 7.00
Subansiri ko Pani
siyum Noh-Koro to Yigu jobe at Gyate vill 1 7.00 6
338 Upper MOA&FW Har Khet 1 12.00
Subansiri ko Pani
siyum Hote Nallah at Jingba Rai 1 12.00 5
339 Upper MOA&FW Har Khet 1 10.00
Subansiri ko Pani
siyum mip at Mosu vill 1 10.00 9
340 Upper MOA&FW Har Khet 1 10.00
Subansiri ko Pani Sato Nallah at Bogia
siyum 1 10.00 5
341 Upper MOA&FW Har Khet Ore nallah at Ekke 1 10.00
Subansiri ko Pani
siyum 1 10.00 6
342 Upper MOA&FW Har Khet 1 12.00
Subansiri ko Pani Tungying to Makpia at Dui
siyum 1 12.00 5

246 | P a g e
343 Upper MOA&FW Har Khet 1 8.00
Subansiri ko Pani Tapo nallah to Namne moring at Kajring
siyum 1 8.00 2
344 Upper MOA&FW Har Khet 1 5.00
Subansiri ko Pani
siyum Singruwa Nallah to perung at kajring 1 5.00 2
345 Upper MOA&FW Har Khet 1 5.00
Subansiri ko Pani
siyum Sigiam nallah at Dui 1 5.00 2
346 Upper MOA&FW Har Khet Sipi nallah to Koying at Byania 1 2.00
Subansiri ko Pani
siyum 1 2.00 2
347 Upper MOA&FW Har Khet Noh Nala to Bame at Tayum vill 1 8.00
Subansiri ko Pani
siyum 1 8.00 3
348 Upper MOA&FW Har Khet Koh Nala to Dilling at Dilling vill 1 8.00
Subansiri ko Pani
siyum 1 8.00 3
349 Upper MOA&FW Har Khet Boma Nallah to Check dam at Dilling and Tayum vill 1 8.00
Subansiri ko Pani
siyum 1 8.00 3
350 Upper MOA&FW Har Khet Daw Nala to Jakar Jobe at Eyum vill 1 8.00
Subansiri ko Pani
siyum 1 8.00 4
351 Upper MOA&FW Har Khet Lingia Nala to Daying Jobe at Eyum vill 1 8.00
Subansiri ko Pani
siyum 1 8.00 4
352 Upper MOA&FW Har Khet 1 8.00
Subansiri ko Pani
siyum Kui Nallah to Check dam at Eyum to Gyate vill 1 8.00 4
353 Upper MOA&FW Har Khet 1 7.00
Subansiri ko Pani
siyum Kungkia Nallah to Tabiu yorko at Pochak 1 7.00 5
354 Upper MOA&FW Har Khet 1 8.00
Subansiri ko Pani
siyum Hagia Nallah to :Lingione at Pochak 1 8.00 6

247 | P a g e
355 Upper MOA&FW Har Khet 1 5.00
Subansiri ko Pani
siyum Kete Nallah to Sikiu rong at Dui vill 1 5.00 5
356 Upper MOA&FW Har Khet 1 4.00
Subansiri ko Pani
siyum Taning to Taningne at Mosu vill 1 4.00 7

CAD NEW SCHEMES


Sl.No. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated Remarks
the Ministry / Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
1 Upper MOA&FW Har Khet Renov.of Joho Nallah to Tiljaring at Tiljaring Vill 1 20.00 11 3 20.00 MLA&ASM
Subansiri ko Pani
Taliha
2 Upper MOA&FW Har Khet Ogu-sho Nallah to Bobomjobe at Lingram Vill 1 15.00 9 2 15.00 MLA & ASM
Subansiri ko Pani
Taliha
3 Upper MOA&FW Har Khet Chingchibong to Momi under Mara vill 1 10.00 6 1 10.00 MLA
Subansiri ko Pani
Taliha
4 Upper MOA&FW Har Khet Joho Nallah to Lepajaring under Lepajaring vill 1 12.00 7 2 12.00 MLA
Subansiri ko Pani
Taliha
5 Upper MOA&FW Har Khet Kebaso to Si-Joring at Kebaso Mara vill 1 12.00 7 2 12.00 MLA&ASM
Subansiri ko Pani
Taliha
6 Upper MOA&FW Har Khet Tarekoro to Bairingjo at Setumbobing Mara vill 1 6.00 5 1 6.00 ASM
Subansiri ko Pani
Taliha
7 Upper MOA&FW Har Khet Raba to Kiora at Dagiam Vill 1 4.00 3 1 4.00 MLA&ASM
Subansiri ko Pani
Taliha

248 | P a g e
8 Upper MOA&FW Har Khet Taying Nallah to Taayingmoring at Tabomna vill 1 12.00 9 2 12.00 CE&MLA
Subansiri ko Pani
Taliha
9 Upper MOA&FW Har Khet Siding Nallah to upper Chotam at Tili-jaring vill 1 3.00 3 1 3.00 MLA
Subansiri ko Pani
Taliha
10 Upper MOA&FW Har Khet Tona ochi to Tonarongo at Ngute vill 1 4.00 1 1 4.00 HCM
Subansiri ko Pani
Taliha
11 Upper MOA&FW Har Khet Moku Nallah to Si-Jobe at Kodak Vill 1 7.00 6 1 7.00 ASM
Subansiri ko Pani
Taliha
12 Upper MOA&FW Har Khet CC linning of Yeo Nallah to Sinamching at Sinamsing vill 1 15.00 1 2 15.00 MLA,CE &
Subansiri ko Pani ASM
Taliha
13 Upper MOA&FW Har Khet Neelakseko at Gyasing vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
14 Upper MOA&FW Har Khet Enchi nallah to Maki at Maki vill 1 3.00 1 1 3.00 MLA& AC
Subansiri ko Pani
Taliha
15 Upper MOA&FW Har Khet Rachitso Tachor moring under Lingram Vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
Taliha
16 Upper MOA&FW Har Khet Kio Nallah to Si-Joring Agri Field(Kow) at Kodak 1 5.00 3 1 5.00
Subansiri ko Pani
Taliha
17 Upper MOA&FW Har Khet Roh Koro to Nguring at Mara vill 1 18.00 15 2 18.00 MLA
Subansiri ko Pani
Taliha
18 Upper MOA&FW Har Khet Kido nallah under Jiba vill 1 4.00 2 2 4.00 MLA
Subansiri ko Pani
Taliha

249 | P a g e
19 Upper MOA&FW Har Khet Kote nallah at Mering under Mering Vill 1 6.00 5 1 6.00 MLA&ASM
Subansiri ko Pani
Taliha
20 Upper MOA&FW Har Khet Siriso Nallah to Porbujobe at Dupit vill 1 4.00 2 1 4.00 MLA
Subansiri ko Pani
Taliha
21 Upper MOA&FW Har Khet Ngo koro to Bokra under Mara Vill 1 5.00 7 1 5.00 MLA
Subansiri ko Pani
Taliha
22 Upper MOA&FW Har Khet Raso karo to Nadarengo at Ningtemori Vill 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
23 Upper MOA&FW Har Khet Rayo Nallah to Konia(Teji konia) at konia Vill 1 3.00 5 1 3.00 HCM
Subansiri ko Pani
Taliha
24 Upper MOA&FW Har Khet Ratak Nallah to Amperiktak at Mo-Mara 1 4.00 5 1 4.00 MLA
Subansiri ko Pani
Taliha
25 Upper MOA&FW Har Khet Ngo koro to Bognejobe at Bogne Mara Vill 1 4.00 5 1 4.00 MLA
Subansiri ko Pani
Taliha
26 Upper MOA&FW Har Khet Jamiak karo to Nintemori at Nintemori Vill 1 3.00 1 1 3.00 MLA
Subansiri ko Pani
Taliha
27 Upper MOA&FW Har Khet Yoh nallah to Rajebong at sinamsing vill 1 3.00 3 1 3.00 MLA&ASM
Subansiri ko Pani
Taliha
28 Upper MOA&FW Har Khet Kebaso Nallah to chebamoring at Chebamara vill 1 10.00 6 1 10.00 MLA & ex-
Subansiri ko Pani ASM
Taliha
29 Upper MOA&FW Har Khet Tada koro to Namching at Cheba Mara Vill 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha

250 | P a g e
30 Upper MOA&FW Har Khet khadin soko to aying jobey at Aying Rigia vill 1 7.00 6 1 7.00
Subansiri ko Pani
Taliha
31 Upper MOA&FW Har Khet Jigiam Nallah to Giamdu at Siriring Vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
32 Upper MOA&FW Har Khet Jamiak karo to Bolinrijo at Nintemori Vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
33 Upper MOA&FW Har Khet Ongying Moring under Jeba Vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
34 Upper MOA&FW Har Khet Raje Nallah to Si-Joring 1 5.00 1 1 5.00 MLA
Subansiri ko Pani
Taliha
35 Upper MOA&FW Har Khet Bharatjoring at Bogne Mara vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
36 Upper MOA&FW Har Khet Khadin soko to putung jobey at Aying Rigia vill 1 4.00 1 1 4.00 ex-asm
Subansiri ko Pani
Taliha
37 Upper MOA&FW Har Khet Rikmo to Chinku at Rigia vii 1 3.00 1 1 3.00 MLA
Subansiri ko Pani
Taliha
38 Upper MOA&FW Har Khet Kokpu Nallah under Aging Konia 1 2.00 1 1 2.00 MLA
Subansiri ko Pani
Taliha
39 Upper MOA&FW Har Khet Aya siku to Takke Esi-Rongo at Mo-Mara 1 4.00 1 1 4.00 MLA
Subansiri ko Pani
Taliha
40 Upper MOA&FW Har Khet Kopin soko to Kaksu Lakpin at Mering Mara 1 4.00 2 1 4.00 MLA
Subansiri ko Pani
Taliha

251 | P a g e
41 Upper MOA&FW Har Khet Tare kro to bairingjo at setum at bobing mara 1 10.00 6 1 10.00 ASM
Subansiri ko Pani
Taliha
42 Upper MOA&FW Har Khet Dungda sho to kiakung moring at Doyum vill 1 4.00 1 1 4.00 MLA
Subansiri ko Pani
Taliha
43 Upper MOA&FW Har Khet Khadin soko to momo moring at Aying Rigia vill 1 3.00 1 1 3.00 ex-asm
Subansiri ko Pani
Taliha
44 Upper MOA&FW Har Khet Nbo Silco to Heehe village at Heehe area 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
45 Upper MOA&FW Har Khet Enchi nallah to enchi moring at ahging konia 1 2.00 4 1 2.00 AC
Subansiri ko Pani
Taliha
46 Upper MOA&FW Har Khet Todrokoro to Jaring at Tiljaring vill 1 3.00 4 1 3.00 MLA
Subansiri ko Pani
Taliha
47 Upper MOA&FW Har Khet C/O Water harvesting structures at Nayam vill 1 10.00 8 1 10.00
Subansiri ko Pani
Taliha
48 Upper MOA&FW Har Khet Enchi nallah to Nideme at Ahging Konia vill 1 2.00 3 1 2.00 ex-asm
Subansiri ko Pani
Taliha
49 Upper MOA&FW Har Khet Enchi nallah to chingku konia at Ahging konia vill 1 3.00 2 1 3.00 ex-asm
Subansiri ko Pani
Taliha
50 Upper MOA&FW Har Khet Enchi nallah to aging konia at ahging konia vill 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
51 Upper MOA&FW Har Khet Sorung Nallah to Aya Ringjo village Heya Mara vill 1 4.00 2 1 4.00 MLA
Subansiri ko Pani
Taliha

252 | P a g e
52 Upper MOA&FW Har Khet Tona koro to Tonarongo at Ngute vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
Taliha
53 Upper MOA&FW Har Khet Reing seko to Lukpejobe at Mo-Mara vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
Taliha
54 Upper MOA&FW Har Khet Lingam Rongo at Timba vill 1 4.00 1 1 4.00
Subansiri ko Pani
Taliha
55 Upper MOA&FW Har Khet Miyonsikio to Eboporing at Ebo Vill 1 3.00 2 1 3.00 Ex-ZPC
Subansiri ko Pani
Taliha
56 Upper MOA&FW Har Khet Cheta Sikio to Edenmoring at Ebo vill 1 3.00 2 1 3.00 Ex-ZPC
Subansiri ko Pani
Taliha
57 Upper MOA&FW Har Khet Kamcho koro to yagtakrijo at BagbiVill 1 6.00 6 1 6.00 GPM
Subansiri ko Pani
Taliha
58 Upper MOA&FW Har Khet Eichingmoring(taka) under Mara vill 1 5.00 2 1 5.00 Ex-ASM
Subansiri ko Pani
Taliha
59 Upper MOA&FW Har Khet C/O Water harvesting structures at Radiing vill 1 10.00 9 1 10.00
Subansiri ko Pani
Taliha
60 Upper MOA&FW Har Khet Enchi nallah to Ema siku at Ahging konia 1 2.00 1 1 2.00 AC
Subansiri ko Pani
Taliha
61 Upper MOA&FW Har Khet Senchar-ne to Raba at Lepajaring Vill 1 5.00 1 1 5.00
Subansiri ko Pani
Taliha
62 Upper MOA&FW Har Khet Eching-mari to bogne at Bogne 1 3.00 3 1 3.00 ASM
Subansiri ko Pani
Taliha

253 | P a g e
63 Upper MOA&FW Har Khet Riukpuu Nallah under Timba vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
64 Upper MOA&FW Har Khet Chebakh koro Lengpajobe at Pakpa village 1 3.00 2 1 3.00 HM,WRD
Subansiri ko Pani
Taliha
65 Upper MOA&FW Har Khet Bogching koro to Bogching at Bogne Vill 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
66 Upper MOA&FW Har Khet Rote koro to digi at Bogne 1 3.00 5 1 3.00
Subansiri ko Pani
Taliha
67 Upper MOA&FW Har Khet Enchi nallah to Enba jobe at Ahging konia 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
68 Upper MOA&FW Har Khet Riago soko to hagang at Papa Vill 1 4.00 5 1 4.00 ASM
Subansiri ko Pani
Taliha
69 Upper MOA&FW Har Khet Yormi koro to Paktam ringjo at Papa Vill 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
70 Upper MOA&FW Har Khet Sijako to bokra at Bogne 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
71 Upper MOA&FW Har Khet Enchi nallah to nite siku at Ahging konia 1 2.00 1 1 2.00 AC
Subansiri ko Pani
Taliha
72 Upper MOA&FW Har Khet Tada seko to bhui moring at Cheba Mara 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
73 Upper MOA&FW Har Khet Ongying nallah to Ongying Moring under Timba Vill 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha

254 | P a g e
74 Upper MOA&FW Har Khet Nho siko to chokda moring at Chokda 1 10.00 5 1 10.00
Subansiri ko Pani
Taliha
75 Upper MOA&FW Har Khet Yogo Tarak Nallah, Bimpak vill 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
76 Upper MOA&FW Har Khet Kojin nallah to radin kote moring at Dupit vill 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
77 Upper MOA&FW Har Khet Dikdo-koro nallah to sinik-jobe at Dupit 1 4.00 1 1 4.00
Subansiri ko Pani
Taliha
78 Upper MOA&FW Har Khet Kebaso to Cheba Mara vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
79 Upper MOA&FW Har Khet Songs soko to pakpak ringjo at Chebamara 1 12.00 6 1 12.00 Ex-ZPC
Subansiri ko Pani
Taliha
80 Upper MOA&FW Har Khet Pabi nallah to Himbamoring at Dukom Vil 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
81 Upper MOA&FW Har Khet Rachitso to Bubomjobe at Lingram vill 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha
82 Upper MOA&FW Har Khet Ningporing nallah under Duchok vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
83 Upper MOA&FW Har Khet Enchihi nallah to Eba moring at Ahging konia 1 3.00 4 1 3.00 ex-asm
Subansiri ko Pani
Taliha
84 Upper MOA&FW Har Khet Tada koro to namching rijo at Cheba mara 1 5.00 3 1 5.00 MLA
Subansiri ko Pani
Taliha

255 | P a g e
85 Upper MOA&FW Har Khet Omi Nallah under Putung Dui vill 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
86 Upper MOA&FW Har Khet Nilaksikio to Oying at Jiba vill 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
87 Upper MOA&FW Har Khet Sorchi lahak under Timba village 1 4.00 2 1 4.00
Subansiri ko Pani
Taliha
88 Upper MOA&FW Har Khet Gyasi koro to Gyasirijo at Gyasing vill 1 5.00 2 1 5.00 GPM
Subansiri ko Pani
Taliha
89 Upper MOA&FW Har Khet water Harvesting structure at Kodak vill 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
90 Upper MOA&FW Har Khet Tokdik Nallah under Darba vill 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
91 Upper MOA&FW Har Khet Oching koro to gepe at lari Dagiam 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha
92 Upper MOA&FW Har Khet Namching koro to rakeramching at lari Dagiam 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
93 Upper MOA&FW Har Khet Saba koro to sobarijo at Gyasing vill 1 3.00 6 1 3.00
Subansiri ko Pani
Taliha
94 Upper MOA&FW Har Khet Buru Hote to Ongying Jeba vill 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
95 Upper MOA&FW Har Khet Dikgi sow to digi at Bogne Vill 1 3.00 2 1 3.00 ex-ZPC
Subansiri ko Pani
Taliha

256 | P a g e
96 Upper MOA&FW Har Khet Daro nallah to Eche vill 1 4.00 4 1 4.00 ASM
Subansiri ko Pani
Taliha
97 Upper MOA&FW Har Khet Roje Nallah sijoring Mara 1 4.00 2 1 4.00 MLA
Subansiri ko Pani
Taliha
98 Upper MOA&FW Har Khet Jedu nallah to koro moring at Dukum vill 1 5.00 5 1 5.00 GPM
Subansiri ko Pani
Taliha
99 Upper MOA&FW Har Khet Tango sikio lingtum at Row 1 3.00 1.2 1 3.00 MLA
Subansiri ko Pani
Taliha
100 Upper MOA&FW Har Khet Home ote to palin rengo at Ganga camp 1 3.00 1 1 3.00 GPM
Subansiri ko Pani
Taliha
101 Upper MOA&FW Har Khet Jate koro to seja at Bogne Vill 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
102 Upper MOA&FW Har Khet Kurmingho to Maringa at Darba vill 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
103 Upper MOA&FW Har Khet Hakang so to ayen jobung at Darba 1 1.00 4 1 1.00
Subansiri ko Pani
Taliha
104 Upper MOA&FW Har Khet Taying Nallah to Taying moring at Kodak Vill 1 5.00 5 1 5.00 ASM
Subansiri ko Pani
Taliha
105 Upper MOA&FW Har Khet Mew soko to mering rengo at Ganga camp 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
Taliha
106 Upper MOA&FW Har Khet Siching siko to diring jobe at Darba 1 1.00 1 1 1.00 GPM
Subansiri ko Pani
Taliha

257 | P a g e
107 Upper MOA&FW Har Khet Darpin nallah to nisiraga at Darba 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
108 Upper MOA&FW Har Khet Kakpu nallah to koro moring at Dukum 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
109 Upper MOA&FW Har Khet Pabi nallah to papi yorbe at Dukum 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
110 Upper MOA&FW Har Khet Homi ote to yaku bangri at Putung dui 1 3.00 4 1 3.00 GPM
Subansiri ko Pani
Taliha
111 Upper MOA&FW Har Khet Koro nallah to koro moring at Dukum 1 4.00 3 1 4.00 GPM
Subansiri ko Pani
Taliha
112 Upper MOA&FW Har Khet Daro nallah to nisiraga at Darba 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
Taliha
113 Upper MOA&FW Har Khet Jaho nallah to Porii-Larbu Rongo at Tili-jaring 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
114 Upper MOA&FW Har Khet Lingling nallah to Dukum 1 4.00 2 1 4.00
Subansiri ko Pani
Taliha
115 Upper MOA&FW Har Khet Dumpung Kuro to Siching Moring at Dumpung vill 1 4.00 2 1 4.00
Subansiri ko Pani
Taliha
116 Upper MOA&FW Har Khet Jho nallah to jukring at Doyum vill 1 4.00 3 1 4.00 ex-asm
Subansiri ko Pani
Taliha
117 Upper MOA&FW Har Khet Nalo sha nallah to juling at Damba 1 3.00 3 1 3.00 ZPC
Subansiri ko Pani
Taliha

258 | P a g e
118 Upper MOA&FW Har Khet Kojin nallah to kojin riktak at Duchok 1 4.00 2 1 4.00 ASM
Subansiri ko Pani
Taliha
119 Upper MOA&FW Har Khet Damo nallah to ejimha moring at Damba 1 2.00 4 1 2.00 ZPC
Subansiri ko Pani
Taliha
120 Upper MOA&FW Har Khet Saturing at Dupit village 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
121 Upper MOA&FW Har Khet Riga moring to kengpin lengpak at damba 1 3.00 5 1 3.00 ASM
Subansiri ko Pani
Taliha
122 Upper MOA&FW Har Khet Mew seko to yeke rengo at putung dui 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
123 Upper MOA&FW Har Khet anin seko to Ranin rengo at Putung dui 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
124 Upper MOA&FW Har Khet Omi seko to chingku rango at Putung dui 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
125 Upper MOA&FW Har Khet Darpen siko to lipu yorbe at Darba 1 2.00 3 1 2.00 GPM
Subansiri ko Pani
Taliha
126 Upper MOA&FW Har Khet Yarang sho to Gingba Yorbe at Doyum vill 1 3.00 4 1 3.00 ex-asm
Subansiri ko Pani
Taliha
127 Upper MOA&FW Har Khet Oching ote to lower damba at Damba vill 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
128 Upper MOA&FW Har Khet Homi ote to ramsing rengo at Ganga camp 1 3.00 5 1 3.00 ASM
Subansiri ko Pani
Taliha

259 | P a g e
129 Upper MOA&FW Har Khet Hami soko to dew rengo at Ganga camp 1 3.00 2 1 3.00 ASM
Subansiri ko Pani
Taliha
130 Upper MOA&FW Har Khet Paking Nallah under Dedu vill 1 5.00 2 1 5.00 MLA
Subansiri ko Pani
Taliha
131 Upper MOA&FW Har Khet Rijo nallah to lingpi-ne moring at Dupit 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
132 Upper MOA&FW Har Khet Tona koro to chiku Rongo at Ngute vill 1 6.00 6 1 6.00 ASM
Subansiri ko Pani
Taliha
133 Upper MOA&FW Har Khet Tona koro to Taria Rongo at Ngute vill 1 6.00 6 1 6.00 ASM
Subansiri ko Pani
Taliha
134 Upper MOA&FW Har Khet Rachit Soo to Tochor Moring under Lingram vill 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha
135 Upper MOA&FW Har Khet Bilak so to pilu ha at Darba 1 1.00 5 1 1.00 GPM
Subansiri ko Pani
Taliha
136 Upper MOA&FW Har Khet Rio-nallah to taine moring at Darba 1 1.00 6 1 1.00
Subansiri ko Pani
Taliha
137 Upper MOA&FW Har Khet Rio nallah to saturing moring at dupit 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha
138 Upper MOA&FW Har Khet Water Harvesting structure at Timba vill 1 4.00 6 1 4.00
Subansiri ko Pani
Taliha
139 Upper MOA&FW Har Khet Siri-so nallah to a.l.c taliha at Dupit 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha

260 | P a g e
140 Upper MOA&FW Har Khet Goying to rikching at Lingram 1 2.00 3 1 2.00 GPM
Subansiri ko Pani
Taliha
141 Upper MOA&FW Har Khet Hengnesoh, Lepajaring 1 2.00 3 1 2.00 MLA
Subansiri ko Pani
Taliha
142 Upper MOA&FW Har Khet Kojin nallah to laklam pu jobe at Dupit 1 3.00 1 1 3.00 ASM
Subansiri ko Pani
Taliha
143 Upper MOA&FW Har Khet Riva nallah to takering moring at Dupit 1 2.00 6 1 2.00 ASM
Subansiri ko Pani
Taliha
144 Upper MOA&FW Har Khet Kebaso to Tikringka at Mara vill 1 8.00 4 1 8.00 ASM
Subansiri ko Pani
Taliha
145 Upper MOA&FW Har Khet CC Linning Jamiak karo to Niochu Ledirijo at Nintemori Vill 1 10.00 6 1 10.00
Subansiri ko Pani
Taliha
146 Upper MOA&FW Har Khet Nelakseko to Tabiriu at Jiba Vill 1 2.00 6 1 2.00
Subansiri ko Pani
Taliha
147 Upper MOA&FW Har Khet Ongying nallah to Ongying(Yapak) at Timba Vill 1 2.00 6 1 2.00
Subansiri ko Pani
Taliha
148 Upper MOA&FW Har Khet Sigo Seko to Siriring at Siriring Vill 1 2.00 6 1 2.00
Subansiri ko Pani
Taliha
149 Upper MOA&FW Har Khet Jorong-sho to padi moring at Lingram 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
150 Upper MOA&FW Har Khet Nelom-so nallah to mokling moring at Damba 1 1.00 2 1 1.00
Subansiri ko Pani
Taliha

261 | P a g e
151 Upper MOA&FW Har Khet Joho Nallah to Hojutak 1 2.00 1 1 2.00 MLA
Subansiri ko Pani
Taliha
152 Upper MOA&FW Har Khet Nho siko to hechey rangngo at Damba 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
153 Upper MOA&FW Har Khet Paking Nallah to Taba Pocha Moring at Damba vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
154 Upper MOA&FW Har Khet Kojin nallah to sow jobe at Duchok 1 3.00 4 1 3.00 ex-asm
Subansiri ko Pani
Taliha
155 Upper MOA&FW Har Khet Yoh nallah to dopu rigor at Sinamsing 1 2.00 4 1 2.00 ASM
Subansiri ko Pani
Taliha
156 Upper MOA&FW Har Khet Kojin nallah to rappu at Duchok 1 3.00 2 1 3.00 ex-asm
Subansiri ko Pani
Taliha
157 Upper MOA&FW Har Khet Mape moring to Dakar at Timba village 1 6.00 6 1 6.00
Subansiri ko Pani
Taliha
158 Upper MOA&FW Har Khet Kaku tarak nallah to soba moring at Duchok 1 3.00 2 1 3.00 ASM
Subansiri ko Pani
Taliha
159 Upper MOA&FW Har Khet Hagking Soko to No Koyum Mo Mara 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
160 Upper MOA&FW Har Khet Gungba sho to Rangu at Doyum vill 1 3.00 2 1 3.00 ex-asm
Subansiri ko Pani
Taliha
161 Upper MOA&FW Har Khet Kyakung nallah to bokli yorbe at Doyum 1 3.00 1 1 3.00 ZPC
Subansiri ko Pani
Taliha

262 | P a g e
162 Upper MOA&FW Har Khet Jokding Nallah to Ringu - Moring at Doyom vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
163 Upper MOA&FW Har Khet Gungbaso to Rangu at Doyom vill 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
Taliha
164 Upper MOA&FW Har Khet Sidang sho to ringme rikia rongo at Doyum 1 3.00 3 1 3.00 ASM
Subansiri ko Pani
Taliha
165 Upper MOA&FW Har Khet Siriso nallah to pakbu jobe at Dupit 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
166 Upper MOA&FW Har Khet Gote koro to chebarijo at Bagbi Vill 1 3.00 2 1 3.00 GPM
Subansiri ko Pani
Taliha
167 Upper MOA&FW Har Khet Sipung kro to si moring at Deling Mara 1 25.00 16 3 25.00 ASM
Subansiri ko Pani
Taliha
168 Upper MOA&FW Har Khet Kapia nallah to deling at Deling Mara vill 1 12.00 11 2 12.00
Subansiri ko Pani
Taliha
169 Upper MOA&FW Har Khet Kojin nallah to yallu tak at Duchok 1 2.00 3 1 2.00 ex-asm
Subansiri ko Pani
Taliha
170 Upper MOA&FW Har Khet Soko Nallah to Ranin rengo at Putung Dui Vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
171 Upper MOA&FW Har Khet Mew Soko to Yeke Rengo at Dui 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
172 Upper MOA&FW Har Khet Ranin soko ro Ranin Rengo 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha

263 | P a g e
173 Upper MOA&FW Har Khet Paking nallah to Taba picha moring at Damba vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
174 Upper MOA&FW Har Khet Siri-sow to pakbu jobe at Dupit 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
175 Upper MOA&FW Har Khet Epo soku to Galeng pu at Dupit 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
176 Upper MOA&FW Har Khet Omi seko to putung rengo at Putung Dui 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
177 Upper MOA&FW Har Khet Homi soko to Chengku Rengo at Putung Dui 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
178 Upper MOA&FW Har Khet Dumpung koro to siching moring at Dumpung 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
179 Upper MOA&FW Har Khet Hemi seko to Potung Rengo. 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
Taliha
180 Upper MOA&FW Har Khet Cheta siko to eden rongo at Ebo 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
181 Upper MOA&FW Har Khet Ebo siko to tabiyoha moring at Ebo 1 2.00 4 1 2.00 GPM
Subansiri ko Pani
Taliha
182 Upper MOA&FW Har Khet Ju nallah to ujutak at Ebo 1 5.00 1 1 5.00 ASM
Subansiri ko Pani
Taliha
183 Upper MOA&FW Har Khet Nipung lineng to tene juling moring at Ebo 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha

264 | P a g e
184 Upper MOA&FW Har Khet Jo nallah to kedering at Ebo 1 5.00 3 1 5.00 ASM
Subansiri ko Pani
Taliha
185 Upper MOA&FW Har Khet Miyong siko to ebo poring at Ebo 1 5.00 3 1 5.00 GPM
Subansiri ko Pani
Taliha
186 Upper MOA&FW Har Khet Kojing nallah to Ebo moring via Tabiuha at Ebo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
187 Upper MOA&FW Har Khet Kanggo nallah to moging jobe at Eche 1 4.00 4 1 4.00 ASM
Subansiri ko Pani
Taliha
188 Upper MOA&FW Har Khet Peroko nallah to bokchein jobe at Eche 1 4.00 1 1 4.00 ASM
Subansiri ko Pani
Taliha
189 Upper MOA&FW Har Khet Periko nallah to noh jobe at Eche 1 3.00 1 1 3.00 ASM
Subansiri ko Pani
Taliha
190 Upper MOA&FW Har Khet Yeching Nallah to Jungba 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
191 Upper MOA&FW Har Khet Atung Nallah to Dara Moring agril field at Konia 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
192 Upper MOA&FW Har Khet Mibia siko to Lowe5r Gyapin Moring 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
193 Upper MOA&FW Har Khet Richi Siko to Gyapin Moring 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
194 Upper MOA&FW Har Khet Homi ote to yaku bumgri at Ganga camp 1 3.00 6 1 3.00 ASM
Subansiri ko Pani
Taliha

265 | P a g e
195 Upper MOA&FW Har Khet Ranin soko to ranin rengo at Ganga camp 1 2.00 4 1 2.00 ASM
Subansiri ko Pani
Taliha
196 Upper MOA&FW Har Khet Mio nallah to Riago at Regia Vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
197 Upper MOA&FW Har Khet Hariso nallah to chinku moring at Rigia vill 1 5.00 4 1 5.00
Subansiri ko Pani
Taliha
198 Upper MOA&FW Har Khet Nogi Jobe at Talomriktak village 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
199 Upper MOA&FW Har Khet Jaho nallah to jaho moring at Tili-jaring 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
200 Upper MOA&FW Har Khet Homi ote to yaku bumgri at Ganga camp 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
201 Upper MOA&FW Har Khet Ranen nallah to Ranen Rengo at Ganga camp 1 3.00 5 1 3.00 GPM
Subansiri ko Pani
Taliha
202 Upper MOA&FW Har Khet Lera koro to nesu suta at Gyasing 1 5.00 4 1 5.00 GPM
Subansiri ko Pani
Taliha
203 Upper MOA&FW Har Khet Upper Nayam at Damba Vill 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
204 Upper MOA&FW Har Khet Sejah koro to bogra at Bogne Vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
205 Upper MOA&FW Har Khet Moso nallah to byate moring at Mo mara 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha

266 | P a g e
206 Upper MOA&FW Har Khet Seju sikio to busemore at Timba 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
207 Upper MOA&FW Har Khet Sirong to raba at Jaring 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha
208 Upper MOA&FW Har Khet Zoo nallah to degengyor at Jaring 1 9.00 3 1 9.00
Subansiri ko Pani
Taliha
209 Upper MOA&FW Har Khet Enchi nallah to kokpu konia at Ahging Konia vill 1 1.00 1 1 1.00 GPM
Subansiri ko Pani
Taliha
210 Upper MOA&FW Har Khet Merik nallah to siri rongo at Doyum 1 3.00 5 1 3.00 ex-asm
Subansiri ko Pani
Taliha
211 Upper MOA&FW Har Khet Sincherne koro to kaika at Jaring 1 5.00 4 1 5.00 ASM
Subansiri ko Pani
Taliha
212 Upper MOA&FW Har Khet Likung siku to raba at Jaring 1 8.00 4 1 8.00
Subansiri ko Pani
Taliha
213 Upper MOA&FW Har Khet CC Linning Kido Nallah to Ongying 1 4.00 4 1 4.00
Subansiri ko Pani
Taliha
214 Upper MOA&FW Har Khet Pumi nallah to bipu moring at Maki vill 1 1.00 2 1 1.00 ASM
Subansiri ko Pani
Taliha
215 Upper MOA&FW Har Khet Jaho nallah to jaho moring at Tili-jaring 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
216 Upper MOA&FW Har Khet Riokpi nallah to to yeba at Yeba moring 1 5.00 1 1 5.00
Subansiri ko Pani
Taliha

267 | P a g e
217 Upper MOA&FW Har Khet Kara koro to raba at Jaring 1 5.00 1 1 5.00 ASM
Subansiri ko Pani
Taliha
218 Upper MOA&FW Har Khet Kaing pering to dompiorio moring at Jeba 1 2.00 2 1 2.00 ASM
Subansiri ko Pani
Taliha
219 Upper MOA&FW Har Khet Kido nallah to pachu moring at Jeba 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
220 Upper MOA&FW Har Khet Jiling nallah to aying-moring at Jeba 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
221 Upper MOA&FW Har Khet Hakhak nallah to yorlo moring at Jeba 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
222 Upper MOA&FW Har Khet Hoying nallah at Jeba Vill 1 1.00 1 1 1.00
Subansiri ko Pani
Taliha
223 Upper MOA&FW Har Khet Tumte Koro to chotum rijo at Tilijaring 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha
224 Upper MOA&FW Har Khet Enchi nallah to darpane moring at Maki vill 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
Taliha
225 Upper MOA&FW Har Khet Singcher - ne Nallah to Raba Lepajaring village 1 5.00 3 1 5.00
Subansiri ko Pani
Taliha
226 Upper MOA&FW Har Khet Moku nallah to si-jobee at Kodak 1 6.00 9 1 6.00 ASM
Subansiri ko Pani
Taliha
227 Upper MOA&FW Har Khet Zoo Nallah to Degengyor at Jaring vill 1 10.00 11 1 10.00
Subansiri ko Pani
Taliha

268 | P a g e
228 Upper MOA&FW Har Khet Riokpi nallah to Sirune moring at Kodak 1 3.00 4 1 3.00 ASM
Subansiri ko Pani
Taliha
229 Upper MOA&FW Har Khet Jow koro to raba at Lepajaring 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha
230 Upper MOA&FW Har Khet Tanyo Koro to Kopin Agril field at Lepajaring 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
231 Upper MOA&FW Har Khet Hignesow to Dereriong at Lepajaring vill 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
232 Upper MOA&FW Har Khet Joh koro to rasa rijo bagu at Lepajaring 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
233 Upper MOA&FW Har Khet Hingnesew to Dalik rijo at Lepajaring vill 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha
234 Upper MOA&FW Har Khet Singchar-ne koro to raba at Lepajaring 1 2.00 5 1 2.00 GC
Subansiri ko Pani
Taliha
235 Upper MOA&FW Har Khet Linglin nallah to Nak jobee at Kodak 1 7.00 11 1 7.00 ASM
Subansiri ko Pani
Taliha
236 Upper MOA&FW Har Khet Yorte koro to yorte at lepajaring Vill 1 2.00 2 1 2.00 GC
Subansiri ko Pani
Taliha
237 Upper MOA&FW Har Khet Kopin koro to yama lamda at Lepajaring vill 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
238 Upper MOA&FW Har Khet Nho siko to Darba at Darba 1 1.00 5 1 1.00 GPM
Subansiri ko Pani
Taliha

269 | P a g e
239 Upper MOA&FW Har Khet Mow soko to yake rengo at putung dui 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
Taliha
240 Upper MOA&FW Har Khet Pokung seku to galing podor at Lepajaring 1 2.00 2 1 2.00 GC
Subansiri ko Pani
Taliha
241 Upper MOA&FW Har Khet Setend koro to taloring at Lepajaring 1 2.00 4 1 2.00 GC
Subansiri ko Pani
Taliha
242 Upper MOA&FW Har Khet Rio nallah to Mogu jobe at Kodak vill 1 19.00 13 2 19.00 ASM
Subansiri ko Pani
Taliha
243 Upper MOA&FW Har Khet Hengneso to raba at Lepajaring 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
244 Upper MOA&FW Har Khet Singcher -ne nallah to Raba village Lepajaring 1 3.00 2 1 3.00 MLA
Subansiri ko Pani
Taliha
245 Upper MOA&FW Har Khet Kopin koro to kopin rongo at Lepajaring 1 1.50 3 1 1.50
Subansiri ko Pani
Taliha
246 Upper MOA&FW Har Khet Raba koro to punke rengo at Lepajaring 1 1.50 2 1 1.50
Subansiri ko Pani
Taliha
247 Upper MOA&FW Har Khet Row koro to nguring rinko at Mara Vill 1 2.00 6 1 2.00 CE WRD
Subansiri ko Pani
Taliha
248 Upper MOA&FW Har Khet Bomlo-sho to padi moring at Lingram 1 3.00 1 1 3.00 Ex-ZPC
Subansiri ko Pani
Taliha
249 Upper MOA&FW Har Khet Jaamiak Nallah under Nintemori vill 1 2.00 2 1 2.00 MLA
Subansiri ko Pani
Taliha

270 | P a g e
250 Upper MOA&FW Har Khet Yinchi to yinvhi jobe at Maki 1 2.00 1 1 2.00 ZPM
Subansiri ko Pani
Taliha
251 Upper MOA&FW Har Khet Pomi nallah to bate moring at Eche vill 1 5.00 2 1 5.00 ASM
Subansiri ko Pani
Taliha
252 Upper MOA&FW Har Khet Degom siko to payeng moring at Regia 1 4.00 1 1 4.00 Ex-ZPC
Subansiri ko Pani
Taliha
253 Upper MOA&FW Har Khet Bami koro to bami at Lepajaring 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
254 Upper MOA&FW Har Khet Bakap-horo to lingrine moring jobe at Lingram vill 1 2.00 1 1 2.00 ex-asm
Subansiri ko Pani
Taliha
255 Upper MOA&FW Har Khet Sipung kro to si moring at Deling mara 1 10.00 6 1 10.00 ASM
Subansiri ko Pani
Taliha
256 Upper MOA&FW Har Khet Dharo siko to bate yorbe at Darba 1 1.00 4 1 1.00 GPM
Subansiri ko Pani
Taliha
257 Upper MOA&FW Har Khet Dokio koro to laring at lari Dagiam 1 1.00 3 1 1.00
Subansiri ko Pani
Taliha
258 Upper MOA&FW Har Khet Didu koro to didu at lari Dagiam 1 1.00 3 1 1.00
Subansiri ko Pani
Taliha
259 Upper MOA&FW Har Khet Nampu seku to laring(east) at lari Dagiam 1 1.00 4 1 1.00
Subansiri ko Pani
Taliha
260 Upper MOA&FW Har Khet Sincherne koro to raba at Jaring 1 9.00 6 1 9.00
Subansiri ko Pani
Taliha

271 | P a g e
261 Upper MOA&FW Har Khet Jorong nallah to jorong ring at Lingram 1 4.00 4 1 4.00
Subansiri ko Pani
Taliha
262 Upper MOA&FW Har Khet Mebia Sow at Lepajaring vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
263 Upper MOA&FW Har Khet Zoo nallah to degengyor at Jaring 1 8.00 5 1 8.00
Subansiri ko Pani
Taliha
264 Upper MOA&FW Har Khet Siling simia to raba at Jaring 1 7.00 1 1 7.00
Subansiri ko Pani
Taliha
265 Upper MOA&FW Har Khet Nia koro to bana at lari Dagiam 1 1.00 4 1 1.00
Subansiri ko Pani
Taliha
266 Upper MOA&FW Har Khet Jegok siko to biba jobe at Darba vill 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
267 Upper MOA&FW Har Khet Jetung nallah to rakring ringo at Lepajaring 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
268 Upper MOA&FW Har Khet Enchi nallah to darpome at Ahging konia 1 2.00 3 1 2.00 ex-asm
Subansiri ko Pani
Taliha
269 Upper MOA&FW Har Khet Jho siko to bubum moring at Lingram 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
270 Upper MOA&FW Har Khet Saju nallah to motung moring at motung 1 5.00 3 1 5.00 GPM
Subansiri ko Pani
Taliha
271 Upper MOA&FW Har Khet Saju nallah to motung moring at motung 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha

272 | P a g e
272 Upper MOA&FW Har Khet Tona koro to tolar rongo at ngute 1 4.00 1 1 4.00 GPM
Subansiri ko Pani
Taliha
273 Upper MOA&FW Har Khet Eche so to dharsing at Darba vill 1 1.00 1 1 1.00 GPM
Subansiri ko Pani
Taliha
274 Upper MOA&FW Har Khet Berikso nallah to Maperikring at Lingram 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
275 Upper MOA&FW Har Khet Gyate-sho to beri moring at Lingram Vill 1 2.00 2 1 2.00 ex-asm
Subansiri ko Pani
Taliha
276 Upper MOA&FW Har Khet Water Harvesting structure at Ledirijo vill 1 5.00 4 1 5.00
Subansiri ko Pani
Taliha
277 Upper MOA&FW Har Khet Hote lingtak to sigang at Regia 1 4.00 2 1 4.00 ASM
Subansiri ko Pani
Taliha
278 Upper MOA&FW Har Khet Pediko nallah to bokte nobe at Eche 1 5.00 4 1 5.00 ASM
Subansiri ko Pani
Taliha
279 Upper MOA&FW Har Khet From nogi siko to nogi ring at nogi 1 8.00 6 1 8.00
Subansiri ko Pani
Taliha
280 Upper MOA&FW Har Khet Payor koro to nagi rinjo at Nogi 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
281 Upper MOA&FW Har Khet Yormi nallah to linging moring at papa 1 2.00 1 1 2.00 GC
Subansiri ko Pani
Taliha
282 Upper MOA&FW Har Khet Rachit siko to paktak moring at papa 1 3.00 4 1 3.00 GPM
Subansiri ko Pani
Taliha

273 | P a g e
283 Upper MOA&FW Har Khet Kojin nallah to ningporing moring at Dochuk 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
Taliha
284 Upper MOA&FW Har Khet Tungrung nallah to solu moring at Dochuk 1 3.00 5 1 3.00 ex-asm
Subansiri ko Pani
Taliha
285 Upper MOA&FW Har Khet Niho nallah to eba moring at Dochuk 1 3.00 1 1 3.00 ex-asm
Subansiri ko Pani
Taliha
286 Upper MOA&FW Har Khet Nima nallah to lebya moring at Dochuk 1 3.00 3 1 3.00 ex-asm
Subansiri ko Pani
Taliha
287 Upper MOA&FW Har Khet Moso Nallah to morkoring under Mara Vill 1 6.00 6 1 6.00
Subansiri ko Pani
Taliha
288 Upper MOA&FW Har Khet Nia koro to bana at Lari Dagiam 1 1.00 2 1 1.00
Subansiri ko Pani
Taliha
289 Upper MOA&FW Har Khet Mibia sow to lepa at Lari dagiam vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
290 Upper MOA&FW Har Khet Jorong nallah to jorong ring at Lingram 1 2.00 1 1 2.00 ex-asm
Subansiri ko Pani
Taliha
291 Upper MOA&FW Har Khet Takering to dupit at Dupit 1 3.00 4 1 3.00 ASM
Subansiri ko Pani
Taliha
292 Upper MOA&FW Har Khet Noh Koro to Koung at Tabomna 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
293 Upper MOA&FW Har Khet Siya honghe to makba yorbe at Tabomna 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha

274 | P a g e
294 Upper MOA&FW Har Khet Rering soko to rering moring at mo mara 1 9.00 6 1 9.00
Subansiri ko Pani
Taliha
295 Upper MOA&FW Har Khet Moso nallah to morkojoring at Mo mara 1 10.00 6 1 10.00
Subansiri ko Pani
Taliha
296 Upper MOA&FW Har Khet Akeng soku to mo kotom at mo mara 1 9.00 6 1 9.00
Subansiri ko Pani
Taliha
297 Upper MOA&FW Har Khet Pachang nallah to paking moring at Dedu 1 5.00 6 1 5.00
Subansiri ko Pani
Taliha
298 Upper MOA&FW Har Khet Rio nallah to takering at Dupit 1 4.00 5 1 4.00
Subansiri ko Pani
Taliha
299 Upper MOA&FW Har Khet Mew soko to maring rengo at putung Dui 1 7.00 7 1 7.00
Subansiri ko Pani
Taliha
300 Upper MOA&FW Har Khet Moku Nallah to Si Jobe 1 4.00 2 1 4.00
Subansiri ko Pani
Taliha
301 Upper MOA&FW Har Khet Ratak soko to hamperiktak at mo mara 1 8.00 2 1 8.00
Subansiri ko Pani
Taliha
302 Upper MOA&FW Har Khet Mosoh koro to Lengtejaring at Mo-mara 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
303 Upper MOA&FW Har Khet Rering seko to lukpe esi-rengo at Mo-mara 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
304 Upper MOA&FW Har Khet Kiring nallah to Timba 1 5.00 5 1 5.00
Subansiri ko Pani
Taliha

275 | P a g e
305 Upper MOA&FW Har Khet Lera karo to madarijo at Ninte mori 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
306 Upper MOA&FW Har Khet Jeling nallah to machi moring at Jeba 1 2.00 6 1 2.00 AC
Subansiri ko Pani
Taliha
307 Upper MOA&FW Har Khet Rio nallah to peli jobe at Maki 1 2.00 4 1 2.00 ASM
Subansiri ko Pani
Taliha
308 Upper MOA&FW Har Khet Row koro to didu bado at lari Dagiam 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
309 Upper MOA&FW Har Khet Joru karo to joru at Nintemori Vill 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
310 Upper MOA&FW Har Khet Jamiak karo to jamirijo at Nintemuri Vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
311 Upper MOA&FW Har Khet Tikre siko to echeng namcheng at Darba 1 1.00 4 1 1.00 GPM
Subansiri ko Pani
Taliha
312 Upper MOA&FW Har Khet Jahow koro to takunibar at lari Dagiam 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
313 Upper MOA&FW Har Khet Row koro to nguring at Mara 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
314 Upper MOA&FW Har Khet Ngokoro siko to nguri ngjobe at Mara 1 15.00 3.2 2 15.00
Subansiri ko Pani
Taliha
315 Upper MOA&FW Har Khet Yagling moring to Eching moring at Mara 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha

276 | P a g e
316 Upper MOA&FW Har Khet Ngokoro siko to bogra jobe at Mara 1 5.00 1 1 5.00
Subansiri ko Pani
Taliha
317 Upper MOA&FW Har Khet Ngokoro siko to bogne at Mara 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha
318 Upper MOA&FW Har Khet Kebaso to si moring at Mara 1 10.00 6 1 10.00
Subansiri ko Pani
Taliha
319 Upper MOA&FW Har Khet Ngo koro to yani bokra at Mara 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
320 Upper MOA&FW Har Khet Tareko seko to yasiko at Nora Mara Vill 1 5.00 5 1 5.00
Subansiri ko Pani
Taliha
321 Upper MOA&FW Har Khet Nbo sikio to heehe village 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
322 Upper MOA&FW Har Khet Yaho koro to bukdu joring at Mara 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
323 Upper MOA&FW Har Khet Kebaso to degamoring at Mara 1 10.00 4 1 10.00 ASM
Subansiri ko Pani
Taliha
324 Upper MOA&FW Har Khet Dabam koro to dabom at lari Dagiam 1 2.00 1 1 2.00 ex-asm
Subansiri ko Pani
Taliha
325 Upper MOA&FW Har Khet Dabam koro to dabom at lari Dagiam 1 2.00 1 1 2.00 ex-asm
Subansiri ko Pani
Taliha
326 Upper MOA&FW Har Khet Himba nallah to himba yorbe at Dukum 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha

277 | P a g e
327 Upper MOA&FW Har Khet Hagang so to dharo jobe at Darba 1 1.00 2 1 1.00
Subansiri ko Pani
Taliha
328 Upper MOA&FW Har Khet Jorung so to Maying Namching 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
329 Upper MOA&FW Har Khet Mowching soko to yake rengo at putung Dui vill 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
330 Upper MOA&FW Har Khet Yagling Moring to Aching Moring at Mara vill. 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
331 Upper MOA&FW Har Khet Jorpi nallah to hactak jobe at Mara 1 2 2 1 2.00
Subansiri ko Pani
Taliha
332 Upper MOA&FW Har Khet Dame Sepok to Duyin Moring at Rongkia 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
333 Upper MOA&FW Har Khet Noh river to noh jobe at Maki 1 2.00 7 1 2.00 ASM
Subansiri ko Pani
Taliha
334 Upper MOA&FW Har Khet Yoh Nallah to Maki vill 1 1.00 6 1 1.00 ASM
Subansiri ko Pani
Taliha
335 Upper MOA&FW Har Khet Enchi nallah to darpane moring at Maki 1 1.00 6 1 1.00 ASM
Subansiri ko Pani
Taliha
336 Upper MOA&FW Har Khet Enchi Nallah to Maki village 1 3.00 5 1 3.00
Subansiri ko Pani
Taliha
337 Upper MOA&FW Har Khet Rakpi nallah to pengom pete at Jeba 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha

278 | P a g e
338 Upper MOA&FW Har Khet Pering nallah to bamba yorl at Jeba 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
339 Upper MOA&FW Har Khet Hongkin nallah to hakhak moring at Jeba 1 2.00 4 1 2.00 AC
Subansiri ko Pani
Taliha
340 Upper MOA&FW Har Khet Dumai Moring village Rongkia Land protection 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
341 Upper MOA&FW Har Khet Rio nallah to mani reklum jobe at Maki 1 2.00 4 1 2.00 ASM
Subansiri ko Pani
Taliha
342 Upper MOA&FW Har Khet Yenchi nallah to lingdu ractor moring at Maki 1 2.00 3 1 2.00 ASM
Subansiri ko Pani
Taliha
343 Upper MOA&FW Har Khet Tari nallah to lingba moring at Maki Vill 1 1.00 1 1 1.00 ASM
Subansiri ko Pani
Taliha
344 Upper MOA&FW Har Khet Jamiak nallah to sinik jobe at Ningtemuri vill 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha
345 Upper MOA&FW Har Khet Hote nallah to biba moring at Maki 1 1.00 1 1 1.00
Subansiri ko Pani
Taliha
346 Upper MOA&FW Har Khet Mow soko to kesing soko at putung Dui vill 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
347 Upper MOA&FW Har Khet Soko soko to yake rengo at putung Dui vill 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
Taliha
348 Upper MOA&FW Har Khet Mew soko to tachu rengo at putung Dui vill 1 5.00 1 1 5.00
Subansiri ko Pani
Taliha

279 | P a g e
349 Upper MOA&FW Har Khet Miyo nallah to Dui at Putung Dui Vill 1 3.00 3 1 3.00 GPM
Subansiri ko Pani
Taliha
350 Upper MOA&FW Har Khet Linging seko to papa moring at Papa vill 1 4.00 6 1 4.00
Subansiri ko Pani
Taliha
351 Upper MOA&FW Har Khet Papa horo to riago at Papa Vill 1 3.00 1 1 3.00
Subansiri ko Pani
Taliha
352 Upper MOA&FW Har Khet Kamchik nallah to hakang at Papa 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
353 Upper MOA&FW Har Khet Rikmo siko to clinbku moring at Rigia vill 1 4.00 3 1 4.00 GPM
Subansiri ko Pani
Taliha
354 Upper MOA&FW Har Khet Mio siko to rilum pu at Rigia 1 4.00 3 1 4.00 GPM
Subansiri ko Pani
Taliha
355 Upper MOA&FW Har Khet Riso siko to clingku yorbe at Rigia 1 4.00 4 1 4.00
Subansiri ko Pani
Taliha
356 Upper MOA&FW Har Khet Chingku at Rigia village 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
357 Upper MOA&FW Har Khet Joh koro to dikgingyor at Lepajaring 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
358 Upper MOA&FW Har Khet Enchi nallah to dukum at Ahging konia 1 2.00 2 1 2.00 ex-asm
Subansiri ko Pani
Taliha
359 Upper MOA&FW Har Khet Darpome to dukum at Ahging konia 1 2.00 5 1 2.00 ex-asm
Subansiri ko Pani
Taliha

280 | P a g e
360 Upper MOA&FW Har Khet Sangpor Joring under Poda Mara 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
361 Upper MOA&FW Har Khet Ngo koro to ngwing at poda Mara 1 8.00 9 1 8.00
Subansiri ko Pani
Taliha
362 Upper MOA&FW Har Khet Tater ringo nallah to Pengpe moring 1 6.00 11 1 6.00
Subansiri ko Pani
Taliha
363 Upper MOA&FW Har Khet Moso to Morko rijo tat Pogia Mara 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
364 Upper MOA&FW Har Khet Chojor siku to degam maring at podo mara 1 8.00 9 1 8.00 ASM
Subansiri ko Pani
Taliha
365 Upper MOA&FW Har Khet Kapia siku to jorpi moring at podo mara 1 8.00 9 1 8.00 ASM
Subansiri ko Pani
Taliha
366 Upper MOA&FW Har Khet Todoro nallah (upper)to ngojing moring at Tilijaring 1 2.00 1.6 1 2.00
Subansiri ko Pani
Taliha
367 Upper MOA&FW Har Khet Todoro nallah (lower)to jaring rijo at tTilijaring 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
368 Upper MOA&FW Har Khet Yah nallah to leneger jebe at maki 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
Taliha
369 Upper MOA&FW Har Khet Godo nallah to taying moring at maki 1 2.00 5 1 2.00 ASM
Subansiri ko Pani
Taliha
370 Upper MOA&FW Har Khet Raba sow to jow at Lepajaring 1 2.00 6 1 2.00 GC
Subansiri ko Pani
Taliha

281 | P a g e
371 Upper MOA&FW Har Khet Siri seedi Nallah at Tilijaring 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
372 Upper MOA&FW Har Khet Ramding nallah to raje at Sinamsing 1 3.00 1 1 3.00 ASM
Subansiri ko Pani
Taliha
373 Upper MOA&FW Har Khet Enchi nallah to tari at ahging Ahging konia 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
374 Upper MOA&FW Har Khet Enchi nallah to zingolingpo at Ahging konia 1 2.00 3.5 1 2.00 ex-asm
Subansiri ko Pani
Taliha
375 Upper MOA&FW Har Khet Oh nallah to nambong moring at Sinamsing vill 1 2.00 4 1 2.00 GPM
Subansiri ko Pani
Taliha
376 Upper MOA&FW Har Khet Yinvhi nallah to tabom jobe at Sinamsing vill 1 2.00 1 1 2.00
Subansiri ko Pani
Taliha
377 Upper MOA&FW Har Khet Enchi nallah to emba moring at Sinamsing 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
378 Upper MOA&FW Har Khet Dogi koro to Galipu at Bagbi Vill 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
379 Upper MOA&FW Har Khet Kia koro to sekirijo at Gyasing 1 5.00 5 1 5.00
Subansiri ko Pani
Taliha
380 Upper MOA&FW Har Khet Pedonghe siko to diring jobe at Darba 1 1.00 2 1 1.00 GPM
Subansiri ko Pani
Taliha
381 Upper MOA&FW Har Khet Nhosho koro to tabamna moring at Talomriktak 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha

282 | P a g e
382 Upper MOA&FW Har Khet Yah nallah to bokdu jobe at Maki 1 1.00 5 1 1.00 ASM
Subansiri ko Pani
Taliha
383 Upper MOA&FW Har Khet Siya honghe to chinku moring at Tabomna 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
384 Upper MOA&FW Har Khet Sugo Nallah to Ringsu Moring at Siri Ring vill 1 3.00 4 1 3.00
Subansiri ko Pani
Taliha
385 Upper MOA&FW Har Khet Takte Nallah to Pio Jobe at Siri Ring village 1 3.00 4 1 3.00
Subansiri ko Pani
Taliha
386 Upper MOA&FW Har Khet Mo nallah to talom riktak at Tabomna vill 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
387 Upper MOA&FW Har Khet Siya honghe to tabomna moring at Tabomna 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
388 Upper MOA&FW Har Khet Mo nallah to mo jobe at tabomna 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
389 Upper MOA&FW Har Khet Mo nallah to rupji punghe at tabomna 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
390 Upper MOA&FW Har Khet Hiching nallah to goying rikching at lingram 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha
391 Upper MOA&FW Har Khet Tanio koro to kopin at lari dagiam 1 3.00 2 1 3.00 GPM
Subansiri ko Pani
Taliha
392 Upper MOA&FW Har Khet Rasing koro to rasing at lari dagiam 1 1.00 5 1 1.00
Subansiri ko Pani
Taliha

283 | P a g e
393 Upper MOA&FW Har Khet Taying nallah to same ringhe at tabomna 1 1.00 1 1 1.00
Subansiri ko Pani
Taliha
394 Upper MOA&FW Har Khet Letak koro to Namchi hari at Bagbi Vill 1 7.00 3 1 7.00 GPM
Subansiri ko Pani
Taliha
395 Upper MOA&FW Har Khet Jurpi nallah to haktak at yakling moring vill 1 12.00 1 1 12.00
Subansiri ko Pani
Taliha
396 Upper MOA&FW Har Khet Siching siko to dumpong moring at Darba 1 2.00 2 1 2.00 GPM
Subansiri ko Pani
Taliha
397 Upper MOA&FW Har Khet Dompung moring to darba jobe at Darba 1 1.00 3 1 1.00 GPM
Subansiri ko Pani
Taliha
398 Upper MOA&FW Har Khet Yillo lingne to damba at damba 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
399 Upper MOA&FW Har Khet Topune moring to riga moring at Dedu vill 1 10.00 12 1 10.00
Subansiri ko Pani
Taliha
400 Upper MOA&FW Har Khet Pitak koro to lepa at Lepajaring 1 2.00 5 1 2.00 GC
Subansiri ko Pani
Taliha
401 Upper MOA&FW Har Khet Kereng seku to kereng at lepajaring 1 2.00 5 1 2.00
Subansiri ko Pani
Taliha
402 Upper MOA&FW Har Khet No Nallah river at Talomriktak village 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
403 Upper MOA&FW Har Khet No nallah to jobey moring at talomriktak 1 5.00 2 1 5.00
Subansiri ko Pani
Taliha

284 | P a g e
404 Upper MOA&FW Har Khet Chami koro to ketamrijo at Bagbi Vill 1 2.00 4 1 2.00
Subansiri ko Pani
Taliha
405 Upper MOA&FW Har Khet Leke karo to lekerijo at Nintemori Vill 1 12.00 15 1 12.00
Subansiri ko Pani
Taliha
406 Upper MOA&FW Har Khet Lera karo to Nintemoring at Nintemori Vill 1 8.00 11 1 8.00
Subansiri ko Pani
Taliha
407 Upper MOA&FW Har Khet Dharing siko to bipu yorbe at darba 1 1.00 1 1 1.00 GPM
Subansiri ko Pani
Taliha
408 Upper MOA&FW Har Khet Siku siko to Siching jobe at Darba vill 1 2.00 1 1 2.00 GPM
Subansiri ko Pani
Taliha
409 Upper MOA&FW Har Khet Tareko Nallah To Nartam Rengo At Mo Mara 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
410 Upper MOA&FW Har Khet Kebaso Nallah To Yukba Rengo At Mo Mara 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
411 Upper MOA&FW Har Khet Miyo Nallah To Dui At Potung Dui 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
412 Upper MOA&FW Har Khet Inchi Nallah At Maki Vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
413 Upper MOA&FW Har Khet Mo nallah to bidak joring at tabomna 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
414 Upper MOA&FW Har Khet Mo nallah to bate jorbe at tabomna 1 2.00 3 1 2.00
Subansiri ko Pani
Taliha

285 | P a g e
415 Upper MOA&FW Har Khet Tabamna to Sinia Nallah at Chokda 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
416 Upper MOA&FW Har Khet Tabomna To Janjoring at Chokda 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
417 Upper MOA&FW Har Khet Jow Koro To Ape Regha At Dagiam 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
418 Upper MOA&FW Har Khet Ranen Nallah To Ranen Rengo At Ganga Camp 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
419 Upper MOA&FW Har Khet Taying Jobe At Kodak 1 7.00 5 1 7.00 MLA
Subansiri ko Pani
Taliha
420 Upper MOA&FW Har Khet Si-Moring At Kodak Village 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
421 Upper MOA&FW Har Khet Dsub Nallah To Pakring Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
422 Upper MOA&FW Har Khet Kaku Nallah To Amria Jobe At kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
423 Upper MOA&FW Har Khet Sob Nallah To Joying Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
424 Upper MOA&FW Har Khet Ldin Nallah To Edu Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
425 Upper MOA&FW Har Khet Penpu Nallah To Ruring Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha

286 | P a g e
426 Upper MOA&FW Har Khet Eding Nallah To Eding Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
427 Upper MOA&FW Har Khet Dan Nallah To Jobe At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
428 Upper MOA&FW Har Khet Sub To Pakring Moring At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
429 Upper MOA&FW Har Khet Lung Nallah To Lung Jobe At Kamlo 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
430 Upper MOA&FW Har Khet Kebaso Nallah To Rale Pama Rengo At Mora Mara 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
431 Upper MOA&FW Har Khet Tareko Nallah To Bate Rengo At Mora Mara 1 3.00 2 1 3.00
Subansiri ko Pani
Taliha
432 Upper MOA&FW Har Khet Kebaso Nallah To Talipudar Rengo At Mora Mara 1 4.00 3 1 4.00
Subansiri ko Pani
Taliha
433 Upper MOA&FW Har Khet No-Jobe At Talam Rikta Vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
434 Upper MOA&FW Har Khet Riokpi Nallah to Leduha Moring at SiNamsing 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
435 Upper MOA&FW Har Khet Si-Namsing Moring At SiNamsing Vill 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha
436 Upper MOA&FW Har Khet Si-Nallah To Lingrak At Takiongpuring 1 2.00 2 1 2.00
Subansiri ko Pani
Taliha

287 | P a g e
437 Upper MOA&FW Har Khet Rikpi Nallah To Heba Moring At Konia 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
438 Upper MOA&FW Har Khet Tater Nallah To Pungpe Moring Konia At Konia 1 3.00 3 1 3.00
Subansiri ko Pani
Taliha
439 Upper MOA&FW Har Khet Taaying Nallah To Taying Moring At Tabomna Vill 1 15.00 11 1 15.00 SE WRD
Subansiri ko Pani
Taliha
440 Upper MOA&FW Har Khet Sorki nallah to Aba Rengo at Riamuk 1 2.00 6 1 2.00
Subansiri ko Pani
Taliha
441 Upper MOA&FW Har Khet Dara Seko to Tarimori at Konia village 1 3.00 7 1 3.00
Subansiri ko Pani
Taliha
442 Upper MOA&FW Har Khet Byete Nallah to Si-Degam at Mara 1 3 2 1 3.00
Subansiri ko Pani
Taliha
443 Upper MOA&FW Har Khet Pisehio nallah At Tabinmoring 1 5 3.5 1 5.00
Subansiri ko Pani
Taliha
444 Upper MOA&FW Har Khet CC Drain at Hao Nallah to Aching Mori vill 1 5 10 1 5.00 MLA
Subansiri ko Pani
Taliha
445 Upper MOA&FW Har Khet MIP at Papa Village( Sake Mayeng) 1 20 30 1 20.00 MLA
Subansiri ko Pani
Taliha

CAD NEW SCHEMES


Activity (CAD for C/O MIP from)

288 | P a g e
Comman
Name Concerned Total Catchmen Period of Estimate
Sl.No Componen d area / Remark
of the Ministry / Numbe t area implementatio d cost in
.
Department
t Irrigation s
Block r (Sq.Km.) n (year) Lakhs
(ha)
1 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning vill 1 3.00 2 1 3.00 MLA
ko Pani
2 Paying MOA&FW Har Khet Sepung Nallah under Kamsar vill 1 3.00 2 1 3.00 MLA
ko Pani
3 Paying MOA&FW Har Khet Bamdom Nallah to Kaji at Bomdom Vill 1 8.00 9 1 8.00 MLA
ko Pani
4 Paying MOA&FW Har Khet Honing sikio to jarjo moring at raimuk 1 4.00 1 1 4.00 MLA
ko Pani
5 Paying MOA&FW Har Khet Yoh Nallah under Ramsing Vill 1 3.00 3 1 3.00 MLA
ko Pani
6 Paying MOA&FW Har Khet Sekit Nallah to Kalaring Moring under Maling 1 4.00 2 1 4.00 ZPM
ko Pani
7 Paying MOA&FW Har Khet Siral nallah to upper mengio at Paktung 1 3.00 3 1 3.00 ASM
ko Pani
8 Paying MOA&FW Har Khet Kagar nallah to Chilaring at Pakpu maling 1 3.00 3 1 3.00 MLA
ko Pani
9 Paying MOA&FW Har Khet Henge nallah to Jate moring at Jami vill 1 6.00 6 1 6.00 MLA
ko Pani
10 Paying MOA&FW Har Khet Amria Nallah to Amriamoring at Nyompu vill 1 6.00 6 1 6.00 MLA
ko Pani
11 Paying MOA&FW Har Khet Haye nallah to Tadok-Hayemoring at Lingri 1 3.00 2 1 3.00 MLA
ko Pani
12 Paying MOA&FW Har Khet Yorching Nallah to setok Joring at Kaji Vill 1 4.00 4 1 4.00 HM,WRD
ko Pani
13 Paying MOA&FW Har Khet Sirit nallah to chido jobe at Paktung vill. 1 2.00 6 1 2.00 ASM
ko Pani
14 Paying MOA&FW Har Khet Polo Nallah to Lingo-Lingne under Maling 1 3.00 2 1 3.00 ZPM
ko Pani
15 Paying MOA&FW Har Khet Siching siko to Bokdu moring at Dagam 1 2.00 2 1 2.00 ASM
ko Pani

289 | P a g e
16 Paying MOA&FW Har Khet Seka siko to karing jobe at Lingri 1 2.00 2 1 2.00
ko Pani
17 Paying MOA&FW Har Khet Popung Nallah ,Pakpu malling 1 2.00 2 1 2.00 MLA
ko Pani
18 Paying MOA&FW Har Khet Water Harvesting pound to Hering at Ramsing 1 5.00 2 1 5.00 ASM
ko Pani
19 Paying MOA&FW Har Khet How nallah to Aching moring at WRC field at Aching 1 5.00 3 1 5.00
ko Pani moring
20 Paying MOA&FW Har Khet Yoh siko to Hering moring at Ramching vill 1 1.00 3 1 1.00
ko Pani
21 Paying MOA&FW Har Khet Ami Nallah to Nartak at Paying Vill 1 5.00 2 1 5.00 MLA
ko Pani
22 Paying MOA&FW Har Khet Siching siko to Ringte moring at Chingring moring 1 2.00 6 1 2.00 ASM
ko Pani
23 Paying MOA&FW Har Khet Bokdu Koro to Yo Joring at Ramching 1 2.00 3 1 2.00
ko Pani
24 Paying MOA&FW Har Khet Kamda Nallah under Kamda Vill 1 3.00 2 1 3.00 MLA
ko Pani
25 Paying MOA&FW Har Khet Yayo koro to Yak at Ramsing 1 1.00 3 1 1.00 MLA
ko Pani
26 Paying MOA&FW Har Khet Bomdom Nallah under Kaji Vill 1 3.00 2 1 3.00 MLA
ko Pani
27 Paying MOA&FW Har Khet Litto nallah to singjoring at Kaji 1 3.00 2 1 3.00
ko Pani
28 Paying MOA&FW Har Khet Ringte Moring to Sine Nallah at Pakba village 1 5.00 3 1 5.00 MLA
ko Pani
29 Paying MOA&FW Har Khet Sichi nallah to bororing at Kamda 1 2.00 3 1 2.00 ASM
ko Pani
30 Paying MOA&FW Har Khet Sirit Koro to Namching moring at Dagam 1 2.00 3 1 2.00 ASM
ko Pani
31 Paying MOA&FW Har Khet Geri sekio to tegdo at Aching moring 1 4.00 3 1 4.00
ko Pani
32 Paying MOA&FW Har Khet Sikit Nallah under Ginglo vill 1 3.00 4 1 3.00 MLA
ko Pani

290 | P a g e
33 Paying MOA&FW Har Khet Sera Nallah toi Bodomko at Badam Puring 1 5.00 2 1 5.00
ko Pani
34 Paying MOA&FW Har Khet CC Linning MIP under Tarba Vill 1 5.00 2 1 5.00
ko Pani
35 Paying MOA&FW Har Khet Bamdom Nallah to Ningporing at Bomdom 1 20.00 15 3 20.00
ko Pani
36 Paying MOA&FW Har Khet Grii Nallah Under Esso vill 1 2.00 2 1 2.00 MLA
ko Pani
37 Paying MOA&FW Har Khet Poktung nallah to Meniapuring at Paktung 1 2.00 2 1 2.00
ko Pani
38 Paying MOA&FW Har Khet Nigchi nallah to muglung putung at Baring 1 2.00 3 1 2.00 ASM
ko Pani
39 Paying MOA&FW Har Khet Chingam Nallah to Cheyang at Bibe Riamuk vill 1 3.00 4 1 3.00
ko Pani
40 Paying MOA&FW Har Khet Bamdom Nallah to Ningporing at Bomdom 1 6.00 9 1 6.00 MLA
ko Pani
41 Paying MOA&FW Har Khet Mopi jobe soko to Mopi at Tajering Vill 1 5.00 2 1 5.00
ko Pani
42 Paying MOA&FW Har Khet Siching siko to ringchi moring at Chingring moring Vill 1 3.00 5 1 3.00 ASM
ko Pani
43 Paying MOA&FW Har Khet Sewhen nallah to Bibe at Bibe Riamuk vill 1 3.00 1 1 3.00
ko Pani
44 Paying MOA&FW Har Khet Yo siko to Hering Moring 1 4.00 1 1 4.00 MLA
ko Pani
45 Paying MOA&FW Har Khet Parung Nallah to Chido moring at Jami Vill 1 6.00 9 1 6.00
ko Pani
46 Paying MOA&FW Har Khet Sibah nallah to sapu moring at Baring 1 2.00 3 1 2.00 ASM
ko Pani
47 Paying MOA&FW Har Khet Paktung soko at Tajering Vill 1 5.00 2 1 5.00
ko Pani
48 Paying MOA&FW Har Khet Bokba siko to Ringchi moring at Dagam 1 2.00 2 1 2.00
ko Pani
49 Paying MOA&FW Har Khet Sirit siko Namching moring at Dagam vill 1 2.00 2 1 2.00
ko Pani

291 | P a g e
50 Paying MOA&FW Har Khet Bate nallah at Tarba 1 5.00 3 1 5.00 ASM
ko Pani
51 Paying MOA&FW Har Khet Rua nallah to Rua moring at Lingri 1 2.00 2 1 2.00
ko Pani
52 Paying MOA&FW Har Khet Ribia nallah to Eden moring at Lingri 1 2.00 2 1 2.00
ko Pani
53 Paying MOA&FW Har Khet Raring nallah to raring Moring at Doloripu 1 2.00 5 1 2.00
ko Pani
54 Paying MOA&FW Har Khet Mibia siko to Deba moring 1 2.00 4 1 2.00
ko Pani
55 Paying MOA&FW Har Khet Sorki nallah to Rukpu lingne at Bibe Riamuk vill 1 4.00 4 1 4.00 ASM
ko Pani
56 Paying MOA&FW Har Khet Kagar sikio to pinchi lingruk at Kagar maling 1 4.00 3 1 4.00
ko Pani
57 Paying MOA&FW Har Khet Sirit Koro to payir moring at Dagam 1 3.00 2 1 3.00
ko Pani
58 Paying MOA&FW Har Khet Toku nallah to Rering moring at Paktung 1 3.00 3 1 3.00
ko Pani
59 Paying MOA&FW Har Khet Siri nallah to siri rijo at Esso Vill 1 7.00 9 1 7.00
ko Pani
60 Paying MOA&FW Har Khet Keda nallah to ringte -lingyo-ne at Esso vill 1 5.00 2 1 5.00
ko Pani
61 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning 1 3.00 2 1 3.00
ko Pani
62 Paying MOA&FW Har Khet Siri Nallah to Siri Jobe at Giri Esso vill. 1 3.00 2 1 3.00
ko Pani
63 Paying MOA&FW Har Khet Kagar Nala to tokpak moring at Pakpu maling 1 3.00 3 1 3.00
ko Pani
64 Paying MOA&FW Har Khet Oching nallah to kamrung at Ginglo 1 3.00 4 1 3.00 ASM
ko Pani
65 Paying MOA&FW Har Khet Pakne-pin Nallah to Tachila at Kamsar Vill 1 4.00 4 1 4.00
ko Pani
66 Paying MOA&FW Har Khet Keda nallah to siku harrya at Esso vill 1 4.00 2 1 4.00
ko Pani

292 | P a g e
67 Paying MOA&FW Har Khet Ribia Nallah to Eden Moring 1 3.00 2 1 3.00
ko Pani
68 Paying MOA&FW Har Khet Mibia siko to lower Gyapin moring 1 3.00 2 1 3.00
ko Pani
69 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning 1 5.00 1 1 5.00
ko Pani
70 Paying MOA&FW Har Khet Tungku nallah to Chukring moring at Haning 1 5.00 1 1 5.00
ko Pani
71 Paying MOA&FW Har Khet Water Harvesting pound to Hering at Ramsing 1 5.00 1 1 5.00
ko Pani
72 Paying MOA&FW Har Khet Seka soko to karing Jobe at Lingri 1 5.00 2 1 5.00
ko Pani
73 Paying MOA&FW Har Khet Mape Siku to Joki Moring at Jaring 1 5.00 2 1 5.00
ko Pani
74 Paying MOA&FW Har Khet Ngochisi nallah to Tamarmoring at Jaring 1 5.00 2 1 5.00
ko Pani
75 Paying MOA&FW Har Khet Jening Nallah under Ngaba vill 1 2.00 5 1 2.00
ko Pani
76 Paying MOA&FW Har Khet Bokpin nallah to Bokpin jobe at Lingri vill 1 2.00 2 1 2.00
ko Pani
77 Paying MOA&FW Har Khet Sicharing Nallah to Singjoring at Tarba 1 14.00 5 2 14.00
ko Pani
78 Paying MOA&FW Har Khet Shahtoda to Keyilindi pengge at jaring 1 5.00 3 1 5.00
ko Pani
79 Paying MOA&FW Har Khet Ragi nallah to Bodomko at Badam puring 1 3.00 2 1 3.00
ko Pani
80 Paying MOA&FW Har Khet Talikseku to Singkapombetimba ay jaring 1 5.00 3 1 5.00
ko Pani
81 Paying MOA&FW Har Khet Dsob nallah to Pakring moring at Kamlo 1 3.00 4 1 3.00
ko Pani
82 Paying MOA&FW Har Khet Tempin nallah to Roring jobe at Paktung 1 2.00 2 1 2.00
ko Pani
83 Paying MOA&FW Har Khet Eding Nallah to Ewding moring at Kamlo 1 2.00 2 1 2.00
ko Pani

293 | P a g e
84 Paying MOA&FW Har Khet Doh nallah to Doh jobe at Kamlo 1 4.00 2 1 4.00
ko Pani
85 Paying MOA&FW Har Khet Rete nallah to Haging moring at Baring 1 3.00 3 1 3.00
ko Pani
86 Paying MOA&FW Har Khet Martak nallah to Lingream at Bibe Riamuk vill 1 5.00 2 1 5.00
ko Pani
87 Paying MOA&FW Har Khet Babak nallah to Ambung moring at Nyompu 1 4.00 1 1 4.00
ko Pani
88 Paying MOA&FW Har Khet Gambung Siritseko to Gambung Pachung at jaring 1 5.00 6 1 5.00
ko Pani
89 Paying MOA&FW Har Khet How nallah at Aching moring 1 4.00 3 1 4.00
ko Pani
90 Paying MOA&FW Har Khet Sirit Nalah to Chingku at Kaji 1 3.00 2 1 3.00 ASM
ko Pani
91 Paying MOA&FW Har Khet Sili nallah to Linge moring at Jami 1 6.00 5 1 6.00
ko Pani
92 Paying MOA&FW Har Khet Sili Nallah at Jami Vill 1 4.00 2 1 4.00
ko Pani
93 Paying MOA&FW Har Khet Jatemoring to Sili Nallah at Jami 1 3.00 2 1 3.00
ko Pani
94 Paying MOA&FW Har Khet Mutung puring river to jarjo 1 5.00 2 1 5.00
ko Pani
95 Paying MOA&FW Har Khet Haye nallah to Ringe at Lingri Vill 1 2.00 2 1 2.00
ko Pani
96 Paying MOA&FW Har Khet Degiam to Takong at Kamra 1 3.00 2 1 3.00
ko Pani
97 Paying MOA&FW Har Khet Sorong to Domring at Kamra 1 2.00 2 1 2.00
ko Pani
98 Paying MOA&FW Har Khet Oje Nallah to Nam changba at Kamra 1 2.00 2 1 2.00
ko Pani
99 Paying MOA&FW Har Khet Punchi nallah to Tunuha at Kamra 1 3.00 3 1 3.00
ko Pani
100 Paying MOA&FW Har Khet Sirong to Namching at Kamra. 1 2.00 4 1 2.00
ko Pani

294 | P a g e
101 Paying MOA&FW Har Khet Jorung seko to Pariyorlo rato tobe at jaring 1 5.00 3 1 5.00
ko Pani
102 Paying MOA&FW Har Khet Amria jobe to Kaku naila at Kamlo 1 3.00 2 1 3.00
ko Pani
103 Paying MOA&FW Har Khet Runing moring to pimpu lalla at Kamlo vill 1 2.00 2 1 2.00
ko Pani
104 Paying MOA&FW Har Khet Toku nallah to Tanam riktam at Tajering 1 5.00 2 1 5.00
ko Pani
105 Paying MOA&FW Har Khet Mopi nallah to Kudam Kakra at Tajering 1 5.00 2 1 5.00
ko Pani
106 Paying MOA&FW Har Khet Sob nallah to pakming moring at Kamlo 1 3.00 2 1 3.00
ko Pani
107 Paying MOA&FW Har Khet Luring nallah to Luring jobe at Kamlo 1 3.00 2 1 3.00
ko Pani
108 Paying MOA&FW Har Khet Bidak nallah to saki lamte at Ginglo 1 3.00 4 1 3.00
ko Pani
109 Paying MOA&FW Har Khet Siluk Nalah to Kaji 1 4.00 5 1 4.00
ko Pani
110 Paying MOA&FW Har Khet Leo Nalah to Yangampu at Kaji 1 4.00 3 1 4.00
ko Pani
111 Paying MOA&FW Har Khet Ranik Nalah to Modom at Kaji 1 3.00 2 1 3.00
ko Pani
112 Paying MOA&FW Har Khet Yalang Nallah to Bomdom at Kaji 1 3.00 2 1 3.00
ko Pani
113 Paying MOA&FW Har Khet Pomi nalah to Takam Namching at Kaji 1 3.00 1 1 3.00
ko Pani
114 Paying MOA&FW Har Khet Sampu moring to homi at Baring vill 1 3.00 3 1 3.00
ko Pani
115 Paying MOA&FW Har Khet Sikiak siko to Bipu moring at Dagam 1 3.00 2 1 3.00
ko Pani
116 Paying MOA&FW Har Khet Richi siko to Gyapin moring at Dagam 1 2.00 2 1 2.00
ko Pani
117 Paying MOA&FW Har Khet Mibia siko to Deba moring at Dagam 1 3.00 2 1 3.00
ko Pani

295 | P a g e
118 Paying MOA&FW Har Khet Sesi to dego at Kamda 1 4.00 2 1 4.00
ko Pani
119 Paying MOA&FW Har Khet Gewnhring nallah to Tage moring at Lingri 1 2.00 2 1 2.00 ASM
ko Pani
120 Paying MOA&FW Har Khet Rekpuseko to Rakda yorbe at Jaring 1 5.00 2 1 5.00
ko Pani
121 Paying MOA&FW Har Khet Kadin Siko to Deba Moring 1 2.00 5 1 2.00
ko Pani
122 Paying MOA&FW Har Khet Giri nallah to giri esso at Esso vIll 1 6.00 9 1 6.00
ko Pani
123 Paying MOA&FW Har Khet Sinbha nallah to Sumbuko moring at Lingri 1 2.00 2 1 2.00
ko Pani
124 Paying MOA&FW Har Khet Beku nallah to Martak moring at Lingri 1 2.00 2 1 2.00
ko Pani
125 Paying MOA&FW Har Khet Yowo nallah to hoding at Ramsing 1 2.00 3 1 2.00
ko Pani
126 Paying MOA&FW Har Khet Yo siko to hering moring at Ramsing 1 3.00 2 1 3.00
ko Pani
127 Paying MOA&FW Har Khet Hodin koro to palaring at ramsing 1 2.00 3 1 2.00
ko Pani
128 Paying MOA&FW Har Khet Jaying moring to sop nallah at Kamlo 1 3.00 2 1 3.00
ko Pani
129 Paying MOA&FW Har Khet Lingpa nallah to Blingpa jobe at Lingri 1 1.00 3 1 1.00
ko Pani
130 Paying MOA&FW Har Khet Tingchi nallah to Tingchi moring at Lingri 1 2.00 2 1 2.00
ko Pani
131 Paying MOA&FW Har Khet Singking nallah to singking jobe at Lingri 1 2.00 3 1 2.00
ko Pani
132 Paying MOA&FW Har Khet Siring nallah to Kaba jobe at Lingri 1 2.00 2 1 2.00
ko Pani
133 Paying MOA&FW Har Khet Bema kura to Reging moring at Madardui 1 4.00 3 1 4.00
ko Pani
134 Paying MOA&FW Har Khet Sikuniming nallah to klaring rango at Maling 1 3.00 3 1 3.00
ko Pani

296 | P a g e
135 Paying MOA&FW Har Khet Chingkeng nallah to Single jobe at Lingri 1 2.00 3 1 2.00
ko Pani
136 Paying MOA&FW Har Khet Ridi nallah to Pitak jobe at Lingri 1 2.00 2 1 2.00 ASM
ko Pani
137 Paying MOA&FW Har Khet Adiu moring to idin olaala at kamlo 1 3.00 2 1 3.00
ko Pani
138 Paying MOA&FW Har Khet Kabak sekio to kabak jobe at Moying Moring 1 4.00 2 1 4.00 ASM
ko Pani
139 Paying MOA&FW Har Khet Ome nallah to Koto moring at Kamra 1 3.00 3 1 3.00
ko Pani
140 Paying MOA&FW Har Khet Yenpine to Degiam at Kamra 1 2.00 3 1 2.00
ko Pani
141 Paying MOA&FW Har Khet Lomnringhoching nallah to Make Jobe at Jaring 1 5.00 2 1 5.00
ko Pani
142 Paying MOA&FW Har Khet Klering Nallah to Bode Moring at Jaring 1 5.00 2 1 5.00
ko Pani
143 Paying MOA&FW Har Khet Paramsiko to Tapung Yorbe at jaring 1 5.00 2 1 5.00
ko Pani
144 Paying MOA&FW Har Khet Hopen pering to Gertepacham at jaring 1 5.00 2 1 5.00 GPC
ko Pani
145 Paying MOA&FW Har Khet Geye nallah to lingbya at Esso 1 3.00 2 1 3.00
ko Pani
146 Paying MOA&FW Har Khet Bodung nallah to Kingnuk at Tarba 1 5.00 2 1 5.00
ko Pani
147 Paying MOA&FW Har Khet Kambe nala to latak moring at Nyompu 1 8.00 9 1 8.00
ko Pani
148 Paying MOA&FW Har Khet Sira nalah to tai riktak at Nyompu 1 3.00 2 1 3.00
ko Pani
149 Paying MOA&FW Har Khet Lingsak nallah to Hanging jobe at Lingri 1 2.00 2 1 2.00
ko Pani
150 Paying MOA&FW Har Khet Taku siring nallah to Taku siring moring at Lingri 1 2.00 2 1 2.00
ko Pani
151 Paying MOA&FW Har Khet Ribu nallah to Lingnia moring at Lingri 1 2.00 4 1 2.00
ko Pani

297 | P a g e
152 Paying MOA&FW Har Khet Sika-sikio to tapu rijo at Lingri 1 2.00 4 1 2.00
ko Pani
153 Paying MOA&FW Har Khet Haye nallah to Haye moring at Lingri 1 1.00 4 1 1.00
ko Pani
154 Paying MOA&FW Har Khet Hapsing nallah to Hapsing moring at Lingri 1 1.00 5 1 1.00
ko Pani
155 Paying MOA&FW Har Khet sika sikio to karing jobe at lingri 1 2.00 2 1 2.00
ko Pani
156 Paying MOA&FW Har Khet Silu river to Loguring A/field 1 3.00 2 1 3.00
ko Pani
157 Paying MOA&FW Har Khet Dongchi nallah to Bilang rikga moring at Lable. 1 15.00 8 2 15.00
ko Pani
158 Paying MOA&FW Har Khet Kioki Nallah to Lable moring at Lable. 1 15.00 8 2 15.00
ko Pani
159 Paying MOA&FW Har Khet Kadin siko to lable maring at Lable 1 5.00 5 1 5.00
ko Pani
160 Paying MOA&FW Har Khet Sichi nallah to chc moring at Lable 1 3.00 3 1 3.00
ko Pani
161 Paying MOA&FW Har Khet Siku to to mebia jobe at Paktung 1 2.00 3 1 2.00
ko Pani
162 Paying MOA&FW Har Khet Kabak sekio to kabak jobe at Moying Moring 1 4.00 2 1 4.00 ASM
ko Pani
163 Paying MOA&FW Har Khet Peri nanikoro to Bate at Ramsing 1 3.00 1 1 3.00
ko Pani
164 Paying MOA&FW Har Khet Daching Koro to Rekpu at Ramsing 1 2.00 2 1 2.00
ko Pani
165 Paying MOA&FW Har Khet Yago koro to Yojorijo at Ramsing 1 2.00 3 1 2.00
ko Pani
166 Paying MOA&FW Har Khet Sichak Seko to Yappi rijo at Tarba village 1 3.00 2 1 3.00 ASM
ko Pani
167 Paying MOA&FW Har Khet Kambe/Taroku nallah at Lapak at Nimpu 1 5.00 2 1 5.00 ASM
ko Pani
168 Paying MOA&FW Har Khet Nichi Nio to liya at Liya Ngunu 1 2.00 2 1 2.00
ko Pani

298 | P a g e
169 Paying MOA&FW Har Khet Giri nallah to ringte moring at Esso 1 3.00 2 1 3.00
ko Pani
170 Paying MOA&FW Har Khet Sichak nallah to Mokum Rango at Maling 1 3.00 3 1 3.00
ko Pani
171 Paying MOA&FW Har Khet Jote nallah to Lopata moring at Nyompu 1 5.00 2 1 5.00
ko Pani
172 Paying MOA&FW Har Khet Kingumpu to Rakmi jobe at Pakba 1 5.00 3 1 5.00
ko Pani
173 Paying MOA&FW Har Khet Tongin nallah to Bikar at Paktung 1 2.00 3 1 2.00
ko Pani
174 Paying MOA&FW Har Khet Beku Osing nallah to Beku jobe at Lingri 1 1.00 2 1 1.00
ko Pani
175 Paying MOA&FW Har Khet Ribia sikio nallah to ribia moring at Lingri 1 2.00 2 1 2.00
ko Pani
176 Paying MOA&FW Har Khet sippik nallah to rapu moring at pillung moring 1 4.00 1 1 4.00
ko Pani
177 Paying MOA&FW Har Khet Pirik Sikoi to Leba moring at pillung Malimng 1 3.00 1 1 3.00
ko Pani
178 Paying MOA&FW Har Khet Bima nallah to Paye jobe at Nyompu 1 7.00 9 1 7.00
ko Pani
179 Paying MOA&FW Har Khet Chido nallah to chido moring at paktung 1 3.00 2 1 3.00
ko Pani
180 Paying MOA&FW Har Khet Paring nallah to chido at Paktung 1 4.00 2 1 4.00 MLA
ko Pani
181 Paying MOA&FW Har Khet Sira nallah to mengio at Paktung 1 3.00 3 1 3.00 ASM
ko Pani
182 Paying MOA&FW Har Khet Bimaku Nallah to Sirung moring at Nyompu 1 8.00 6 1 8.00 ASM
ko Pani
183 Paying MOA&FW Har Khet Nyumpu Nallah, Nyumpu 1 5.00 2 1 5.00 ASM
ko Pani
184 Paying MOA&FW Har Khet Eyo nallah to dering moring at Nyumpu 1 2.00 3 1 2.00 MLA
ko Pani
185 Paying MOA&FW Har Khet Jote nallah to sadam moring at Nyumpu 1 2.00 3 1 2.00
ko Pani

299 | P a g e
186 Paying MOA&FW Har Khet Sara nallah to yara at Nyumpu 1 2.00 3 1 2.00
ko Pani
187 Paying MOA&FW Har Khet Bate nallah to Bami moring at pillung Maling 1 4.00 3 1 4.00
ko Pani
188 Paying MOA&FW Har Khet Tabom nallah to Apopo moring at pillung Maling 1 3.00 2 1 3.00
ko Pani
189 Paying MOA&FW Har Khet Sira Nallah to Raring jobe at Nyompu vill 1 5.00 3 1 5.00
ko Pani
190 Paying MOA&FW Har Khet Ayo nalah to Diring moring at Nyompu vill 1 10.00 8 1 10.00
ko Pani
191 Paying MOA&FW Har Khet Namin nallah to Pakring at Nyompu vill 1 6.00 2 1 6.00 MLA
ko Pani
192 Paying MOA&FW Har Khet Sirung nallah to Ringi moring at Nyompu vill 1 5.00 1 1 5.00
ko Pani
193 Paying MOA&FW Har Khet Sika to Takung at Kamra vill 1 2.00 2 1 2.00
ko Pani
194 Paying MOA&FW Har Khet Ote to Puring at Karma vill 1 2.00 2 1 2.00
ko Pani
195 Paying MOA&FW Har Khet Noh koro to kaung at Tabomna 1 3.00 2 1 3.00
ko Pani
196 Paying MOA&FW Har Khet Nungnu Nallah Nungnu 1 2.00 2 1 2.00
ko Pani
197 Paying MOA&FW Har Khet Siocghing to Yarte at Ngugnu 1 2.00 2 1 2.00
ko Pani
198 Paying MOA&FW Har Khet Pali to Degiam at Ngugnu 1 2.00 2 1 2.00
ko Pani
199 Paying MOA&FW Har Khet Dabongdarong to Lingjaring at Ngugnu 1 2.00 2 1 2.00
ko Pani
200 Paying MOA&FW Har Khet Amrah to sacku yord at Ngugnu 1 2.00 2 1 2.00
ko Pani
201 Paying MOA&FW Har Khet Hote to Dadung at Ngugnu 1 2.00 2 1 2.00
ko Pani
202 Paying MOA&FW Har Khet Lingpa to Tochiyo at Ngugnu 1 3.00 6 1 3.00
ko Pani

300 | P a g e
203 Paying MOA&FW Har Khet Kadin nallah to Lipa moring at Chingku Dagam vill 1 3.00 4 1 3.00
ko Pani
204 Paying MOA&FW Har Khet Salung nallah to hoparijo at Nungnu Vill 1 3.00 1 3.00
ko Pani
205 Paying MOA&FW Har Khet Hoching Nallah to Nirinejobe at Pakba Vill 1 3.00 1 3.00
ko Pani
206 Paying MOA&FW Har Khet Sirit Siko to West Namching Moring 1 5.00 2 1 5.00
ko Pani
207 Paying MOA&FW Har Khet Paking nallah to bapiring at Paktung 1 3.00 3 1 3.00 ASM
ko Pani
208 Paying MOA&FW Har Khet Bimpak nallah to bimpak moring at jaring 1 5.00 2 1 5.00
ko Pani
209 Paying MOA&FW Har Khet Reku to Reru jobe at Pakba 1 4.00 3 1 4.00
ko Pani
210 Paying MOA&FW Har Khet Karbom ro karbo mn karlum nallah at Pakba 1 10.00 5 1 10.00
ko Pani
211 Paying MOA&FW Har Khet Rariw Agril field at Bomdom village 1 5.00 2 1 5.00
ko Pani
212 Paying MOA&FW Har Khet wall at Silog joreng Bomdom 1 5.00 2 1 5.00
ko Pani
213 Paying MOA&FW Har Khet Oching nallah to lingring moring at Kagar 1 3.00 1 3.00
ko Pani
214 Paying MOA&FW Har Khet Hamring moring at Arma vill 1 5.00 1 1 5.00
ko Pani
215 Paying MOA&FW Har Khet Yoo siko to panama Moring at Ramsing 1 3.00 2 1 3.00 ASM
ko Pani
216 Paying MOA&FW Har Khet Yoh siko to tali moring at Ramsing 1 3.00 2 1 3.00 ASM
ko Pani
217 Paying MOA&FW Har Khet Paking nallah to bikar at Paktung vill 1 4.00 3 1 4.00 ASM
ko Pani
218 Paying MOA&FW Har Khet Sirung nallah to Apopo moring at pillung maling vill 1 3.00 3 1 3.00
ko Pani
219 Paying MOA&FW Har Khet Bate Nallah to koje jobe at Pillung Maling 1 3.00 3 1 3.00
ko Pani

301 | P a g e
220 Paying MOA&FW Har Khet Moriseku to Chingku Timbariatak at jaring 1 5.00 3 1 5.00
ko Pani
221 Paying MOA&FW Har Khet Bimpak nallah to bimpak moring at jaring 1 4.00 3 1 4.00
ko Pani
222 Paying MOA&FW Har Khet Sirit nallah to siluk jobe at jaring 1 3.00 3 1 3.00
ko Pani
223 Paying MOA&FW Har Khet Tarak nallah to Dimon jobe at Paktung 1 4.00 3 1 4.00
ko Pani
224 Paying MOA&FW Har Khet Siko nallah to Lower Mibering at Paktung 1 3.00 3 1 3.00
ko Pani
225 Paying MOA&FW Har Khet Sera nallah to Sedumko at paktung 1 3.00 3 1 3.00
ko Pani
226 Paying MOA&FW Har Khet Tongpin nallah to Paktung 1 3.00 3 1 3.00
ko Pani
227 Paying MOA&FW Har Khet Paktung anllah to Bikarjobe at Paktung 1 4.00 3 1 4.00
ko Pani
228 Paying MOA&FW Har Khet Siko sigo nallah to Lower mebiaring at Paktung 1 2.00 3 1 2.00
ko Pani
229 Paying MOA&FW Har Khet Sikit koro to giadap sukunium at pakpu maling 1 2.00 1 1 2.00
ko Pani
230 Paying MOA&FW Har Khet Taipu koro to linggo lingne mori at pakpu maling 1 2.00 1 1 2.00
ko Pani
231 Paying MOA&FW Har Khet Sillu nallah to mokam moring at Pakpu maling 1 2.00 1 2.00
ko Pani
232 Paying MOA&FW Har Khet Rio Nallah to Togu moring at Pakpu Maling 1 2.00 3 1 2.00
ko Pani
233 Paying MOA&FW Har Khet Sika sikio nallah to Ringhi Rinhka at Pakpu Maling 1 2.00 3 1 2.00
ko Pani
234 Paying MOA&FW Har Khet Sirit nallah to Daro chita at Pakpu Maling 1 2.00 2 1 2.00
ko Pani
235 Paying MOA&FW Har Khet Taipu Nallah to Rinknya ringo at pakpu maling 1 2.00 2 1 2.00
ko Pani
236 Paying MOA&FW Har Khet Talamha seko to Yelutak-ringo at Pakpu Maling 1 2.00 2 1 2.00
ko Pani

302 | P a g e
237 Paying MOA&FW Har Khet Bokdu Koro to Yo Joring at Ramsing 1 2.00 2 1 2.00
ko Pani
238 Paying MOA&FW Har Khet Taipu nallah to Singkintam at pakpu maling 1 2.00 2 1 2.00
ko Pani
239 Paying MOA&FW Har Khet Silu sikio nallah to yormi ringo at Pakpu maling 1 2.00 2 1 2.00
ko Pani
240 Paying MOA&FW Har Khet Kapor Nallah to Pakpu Maling village 1 2.00 2 1 2.00
ko Pani
241 Paying MOA&FW Har Khet Silu siko nallah to Talomha rongo at Pakpu maling 1 2.00 3 1 2.00
ko Pani
242 Paying MOA&FW Har Khet Silu siko nallah to Yerja Lungpu Ringo at Pakpu maling 1 2.00 3 1 2.00
ko Pani
243 Paying MOA&FW Har Khet sikit nallah to doro chit at Pakpu maling 1 3.00 1 3.00
ko Pani
244 Paying MOA&FW Har Khet Silu siko nallah to yormi rango at Pakpu maling 1 3.00 2 1 3.00
ko Pani
245 Paying MOA&FW Har Khet Gyiba sikyo to Sala rega at pakpu maling 1 2.00 3 1 2.00
ko Pani
246 Paying MOA&FW Har Khet Silu siko nallah to Doching Tering Ringo at Pakpu maling 1 1.00 3 1 1.00
ko Pani
247 Paying MOA&FW Har Khet Sepung Nallah Sepung vill 1 2.00 4 1 2.00
ko Pani
248 Paying MOA&FW Har Khet Sikit nallah to Luduwa moring at Pakpu malling 1 1.00 3 1 1.00
ko Pani
249 Paying MOA&FW Har Khet Sipik nallah to Tame Moring at pillung Maling 1 2.00 4 1 2.00
ko Pani
250 Paying MOA&FW Har Khet Sichi kobung nallah to gobia at Paying 1 3.00 3 1 3.00 ASM
ko Pani
251 Paying MOA&FW Har Khet Ote nallah to tungpa rupu at Paying 1 3.00 3 1 3.00 ASM
ko Pani
252 Paying MOA&FW Har Khet Honing sikio to jarjo moring at raimuk 1 3.00 2 1 3.00
ko Pani
253 Paying MOA&FW Har Khet Ringsing nallah to Narbom at Jorjo Raimuk 1 5.00 1 1 5.00
ko Pani

303 | P a g e
254 Paying MOA&FW Har Khet Ching moring at Raimuk 1 3.00 2 1 3.00
ko Pani
255 Paying MOA&FW Har Khet Narak nallah to Bungkung moring at pillung Maling 1 4.00 2 1 4.00
ko Pani
256 Paying MOA&FW Har Khet Niakne -pin to sene nallah at Tachiring 1 5.00 2 1 5.00
ko Pani
257 Paying MOA&FW Har Khet Aerung seku to Tadiktalu pacham 1 5.00 2 1 5.00
ko Pani
258 Paying MOA&FW Har Khet Bate nallah at Pillung maling 1 3.00 3 1 3.00 ASM
ko Pani
259 Paying MOA&FW Har Khet Tobom sikio to tabom sibia at pillung maling 1 3.00 3 1 3.00 GPM
ko Pani
260 Paying MOA&FW Har Khet Gaya Nallah to Ringte Moring at Esso 1 3.00 2 1 3.00
ko Pani
261 Paying MOA&FW Har Khet Sipung Nallah To Sichi Jobe At Haching moring 1 2.00 4 1 2.00
ko Pani
262 Paying MOA&FW Har Khet Sipung Nallah To Habia Jobe Haching Moring 1 2.00 4 1 2.00
ko Pani
263 Paying MOA&FW Har Khet Yoo Siko to Panama Moring 1 5.00 2 1 5.00
ko Pani
264 Paying MOA&FW Har Khet Sorki nallah to Ddabang darunk at Lingruk Raimuk 1 3.00 2 1 3.00
ko Pani
265 Paying MOA&FW Har Khet Sorki to sebia moring at Lingruk Raimuk 1 3.00 3 1 3.00
ko Pani
266 Paying MOA&FW Har Khet Sorkinia nallah to Haba at Jorjo Raimuk 1 4.00 2 1 4.00
ko Pani
267 Paying MOA&FW Har Khet Sorchi nallah to jarjo riamuk rijo at Riamuk 1 4.00 1 4.00
ko Pani
268 Paying MOA&FW Har Khet Sibne Nallah to Haba at Jorjo Raimuk 1 5.00 2 1 5.00
ko Pani
269 Paying MOA&FW Har Khet Tabom sibia to Lingpa Lobia at Jorjo raimuk 1 4.00 2 1 4.00
ko Pani
270 Paying MOA&FW Har Khet Mutung puring to jorjo raimuk 1 3.00 2 1 3.00
ko Pani

304 | P a g e
271 Paying MOA&FW Har Khet Lingpakoro to Bapdin at Ramsing 1 2.00 1 1 2.00
ko Pani
272 Paying MOA&FW Har Khet Bachi Koro to Rakur at Ramsing 1 2.00 4 1 2.00
ko Pani
273 Paying MOA&FW Har Khet Yoh Nallah Ramching 1 2.00 3 1 2.00
ko Pani
274 Paying MOA&FW Har Khet Yoyo Koro to Hering at Ramsing 1 2.00 3 1 2.00
ko Pani
275 Paying MOA&FW Har Khet Sikuniming Nallah To Klaring At Maling 1 2.00 2 1 2.00
ko Pani
276 Paying MOA&FW Har Khet Sichak Nallah To Mokum Rengo At Maling 1 2.00 2 1 2.00
ko Pani
277 Paying MOA&FW Har Khet Pakba Suku To Surung At Pakba 1 2.00 2 1 2.00
ko Pani
278 Paying MOA&FW Har Khet Niakne Pin Sokio Nallah To Hadring Moring At 1 2.00 2 1 2.00
ko Pani Tachiring
279 Paying MOA&FW Har Khet Suku sokio Nallah To Ringte Moring At Tachiring 1 2.00 2 1 2.00
ko Pani
280 Paying MOA&FW Har Khet Water collection pound to litona yorbe at Ramsing 1 1.00 2 1 1.00
ko Pani
281 Paying MOA&FW Har Khet Yagio koro to lingpa at Ramsing 1 2.00 2 1 2.00
ko Pani
282 Paying MOA&FW Har Khet Siluk Nallah To Bimpik(left side) At Tarba 1 1.50 3 1 1.50
ko Pani
283 Paying MOA&FW Har Khet Yo Koro to Patom Jobe at Ramsing village 1 2.00 2 1 2.00
ko Pani
284 Paying MOA&FW Har Khet Nirinew to Ringte at Ngugnu 1 2.00 2 1 2.00
ko Pani
285 Paying MOA&FW Har Khet Sorong to Gering at Ngugnu 1 2.00 2 1 2.00
ko Pani
286 Paying MOA&FW Har Khet Soring to Yapu moring at Ngugnu 1 2.00 2 1 2.00
ko Pani
287 Paying MOA&FW Har Khet Sorong to Degiam at Ngugnu 1 1.00 2 1 1.00
ko Pani

305 | P a g e
288 Paying MOA&FW Har Khet Kabong to Degiam at Ngugnu 1 1.00 2 1 1.00
ko Pani
289 Paying MOA&FW Har Khet Hodinso koro to Seki at Ramsing 1 2.00 3 1 2.00
ko Pani
290 Paying MOA&FW Har Khet Reping moring at Arma 1 3.00 2 1 3.00
ko Pani
291 Paying MOA&FW Har Khet Sepa moring at Arma 1 3.00 2 1 3.00
ko Pani
292 Paying MOA&FW Har Khet Hakar moring at Arma. 1 4.00 2 1 4.00
ko Pani
293 Paying MOA&FW Har Khet Siching nallah to Repina Moring at Arma 1 6.00 4 1 6.00
ko Pani
294 Paying MOA&FW Har Khet Sinbha Nalah to Sombuko Moring 1 4.00 2 1 4.00
ko Pani
295 Paying MOA&FW Har Khet Punchi nallah to sipung at Sepung 1 10.00 2 1 10.00
ko Pani
296 Paying MOA&FW Har Khet Yoo Siko to Tali Moring 1 2.00 2 1 2.00
ko Pani
297 Paying MOA&FW Har Khet Toku nallah to tanam rintak at jering 1 4.00 3 1 4.00
ko Pani
298 Paying MOA&FW Har Khet Lingye nallah to kodom at jaring 1 2.00 3 1 2.00
ko Pani
299 Paying MOA&FW Har Khet Silu Nallah To Mokum Moring At Pakpu Maling 1 2.00 2 1 2.00
ko Pani
300 Paying MOA&FW Har Khet Siku Nimum Nallah To Kalaring At Pakpu Maling 1 2.00 2 1 2.00
ko Pani
301 Paying MOA&FW Har Khet Silu Nallah To Liguring At Pakpu Maling 1 2.00 2 1 2.00
ko Pani
302 Paying MOA&FW Har Khet Selu Nallah To Pakpu Rengo At Pakpu Maling 1 2.00 2 1 2.00
ko Pani
303 Paying MOA&FW Har Khet Lingye nallah to dimi at jaring 1 3.00 3 1 3.00
ko Pani

306 | P a g e
304 Paying MOA&FW Har Khet Lingga Koro to Killing tode at jaring 1 5.00 3 1 5.00
ko Pani
305 Paying MOA&FW Har Khet Siluk Nallah To Bimpik At Tarba 1 1.50 3 1 1.50
ko Pani
306 Paying MOA&FW Har Khet Bate Nallah To Bimak At Tarba 1 1.50 3 1 1.50
ko Pani
307 Paying MOA&FW Har Khet Bongring Nallah To Siluk Joring At Tarba 1 1.50 3 1 1.50
ko Pani
308 Paying MOA&FW Har Khet Kadin siko to Deba moring at Dagam 1 2.00 4 1 2.00 ASM
ko Pani
309 Paying MOA&FW Har Khet Masar Nallah to Ayu Arung at Pakba village 1 4.00 8 1 4.00
ko Pani

CAD NEW SCHEMES


Sl.No. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated Remarks
the Ministry / Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

1 GIBA Har Khet ko MOA&FW Oto koro to Jorung rijo at Jarjori 1 5.00 9.00 1 5.00 MLA
Pani
2 GIBA Har Khet ko MOA&FW Yagik koro to Pudarijo at Liriak 1 3.00 8.00 1 3.00 -do-
Pani
3 GIBA Har Khet ko MOA&FW Minta koro to Cheterijo at Dumpin 1 4.00 12.00 1 4.00 -do-
Pani
4 GIBA Har Khet ko MOA&FW Jelang nallah to Kamrung rejo at Jari 1 3.00 5.00 1 3.00 -do-
Pani
5 GIBA Har Khet ko MOA&FW Riau koro to Radisiri Gaperijo at Leya 1 6.00 9.00 1 6.00 -do-
Pani
6 GIBA Har Khet ko MOA&FW Tiklikoro to Muririjo at Muri Dignium 1 4.00 7.00 1 4.00 -do-
Pani
7 GIBA Har Khet ko MOA&FW Gigne Koro to Tadarijo at Bate 1 5.00 9.00 1 5.00 -do-
Pani

307 | P a g e
8 GIBA Har Khet ko MOA&FW Gargik koro to Dallu Singgu at Jitu 1 5.00 11.00 1 5.00 -do-
Pani
9 GIBA Har Khet ko MOA&FW Khaa koro to Tangki rijo at Menga Dignium 1 15.00 12.00 2 15.00 -do-
Pani
10 GIBA Har Khet ko MOA&FW Romi koro to Pingging rijo at Bate 1 5.00 8.00 1 5.00 -do-
Pani
11 GIBA Har Khet ko MOA&FW Takisi koro to Ringmirijo at Jari 1 4.00 7.00 1 4.00 -do-
Pani
12 GIBA Har Khet ko MOA&FW Sigo koro to Puniarijo at Leriak 1 8.00 11.00 1 8.00 -do-
Pani
13 GIBA Har Khet ko MOA&FW Oching Koro to Taririjo at Pigia 1 4.00 8.00 1 4.00 -do-
Pani
14 GIBA Har Khet ko MOA&FW Mokli koro Moklirijo at Leya 1 4.00 10.00 1 4.00 -do-
Pani
15 GIBA Har Khet ko MOA&FW Talikso koro to Nayam (Nyaru) rijo at Leriak 1 5.00 12.00 1 5.00 -do-
Pani
16 GIBA Har Khet ko MOA&FW Liru koro to Yorko rijo at Yolu 1 7.00 8.00 1 7.00 -do-
Pani
17 GIBA Har Khet ko MOA&FW Hapin koro to Neporijo at Sogum vill 1 10.00 9.00 1 10.00 -do-
Pani
18 GIBA Har Khet ko MOA&FW Dolo koro to Pekam Chalinrijo at Natam 1 5.00 12.00 1 5.00 -do-
Pani
19 GIBA Har Khet ko MOA&FW Gamgte koro to Dargung rijo at dargung 1 4.00 6.00 1 4.00 -do-
Pani
20 GIBA Har Khet ko MOA&FW Takia leba koro to Muri Yorio at Sorum 1 3.00 5.00 1 3.00 -do-
Pani
21 GIBA Har Khet ko MOA&FW Going Koro to Hatok rijo at Giba 1 3.00 6.00 1 3.00 -do-
Pani
22 GIBA Har Khet ko MOA&FW Jelang Koro to Kamrungrijo at Jari 1 4.00 8.00 1 4.00 -do-
Pani
23 GIBA Har Khet ko MOA&FW Boklin koro to Okhasiri rijo at Jari 1 6.00 8.00 1 6.00 -do-
Pani
24 GIBA Har Khet ko MOA&FW Honikoro to Hamirijo at Peya 1 3.00 7.00 1 3.00 -do-
Pani

308 | P a g e
25 GIBA Har Khet ko MOA&FW Tunri koro to Sarakpung rijo at Lingdam 1 5.00 8.00 1 5.00 -do-
Pani
26 GIBA Har Khet ko MOA&FW Hami So to Tadarrijo at Piya 1 1.00 12.00 1 1.00 -do-
Pani
27 GIBA Har Khet ko MOA&FW Otte koro to Miiring rijo at Rebi 1 15.00 18.00 1 15.00 -do-
Pani
28 GIBA Har Khet ko MOA&FW Tabu koro to Harak rijo at Sakarpung 1 3.00 14.00 1 3.00 -do-
Pani
29 GIBA Har Khet ko MOA&FW Ote koro to Tikdo Goyar at Rebi 1 6.00 15.00 1 6.00 -do-
Pani
30 GIBA Har Khet ko MOA&FW Beo koro to Bibarijo at Dumpin 1 4.00 7.00 1 4.00 -do-
Pani
31 GIBA Har Khet ko MOA&FW Kijamso to Kiyungrijo at Marging 1 2.00 9.00 1 2.00 -do-
Pani
32 GIBA Har Khet ko MOA&FW Lakbung koro to Darung rijo at Leriak 1 6.00 9.00 1 6.00 -do-
Pani
33 GIBA Har Khet ko MOA&FW Hayengsow koro to Hagam rijo at Rebi 1 6.00 12.00 1 6.00 -do-
Pani
34 GIBA Har Khet ko MOA&FW Momisho koro to Darta Paddy field at Sogum 1 3.00 4.00 1 3.00 -do-
Pani
35 GIBA Har Khet ko MOA&FW Koktak sow koro to Jagorkirijo at Jitak 1 3.00 4.00 1 3.00 -do-
Pani
36 GIBA Har Khet ko MOA&FW Sigo koro to Sigo Totokrijo at Leriak 1 3.00 10.00 1 3.00 -do-
Pani
37 GIBA Har Khet ko MOA&FW Boklin koro Jirorijo at Leya 1 7.00 12.00 1 7.00 -do-
Pani
38 GIBA Har Khet ko MOA&FW Amhjor koro to Bilamrijo at Sorum 1 3.00 11.00 1 3.00 -do-
Pani
39 GIBA Har Khet ko MOA&FW Maki koro to Maki rijo at Bate 1 3.00 10.00 1 3.00 -do-
Pani
40 GIBA Har Khet ko MOA&FW Bate Siriu to Egarporing at Lingdam 1 5.00 10.00 1 5.00 -do-
Pani
41 GIBA Har Khet ko MOA&FW Pobe koro to Kamting rijo at Rago 1 4.00 7.00 1 4.00 -do-
Pani

309 | P a g e
42 GIBA Har Khet ko MOA&FW Rakching Koro to Raksa rijo at New Rava 1 3.00 9.00 1 3.00 -do-
Pani
43 GIBA Har Khet ko MOA&FW Nilak koro to Kiakamrijo at Lungte 1 15.00 7.00 1 15.00 -do-
Pani
44 GIBA Har Khet ko MOA&FW Nyepo koro to Tangke rijo at Dignium 1 6.00 11.00 1 6.00 -do-
Pani
45 GIBA Har Khet ko MOA&FW Bichi koro to Biorijo at Dumpin 1 4.00 10.00 1 4.00 -do-
Pani
46 GIBA Har Khet ko MOA&FW Lingrisow koro to Lamchummoring rijo at Luchi 1 5.00 9.00 1 5.00 -do-
Pani
47 GIBA Har Khet ko MOA&FW Tabiu koro to Takjirijo at Lingdam 1 7.00 12.00 1 7.00 -do-
Pani
48 GIBA Har Khet ko MOA&FW Rachit so koro to Kokcho rijo at Marging 1 3.00 4.00 1 3.00 -do-
Pani
49 GIBA Har Khet ko MOA&FW Todo koro to Dalorijo at Lomigaling Vill 1 3.00 3.00 1 3.00 -do-
Pani
50 GIBA Har Khet ko MOA&FW Oching koro to Lomirijo at Jitu vill 1 4.00 5.00 1 4.00 -do-
Pani
51 GIBA Har Khet ko MOA&FW Gongte Nallah to Dargungrijo at Dargung 1 5.00 8.00 1 5.00 ZPC/BDO Giba
Pani
52 GIBA Har Khet ko MOA&FW Haguro koro to Gope rijo at Dignium 1 6.00 9.00 1 6.00 ZPC
Pani
53 GIBA Har Khet ko MOA&FW Bichi koro to Biorijo at Dumpin 1 5.00 11.00 1 5.00 ZPC
Pani
54 GIBA Har Khet ko MOA&FW Oching koro to Lomi rijo at Jitu 1 4.00 6.00 1 4.00 ZPC
Pani
55 GIBA Har Khet ko MOA&FW Radi koro to Harap rijo at Kikik 1 6.00 8.00 1 6.00 ZPC
Pani
56 GIBA Har Khet ko MOA&FW Tungri koro to Sarakpung rijo at Lingdam 1 6.00 11.00 1 6.00 ZPC
Pani
57 GIBA Har Khet ko MOA&FW Otto koro Darungrijo at Leriak 1 15.00 14.00 2 15.00 ZPC/BDO Giba
Pani
58 GIBA Har Khet ko MOA&FW Riau koro to Radisiri Geperijo at Leya 1 12.00 16.00 2 12.00 ZPC
Pani

310 | P a g e
59 GIBA Har Khet ko MOA&FW Todo koro to Dalo rijo at Lomigaling 1 8.00 9.00 1 8.00 ZPC
Pani
60 GIBA Har Khet ko MOA&FW Sigo koro to Puniya rijo at Leriak. 1 3.00 17.00 1 3.00 ZPC/BDO Giba
Pani
61 GIBA Har Khet ko MOA&FW Nielak soho to Kiakam rijo at Lungte 1 3.00 6.00 1 3.00 ZPC
Pani
62 GIBA Har Khet ko MOA&FW Richitso koro to Kokcho rijo at Marging 1 4.00 9.00 1 4.00 ZPC
Pani
63 GIBA Har Khet ko MOA&FW Yagik Koro to Pudarijo at Leriak 1 5.00 7.00 1 5.00 ZPC
Pani
64 GIBA Har Khet ko MOA&FW Khaa koro to Tangkirijo at Menga Dignium 1 6.00 12.00 1 6.00 ZPC
Pani
65 GIBA Har Khet ko MOA&FW Takialebe koro to Muri Yorio at Sorum 1 5.00 8.00 1 5.00 ZPC
Pani
66 GIBA Har Khet ko MOA&FW Tungri koro to Sengbe rijo at Sherakpung 1 5.00 8.00 1 5.00 ZPC
Pani
67 GIBA Har Khet ko MOA&FW Ochi koro to Pakpirijo at Leriak 1 4.00 12.00 1 4.00 ZPC
Pani
68 GIBA Har Khet ko MOA&FW Tabu koro to Harak rijo at Sherakpung 1 5.00 9.00 1 5.00 ZPC
Pani
69 GIBA Har Khet ko MOA&FW Tikli koro to Muririjo at Muri Dignium 1 5.00 7.00 1 5.00 ZPC
Pani
70 GIBA Har Khet ko MOA&FW Hami koro to Tade rijo at Piya 1 5.00 8.00 1 5.00 ZPC
Pani
71 GIBA Har Khet ko MOA&FW Tasar koro to Yorterijo at Rago 1 4.00 8.00 1 4.00 ZPC
Pani
72 GIBA Har Khet ko MOA&FW Hami koro to Hami rijo at Piya 1 6.00 9.00 1 6.00 ZPC
Pani
73 GIBA Har Khet ko MOA&FW Sigo koro to Puniya rijo at Puda Vill 1 6.00 9.00 1 6.00 ZPC
Pani
74 GIBA Har Khet ko MOA&FW Nahara koro to Piya rijo at Rava 1 5.00 8.00 1 5.00 ZPC
Pani
75 GIBA Har Khet ko MOA&FW Ote koro to Ruorijo at Rebi 1 6.00 16.00 1 6.00 ZPC
Pani

311 | P a g e
76 GIBA Har Khet ko MOA&FW Liru koro to Yorkorijo at Yolu 1 3.00 5.00 1 3.00 ZPC
Pani
77 GIBA Har Khet ko MOA&FW Soki nallah to Tabarijo at Bate 1 2.00 14.00 1 2.00 BDO Giba
Pani
78 GIBA Har Khet ko MOA&FW Ote koro to Mering rijo at Rebi 1 20.00 12.00 3 20.00 ZPC/BDO Giba
Pani
79 GIBA Har Khet ko MOA&FW Bate Nallah to Kodumrijo at Bate 1 4.00 20.00 1 4.00 BDO Giba
Pani
80 GIBA Har Khet ko MOA&FW Gipu nallah to Singmepurijo at Rago 1 5.00 9.00 1 5.00 BDO Giba
Pani
81 GIBA Har Khet ko MOA&FW Sengrung koro to Bamerijo at Dumpin 1 7.00 14.00 1 7.00 BDO Giba
Pani
82 GIBA Har Khet ko MOA&FW Nilum siku to Nilum rijo at Dargung 1 3.00 7.00 1 3.00 BDO Giba
Pani
83 GIBA Har Khet ko MOA&FW Bate nallah to Kadam rijo at Bate 1 1.00 16.00 1 1.00 BDO Giba
Pani
84 GIBA Har Khet ko MOA&FW Siso nallah to Si Rango at Bami 1 2.50 10.00 1 2.50 BDO Giba
Pani
85 GIBA Har Khet ko MOA&FW Deri Dera nallah to Otejobe at Dargung 1 6.00 9.00 1 6.00 BDO Giba
Pani
86 GIBA Har Khet ko MOA&FW Biyach koro to Biyach rijo at Bate 1 1.00 14.00 1 1.00 BDO Giba
Pani
87 GIBA Har Khet ko MOA&FW Gichi koro to Tankirijo at Dignium 1 5.00 12.00 1 5.00 BDO Giba
Pani
88 GIBA Har Khet ko MOA&FW Ladung koro to Dungchi rijo at Dumpin 1 8.00 9.00 1 8.00 BDO Giba
Pani
89 GIBA Har Khet ko MOA&FW Bisar koro to Bisar rijo at Bate 1 1.00 10.00 1 1.00 BDO Giba
Pani
90 GIBA Har Khet ko MOA&FW Haging Soh to Chedam Pobe at Jitak 1 7.00 6.00 1 7.00 BDO Giba
Pani
91 GIBA Har Khet ko MOA&FW Taibu nallah to Harak rijo at Dobin 1 10.00 13.00 1 10.00 BDO Giba
Pani
92 GIBA Har Khet ko MOA&FW Konu koro to Konu rijo at Bate 1 3.00 8.00 1 3.00 BDO Giba
Pani
93 GIBA Har Khet ko MOA&FW Tikre Sow to Oka Seriu at Jari- II 1 15.00 11.00 2 15.00 BDO Giba
Pani

312 | P a g e
94 GIBA Har Khet ko MOA&FW Yormi koro to Koktak rijo at Dumpin 1 10.00 10.00 1 10.00 BDO Giba
Pani
95 GIBA Har Khet ko MOA&FW Siso koro to Si rijo at Bate 1 4.00 11.00 1 4.00 BDO Giba
Pani
96 GIBA Har Khet ko MOA&FW Chingrung nallah to Dokio Puring at Bami 1 3.00 12.00 1 3.00 BDO Giba
Pani
97 GIBA Har Khet ko MOA&FW Tabiu Sow nallah to Mengarijo at Lingdam 1 9.00 8.00 1 9.00 ASM/ BDO Giba
Pani
98 GIBA Har Khet ko MOA&FW Romi koro to Romi rijo at Bate 1 1.50 7.00 1 1.50 BDO Giba
Pani
99 GIBA Har Khet ko MOA&FW Siso nallah to Bate Ringo at Bami 1 2.00 11.00 1 2.00 BDO Giba
Pani
100 GIBA Har Khet ko MOA&FW Riak Nallah to Riak rijo at Dargung 1 7.00 12.00 1 7.00 BDO Giba
Pani
101 GIBA Har Khet ko MOA&FW Rinba Sikio to Gipe Moring at Lingdam 1 9.00 10.00 1 9.00 ASM/ BDO Giba
Pani
102 GIBA Har Khet ko MOA&FW Hagu koro to Hagurijo at Dignium 1 3.00 10.00 1 3.00 BDO Giba
Pani
103 GIBA Har Khet ko MOA&FW Tungri nallah to Ching Kubang at Bami 1 2.00 8.00 1 2.00 BDO Giba
Pani
104 GIBA Har Khet ko MOA&FW Lepar koro to Lepar rijo at Dignium 1 3.00 8.00 1 3.00 BDO Giba
Pani
105 GIBA Har Khet ko MOA&FW Margung Nalah to Tosi rijo at Lomigaling. 1 12.00 7.00 2 12.00 BDO Giba
Pani
106 GIBA Har Khet ko MOA&FW Sego koro to Lekar Kachirijo at Leriak- I 1 15.00 15.00 2 15.00 BDO Giba
Pani
107 GIBA Har Khet ko MOA&FW Bate nallah to Baterijo at Bate 1 5.00 17.00 2 5.00 ASM/ BDO Giba
Pani
108 GIBA Har Khet ko MOA&FW Gingir Nallah to Yrpi rijo at Dobin 1 16.00 7.00 2 16.00 BDO Giba
Pani
109 GIBA Har Khet ko MOA&FW Dungchi koro to Pakpu rijo at Dumpin 1 10.00 12.00 1 10.00 BDO Giba
Pani
110 GIBA Har Khet ko MOA&FW Cheniaso to Gungte rijo at Dargung 1 4.00 6.00 1 4.00 BDO Giba
Pani

313 | P a g e
111 GIBA Har Khet ko MOA&FW Biring koro to Darchi rijo at Dumpin 1 8.00 8.00 1 8.00 BDO Giba
Pani
112 GIBA Har Khet ko MOA&FW Begam koro to Begam rijo at Dignium 1 4.00 9.00 1 4.00 BDO Giba
Pani
113 GIBA Har Khet ko MOA&FW Ringri koro to Gialamrijo at Luchi 1 12.00 8.00 2 12.00 BDO Giba
Pani
114 GIBA Har Khet ko MOA&FW Bering nallah to Kotum rijo at Dumpin 1 10.00 9.00 1 10.00 BDO Giba
Pani
115 GIBA Har Khet ko MOA&FW Pagisow to Kamrung at Jari- I 1 25.00 9.00 3 25.00 BDO Giba
Pani
116 GIBA Har Khet ko MOA&FW Nepo koro to Gope rijo at Dignium 1 5.00 13.00 1 5.00 BDO Giba
Pani
117 GIBA Har Khet ko MOA&FW Momiso koro to Si-Jori at Jarjori 1 20.00 11.00 3 20.00 BDO Giba
Pani
118 GIBA Har Khet ko MOA&FW Siso to Bami Hora at Jitak 1 6.00 7.00 1 6.00 BDO Giba
Pani
119 GIBA Har Khet ko MOA&FW Ote koro to Ote rijo at Lomigaling. 1 8.00 10.00 1 8.00 BDO Giba
Pani
120 GIBA Har Khet ko MOA&FW Oksu so to Oksu rijo at Marging 1 1.50 8.00 1 1.50 BDO Giba
Pani
121 GIBA Har Khet ko MOA&FW Banesow to Ghairijo at Jitu 1 11.00 10.00 1 11.00 BDO Giba
Pani
122 GIBA Har Khet ko MOA&FW Toniom koro to Namdumrijo at Luchi 1 10.00 10.00 1 10.00 BDO Giba
Pani
123 GIBA Har Khet ko MOA&FW Koring Sow to Tamar rijo at Makba 1 5.00 7.00 1 5.00 BDO Giba
Pani
124 GIBA Har Khet ko MOA&FW Koriasow to Koriarijo at Jitu 1 3.00 8.00 1 3.00 BDO Giba
Pani
125 GIBA Har Khet ko MOA&FW Bami nallah to Yaktange at Bami 1 1.50 9.00 1 1.50 BDO Giba
Pani
126 GIBA Har Khet ko MOA&FW Gingri so to Hami Hate rijo at Lingdam 1 10.00 9.00 1 10.00 ASM/ BDO Giba
Pani
127 GIBA Har Khet ko MOA&FW Makhu koro to Makba rijo at Makba 1 10.00 8.00 1 10.00 BDO Giba
Pani

314 | P a g e
128 GIBA Har Khet ko MOA&FW Sego koro to Lakarrijo at Leriak 1 20.00 8.00 2 20.00 BDO Giba
Pani
129 GIBA Har Khet ko MOA&FW Namdum koro to Damirijo at Leriak- II 1 9.50 12.00 1 9.50 BDO Giba
Pani
130 GIBA Har Khet ko MOA&FW Seko koro to Darding rijo at Jitu 1 10.00 11.00 1 10.00 BDO Giba
Pani
131 GIBA Har Khet ko MOA&FW Oto koro to Damirijo at Leriak 1 5.00 10.00 1 5.00 BDO Giba
Pani
132 GIBA Har Khet ko MOA&FW Ginging Nallah to Joko Ringjo at Jitak 1 4.00 8.00 1 4.00 BDO Giba
Pani
133 GIBA Har Khet ko MOA&FW Mayeng Oching to Lomirijo at Lomigaling. 1 10.00 8.00 1 10.00 BDO Giba
Pani
134 GIBA Har Khet ko MOA&FW Charmi nallah to Charmirijo at Markia 1 10.00 13.00 1 10.00 BDO Giba
Pani
135 GIBA Har Khet ko MOA&FW Toshi koro to Toshi rijo at Lomigaling. 1 10.00 9.00 1 10.00 BDO Giba
Pani
136 GIBA Har Khet ko MOA&FW Leya koro to Bakaprijo at Luchi 1 8.00 9.00 1 8.00 BDO Giba
Pani
137 GIBA Har Khet ko MOA&FW Ghaiseku to Pipu rijo at Jitu 1 1.00 7.00 1 1.00 BDO Giba
Pani
138 GIBA Har Khet ko MOA&FW Hami so nallah to Aye Duke at Engpu Marging 1 2.00 9.00 1 2.00 BDO Giba
Pani
139 GIBA Har Khet ko MOA&FW Tabom nallah to Hatak rijo at Lungte 1 10.00 9.00 1 10.00 BDO Giba
Pani
140 GIBA Har Khet ko MOA&FW Romi So to Romijobe at Piya 1 2.00 9.00 1 2.00 BDO Giba
Pani
141 GIBA Har Khet ko MOA&FW Muglih nallah to Yorkorijo at Pute 1 16.00 8.00 1 16.00 BDO Giba
Pani
142 GIBA Har Khet ko MOA&FW Singchi koro to Singchi rijo at Lute 1 10.00 7.00 1 10.00 BDO Giba
Pani
143 GIBA Har Khet ko MOA&FW Marung koro to Lote rijo at Natam 1 9.00 12.00 1 9.00 BDO Giba
Pani
144 GIBA Har Khet ko MOA&FW Tabum koro to Bate rijo at Makba 1 8.00 6.00 1 8.00 BDO Giba
Pani

315 | P a g e
145 GIBA Har Khet ko MOA&FW Yurmi koro to Pekam rijo at Natam 1 10.00 9.00 1 10.00 BDO Giba
Pani
146 GIBA Har Khet ko MOA&FW Serik koro to Serik rijo at Muri Dignium 1 4.00 7.00 1 4.00 BDO Giba
Pani
147 GIBA Har Khet ko MOA&FW Lingke koro to Makba rijo at Makba 1 5.00 10.00 1 5.00 BDO Giba
Pani
148 GIBA Har Khet ko MOA&FW Oching nallah to Engpu rijo at Engpu Marging 1 2.00 9.00 1 2.00 ASM/ BDO Giba
Pani
149 GIBA Har Khet ko MOA&FW Si-so nallah to Tase Pagit at Marging 1 3.00 12.00 1 3.00 ASM/ BDO Giba
Pani
150 GIBA Har Khet ko MOA&FW Ningpo koro to Rutasi at Marging 1 1.00 11.00 1 1.00 ASM/ BDO Giba
Pani
151 GIBA Har Khet ko MOA&FW Lepu nallah to Kumpok rijo at Markia 1 5.00 11.00 1 5.00 BDO Giba
Pani
152 GIBA Har Khet ko MOA&FW Oching koro to Lengpung rijo at Natam 1 5.00 15.00 1 5.00 BDO Giba
Pani
153 GIBA Har Khet ko MOA&FW Yakpo so nallah to Yakpo rijo at Marging 1 2.00 6.00 1 2.00 BDO Giba
Pani
154 GIBA Har Khet ko MOA&FW Lute koro to Rapirijo at Lute 1 20.00 8.00 2 20.00 BDO Giba
Pani
155 GIBA Har Khet ko MOA&FW Siso nallah to Ete Pobe rijo at Ete Pobe Marging 1 3.00 10.00 1 3.00 BDO Giba
Pani
156 GIBA Har Khet ko MOA&FW Lepu koro to Umpra rijo at Markia 1 10.00 12.00 1 10.00 BDO Giba
Pani
157 GIBA Har Khet ko MOA&FW Loma koro to Taririjo at Pagia 1 20.00 10.00 2 20.00 BDO Giba
Pani
158 GIBA Har Khet ko MOA&FW Hate So to Taji Yorbe at Piya 1 1.50 10.00 1 1.50 BDO Giba
Pani
159 GIBA Har Khet ko MOA&FW Ote Nallah to Poring Namching at Rago 1 3.00 10.00 1 3.00 BDO Giba
Pani
160 GIBA Har Khet ko MOA&FW Niko nallah to Lomi Lote rijo at Natam 1 8.00 8.00 1 8.00 BDO Giba
Pani
161 GIBA Har Khet ko MOA&FW Tabom Siku to Singriha rijo at Markia 1 5.00 11.00 1 5.00 BDO Giba
Pani

316 | P a g e
162 GIBA Har Khet ko MOA&FW Jaho nallah to Chimba rijo at Pigia 1 9.00 8.00 1 9.00 BDO Giba
Pani
163 GIBA Har Khet ko MOA&FW Lekar koro to Karter rijo at Puda 1 18.00 10.00 2 18.00 BDO Giba
Pani
164 GIBA Har Khet ko MOA&FW Oppe koro to Hoggo rijo at Rago 1 2.00 6.00 1 2.00 BDO Giba
Pani
165 GIBA Har Khet ko MOA&FW Singha nallah to Lingter rijo at Markia 1 5.00 9.00 1 5.00 BDO Giba
Pani
166 GIBA Har Khet ko MOA&FW Nialak koro to Takmirijo at Lute 1 3.00 6.00 1 3.00 BDO Giba
Pani
167 GIBA Har Khet ko MOA&FW Singha nallah to Amte Muring at Markia 1 5.00 7.00 1 5.00 BDO Giba
Pani
168 GIBA Har Khet ko MOA&FW Pagi nallah to Parerijo at Pigia 1 18.00 12.00 2 18.00 BDO Giba
Pani
169 GIBA Har Khet ko MOA&FW Tikli koro to Tiklirijo at Muri Dignium 1 3.00 8.00 1 3.00 BDO Giba
Pani
170 GIBA Har Khet ko MOA&FW Taba so nallah to Tabarijo at Marging 1 2.00 7.00 1 2.00 BDO Giba
Pani
171 GIBA Har Khet ko MOA&FW Dote koro to Dote rijo at Muri Dignium 1 8.00 9.00 3 8.00 BDO Giba
Pani
172 GIBA Har Khet ko MOA&FW Biri koro to Lomi rijo at Natam 1 15.00 8.00 2 15.00 BDO Giba
Pani
173 GIBA Har Khet ko MOA&FW Komma koro to Singring rijo at Makba 1 5.00 9.00 2 5.00 BDO Giba
Pani
174 GIBA Har Khet ko MOA&FW Birap koro to Kiaki rijo at Natam 1 7.00 10.00 2 7.00 BDO Giba
Pani
175 GIBA Har Khet ko MOA&FW Charto koro to Noshi rijo at Markia 1 15.00 9.00 2 15.00 BDO Giba
Pani
176 GIBA Har Khet ko MOA&FW Ote Siku to Takia rijo at Markia 1 5.00 8.00 1 5.00 BDO Giba
Pani
177 GIBA Har Khet ko MOA&FW Dargit nallah to Helle rijo at Natam 1 15.00 10.00 2 15.00 BDO Giba
Pani
178 GIBA Har Khet ko MOA&FW Moglih koro to Merum rijo at Pute 1 7.00 9.00 2 7.00 BDO Giba
Pani

317 | P a g e
179 GIBA Har Khet ko MOA&FW Lingling koro to Yaterijo at Pigia 1 25.00 9.00 3 25.00 BDO Giba
Pani
180 GIBA Har Khet ko MOA&FW Mahung nallah to Hirruha rijo at Markia 1 10.00 6.00 1 10.00 BDO Giba
Pani
181 GIBA Har Khet ko MOA&FW Oching koro to Yamirijo at Pigia 1 3.00 7.00 1 3.00 BDO Giba
Pani
182 GIBA Har Khet ko MOA&FW Ote koro to Jigam rijo at Rago 1 3.00 8.00 1 3.00 BDO Giba
Pani
183 GIBA Har Khet ko MOA&FW Oching koro to Hejupuh at Rebi 1 3.00 12.00 1 3.00 BDO Giba
Pani
184 GIBA Har Khet ko MOA&FW Kahun nallah to Kijamrijo at Marging 1 6.00 7.00 1 6.00 ASM
Pani
185 GIBA Har Khet ko MOA&FW Sigia koro to Yaprung rijo at Pigia 1 10.00 11.00 1 10.00 BDO Giba
Pani
186 GIBA Har Khet ko MOA&FW Hami so to Piya rijo at Piya 1 4.00 6.00 1 4.00 BDO Giba
Pani
187 GIBA Har Khet ko MOA&FW Narra Nallah to Edeha rijo at Rava 1 10.00 8.00 1 10.00 BDO Giba
Pani
188 GIBA Har Khet ko MOA&FW Tungri nallah to Jigioporing at Sherakpung 1 6.00 8.00 1 6.00 ASM/BDO Giba
Pani
189 GIBA Har Khet ko MOA&FW Hami So to Kongkiora at Piya 1 2.50 13.00 1 2.50 BDO Giba
Pani
190 GIBA Har Khet ko MOA&FW Gipu Sow to Simme rijo at Rago 1 5.00 7.00 1 5.00 BDO Giba
Pani
191 GIBA Har Khet ko MOA&FW Okching Sow to Pekdarijo at Pute 1 8.00 10.00 1 8.00 BDO Giba
Pani
192 GIBA Har Khet ko MOA&FW Jiji Sow to Jaring rijo at Rebi 1 5.00 7.00 1 5.00 BDO Giba
Pani
193 GIBA Har Khet ko MOA&FW Taliksiting koro to Liking rijo at Pigia 1 6.00 9.00 1 6.00 BDO Giba
Pani
194 GIBA Har Khet ko MOA&FW Raksha koro to Sappe rijo at Rago 1 10.00 8.00 1 10.00 BDO Giba
Pani
195 GIBA Har Khet ko MOA&FW Domda nallah to Tamchok Tama rijo at Rava 1 12.00 7.00 2 12.00 BDO Giba
Pani

318 | P a g e
196 GIBA Har Khet ko MOA&FW Seko koro to Neporing rijo at Rebi 1 10.00 9.00 1 10.00 BDO Giba
Pani
197 GIBA Har Khet ko MOA&FW Tachar nallah to Paning Moring at Rago 1 5.00 6.00 1 5.00 BDO Giba
Pani
198 GIBA Har Khet ko MOA&FW Sik koro to Yagik rijo at Siyorbe 1 4.00 10.00 1 4.00 BDO Giba
Pani
199 GIBA Har Khet ko MOA&FW Gingri koro to Yarte rijo at Rago 1 3.00 11.00 1 3.00 BDO Giba
Pani
200 GIBA Har Khet ko MOA&FW Yellu koro to Meosar rijo at Rava 1 10.00 8.00 1 10.00 BDO Giba
Pani
201 GIBA Har Khet ko MOA&FW Sibeng koro to Narra rijo at Rago 1 5.00 9.00 1 5.00 BDO Giba
Pani
202 GIBA Har Khet ko MOA&FW Gungte nallah to Dargungrijo at Dargung 1 5.00 8.00 1 5.00 ASM
Pani
203 GIBA Har Khet ko MOA&FW Ringa nallah to Terte rijo at Rago 1 5.00 8.00 1 5.00 BDO Giba
Pani
204 GIBA Har Khet ko MOA&FW Cherte nallah to Chebarijo at Rago 1 5.00 10.00 1 5.00 BDO Giba
Pani
205 GIBA Har Khet ko MOA&FW Nagi nallah to Tana Taharijo at Rago 1 5.00 12.00 1 5.00 BDO Giba
Pani
206 GIBA Har Khet ko MOA&FW Pobe nallah to Donyi Rikha at Rava 1 6.00 7.00 1 6.00 BDO Giba
Pani
207 GIBA Har Khet ko MOA&FW Nilak koro to Kamling Muri at Rava 1 6.00 9.00 1 6.00 BDO Giba
Pani
208 GIBA Har Khet ko MOA&FW Bokle koro to Takar Rikyar at Rava 1 5.00 6.00 1 5.00 BDO Giba
Pani
209 GIBA Har Khet ko MOA&FW Ope koro to Narpi Dumcho at Rava 1 10.00 10.00 1 10.00 BDO Giba
Pani
210 GIBA Har Khet ko MOA&FW Ote koro to Rava rijo at Rava 1 10.00 9.00 1 10.00 BDO Giba
Pani
211 GIBA Har Khet ko MOA&FW Take nallah to Sibe rijo at Rava 1 5.00 11.00 1 5.00 BDO Giba
Pani
212 GIBA Har Khet ko MOA&FW Pobe Sow to Dumda rijo at Rago 1 4.00 7.00 1 4.00 BDO Giba
Pani

319 | P a g e
213 GIBA Har Khet ko MOA&FW Narra koro to Piya rijo at Rava 1 4.00 7.00 1 4.00 BDO Giba
Pani
214 GIBA Har Khet ko MOA&FW Narra nallah to Piria rijo at Rava 1 8.00 9.00 1 8.00 BDO Giba
Pani
215 GIBA Har Khet ko MOA&FW Kamling sow to Dardu rijo at Rago 1 3.00 8.00 1 3.00 BDO Giba
Pani
216 GIBA Har Khet ko MOA&FW Kimi nallah to Kite rijo at Rava 1 8.00 6.00 1 8.00 BDO Giba
Pani
217 GIBA Har Khet ko MOA&FW Tungri anllah to Loklamrijo at Bami 1 5.00 7.00 1 5.00 ASM
Pani
218 GIBA Har Khet ko MOA&FW Opin koro to Opinrijo at Rebi 1 6.00 10.00 1 6.00 BDO Giba
Pani
219 GIBA Har Khet ko MOA&FW Bate Nallah to Bisarijo at Bate 1 5.00 13.00 1 5.00 ASM
Pani
220 GIBA Har Khet ko MOA&FW Lingra koro to Gapherijo at Rebi 1 25.00 8.00 1 25.00 BDO Giba
Pani
221 GIBA Har Khet ko MOA&FW Ote koro to Lumtak rijo at Sogum 1 10.00 11.00 1 10.00 BDO Giba
Pani
222 GIBA Har Khet ko MOA&FW Harak nallah to Hoju rijo at Ribi 1 20.00 11.00 2 20.00 BDO Giba
Pani
223 GIBA Har Khet ko MOA&FW Pesa koro to Maaki rijo at Bate 1 3.00 9.00 1 3.00 BDO Giba
Pani
224 GIBA Har Khet ko MOA&FW Sopun nallah to Rania rijo at Ribi 1 10.00 14.00 1 10.00 BDO Giba
Pani
225 GIBA Har Khet ko MOA&FW Row koro to Makri rijo at Bate 1 2.00 7.00 1 2.00 BDO Giba
Pani
226 GIBA Har Khet ko MOA&FW Peyu koro to Peyurijo at Sedu vill 1 2.00 11.00 1 2.00 BDO Giba
Pani
227 GIBA Har Khet ko MOA&FW Sigia So to Tabiu-Ring rijo at Sherakpung 1 8.00 7.00 1 8.00 ASM/BDO Giba
Pani
228 GIBA Har Khet ko MOA&FW Baich Nallah to Baterijo at Bate 1 6.00 15.00 1 6.00 ASM
Pani
229 GIBA Har Khet ko MOA&FW Chingrung Kobong Nallah to Bami rijo at Bami 1 5.00 13.00 1 5.00 ASM
Pani
230 GIBA Har Khet ko MOA&FW Bate Nalla to Baterijo at Bate 1 15.00 17.00 2 15.00 ASM
Pani

320 | P a g e
231 GIBA Har Khet ko MOA&FW Oching nallah to Oksu Rijo at Marging 1 4.00 15.00 1 4.00 ASM
Pani
232 GIBA Har Khet ko MOA&FW Dumda koro to Gippu rijo at Rago 1 5.00 9.00 1 5.00 BDO Giba
Pani
233 GIBA Har Khet ko MOA&FW Magri nallah to Magririjo at Bate 1 5.00 9.00 1 5.00
Pani
234 GIBA Har Khet ko MOA&FW Issaso to Makirijo at Bate 1 5.00 12.00 1 5.00
Pani
235 GIBA Har Khet ko MOA&FW Bate/Mengekoro to Markrijo at Bate 1 5.00 9.00 1 5.00
Pani
236 GIBA Har Khet ko MOA&FW Si so nallah to Bami rijo at Bami 1 4.00 9.00 1 4.00
Pani
237 GIBA Har Khet ko MOA&FW Pisaso to Rimgiora at Bami 1 5.00 8.00 1 5.00
Pani
238 GIBA Har Khet ko MOA&FW Bate Nallah to Kangrijo at Bami 1 5.00 10.00 1 5.00
Pani
239 GIBA Har Khet ko MOA&FW Yaktak Nallah to Yaktakrijo at Bami 1 5.00 11.00 1 5.00
Pani
240 GIBA Har Khet ko MOA&FW Sinsi nallah to Singmala at Dargung 1 9.00 15.00 1 9.00
Pani
241 GIBA Har Khet ko MOA&FW Dargong rijo to gongte nallah at Dargung 1 2.00 11.00 1 2.00
Pani
242 GIBA Har Khet ko MOA&FW Deri Dera koro to Jube at Darung 1 6.00 12.00 1 6.00
Pani
243 GIBA Har Khet ko MOA&FW Gonte nallah to Gongte rijo at Dargung 1 8.00 12.00 1 8.00
Pani
244 GIBA Har Khet ko MOA&FW Senjuso to senjurijo at Dargung 1 5.00 9.00 1 5.00
Pani
245 GIBA Har Khet ko MOA&FW Binju koro to Binju rijo at Dignium 1 4.00 12.00 1 4.00
Pani
246 GIBA Har Khet ko MOA&FW Lumlita so to Guha rijo at Dobin 1 5.00 6.00 1 5.00
Pani
247 GIBA Har Khet ko MOA&FW Bami Hora to Tumling poring at Dobin 1 3.00 7.00 1 3.00
Pani
248 GIBA Har Khet ko MOA&FW Gengri so to Amtum rijo at Dobin 1 3.00 6.00 1 3.00
Pani

321 | P a g e
249 GIBA Har Khet ko MOA&FW Dungchi koro to Tala rijo at Dumpin 1 4.00 9.00 1 4.00
Pani
250 GIBA Har Khet ko MOA&FW Dunchi koro to Bamerijo at Dumpin 1 3.00 8.00 1 3.00
Pani
251 GIBA Har Khet ko MOA&FW Sengrong kobong to Tamlingrijo at Dumpin 1 4.00 6.00 1 4.00
Pani
252 GIBA Har Khet ko MOA&FW Dungchi koro to Yormi oching at Dumpin 1 4.00 7.00 1 4.00
Pani
253 GIBA Har Khet ko MOA&FW Diring oching to Biorijo at Dumpin 1 5.00 7.00 1 5.00
Pani
254 GIBA Har Khet ko MOA&FW Dongchi koro to bam rijo at Dumpin 1 2.00 6.00 1 2.00
Pani
255 GIBA Har Khet ko MOA&FW Ruje rukar to kutom rijo at Dumpin 1 5.00 6.00 1 5.00
Pani
256 GIBA Har Khet ko MOA&FW Oching koro to Pakpurijo at Dumpin 1 9.00 10.00 1 9.00
Pani
257 GIBA Har Khet ko MOA&FW Darte koro to Darchirijo at Dumpin 1 4.00 8.00 1 4.00
Pani
258 GIBA Har Khet ko MOA&FW Ruchekoro to Kotam rijo at Dumpin 1 2.00 6.00 1 2.00
Pani
259 GIBA Har Khet ko MOA&FW Dungchi koro to Ladung rijo at Dumpin. 1 3.00 10.00 1 3.00
Pani
260 GIBA Har Khet ko MOA&FW Ramri koro to Songrong kubung at Dumpin 1 12.00 15.00 1 12.00
Pani
261 GIBA Har Khet ko MOA&FW Nambiya river at engpung Marging 1 5.00 11.00 1 5.00
Pani
262 GIBA Har Khet ko MOA&FW Sigiaso to Ramdirijo at Giba HQ 1 12.00 14.00 2 12.00
Pani
263 GIBA Har Khet ko MOA&FW Takisi to Tarangurak at Giba HQ 1 18.00 17.00 2 18.00
Pani
264 GIBA Har Khet ko MOA&FW Nepo koro to Tanki rijo at Gichi Dignium 1 30.00 24.00 3 30.00
Pani
265 GIBA Har Khet ko MOA&FW Petosmakria rijo at Gichi Dignium 1 8.00 14.00 1 8.00
Pani

322 | P a g e
266 GIBA Har Khet ko MOA&FW Peyu koro to Sedurijo at Gichi Dignium 1 10.00 15.00 1 10.00
Pani
267 GIBA Har Khet ko MOA&FW Sigo koro to Segorijo at Gichi Dignium 1 6.00 9.00 1 6.00
Pani
268 GIBA Har Khet ko MOA&FW Begam& Baharijo at Gichi Dignium 1 11.00 10.00 2 11.00
Pani
269 GIBA Har Khet ko MOA&FW Namdam & Lepar rijo at Gite Dignium 1 12.00 15.00 2 12.00
Pani
270 GIBA Har Khet ko MOA&FW Page koro to Hatok rijo at Jari 1 7.00 10.00 1 7.00
Pani
271 GIBA Har Khet ko MOA&FW Page koro to Remi rijo at Jari 1 9.00 11.00 1 9.00
Pani
272 GIBA Har Khet ko MOA&FW Pote Nala to Pute rijo at Jari. 1 3.00 7.00 1 3.00
Pani
273 GIBA Har Khet ko MOA&FW Page koro to Jilling Kamning rijo at Jaring 1 6.00 8.00 1 6.00
Pani
274 GIBA Har Khet ko MOA&FW Page koro to Okaseirijo at Jaring 1 10.00 12.00 1 10.00
Pani
275 GIBA Har Khet ko MOA&FW Oto Koro to Nikpori rijo at Jarjori 1 3.00 8.00 1 3.00
Pani
276 GIBA Har Khet ko MOA&FW Gungung Koro to Jorung rijo at Jarjori 1 4.00 7.00 1 4.00
Pani
277 GIBA Har Khet ko MOA&FW Momisou to Jarjoririjo at Jarjori 1 6.00 7.00 1 6.00
Pani
278 GIBA Har Khet ko MOA&FW Momisou to Hakriarijo at Jarjori 1 5.00 12.00 1 5.00
Pani
279 GIBA Har Khet ko MOA&FW Momisou to Tajerijo at Jarjori 1 3.00 8.00 1 3.00
Pani
280 GIBA Har Khet ko MOA&FW Haging to Hapu Lingdam at Jitak 1 2.00 6.00 1 2.00
Pani
281 GIBA Har Khet ko MOA&FW Oching ote koro to Jitak rijo at Jitak 1 3.00 7.00 1 3.00
Pani
282 GIBA Har Khet ko MOA&FW Ginging so to Koktak rijo at Jitak 1 5.00 7.00 1 5.00
Pani

323 | P a g e
283 GIBA Har Khet ko MOA&FW Jiji Sinu to Damte Pobe at Jitak 1 4.00 6.00 1 4.00
Pani
284 GIBA Har Khet ko MOA&FW Rimi koro to Tabe rijo at Jitak 1 4.00 7.00 1 4.00
Pani
285 GIBA Har Khet ko MOA&FW Raga so to Sobing Joring at Jitak 1 5.00 7.00 1 5.00
Pani
286 GIBA Har Khet ko MOA&FW Siso to Babi Yerdum at Jitak 1 2.00 6.00 1 2.00
Pani
287 GIBA Har Khet ko MOA&FW Marung koro to Toshi rijo at Jitu 1 6.00 7.00 1 6.00
Pani
288 GIBA Har Khet ko MOA&FW Galling koro to Lingpung rijo at Jitu 1 5.00 8.00 1 5.00
Pani
289 GIBA Har Khet ko MOA&FW Maying oching to Lingcho kotung at Jitu 1 4.00 6.00 1 4.00
Pani
290 GIBA Har Khet ko MOA&FW Dalo snow koro to Dalo Yorbe at Jitu 1 2.00 8.00 1 2.00
Pani
291 GIBA Har Khet ko MOA&FW Yote Yorbe koro to Parong at Jitu 1 2.00 10.00 1 2.00
Pani
292 GIBA Har Khet ko MOA&FW Bane koro to Jitu rijo at Jitu. 1 4.00 9.00 1 4.00
Pani
293 GIBA Har Khet ko MOA&FW Pete koro & Pemi koro to Kikukpu rijo at Kikik 1 6.00 8.00 1 6.00
Pani
294 GIBA Har Khet ko MOA&FW Tabiu koro to Sarakpung at Lingdam 1 5.00 12.00 1 5.00
Pani
295 GIBA Har Khet ko MOA&FW Tabin so Nallah to Meggarijo at Lingdam 1 3.00 6.00 1 3.00
Pani
296 GIBA Har Khet ko MOA&FW Taso nallah to Tungriba at Lingdam 1 5.00 8.00 1 5.00
Pani
297 GIBA Har Khet ko MOA&FW Jeling sirbing at Miokam rungo at Lingdam 1 4.00 7.00 1 4.00
Pani
298 GIBA Har Khet ko MOA&FW Sigiasokororo to Tabiu rij at Lingdam 1 4.00 9.00 1 4.00
Pani
299 GIBA Har Khet ko MOA&FW Rimbasi koro to Gepemoring at Lingdam 1 3.00 5.00 1 3.00
Pani

324 | P a g e
300 GIBA Har Khet ko MOA&FW Ningposo koro to Yerching yerte at Lingdam 1 3.00 6.00 1 3.00
Pani
301 GIBA Har Khet ko MOA&FW Rinte babing ngong to Tumgbia kotum at Lingdam 1 1.00 6.00 1 1.00
Pani
302 GIBA Har Khet ko MOA&FW Sidum sich tabluring at Lingdam 1 4.00 7.00 1 4.00
Pani
303 GIBA Har Khet ko MOA&FW Ochingso to Ering yorbe at Lingdam 1 3.00 9.00 1 3.00
Pani
304 GIBA Har Khet ko MOA&FW Singri koro to Haterijo at Lingdam 1 4.00 6.00 1 4.00
Pani
305 GIBA Har Khet ko MOA&FW Siso to Bamiora at Lingdam 1 3.00 8.00 1 3.00
Pani
306 GIBA Har Khet ko MOA&FW Yangunpopso to Taiyer at Lingdam 1 3.00 7.00 1 3.00
Pani
307 GIBA Har Khet ko MOA&FW Sejerso koro to Hamirijo at Lingdam 1 3.00 6.00 1 3.00
Pani
308 GIBA Har Khet ko MOA&FW Lakmukso koro to Dachingporing at Lingdam 1 4.00 8.00 1 4.00
Pani
309 GIBA Har Khet ko MOA&FW Kiori Moikg to Raporijo at Lingdam 1 4.00 9.00 1 4.00
Pani
310 GIBA Har Khet ko MOA&FW Rambasekio to Rimpidai at Lingdam 1 3.00 8.00 1 3.00
Pani
311 GIBA Har Khet ko MOA&FW Lumlita so to Guharijo at Lingdam 1 5.00 10.00 1 5.00
Pani
312 GIBA Har Khet ko MOA&FW Bamihora to Tumlingporing at Lingdam 1 3.00 7.00 1 3.00
Pani
313 GIBA Har Khet ko MOA&FW Gengriso to Amtumrijo at Lingdam 1 3.00 9.00 1 3.00
Pani
314 GIBA Har Khet ko MOA&FW Riok koro to Yagampu at Lingdam vill. 1 12.00 20.00 2 12.00
Pani
315 GIBA Har Khet ko MOA&FW Uda koro to Daru rijo at Leriak 1 22.00 18.00 3 22.00
Pani
316 GIBA Har Khet ko MOA&FW Puda koro to Talunama at Leriak 1 9.00 15.00 1 9.00
Pani

325 | P a g e
317 GIBA Har Khet ko MOA&FW Puda koro to Belutam at Leriak 1 8.00 14.00 1 8.00
Pani
318 GIBA Har Khet ko MOA&FW Sogo koro to Damirijo at Leriak 1 3.00 15.00 1 3.00
Pani
319 GIBA Har Khet ko MOA&FW Sogo koro to Pagajohu at Leriak 1 3.00 18.00 1 3.00
Pani
320 GIBA Har Khet ko MOA&FW Darung rijo at Leriak 1 2.00 12.00 1 2.00
Pani
321 GIBA Har Khet ko MOA&FW Sogo koro to Hegetum at Leriak 1 4.00 16.00 1 4.00
Pani
322 GIBA Har Khet ko MOA&FW Sigo koro to Sigo rijo at Leriak 1 6.00 16.00 1 6.00
Pani
323 GIBA Har Khet ko MOA&FW Chogo Sho to Hacham Pate at Leya 1 5.00 8.00 1 5.00 74 - ASM Menga IV
Pani
324 GIBA Har Khet ko MOA&FW Boklin koro to Godarijo at Leya 1 5.00 10.00 1 5.00 74 - ASM Menga IV
Pani
325 GIBA Har Khet ko MOA&FW Tasamsoh koro to Yorkorijo at Leya 1 9.00 14.00 1 9.00
Pani
326 GIBA Har Khet ko MOA&FW Tasum koro to Mugli rijo at Leya 1 3.00 14.00 1 3.00
Pani
327 GIBA Har Khet ko MOA&FW Rew koro to Toprijo at Leya 1 4.00 24.00 1 4.00
Pani
328 GIBA Har Khet ko MOA&FW Terisatum koro Rinurijo at Leya 1 2.00 7.00 1 2.00
Pani
329 GIBA Har Khet ko MOA&FW Chogo koro to Chogopah at Leya 1 7.00 9.00 1 7.00
Pani
330 GIBA Har Khet ko MOA&FW Tasumso to Tariorijo at Leya 1 4.00 11.00 1 4.00
Pani
331 GIBA Har Khet ko MOA&FW Garget koro to Bera jobe at Lomigaling 1 5.00 7.00 1 5.00
Pani
332 GIBA Har Khet ko MOA&FW Bri koro to Lingkit at Lomigaling 1 3.00 5.00 1 3.00
Pani
333 GIBA Har Khet ko MOA&FW Lengling so to Gite rijo at Lomigaling 1 15.00 19.00 2 15.00
Pani

326 | P a g e
334 GIBA Har Khet ko MOA&FW Jiling soh to chambarijo at Luchi 1 9.00 9.00 1 9.00
Pani
335 GIBA Har Khet ko MOA&FW Lingrisoh to Gilam rijo at Luchi 1 4.00 8.00 1 4.00
Pani
336 GIBA Har Khet ko MOA&FW Rakpesoh to Rakperijo at Luchi 1 3.00 6.00 1 3.00
Pani
337 GIBA Har Khet ko MOA&FW Luchisoh to Namdum at Luchi 1 4.00 7.00 1 4.00
Pani
338 GIBA Har Khet ko MOA&FW Toniom koro to Namching rijo at Luchi 1 3.00 9.00 1 3.00
Pani
339 GIBA Har Khet ko MOA&FW Lochosoh to Yorkorijo at Luchi 1 6.00 8.00 1 6.00
Pani
340 GIBA Har Khet ko MOA&FW Seku koro to Bapak rijo at Luchi 1 3.00 7.00 1 3.00
Pani
341 GIBA Har Khet ko MOA&FW Kapsarsoh to Kapsarrijo at Luchi 1 3.00 6.00 1 3.00
Pani
342 GIBA Har Khet ko MOA&FW Luchisoh to Bikchum rijo at Luchi 1 3.00 12.00 1 3.00
Pani
343 GIBA Har Khet ko MOA&FW Lunchi soh to Maying rijo at Luchi 1 5.00 10.00 1 5.00
Pani
344 GIBA Har Khet ko MOA&FW Neya koro to Tumririjo at Lungte 1 2.00 6.00 1 2.00
Pani
345 GIBA Har Khet ko MOA&FW Luchisoho to Namdamrijo at Lungte 1 3.00 12.00 1 3.00
Pani
346 GIBA Har Khet ko MOA&FW Lumtesoho to Bdedrijo at Lungte 1 3.00 9.00 1 3.00
Pani
347 GIBA Har Khet ko MOA&FW Nielak soho to Tasurega at Lungte 1 4.00 8.00 1 4.00
Pani
348 GIBA Har Khet ko MOA&FW Opensaho to Lungte rijo at Lungte 1 4.00 9.00 1 4.00
Pani
349 GIBA Har Khet ko MOA&FW Jelling to Hatak takmi at Lungte 1 3.00 7.00 1 3.00
Pani
350 GIBA Har Khet ko MOA&FW Ragasoho to sengchi at Lungte 1 3.00 8.00 1 3.00
Pani

327 | P a g e
351 GIBA Har Khet ko MOA&FW Rosi soho to Kochum at Lungte 1 3.00 6.00 1 3.00
Pani
352 GIBA Har Khet ko MOA&FW Lugchi soho to Kokukrijo at Lungte 1 4.00 9.00 1 4.00
Pani
353 GIBA Har Khet ko MOA&FW Lungte soho to Raperijo at Lungte 1 6.00 8.00 1 6.00
Pani
354 GIBA Har Khet ko MOA&FW Koto koro to Yepak rijo at Marging 1 4.00 11.00 1 4.00
Pani
355 GIBA Har Khet ko MOA&FW Kijamso to Etepobe at Marging 1 7.00 11.00 1 7.00
Pani
356 GIBA Har Khet ko MOA&FW Ochingso to Ochingrongo at Marging 1 7.00 9.00 1 7.00
Pani
357 GIBA Har Khet ko MOA&FW Oching so to Oksujbe at Marging 1 8.00 12.00 1 8.00
Pani
358 GIBA Har Khet ko MOA&FW Rachik so to Rakperijo at Marging 1 6.00 8.00 1 6.00
Pani
359 GIBA Har Khet ko MOA&FW Pakpuso to Pakpurijo at Marging 1 4.00 7.00 1 4.00
Pani
360 GIBA Har Khet ko MOA&FW Perisekuso to Hagorijo at Marging 1 3.00 8.00 1 3.00
Pani
361 GIBA Har Khet ko MOA&FW Jasing so to Jasingrijo at Marging 1 3.00 6.00 1 3.00
Pani
362 GIBA Har Khet ko MOA&FW Cheba Nallah to Tabarijo at Marging 1 3.00 7.00 1 3.00
Pani
363 GIBA Har Khet ko MOA&FW Sikso nallah to Chamirijo at Marging 1 4.00 7.00 1 4.00
Pani
364 GIBA Har Khet ko MOA&FW Seso nallah to Tase Pagitrijo at Marging 1 4.00 12.00 1 4.00
Pani
365 GIBA Har Khet ko MOA&FW Nigpo koro to Rotasirijo at Marging 1 5.00 7.00 1 5.00
Pani
366 GIBA Har Khet ko MOA&FW Seso nalah to Emipoberijo at Marging 1 3.00 8.00 1 3.00
Pani
367 GIBA Har Khet ko MOA&FW Yapo nalah to Paro rijo at Marging 1 4.00 7.00 1 4.00
Pani

328 | P a g e
368 GIBA Har Khet ko MOA&FW Kiong Nalah to Kijamrijo at Marging 1 5.00 6.00 1 5.00
Pani
369 GIBA Har Khet ko MOA&FW Oching nallah to Humporijo at Marging 1 7.00 8.00 1 7.00
Pani
370 GIBA Har Khet ko MOA&FW Leppu koro Kumpok rijo Markia 1 3.00 11.00 1 3.00
Pani
371 GIBA Har Khet ko MOA&FW Leppu koro Nalo Yorbe at Markia 1 2.00 8.00 1 2.00
Pani
372 GIBA Har Khet ko MOA&FW Leppu koro Umpra rijo at Markia 1 2.00 14.00 1 2.00
Pani
373 GIBA Har Khet ko MOA&FW Chorta koro Tarmi rijo at Markia 1 3.00 10.00 1 3.00
Pani
374 GIBA Har Khet ko MOA&FW Chato koro Charto rijo at Markia 1 4.00 7.00 1 4.00
Pani
375 GIBA Har Khet ko MOA&FW Singha koro Lingtar rijo at Markia 1 3.00 9.00 1 3.00
Pani
376 GIBA Har Khet ko MOA&FW Tachak Sipper Siku Takta rijo at Markia 1 4.00 6.00 1 4.00
Pani
377 GIBA Har Khet ko MOA&FW Tabom koro Singri Nampo at Markia 1 3.00 5.00 1 3.00
Pani
378 GIBA Har Khet ko MOA&FW Singha koro Jiggo Ring Ngo at Markia 1 4.00 7.00 1 4.00
Pani
379 GIBA Har Khet ko MOA&FW Mahung/Luppu koro Herru Ha Ritak at Markia 1 5.00 8.00 1 5.00
Pani
380 GIBA Har Khet ko MOA&FW Charto/Lepu koro Yarung rijo at Markia 1 7.00 7.00 1 7.00
Pani
381 GIBA Har Khet ko MOA&FW Si koro Noshi rijo at Markia 1 3.00 6.00 1 3.00
Pani
382 GIBA Har Khet ko MOA&FW Pario Pare koro Pario Pare rijo at Markia 1 4.00 7.00 1 4.00
Pani
383 GIBA Har Khet ko MOA&FW Yaho koro Kennu rijo at Markia 1 3.00 6.00 1 3.00
Pani
384 GIBA Har Khet ko MOA&FW Ote siku Ringte Ringo at Markia 1 3.00 6.00 1 3.00
Pani

329 | P a g e
385 GIBA Har Khet ko MOA&FW Ote siku Kirong Ringo at Markia 1 3.00 8.00 1 3.00
Pani
386 GIBA Har Khet ko MOA&FW Chartoo nallah to Tarmi rijo at Markia 1 3.00 6.00 1 3.00
Pani
387 GIBA Har Khet ko MOA&FW Maung nallah to Eru rijo at Markia 1 10.00 7.00 1 10.00
Pani
388 GIBA Har Khet ko MOA&FW Pappak nallah to Mew rijo at Markia 1 11.00 9.00 2 11.00
Pani
389 GIBA Har Khet ko MOA&FW Lipu nallah to Markia at Markia 1 4.00 10.00 1 4.00
Pani
390 GIBA Har Khet ko MOA&FW Bogdu rijo at Mosi 1 2.00 7.00 1 2.00
Pani
391 GIBA Har Khet ko MOA&FW Sippi river Maji rijo at Mosi 1 5.00 270.00 1 5.00
Pani
392 GIBA Har Khet ko MOA&FW Sippi river Mori Ramme at Mosi 1 5.00 285.00 1 5.00
Pani
393 GIBA Har Khet ko MOA&FW Mali Maji Rakya rijo at Mosi 1 8.00 10.00 1 8.00
Pani
394 GIBA Har Khet ko MOA&FW Tikli koro to Dacho rijo at Muri Dignium 1 5.00 6.00 1 5.00
Pani
395 GIBA Har Khet ko MOA&FW Serik rijo at Muri Dignium 1 4.00 6.00 1 4.00
Pani
396 GIBA Har Khet ko MOA&FW Lipik & Hallo koro to Namch rijo at Namchi 1 4.00 9.00 1 4.00
Pani
397 GIBA Har Khet ko MOA&FW Gyamkam koro to Gyakam rijo at Namchi 1 2.00 6.00 1 2.00
Pani
398 GIBA Har Khet ko MOA&FW Nallo koro to Didu Kochaom at Namchi 1 2.00 7.00 1 2.00
Pani
399 GIBA Har Khet ko MOA&FW Tania koro to Rama Myodu at Namchi 1 5.00 9.00 1 5.00
Pani
400 GIBA Har Khet ko MOA&FW Lipik koro to Pago Lekin at Namchi 1 15.00 17.00 2 15.00
Pani
401 GIBA Har Khet ko MOA&FW Biri koro Pekamchalen rijo at Natam 1 9.00 12.00 1 9.00
Pani

330 | P a g e
402 GIBA Har Khet ko MOA&FW Dungchi koro to pakpu rijo at Natam 1 2.00 11.00 1 2.00
Pani
403 GIBA Har Khet ko MOA&FW Marong koro Yaling rijo at Natam 1 7.00 9.00 1 7.00
Pani
404 GIBA Har Khet ko MOA&FW Tosi koro Ale rijo at Natam 1 3.00 6.00 1 3.00
Pani
405 GIBA Har Khet ko MOA&FW Seru koro Lingdam rijo at Natam 1 12.00 14.00 1 12.00
Pani
406 GIBA Har Khet ko MOA&FW Beri koro to Galling rijo at Natam 1 3.00 13.00 1 3.00
Pani
407 GIBA Har Khet ko MOA&FW Seging koro to Lote rijo at Natam. 1 4.00 7.00 1 4.00
Pani
408 GIBA Har Khet ko MOA&FW Bami rijo to jachi koromat Pigia 1 3.00 6.00 1 3.00
Pani
409 GIBA Har Khet ko MOA&FW Radung Seru Nallah to Jachi rijo at Pigia 1 2.00 5.50 1 2.00
Pani
410 GIBA Har Khet ko MOA&FW Alecseteng to Narpu rijo at Pigia 1 9.00 10.00 1 9.00
Pani
411 GIBA Har Khet ko MOA&FW Alecsetengto Pare rijo at Pigia 1 8.00 8.00 1 8.00
Pani
412 GIBA Har Khet ko MOA&FW Takuso koro to yate rijo at Pigia 1 6.00 6.00 1 6.00
Pani
413 GIBA Har Khet ko MOA&FW Tari rijo to Tari rijo at Pigia 1 12.00 14.00 2 12.00
Pani
414 GIBA Har Khet ko MOA&FW Sugu river to Ramching at Pigia 1 7.00 12.00 1 7.00
Pani
415 GIBA Har Khet ko MOA&FW Soegia river to Yami rijo at Pigia 1 5.00 8.00 1 5.00
Pani
416 GIBA Har Khet ko MOA&FW Stum river to Lomi rijo at Pigia 1 10.00 14.00 1 10.00
Pani
417 GIBA Har Khet ko MOA&FW Ngui river to Bageng rijo at Pigia 1 11.00 12.00 1 11.00
Pani
418 GIBA Har Khet ko MOA&FW Taku river to Yate & Yake at Pigia 1 8.00 9.00 1 8.00
Pani

331 | P a g e
419 GIBA Har Khet ko MOA&FW Sugu koro to Yaprung rijo at Pigia 1 7.00 11.00 1 7.00
Pani
420 GIBA Har Khet ko MOA&FW Romi Nallah to Romi rijo at Piya 1 5.00 8.00 1 5.00
Pani
421 GIBA Har Khet ko MOA&FW Ro Nallah to Ro rijo at Piya 1 3.00 12.00 1 3.00
Pani
422 GIBA Har Khet ko MOA&FW Hami so to Domi Riktak at Piya 1 3.00 10.00 1 3.00
Pani
423 GIBA Har Khet ko MOA&FW Hate Nallah to Hai Doke at Piya 1 4.00 9.00 1 4.00
Pani
424 GIBA Har Khet ko MOA&FW Konki Nallah to Konki orto at Piya 1 4.00 6.00 1 4.00
Pani
425 GIBA Har Khet ko MOA&FW Romi So to Romi rijo at Piya 1 5.00 8.00 1 5.00
Pani
426 GIBA Har Khet ko MOA&FW Mugli koro to Mugli rijo at Pute 1 4.00 7.00 1 4.00
Pani
427 GIBA Har Khet ko MOA&FW Page koro to Tain Lepek at Pute 1 5.00 11.00 1 5.00
Pani
428 GIBA Har Khet ko MOA&FW Page koro to Merum rijo at Pute 1 5.00 9.00 1 5.00
Pani
429 GIBA Har Khet ko MOA&FW Page koro to Leba rijo at Pute 1 4.00 19.00 1 4.00
Pani
430 GIBA Har Khet ko MOA&FW Page koro to Meri Lene at Pute 1 3.00 15.00 1 3.00
Pani
431 GIBA Har Khet ko MOA&FW Page koro to Tikdo serio at Pute 1 6.00 14.00 1 6.00
Pani
432 GIBA Har Khet ko MOA&FW Page koro to Sarne Yorlo at Pute 1 8.00 17.00 1 8.00
Pani
433 GIBA Har Khet ko MOA&FW Momi-so to Lekar -rijo at Puda Leriak 1 3.00 17.00 1 3.00
Pani
434 GIBA Har Khet ko MOA&FW Mogli koro to Pute rijo at Pute. 1 3.00 9.00 1 3.00
Pani
435 GIBA Har Khet ko MOA&FW Pobe/Ote sukh Nalah to Kamleng rijo at Rago 1 4.00 7.00 1 4.00
Pani

332 | P a g e
436 GIBA Har Khet ko MOA&FW Charmi Nalah to Pani muri rijo at Rago 1 5.00 7.00 1 5.00
Pani
437 GIBA Har Khet ko MOA&FW Pobe/Opeso Nalah to Dumda Yorbe at Rago 1 10.00 10.00 1 10.00
Pani
438 GIBA Har Khet ko MOA&FW Kamcho Nalah to Tarte rijo at Rago 1 5.00 9.00 1 5.00
Pani
439 GIBA Har Khet ko MOA&FW Gepu so Nalah to Sebe rang rijo at Rago 1 4.00 7.00 1 4.00
Pani
440 GIBA Har Khet ko MOA&FW Take so Nalah to Pakiya rijo at Rago 1 12.00 13.00 2 12.00
Pani
441 GIBA Har Khet ko MOA&FW Dumba/Nagi Nalah to Singmepung at Rago 1 4.00 7.00 1 4.00
Pani
442 GIBA Har Khet ko MOA&FW Ope/Take so Nalah to Jigam Yartak at Rago 1 7.00 9.00 1 7.00
Pani
443 GIBA Har Khet ko MOA&FW Palato nallah to gingre at Rago 1 3.00 8.00 1 3.00
Pani
444 GIBA Har Khet ko MOA&FW Charte Nalah to Yarte rijo at Rago 1 2.00 5.00 1 2.00
Pani
445 GIBA Har Khet ko MOA&FW Dani rijo to ari rijo at rago 1 3.00 5.00 1 3.00
Pani
446 GIBA Har Khet ko MOA&FW Upper Raksha Nalah to Saape ha at Rago 1 9.00 11.00 1 9.00
Pani
447 GIBA Har Khet ko MOA&FW Rakchen Raksha Nalah to Hashiya rijo at Rago 1 6.00 7.00 1 6.00
Pani
448 GIBA Har Khet ko MOA&FW Take so Nalah to Si Tak rijo at Rago 1 4.00 6.00 1 4.00
Pani
449 GIBA Har Khet ko MOA&FW Tacher Nalah to Singri Yorbe at Rago 1 3.00 5.00 1 3.00
Pani
450 GIBA Har Khet ko MOA&FW Hobom Nalah to Kingte Rijo at Rago 1 4.00 7.00 1 4.00
Pani
451 GIBA Har Khet ko MOA&FW Ringa Nalah to Kingmi rijo at Rago 1 3.00 7.00 1 3.00
Pani
452 GIBA Har Khet ko MOA&FW Doni Nalah to Heriha rijo at Rago 1 2.00 6.00 1 2.00
Pani

333 | P a g e
453 GIBA Har Khet ko MOA&FW Pakne Nalah to Panning Moring at Rago 1 2.00 5.00 1 2.00
Pani
454 GIBA Har Khet ko MOA&FW Biote Nalah to Biochin Biote at Rago 1 3.00 9.00 1 3.00
Pani
455 GIBA Har Khet ko MOA&FW Raji koro to Dedam rijo at Raji 1 15.00 14.00 1 15.00
Pani
456 GIBA Har Khet ko MOA&FW Herong koro to Rapi rijo at Rapi 1 15.00 17.00 2 15.00
Pani
457 GIBA Har Khet ko MOA&FW Doni koro to Eringha rijo at Rava 1 5.00 10.00 1 5.00
Pani
458 GIBA Har Khet ko MOA&FW Rakching nallah to Raksha Rijo at Rava 1 4.00 5.00 1 4.00
Pani
459 GIBA Har Khet ko MOA&FW Nara Nallah to Piya rijo at Rava 1 6.00 7.00 1 6.00
Pani
460 GIBA Har Khet ko MOA&FW Raksha Nallah to Hedeha rijo at Rava 1 5.00 8.00 1 5.00
Pani
461 GIBA Har Khet ko MOA&FW Piya Nallah to Rab Yorbe rijo at Rava 1 3.00 6.00 1 3.00
Pani
462 GIBA Har Khet ko MOA&FW Dachak Dariak Nallah to Kimi rijo at Rava 1 3.00 6.00 1 3.00
Pani
463 GIBA Har Khet ko MOA&FW Nagi Nallah to Pochak rijo at Rava 1 3.00 7.00 1 3.00
Pani
464 GIBA Har Khet ko MOA&FW Jiguk Nallah to Jiguk rijo at Rava 1 3.00 5.00 1 3.00
Pani
465 GIBA Har Khet ko MOA&FW Pikya Nallah to Taku rijo at Rava 1 2.00 6.00 1 2.00
Pani
466 GIBA Har Khet ko MOA&FW Rakte Nallah to Raksha rijo at Rava 1 2.00 7.00 1 2.00
Pani
467 GIBA Har Khet ko MOA&FW Piya Nallah to Lingiha rijo at Rava 1 5.00 7.00 1 5.00
Pani
468 GIBA Har Khet ko MOA&FW Rakching Nallah to Naraha rijo at Rava 1 4.00 6.00 1 4.00
Pani
469 GIBA Har Khet ko MOA&FW Gipu/Takke Nallah to Sibe rijo at Rava 1 2.00 6.00 1 2.00
Pani

334 | P a g e
470 GIBA Har Khet ko MOA&FW Mahasa koro to piyanjo at Rava1 1 2.00 6.00 1 2.00
Pani
471 GIBA Har Khet ko MOA&FW Narha Nallah to Narpu rijo at Rava 1 2.00 6.00 1 2.00
Pani
472 GIBA Har Khet ko MOA&FW Kamling Nallah to Leya rijo at Rava 1 2.00 5.00 1 2.00
Pani
473 GIBA Har Khet ko MOA&FW Dachak Dariak Nallah to Tikdo rijo at Rava 1 2.00 6.00 1 2.00
Pani
474 GIBA Har Khet ko MOA&FW Pobe Nallah to Hotak rijo at Rava 1 2.00 5.00 1 2.00
Pani
475 GIBA Har Khet ko MOA&FW Take Nallah to Ope rijo at Rava 1 1.00 4.00 1 1.00
Pani
476 GIBA Har Khet ko MOA&FW Gipu Nallah to Gipu rijo at Rava 1 1.00 5.00 1 1.00
Pani
477 GIBA Har Khet ko MOA&FW Hote Nallah to Yama Pakha rijo at Rava 1 2.00 6.00 1 2.00
Pani
478 GIBA Har Khet ko MOA&FW Sigum Nallah to Sigum rijo at Rava 1 1.00 5.00 1 1.00
Pani
479 GIBA Har Khet ko MOA&FW Nahara koro to Riya rijo at Rava 1 5.00 6.00 1 5.00
Pani
480 GIBA Har Khet ko MOA&FW Pako Nallah to Pigya Rijo at Rava 1 1.00 4.00 1 1.00
Pani
481 GIBA Har Khet ko MOA&FW Dachak Dariak Nallah to Pindo peo rijo at Rava 1 1.00 4.00 1 1.00
Pani
482 GIBA Har Khet ko MOA&FW Ope koro to Meri rijo at Rebi 1 6.00 17.00 1 6.00
Pani
483 GIBA Har Khet ko MOA&FW Ote koro to Gepe rijo at Rebi 1 4.00 17.00 1 4.00
Pani
484 GIBA Har Khet ko MOA&FW Gonia koro to pisa magria at Rebi 1 5.00 17.00 1 5.00
Pani
485 GIBA Har Khet ko MOA&FW Lekukobu koro to sha rijo at Rebi 1 6.00 17.00 1 6.00
Pani
486 GIBA Har Khet ko MOA&FW Oto koro to goke rengo at Rebi 1 5.00 17.00 1 5.00
Pani

335 | P a g e
487 GIBA Har Khet ko MOA&FW Nengporijg koro to Nengporijg rijo at Rebi 1 3.00 6.00 1 3.00
Pani
488 GIBA Har Khet ko MOA&FW Lengra Koro to Gaphe rijo at Rebi 1 3.00 7.00 1 3.00
Pani
489 GIBA Har Khet ko MOA&FW Haging so koro to Yabia rijo at Rebi 1 8.00 9.00 1 8.00
Pani
490 GIBA Har Khet ko MOA&FW Nengpo koro to Kaktak rijo at Rebi 1 15.00 13.00 2 15.00
Pani
491 GIBA Har Khet ko MOA&FW Ote koro to Oyu runge at Rebi. 1 3.00 14.00 1 3.00
Pani
492 GIBA Har Khet ko MOA&FW Ote koro to Hapung rijo at Rebi. 1 3.00 11.00 1 3.00
Pani
493 GIBA Har Khet ko MOA&FW Ote koro to Nering rijo at Rebi 1 3.00 8.00 1 3.00
Pani
494 GIBA Har Khet ko MOA&FW Tungri nallah to Sengbe rijo at Sherakpung 1 3.00 11.00 1 3.00
Pani
495 GIBA Har Khet ko MOA&FW Tabiu Nallah to Tabiu Rengo at Sherakpung 1 6.00 7.00 1 6.00
Pani
496 GIBA Har Khet ko MOA&FW Sete koro to Cheke rijo at Sherakpung 1 15.00 11.00 2 15.00
Pani
497 GIBA Har Khet ko MOA&FW Tongri Nallah to Harak rijo at Sherakpung 1 7.00 11.00 1 7.00
Pani
498 GIBA Har Khet ko MOA&FW Singbe rijo at Sherakpung 1 3.00 10.00 1 3.00
Pani
499 GIBA Har Khet ko MOA&FW Tongri Nallah to Hingne rijo at Sherakpung 1 16.00 17.00 1 16.00
Pani
500 GIBA Har Khet ko MOA&FW Makbia Moring at Sherakpung 1 3.00 8.00 1 3.00
Pani
501 GIBA Har Khet ko MOA&FW Siku Kubing at Sherakpung 1 3.00 8.00 1 3.00
Pani
502 GIBA Har Khet ko MOA&FW Riokpu Nallah to Duni rijo at Sherakpung 1 6.00 8.00 1 6.00
Pani
503 GIBA Har Khet ko MOA&FW Harak Nallah to Riampi Rengo at Sherakpung 1 3.00 6.00 1 3.00
Pani

336 | P a g e
504 GIBA Har Khet ko MOA&FW Siku Kubung to Jegio porijg at Sherakpung 1 3.00 5.00 1 3.00
Pani
505 GIBA Har Khet ko MOA&FW Siku Kubung to Chely rijo at Sherakpung 1 3.00 5.00 1 3.00
Pani
506 GIBA Har Khet ko MOA&FW Sidum si to Kumpok rijo at Sherakpung 1 4.00 7.00 1 4.00
Pani
507 GIBA Har Khet ko MOA&FW Eachi koro to Tabe rijo at Sera Tapapu 1 10.00 12.00 1 10.00
Pani
508 GIBA Har Khet ko MOA&FW Uyi Roo to Retum rijo at Serne Yorlo, Giba 1 9.00 14.00 1 9.00
Pani
509 GIBA Har Khet ko MOA&FW Sarmen koro to Pagiasuri rijo at Sera Tapapu 1 5.00 12.00 1 5.00
Pani
510 GIBA Har Khet ko MOA&FW Pete koro to Riokam rijo at Sera Tapapu 1 15.00 16.00 2 15.00
Pani
511 GIBA Har Khet ko MOA&FW Pemi koro to Batambale rijo at Sera Tapapu 1 12.00 13.00 1 12.00
Pani
512 GIBA Har Khet ko MOA&FW Tabe koro to Giamde rijo at Sera Tapapu. 1 5.00 7.00 1 5.00
Pani
513 GIBA Har Khet ko MOA&FW Outo koro to Lamtak rijo at Sorum 1 4.00 9.00 1 4.00
Pani
514 GIBA Har Khet ko MOA&FW Outo koro to Takte rijo at Sorum 1 4.00 10.00 1 4.00
Pani
515 GIBA Har Khet ko MOA&FW Momi koro to Si-rijo at Sorum 1 3.00 6.00 1 3.00
Pani
516 GIBA Har Khet ko MOA&FW Outo koro to Lekar rijo at Sorum 1 5.00 8.00 1 5.00
Pani
517 GIBA Har Khet ko MOA&FW Outo koro to Takria rijo at Sorum 1 5.00 6.00 1 5.00
Pani
518 GIBA Har Khet ko MOA&FW Outo koro to Darta rijo at Sorum 1 4.00 7.00 1 4.00
Pani
519 GIBA Har Khet ko MOA&FW Outo koro to Siri rijo at Sorum 1 3.00 8.00 1 3.00
Pani
520 GIBA Har Khet ko MOA&FW Kioram koro to Ahmjor rijo at Sorum 1 2.00 6.00 1 2.00
Pani

337 | P a g e
521 GIBA Har Khet ko MOA&FW Riami koro to Chogo rijo at Sorum 1 2.00 5.00 1 2.00
Pani
522 GIBA Har Khet ko MOA&FW Goda rijo at Sorum 1 2.00 4.00 1 2.00
Pani
523 GIBA Har Khet ko MOA&FW Amjor rijo to kioram so at Sorum 1 2.00 5.00 1 2.00
Pani
524 GIBA Har Khet ko MOA&FW Ranggi koro to Raha rijo at Sorum 1 2.00 5.00 1 2.00
Pani
525 GIBA Har Khet ko MOA&FW Uhiru koro to Belam rijo at Sorum 1 2.00 6.00 1 2.00
Pani
526 GIBA Har Khet ko MOA&FW Niari soh koro to Beria rijo at Sorum 1 2.00 4.00 1 2.00
Pani
527 GIBA Har Khet ko MOA&FW Menko nallah to Menko rijo at Sorum 1 5.00 6.00 1 5.00
Pani
528 GIBA Har Khet ko MOA&FW Chogoso koro to Yorko rijo at Sorum 1 2.00 7.00 1 2.00
Pani
529 GIBA Har Khet ko MOA&FW Riami koro to Gote rijo at Sorum 1 3.00 7.00 1 3.00
Pani
530 GIBA Har Khet ko MOA&FW Ginchi koro to matu rango at Sikarijo 1 2.00 4.00 1 2.00
Pani
531 GIBA Har Khet ko MOA&FW Pagi koro to Dapin Yorbe at Yolu 1 15.00 16.00 1 15.00
Pani
532 GIBA Har Khet ko MOA&FW Limi koro to Sa-Yorbe at Yolu 1 15.00 14.00 1 15.00
Pani
533 GIBA Har Khet ko MOA&FW Lite koro to Bokpen Yorbe at Yolu 1 10.00 12.00 1 10.00
Pani
534 GIBA Har Khet ko MOA&FW Kamchi so koro to Kamchi Yorbe at Yolu 1 25.00 19.00 3 25.00
Pani
535 GIBA Har Khet ko MOA&FW Nyonio koro to Seku Tam at Yolu 1 15.00 14.00 1 15.00
Pani
536 GIBA Har Khet ko MOA&FW Sebin koro to Yorko Yolu at Yolu 1 8.00 10.00 1 8.00
Pani
537 GIBA Har Khet ko MOA&FW Si koro to Yak Yor Yolu at Yolu 1 4.00 6.00 1 4.00
Pani

338 | P a g e
538 GIBA Har Khet ko MOA&FW Jaow koro to ampu Yamba at Yolu 1 3.00 5.00 1 3.00
Pani
539 GIBA Har Khet ko MOA&FW Pikar koro to Hami Yolu at Yolu 1 8.00 10.00 1 8.00
Pani
540 GIBA Har Khet ko MOA&FW Chamio koro to Bokpin Niyokam at Yolu 1 2.00 6.00 1 2.00
Pani
541 GIBA Har Khet ko MOA&FW Pare koro to Kamte Nyokam at Yolu 1 3.00 7.00 1 3.00
Pani
542 GIBA Har Khet ko MOA&FW Lora koro to Yorko rijo at Yolu 1 6.00 9.00 1 6.00
Pani
543 GIBA Har Khet ko MOA&FW Suw koro to Tumdi rijo at Yolu 1 4.00 7.00 1 4.00
Pani
544 GIBA Har Khet ko MOA&FW Riaw koro to Hate Yorbe at Yolu. 1 7.00 9.00 1 7.00
Pani
545 GIBA Har Khet ko MOA&FW Gapu koro to Bate rijo at Yolu 1 4.00 6.00 1 4.00
Pani
546 GIBA Har Khet ko MOA&FW Heya koro to Hate rijo at Yolu 1 5.00 6.50 1 5.00
Pani
547 GIBA Har Khet ko MOA&FW Paa koro to Paa rijo at Lokar rijo 1 3.00 6.00 1 3.00
Pani
548 GIBA Har Khet ko MOA&FW Bhai koro to Bhai rijo at Lokar rijo 1 7.00 9.00 1 7.00
Pani
549 GIBA Har Khet ko MOA&FW Ote koro to Mana rijo at Lokar rijo 1 6.00 8.00 1 6.00
Pani
550 GIBA Har Khet ko MOA&FW Hayang Nallah to Gianching rijo at Henge Doke 1 7.00 9.00 1 7.00
Pani
551 GIBA Har Khet ko MOA&FW Lintak koro to Lintak rijo at Henge Doke 1 10.00 11.00 1 10.00
Pani
552 GIBA Har Khet ko MOA&FW Hayang rijo at Henge Doke 1 6.00 8.00 1 6.00
Pani
553 GIBA Har Khet ko MOA&FW Jigok koro to Chikiorijo at Henge Doke. 1 4.00 7.00 1 4.00
Pani
554 GIBA Har Khet ko MOA&FW Talek koro to Hamariga rijo at Hamrijo 1 3.00 6.00 1 3.00
Pani

339 | P a g e
555 GIBA Har Khet ko MOA&FW Lebar koro to Kirum rijo at Molo 1 9.00 11.00 1 9.00
Pani
556 GIBA Har Khet ko MOA&FW Pak koro to Chetam rijo at Molo 1 7.00 9.00 1 7.00
Pani
557 GIBA Har Khet ko MOA&FW Sorku koro to Nyalo rijo at Molo 1 5.00 6.00 1 5.00
Pani
558 GIBA Har Khet ko MOA&FW Motu koro to Pirapu at Molo 1 10.00 12.00 1 10.00
Pani
559 GIBA Har Khet ko MOA&FW Kancho koro to Ango Yorlo at Molo 1 12.00 15.00 2 12.00
Pani
560 GIBA Har Khet ko MOA&FW So Nalha to Tabarijo at Yakpo 1 5.00 8.00 1 5.00
Pani
561 GIBA Har Khet ko MOA&FW Binju koro to Binju rijo at Patum village 1 5.00 6.00 1 5.00
Pani

CAD NEW SCHEMES


Sl.No. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated Remarks
the District/ Ministry / No. area / area implementation cost in
Block Department Irrigation (Sq.Km.) (year) Lakhs
(ha)

1 Chetam Har Khet ko MOA&FW Row koro to Bukdorijo at Jeke 1 3.00 12.00 1 3.00 MLA
Pani
2 Chetam Har Khet ko MOA&FW Miriong koro to Rongmi rijo at Jeke 1 3.00 14.00 1 3.00 MLA
Pani
3 Chetam Har Khet ko MOA&FW Kungtam koro to Nacha rijo at Magria 1 5.00 12.00 1 5.00 MLA
Pani
4 Chetam Har Khet ko MOA&FW Raw koro to Kamrik rijo at Jeke 1 1.00 15.00 1 1.00 MLA
Pani
5 Chetam Har Khet ko MOA&FW Hakra koro to Mendingrijo at Dasi 1 5.00 13.00 1 5.00 MLA
Pani
6 Chetam Har Khet ko MOA&FW Pelo koro to Korarijo at Lomi Lote 1 3.00 13.00 1 3.00 MLA
Pani

340 | P a g e
7 Chetam Har Khet ko MOA&FW Hakpi koro to Maje rijo at Boging 1 4.00 12.00 1 4.00 MLA
Pani
8 Chetam Har Khet ko MOA&FW Kamcho koro to Kamchorijo at Dasi 1 4.00 12.00 1 4.00 MLA
Pani
9 Chetam Har Khet ko MOA&FW Rapri koro to Neoringrijo at Marbom 1 6.00 13.00 1 6.00 MLA
Pani
10 Chetam Har Khet ko MOA&FW Cheta Koro to Saramrijo at Daru village 1 6.00 12.00 1 6.00 MLA
Pani
11 Chetam Har Khet ko MOA&FW Taje Koro to Lekurijo at Sebing 1 5.00 12.00 1 5.00 MLA
Pani
12 Chetam Har Khet ko MOA&FW Sigum koro to Sepa rijo at Rikung 1 3.00 15.00 1 3.00 MLA
Pani
13 Chetam Har Khet ko MOA&FW Hate koro to Hami rijo at Dai 1 4.00 11.00 1 4.00 MLA
Pani
14 Chetam Har Khet ko MOA&FW Moya koro to Moyarijo at Raji 1 6.00 15.00 1 6.00 MLA
Pani
15 Chetam Har Khet ko MOA&FW Riokpu to Mayarijo at Moyaraji vill 1 5.0 10.0 1 5.00 MLA
Pani
16 Chetam Har Khet ko MOA&FW Jikchum riju at Raha vill 1 3.00 9.00 1 3.00 MLA
Pani
17 Chetam Har Khet ko MOA&FW Saha koro to Rukapakrijo at Sari 1 4.00 11.00 1 4.00 MLA
Pani
18 Chetam Har Khet ko MOA&FW Badung koro to Leke rijo at Jeke 1 2.00 14.00 1 2.00 MLA
Pani
19 Chetam Har Khet ko MOA&FW Tajum koro to Tajum rijo at Dadi 1 4.00 9.00 1 4.00 MLA
Pani
20 Chetam Har Khet ko MOA&FW Tatak Nallah to Jinarijo at Guha vill 1 10.00 12.00 1 10.00 MLA
Pani
21 Chetam Har Khet ko MOA&FW Nyo koro to Nyorijo at Nilling vill 1 4.00 8.00 1 4.00 MLA
Pani
22 Chetam Har Khet ko MOA&FW Bokpu koro to Namdum rijo at Sera 1 4.00 13.00 1 4.00 MLA
Pani
23 Chetam Har Khet ko MOA&FW Tabe koro to Giamde rijo at Tapapu. 1 5.00 7.00 1 5.00 DC
Pani

341 | P a g e
24 Chetam Har Khet ko MOA&FW Jiri koro to Bogirijo at Soki 1 5.00 12.00 1 5.00 MLA
Pani
25 Chetam Har Khet ko MOA&FW Mali-Maji koro to Chii Moririjo at Mosi 1 5.00 9.00 1 5.00 MLA
Pani
26 Chetam Har Khet ko MOA&FW Sbila koro to Hiya rijo at Duni 1 4.00 11.00 1 4.00 MLA
Pani
27 Chetam Har Khet ko MOA&FW Sippi koro to Dedo Bokpenrijo at Batam 1 6.00 227.00 1 6.00 MLA
Pani
28 Chetam Har Khet ko MOA&FW Dolo koro to Chorta rijo at Bayor 1 8.00 12.00 1 8.00 MLA
Pani
29 Chetam Har Khet ko MOA&FW Pekching koro to Magria Ringio at Magria 1 6.00 11.00 1 6.00 MLA
Pani
30 Chetam Har Khet ko MOA&FW Maji koro to Maji Saget Ringio at Dayam 1 4.00 12.00 1 4.00 MLA
Pani
31 Chetam Har Khet ko MOA&FW Kare koro to Hinjurijo at Hinju 1 4.00 8.00 1 4.00 MLA
Pani
32 Chetam Har Khet ko MOA&FW Molo koro to Jeli rijo at Kare vill 1 5.00 9.00 1 5.00 MLA
Pani
33 Chetam Har Khet ko MOA&FW Hakra koro to Dimirijo at Dasi 1 4.00 11.00 1 4.00 MLA
Pani
34 Chetam Har Khet ko MOA&FW Omme koro to Tamet rijo at Sebing vill 1 5.00 9.00 1 5.00 MLA
Pani
35 Chetam Har Khet ko MOA&FW Kore koro to Hinjurijo at Hinju 1 4.00 8.00 1 4.00 MLA
Pani
36 Chetam Har Khet ko MOA&FW Hakpe koro to Majirijo at Boging vill 1 4.00 7.00 1 4.00 MLA
Pani
37 Chetam Har Khet ko MOA&FW Darmi koro to Tabin rijo at Dabu 1 4.00 13.00 1 4.00 MLA
Pani
38 Chetam Har Khet ko MOA&FW Mirong koro to rongmi rijo at Jeke vill 1 5.00 10.00 1 5.00 MLA
Pani
39 Chetam Har Khet ko MOA&FW Tabu koro to Maniarijo at Belu 1 4.00 12.00 1 4.00 MLA
Pani
40 Chetam Har Khet ko MOA&FW Paching koro to Miyo rijo at Boiging vill 1 3.00 6.00 1 3.00 MLA
Pani

342 | P a g e
41 Chetam Har Khet ko MOA&FW Kamcho koro to Molorijo at Dasi 1 15.00 15.00 2 15.00 MLA
Pani
42 Chetam Har Khet ko MOA&FW Talo koro to Mopoin rijo at Dai vill 1 4.00 7.00 1 4.00 MLA
Pani
43 Chetam Har Khet ko MOA&FW Kochak koro to Talirijo at Dai vill 1 3.00 6.00 1 3.00 MLA
Pani
44 Chetam Har Khet ko MOA&FW Hakpi koro to Sippiringio at Boging 1 4.00 10.00 1 4.00 MLA
Pani
45 Chetam Har Khet ko MOA&FW Jite Sirio koro to Hamiringjo at Lingking 1 4.00 11.00 1 4.00 MLA
Pani
46 Chetam Har Khet ko MOA&FW Otte koro to Holinrijo at Daru 1 4.00 12.00 1 4.00 MLA
Pani
47 Chetam Har Khet ko MOA&FW Kopo koro to Gingchakrijo at Nilling 1 4.00 9.00 1 4.00 MLA
Pani
48 Chetam Har Khet ko MOA&FW Kungtahm koro to Vijayrijo at Dai 1 4.00 7.00 1 4.00 MLA
Pani
49 Chetam Har Khet ko MOA&FW Chichi chene koro to Rochu rijo at Belu 1 4.00 6.00 1 4.00 MLA
Pani
50 Chetam Har Khet ko MOA&FW Cheta koro to Saram rijo at Daru. 1 2.00 8.00 1 2.00 ZPM
Pani
51 Chetam Har Khet ko MOA&FW Chusi koro to Nitarijo at Lote 1 4.00 11.00 1 4.00 ZPM
Pani
52 Chetam Har Khet ko MOA&FW Bipo koro to Libirijo at Ruji 1 4.00 10.00 1 4.00 ZPM
Pani
53 Chetam Har Khet ko MOA&FW Leku koro to Pakha rijo at Sari 1 4.00 9.00 1 4.00 ZPM
Pani
54 Chetam Har Khet ko MOA&FW Sogum koro to Separijo at Rikung 1 4.00 15.00 1 4.00 ZPM
Pani
55 Chetam Har Khet ko MOA&FW Chichi Chine koro to Rokchu rijo at Belu. 1 4.00 8.00 1 4.00 ZPM
Pani
56 Chetam Har Khet ko MOA&FW Loho koro to Napenrijo (Porgiam) at Sera 1 4.00 12.00 1 4.00 ZPC
Pani
57 Chetam Har Khet ko MOA&FW Boging koro to Boging rijo at Boging 1 2.00 15.00 1 2.00 CO Nilling
Pani

343 | P a g e
58 Chetam Har Khet ko MOA&FW Hama koro to Lintaksiku at Hagne Doke 1 2.00 10.00 1 2.00 CO Niling
Pani
59 Chetam Har Khet ko MOA&FW Hama koro to Tajak rijo at Dadi 1 1.00 12.00 1 1.00 CO Nilling
Pani
60 Chetam Har Khet ko MOA&FW Tanamso to Raring Ringjo at Daru. 1 2.00 10.00 1 2.00 CO Nilling
Pani
61 Chetam Har Khet ko MOA&FW Nyo koro to Nyo rijo at Boging 1 4.00 11.00 1 4.00 CO Nilling
Pani
62 Chetam Har Khet ko MOA&FW Hachi koro to Hachi Nyoring at Cheging 1 8.00 13.00 1 8.00 CO Nilling
Pani
63 Chetam Har Khet ko MOA&FW Noi koro to Hoya rijo at Ningpin 1 2.00 10.00 1 2.00 CO Niling
Pani
64 Chetam Har Khet ko MOA&FW Sippi koro to Dering rijo at Dayam 1 1.50 226.00 1 1.50 CO Nilling
Pani
65 Chetam Har Khet ko MOA&FW Gimok koro to Riamriang rijo at Dadi 1 1.00 12.00 1 1.00 CO Nilling
Pani
66 Chetam Har Khet ko MOA&FW Riksar koro to Guha rijo at Guha 1 2.00 20.00 1 2.00 CO Nilling
Pani
67 Chetam Har Khet ko MOA&FW Rabong koro to Jelirijo at Boging 1 5.00 9.00 1 5.00 CO Nilling
Pani
68 Chetam Har Khet ko MOA&FW Basi koro to Gimok rijo at Dadi 1 1.50 11.00 1 1.50 CO Nilling
Pani
69 Chetam Har Khet ko MOA&FW Hutey koro to Homi rijo at Raha vill 1 1.00 14.00 1 1.00 CO Niling
Pani
70 Chetam Har Khet ko MOA&FW Merong koro to Merong rijo at Jeke 1 1.00 10.00 1 1.00 CO Nilling
Pani
71 Chetam Har Khet ko MOA&FW Nyo koro to Tengin Haring at Boging 1 3.00 8.00 1 3.00 CO Nilling
Pani
72 Chetam Har Khet ko MOA&FW Sippi koro to Paa rijo at Dadi 1 1.00 15.00 1 1.00 CO Nilling
Pani
73 Chetam Har Khet ko MOA&FW Nudung koro to Leme rijo at Guha 1 2.00 15.00 1 2.00 CO Nilling
Pani
74 Chetam Har Khet ko MOA&FW Nambung koro to Basi rijo 1 3.00 9.00 1 3.00 CO Nilling
Pani

344 | P a g e
75 Chetam Har Khet ko MOA&FW Domching koro to Rasing rijo at Daru. 1 5.00 9.00 1 5.00 CO Nilling
Pani
76 Chetam Har Khet ko MOA&FW Haging koro to Haging Rijo at Rikung 1 2.00 14.00 1 2.00 CO Niling
Pani
77 Chetam Har Khet ko MOA&FW Butu koro to Hotak rijo at Guha 1 6.00 13.00 1 6.00 CO Nilling
Pani
78 Chetam Har Khet ko MOA&FW Hachi koro Haching Nyoring at Cheging 1 1.00 11.00 1 1.00 CO Nilling
Pani
79 Chetam Har Khet ko MOA&FW Lebakoro to Lebarijo at Dayam 1 8.00 10.00 1 8.00 CO Nilling
Pani
80 Chetam Har Khet ko MOA&FW Rao koro to Nangko rijo at Jeke 1 1.00 11.00 1 1.00 CO Nilling
Pani
81 Chetam Har Khet ko MOA&FW Chadak koro to Singha rijo at Lingsa 1 1.00 15.00 1 1.00 CO Nilling
Pani
82 Chetam Har Khet ko MOA&FW Gima koro to Riamte rijo at Dadi 1 1.50 10.00 1 1.50 CO Nilling
Pani
83 Chetam Har Khet ko MOA&FW Bhaiso koro to Leba See at Dayam 1 1.00 12.00 1 1.00 CO Nilling
Pani
84 Chetam Har Khet ko MOA&FW Riksar koro to Guharijo at Guha 1 20.00 22.00 2 20.00 CO Nilling
Pani
85 Chetam Har Khet ko MOA&FW Ote koro to Ringchi Ringte at Lokar rijo 1 2.00 9.00 1 2.00 CO Niling
Pani
86 Chetam Har Khet ko MOA&FW Pikching koro to Pikching rijo at Magria 1 1.00 14.00 1 1.00 CO Nilling
Pani
87 Chetam Har Khet ko MOA&FW Tiksikso koro to Giadu Nioring at Niling 1 3.00 7.00 1 3.00 CO Niling
Pani
88 Chetam Har Khet ko MOA&FW Hayung koro to Doyik rijo at Dadi 1 2.00 12.00 1 2.00 CO Nilling
Pani
89 Chetam Har Khet ko MOA&FW Leba koro to Yumgiam rijo at Dayam 1 1.00 11.00 1 1.00 CO Nilling
Pani
90 Chetam Har Khet ko MOA&FW Riksar koro to Leme rijo at Guha 1 4.00 19.00 1 4.00 CO Nilling
Pani
91 Chetam Har Khet ko MOA&FW Linking koro to Nyoko rijo at Linking 1 1.00 10.00 1 1.00 CO Nilling
Pani

345 | P a g e
92 Chetam Har Khet ko MOA&FW Nyo koro to Nyorijo at Daru. 1 2.00 11.00 1 2.00 CO Nilling
Pani
93 Chetam Har Khet ko MOA&FW Tatak koro to Guha rijo at Guha 1 3.00 14.00 1 3.00 CO Nilling
Pani
94 Chetam Har Khet ko MOA&FW Yorpi koro to Dokte rijo at Rikung 1 1.00 10.00 1 1.00 CO Niling
Pani
95 Chetam Har Khet ko MOA&FW Hutey koro to Soi rijo at Ningpin 1 3.00 11.00 1 3.00 CO Niling
Pani
96 Chetam Har Khet ko MOA&FW Bodu koro to Lumtak rijo at Dasi 1 4.00 12.00 1 4.00 ASM
Pani
97 Chetam Har Khet ko MOA&FW Tatak koro to Dekio rijo at Guha 1 1.00 14.00 1 1.00 CO Nilling
Pani
98 Chetam Har Khet ko MOA&FW Tengin Sow to Rage rijo at Jeke 1 5.00 11.00 1 5.00 CO Nilling
Pani
99 Chetam Har Khet ko MOA&FW Leba koro to Bimpak rijo at Dayam 1 1.50 13.00 1 1.50 CO Nilling
Pani
100 Chetam Har Khet ko MOA&FW Raho koro to Rengmi rijo at Jeke 1 3.00 13.00 1 3.00 CO Nilling
Pani
101 Chetam Har Khet ko MOA&FW Sippi river to Chichi Bokpin at Batam/ Belu 1 2.00 258.00 1 2.00 ASM
Pani
102 Chetam Har Khet ko MOA&FW Punggu koro to Mardo rijo at Guha 1 2.00 12.00 1 2.00 CO Nilling
Pani
103 Chetam Har Khet ko MOA&FW Haching Bhai to Lingsa Rapi rijo at Lingsa 1 10.00 14.00 1 10.00 CO Nilling
Pani
104 Chetam Har Khet ko MOA&FW Dimi koro to Dimirijo at Dasi vill 1 4.00 11.00 1 4.00 ASM
Pani
105 Chetam Har Khet ko MOA&FW Pitak koro to Lingsa rijo at Lingsa 1 2.00 10.00 1 2.00 CO Nilling
Pani
106 Chetam Har Khet ko MOA&FW Darmi koro to Tararijo at Dabu 1 3.00 10.00 1 3.00 ASM
Pani
107 Chetam Har Khet ko MOA&FW Tatak koro to Guha rijo at Guha 1 1.00 11.00 1 1.00 CO Nilling
Pani
108 Chetam Har Khet ko MOA&FW Pakpi koro to Pakpi rijo at Lingsa 1 1.00 9.00 1 1.00 CO Nilling
Pani

346 | P a g e
109 Chetam Har Khet ko MOA&FW Homi koro to Magria rijo at Magria 1 8.00 11.00 1 8.00 CO Nilling
Pani
110 Chetam Har Khet ko MOA&FW Koposo koro to Nio rijo at Niling 1 3.00 8.00 1 3.00 CO Niling
Pani
111 Chetam Har Khet ko MOA&FW Otey koro to Piktey rijo at Magria 1 1.00 10.00 1 1.00 CO Nilling
Pani
112 Chetam Har Khet ko MOA&FW Sigum koro to Pokpitering at Guha 1 7.00 14.00 1 7.00 CO Nilling
Pani
113 Chetam Har Khet ko MOA&FW Pikching koro to Piktey Yorbe at Magria 1 1.00 12.00 1 1.00 CO Nilling
Pani
114 Chetam Har Khet ko MOA&FW Jitey koro to Yorte rijo at Linking 1 1.00 15.00 1 1.00 CO Nilling
Pani
115 Chetam Har Khet ko MOA&FW Hachi koro to Pakkam rijo at Niling 1 6.00 8.00 1 6.00 CO Niling
Pani
116 Chetam Har Khet ko MOA&FW Ngudung koro to See rijo at Rikung 1 2.00 9.00 1 2.00 CO Niling
Pani
117 Chetam Har Khet ko MOA&FW Riksar koro to Hagung rijo at Guha 1 2.00 18.00 1 2.00 CO Nilling
Pani
118 Chetam Har Khet ko MOA&FW Longte koro to Kadakrijo at Niling 1 2.00 10.00 1 2.00 CO Niling
Pani
119 Chetam Har Khet ko MOA&FW Sorong koro to Yorko rijo at Magria 1 1.00 9.00 1 1.00 CO Nilling
Pani
120 Chetam Har Khet ko MOA&FW Nio koro to Pajok rijo at Niling 1 2.00 9.00 1 2.00 CO Niling
Pani
121 Chetam Har Khet ko MOA&FW Mara Rakching koro to Hake rijo at Niling 1 1.00 11.00 1 1.00 CO Niling
Pani
122 Chetam Har Khet ko MOA&FW Mending koro to Sahu rijo at Niling 1 1.00 7.00 1 1.00 CO Niling
Pani
123 Chetam Har Khet ko MOA&FW Homi koro to Homi rijo at Niling 1 1.00 6.00 1 1.00 CO Niling
Pani
124 Chetam Har Khet ko MOA&FW Ommi koro to Yorte rijo at Linking 1 5.00 13.00 1 5.00 CO Nilling
Pani
125 Chetam Har Khet ko MOA&FW Butu koro to Doji rijo at Guha 1 1.00 11.00 1 1.00 CO Nilling
Pani

347 | P a g e
126 Chetam Har Khet ko MOA&FW Kamya koro to Gongo Nioring at Niling 1 3.00 9.00 1 3.00 CO Niling
Pani
127 Chetam Har Khet ko MOA&FW Pakpi koro to Pakpi rijo at Linking 1 2.00 14.00 1 2.00 CO Nilling
Pani
128 Chetam Har Khet ko MOA&FW Laktung koro to Hami rijo at Linking 1 2.00 11.00 1 2.00 CO Nilling
Pani
129 Chetam Har Khet ko MOA&FW Oching koro to Pokpetering at Rikung 1 10.00 11.00 1 10.00 CO Niling
Pani
130 Chetam Har Khet ko MOA&FW Sippi koro to Sopen rijo at Guha 1 2.00 231.00 1 2.00 CO Nilling
Pani
131 Chetam Har Khet ko MOA&FW Hoching koro to Raikrijo at Rikung 1 2.00 11.00 1 2.00 CO Niling
Pani
132 Chetam Har Khet ko MOA&FW Sarmiso koro to Takmi rijo at Niling 1 1.00 8.00 1 1.00 CO Niling
Pani
133 Chetam Har Khet ko MOA&FW Sebing koro to Sogum koro rijo (Dupung) at 1 2.00 12.00 1 2.00 CO Niling
Pani Rikung
134 Chetam Har Khet ko MOA&FW Lodo koro to Saa rijo at Rikung 1 3.00 12.00 1 3.00 CO Niling
Pani
135 Chetam Har Khet ko MOA&FW Soo koro to Sorijo at Rikung 1 2.00 11.00 1 2.00 CO Niling
Pani
136 Chetam Har Khet ko MOA&FW Rikli koro to Chotamtami at Dasi vill 1 4.00 7.00 1 4.00 ASM
Pani
137 Chetam Har Khet ko MOA&FW Oching koro to Pokpetering (Lakam rijo) at 1 2.00 13.00 1 2.00 CO Niling
Pani Rikung
138 Chetam Har Khet ko MOA&FW Hutey koro to Minding rijo at Ningpin 1 2.00 10.00 1 2.00 CO Niling
Pani
139 Chetam Har Khet ko MOA&FW Homi koro to Nogam Homi rijo at Ningpin 1 4.00 7.00 1 4.00 CO Niling
Pani
140 Chetam Har Khet ko MOA&FW Talit koro to Hama riga at Dadi 1 2.00 13.00 1 2.00 CO Nilling
Pani
141 Chetam Har Khet ko MOA&FW Noi koro to Naru rijo at Ningpin 1 2.00 11.00 1 2.00 CO Niling
Pani
142 Chetam Har Khet ko MOA&FW Hutey koro to Soi rijo at Raha vill 1 2.00 12.00 1 2.00 CO Niling
Pani

348 | P a g e
143 Chetam Har Khet ko MOA&FW Rasing koro to Rasing rijo at Jeke 1 2.00 9.00 1 2.00 CO Nilling
Pani
144 Chetam Har Khet ko MOA&FW Biaso koro to Bai rijo at Lokar rijo 1 2.00 10.00 1 2.00 CO Niling
Pani
145 Chetam Har Khet ko MOA&FW Singha koro to Tamirijo at Lingsa 1 1.00 11.00 1 1.00 CO Nilling
Pani
146 Chetam Har Khet ko MOA&FW Hayong koro to Hayungrijo at Hagne Doke 1 2.00 8.00 1 2.00 CO Niling
Pani
147 Chetam Har Khet ko MOA&FW Tombom koro to Tombom rijo at Cheging 1 3.00 15.00 1 3.00 CO Nilling
Pani
148 Chetam Har Khet ko MOA&FW Hayung koro to Giaching rijo at Hagne Doke 1 2.00 11.00 1 2.00 CO Niling
Pani
149 Chetam Har Khet ko MOA&FW Gingju koro to Hamarijo at Hamariga 1 2.00 8.00 1 2.00 CO Niling
Pani
150 Chetam Har Khet ko MOA&FW Nyo koro to Hakpi rijo at Boging 1 4.00 16.00 1 4.00 CO Nilling
Pani
151 Chetam Har Khet ko MOA&FW Sebia koro to Hapi rijo at Dadi 1 1.50 9.00 1 1.50 CO Nilling
Pani
152 Chetam Har Khet ko MOA&FW Tari koro to Darurijo at Daru. 1 2.00 13.00 1 2.00 CO Nilling
Pani
153 Chetam Har Khet ko MOA&FW Sippi Koro to Sugia rijo at Guha 1 7.00 230.00 1 7.00 CO Nilling
Pani
154 Chetam Har Khet ko MOA&FW Singlok koro to Singlok rijo at Magria 1 1.00 13.00 1 1.00 CO Nilling
Pani
155 Chetam Har Khet ko MOA&FW Jitey koro to Yorte rijo at Lingsa 1 1.00 12.00 1 1.00 CO Nilling
Pani
156 Chetam Har Khet ko MOA&FW Biachi koro to Biachirijo at Batam 1 10.00 17.00 1 10.00 ASM
Pani
157 Chetam Har Khet ko MOA&FW Lift irrg from Sippi river to Dido Bokpin at 1 10.00 255.00 1 10.00 ASM
Pani Batam
158 Chetam Har Khet ko MOA&FW Sippi river to Dido at Batam/ Belu 1 10.00 256.00 1 10.00 ASM
Pani
159 Chetam Har Khet ko MOA&FW Sena Koro to Naririjo riko at Siga 1 2.00 10.00 1 2.00 ASM
Pani

349 | P a g e
160 Chetam Har Khet ko MOA&FW Lift irr from Sippi river to Kocharijo at 1 10.00 260.00 1 10.00 ASM
Pani Batam/Belu
161 Chetam Har Khet ko MOA&FW Tabukoro to Taburijo at Belu 1 2.00 11.00 1 2.00 ASM
Pani
162 Chetam Har Khet ko MOA&FW Girgik koro to Mending rijo at Dai 1 4.00 12.00 1 4.00 ASM
Pani
163 Chetam Har Khet ko MOA&FW Kia koro to Sedum Puchup rijo at Dai 1 4.00 7.00 1 4.00 ASM
Pani
164 Chetam Har Khet ko MOA&FW Boduso koro to Tamarijo at Dasi vill 1 4.00 9.00 1 4.00 ASM
Pani
165 Chetam Har Khet ko MOA&FW Bipo koro to Serik rijo at Hina 1 4.00 6.00 1 4.00 ASM
Pani
166 Chetam Har Khet ko MOA&FW Lide koro to Liderijo at Dasi vill 1 4.00 13.00 1 4.00 ASM
Pani
167 Chetam Har Khet ko MOA&FW Lomtak koro to Hiririjo at Hinju 1 8.00 10.00 1 8.00 ASM
Pani
168 Chetam Har Khet ko MOA&FW Kamcho koro to Pakleri at Dasi vill 1 4.00 9.00 1 4.00 ASM
Pani
169 Chetam Har Khet ko MOA&FW Sorjo koro to Dalorijo at Kare vill 1 2.00 7.00 1 2.00 ASM
Pani
170 Chetam Har Khet ko MOA&FW Kambia Koro to Takiorijo at Doni vill 1 4.00 13.00 1 4.00 ASM
Pani
171 Chetam Har Khet ko MOA&FW Dabu koro to Dabu rijo at Dabu 1 5.00 7.00 1 5.00 ASM
Pani
172 Chetam Har Khet ko MOA&FW Sippi koro to Sumpirijo at Namchi 1 2.00 11.00 1 2.00 ASM
Pani
173 Chetam Har Khet ko MOA&FW Tanio koro to Meterijo at Harak vill 1 2.00 12.00 1 2.00 ASM
Pani
174 Chetam Har Khet ko MOA&FW Chusi koro toBalorijo at Hina 1 4.00 7.00 1 4.00 ASM
Pani
175 Chetam Har Khet ko MOA&FW Naloh koro to Namchi rijo at Namchi 1 2.00 9.00 1 2.00 ASM
Pani
176 Chetam Har Khet ko MOA&FW Papak koro to Joru rijo at Sera 1 5.00 12.00 1 5.00 ASM
Pani

350 | P a g e
177 Chetam Har Khet ko MOA&FW Bupu koro to Delirijo at Kare vill 1 8.00 8.00 1 8.00 ASM
Pani
178 Chetam Har Khet ko MOA&FW Letor koro to Nangko rijo at Hina 1 4.00 8.00 1 4.00 ASM
Pani
179 Chetam Har Khet ko MOA&FW Yiarko Koro to Riamring rijo at Dadi 1 8.00 13.00 1 8.00 GPC
Pani
180 Chetam Har Khet ko MOA&FW China koro to Jedoum rijo at Batam 1 15.00 13.00 2 15.00
Pani
181 Chetam Har Khet ko MOA&FW Gumgum so to Silu rijo at Silu vill 1 3.00 10.00 1 3.00 ASM
Pani
182 Chetam Har Khet ko MOA&FW Pajok koro to Hinju rijo at Hinju vill 1 4.00 7.00 1 4.00 ASM
Pani
183 Chetam Har Khet ko MOA&FW Molo koro to Molorijo at Kare vill 1 1.50 10.00 1 1.50 ASM
Pani
184 Chetam Har Khet ko MOA&FW Hidam seram koro to Jetegote at Kare 1 5.00 6.00 1 5.00 ASM
Pani
185 Chetam Har Khet ko MOA&FW Radhi koro to Radhirijo at Hina 1 4.00 11.00 1 4.00 ASM
Pani
186 Chetam Har Khet ko MOA&FW Teri koro to Teri Pyakar at Siga vill 1 2.00 7.00 1 2.00 ASM
Pani
187 Chetam Har Khet ko MOA&FW Tani suku to Jererijo at Kare vill 1 3.00 9.00 1 3.00 ASM
Pani
188 Chetam Har Khet ko MOA&FW Dapo koro to Bogi Bida at Lechin 1 3.00 7.00 1 3.00 ASM
Pani
189 Chetam Har Khet ko MOA&FW Chemio koro to Pakba at Bayor vill 1 11.00 12.00 2 11.00 -do-
Pani
190 Chetam Har Khet ko MOA&FW Moji koro to Ragyar rijo at Mosi vill 1 4.00 9.00 1 4.00 ASM
Pani
191 Chetam Har Khet ko MOA&FW Lepu koro to Namchirijo at Namchi 1 2.00 12.00 1 2.00 ASM
Pani
192 Chetam Har Khet ko MOA&FW Lomi koro to Tudhi rijo at Hina 1 4.00 10.00 1 4.00 ASM
Pani
193 Chetam Har Khet ko MOA&FW Tigri koro to Napin rijo at Namchi 1 2.00 7.00 1 2.00 ASM
Pani

351 | P a g e
194 Chetam Har Khet ko MOA&FW Loh koro to Tonari rijo at Siga vill 1 3.00 11.00 1 3.00 ASM
Pani
195 Chetam Har Khet ko MOA&FW Loho koro to Omik Lepik at Namchi 1 2.00 8.00 1 2.00 ASM
Pani
196 Chetam Har Khet ko MOA&FW Sha koro to Saririjo at Sari 1 2.00 6.00 1 2.00 ASM
Pani
197 Chetam Har Khet ko MOA&FW Sameen koro to Jeberijo at Sera 1 4.00 6.00 1 4.00 ASM
Pani
198 Chetam Har Khet ko MOA&FW Kolu koro to Kolu rijo at Sebing 1 6.00 8.00 1 6.00 ASM
Pani
199 Chetam Har Khet ko MOA&FW Papak koro to Pyakar rijo at Sera 1 5.00 16.00 1 5.00 ASM
Pani
200 Chetam Har Khet ko MOA&FW Lomikoro to Sippi rijo art Hina 1 4.00 12.00 1 4.00 ASM
Pani
201 Chetam Har Khet ko MOA&FW Loh koro to Napin rijo at Sera 1 4.00 8.00 1 4.00 ASM
Pani
202 Chetam Har Khet ko MOA&FW Sippi river to Sumpirijo at Siga 1 3.00 306.00 1 3.00 ASM
Pani
203 Chetam Har Khet ko MOA&FW Shakoro to Sayor rijo at Marbom 1 8.00 5.00 1 8.00 -do-
Pani
204 Chetam Har Khet ko MOA&FW Lomdi koro to Papak rijo at Sera 1 4.00 7.00 1 4.00 ASM
Pani
205 Chetam Har Khet ko MOA&FW Kiri koro to Jamirijo at Batam 1 10.00 12.00 1 10.00
Pani
206 Chetam Har Khet ko MOA&FW Loh koro to Nusi rijo at Sera 1 4.00 11.00 1 4.00 ASM
Pani
207 Chetam Har Khet ko MOA&FW Semin koro to Pagia suri rijo(Nonia) at Sera 1 4.00 12.00 1 4.00 ASM
Pani Tapapu
208 Chetam Har Khet ko MOA&FW Papak koro to Tabom rijo at Sera 1 4.00 8.00 1 4.00 ASM
Pani
209 Chetam Har Khet ko MOA&FW Malikoro to Laberijo at Sera vill 1 4.00 11.00 1 4.00 ASM
Pani
210 Chetam Har Khet ko MOA&FW Semin koro to Taberijo at Sera Tapapu 1 4.00 11.00 1 4.00 ASM
Pani

352 | P a g e
211 Chetam Har Khet ko MOA&FW Semin koro to Pagia suri rijo(Genam) at Sera 1 5.00 12.00 1 5.00 ASM
Pani Tapapu
212 Chetam Har Khet ko MOA&FW Sena koro to Mako Naririjo at Siga 1 7.00 8.00 1 7.00 ZPM
Pani
213 Chetam Har Khet ko MOA&FW Harbasi koro to Harbarijo at Marbom 1 10.00 9.00 1 10.00 -do-
Pani
214 Chetam Har Khet ko MOA&FW Napin ochi koro to Naririjo( Rira) at Siga 1 2.00 9.00 1 2.00 ASM
Pani
215 Chetam Har Khet ko MOA&FW Papak koro to Gayi rijo at Sera 1 4.00 11.00 1 4.00 ASM
Pani
216 Chetam Har Khet ko MOA&FW Pelokoro to Khenyi rijo at Hina 1 4.00 9.00 1 4.00 ASM
Pani
217 Chetam Har Khet ko MOA&FW Jalikoro to Jama at Siga 1 2.00 13.00 1 2.00 ASM
Pani
218 Chetam Har Khet ko MOA&FW Nar koro to Gyakamat Siga 1 2.00 12.00 1 2.00 ASM
Pani
219 Chetam Har Khet ko MOA&FW Hoso koro to Ringipitak at Siga vill 1 2.00 9.00 1 2.00 ASM
Pani
220 Chetam Har Khet ko MOA&FW Paga koro to Lechin at Lechin vill 1 2.00 9.00 1 2.00 ASM
Pani
221 Chetam Har Khet ko MOA&FW Rama Koro to Rama myodu at Siga 1 3.00 6.00 1 3.00 ASM
Pani
222 Chetam Har Khet ko MOA&FW Pitak koroto Phitak at Siga 1 3.00 10.00 1 3.00 ASM
Pani
223 Chetam Har Khet ko MOA&FW Pete koro to Riokam rijo at Sera Tapapu 1 15.00 16.00 1 15.00 ASM
Pani
224 Chetam Har Khet ko MOA&FW Tabin koro to Tabinrijo at Silu vill 1 4.00 8.00 1 4.00 ASM
Pani
225 Chetam Har Khet ko MOA&FW Shaa koro to Shaa rijo at Sari 1 3.00 11.00 1 3.00 ASM
Pani
226 Chetam Har Khet ko MOA&FW Silu koro to Silurijo at Silu village 1 4.00 8.00 1 4.00 ASM
Pani
227 Chetam Har Khet ko MOA&FW Sebiu koro to Bogikrijo at Soki 1 6.00 10.00 1 6.00 ASM
Pani

353 | P a g e
228 Chetam Har Khet ko MOA&FW Kahakoro to Takki at Bayor vill 1 10.00 12.00 1 10.00 G
Pani /Chairperson
229 Chetam Har Khet ko MOA&FW Loh koro to Gyakam rijo at Sera vill 1 4.00 10.00 1 4.00 ASM
Pani
230 Chetam Har Khet ko MOA&FW Si koro to Yaperijo at Bayor 1 5.00 14.00 1 5.00 -do-
Pani
231 Chetam Har Khet ko MOA&FW Liru koro to Chetiarijo at Chortorijo 1 5.00 10.00 1 5.00 G/Chairperson
Pani
232 Chetam Har Khet ko MOA&FW Basi koro to Giamok rijo at Dadi 1 7.00 15.00 1 7.00 GPC
Pani
233 Chetam Har Khet ko MOA&FW Loh koro to Naririjo at Sera 1 4.00 9.00 1 4.00 ASM
Pani
234 Chetam Har Khet ko MOA&FW Kama koro to Hami rijo at Dai 1 6.00 12.00 1 6.00 GPC
Pani
235 Chetam Har Khet ko MOA&FW Sha koro to Tapiumrijo at Marbom 1 10.00 8.00 1 10.00 Gram
Pani Chairperson
236 Chetam Har Khet ko MOA&FW Naloom Koro to Sayorrijo at Marbom 1 6.00 8.00 1 6.00 -do-
Pani
237 Chetam Har Khet ko MOA&FW SeIi koro Takirik dum at Marbom 1 9.00 12.00 1 9.00 -do-
Pani
238 Chetam Har Khet ko MOA&FW Tasum koro to Dedirijo at Marbom 1 10.00 10.00 1 10.00 -do-
Pani
239 Chetam Har Khet ko MOA&FW Petin koro to Bido rijo at Batam 1 15.00 14.00 2 15.00
Pani
240 Chetam Har Khet ko MOA&FW Ramdukoro to Taminrijo at Batam 1 15.00 14.00 2 15.00
Pani
241 Chetam Har Khet ko MOA&FW Gigi koro to Memerijo at Marbom 1 12.00 3.00 2 12.00 GPC
Pani
242 Chetam Har Khet ko MOA&FW Chiri koro to Bijey rijo at Batam 1 5.00 7.00 1 5.00
Pani
243 Chetam Har Khet ko MOA&FW Ochak koro to Tikio rijo at Batam 1 5.00 9.00 1 5.00
Pani
244 Chetam Har Khet ko MOA&FW Otekoro to Toburijo at Batam 1 15.00 12.00 1 15.00
Pani

354 | P a g e
245 Chetam Har Khet ko MOA&FW Tabu koro to Nidim rijo at Batam 1 15.00 15.00 1 15.00
Pani
246 Chetam Har Khet ko MOA&FW Darlo koro to Dayi rijo at Bayor 1 6.00 10.00 1 6.00
Pani
247 Chetam Har Khet ko MOA&FW Namchi koro to Baterijo at Bayor 1 8.00 11.00 1 8.00
Pani
248 Chetam Har Khet ko MOA&FW Kocham koro to Jepurijo at Belu 1 12.00 13.00 1 12.00
Pani
249 Chetam Har Khet ko MOA&FW Nalo koro to Tayumrijo at Belu 1 5.00 7.00 1 5.00
Pani
250 Chetam Har Khet ko MOA&FW Nio Koro to Hakperijo at Boging 1 3.00 6.00 1 3.00
Pani
251 Chetam Har Khet ko MOA&FW Hakpe koro to Takamharijo at Boging 1 4.00 8.00 1 4.00
Pani
252 Chetam Har Khet ko MOA&FW Sippi koro to Sippirijo at Boging 1 10.00 225.00 1 10.00
Pani
253 Chetam Har Khet ko MOA&FW Sisi koro to Doku rijo at Boging 1 8.00 14.00 1 8.00
Pani
254 Chetam Har Khet ko MOA&FW Nio Koro to Niorijo at Boging 1 5.00 6.50 1 5.00
Pani
255 Chetam Har Khet ko MOA&FW Pachung nallah to Bogingrijo at Boging 1 10.00 13.00 1 10.00
Pani
256 Chetam Har Khet ko MOA&FW Doku nallah to Rabongrijo at Boging 1 4.00 10.00 1 4.00
Pani
257 Chetam Har Khet ko MOA&FW Cheging koro to Nalamrijo at Cheging 1 3.00 8.00 1 3.00
Pani
258 Chetam Har Khet ko MOA&FW Hari river to Hachi rijo at Cheging 1 7.00 12.00 1 7.00
Pani
259 Chetam Har Khet ko MOA&FW Hachi river to cheging rijo at Cheging 1 8.00 12.00 1 8.00
Pani
260 Chetam Har Khet ko MOA&FW Tombom koro to tobbom rijo at Cheging 1 5.00 10.00 1 5.00
Pani
261 Chetam Har Khet ko MOA&FW Tombom koro to Delerijo at Cheging 1 9.00 14.00 1 9.00
Pani

355 | P a g e
262 Chetam Har Khet ko MOA&FW Motu koro to Chetam Dumtorijo at Chetam 1 13.00 17.00 2 13.00
Pani
263 Chetam Har Khet ko MOA&FW Tani koro to Tejirijo at Chetam 1 12.00 13.00 1 12.00
Pani
264 Chetam Har Khet ko MOA&FW Tabu koro to Pirarijo at Chetam 1 8.00 9.00 1 8.00
Pani
265 Chetam Har Khet ko MOA&FW Tani koro to Rojenrijo at Chetam 1 7.00 11.00 1 7.00
Pani
266 Chetam Har Khet ko MOA&FW Tani koro to Tummuhari at Chetam 1 5.00 10.00 1 5.00
Pani
267 Chetam Har Khet ko MOA&FW Bapik koro to Molo at Chetam 1 6.00 9.00 1 6.00
Pani
268 Chetam Har Khet ko MOA&FW Sorjo koro to Mukji rijo at Chetam 1 12.00 11.00 1 12.00
Pani
269 Chetam Har Khet ko MOA&FW Sippi river to Rammemori at Chetia 1 6.00 9.00 1 6.00
Pani
270 Chetam Har Khet ko MOA&FW Mali Maji to Chetiarijo at Chetia 1 5.00 7.50 1 5.00
Pani
271 Chetam Har Khet ko MOA&FW Mali koro to Nyakam rijo at Chetia 1 4.00 9.00 1 4.00
Pani
272 Chetam Har Khet ko MOA&FW Ramso koro to Muririjo at Chetia 1 4.00 10.00 1 4.00
Pani
273 Chetam Har Khet ko MOA&FW Nambum koro to Daterrijo at Dadi 1 3.00 8.00 1 3.00
Pani
274 Chetam Har Khet ko MOA&FW Sibia koro to Takjakrijo at Dadi 1 3.00 7.00 1 3.00
Pani
275 Chetam Har Khet ko MOA&FW Ngorak koro to Yagok rijo at Dadi 1 4.00 9.00 1 4.00
Pani
276 Chetam Har Khet ko MOA&FW Nambung koro to Haporijo at Dadi 1 2.00 6.00 1 2.00
Pani
277 Chetam Har Khet ko MOA&FW Richiringle koro to Rinchiringlerijo at Dadi 1 5.00 11.00 1 5.00
Pani
278 Chetam Har Khet ko MOA&FW Nambum koro to Basirijo at Dadi 1 5.00 12.00 1 5.00
Pani

356 | P a g e
279 Chetam Har Khet ko MOA&FW Tashisou koro to Ratey yorbe at Dadi 1 6.00 10.00 1 6.00
Pani
280 Chetam Har Khet ko MOA&FW Lokar koto to Lkar rijo at Dadi 1 5.00 9.00 1 5.00
Pani
281 Chetam Har Khet ko MOA&FW Sebia koro to Sebia rijo at Dadi 1 8.00 14.00 1 8.00
Pani
282 Chetam Har Khet ko MOA&FW Hapa koro to Hapak rijo at Dadi 1 4.00 11.00 1 4.00
Pani
283 Chetam Har Khet ko MOA&FW Sibia koro to Sibia rijo at Dadi vill. 1 5.00 12.00 1 5.00
Pani
284 Chetam Har Khet ko MOA&FW Rongte koro to Boksu rijo at Dai 1 4.00 8.00 1 4.00
Pani
285 Chetam Har Khet ko MOA&FW Sippi river to Tamerijo at Dai 1 10.00 215.00 1 10.00
Pani
286 Chetam Har Khet ko MOA&FW Kongtam koro to Kongtam rijo at Dai 1 3.00 7.00 1 3.00
Pani
287 Chetam Har Khet ko MOA&FW Mending koro to Mending rijo at Dai 1 5.00 9.00 1 5.00
Pani
288 Chetam Har Khet ko MOA&FW Niotu Koro to Chalikrijo at Dai 1 10.00 12.00 1 10.00
Pani
289 Chetam Har Khet ko MOA&FW Niosar koro to Lengda rijo at Dai 1 2.00 8.00 1 2.00
Pani
290 Chetam Har Khet ko MOA&FW Pemakoro to Tengkam rijo at Dai 1 2.00 7.00 1 2.00
Pani
291 Chetam Har Khet ko MOA&FW Nanko koro to Sedung pochup at Dai 1 5.00 6.00 1 5.00
Pani
292 Chetam Har Khet ko MOA&FW Gargik koro to Kargikrijo at Dai 1 5.00 9.00 1 5.00
Pani
293 Chetam Har Khet ko MOA&FW Kia koro to Dairijo at Dai 1 2.00 12.00 1 2.00
Pani
294 Chetam Har Khet ko MOA&FW Tome koro to Tome rijo at Dai 1 2.00 13.00 1 2.00
Pani
295 Chetam Har Khet ko MOA&FW Tanamso to Suku rijo at Daru 1 4.00 6.00 1 4.00
Pani

357 | P a g e
296 Chetam Har Khet ko MOA&FW Tarekor to Teringtere at Daru 1 5.00 8.00 1 5.00
Pani
297 Chetam Har Khet ko MOA&FW Niumpu koro to Rasing Hare at Daru 1 10.00 14.00 1 10.00
Pani
298 Chetam Har Khet ko MOA&FW Dunching koro to Rasingrijo at Daru 1 4.00 8.00 1 4.00
Pani
299 Chetam Har Khet ko MOA&FW Tare koro to Jiting at Daru 1 10.00 12.00 1 10.00
Pani
300 Chetam Har Khet ko MOA&FW Nasu koro to Nasusahu at Daru 1 5.00 10.00 1 5.00
Pani
301 Chetam Har Khet ko MOA&FW Damrijo at Daru 1 5.00 9.00 1 5.00
Pani
302 Chetam Har Khet ko MOA&FW Tanamso to Bedaraga at Daru 1 10.00 7.00 1 10.00
Pani
303 Chetam Har Khet ko MOA&FW Lidi koro to Lidirijo at Dasi 1 10.00 14.00 1 10.00
Pani
304 Chetam Har Khet ko MOA&FW Dite koro to Molo rijo at Dasi 1 5.00 9.00 1 5.00
Pani
305 Chetam Har Khet ko MOA&FW Dimi koro to Mindi rijo at Dasi 1 2.00 11.00 1 2.00
Pani
306 Chetam Har Khet ko MOA&FW Dimi koro to Bojum rijo at Dasi 1 2.00 11.00 1 2.00
Pani
307 Chetam Har Khet ko MOA&FW Kamcho koro to yobu-bolo rijo at Dasi 1 2.00 11.00 1 2.00
Pani
308 Chetam Har Khet ko MOA&FW Lomtak koro to Lumtakrijo at Dasi 1 5.00 11.00 1 5.00
Pani
309 Chetam Har Khet ko MOA&FW Demi koro to Mindi rijo at Dasi 1 20.00 21.00 2 20.00
Pani
310 Chetam Har Khet ko MOA&FW Make koro to Yima rijo at Dasi 1 4.00 12.00 1 4.00
Pani
311 Chetam Har Khet ko MOA&FW Hokdi koro to Kolupung rijo at Dasi 1 4.00 10.00 1 4.00
Pani
312 Chetam Har Khet ko MOA&FW Leba Koro to Lebarijo at Dayam 1 4.00 14.00 1 4.00
Pani

358 | P a g e
313 Chetam Har Khet ko MOA&FW Sha koro to to Pakba rijo at Debi vill 1 2.00 12.00 1 2.00
Pani
314 Chetam Har Khet ko MOA&FW Maasi koro to Pootepatlin at Duni 1 8.00 10.00 1 8.00
Pani
315 Chetam Har Khet ko MOA&FW Sibin koro to Takkiomori at Duni 1 4.00 14.00 1 4.00
Pani
316 Chetam Har Khet ko MOA&FW Gunekoro to Kioko at Duni 1 5.00 14.00 1 5.00
Pani
317 Chetam Har Khet ko MOA&FW Kangil sii koro to Kangkii yorbe at Duni 1 4.00 11.00 1 4.00
Pani
318 Chetam Har Khet ko MOA&FW Bupusii koro to Bupu rijo at Duni 1 4.00 10.00 1 4.00
Pani
319 Chetam Har Khet ko MOA&FW Darmi koro to Ta rijo at Dabu 1 1.00 11.00 1 1.00
Pani
320 Chetam Har Khet ko MOA&FW Togi koro to Togi rijo ar Dabu 1 1.00 12.00 1 1.00
Pani
321 Chetam Har Khet ko MOA&FW Su koro to Jedik rijo at Dabu 1 3.00 12.00 1 3.00
Pani
322 Chetam Har Khet ko MOA&FW Pajok koro to Pajok rijo at Dabu 1 2.00 12.00 1 2.00
Pani
323 Chetam Har Khet ko MOA&FW Dabu koro to Boklin rijo at Dabu 1 2.00 11.00 1 2.00
Pani
324 Chetam Har Khet ko MOA&FW Darmi koro to Dikpe rijo at Dabu 1 1.00 11.00 1 1.00
Pani
325 Chetam Har Khet ko MOA&FW Kechu koro to Togi Yorlo at Dabu 1 4.00 7.00 1 4.00
Pani
326 Chetam Har Khet ko MOA&FW Su koro to Taha rijo at Dabu 1 9.00 10.00 1 9.00
Pani
327 Chetam Har Khet ko MOA&FW Rate koro to Tagam rijo at Dabu 1 4.00 7.00 1 4.00
Pani
328 Chetam Har Khet ko MOA&FW Kamnia koro to Kamnia rijo at Dabu 1 4.00 6.00 1 4.00
Pani
329 Chetam Har Khet ko MOA&FW Jokte koro to Raksa rijo at Dabu 1 4.00 6.00 1 4.00
Pani

359 | P a g e
330 Chetam Har Khet ko MOA&FW Hotakrijo at Guha 1 25.00 21.00 3 25.00
Pani
331 Chetam Har Khet ko MOA&FW Pungusoh to Mardo rijo at Guha 1 16.00 16.00 1 16.00
Pani
332 Chetam Har Khet ko MOA&FW Sippi river to Sugya rijo at Guha 1 15.00 227.00 1 15.00
Pani
333 Chetam Har Khet ko MOA&FW Sippi river to Charak rijo at Guha 1 6.00 228.00 1 6.00
Pani
334 Chetam Har Khet ko MOA&FW Riksar koro to Guharijo at Guha 1 20.00 22.00 2 20.00
Pani
335 Chetam Har Khet ko MOA&FW Butu river to Guhalimerijo at Guha 1 7.00 10.00 1 7.00
Pani
336 Chetam Har Khet ko MOA&FW Riksar koro to Lime rijo at Guha 1 6.00 20.00 1 6.00
Pani
337 Chetam Har Khet ko MOA&FW Hayung koro to Hane rijo at Hene Duku 1 4.00 12.00 1 4.00
Pani
338 Chetam Har Khet ko MOA&FW Bingam koro to Bingam rijo at Hina 1 10.00 10.50 1 10.00
Pani
339 Chetam Har Khet ko MOA&FW Hesor koro to Hesor rijo at Hina 1 5.00 7.00 1 5.00
Pani
340 Chetam Har Khet ko MOA&FW Dochi koro to Dochi rijo at Hina 1 10.00 10.00 1 10.00
Pani
341 Chetam Har Khet ko MOA&FW Pio koro to Pio rijo at Hina 1 15.00 19.00 1 15.00
Pani
342 Chetam Har Khet ko MOA&FW Namchi koro to Namachi rijo at Hina 1 6.00 8.00 1 6.00
Pani
343 Chetam Har Khet ko MOA&FW Karba koro to Karba rijo at Hina 1 6.00 7.00 1 6.00
Pani
344 Chetam Har Khet ko MOA&FW Ngamdu Sete to Nyamdu rijo at Hina 1 5.00 6.00 1 5.00
Pani
345 Chetam Har Khet ko MOA&FW Pelo koro to Pelo rijo at Hina 1 4.00 7.00 1 4.00
Pani
346 Chetam Har Khet ko MOA&FW Haso koro to Piorijo at Hina 1 10.00 14.00 1 10.00
Pani

360 | P a g e
347 Chetam Har Khet ko MOA&FW Kow koro to Pobe at Hinju 1 4.00 7.00 1 4.00
Pani
348 Chetam Har Khet ko MOA&FW Komar koro to Lochilori at Hinju 1 7.00 9.00 1 7.00
Pani
349 Chetam Har Khet ko MOA&FW Paknekoro to Hinjupobeo at Hinju 1 6.00 7.00 1 6.00
Pani
350 Chetam Har Khet ko MOA&FW Korekoro to Niapung rijo at Hinju 1 5.00 6.00 1 5.00
Pani
351 Chetam Har Khet ko MOA&FW Pojok koro to Rami at Hinju 1 6.00 8.00 1 6.00
Pani
352 Chetam Har Khet ko MOA&FW Dunikoro to Lomirijo at Hinju 1 9.00 10.00 1 9.00
Pani
353 Chetam Har Khet ko MOA&FW Rami koro to Pakgumori at Hinju 1 8.00 9.00 1 8.00
Pani
354 Chetam Har Khet ko MOA&FW Nianing koro to Poniarijo at Hinju 1 7.00 9.00 1 7.00
Pani
355 Chetam Har Khet ko MOA&FW Kasi koro to Kairijo at Hinju 1 4.00 8.00 1 4.00
Pani
356 Chetam Har Khet ko MOA&FW Like rijo at Jeke vill 1 5.00 12.00 1 5.00 PR
Pani
357 Chetam Har Khet ko MOA&FW Sippi koro to Lekerijo at Jeke 1 6.00 235.00 1 6.00
Pani
358 Chetam Har Khet ko MOA&FW Rahu koro to Rahurijo at Jeke 1 5.00 9.00 1 5.00
Pani
359 Chetam Har Khet ko MOA&FW Paagberin to Ragerijo at Jeke 1 5.00 8.00 1 5.00
Pani
360 Chetam Har Khet ko MOA&FW Taming sow to Moming rijo at Jeke 1 6.00 10.00 1 6.00
Pani
361 Chetam Har Khet ko MOA&FW Boghin koro to Tarungtarerijo at Jeke 1 5.00 14.00 1 5.00
Pani
362 Chetam Har Khet ko MOA&FW Sehin koro to Bogding rijo at Jeke 1 7.00 9.00 1 7.00
Pani
363 Chetam Har Khet ko MOA&FW Rahin koro to Saharijo at Jeke 1 5.00 10.00 1 5.00
Pani

361 | P a g e
364 Chetam Har Khet ko MOA&FW Jeke koro to Paching rijo at Jeke 1 5.00 16.00 1 5.00
Pani
365 Chetam Har Khet ko MOA&FW Jeke koro to Renga rijo at Jeke 1 6.00 12.00 1 6.00
Pani
366 Chetam Har Khet ko MOA&FW Tode koro to Serik rijo at Kare 1 10.00 12.00 1 10.00
Pani
367 Chetam Har Khet ko MOA&FW Sorjo koro to Dalirijo at Kare 1 15.00 16.00 2 15.00
Pani
368 Chetam Har Khet ko MOA&FW Molo koro to Derlo rijo at Kare 1 7.00 9.00 1 7.00
Pani
369 Chetam Har Khet ko MOA&FW Molo koro to Sarkumori at Kare 1 4.00 9.00 1 4.00
Pani
370 Chetam Har Khet ko MOA&FW Motu koro to Meba rijo at Kare 1 9.00 12.00 1 9.00
Pani
371 Chetam Har Khet ko MOA&FW Riyum koro to Nimpe rijo at Kare 1 8.00 12.00 1 8.00
Pani
372 Chetam Har Khet ko MOA&FW Kare koro to Sorjorijo at Kare 1 5.00 9.00 1 5.00
Pani
373 Chetam Har Khet ko MOA&FW Sari koro to Posarijo at Kare 1 12.00 14.00 2 12.00
Pani
374 Chetam Har Khet ko MOA&FW Sarjo koro to Ritukoo to at Kare 1 6.00 9.00 1 6.00
Pani
375 Chetam Har Khet ko MOA&FW Dapo koro to Bogi rijo at Lechin 1 3.00 8.00 1 3.00
Pani
376 Chetam Har Khet ko MOA&FW Chinte koro to Lechin Chindum at Lechin 1 4.00 7.00 1 4.00
Pani
377 Chetam Har Khet ko MOA&FW Hosoh koro to Lechin at Lechin 1 3.50 6.00 1 3.50
Pani
378 Chetam Har Khet ko MOA&FW Linring koro to Biyungpi rijo at Lingsa 1 6.00 8.00 1 6.00
Pani
379 Chetam Har Khet ko MOA&FW Lingsa koro to Lingsarijo at Lingsa 1 10.00 12.00 1 10.00
Pani
380 Chetam Har Khet ko MOA&FW Jitey koro to Hatey rijo at Lingsa 1 11.00 13.00 1 11.00
Pani

362 | P a g e
381 Chetam Har Khet ko MOA&FW Pimpi koro to Paberijo at Lingsa 1 15.00 16.00 2 15.00
Pani
382 Chetam Har Khet ko MOA&FW Herong koro to Laklamrijo at Lingsa 1 12.00 15.00 1 12.00
Pani
383 Chetam Har Khet ko MOA&FW Tachocho koro to Nachorijo at Lingsa 1 3.00 12.00 1 3.00
Pani
384 Chetam Har Khet ko MOA&FW Ote koro to Darung rijo at Lingsa 1 4.00 10.00 1 4.00
Pani
385 Chetam Har Khet ko MOA&FW Tedu koro to Tedurijo at Lote 1 10.00 11.00 1 10.00
Pani
386 Chetam Har Khet ko MOA&FW Pelo koro to Radirijo at Lote 1 10.00 13.00 1 10.00
Pani
387 Chetam Har Khet ko MOA&FW Radi koro to Loterijo at Lote 1 15.00 15.00 2 15.00
Pani
388 Chetam Har Khet ko MOA&FW Lomi koro to Lomirijo at Lote 1 16.00 12.00 2 16.00
Pani
389 Chetam Har Khet ko MOA&FW Pelo koro to Gamsonrijo at Lote 1 4.00 9.00 1 4.00
Pani
390 Chetam Har Khet ko MOA&FW Radi koro to Dalorijo at Lote 1 4.00 8.00 1 4.00
Pani
391 Chetam Har Khet ko MOA&FW CC linning from Pelo koro to Redding rijo at 1 5.00 5.00 1 5.00
Pani Lote
392 Chetam Har Khet ko MOA&FW Chusi koro to Mundi rijo at Lote. 1 10.00 47.00 1 10.00
Pani
393 Chetam Har Khet ko MOA&FW Jenpa nallah to Haparijo at Magria 1 4.00 7.00 1 4.00
Pani
394 Chetam Har Khet ko MOA&FW Nangko to Bokenrijo at Magria 1 3.00 8.00 1 3.00
Pani
395 Chetam Har Khet ko MOA&FW Niami koto to Binrakrijo at Magria 1 6.00 9.00 1 6.00
Pani
396 Chetam Har Khet ko MOA&FW Dila koro to Ladung rijo at Magria 1 9.00 10.00 1 9.00
Pani
397 Chetam Har Khet ko MOA&FW Laba koro to Binij rijo at Magria 1 2.00 7.00 1 2.00
Pani

363 | P a g e
398 Chetam Har Khet ko MOA&FW Malikoro to Ralomrijo at Magria 1 4.00 8.00 1 4.00
Pani
399 Chetam Har Khet ko MOA&FW Jutkoro to Botomrijo at Magria 1 5.00 9.00 1 5.00
Pani
400 Chetam Har Khet ko MOA&FW Hagikoro to Logingjet Tejo at Magria 1 6.00 8.00 1 6.00
Pani
401 Chetam Har Khet ko MOA&FW Hapikoro to Rate rijo at Magria 1 6.00 7.00 1 6.00
Pani
402 Chetam Har Khet ko MOA&FW Seko sebiakoro to Jebomrijo at Magria 1 9.00 10.00 1 9.00
Pani
403 Chetam Har Khet ko MOA&FW Namching Namko koro to Raklenrijo at 1 6.00 7.00 1 6.00
Pani Magria
404 Chetam Har Khet ko MOA&FW Nachkoro to Teporijo at Magria 1 6.00 9.00 1 6.00
Pani
405 Chetam Har Khet ko MOA&FW Magria nallah to Magriarijo at Magria 1 10.00 11.00 1 10.00
Pani
406 Chetam Har Khet ko MOA&FW Pikte Nalah to Pikterijo at Magria 1 5.00 8.00 1 5.00
Pani
407 Chetam Har Khet ko MOA&FW Kama koro to Kama rij at Magria 1 6.00 8.00 1 6.00
Pani
408 Chetam Har Khet ko MOA&FW Omi nallah to Omirijo at Margria 1 6.00 7.00 1 6.00
Pani
409 Chetam Har Khet ko MOA&FW Piji nallah to Piji rijo at Magria 1 5.00 9.00 1 5.00
Pani
410 Chetam Har Khet ko MOA&FW Gigi koro to Meme rijo at Marbom 1 15.00 18.00 2 15.00
Pani
411 Chetam Har Khet ko MOA&FW Tasung koro to Tajayorbe rijo at Marbom 1 12.00 13.00 2 12.00
Pani
412 Chetam Har Khet ko MOA&FW Shah koro to Tapinkochamrijo at Marbom 1 13.00 14.00 2 13.00
Pani
413 Chetam Har Khet ko MOA&FW Melum koro to Seyorijo at Marbom 1 10.00 11.00 1 10.00
Pani
414 Chetam Har Khet ko MOA&FW Taikshow koro to Takirikdumrijo at Marbom 1 8.00 12.00 1 8.00
Pani

364 | P a g e
415 Chetam Har Khet ko MOA&FW Sachar koro to Chogo rijo at Marbom 1 8.00 9.00 1 8.00
Pani
416 Chetam Har Khet ko MOA&FW Erbasaku koro to Larjarijo at Marbom 1 5.00 7.00 1 5.00
Pani
417 Chetam Har Khet ko MOA&FW Seli koro to Bachirijo (Pakba) at Marbom 1 8.00 8.00 1 8.00
Pani
418 Chetam Har Khet ko MOA&FW Talikshow koro to Chemio rijo at Marbom 1 8.00 8.00 1 8.00
Pani
419 Chetam Har Khet ko MOA&FW Saha koro to Ridumrijo at ,Marbom 1 6.00 10.00 1 6.00
Pani
420 Chetam Har Khet ko MOA&FW Mali Maji to Rakyar rijo & Lebe rijo at Mosi 1 8.00 10.00 1 8.00
Pani
421 Chetam Har Khet ko MOA&FW Bogdu rijo at Mosi 1 2.00 7.00 1 2.00
Pani
422 Chetam Har Khet ko MOA&FW Sippi river to Maji rijo at Mosi 1 5.00 270.00 1 5.00
Pani
423 Chetam Har Khet ko MOA&FW Sippi river to Mori Ramme at Mosi 1 5.00 285.00 1 5.00
Pani
424 Chetam Har Khet ko MOA&FW Hayong koro to Lokak rijo at Niling 1 3.00 7.00 1 3.00
Pani
425 Chetam Har Khet ko MOA&FW Teksik so to Mapo rijo at Niling 1 3.00 7.00 1 3.00
Pani
426 Chetam Har Khet ko MOA&FW Kadak river to Kadak rijoat Niling 1 4.00 8.00 1 4.00
Pani
427 Chetam Har Khet ko MOA&FW Hachi koro to Rapr rijo at Niling 1 4.00 8.00 1 4.00
Pani
428 Chetam Har Khet ko MOA&FW Mara Rakching koro to Talum Haa at Niling 1 3.00 6.00 1 3.00
Pani
429 Chetam Har Khet ko MOA&FW Relung koro to Relung rijo at Niling 1 5.00 7.00 1 5.00
Pani
430 Chetam Har Khet ko MOA&FW Nio koro to Rasing rijo at Niling 1 2.00 5.00 1 2.00
Pani
431 Chetam Har Khet ko MOA&FW Tako Ngong koro to Hetak Niodi rijo at Niling 1 3.00 6.00 1 3.00
Pani

365 | P a g e
432 Chetam Har Khet ko MOA&FW Hayong koro to Gengo Nioring at Niling 1 3.00 7.00 1 3.00
Pani
433 Chetam Har Khet ko MOA&FW Sengrik koro to Seku rijo at Niling 1 3.00 6.00 1 3.00
Pani
434 Chetam Har Khet ko MOA&FW Lungchi koro to Sengo reko at Niling 1 2.00 5.00 1 2.00
Pani
435 Chetam Har Khet ko MOA&FW Yabi koro toYabi Seram at Niling 1 3.00 8.00 1 3.00
Pani
436 Chetam Har Khet ko MOA&FW senchak koro to Humi rijo at Niling 1 3.00 8.00 1 3.00
Pani
437 Chetam Har Khet ko MOA&FW Humi koro to Niako rijo at Niling 1 4.00 7.50 1 4.00
Pani
438 Chetam Har Khet ko MOA&FW Darin koro to Darinrijo at Nilling 1 3.00 8.00 1 3.00
Pani
439 Chetam Har Khet ko MOA&FW Nio koro to Nioringjo at Nilling 1 3.00 11.00 1 3.00
Pani
440 Chetam Har Khet ko MOA&FW Humi nallah to Memper Rijo at Raha. 1 7.00 8.50 1 7.00
Pani
441 Chetam Har Khet ko MOA&FW Delo koro to Rage rijo at Rage vill 1 3.00 12.00 1 3.00
Pani
442 Chetam Har Khet ko MOA&FW Raji koro to Dedam rijo at Raji 1 15.00 14.00 2 15.00
Pani
443 Chetam Har Khet ko MOA&FW Ampu koro to Doirijo at Raji 1 2.00 12.00 1 2.00
Pani
444 Chetam Har Khet ko MOA&FW Sha koro to Haterrijo at Raji 1 2.00 9.00 1 2.00
Pani
445 Chetam Har Khet ko MOA&FW Rameso koro to Sagiam rijo at Rame 1 5.00 10.00 1 5.00
Pani
446 Chetam Har Khet ko MOA&FW Sogum koro to Lakam rijo at Rikung 1 16.00 16.00 2 16.00
Pani
447 Chetam Har Khet ko MOA&FW Sogum koro to Dupung rijo at Rikung 1 14.00 14.00 2 14.00
Pani
448 Chetam Har Khet ko MOA&FW Soh koro to Megu rijoat Rikung 1 17.00 17.00 2 17.00
Pani

366 | P a g e
449 Chetam Har Khet ko MOA&FW Dicho koro to Hakra rijo at Ruji 1 14.00 12.00 2 14.00
Pani
450 Chetam Har Khet ko MOA&FW Bipo koro to Jile rijo at Ruji 1 8.00 9.00 1 8.00
Pani
451 Chetam Har Khet ko MOA&FW Crow koro to Serik rijo at Ruji 1 5.00 8.00 1 5.00
Pani
452 Chetam Har Khet ko MOA&FW Pigya koro to Pigia rijo at Ruji 1 5.00 7.50 1 5.00
Pani
453 Chetam Har Khet ko MOA&FW Segum koro to Segum rijo at Ruji 1 7.00 8.00 1 7.00
Pani
454 Chetam Har Khet ko MOA&FW Boglin koro to Lebi rijo at Ruji 1 6.00 7.00 1 6.00
Pani
455 Chetam Har Khet ko MOA&FW Ragyi rijo at Ruji 1 7.00 8.00 1 7.00
Pani
456 Chetam Har Khet ko MOA&FW Chow koro to Seriok rijo at Ruji 1 4.00 9.00 1 4.00
Pani
457 Chetam Har Khet ko MOA&FW Sha koro to Puyar Rongo at Sari 1 6.00 9.00 1 6.00
Pani
458 Chetam Har Khet ko MOA&FW Sari koro to Telo rijo at Sari 1 15.00 16.00 2 15.00
Pani
459 Chetam Har Khet ko MOA&FW Ampa koro to Doi rijo at Sari 1 2.00 4.00 1 2.00
Pani
460 Chetam Har Khet ko MOA&FW Saha koro to Sako rijo at Sari 1 1.00 4.00 1 1.00
Pani
461 Chetam Har Khet ko MOA&FW Shema koro to Sakorijo at Sari 1 2.00 8.00 1 2.00
Pani
462 Chetam Har Khet ko MOA&FW Kore koro to Seive rijo at Sebing 1 6.00 7.00 1 6.00
Pani
463 Chetam Har Khet ko MOA&FW Kama koro to Mudi rijo at Sebing 1 2.00 6.00 1 2.00
Pani
464 Chetam Har Khet ko MOA&FW Niosar koro to Kiden rijo at Sebing 1 2.00 6.00 1 2.00
Pani
465 Chetam Har Khet ko MOA&FW Midia koro to Midi rijo at Sebing 1 3.00 7.00 1 3.00
Pani

367 | P a g e
466 Chetam Har Khet ko MOA&FW Sebing koro to Kodin rijo at Sebing 1 6.00 7.00 1 6.00
Pani
467 Chetam Har Khet ko MOA&FW Muju koro to Muju rijo at Sebing 1 7.00 8.00 1 7.00
Pani
468 Chetam Har Khet ko MOA&FW Miosar koro to Miosar rijo at Sebing 1 5.00 7.00 1 5.00
Pani
469 Chetam Har Khet ko MOA&FW Miomi koro to Miomi rijo at Sebing 1 3.00 6.00 1 3.00
Pani
470 Chetam Har Khet ko MOA&FW Mapak koro to Mapak rijoat Sebing 1 7.00 9.00 1 7.00
Pani
471 Chetam Har Khet ko MOA&FW Motu koro to Motu rijo at Sebing 1 5.00 7.00 1 5.00
Pani
472 Chetam Har Khet ko MOA&FW Siling koro to Siling rijo at Sebing 1 3.00 6.00 1 3.00
Pani
473 Chetam Har Khet ko MOA&FW Tenin so koro to Meru rijo at Sebing 1 4.00 7.00 1 4.00
Pani
474 Chetam Har Khet ko MOA&FW Lida koro to Lida rijo at Sebing 1 4.00 6.00 1 4.00
Pani
475 Chetam Har Khet ko MOA&FW Sagi koro to Hegi rijo at Sebing 1 5.00 9.00 1 5.00
Pani
476 Chetam Har Khet ko MOA&FW Kokio koro to Kokio rijo at Sebing 1 5.00 9.00 1 5.00
Pani
477 Chetam Har Khet ko MOA&FW Hate koro to Hate rijo at Sebing 1 4.00 8.00 1 4.00
Pani
478 Chetam Har Khet ko MOA&FW Biken koro to Lene rijo at Sebing 1 5.00 8.00 1 5.00
Pani
479 Chetam Har Khet ko MOA&FW Hami koro to Hami rijo at Sebing 1 5.00 6.00 1 5.00
Pani
480 Chetam Har Khet ko MOA&FW Niotu koro to Palin rijo at Sebing . 1 3.00 17.00 1 3.00
Pani
481 Chetam Har Khet ko MOA&FW Sepe koro to Maw rijo at Sebing 1 4.00 12.00 1 4.00
Pani
482 Chetam Har Khet ko MOA&FW Selu river to Dekio rijo at Sebing 1 4.00 21.00 1 4.00
Pani

368 | P a g e
483 Chetam Har Khet ko MOA&FW Sarmen koro to Gai rijo at Sera 1 3.00 7.00 1 3.00
Pani
484 Chetam Har Khet ko MOA&FW Sarmen koro to Jeb rijo at Sera 1 6.00 9.00 1 6.00
Pani
485 Chetam Har Khet ko MOA&FW Papak koro to Papak rijo at Sera 1 7.00 9.00 1 7.00
Pani
486 Chetam Har Khet ko MOA&FW Papak koro to Gay rijo at Sera 1 7.00 16.00 1 7.00
Pani
487 Chetam Har Khet ko MOA&FW Loh koro & Lumdik koro to Gyakam rijo at 1 7.00 15.00 1 7.00
Pani Sera
488 Chetam Har Khet ko MOA&FW Loh koro & Sena koro to Nari rijo at Sera 1 9.00 13.00 1 9.00
Pani
489 Chetam Har Khet ko MOA&FW Loh koro & Lumdik koro to Nusi rijo at Sera 1 9.00 11.00 1 9.00
Pani
490 Chetam Har Khet ko MOA&FW Papak koro to Pindi rijo at Sera 1 8.00 10.00 1 8.00
Pani
491 Chetam Har Khet ko MOA&FW Sarmen koro to Miri rijo at Sera 1 6.00 9.00 1 6.00
Pani
492 Chetam Har Khet ko MOA&FW Semin koro to Jebe rijo at Sera 1 4.00 9.00 1 4.00
Pani
493 Chetam Har Khet ko MOA&FW Eachi koro to Tabe rijo at Sera Tapapu 1 10.00 12.00 1 10.00
Pani
494 Chetam Har Khet ko MOA&FW Sarmen koro to Pagiasuri rijo at Sera Tapapu 1 5.00 12.00 1 5.00
Pani
495 Chetam Har Khet ko MOA&FW Pemi koro to Batambale rijo at Sera Tapapu 1 12.00 13.00 2 12.00
Pani
496 Chetam Har Khet ko MOA&FW Sena & Loh koro to Nari rijo at Siga 1 4.00 9.00 1 4.00
Pani
497 Chetam Har Khet ko MOA&FW Pitak koro to Pitak rijo at Siga 1 4.00 7.00 1 4.00
Pani
498 Chetam Har Khet ko MOA&FW Loh koro to Napin rijo at Siga 1 2.00 8.00 1 2.00
Pani
499 Chetam Har Khet ko MOA&FW Tiri koro to Leriak Habu at Siga 1 2.50 10.00 1 2.50
Pani

369 | P a g e
500 Chetam Har Khet ko MOA&FW Tiri koro to Tiri Pyakar at Siga 1 2.00 8.00 1 2.00
Pani
501 Chetam Har Khet ko MOA&FW Tiri koro to Bhirap at Siga 1 3.00 7.00 1 3.00
Pani
502 Chetam Har Khet ko MOA&FW Tiri koro to Riktam pu at Siga 1 3.00 14.00 1 3.00
Pani
503 Chetam Har Khet ko MOA&FW Jali koro to Jama Yorlo at Siga 1 3.00 7.00 1 3.00
Pani
504 Chetam Har Khet ko MOA&FW Sippi koro to Sampi rijo at Siga 1 35.00 305.00 3 35.00
Pani
505 Chetam Har Khet ko MOA&FW Naloh koro to Pikda Lepik at Siga 1 2.00 5.00 1 2.00
Pani
506 Chetam Har Khet ko MOA&FW Sippi koro to Ringi Rochi at Siga 1 20.00 310.00 2 20.00
Pani
507 Chetam Har Khet ko MOA&FW Sena stream to Makokaririjo at Siga 1 7.00 10.00 1 7.00
Pani
508 Chetam Har Khet ko MOA&FW Soo koro to Silu rijo at Silu 1 8.00 10.00 1 8.00
Pani
509 Chetam Har Khet ko MOA&FW Darmi koro to Vimpu rijo at Silu 1 8.00 11.00 1 8.00
Pani
510 Chetam Har Khet ko MOA&FW Silu koro to Pedu rijo at Silu 1 5.00 10.00 1 5.00
Pani
511 Chetam Har Khet ko MOA&FW Satgum koro to Pepo rijo at Silu 1 8.00 11.00 1 8.00
Pani
512 Chetam Har Khet ko MOA&FW Gumgum soo to Jentum rijo at Silu. 1 5.00 7.50 1 5.00
Pani
513 Chetam Har Khet ko MOA&FW Boken koro to Silu rijo at Silu 1 4.00 2.00 1 4.00
Pani
514 Chetam Har Khet ko MOA&FW Sippi River to Machi rijo at Soki 1 15.00 347.00 2 15.00
Pani
515 Chetam Har Khet ko MOA&FW Sippi River to Bogik rijo at Soki 1 25.00 335.00 3 25.00
Pani
516 Chetam Har Khet ko MOA&FW Sippi River to Mopin rijo at Soki 1 12.00 320.00 2 12.00
Pani

370 | P a g e
517 Chetam Har Khet ko MOA&FW Sippi River to Chihi rijo at Soki 1 10.00 325.00 1 10.00
Pani
518 Chetam Har Khet ko MOA&FW Sebu koro to Jai rijo at Soki 1 8.00 317.00 1 8.00
Pani
519 Chetam Har Khet ko MOA&FW Sebu koro to Sebu rijo at Soki 1 3.00 8.00 1 3.00
Pani
520 Chetam Har Khet ko MOA&FW Sebu koro to Takio rijo at Soki 1 1.00 5.00 1 1.00
Pani
521 Chetam Har Khet ko MOA&FW Pete koro & Pemi koro to Kikukpu rijo at Kikik 1 6.00 8.00 1 6.00
Pani
522 Chetam Har Khet ko MOA&FW Radi koro to Harap rijo Kikik 1 6.00 8.00 1 6.00
Pani
523 Chetam Har Khet ko MOA&FW Semin koro to Gayirijo at Kikik 1 4.00 9.00 1 4.00
Pani
524 Chetam Har Khet ko MOA&FW Shah koro to Tara rijo at Shak 1 3.00 9.00 1 3.00
Pani
525 Chetam Har Khet ko MOA&FW Sete koro to Cheke rijo at Shak 1 15.00 11.00 2 15.00
Pani
526 Chetam Har Khet ko MOA&FW Herong koro to Rapi rijo at Rapi 1 15.00 17.00 2 15.00
Pani
527 Chetam Har Khet ko MOA&FW Hakra so to Mengnia rijo at Megnia 1 6.00 8.00 1 6.00
Pani
528 Chetam Har Khet ko MOA&FW Lidi so to Demi rijo at Megnia 1 8.00 10.00 1 8.00
Pani
529 Chetam Har Khet ko MOA&FW Budi koro to Date rijo at Megnia 1 15.00 17.00 2 15.00
Pani
530 Chetam Har Khet ko MOA&FW Lomtak koro to Talom rijo at Megnia 1 8.00 10.00 1 8.00
Pani
531 Chetam Har Khet ko MOA&FW Talom koro to Tamar rijo at Megnia 1 15.00 16.00 2 15.00
Pani
532 Chetam Har Khet ko MOA&FW Paa koro to Paa rijo at Lokar rijo 1 3.00 6.00 1 3.00
Pani
533 Chetam Har Khet ko MOA&FW Bhai koro to Bhai rijo at Lokar rijo 1 7.00 9.00 1 7.00
Pani

371 | P a g e
534 Chetam Har Khet ko MOA&FW Ote koro to Mana rijo at Lokar rijo 1 6.00 8.00 1 6.00
Pani
535 Chetam Har Khet ko MOA&FW Hayang Nallah to Gianching rijo at Hagne 1 7.00 9.00 1 7.00
Pani Doke
536 Chetam Har Khet ko MOA&FW Lintak koro to Lintak rijo at Hagne Doke 1 10.00 11.00 1 10.00
Pani
537 Chetam Har Khet ko MOA&FW Hayang rijo at Hagne Doke 1 6.00 8.00 1 6.00
Pani
538 Chetam Har Khet ko MOA&FW Jigok koro to Chikiorijo at Hagne Doke 1 4.00 7.00 1 4.00
Pani
539 Chetam Har Khet ko MOA&FW Talek koro to Hamariga rijo at Hamrijo 1 3.00 6.00 1 3.00
Pani
540 Chetam Har Khet ko MOA&FW Lebar koro to Kirum rijo at Molo 1 9.00 11.00 1 9.00
Pani
541 Chetam Har Khet ko MOA&FW Pak koro to Chetam rijo at Molo 1 7.00 9.00 1 7.00
Pani
542 Chetam Har Khet ko MOA&FW Sorku koro to Nyalo rijo at Molo 1 5.00 6.00 1 5.00
Pani
543 Chetam Har Khet ko MOA&FW Motu koro to Pirapu at Molo 1 10.00 12.00 1 10.00
Pani
544 Chetam Har Khet ko MOA&FW Kancho koro to Ango Yorlo at Molo 1 12.00 15.00 2 12.00
Pani
545 Chetam Har Khet ko MOA&FW Morkik rijo to Morkik rijo at Chorta rijo 1 12.00 17.00 2 12.00
Pani
546 Chetam Har Khet ko MOA&FW Senik koro to Yaklupu rijo at Chorta rijo 1 10.00 12.00 1 10.00
Pani
547 Chetam Har Khet ko MOA&FW Rakyar rijo to Leber rijo at Mosi 1 6.00 11.00 1 6.00
Pani
548 Chetam Har Khet ko MOA&FW Jigi koro to Bogikrijo of Nambasoki, Duni, 1 20.00 21.00 1 20.00
Pani Soki, Machirijo and Naacha
549 Chetam Har Khet ko MOA&FW Nioko rijo MIP at Majirijo vill under Chetam. 1 3.00 10.00 1 3.00
Pani

372 | P a g e
CAD NEW SCHEMES
Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated
the Ministry / Number area / area implementation cost in
Sl.No. District/ Department Irrigation (Sq.Km.) (year) Lakhs Remarks
Block (ha)

Daporijo Har Khet MOA&FW She koro to Dakda rijo at Pegarijo, Sikarijo I, 1 60.00 10.00 3 60.00
1 Block ko Pani Sikarijo II, Sikarijo III, Yekar, Lejirijo Jal Gram
(Sigen-I)

Daporijo Har Khet MOA&FW Sigenkoro to Tak rijo at Sikarijo I 1 5.00 34.00 1 5.00
2 Block ko Pani
(Sigen-I) MLA Daporijo
Daporijo Har Khet MOA&FW Sehkoro to Dakdarijo at Sikarijo II 1 5.00 12.00 1 5.00
3 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Magrak Koro to Neeru setu at Sikar-II 1 10.00 12.00 1 10.00
4 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sikar koro to Sikar WRC field at Sikar-I 1 5.00 10.00 1 5.00
5 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sikar koro to Pagalepu at Sikar-II 1 10.00 12.00 1 10.00
6 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ginchi Koro to Takrijo at Sikar-I 1 5.00 40.00 1 5.00
7 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Komu koro to Dakdarijo at Sikar-II 1 10.00 10.00 1 10.00
8 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Duni river to Rite rijo at Rite 1 15.00 60.00 2 15.00
9 Block ko Pani
(Sigen-I) -do-

373 | P a g e
Daporijo Har Khet MOA&FW Pote koro to Kirum rijo at Motu vill 1 7.00 17.00 1 7.00
10 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sik koro to Ngindi rijo at Dulom 1 5.00 11.00 1 5.00
11 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sippi koro to Tamiririjo at Sikom 1 5.00 381.00 1 5.00
12 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW See koro to Taluk rijo at Lejirijo. 1 6.00 15.00 1 6.00
13 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Dol koro to Taponurijo at Yekar 1 4.00 8.00 1 4.00
14 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Kamu koro to Tikjirijo at Dulom 1 5.00 12.00 1 5.00
15 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Kommar koro to Kammurijo at Yekar 1 5.00 9.00 1 5.00
16 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW CC lining from Shee koro to Tute rijo at Motu 1 9.00 12.00 1 9.00
17 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Mod koro to Monarijo at Nima vill 1 7.00 13.00 1 7.00
18 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Nyepo koro to Tachi rijo at Pisa-I vill 1 6.00 10.00 1 6.00
19 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Siri Lebar Nallah to Yararijo at Jeram 1 5.00 25.00 1 5.00
20 Block ko Pani
(Sigen-I) -do-

374 | P a g e
Daporijo Har Khet MOA&FW Dado koro to Dadorijo (Yajarijo )at Nima vill 1 7.00 5.00 1 7.00
21 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Daruk koro to Batakrijo at Batak 1 4.00 7.00 1 4.00
22 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Yanam koro to Ngudar rijo at Ngudar 1 10.00 7.00 1 10.00
23 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Modi koro to Namdam rijo at Dubi 1 7.00 11.00 1 7.00
24 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Hachi koro to Hachi rijo at Lamdik village 1 15.00 12.00 2 15.00
25 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW CC Lining at Ridumrijo at Sikom 1 9.00 12.00 1 9.00
26 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Namchi rijo to Namchi rijo at Jeram vill. 1 8 14 1 8.00
27 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Rigi koro to Tablerijo at Pissa II 1 5.00 12.00 1 5.00
28 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ledu koro to Pakdam rijo at Patum vill 1 4.00 8.00 1 4.00
29 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Bomyir koro to Bomyir rijo at Pagerijo 1 12.00 14.00 2 12.00
30 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sitin koro to Doli rijo at Lamdik 1 25.00 10.00 3 25.00
31 Block ko Pani
(Sigen-I) -do-

375 | P a g e
Daporijo Har Khet MOA&FW Duni river to Ridum rijo at Sikom 1 25.00 60.00 3 25.00
32 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sitin koro to Boxrijo at Lamdik 1 20.00 10.00 2 20.00
33 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sitin river to Sokarijo at Lamdik 1 25.00 10.00 3 25.00
34 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Dodo koro to Leilirijo at Motu 1 20.00 8.00 2 20.00
35 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Tekesi koro to Mio at Dubi vill 1 3.00 8.00 1 3.00
36 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Pochikoro to Ngudirrijo at Ngudir. 1 3.00 9.00 1 3.00
37 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ngoi koro to Tah rijo at Dubi 1 3.00 10.00 1 3.00
38 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sippi koro to Tabelerijo at karda 1 6.00 120.00 1 6.00
39 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ngu koro to Dagirijo at Dubi vill 1 2.00 8.00 1 2.00
40 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Niumte Koro to Kardarijo at karda 1 4.00 9.00 1 4.00
41 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Kom koro to Uyemo rijo at Yekar 1 6.00 10.00 1 6.00
42 Block ko Pani
(Sigen-I) -do-

376 | P a g e
Daporijo Har Khet MOA&FW Se-koro to Yorsi rijo at leji rijo 1 5.00 12.00 1 5.00
43 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Komu koro to Ley-len rijo at Yekar 1 12.00 10.00 2 12.00
44 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sey koro to Sey rijo at lejirijo 1 15.00 12.00 2 15.00
45 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Dol koro to Dolrijo at Yekar vill 1 12.00 14.00 2 12.00
46 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Malso koro to Malso rijo at Lamdik 1 6.00 9.00 1 6.00
47 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Mintu koro to Table rijo at Karda 1 5.00 9.00 1 5.00
48 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW See koro to Taluk rijo at Lejirijo 1 6.00 11.00 1 6.00
49 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Lejio koro to Leji Dumpum at Legirijo 1 6.00 13.00 1 6.00
50 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Pote koro to Kirumrijo at Motu 1 5.00 9.00 1 5.00
51 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Jigi koro to Bogik rijo at Soki, Namba Soki 1 5.00 8.00 1 5.00
52 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ledu koro to Pakdam rijo at Patum 1 5.00 11.00 1 5.00
53 Block ko Pani
(Sigen-I) -do-

377 | P a g e
Daporijo Har Khet MOA&FW Neypokoro to Tachirijo at Pissa I 1 4.00 11.00 1 4.00
54 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Duni koro to Riterijo at Sikom 1 5.00 11.00 1 5.00
55 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Ginchin Koro to Matu Rongo at Sikarijo 1 2.00 5.00 1 2.00
56 Block ko Pani
(Sigen-I) ZPC
Daporijo Har Khet MOA&FW Dado koro to Apirijo at Nima vill. 1 12.00 9.00 2 12.00 MLA (Raga ST)
57 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Mud Koro to Taka rijo at Nima vill. 1 8.00 8.00 1 8.00 MLA (Raga ST)
58 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Mod koro to Bona rijo at Nima vill. 1 9.00 7.00 1 9.00 MLA (Raga ST)
59 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dodo koro to Kampu Haririjo at Ripe Nima 1 9.00 6.00 1 9.00 MLA (Raga ST)
60 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Puna koro to Pular rijo at Ripe Nima 1 8.00 5.00 1 8.00 MLA (Raga ST)
61 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Mad koro to Monarijo at Nima vill 1 6.00 5.00 1 6.00 MLA Daporijo
62 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kombo koro to Kamlik rijo at Patum 1 20.00 10.00 2 20.00 CO/Member secy
63 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Tarum koro to Sippi-I 1 3.00 10.00 1 3.00
64 Block ko Pani
(Sigen-I) -do-

378 | P a g e
Daporijo Har Khet MOA&FW Siri koro to Depak Namchi at Jeram vill. 1 5.00 9.00 1 5.00
65 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Shekek koro to Payir rijo at Dulom vill 1 2.00 8.00 1 2.00
66 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Dodo koro to Boyen Yollow via Morak sillo at 1 5.00 8.00 1 5.00
67 Block ko Pani Nima
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Batak koro to Amji rijo at Jeram 1 15.00 11.00 2 15.00
68 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Modi koro to Namnum Batak at Batak vill 1 5.00 9.00 1 5.00
69 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Niomchi koro to Nampam Pamlo at Patum 1 5.00 6.00 1 5.00
70 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Dodo koro to Yorarijo at Jeram vill. 1 10.00 8.00 1 10.00
71 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Sippi koro to Jugdi sippi-III 1 2.00 140.00 1 2.00
72 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Lebar koro to Yararijo at Jeram vill 1 10.00 7.00 1 10.00
73 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Diki koro to Sippirijo at Sippi-II 1 4.00 12.00 1 4.00
74 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Payir koro to Payir rijo at Dulom vill 1 3.00 9.00 1 3.00
75 Block ko Pani
(Sigen-I) -do-

379 | P a g e
Daporijo Har Khet MOA&FW Leli koro to Kotar rijo at Jeram vill 1 20.00 12.00 2 20.00
76 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Rut river koro to Rutrijo at Dulom vill 1 9.00 10.00 1 9.00
77 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Bona koro to Regam WRC field at Nima 1 5.00 12.00 1 5.00
78 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Kino koro to Bomte Ritak at Dulom vill 1 4.00 7.00 1 4.00
79 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Siri koro to Diki Pomdo rijo at Batak. 1 6.00 9.00 1 6.00
80 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Rut sekek , Payir koro to Namsi rijo at Dulom 1 5.00 9.00 1 5.00
81 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Nima koro to Katurijo at Nima 1 6.00 10.00 1 6.00
82 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Rat koro to Ratrijo at Nima 1 4.00 11.00 1 4.00
83 Block ko Pani
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Mud koro to Rogamrijo to Katurijo and Nima 1 7.00 9.00 1 7.00
84 Block ko Pani Bumboi via Ratrijo
(Sigen-I) -do-
Daporijo Har Khet MOA&FW Doni river to Tikri rijo at Sikom vill 1 5.00 11.00 1 5.00
85 Block ko Pani
(Sigen-I) GPC/ASM
Daporijo Har Khet MOA&FW CC Lining at Ridum rijo at Sikom 1 8.00 12.00 1 8.00
86 Block ko Pani
(Sigen-I) GPC/ASM

380 | P a g e
Daporijo Har Khet MOA&FW CC Lining at Yajir rijo at Sikom 1 8.00 13.00 1 8.00
87 Block ko Pani
(Sigen-I) GPC/ASM
Daporijo Har Khet MOA&FW Kuri nallah to Dapor Rijo at Batak 1 7.00 6.00 1 7.00
88 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kamu koro to Depak Nachi rijo at Batak 1 7.00 10.00 1 7.00
89 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kori koro to Yegi rijo at Batak 1 10.00 14.00 1 10.00
90 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Siri koro to Riokpu at Batak. 1 5.00 12.00 1 5.00
91 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sik koro to Sik rijo at Dulom 1 15.00 20.00 2 15.00
92 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ginchi koro to Namsi rijo at Dulom 1 16.00 25.00 2 16.00
93 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ginchi koro to Rub rijo at Dulom 1 18.00 23.00 2 18.00
94 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ginchi koro to Bayor rijo at Dulom 1 17.00 21.00 2 17.00
95 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ginchi koro to Tani Sipanju at Dulom 1 25.00 20.00 3 25.00
96 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kulu koro to Bumterijo at Dulom 1 10.00 15.00 1 10.00
97 Block ko Pani
(Sigen-I)

381 | P a g e
Daporijo Har Khet MOA&FW Seke koro to Tago Nikro rijo at Dulom 1 8.00 12.00 1 8.00
98 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kamu koro to Gijo rijo at Dulom 1 4.00 10.00 1 4.00
99 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Siri koro to Siri rijo at Jeram 1 15.00 17.00 2 15.00
100 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dodo koro to Jeram rijo at Jeram 1 25.00 21.00 3 25.00
101 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Lebar koro to Lebar rijo at Jeram 1 15.00 17.00 2 15.00
102 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Lili koro to Gichak rijo (Yora) at Jeram. 1 7.00 10.00 1 7.00
103 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Puto koro to Yomrorijo at Karda 1 6.00 8.00 1 6.00
104 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Jada koro to Jada rijo at Karda 1 9.00 12.00 1 9.00
105 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Yama koro to Yama rijo at Karda 1 8.00 10.00 1 8.00
106 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Otte koro to Karda rijo at Karda 1 9.00 12.00 1 9.00
107 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ngoye koro to Pakdam rijo at Kopin vill 1 5.00 12.00 1 5.00
108 Block ko Pani
(Sigen-I)

382 | P a g e
Daporijo Har Khet MOA&FW Melsho koro to Bamru rijo at Lamdik 1 2.00 6.00 1 2.00
109 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sitin koro to Boxi rijo at Lamdik 1 5.00 8.00 1 5.00
110 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Koje koro to Hachi rijo at Lamdik 1 7.00 9.00 1 7.00
111 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Gitu koro to Amagi rijo at Lamdik 1 10.00 12.00 1 10.00
112 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Melso river to Namchirijo at Lamdik 1 6.00 7.00 1 6.00
113 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sitin river to Doli Hachiri at Lamdik 1 6.00 9.00 1 6.00
114 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Yorse koro to Sey rijo at Lejirijo 1 5.00 9.00 1 5.00
115 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Tulum koro to Tulum rijo at Lejirijo 1 10.00 11.00 1 10.00
116 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Lete koro to Leji reepa at Lejirijo 1 5.00 7.00 1 5.00
117 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dedo koro to Timb rijo at Motu 1 10.00 11.00 1 10.00
118 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dedo koro to kota rijo at Motu 1 10.00 13.00 1 10.00
119 Block ko Pani
(Sigen-I)

383 | P a g e
Daporijo Har Khet MOA&FW Lili koro to Lili rijo at Motu 1 10.00 12.00 1 10.00
120 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kamlik koro to Kamchak rijo at Patum 1 8.00 10.00 1 8.00
121 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Niumchi koro to Rimpu yelo at Patum 1 35.00 27.00 3 35.00
122 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kambu koro to Niumbu rijo at Patum 1 7.00 10.00 1 7.00
123 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Binju koro to Binju rijo at Patum 1 6.00 11.00 1 6.00
124 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Niumchi koro to Tumb rijo at Patum 1 5.00 7.00 1 5.00
125 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Kamlik koro to Saa rijo at Patum 1 6.00 12.00 1 6.00
126 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sorga koro to Sirilaktu at Patum 1 5.00 8.00 1 5.00
127 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Rimpu nallah to Mapap Rengo at Rimpu Yorbe 1 4.00 11.00 1 4.00
128 Block ko Pani at Patum Vill
(Sigen-I)
Daporijo Har Khet MOA&FW Numtekoro to Pissa rijo at Pisa 1 25.00 22.00 3 25.00
129 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Belo koro to Rapenrijo at Riterijo 1 12.00 13.00 2 12.00
130 Block ko Pani
(Sigen-I)

384 | P a g e
Daporijo Har Khet MOA&FW Duni koro to Repin rijo at Sikom 1 5.00 12.00 1 5.00
131 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Duni koro to Tudde sere at Sikom 1 5.00 8.00 1 5.00
132 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Komra koro to Mele rijo at Sikom 1 5.00 9.00 1 5.00
133 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Doni koro to Lamlam rijo at Sikom 1 4.00 10.00 1 4.00
134 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Raa koro to Raa rijo at Sikom 1 3.00 7.00 1 3.00
135 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Neeru koro to Neeru Setu at Sikar-II 1 10.00 13.00 1 10.00
136 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Magrak koro to Magrak rijo at Sikar-II 1 10.00 16.00 1 10.00
137 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Lete koro to Leterijo at Sikarijo 1 5.00 7.00 1 5.00
138 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Pissa koro to Datrijo at Sippi 1 6.00 9.00 1 6.00
139 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sippi River to Sippi rijo at Sippi 1 30.00 382.00 3 30.00
140 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Chokar rijo at Sippi 1 10.00 12.00 1 10.00
141 Block ko Pani
(Sigen-I)

385 | P a g e
Daporijo Har Khet MOA&FW Saa koro to Saa rijo at Sippi 1 15.00 16.00 2 15.00
142 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Jeli koro to Jele rijo at Sippi 1 8.00 10.00 1 8.00
143 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Jeli koro to Regi rijo at Sippi 1 7.00 9.00 1 7.00
144 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ledi koro to Tai rijo at Sippi 1 2.00 6.00 1 2.00
145 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Komo koro to lejlen rijo at Yekar 1 10.00 15.00 1 10.00
146 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Pate koro & Lerip koro to Lerip rijo at Yekar 1 5.00 8.00 1 5.00
147 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Komu koro to Komu rijo at Yekar 1 5.00 12.00 1 5.00
148 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Komar koro to Komar rijo at Yekar 1 7.00 11.00 1 7.00
149 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Ginchi to Katu rijo at Yekar 1 50.00 24.00 3 50.00
150 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Yekar koro to Taka rijo at Yekar 1 30.00 12.00 3 30.00
151 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Tasum koro to Mudar rijo at Ngudar 1 25.00 19.00 3 25.00
152 Block ko Pani
(Sigen-I)

386 | P a g e
Daporijo Har Khet MOA&FW Mio koro to Kopin rijo at Dubi 1 3.00 6.00 1 3.00
153 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sippi River to Dagi rijo at Dubi 1 9.00 372.00 1 9.00
154 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sochak koro to Lable rijo at Dubi 1 5.00 9.00 1 5.00
155 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Daat koro to Daat rijo at Daterijo 1 10.00 14.00 1 10.00
156 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Duni koro to Tigri rijo at Rite 1 10.00 13.00 1 10.00
157 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Duni river to Ritrrijo at Rite 1 6.00 14.00 1 6.00
158 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Numte koro to Pisa rijo at Pissa-II 1 25.00 21.00 3 25.00
159 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Lebar koro to Lebar rijo at Lebar 1 15.00 16.00 2 15.00
160 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Liduk koro to Pakdam rijo at Pakdam 1 4.00 9.00 1 4.00
161 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dodo koro to Hemum Mumku at Repen Nima 1 5.00 5.00 1 5.00
162 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Dado Koro to Rath rijo At Morak Nima 1 8.00 5.00 1 8.00
163 Block ko Pani
(Sigen-I)

387 | P a g e
Daporijo Har Khet MOA&FW Morak Nallah To Rath rijo at Morak Nima 1 6.00 5.00 1 6.00
164 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Morak Nallah to Morak rijo at Morak Nima 1 5.00 7.00 1 5.00
165 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Nima Koro Boomdi WRC field at Nima 1 7.00 9.00 1 7.00
166 Block ko Pani
(Sigen-I)
Daporijo Har Khet MOA&FW Sigen Koro To Bonye yolo at Nima 1 6.00 6.00 1 6.00
167 Block ko Pani
(Sigen-I)
167 1554.00 1554.00

1 Daporijo MOA&FW Har khet Sima Nallh to Ragarijo agril field at Jigi vill. 1 14.00 8.00 2 14.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
2 Daporijo MOA&FW Har khet Sikka-Nallah to Ragamrijo agril field at Jigi vill. 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
3 Daporijo MOA&FW Har khet Suk nallh to Pok-Hih agril field at Jigi vill. 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
4 Daporijo MOA&FW Har khet Se nallah to Temririjo agril field at Bomikoto. 1 60.00 30.00 3 60.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
5 Daporijo MOA&FW Har khet Rechi nallah to Eke-Nungu agril field at 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani Bomikoto vill.
(Sigen
II)

388 | P a g e
6 Daporijo MOA&FW Har khet Sima nallah to Shri rijo at Naremuri vill. 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
7 Daporijo MOA&FW Har khet Sipakoro to Porokyorb agril field at Nare Muri. 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
8 Daporijo MOA&FW Har khet Sigen river to Tode WRC filed at Hegineche 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
9 Daporijo MOA&FW Har khet Siken yama koro to Pobarrijo agril field at Pono 1 7.00 6.00 1 7.00 MLA (Raga ST)
Block ko Pani vill.
(Sigen
II)
10 Daporijo MOA&FW Har khet Bohakaro to Taramuri at Pobo vill 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
11 Daporijo MOA&FW Har khet Suk river to Pakyakrijo agril field at Mite vill. 1 18.00 9.00 2 18.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
12 Daporijo MOA&FW Har khet Suk koro to Tajam Bkche rijo at Mite vill. 1 10.00 10.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
13 Daporijo MOA&FW Har khet Sega Nallah to Tompurijo at Hangkar village 1 12.00 6.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
14 Daporijo MOA&FW Har khet Tatik koro to larparijo at Hangkar vill 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

389 | P a g e
15 Daporijo MOA&FW Har khet Solo koro to solorijo at Yitor 1 12.00 8.00 2 12.00 MLA (Raga ST)/ c. level.
Block ko Pani
(Sigen
II)
16 Daporijo MOA&FW Har khet Hamakkhark koro to Daturijo at Yitor vill. 1 8.00 7.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
17 Daporijo MOA&FW Har khet Moja koro to Moyarijo at Niji vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
18 Daporijo MOA&FW Har khet Patero koro to Geriya rijo at Niji vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
19 Daporijo MOA&FW Har khet Rukoro to Yatu murmenrijo at Ligu vill 1 8.00 40.00 1 8.00 MLA (Raga ST)/C. level.
Block ko Pani
(Sigen
II)
20 Daporijo MOA&FW Har khet Murmenkoro to Penniyarijo at Ligu vill. 1 16.00 10.00 2 16.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
21 Daporijo MOA&FW Har khet Rukoro to Rurijo at Ligu vill 1 15.00 10.00 2 15.00 MLA (Raga ST)/c. level.
Block ko Pani
(Sigen
II)
22 Daporijo MOA&FW Har khet Tabagi koro to Pikar rijo at Ligu (linko) 1 4.00 8.00 1 4.00 MLA Daporijo
Block ko Pani
(Sigen
II)
23 Daporijo MOA&FW Har khet Kipo koro to Pikarrijo at Linko vill. 1 8.00 3.00 1 8.00 MLA (Raga ST)/C.level
Block ko Pani
(Sigen
II)

390 | P a g e
24 Daporijo MOA&FW Har khet Teer koro to Dilidi at Liruk vill. 1 12.00 6.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
25 Daporijo MOA&FW Har khet Yumli koro to Kampu nori at Liruk vill. 1 8.00 4.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
26 Daporijo MOA&FW Har khet Peer koro Talek rijo at Degom vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
27 Daporijo MOA&FW Har khet Titik koro to Bokdum Buri at Rija vill. 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
28 Daporijo MOA&FW Har khet Shekoro to Sherijo at Sarijo vill. 1 10.00 8.00 1 10.00 MLA (Raga ST)/c level.
Block ko Pani
(Sigen
II)
29 Daporijo MOA&FW Har khet Hesh koro to Bayum rijo at Tompurijo vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
30 Daporijo MOA&FW Har khet Siga nallah to Degamrijo at Degom vill. 1 7.00 5.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
31 Daporijo MOA&FW Har khet Sigen koro to Talam rijo at Tugumpu vill 1 4.00 140.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
32 Daporijo MOA&FW Har khet Pirkoro to Tgoporijo at Taporijo vill. 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

391 | P a g e
33 Daporijo MOA&FW Har khet Siga nallah to Sikrijo at Cheharijo vill. 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
34 Daporijo MOA&FW Har khet Segin nallh to Yaniasil agril field at jigi 1 30.00 8.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
35 Daporijo MOA&FW Har khet Sima nallah to Namdum mattak agril field at Jigi 1 30.00 8.00 3 30.00 MLA (Raga ST)
Block ko Pani vill.
(Sigen
II)
36 Daporijo MOA&FW Har khet Sille koro to silloko rijo agril field at Jigi vill. 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
37 Daporijo MOA&FW Har khet Dodo nallah to Jummyrijo agril filed at Jigi 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
38 Daporijo MOA&FW Har khet Seppa(Ngibla) Nallah to Prog Yorbe at 1 60.00 30.00 3 60.00 MLA (Raga ST)
Block ko Pani Bomikoto.
(Sigen
II)
39 Daporijo MOA&FW Har khet Sika nallah to Boririjo agril field at Bomikoto vill. 1 30.00 15.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
40 Daporijo MOA&FW Har khet Sima nallah to Hiram agril field at Bomikoto vill. 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
41 Daporijo MOA&FW Har khet Takam koro to Takam Yark agril field at Nare 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani Muri
(Sigen
II)

392 | P a g e
42 Daporijo MOA&FW Har khet She nallah to She-rijo at Naremuiri 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
43 Daporijo MOA&FW Har khet Sa koro to Higi yorb at Hegi nemchi 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
44 Daporijo MOA&FW Har khet Merkoro to Merrijo at Pobo vill 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
45 Daporijo MOA&FW Har khet Solo koro to Satorijo at Pobo vill 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
46 Daporijo MOA&FW Har khet Salo nallah to kukum rijo agril field at Mite vill. 1 12.00 9.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
47 Daporijo MOA&FW Har khet Saya nallah to Path rijo agril field at Mite vill. 1 10.00 5.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
48 Daporijo MOA&FW Har khet Suk river to Yapu rijo at Mite vill. 1 14.00 9.00 2 14.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
49 Daporijo MOA&FW Har khet Siga nallah to ketri gayakrijo at Hangkar 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
50 Daporijo MOA&FW Har khet Lirum koro to Yage rijo at Hangkar 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

393 | P a g e
51 Daporijo MOA&FW Har khet Titik koro to Degom rijo (Malarrijo) at Hangkar 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani vill.
(Sigen
II)
52 Daporijo MOA&FW Har khet Sigen koro to Bokpen rijo at Yitor vill 1 10.00 140.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
53 Daporijo MOA&FW Har khet Sila koro to Lodurijo at Yitor vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
54 Daporijo MOA&FW Har khet Kass koro to Chakemrijo at Niji 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
55 Daporijo MOA&FW Har khet Gendorrijo to Yakmirijo at Niji vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
56 Daporijo MOA&FW Har khet Rurijo to Makekrijo at Niji 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
57 Daporijo MOA&FW Har khet Murmenkoro to Namlo Yaja at Ligu vill 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
58 Daporijo MOA&FW Har khet Rukoro to Katorijo at Ligu vill 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
59 Daporijo MOA&FW Har khet Rukoro to Titi rijo at Ligu vill 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

394 | P a g e
60 Daporijo MOA&FW Har khet Sigen river to Taka Bokpen at Ligu 1 10.00 155.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
61 Daporijo MOA&FW Har khet Kodumkoro to Tabagi at Linko vill. 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
62 Daporijo MOA&FW Har khet Koch koro to Pike rijo at linko vill. 1 8.00 4.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
63 Daporijo MOA&FW Har khet Tir koro to Danya Namchi at Liruk vill 1 10.00 3.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
64 Daporijo MOA&FW Har khet Koch nallah to Koch Puto agril field at liruk vill. 1 8.00 8.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
65 Daporijo MOA&FW Har khet Sipmim nallah to pedborijo at Sarijo 1 6.00 6.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
66 Daporijo MOA&FW Har khet Sha nallah to sharijo agril field at Sarijo vill. 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
67 Daporijo MOA&FW Har khet Shey nallah to Togumpu at Tugumpu vill 1 3.00 3.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
68 Daporijo MOA&FW Har khet Sin koro to Lenparijo at Taporijo vill. 1 60.00 30.00 3 60.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

395 | P a g e
69 Daporijo MOA&FW Har khet Sa nallah to Binlyrijo at Jigi 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
70 Daporijo MOA&FW Har khet Sigen nallah to Talen rijo agril field at Jigi vill. 1 9.00 9.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
71 Daporijo MOA&FW Har khet Sikka nallah to Yakrijo agril field at Jigi vill. 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
72 Daporijo MOA&FW Har khet Nampom koro to Bomi rijo agril field at Jigi vill. 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
73 Daporijo MOA&FW Har khet Chee nallah to moririjo at Bomikoto vill. 1 30.00 15.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
74 Daporijo MOA&FW Har khet Sika nallah to Boririjo & pokporrijo agril field at 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani Bomikoto
(Sigen
II)
75 Daporijo MOA&FW Har khet Sima nallah to Nare Muri agril field at Nare Muri. 1 5.00 6.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
76 Daporijo MOA&FW Har khet Sipa nallah to Takam Yorb agril field at Nare 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani Muri
(Sigen
II)
77 Daporijo MOA&FW Har khet Lipa rijo agril field at Pobo vill. 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

396 | P a g e
78 Daporijo MOA&FW Har khet Hinch hempin koro to Sirborijo at Pobo vill 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
79 Daporijo MOA&FW Har khet Sipa nallah to Tamaruri rijo agril field at Pobo vill 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
80 Daporijo MOA&FW Har khet Tad koro to Pukpe rijo at Mite vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
81 Daporijo MOA&FW Har khet Tapak koro to Bhutuia rijo at Mite vill. 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
82 Daporijo MOA&FW Har khet Tapa koro to Taparijo at Mite vill 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
83 Daporijo MOA&FW Har khet Barak nallah to Aya Podum Agril Field at Mite 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani Vill.
(Sigen
II)
84 Daporijo MOA&FW Har khet Majum rijo agril field at Top vill 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
85 Daporijo MOA&FW Har khet Sega nallah to Yagerijo at Hangkar vill. 1 12.00 6.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
86 Daporijo MOA&FW Har khet Siga nallah to Degom pada rijo at Hangkar 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

397 | P a g e
87 Daporijo MOA&FW Har khet Siga nallah to Box Bokpen at Hangkar 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
88 Daporijo MOA&FW Har khet Sigen koro to lebe rijo at Yitor vill. 1 6.00 140.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
89 Daporijo MOA&FW Har khet Sikom koro to pobarrijo at Yitor vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
90 Daporijo MOA&FW Har khet Rukoro to Talomrijo at Niji 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
91 Daporijo MOA&FW Har khet Sigen koro(paga rijo) to Takrijo at Niji 1 10.00 9.00 1 10.00 MLA (Raga ST)C /. Level.
Block ko Pani
(Sigen
II)
92 Daporijo MOA&FW Har khet Sikoro to Taniarijo at Niji 1 9.00 9.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
93 Daporijo MOA&FW Har khet Birikoro to Tajarijo at Niji 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
94 Daporijo MOA&FW Har khet Koch koro to Yapakcoch rijo at ligu 1 10.00 10.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
95 Daporijo MOA&FW Har khet Morak koro to Rurijo at ligu vill 1 8.00 6.00 1 8.00 MLA (Raga ST)/ MLA
Block ko Pani Daporijo
(Sigen
II)

398 | P a g e
96 Daporijo MOA&FW Har khet Rukoro to Murmenrijo at ligu vill 1 26.00 5.00 3 26.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
97 Daporijo MOA&FW Har khet Murmen koro to Murmen rijo at Linko vill. 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
98 Daporijo MOA&FW Har khet Sigum koro to Sigumrijo at Linko vill 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
99 Daporijo MOA&FW Har khet Se nallah to Temririjo agril filed at Sarijo vill. 1 5.00 3.00 1 5.00 MLA (Raga ST)/ c. level.
Block ko Pani
(Sigen
II)
100 Daporijo MOA&FW Har khet Nigbla koro to yirbirijo at shikirijo vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
101 Daporijo MOA&FW Har khet Suin koro to Japo rijo at Taporijo vill. 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
102 Daporijo MOA&FW Har khet Riba nallah to Pok-Hiib agril field at Jigi vill. 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
103 Daporijo MOA&FW Har khet Sika nallah to Rah sinik at Jigi vill. 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
104 Daporijo MOA&FW Har khet Rach nallah to Yania sil agril field at Jigi 1 30.00 8.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

399 | P a g e
105 Daporijo MOA&FW Har khet Rib nallah to Ramrokorijo agril field at Jigi 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
106 Daporijo MOA&FW Har khet Rich nallah to Merrijo and Yaniasilarea at 1 9.00 7.00 1 9.00 MLA (Raga ST)
Block ko Pani Bomikoto vill.
(Sigen
II)
107 Daporijo MOA&FW Har khet Rechi nallah to Eke-Nungu agril field at 1 30.00 15.00 3 30.00 MLA (Raga ST)
Block ko Pani Bomikoto vill.
(Sigen
II)
108 Daporijo MOA&FW Har khet Sika nallah to Ragomrijo agril field at Nare muri 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
109 Daporijo MOA&FW Har khet Sipmin nallah to Pode rijo at Pobo vill. 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
110 Daporijo MOA&FW Har khet Rik koro to Tapo rijo at Pobo vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
111 Daporijo MOA&FW Har khet Pokpe nallah to Mama rijo at Mite vill. 1 8.00 9.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
112 Daporijo MOA&FW Har khet See-koro to Yamirijo at Mite vill. 1 7.00 6.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
113 Daporijo MOA&FW Har khet Suk koro to Talam Bkche rijo at Mite vill. 1 10.00 10.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

400 | P a g e
114 Daporijo MOA&FW Har khet Sega koro to Pegem roitak at Hangkar 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
115 Daporijo MOA&FW Har khet Sigin river to Meabrijo at Hangkar 1 8.00 150.00 1 8.00 MLA (Raga ST)C/Level.
Block ko Pani
(Sigen
II)
116 Daporijo MOA&FW Har khet Sigen koro bathe rijo at Hankar 1 8.00 150.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
117 Daporijo MOA&FW Har khet She koro to miknirijo at Hangkar 1 9.00 5.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
118 Daporijo MOA&FW Har khet Solo koro to Sikrijo at yitor vill. 1 9.00 8.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
119 Daporijo MOA&FW Har khet Perekoro to Polorijo at Niji 1 8.00 8.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
120 Daporijo MOA&FW Har khet Liverkoro to Tadakrijo at Niji 1 10.00 9.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
121 Daporijo MOA&FW Har khet Si nallah to Katorijo at Niji 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
122 Daporijo MOA&FW Har khet Rokooro to Yatu at Khatrijo vill. 1 14.00 10.00 1 14.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

401 | P a g e
123 Daporijo MOA&FW Har khet Ru nallah to Pigamrijo at Ligu 1 12.00 10.00 1 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
124 Daporijo MOA&FW Har khet Rukoro to Pikarrijo at ligu 1 9.00 8.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
125 Daporijo MOA&FW Har khet Sigen koro to Rogam Bakpen at Ligu vill 1 8.00 155.00 1 8.00 MLA (Raga ST) / MLA
Block ko Pani Daporijo
(Sigen
II)
126 Daporijo MOA&FW Har khet Raw koro to kodumrijo at Linko vill. 1 8.00 4.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
127 Daporijo MOA&FW Har khet Tamro rijo MIP at Jigi vill 1 12.00 10.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
128 Daporijo MOA&FW Har khet Saarrijo to Mir attak WRC field at Jigi 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
129 Daporijo MOA&FW Har khet Tap nallah to ragarijo agril field at Jigi 1 9.00 7.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
130 Daporijo MOA&FW Har khet Sa nllah to Hage attak at Jigi 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
131 Daporijo MOA&FW Har khet Sima nallah to Kamyarijo agril field a Bomikoto 1 30.00 15.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

402 | P a g e
132 Daporijo MOA&FW Har khet Solo koro to Topo rijo at Pobo vill. 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
133 Daporijo MOA&FW Har khet Sehin yama koro to Pobarijo agril field at Pobo 1 7.00 6.00 1 7.00 MLA (Raga ST)
Block ko Pani vill.
(Sigen
II)
134 Daporijo MOA&FW Har khet Hap-koto to Taramuri at PoboVill 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
135 Daporijo MOA&FW Har khet She river to Asorijo at Bomikoto. 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
136 Daporijo MOA&FW Har khet Mer nallah to kukum rijo agri field at Mite vill. 1 12.00 9.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
137 Daporijo MOA&FW Har khet Rup nallah to Nyania rijo agril field at Mite Vill. 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
138 Daporijo MOA&FW Har khet Sega koro to hipuk rijo at Hangkar vill 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
139 Daporijo MOA&FW Har khet Si river to Chakjarijo at Niji 1 14.00 9.00 2 14.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
140 Daporijo MOA&FW Har khet Sigen koro to Takkarijo at Niji 1 6.00 150.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

403 | P a g e
141 Daporijo MOA&FW Har khet Kas koro to katrijo at Niji 1 7.00 6.00 1 7.00 MLA (Raga ST) c/ level.
Block ko Pani
(Sigen
II)
142 Daporijo MOA&FW Har khet Rhu koro to Nydam rijo at ligu vill 1 7.00 5.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
143 Daporijo MOA&FW Har khet Sirokaro to Pikerrijo at Ligu village 1 15.00 6.00 2 15.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
144 Daporijo MOA&FW Har khet Kodum koro to Taba gi namsi at Ligu vill 1 10.00 8.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
145 Daporijo MOA&FW Har khet Dedo nallah to yadkriijo at jigi 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
146 Daporijo MOA&FW Har khet Rich nallah to meerrijo at jigi 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
147 Daporijo MOA&FW Har khet Tabaki koro to Pikar rijo at Liruk village 1 8.00 20.00 1 8.00 MLA DRJ
Block ko Pani
(Sigen
II)
148 Daporijo MOA&FW Har khet Hegi nallah to hegirijo at Jigi 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
149 Daporijo MOA&FW Har khet Sigen river to Tor rijo agril field at Katrijo 1 4.00 7.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

404 | P a g e
150 Daporijo MOA&FW Har khet Se nallah to Bidarijo at Jigi 1 9.00 5.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
151 Daporijo MOA&FW Har khet Sigen Merrijo at Pobo vill 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
152 Daporijo MOA&FW Har khet Sigenrijo to Storijo at Pobo vill 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
153 Daporijo MOA&FW Har khet Nipokoro koro to Sirborijo at Pobo vill 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
154 Daporijo MOA&FW Har khet Sigen koro to Bokpenrijo at Pobo vill 1 7.00 140.00 1 7.00 MLA (Raga ST)/c level.
Block ko Pani
(Sigen
II)
155 Daporijo MOA&FW Har khet Yeb koro to Takrijo at Niji 1 8.00 8.00 1 8.00 MLA (Raga ST)C /. Level.
Block ko Pani
(Sigen
II)
156 Daporijo MOA&FW Har khet Peerkoro to Tayarijo at Niji 1 8.00 8.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
157 Daporijo MOA&FW Har khet Yapkoro to Takkarijo at Niji 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
158 Daporijo MOA&FW Har khet Bi koro to Birijo at Niji 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

405 | P a g e
159 Daporijo MOA&FW Har khet Ru-koro to Tajor rijo at Niji vill. 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
160 Daporijo MOA&FW Har khet Pokpe nallah to Yasap rijo at mite vill. 1 8.00 9.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
161 Daporijo MOA&FW Har khet Kodum koro to Tassarijo agril field at Ligu vill. 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
162 Daporijo MOA&FW Har khet Tabagi nallah to taturijo agril field at ligu vill. 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
163 Daporijo MOA&FW Har khet Daga koro to Dagarijo at Pobo vill 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
164 Daporijo MOA&FW Har khet Selo Rijo Mip at yetor 1 6.00 6.00 1 6.00 MLA
Block ko Pani
(Sigen
II)
165 Daporijo MOA&FW Har khet Sima Nallah to Porok yorb-Hib agril field at Jigi 1 16.00 6.00 2 16.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
166 Daporijo MOA&FW Har khet Mirinaallh to Tasorijo at Jigi 1 9.00 7.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
167 Daporijo MOA&FW Har khet Roop-koro to Tajom rijo at Niji vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)

406 | P a g e
168 Daporijo MOA&FW Har khet Sigen koro to Sirrijo at Pobo vill 1 6.00 140.00 1 6.00 MLA (Raga ST)/ c.level.
Block ko Pani
(Sigen
II)
169 Daporijo MOA&FW Har khet Che nallah to Tamri (Yokumrijo)agril field at Jigi 1 30.00 8.00 3 30.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
170 Daporijo MOA&FW Har khet Idugte to rijo attak at Mite 1 20.00 12.00 2 20.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
171 Daporijo MOA&FW Har khet See river to Mir-allak (Yaramrijo) at jigi vill 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
172 Daporijo MOA&FW Har khet Silo koro to Pedrijo at Pobo vill 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
173 Daporijo MOA&FW Har khet Raga nallah to Raga rijo agril field at Jigi vill 1 12.00 5.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
174 Daporijo MOA&FW Har khet Sikam koro to Sikupu at Yitor 1 5.00 12.00 1 5.00 circle level.
Block ko Pani
(Sigen
II)
175 Daporijo MOA&FW Har khet Su-koro to nikom rijo at Niji vill. 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
176 Daporijo MOA&FW Har khet Tabagi koro to Yasa rijo at Linko 1 4.00 6.00 1 4.00 Circle Level
Block ko Pani
(Sigen
II)

407 | P a g e
177 Daporijo MOA&FW Har khet Perekoro to Sidikrijo at Niji vil 1 7.00 7.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
178 Daporijo MOA&FW Har khet Murko koro to Ru-ayor at Ligu vill 1 6.00 7.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
179 Daporijo MOA&FW Har khet Pipe irrigation form Shi river to Chakjarijo at Niji 1 20.00 10.00 2 20.00 MLA (Raga ST)
Block ko Pani vill.
(Sigen
II)
180 Daporijo MOA&FW Har khet Sigen nallah to Ram rijo agril field at Jigi vill 1 9.00 9.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Sigen
II)
181 Daporijo MOA&FW Har khet Ru koro to Tacho rijo at Khatrijo vill 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
182 Daporijo MOA&FW Har khet Yob nallah to Takka rijo at Niji 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
183 Daporijo MOA&FW Har khet Ro koro to Kathrijo at kathrijo vill 1 5.00 7.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
184 Daporijo MOA&FW Har khet Buru koro to Daga rijo at Sharijo vill 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Sigen
II)
185 Daporijo MOA&FW Har khet Paat nallah to padama rijo at Mite 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)

408 | P a g e
186 Daporijo MOA&FW Har khet Bona koro to Diglo rijo at Hankar 1 5.00 5.00 1 5.00 ZPM/ circle level.
Block ko Pani
(Sigen
II)
187 Daporijo MOA&FW Har khet Sigen river to :Lebe rijo at Yitor 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Sigen
II)
188 Daporijo MOA&FW Har khet Pher koro to Niji at Ade vill 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
189 Daporijo MOA&FW Har khet Tasar koro to Tasar rijo at Hangkar 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Sigen
II)
190 Daporijo MOA&FW Har khet Yob Nallah to Takka rijo at Niji-II 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Sigen
II)
191 Daporijo MOA&FW Har khet Per Koro To Per rijo At Ade 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
192 Daporijo MOA&FW Har khet Si koro to Sakja rijo at Niji-I 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Sigen
II)
193 Daporijo MOA&FW Har khet Ru koro to tacho rijo at Khatrijo vill 1 5.00 5.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)
194 Daporijo MOA&FW Har khet Sigen river to serbo rijo at Pobo vill 1 5.00 3.00 1 5.00 ZPM
Block ko Pani
(Sigen
II)

409 | P a g e
195 Daporijo MOA&FW Har khet Rukoro to Pudamko rijo at Linko 1 3.00 8.00 1 3.00 circle level
Block ko Pani
(Sigen
II)
196 Daporijo MOA&FW Har khet Rach Nallah To Mur Rijo at Jigi Vill 1 9.00 8.00 1 9.00 circle level.
Block ko Pani
(Sigen
II)
197 Daporijo MOA&FW Har khet Shaa rijo to mirattak at Jigi 1 10.00 3.00 1 10.00 circle level.
Block ko Pani
(Sigen
II)
198 Daporijo MOA&FW Har khet Dado Nallah to nare muri at Jigi 1 7.00 5.00 1 7.00 circle level.
Block ko Pani
(Sigen
II)
199 Daporijo MOA&FW Har khet Kampo Rijo MIP at Jigi 1 5.00 3.00 1 5.00 circle level.
Block ko Pani
(Sigen
II)
200 Daporijo MOA&FW Har khet Bomker rijo to Bomjen rijo at Higi Nichi of Jigi 1 4.00 5.00 1 4.00 circle level.
Block ko Pani vill.
(Sigen
II)
201 Daporijo MOA&FW Har khet Kamya koro to Tami rijo at Jigi village 1 4.00 7.00 1 4.00 circle level.
Block ko Pani
(Sigen
II)
202 Daporijo MOA&FW Har khet Shey river Hegi nemchi at Jigi village 1 15.00 15.00 2 15.00 circle level.
Block ko Pani
(Sigen
II)
203 Daporijo MOA&FW Har khet Sigen river to Kamya rijo at Jigi 1 8.00 130.00 1 8.00 circle level.
Block ko Pani
(Sigen
II)

410 | P a g e
204 Daporijo MOA&FW Har khet Rich koro to Muir attak at Tanya Pada at Jigi 1 15.00 10.00 2 15.00 circle level.
Block ko Pani
(Sigen
II)
205 Daporijo MOA&FW Har khet Sha nallah to Yadok rijo at Jigi 1 15.00 8.00 2 15.00 circle level.
Block ko Pani
(Sigen
II)
206 Daporijo MOA&FW Har khet Sika nallah to Rah sinik at Jigi vill. 1 20.00 12.00 2 20.00 circle level.
Block ko Pani
(Sigen
II)
207 Daporijo MOA&FW Har khet Nibla Nallah to Nare Muri at Jigi 1 15.00 15.00 2 15.00 circle level.
Block ko Pani
(Sigen
II)
208 Daporijo MOA&FW Har khet Sima nallah to Raga attak at Jigi 1 10.00 10.00 1 10.00 circle level.
Block ko Pani
(Sigen
II)
209 Daporijo MOA&FW Har khet She nallah to Aso rijo at Jigi 1 10.00 12.00 1 10.00 circle level.
Block ko Pani
(Sigen
II)
210 Daporijo MOA&FW Har khet Suin koro to Lipa Rijo at Pobo vill 1 6.00 3.00 1 6.00 circle level.
Block ko Pani
(Sigen
II)
211 Daporijo MOA&FW Har khet Sen koro to Taw rijo at Pobo vill 1 5.00 8.00 1 5.00 circle level.
Block ko Pani
(Sigen
II)
212 Daporijo MOA&FW Har khet Sigen koro to Dagarijo at Pobo vill 1 4.00 140.00 1 4.00 circle level.
Block ko Pani
(Sigen
II)

411 | P a g e
213 Daporijo MOA&FW Har khet Suk Bokpen to Kunurijo at Pokpurijo at Mite 1 20.00 30.00 2 20.00 circle level.
Block ko Pani
(Sigen
II)
214 Daporijo MOA&FW Har khet Suk river to Pakpu ayor at Pokpurijo at Mite 1 15.00 30.00 1 15.00 circle level.
Block ko Pani
(Sigen
II)
215 Daporijo MOA&FW Har khet Lipu koro to Lipurijo at Mite 1 20.00 30.00 2 20.00 circle level.
Block ko Pani
(Sigen
II)
216 Daporijo MOA&FW Har khet Padma koro to Pdadma rijo at Mite 1 20.00 25.00 2 20.00 circle level.
Block ko Pani
(Sigen
II)
217 Daporijo MOA&FW Har khet Sey koro to Bonarijo at Hangkar 1 8.00 14.00 1 8.00 circle level.
Block ko Pani
(Sigen
II)
218 Daporijo MOA&FW Har khet Sey Koro to Burrijo at Hangkar 1 15.00 12.00 2 15.00 circle level.
Block ko Pani
(Sigen
II)
219 Daporijo MOA&FW Har khet Tagu koro to Rigumrijo at Hangkar 1 7.00 10.00 1 7.00 circle level.
Block ko Pani
(Sigen
II)
220 Daporijo MOA&FW Har khet Hesh koro to Bonarijo at Hangkar 1 6.00 16.00 1 6.00 circle level.
Block ko Pani
(Sigen
II)
221 Daporijo MOA&FW Har khet Siga koro to Siga Bokpen at Hangkar 1 2.00 13.00 1 2.00 circle level.
Block ko Pani
(Sigen
II)

412 | P a g e
222 Daporijo MOA&FW Har khet Siga koro to Tawanamchi at Hangkar 1 2.00 12.00 1 2.00 circle level.
Block ko Pani
(Sigen
II)
223 Daporijo MOA&FW Har khet Titik koro to Rijarijo at Hangkar 1 3.00 10.00 1 3.00 circle level.
Block ko Pani
(Sigen
II)
224 Daporijo MOA&FW Har khet Tagu koro to Tagium rijo at Hangkar 1 7.00 12.00 1 7.00 circle level.
Block ko Pani
(Sigen
II)
225 Daporijo MOA&FW Har khet Sey koro to Burbukdum at Hangkar 1 5.00 12.00 1 5.00 circle level.
Block ko Pani
(Sigen
II)
226 Daporijo MOA&FW Har khet Sey koro to Bonarijo at Rija 1 6.00 13.00 1 6.00 circle level.
Block ko Pani
(Sigen
II)
227 Daporijo MOA&FW Har khet Tagu koro to Tagemrijo at Rija 1 7.00 10.00 1 7.00 circle level.
Block ko Pani
(Sigen
II)
228 Daporijo MOA&FW Har khet Tab koro to Solorijo at Yitor 1 3.00 8.00 1 3.00 circle level.
Block ko Pani
(Sigen
II)
229 Daporijo MOA&FW Har khet Perkoro to Perrijo at Niji vill 1 10.00 15.00 1 10.00 circle Level.
Block ko Pani
(Sigen
II)
230 Daporijo MOA&FW Har khet Ru koro to Siroko rijo at Ligu 1 5.00 8.00 1 5.00 Circle level.
Block ko Pani
(Sigen
II)

413 | P a g e
231 Daporijo MOA&FW Har khet Kadumko to Murkorijo at Ligu 1 7.00 12.00 1 7.00 Circle level.
Block ko Pani
(Sigen
II)
232 Daporijo MOA&FW Har khet Takek koro to Pikarrijo at Ligu 1 15.00 10.00 2 15.00 Circle level.
Block ko Pani
(Sigen
II)
233 Daporijo MOA&FW Har khet Taka Bokse to takka Bakpen at Ligu 1 6.00 9.00 1 6.00 Circle level.
Block ko Pani
(Sigen
II)
234 Daporijo MOA&FW Har khet Kipo koro to Pikarrijo at Ligu 1 10.00 12.00 1 10.00 Circle level.
Block ko Pani
(Sigen
II)
235 Daporijo MOA&FW Har khet Segun Koro To Segum Rijo At Liruk 1 2.00 6.00 1 2.00 Circle Level
Block ko Pani
(Sigen
II)
236 Daporijo MOA&FW Har khet Tir koro to Dilidi rijo at Liruk 1 8.00 10.00 1 8.00 Circle Level
Block ko Pani
(Sigen
II)
237 Daporijo MOA&FW Har khet Taka Koro To Rukpe Rijo At Mite 1 8.00 8.00 1 8.00
Block ko Pani
(Sigen
II)
238 Daporijo MOA&FW Har khet Lipuk Koro To Taba rijo At Mite 1 6.00 6.00 1 6.00
Block ko Pani
(Sigen
II)
239 Daporijo MOA&FW Har khet Rech nallah to Merrijo and Yaniasila area at 1 9.00 6.00 1 9.00
Block ko Pani Bomikoto
(Sigen
II)

414 | P a g e
240 Daporijo MOA&FW Har khet Hech koro to Boyum rijo at Hangkar. 1 7.00 12.00 1 7.00
Block ko Pani
(Sigen
II)
241 Daporijo MOA&FW Har khet Titik koro to Bokdum Buri at Hangkar. 1 6.00 10.00 1 6.00
Block ko Pani
(Sigen
II)
242 Daporijo MOA&FW Har khet Sigen River to Solo rijo at Yitor 1 6.00 5.00 1 6.00
Block ko Pani
(Sigen
II)
243 Daporijo MOA&FW Har khet Sila koro to Lidu Rijo at Yitor 1 6.00 5.00 1 6.00
Block ko Pani
(Sigen
II)
244 Daporijo MOA&FW Har khet Ru-koro to Tasar retak at Niji vill. 1 5.00 5.00 1 5.00
Block ko Pani
(Sigen
II)
245 Daporijo MOA&FW Har khet Sigen koro to Torrijo a/field at Khatrijo vil 1 4.00 5.00 1 4.00
Block ko Pani
(Sigen
II)
246 Daporijo MOA&FW Har khet Tabagi koro to Lomga Riktak at Ligu 1 4.00 6.00 1 4.00
Block ko Pani
(Sigen
II)
247 Daporijo MOA&FW Har khet Kas koro to jomnia at Ligu 1 4.00 2.00 1 4.00
Block ko Pani
(Sigen
II)
248 Daporijo MOA&FW Har khet Sigum Koro to Nyare Retak at Ligu 1 5.00 4.00 1 5.00
Block ko Pani
(Sigen
II)

415 | P a g e
249 Daporijo MOA&FW Har khet Riu koro To Tama Rijo At Ligu 1 6.00 6.00 1 6.00
Block ko Pani
(Sigen
II)
250 Daporijo MOA&FW Har khet Pikar Ritak MIP at Ligu 1 8.00 5.00 1 8.00
Block ko Pani
(Sigen
II)
251 Daporijo MOA&FW Har khet Ruk Koro To Lomar Rijo At Ligu 1 9.00 9.00 1 9.00
Block ko Pani
(Sigen
II)
252 Daporijo MOA&FW Har khet Ro koro to Tasar litak at Ligu 1 5.00 6.00 1 5.00
Block ko Pani
(Sigen
II)
253 Daporijo MOA&FW Har khet Kipo koro to Jumnia rijo at Ligu vill 1 10.00 3.00 1 10.00
Block ko Pani
(Sigen
II)
254 Daporijo MOA&FW Har khet Teer Koro to Sigum Riktuk at Liruk 1 12.00 9.00 2 12.00
Block ko Pani
(Sigen
II)
255 Daporijo MOA&FW Har khet Yuli koro to Kampu Nori at Liruk 1 8.00 11.00 1 8.00
Block ko Pani
(Sigen
II)
256 Daporijo MOA&FW Har khet Sigen Koro To cho-Tri Ritak At Liruk 1 6.00 5.00 1 6.00
Block ko Pani
(Sigen
II)
257 Daporijo MOA&FW Har khet Teer koro to Dilidi Rejo at Liruk vill. 1 10.00 9.00 1 10.00
Block ko Pani
(Sigen
II)

416 | P a g e
258 Daporijo MOA&FW Har khet Sigen koro to Tor Rijo At Katrijo Vill 1 4.00 5.00 1 4.00
Block ko Pani
(Sigen
II)
259 Daporijo MOA&FW Har khet Tapar Nallah To Rath Rijo At Ruchek Dibu Vill 1 6.00 5.00 1 6.00
Block ko Pani
(Sigen
II)
259 2454.00 2454.00

1 Daporijo MOA&FW Har Khet Sik koro to Tumpe rijo(Tamen rijo)at Lily Dong 1 60.00 10.00 3 60.00 MLA (Raga ST) (Jal Gram)
Block ko Pani
(Gapen
Circle)

2 Daporijo MOA&FW Har Khet Kach Koro to Kach rijo at Lily Dong 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
3 Daporijo MOA&FW Har Khet Rich koro to Mhid Putu Ayor at Liver Don 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
4 Daporijo MOA&FW Har Khet Sik Koro to Dambom Rijo at Mona 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
5 Daporijo MOA&FW Har Khet Chamyo Koro to Chamyo rijo at Gigi 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
6 Daporijo MOA&FW Har Khet Rem Koro to Tachoya ayor at Baja 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

417 | P a g e
7 Daporijo MOA&FW Har Khet Minimat Koro to Katu rijo at Gepen 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
8 Daporijo MOA&FW Har Khet Dora koro to Duyi rijo at Babla vill 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
9 Daporijo MOA&FW Har Khet Silen koro to Tashi rijo at Dek Dakpe 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
10 Daporijo MOA&FW Har Khet Lamar koro to lamar rijo at Nguri 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
11 Daporijo MOA&FW Har Khet Tam koro to Tamrijo at Babla vill 1 3.00 3.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
12 Daporijo MOA&FW Har Khet Dumli Koro to Diyu ayor at Gepen 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
13 Daporijo MOA&FW Har Khet Sik koro to Kagrijo at Don 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
14 Daporijo MOA&FW Har Khet Sik koro to Bakdu rijo at Meg Dong 1 7.00 6.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

418 | P a g e
15 Daporijo MOA&FW Har Khet Sik Koro to Tek Sui at Mona 1 7.00 3.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
16 Daporijo MOA&FW Har Khet Pil koro to Menluk rijo at Meg- Dong 1 12.00 6.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
17 Daporijo MOA&FW Har Khet Sik Koro to Riche Mori at Gigi 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
18 Daporijo MOA&FW Har Khet Gana Koro to Gana rijo at Baja 1 9.00 5.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
19 Daporijo MOA&FW Har Khet Gich Koro to Gich rijo at Dek Dakpe vill 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
20 Daporijo MOA&FW Har Khet Rem River to Rem rijo at Nguri 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
21 Daporijo MOA&FW Har Khet Roch koro to Sikko at Kach rijo at Lily Dong 1 12.00 7.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
22 Daporijo MOA&FW Har Khet Murka koro to Sataririjo at Dipu Dakpe vill 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

419 | P a g e
23 Daporijo MOA&FW Har Khet Get Koro to Bolo Mori at gepen 1 3.00 3.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
24 Daporijo MOA&FW Har Khet Rup Nallah to Giko rijo at Baja 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
25 Daporijo MOA&FW Har Khet Jariya koro to Jariya rijo at Mona 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
26 Daporijo MOA&FW Har Khet Liver koro to Hayi Ayor at Liver Don 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
27 Daporijo MOA&FW Har Khet Nare koro to Tamio Gida at Meg Dong 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
28 Daporijo MOA&FW Har Khet Lilly-koro to Jomta rijo at Lilly- Dong 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
29 Daporijo MOA&FW Har Khet Siru koro to Jagorijo at Lily Dong 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
30 Daporijo MOA&FW Har Khet Nare koro to Nare rijo at Meg Dong 1 9.00 6.00 1 9.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

420 | P a g e
31 Daporijo MOA&FW Har Khet Jende koro to Soyak rijo at Don vill 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
32 Daporijo MOA&FW Har Khet Sik Nallah to Yen rijo at Mona 1 6.00 3.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
33 Daporijo MOA&FW Har Khet Sik koro to Ternuk rijo at Gigi 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
34 Daporijo MOA&FW Har Khet Rup Koro to Kusukko rijo at Baja 1 60.00 45.00 3 60.00 MLA/ (C/level)
Block ko Pani
(Gapen
Circle)
35 Daporijo MOA&FW Har Khet Aper Koro to Aper rijo at Gepen 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
36 Daporijo MOA&FW Har Khet Mamokoro to Tamorijo at Babla vill 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
37 Daporijo MOA&FW Har Khet Sodak koro to Taharipa ayor at Dak Dakpe 1 3.00 3.00 1 3.00 MLA/C. level
Block ko Pani
(Gapen
Circle)
38 Daporijo MOA&FW Har Khet Rem Koro to Ater rijo at Nguri 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

421 | P a g e
39 Daporijo MOA&FW Har Khet Met koro to Talo rijo l at Babla vill 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
40 Daporijo MOA&FW Har Khet Sik koro to Mat rijo at Lily Dong 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
41 Daporijo MOA&FW Har Khet Mali koro to Mali rijo at Meg Dong 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
42 Daporijo MOA&FW Har Khet Sik nallah to Yabom rijo at Derma Don 1 7.00 5.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
43 Daporijo MOA&FW Har Khet Kurko Nallah to Yikam rijo at Mona 1 12.00 6.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
44 Daporijo MOA&FW Har Khet Sik koro to Sudum Puchum at Gigi 1 14.00 7.00 2 14.00 MLA/ ZPM/ Circle level
Block ko Pani
(Gapen
Circle)
45 Daporijo MOA&FW Har Khet Rem koro to Nibarijo at Baja 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
46 Daporijo MOA&FW Har Khet Nipo Koro to Diyu at Gepen 1 2.00 3.00 1 2.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

422 | P a g e
47 Daporijo MOA&FW Har Khet Mamar koro to Mama rijo at Babla vill 1 4.00 4.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
48 Daporijo MOA&FW Har Khet Sikar koro to Sikenrijo at Dakpe 1 2.00 3.00 1 2.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
49 Daporijo MOA&FW Har Khet Tukmar koro to tukmar rijo at Nguri 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
50 Daporijo MOA&FW Har Khet Pul koro to kach Muri at Derma Don 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
51 Daporijo MOA&FW Har Khet Nare koro to Yaring rijo at Meg Dong 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
52 Daporijo MOA&FW Har Khet Sui koro to Tachi rijo at Lily Dong 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
53 Daporijo MOA&FW Har Khet Tato koro to Terporijo at Derma Don 1 9.00 8.00 1 9.00 MLA/Circle level.
Block ko Pani
(Gapen
Circle)
54 Daporijo MOA&FW Har Khet Sudum sui to Bokpen rijo at Meg Dong 1 14.00 8.00 2 14.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

423 | P a g e
55 Daporijo MOA&FW Har Khet Kach koro to Lambi rijo at Lily Dong 1 12.00 7.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
56 Daporijo MOA&FW Har Khet Sik Nallah to Gache rijo at Mona 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
57 Daporijo MOA&FW Har Khet Rem Nallah to Midi Dich dit at Baja 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
58 Daporijo MOA&FW Har Khet Pul Koro to Hji rijo at Liver Don 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
59 Daporijo MOA&FW Har Khet Gitu Koro to Menluk rijo at Meg- Dong 1 12.00 6.00 1 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
60 Daporijo MOA&FW Har Khet Gache Koro to Gache rijo at Mona 1 14.00 8.00 2 14.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
61 Daporijo MOA&FW Har Khet Ser Koro to Karto tomo rijo at Baja 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
62 Daporijo MOA&FW Har Khet Pil Koro to yaji rijo at Don 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

424 | P a g e
63 Daporijo MOA&FW Har Khet Sik koro to Aner rijo at Lily Dong 1 10.00 7.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
64 Daporijo MOA&FW Har Khet Sik koro to Bagdu rijo at Meg Dong 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
65 Daporijo MOA&FW Har Khet Sigum koro to Pamarijo at Don 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
66 Daporijo MOA&FW Har Khet Sik koro to Mot rijo at Lily Dong 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
67 Daporijo MOA&FW Har Khet Koch Nallah to Liyir rijo at Baja 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
68 Daporijo MOA&FW Har Khet Tarak Koro to Ter rijo at Nguri 1 7.00 5.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
69 Daporijo MOA&FW Har Khet Nipo Koro to Liri rijo at Gigi 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
70 Daporijo MOA&FW Har Khet Hatak Koro to Hatak Rijo at Gigi 1 7.00 4.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
71 Daporijo MOA&FW Har Khet Puikoro to Kusuk ko rijio at Baja 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

425 | P a g e
72 Daporijo MOA&FW Har Khet Putuko Nallah to Putuko rijo at Nguri 1 8.00 4.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
73 Daporijo MOA&FW Har Khet Sikh nallah to sikarijo at Dek Dakpe Vill 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
74 Daporijo MOA&FW Har Khet Tadik nallah toTadik Sukrijo at Dakpe vill 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
75 Daporijo MOA&FW Har Khet Remkoro to Rikurijo at Baja 1 5.00 4.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
76 Daporijo MOA&FW Har Khet Dulik koro to Diyu ayor at Gepen 1 2.00 3.00 1 2.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
77 Daporijo MOA&FW Har Khet Kath koro to Tak rijo at Lily Dong 1 11.00 7.00 2 11.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
78 Daporijo MOA&FW Har Khet Sigum koro to Sogumrijo at Don 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
79 Daporijo MOA&FW Har Khet Kath koro to Jomkar rijo at Lilly- Dong 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

426 | P a g e
80 Daporijo MOA&FW Har Khet Gumpenkoro to Jiporijo at Don 1 3.00 2.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
81 Daporijo MOA&FW Har Khet Sui koro to Pega rijo at Meg Dong 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
82 Daporijo MOA&FW Har Khet Sik nallah to Higi Lipik at Lily Dong 1 10.00 5.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
83 Daporijo MOA&FW Har Khet Kach Nallah to Paga rijo at Meg Dong 1 10.00 5.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
84 Daporijo MOA&FW Har Khet Sik koro to Siru rijo at Don vill 1 11.00 8.00 2 11.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
85 Daporijo MOA&FW Har Khet Jeni koro to Sha rijo at Mona 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
86 Daporijo MOA&FW Har Khet Sipa Nallah to Piri rijo at nguri 1 6.00 4.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
87 Daporijo MOA&FW Har Khet Tabla koro to Tila rijo at Pecha Nguri 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

427 | P a g e
88 Daporijo MOA&FW Har Khet Mech nallah to Mepin rijo at Pitak 1 8.00 6.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
89 Daporijo MOA&FW Har Khet Met Nallah to Sikamuri at Sika Babla 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
90 Daporijo MOA&FW Har Khet Tap koro to pur Rijo at Dakpe 1 5.00 5.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
91 Daporijo MOA&FW Har Khet Kach Koro to Kach rijo at Lily Dong 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
92 Daporijo MOA&FW Har Khet Kach koro to Kachrijo at LiliDong vill 1 12.00 8.00 2 12.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
93 Daporijo MOA&FW Har Khet Berak koro to Gami nemchi at Bodak vill 1 10.00 6.00 1 10.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
94 Daporijo MOA&FW Har Khet Hape koro to Hape rijo at Dai Muri vill 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
95 Daporijo MOA&FW Har Khet Tamaksu koro to Jamorijo at Temko 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

428 | P a g e
96 Daporijo MOA&FW Har Khet Remkoro to Kusukkorijo at Dai muri 1 3.00 3.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
97 Daporijo MOA&FW Har Khet Sudum Puchum to Bokpenrijo at Temko 1 6.00 5.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
98 Daporijo MOA&FW Har Khet Sigen koro to Suirijo at Dai Muri 1 6.00 8.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
99 Daporijo MOA&FW Har Khet Sile koro to Chpobarijo at Temko 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
100 Daporijo MOA&FW Har Khet Nipokoro to Liokorijo at Gapen vill 1 3.00 3.00 1 3.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
101 Daporijo MOA&FW Har Khet Nara koro to Bomorijo at Temko 1 5.00 3.00 1 5.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
102 Daporijo MOA&FW Har Khet Sha Nalla to Tamrijo agril field at Dakpe 1 6.00 12.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
103 Daporijo MOA&FW Har Khet Debi koro to Debi rijo at Mona 1 6.00 7.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
104 Daporijo MOA&FW Har Khet Ama koro to Ama rijo at Dai Muri vill 1 4.00 3.00 1 4.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)

429 | P a g e
105 Daporijo MOA&FW Har Khet Tab koro to Puri rijo at Dakpe 1 6.00 9.00 1 6.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
106 Daporijo MOA&FW Har Khet Yachi koo to Yachi rijo at Mona. 1 8.00 5.00 1 8.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
107 Daporijo MOA&FW Har Khet Tadik suk Nallah to Takurijo agril field at Dakpe 1 7.00 9.00 1 7.00 MLA (Raga ST)
Block ko Pani
(Gapen
Circle)
108 Daporijo MOA&FW Har Khet Buru nallah to Buru rijo near Don vill 1 5.00 4.00 1 5.00 Par . Sec
Block ko Pani
(Gapen
Circle)
109 Daporijo MOA&FW Har Khet Sik koro to Mirdamrijo at Lili dong vill 1 6.00 5.00 1 6.00 ZPM
Block ko Pani
(Gapen
Circle)
110 Daporijo MOA&FW Har Khet Gumcha Nallah to Kedrijo at Don 1 5.00 4.00 1 5.00 ZPM
Block ko Pani
(Gapen
Circle)
111 Daporijo MOA&FW Har Khet Sik koro to Tamo rijo at Tom Don Vill 1 5.00 4.00 1 5.00 ZPM
Block ko Pani
(Gapen
Circle)
112 Daporijo MOA&FW Har Khet Derma koro to Dermarijo at Derma Don 1 6.00 4.00 1 6.00 ZPM
Block ko Pani
(Gapen
Circle)

430 | P a g e
113 Daporijo MOA&FW Har Khet Raik Nallah to Tabe rijo at Meg Dong 1 8.00 6.00 1 8.00 ZPM
Block ko Pani
(Gapen
Circle)
114 Daporijo MOA&FW Har Khet Sik koro to Pasi rijo at Mona vill 1 6.00 4.00 1 6.00 ZPM
Block ko Pani
(Gapen
Circle)
115 Daporijo MOA&FW Har Khet Yabek koro to Taporijo at Nguri 1 5.00 10.00 1 5.00 ZPM
Block ko Pani
(Gapen
Circle)
116 Daporijo MOA&FW Har Khet Met Nallah to Sikarijo at Sika Babla 1 15.00 9.00 2 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
117 Daporijo MOA&FW Har Khet Rad Koro to Silu Muri at Sika Babla 1 8.00 6.00 1 8.00 Circle/Level
Block ko Pani
(Gapen
Circle)
118 Daporijo MOA&FW Har Khet Mech nallah to Mepin rijo at Babla 1 15.00 12.00 1 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
119 Daporijo MOA&FW Har Khet Sige nallah to Suirijo at Baja vill 1 25.00 12.00 2 25.00 Circle/Level
Block ko Pani
(Gapen
Circle)
120 Daporijo MOA&FW Har Khet Putuko to Sige rijo at Baja vill 1 3.00 4.00 1 3.00 Circle/Level
Block ko Pani
(Gapen
Circle)

431 | P a g e
121 Daporijo MOA&FW Har Khet Kurko Nallah to Tamorijo at Baja vill 1 10.00 8.00 1 10.00 Circle/Level
Block ko Pani
(Gapen
Circle)
122 Daporijo MOA&FW Har Khet Suk koro to Suk rijo at Baja vill 1 5.00 4.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
123 Daporijo MOA&FW Har Khet Sige nallah to Suirijo at Kamle Baja vill 1 20.00 10.00 2 20.00 Circle/Level
Block ko Pani
(Gapen
Circle)
124 Daporijo MOA&FW Har Khet Tadik suk Koro to Pitak rijo at Dakpe vill 1 4.00 4.00 1 4.00 Circle/Level
Block ko Pani
(Gapen
Circle)
125 Daporijo MOA&FW Har Khet Pigin koro to Pigirit at Dakpe vill 1 20.00 15.00 2 20.00 Circle/Level
Block ko Pani
(Gapen
Circle)
126 Daporijo MOA&FW Har Khet Gichi Nallah to Gitu at Dek Dakpe vill 1 15.00 10.00 2 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
127 Daporijo MOA&FW Har Khet Gitu Nallah to Gitu rijoat Dek Dakpe vill 1 5.00 4.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
128 Daporijo MOA&FW Har Khet Rich Nallah to Mid Ayor At Liver Don 1 6.00 5.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)

432 | P a g e
129 Daporijo MOA&FW Har Khet Pull Koro to Hari ayor at Don vill 1 15.00 12.00 2 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
130 Daporijo MOA&FW Har Khet Tato Koro to Tarfporijo at Derma Don 1 15.00 10.00 2 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
131 Daporijo MOA&FW Har Khet Sik nallah to Sik rijo at Hayi Don 1 10.00 8.00 1 10.00 Circle/Level
Block ko Pani
(Gapen
Circle)
132 Daporijo MOA&FW Har Khet Pull Nallah to Liver Ayor at Hayi Don 1 15.00 10.00 2 15.00 Circle/Level
Block ko Pani
(Gapen
Circle)
133 Daporijo MOA&FW Har Khet Bur Koro to Pama rijo at Hayi Don 1 5.00 4.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
134 Daporijo MOA&FW Har Khet Kach koro to Gumlam rijo at Lily Dong 1 10.00 9.00 1 10.00
Block ko Pani
(Gapen
Circle)
135 Daporijo MOA&FW Har Khet Sik koro to LilliDong at Lilly Dong 1 50.00 20.00 3 50.00 Circle/Level
Block ko Pani
(Gapen
Circle)
136 Daporijo MOA&FW Har Khet Sik nallah to Tomrijo at LillyDong 1 25.00 12.00 3 25.00 Circle/Level
Block ko Pani
(Gapen
Circle)

433 | P a g e
137 Daporijo MOA&FW Har Khet SikKoro to Higi Lipik at Lilly Dong 1 5.00 6.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
138 Daporijo MOA&FW Har Khet Raik koro to Meg Dong at Meg Dong 1 6.00 5.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)
139 Daporijo MOA&FW Har Khet Sik Nallah to Kamdarijo at Mona 1 8.00 6.00 1 8.00 Circle/Level
Block ko Pani
(Gapen
Circle)
140 Daporijo MOA&FW Har Khet Sik koro to Sikrijo at Mona village 1 6.00 7.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)
141 Daporijo MOA&FW Har Khet Paga koro to Dip rijoat Mona vill 1 8.00 5.00 1 8.00 Circle/Level
Block ko Pani
(Gapen
Circle)
142 Daporijo MOA&FW Har Khet Gach koro to Gach rijo at Mona Baja vill 1 6.00 4.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)
143 Daporijo MOA&FW Har Khet Kach koro to Sidumpuchum at Gigi 1 10.00 6.00 1 10.00 Circle/Level
Block ko Pani
(Gapen
Circle)
144 Daporijo MOA&FW Har Khet Sik koro to Siko at Sikko at Gigi 1 6.00 4.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)
145 Daporijo MOA&FW Har Khet Church koro to Eterijo at Nguri vill 1 4.00 8.00 1 4.00 Circle/Level
Block ko Pani

434 | P a g e
(Gapen
Circle)
146 Daporijo MOA&FW Har Khet Rem koro to Putukorijo at Nguri vill 1 3.00 8.00 1 3.00 Circle/Level
Block ko Pani
(Gapen
Circle)
147 Daporijo MOA&FW Har Khet Rem koro to mona Rijo at Nguri 1 5.00 9.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
148 Daporijo MOA&FW Har Khet Sipa koro to Dumli ayor at Nguri 1 6.00 10.00 1 6.00 Circle/Level
Block ko Pani
(Gapen
Circle)
149 Daporijo MOA&FW Har Khet Putuko Nallah to Ramarijo at Nguri 1 5.00 10.00 1 5.00 Circle/Level
Block ko Pani
(Gapen
Circle)
150 Daporijo MOA&FW Har Khet Puil koro to Puil rijo at Geterijo 1 3.00 5.00 1 3.00 Circle/Level
Block ko Pani
(Gapen
Circle)
151 Daporijo MOA&FW Har Khet Pull koro to Giturijo at Geterijo vill 1 50.00 30.00 3 50.00 Circle/Level
Block ko Pani
(Gapen
Circle)
152 Daporijo MOA&FW Har Khet Bach koroto Koposirijo at Babla vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
153 Daporijo MOA&FW Har Khet Tapikoro to Tapirijo at Babla vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)

435 | P a g e
154 Daporijo MOA&FW Har Khet Cha koro to Mekar rijo at Babla vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
155 Daporijo MOA&FW Har Khet Dakpokoro to Dakporijo at Babla vill 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
156 Daporijo MOA&FW Har Khet Suk koro to Tukarijo at Babla vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
157 Daporijo MOA&FW Har Khet Maji koro to Matporo rijo at Babla vill 1 4.00 2.00 1 4.00
Block ko Pani
(Gapen
Circle)
158 Daporijo MOA&FW Har Khet Mech nallah to Tarpob at Babla 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
159 Daporijo MOA&FW Har Khet Met koro to Mepenrijo at Babla 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
160 Daporijo MOA&FW Har Khet Mechkoro to Sulurijo at Babla 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
161 Daporijo MOA&FW Har Khet Rade koro to Tukar ayor at Babla 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)

436 | P a g e
162 Daporijo MOA&FW Har Khet Silu koro to Tadursijo at Babla 1 4.00 4.00 1 4.00
Block ko Pani
(Gapen
Circle)
163 Daporijo MOA&FW Har Khet Rade Nallah to Sulorijo at Babla 1 3.00 4.00 1 3.00
Block ko Pani
(Gapen
Circle)
164 Daporijo MOA&FW Har Khet Gana nallah to Tali Tapurijo at Baja vill. 1 6.00 6.00 1 6.00
Block ko Pani
(Gapen
Circle)
165 Daporijo MOA&FW Har Khet Rem Nallah to Midi dich dit at Baja 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
166 Daporijo MOA&FW Har Khet Rup koro to Kurdrijo at Baja 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)
167 Daporijo MOA&FW Har Khet Rem koro to Tacjaya ayor at Baja 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
168 Daporijo MOA&FW Har Khet Sherkoro to kurto (tomo) rijo at Baja 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
169 Daporijo MOA&FW Har Khet Sik Nallah to Kusukrijo at Baja 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)

437 | P a g e
170 Daporijo MOA&FW Har Khet Koch nallah to Liyirrijo at Baja 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
171 Daporijo MOA&FW Har Khet Rup koro to Nibarijo at Baja vill 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
172 Daporijo MOA&FW Har Khet Remkoro to Rikurijo at Baja vill 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
173 Daporijo MOA&FW Har Khet Puiko to Kusukorijo at Baja vill 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)
174 Daporijo MOA&FW Har Khet Lurko Nallah to Tamorijo at Baja vill 1 10.00 3.00 1 10.00
Block ko Pani
(Gapen
Circle)
175 Daporijo MOA&FW Har Khet Babla koro to Ojirijo at Baja vill 1 20.00 3.00 2 20.00
Block ko Pani
(Gapen
Circle)
176 Daporijo MOA&FW Har Khet Se nallah to Duyigi ayor at Baja vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
177 Daporijo MOA&FW Har Khet Meli koro to Maja rija rijo at Kamle Baja Vill 1 18.00 9.00 2 18.00
Block ko Pani
(Gapen
Circle)

438 | P a g e
178 Daporijo MOA&FW Har Khet Puyinallah to Duigirijo at Kamle Baja vill 1 10.00 6.00 1 10.00
Block ko Pani
(Gapen
Circle)
179 Daporijo MOA&FW Har Khet Mech koro to Moibarijo at Kamle Baja vill 1 12.00 7.00 2 12.00
Block ko Pani
(Gapen
Circle)
180 Daporijo MOA&FW Har Khet Sha nallah to Tamar rijo Dakpe 1 6.00 6.00 1 6.00
Block ko Pani
(Gapen
Circle)
181 Daporijo MOA&FW Har Khet Tadik Suk nallah to Taku Rijo at Dakpe 1 4.00 5.00 1 4.00
Block ko Pani
(Gapen
Circle)
182 Daporijo MOA&FW Har Khet Sha nallah to Tamar rijo at Dakpe 1 6.00 6.00 1 6.00
Block ko Pani
(Gapen
Circle)
183 Daporijo MOA&FW Har Khet Tadik Suk nallah to Taku Rijo at Dakpe 1 4.00 5.00 1 4.00
Block ko Pani
(Gapen
Circle)
184 Daporijo MOA&FW Har Khet Sodak koro to Taaripa Dipu Dakpe 1 15.00 10.00 2 15.00
Block ko Pani
(Gapen
Circle)
185 Daporijo MOA&FW Har Khet Gero koro to Matparo rijo at Dakpe vill 1 8.00 5.00 1 8.00
Block ko Pani
(Gapen
Circle)

439 | P a g e
186 Daporijo MOA&FW Har Khet Tadik suk nallah to Sukrijo at Dakpe vill 1 9.00 6.00 1 9.00
Block ko Pani
(Gapen
Circle)
187 Daporijo MOA&FW Har Khet Slik koro to sharijo at Dakpe 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
188 Daporijo MOA&FW Har Khet Sha koro to sharijo at Dakpe 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)
189 Daporijo MOA&FW Har Khet Sha koro to Dipu at Dakpe 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
190 Daporijo MOA&FW Har Khet Sha koro to cuyi rijo at Dakpe 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
191 Daporijo MOA&FW Har Khet Sepa koro to Jepe rijo at Dakpe 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
192 Daporijo MOA&FW Har Khet Midi Nalla to Midi rijo at Dakpe 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
193 Daporijo MOA&FW Har Khet Daid koro to Daidrijo at Dakpe village 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)

440 | P a g e
194 Daporijo MOA&FW Har Khet Machnala toM aterijo at Dakpe 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
195 Daporijo MOA&FW Har Khet Suk koro to Malrijo at Dakpe vill 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
196 Daporijo MOA&FW Har Khet Sukh nallah to Diparijo at Dek Dakpe 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)
197 Daporijo MOA&FW Har Khet Libar koro to Giterijo at Dakpe 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
198 Daporijo MOA&FW Har Khet Tor koro to Tor rijo at Dakpe vill 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)
199 Daporijo MOA&FW Har Khet Tadiksuk koro to Tamarijo at Dakpe vill 1 6.00 3.00 1 6.00
Block ko Pani
(Gapen
Circle)
200 Daporijo MOA&FW Har Khet Huich nallah to pache at Tape 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)
201 Daporijo MOA&FW Har Khet Puel koro to Derma to Heji at Don 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)

441 | P a g e
202 Daporijo MOA&FW Har Khet sugimkoro to Papa ayor at Don 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)
203 Daporijo MOA&FW Har Khet Seyam koro to Maltera rijo at Don vill 1 6.00 4.00 1 6.00
Block ko Pani
(Gapen
Circle)
204 Daporijo MOA&FW Har Khet Mirpuya koro to Matpela rijo at Don vill 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
205 Daporijo MOA&FW Har Khet Sikkoro to Yagomrijo at Don vill 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
206 Daporijo MOA&FW Har Khet Pil koro toKoch Muri Ayor at Don vill 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
207 Daporijo MOA&FW Har Khet Sik koro to Tomrijo at Don vill 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)
208 Daporijo MOA&FW Har Khet Sinik nallah toSiningrijo at Don vill 1 6.00 9.00 1 6.00
Block ko Pani
(Gapen
Circle)
209 Daporijo MOA&FW Har Khet Si koro to Tapek rijo at Lipa at Don Vill 1 5.00 11.00 1 5.00
Block ko Pani
(Gapen
Circle)

442 | P a g e
210 Daporijo MOA&FW Har Khet Tatokoro to Tarporijo at Derma Don vill 1 9.00 8.00 1 9.00
Block ko Pani
(Gapen
Circle)
211 Daporijo MOA&FW Har Khet Puel koro to Kache muri at Derma Don 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
212 Daporijo MOA&FW Har Khet Sik Nallah to Yagomrijo at Darma Don 1 7.00 5.00 1 7.00
Block ko Pani
(Gapen
Circle)
213 Daporijo MOA&FW Har Khet Liver koro to Hayi ayor at Liver Don vll 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
214 Daporijo MOA&FW Har Khet Gumpenkoro to Jepo ayor at Liver Don vill 1 7.00 7.00 1 7.00
Block ko Pani
(Gapen
Circle)
215 Daporijo MOA&FW Har Khet Sik koro to Siri rijo at Heyi Don vill 1 11.00 8.00 2 11.00
Block ko Pani
(Gapen
Circle)
216 Daporijo MOA&FW Har Khet Richmuri to Tagoko at Tom dong 1 4.00 4.00 1 4.00
Block ko Pani
(Gapen
Circle)
217 Daporijo MOA&FW Har Khet Lajam koro to Lajam rijo at Tomdong Vill 1 3.00 3.00 1 3.00
Block ko Pani
(Gapen
Circle)

443 | P a g e
218 Daporijo MOA&FW Har Khet Lamere Koro to Lamarerijo at LiliDong vill 1 12.00 7.00 2 12.00
Block ko Pani
(Gapen
Circle)
219 Daporijo MOA&FW Har Khet Slu koro to Tachi rijo at LiliDong 1 12.00 6.00 2 12.00
Block ko Pani
(Gapen
Circle)
220 Daporijo MOA&FW Har Khet Tasar Koro to Tasar rijo at Lilidong 1 11.00 7.00 2 11.00
Block ko Pani
(Gapen
Circle)
221 Daporijo MOA&FW Har Khet Sirukoro to Tupirijo at Lilidong 1 10.00 6.00 1 10.00
Block ko Pani
(Gapen
Circle)
222 Daporijo MOA&FW Har Khet Roch koro to Sikiko at kachrijo at Lilidong 1 12.00 7.00 2 12.00
Block ko Pani
(Gapen
Circle)
223 Daporijo MOA&FW Har Khet Maken koro to Makenrijo at Meg Dong vill 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
224 Daporijo MOA&FW Har Khet Sik koro to Bakdurijo at Meg Dong 1 7.00 6.00 1 7.00
Block ko Pani
(Gapen
Circle)
225 Daporijo MOA&FW Har Khet Yami koro to Yami rijo at Meg Dong 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)

444 | P a g e
226 Daporijo MOA&FW Har Khet Mirdam Koro to Mirdam rijo at Meg Dong vill 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
227 Daporijo MOA&FW Har Khet Sik koro to Bagdurijo at Meg Dong 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
228 Daporijo MOA&FW Har Khet Sudusui koro to Bokpenrijo at Meg Dong 1 7.00 4.00 1 7.00
Block ko Pani
(Gapen
Circle)
229 Daporijo MOA&FW Har Khet Tugli koro to Pegarijo at Meg Dong 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
230 Daporijo MOA&FW Har Khet Sik koro to Pegarijo at Meg Dong vill 1 7.00 6.00 1 7.00
Block ko Pani
(Gapen
Circle)
231 Daporijo MOA&FW Har Khet Kat nallah to paga rijo at MegDong 1 10.00 5.00 1 10.00
Block ko Pani
(Gapen
Circle)
232 Daporijo MOA&FW Har Khet Tad koro to Tadrijo at Lipu vill 1 12.00 8.00 2 12.00
Block ko Pani
(Gapen
Circle)
233 Daporijo MOA&FW Har Khet Yadamli pik koro to Tamikrijo at Lipu vill 1 2.00 2.00 1 2.00
Block ko Pani
(Gapen
Circle)

445 | P a g e
234 Daporijo MOA&FW Har Khet Sigen koro to suirijo at Daimuri 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
235 Daporijo MOA&FW Har Khet Swaknallah to Gudinpurijo at Rit Baja 1 12.00 8.00 2 12.00
Block ko Pani
(Gapen
Circle)
236 Daporijo MOA&FW Har Khet Gita koro to Samarijo at Tape vill 1 5.00 4.00 1 5.00
Block ko Pani
(Gapen
Circle)
237 Daporijo MOA&FW Har Khet Yimdi koro to Yimdirijo at Mona 1 10.00 5.00 1 10.00
Block ko Pani
(Gapen
Circle)
238 Daporijo MOA&FW Har Khet Tem koro to Temrijo at Mona vill 1 5.00 6.00 1 5.00
Block ko Pani
(Gapen
Circle)
239 Daporijo MOA&FW Har Khet Sik Nallah to Dibrijo at Mona 1 10.00 6.00 1 10.00
Block ko Pani
(Gapen
Circle)
240 Daporijo MOA&FW Har Khet Sik koro to Teksuhi at Mona vill 1 12.00 7.00 1 12.00
Block ko Pani
(Gapen
Circle)
241 Daporijo MOA&FW Har Khet Pipe Irrigation from Sik koro to Temko rijo at 1 40.00 14.00 3 40.00
Block ko Pani Mona vill
(Gapen
Circle)

446 | P a g e
242 Daporijo MOA&FW Har Khet Sik koro to Sikrijo at Mona vill 1 15.00 10.00 2 15.00
Block ko Pani
(Gapen
Circle)
243 Daporijo MOA&FW Har Khet Neltaro koro to Nelyorgerijo at Mona vill 1 6.00 3.00 1 6.00
Block ko Pani
(Gapen
Circle)
244 Daporijo MOA&FW Har Khet Limi koro to Torpokorijo at Mona 1 6.00 4.00 1 6.00
Block ko Pani
(Gapen
Circle)
245 Daporijo MOA&FW Har Khet Yekechikoro to Yakterijo at Mona 1 7.00 3.00 1 7.00
Block ko Pani
(Gapen
Circle)
246 Daporijo MOA&FW Har Khet Dodo koro to Daririjo at Mona 1 8.00 3.00 1 8.00
Block ko Pani
(Gapen
Circle)
247 Daporijo MOA&FW Har Khet Jenekoro to Sharijo at Mona 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
248 Daporijo MOA&FW Har Khet Sik Nallah to Kebjitakenrijo at Mona 1 6.00 2.00 1 6.00
Block ko Pani
(Gapen
Circle)
249 Daporijo MOA&FW Har Khet Geye stream to Geterrijo, Geyamarijo, Simrum
Block ko Pani paya, Niktamoh, Sorapaya and Muriya Pomlem
1 150.00 50.00 3 150.00
(Gapen WRC field at Mona vill.
Circle)

447 | P a g e
250 Daporijo MOA&FW Har Khet Sik koro to Kamlarijo at Mona vill 1 20.00 12.00 2 20.00
Block ko Pani
(Gapen
Circle)
251 Daporijo MOA&FW Har Khet Mirko koro to Leririjo at Mona vill 1 20.00 10.00 2 20.00
Block ko Pani
(Gapen
Circle)
252 Daporijo MOA&FW Har Khet Sik Nallah to Karkurijo at Mona vill 1 20.00 10.00 2 20.00
Block ko Pani
(Gapen
Circle)
253 Daporijo MOA&FW Har Khet Lojar nallah to Tajarijo at Mona Baja vill 1 14.00 8.00 2 14.00
Block ko Pani
(Gapen
Circle)
254 Daporijo MOA&FW Har Khet Kurko to Yikkamrijo at Mona Baja vill 1 9.00 6.00 1 9.00
Block ko Pani
(Gapen
Circle)
255 Daporijo MOA&FW Har Khet Sit koro to Lojar rijo at Mona Baja vill 1 8.00 5.00 1 8.00
Block ko Pani
(Gapen
Circle)
256 Daporijo MOA&FW Har Khet Jariya koro to Jariyarijo at Mona Baja vill 1 9.00 6.00 1 9.00
Block ko Pani
(Gapen
Circle)
257 Daporijo MOA&FW Har Khet Tadi koro to Madirijo at Mona Baja vill 1 8.00 5.00 1 8.00
Block ko Pani
(Gapen
Circle)

448 | P a g e
258 Daporijo MOA&FW Har Khet Nelpaya koro to Somti rijo at Mona Baja vill 1 10.00 6.00 1 10.00
Block ko Pani
(Gapen
Circle)
259 Daporijo MOA&FW Har Khet Murkokoro to Rijumrijo at Mona Baja vill 1 8.00 5.00 1 8.00
Block ko Pani
(Gapen
Circle)
260 Daporijo MOA&FW Har Khet Mirko koro to Leririjo at Mona Don vill 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)
261 Daporijo MOA&FW Har Khet Deyom koro to Deyum rijo at Nguri 1 8.00 9.00 1 8.00
Block ko Pani
(Gapen
Circle)
262 Daporijo MOA&FW Har Khet Rem Nallah to Maradrijo at Nguri 1 10.00 10.00 1 10.00
Block ko Pani
(Gapen
Circle)
263 Daporijo MOA&FW Har Khet Rem Nalla to Tam Rijo at Nguri 1 6.00 10.00 1 6.00
Block ko Pani
(Gapen
Circle)
264 Daporijo MOA&FW Har Khet Bokoro to Gichirite at Nguri 1 7.00 5.00 1 7.00
Block ko Pani
(Gapen
Circle)
265 Daporijo MOA&FW Har Khet Nyipo Koro to Yelirijo at Nguri 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)

449 | P a g e
266 Daporijo MOA&FW Har Khet Tapo to Yebekrijo at Nguri 1 5.00 3.00 1 5.00
Block ko Pani
(Gapen
Circle)
267 Daporijo MOA&FW Har Khet Yapi koro to Tairijo at Nguri 1 6.00 4.00 1 6.00
Block ko Pani
(Gapen
Circle)
268 Daporijo MOA&FW Har Khet Sepa koro to Dudirijo at Nguri 1 6.00 4.00 1 6.00
Block ko Pani
(Gapen
Circle)
269 Daporijo MOA&FW Har Khet Siber koro to Pillarijo at Nguri 1 6.00 8.00 1 6.00
Block ko Pani
(Gapen
Circle)
270 Daporijo MOA&FW Har Khet Met koro to Tumperijo at Babla 1 4.00 3.00 1 4.00
Block ko Pani
(Gapen
Circle)
271 Daporijo MOA&FW Har Khet Sik koro to Siru Tapakrijo at Geterijo vill 1 30.00 16.00 3 30.00
Block ko Pani
(Gapen
Circle)
272 Daporijo MOA&FW Har Khet Yam koro to kuku rijo at Geterijo 1 5.00 5.00 1 5.00
Block ko Pani
(Gapen
Circle)
273 Daporijo MOA&FW Har Khet Puill koro to tajar ayor at Geterijo 1 6.00 6.00 1 6.00
Block ko Pani
(Gapen
Circle)

450 | P a g e
274 Daporijo MOA&FW Har Khet Yaj koro to tali rijo at Geterijo 1 5.00 7.00 1 5.00
Block ko Pani
(Gapen
Circle)
275 Daporijo MOA&FW Har Khet Puill koro to Taler ayor at Geterijo 1 6.00 6.00 1 6.00
Block ko Pani
(Gapen
Circle)
276 Daporijo MOA&FW Har Khet Yej koro to Gepu-Ayer at Geterijo vill 1 8.00 6.00 1 8.00
Block ko Pani
(Gapen
Circle)
277 Daporijo MOA&FW Har Khet Kach koro to ekke pato at Keda 1 6.00 5.00 1 6.00
Block ko Pani
(Gapen
Circle)

CAD NEW
SCHEMES
Sl.No. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated cost Remarks
the Ministry / Number area / area implementation in Lakhs
District/ Department Irrigation (Sq.Km.) (year)
Block (ha)

1 Puchigeko MOA&FW Har Khet ko Suk koro to Ramrijo at Angolomdak 1 10 6 1 10.00 MLA
Block Pani
2 Puchigeko MOA&FW Har Khet ko Sibe koro to Tairijo at Balakmuri 1 30 3 1 30.00 MLA
Block Pani
3 Puchigeko MOA&FW Har Khet ko Sibe koro to Taniarijo at Balakmuri 1 6 4 1 6.00 MLA
Block Pani
4 Puchigeko MOA&FW Har Khet ko Ngoka Koro toTapakrijo at Bopi 1 12 7 2 12.00 MLA
Block Pani
5 Puchigeko MOA&FW Har Khet ko Omle koro to Gitumuri at Bopi 1 10 6 1 10.00 MLA
Block Pani

451 | P a g e
6 Puchigeko MOA&FW Har Khet ko Beak nallah to Bodorijo a/field at Gami vill 1 10 6 1 10.00 MLA
Block Pani
7 Puchigeko MOA&FW Har Khet ko Gayak koro to Boarijo at Gami vill 1 10 7 1 10.00 MLA
Block Pani
8 Puchigeko MOA&FW Har Khet ko Tichi koro to Toich litrijo at Gichi lomdak 1 10 6 1 10.00 MLA
Block Pani
9 Puchigeko MOA&FW Har Khet ko Titti koro to Pobu rijo at Gichi Lomdak vill 1 12 7 2 12.00 MLA
Block Pani
10 Puchigeko MOA&FW Har Khet ko Titik koro to Putuko rijo at Gich Potu. 1 7 5 1 7.00 MLA
Block Pani
11 Puchigeko MOA&FW Har Khet ko Suk river to Sukrijo at Laa 1 14 6 2 14.00 MLA
Block Pani
12 Puchigeko MOA&FW Har Khet ko Selege to Reechrijo at Laa 1 10 6 1 10.00 MLA
Block Pani
13 Puchigeko MOA&FW Har Khet ko Hankoro to Tigli Paglet at Pidi laa vill 1 8 9 1 8.00 MLA
Block Pani
14 Puchigeko MOA&FW Har Khet ko Moyakoro to Moyarijo at Mugli 1 8 6 1 8.00 MLA(C/level)
Block Pani
15 Puchigeko MOA&FW Har Khet ko Timakoro to Pitak rijo at Mugli 1 6 3 1 6.00 MLA
Block Pani
16 Puchigeko MOA&FW Har Khet ko Amperkoro to Asmperrijo at Yongi Mugli 1 6 4 1 6.00 MLA
Block Pani
17 Puchigeko MOA&FW Har Khet ko Rey koro to Meme agarrijo at Muri 1 9 6 1 9.00 MLA
Block Pani
18 Puchigeko MOA&FW Har Khet ko Garak koro to Nika Nimsi at Muri 1 8 6 1 8.00 MLA/
Block Pani (C/level)
19 Puchigeko MOA&FW Har Khet ko Yorge koro to Himpom rijo at Nika Muri vill 1 17 12 2 17.00 MLA
Block Pani
20 Puchigeko MOA&FW Har Khet ko Ge river to Siletech rijo at Nika Muri Vill 1 15 10 2 15.00 MLA/
Block Pani (C/level)
21 Puchigeko MOA&FW Har Khet ko Sit koro to Mimme yagarrijo at Lol Muri 1 12 6 2 12.00 MLA
Block Pani
22 Puchigeko MOA&FW Har Khet ko Tigirkoro to Sumorijo at Pega Lomdak 1 6 5 1 6.00 MLA
Block Pani

452 | P a g e
23 Puchigeko MOA&FW Har Khet ko Sum nallah to Riyirijo at Pega Lomdak vill 1 5 4 1 5.00 MLA
Block Pani
24 Puchigeko MOA&FW Har Khet ko Sim river to Koch rijo at Pega kotu vill 1 9 8 1 9.00 MLA
Block Pani
25 Puchigeko MOA&FW Har Khet ko Techakkoro to Putrijo at Puchigeko 1 7 5 1 7.00 MLA
Block Pani
26 Puchigeko MOA&FW Har Khet ko Kalegikoro to Nigma area at Puchigeko 1 8 6 1 8.00 MLA/
Block Pani (C/level)
27 Puchigeko MOA&FW Har Khet ko Suksim river to Yalerijo at Sikipatu vill 1 14 7 2 14.00 MLA
Block Pani
28 Puchigeko MOA&FW Har Khet ko Tab nallah to Bokpalitak at Sikipotu vill 1 12 6 2 12.00 MLA
Block Pani
29 Puchigeko MOA&FW Har Khet ko Suk River to sipopochok at Tidirgi vill 1 5 5 1 5.00 MLA
Block Pani
30 Puchigeko MOA&FW Har Khet ko Kach koro to Ekkipato agrifield at Keda 1 5 4 1 5.00 MLA
Block Pani
31 Puchigeko MOA&FW Har Khet ko Sibe Nallah to Siberijo at Balak muri vill 1 10 6 1 10.00 MLA
Block Pani
32 Puchigeko MOA&FW Har Khet ko Tab Nallah to Gipenrijo at Balakmuri 1 6 4 1 6.00 MLA
Block Pani
33 Puchigeko MOA&FW Har Khet ko Suk river toTapaso agril field at Bopi 1 8 6 1 8.00 MLA
Block Pani
34 Puchigeko MOA&FW Har Khet ko Berak Koro to Badakrijo at Gami vill 1 12 6 2 12.00 MLA/
Block Pani (C/level)
35 Puchigeko MOA&FW Har Khet ko Berak koro to Yetor at Gami vill. 1 10 6 1 10.00 MLA
Block Pani
36 Puchigeko MOA&FW Har Khet ko Tatik koro toDukrijo agril field at Gichi Lomdak 1 14 8 2 14.00 MLA
Block Pani
37 Puchigeko MOA&FW Har Khet ko Kock koro to tich litak at Gichi lomdak 1 12 7 2 12.00 MLA
Block Pani
38 Puchigeko MOA&FW Har Khet ko Sukh koro to Dsukhrijo at Laa 1 12 7 2 12.00 MLA
Block Pani
39 Puchigeko MOA&FW Har Khet ko Kach koro to Ekki Patu at Mugli vill 1 4 2 1 4.00 MLA
Block Pani

453 | P a g e
40 Puchigeko MOA&FW Har Khet ko Sibe koro to Richrijo at Mugli 1 9 7 1 9.00 MLA
Block Pani
41 Puchigeko MOA&FW Har Khet ko Midik koro to Komarijo at Muri 1 7 5 1 7.00 MLA
Block Pani
42 Puchigeko MOA&FW Har Khet ko Nigenkoro to Kalakrijo at Muri 1 6 4 1 6.00 MLA
Block Pani
43 Puchigeko MOA&FW Har Khet ko Suk river toTapasorijo agril field at Pega Lomdak vill 1 12 10 2 12.00 MLA/
Block Pani (C/level)
44 Puchigeko MOA&FW Har Khet ko Chipak koro to Talrijo at Pega Lomdak 1 9 6 1 9.00 MLA
Block Pani
45 Puchigeko MOA&FW Har Khet ko Tab nallah to Gokpa litak at Sikipotu vill 1 10 8 1 10.00 MLA
Block Pani
46 Puchigeko MOA&FW Har Khet ko Tab nallah to Maromrijo at Sikipotu vill 1 16 8 2 16.00 MLA
Block Pani
47 Puchigeko MOA&FW Har Khet ko Kolagi to Ro- Nigme at Puchigeko 1 6 4 1 6.00 MLA
Block Pani
48 Puchigeko MOA&FW Har Khet ko Puchi koro to Tage Rijo At Puchigeko 1 5 5 1 5.00 MLA/ZPM
Block Pani
49 Puchigeko MOA&FW Har Khet ko Tap Koro to Bgiperrijo at Balakmuri 1 5 3 1 5.00 MLA
Block Pani
50 Puchigeko MOA&FW Har Khet ko Gip Koro to Gigi rijo at Balakmuri 1 6 4 1 6.00 MLA
Block Pani
51 Puchigeko MOA&FW Har Khet ko Sim river to Tayalrijo at Pega Lomdak vill 1 8 6 1 8.00 MLA
Block Pani
52 Puchigeko MOA&FW Har Khet ko Suk River to lirum Agri field At Tidirgi Vill 1 5 5 1 5.00 MLA
Block Pani
53 Puchigeko MOA&FW Har Khet ko Sibe river to Nona at Gami vill 1 10 6 1 10.00 MLA
Block Pani
54 Puchigeko MOA&FW Har Khet ko Gayak koro to Taken at Gami vill 1 12 8 2 12.00 MLA
Block Pani
55 Puchigeko MOA&FW Har Khet ko Koch koro to Kutu rijo at Gichi Lomdak 1 6 5 1 6.00 MLA
Block Pani
56 Puchigeko MOA&FW Har Khet ko Tadakoro to Tadarijo at Mugli 1 8 6 1 8.00 MLA(C/level)
Block Pani

454 | P a g e
57 Puchigeko MOA&FW Har Khet ko Gamkoro to Put atak at Mugli 1 6 5 1 6.00 MLA
Block Pani
58 Puchigeko MOA&FW Har Khet ko Timakoro to Ekki patu at Mugli 1 8 6 1 8.00 MLA
Block Pani
59 Puchigeko MOA&FW Har Khet ko Sit koro to Mimeyegerrijo at Muri 1 4 2 1 4.00 MLA/
Block Pani (C/level)
60 Puchigeko MOA&FW Har Khet ko Purukoro to Richrijo at Muri 1 8 5 1 8.00 MLA
Block Pani
61 Puchigeko MOA&FW Har Khet ko Sim nallah to Rikchirijo at Pega lomdak 1 8 5 1 8.00 MLA/
Block Pani (C/level)
62 Puchigeko MOA&FW Har Khet ko Kock koro to Kochrijo at Pegalomdak 1 7 5 1 7.00 MLA
Block Pani
63 Puchigeko MOA&FW Har Khet ko Ngoi nallah to Moramrijo at Sikipotu vill 1 10 6 1 10.00 MLA
Block Pani
64 Puchigeko MOA&FW Har Khet ko Libakoro to Liba rijo at Balakmuri 1 4 3 1 4.00 MLA
Block Pani
65 Puchigeko MOA&FW Har Khet ko Sibe Nallah to siberijo via Kayokoro at Gami 1 4 8 1 4.00 MLA
Block Pani
66 Puchigeko MOA&FW Har Khet ko Yarge Koro to Yarge atak at Mugli 1 7 5 1 7.00 MLA
Block Pani
67 Puchigeko MOA&FW Har Khet ko Pitak koro to Lala lasa at Mugli vill 1 5 8 1 5.00 MLA
Block Pani
68 Puchigeko MOA&FW Har Khet ko Sit Koro to Noke Nemchi at Muri 1 5 3 1 5.00 MLA
Block Pani
69 Puchigeko MOA&FW Har Khet ko Kolagi stream to Nablak rijo at Puchigeko 1 4 6 1 4.00 MLA/ZPM
Block Pani
70 Puchigeko MOA&FW Har Khet ko Sibe river to Gayrijo at Gami vill 1 12 7 2 12.00 MLA
Block Pani
71 Puchigeko MOA&FW Har Khet ko Nyapu koro to Yaminrijo at Mugli 1 4 9 1 4.00 MLA
Block Pani
72 Puchigeko MOA&FW Har Khet ko Yaro Nallah to Nalo rijo at Mugli 1 3 8 1 3.00 MLA
Block Pani
73 Puchigeko MOA&FW Har Khet ko Nyalo Nalla to Nyalo rijo at Mugli 1 4 6 1 4.00 MLA
Block Pani

455 | P a g e
74 Puchigeko MOA&FW Har Khet ko Nyalo Nallah to Tamakrijo at Mugli vill 1 6 6 1 6.00 MLA
Block Pani
75 Puchigeko MOA&FW Har Khet ko Digbak koro to Digbakrijo at Muri village 1 4 2 1 4.00 MLA
Block Pani
76 Puchigeko MOA&FW Har Khet ko Sit koro to Higi Ningo at Muri village 1 5 3 1 5.00 MLA
Block Pani
77 Puchigeko MOA&FW Har Khet ko Sit koro to Ninamo at Muri vill 1 25 3 3 25.00 MLA/
Block Pani (C/level)
78 Puchigeko MOA&FW Har Khet ko Pisik temkoro to Nyaburijo at Mugli 1 5 8 1 5.00 ZPM
Block Pani
79 Puchigeko MOA&FW Har Khet ko Sim koro to Malar tarik rijo at Gichi Lomdak 1 4 7 1 4.00 ZPM
Block Pani
80 Puchigeko MOA&FW Har Khet ko Sim koro to Nyalarijo at Gichi Lomdak 1 14 8 2 14.00 ZPM
Block Pani
81 Puchigeko MOA&FW Har Khet ko Gay koro to Yumrijo at Gami vill 1 4 6 1 4.00 ZPM
Block Pani
82 Puchigeko MOA&FW Har Khet ko Gay koro to Hagekayo rijo at Gami 1 5 8 1 5.00 ZPM
Block Pani
83 Puchigeko MOA&FW Har Khet ko Sibi Koro To Machu at Balakmuri 1 6 3 1 6.00 ZPM
Block Pani
84 Puchigeko MOA&FW Har Khet ko Pakba koro to Ngethmuri at Bopi vill 1 6 6 1 6.00 GPM
Block Pani
85 Puchigeko MOA&FW Har Khet ko Sukh koro to Tomrijo at Laa vill 1 4 8 1 4.00 ZPM
Block Pani
86 Puchigeko MOA&FW Har Khet ko Henkoro to Tore rijo at Laa vill 1 3 9 1 3.00 ZPM
Block Pani
87 Puchigeko MOA&FW Har Khet ko Yumdi koro to Makenrijo at Laa 1 5 7 1 5.00 ZPM
Block Pani
88 Puchigeko MOA&FW Har Khet ko Suk koro to Aniakrijo at Laa 1 3 6 1 3.00 ZPM
Block Pani
89 Puchigeko MOA&FW Har Khet ko Suk River to sipopochok at Ango Lomak 1 5 4 1 5.00 C/level
Block Pani
90 Puchigeko MOA&FW Har Khet ko Lirumkoro to Sipopachep at Ango lomdak vill 1 7 3 1 7.00 C/level
Block Pani

456 | P a g e
91 Puchigeko MOA&FW Har Khet ko Tumle Koro to Tumle rijo at Balakmuri 1 6 3 1 6.00 (C/level)
Block Pani
92 Puchigeko MOA&FW Har Khet ko Bugri koro to Pagarijo at Balakmuri 1 8 4 1 8.00 C/Level.)
Block Pani
93 Puchigeko MOA&FW Har Khet ko Tap Koro to Rekpe rijo at Balakmuri 1 6 3 1 6.00 C/level
Block Pani
94 Puchigeko MOA&FW Har Khet ko Suk Koro to Suk Rijo at Bopi Vill 1 5 4 1 5.00 C/level
Block Pani
95 Puchigeko MOA&FW Har Khet ko Titti koro To Echi Black at Gichi Lomdak 1 6 6 1 6.00 C/level
Block Pani
96 Puchigeko MOA&FW Har Khet ko Koch Koro to Sili Rijo at Gichi Lomdak 1 5 6 1 5.00 C/level
Block Pani
97 Puchigeko MOA&FW Har Khet ko Titik koro to Pubu Rijo at Gich Potu 1 6 5 1 6.00 C/level
Block Pani
98 Puchigeko MOA&FW Har Khet ko Hen kor to Hen Rijo at Laa vill 1 5 4 1 5.00 C/level
Block Pani
99 Puchigeko MOA&FW Har Khet ko Kulagi to Kulagi Rijo at Laa Vill 1 4 3 1 4.00 C/level
Block Pani
100 Puchigeko MOA&FW Har Khet ko Koj Koro to Eki at Mugli vill 1 4 6 1 4.00 C/level
Block Pani
101 Puchigeko MOA&FW Har Khet ko Sonyo Koro to Sonyorijo at mugli 1 5 4 1 5.00 C/level
Block Pani
102 Puchigeko MOA&FW Har Khet ko Rich Nallah to Richrit at Lut Mugli vill 1 15 6 2 15.00 C/level
Block Pani
103 Puchigeko MOA&FW Har Khet ko Sige nallah to Richrit at Lut Mugli vill 1 20 5 2 20.00 C/level
Block Pani
104 Puchigeko MOA&FW Har Khet ko Boa Koro to Boarijo at lut mugli 1 3 4 1 3.00 C/level
Block Pani
105 Puchigeko MOA&FW Har Khet ko Kachakat koro to Pui rijo at Pega Lomdak 1 5 6 1 5.00 C/level
Block Pani
106 Puchigeko MOA&FW Har Khet ko Rob koro to Sukrijo at Ango lomdak 1 7 5 1 7.00
Block Pani
107 Puchigeko MOA&FW Har Khet ko Suk river to Moramrijo at Ango lomdak 1 7 4 1 7.00
Block Pani

457 | P a g e
108 Puchigeko MOA&FW Har Khet ko Suk river to Kolakrijo at Ango lomdak vill 1 6 3 1 6.00
Block Pani
109 Puchigeko MOA&FW Har Khet ko Suk river to Haglenrijo at Ango lomdak vill 1 12 7 2 12.00
Block Pani
110 Puchigeko MOA&FW Har Khet ko Suk river to Bogduliutu at Ango lomdak vill 1 10 5 1 10.00
Block Pani
111 Puchigeko MOA&FW Har Khet ko Rakepin koro to Page rijo at Balakmuri vill 1 8 5 1 8.00
Block Pani
112 Puchigeko MOA&FW Har Khet ko Titik koro to Silirijo at Gichi Lomdak 1 5 8 1 5.00
Block Pani
113 Puchigeko MOA&FW Har Khet ko Tati koro to Putukorijo at Gichi Lomdak 1 6 5 1 6.00
Block Pani
114 Puchigeko MOA&FW Har Khet ko Suk Koro To Namrak Rijo At Pidi Laa Vill 1 8 9 1 8.00
Block Pani
115 Puchigeko MOA&FW Har Khet ko Sit Koro Bage Rijo at Muri 1 6 4 1 6.00
Block Pani
116 Puchigeko MOA&FW Har Khet ko Ge river to Kolokrijo at Nika Muri Vill 1 20 15 2 20.00
Block Pani
117 Puchigeko MOA&FW Har Khet ko Tigri koro to Sumorijo at Pega Lomdak 1 6 4 1 6.00
Block Pani
118 Puchigeko MOA&FW Har Khet ko Suk river to Rablerijo at Pega Lomdak 1 6 4 1 6.00
Block Pani
119 Puchigeko MOA&FW Har Khet ko Tali koro to Simrijo at Pega Lomdak 1 4 5 1 4.00
Block Pani
120 Puchigeko MOA&FW Har Khet ko Nimchi koro to Rajrijo at Pega Lomdak 1 4 7 1 4.00
Block Pani
121 Puchigeko MOA&FW Har Khet ko Rupa koro to Didrijo at Pega Lomdak 1 4 6 1 4.00
Block Pani
122 Puchigeko MOA&FW Har Khet ko Kat nallah to Nehru rijo (Sim rijo) at Pega Lomdak 1 3 8 1 3.00
Block Pani
123 Puchigeko MOA&FW Har Khet ko Koch koro to Pui rijo at Pega Lomdak 1 8 6 1 8.00
Block Pani
124 Puchigeko MOA&FW Har Khet ko Sim river to Rebokrijo at Pega Lomdak vill 1 7 5 1 7.00
Block Pani

458 | P a g e
125 Puchigeko MOA&FW Har Khet ko Silum koro to Giterijo at Pega Lomdak vill 1 7 4 1 7.00
Block Pani
126 Puchigeko MOA&FW Har Khet ko Heche koro to Sukrijo at Pega Lomdak 1 8 8 1 8.00
Block Pani
127 Puchigeko MOA&FW Har Khet ko Suk river to Ngoilerijo at Pega lomdak 1 6 6 1 6.00
Block Pani
128 Puchigeko MOA&FW Har Khet ko Tail koro to Simrijo at Pegalomdak. 1 4 5 1 4.00
Block Pani
129 Puchigeko MOA&FW Har Khet ko Suk river to Sonyi rijo at pegaKoto vill 1 7 6 1 7.00
Block Pani
130 Puchigeko MOA&FW Har Khet ko Tai koro to Tapaso rijo at Pega Koto vill 1 7 5 1 7.00
Block Pani
131 Puchigeko MOA&FW Har Khet ko Kath koro to Kathrijo at Pega Koto vill 1 8 4 1 8.00
Block Pani
132 Puchigeko MOA&FW Har Khet ko Tel koro to Deed Namchi at Pega Koto vill 1 6 8 1 6.00
Block Pani
133 Puchigeko MOA&FW Har Khet ko Sim river to Bukpenrijo at Pegakoto vill 1 7 7 1 7.00
Block Pani
134 Puchigeko MOA&FW Har Khet ko Jesaputu at Puchigeko 1 4 5 1 4.00
Block Pani
135 Puchigeko MOA&FW Har Khet ko Giyi koro to tayen puru at Puchigeko 1 4 5 1 4.00
Block Pani
136 Puchigeko MOA&FW Har Khet ko Suk Nallah to Tijir Rijo at Sikipotu 1 5 5 1 5.00
Block Pani
137 Puchigeko MOA&FW Har Khet ko Barak koro to Bami Namchi at Bodak vill 1 10 6 1 10.00
Block Pani
138 Puchigeko MOA&FW Har Khet ko Ngoi nallah to Marom rijo at Sikipatu vill 1 12 9 2 12.00
Block Pani
139 Puchigeko MOA&FW Har Khet ko Mech Nala to Mipenrijo at Pitak vill 1 8 6 1 8.00
Block Pani
140 Puchigeko MOA&FW Har Khet ko Suk river to Matrijo at TakeK Bate 1 7 4 1 7.00
Block Pani

459 | P a g e
CAD NEW SCHEMES
Sl.N Name of the Concerne Compone Activity (CAD for C/O MIP from) Total Comma Catchme Period of Estimate Remarks
o. District/ Block d Ministry nt Numb nd area / nt area implementati d cost in
/ er Irrigation (Sq.Km.) on (year) Lakhs
Departme (ha)
nt
1 U/Subansiri/Dumpo MOA&FW Har Khet Sha koro to Moro Gee, Lodam, 1 120.00 52.00 3 120.00 MLA
rijo ko Pani Batak Ripa, Reet Muri, Hivindee,
Yakrak & Gimp Ripa at Old Richi

2 U/Subansiri/Dumpo MOA&FW Har Khet Jesir/jebkoro to Jisir rijo at Pomte 1 14.00 15.00 2 14.00 MLA
rijo ko Pani Bage
3 U/Subansiri/Dumpo MOA&FW Har Khet Pinru to Jaa rijo at Dere vill (Beyak). 1 4.00 6.00 1 4.00 MLA
rijo ko Pani
4 U/Subansiri/Dumpo MOA&FW Har Khet Si Koro to Dulirijo at Nguki 1 25.00 16.00 3 25.00 MLA
rijo ko Pani

5 U/Subansiri/Dumpo MOA&FW Har Khet Jelak koro to Jidik rijo at Pomte 1 6.00 15.00 1 6.00 MLA
rijo ko Pani Bage.
6 U/Subansiri/Dumpo MOA&FW Har Khet Masi koro to Pebrijo at New Hali. 1 4.00 8.00 1 4.00 MLA
rijo ko Pani

7 U/Subansiri/Dumpo MOA&FW Har Khet Jeet koro to Tugu rijo at Paksok. 1 4.00 7.00 1 4.00 MLA
rijo ko Pani

8 U/Subansiri/Dumpo MOA&FW Har Khet Dere koro to Dererijo at Beyak 1 5.00 24.00 1 5.00 MLA
rijo ko Pani
9 U/Subansiri/Dumpo MOA&FW Har Khet Lile koro to Jinbe rijo at Old Hane. 1 4.00 12.00 1 4.00 MLA
rijo ko Pani

10 U/Subansiri/Dumpo MOA&FW Har Khet Biam koro to Mokam rijo at Gite 1 4.00 8.00 1 4.00 MLA
rijo ko Pani Bage.
11 U/Subansiri/Dumpo MOA&FW Har Khet Rilum koro to Rite Bomdi at Param. 1 5.00 7.00 1 5.00 MLA
rijo ko Pani

460 | P a g e
12 U/Subansiri/Dumpo MOA&FW Har Khet Kamju koro to Denri rijo at Denri 1 5.00 13.00 1 5.00 MLA
rijo ko Pani Nguki
13 U/Subansiri/Dumpo MOA&FW Har Khet Jipin koro to Lirum rijo at Dere Nalo. 1 5.00 10.00 1 5.00 MLA
rijo ko Pani

14 U/Subansiri/Dumpo MOA&FW Har Khet Jinyar koro to Beli rijo at Aya Nirin. 1 10.00 14.00 1 10.00 MLA
rijo ko Pani
15 U/Subansiri/Dumpo MOA&FW Har Khet Pint koro to Pikrijo at Aki Nirin. 1 5.00 50.00 1 5.00 MLA
rijo ko Pani
16 U/Subansiri/Dumpo MOA&FW Har Khet Pinte koro to Eka rijo at Aki Nirin. 1 3.00 42.00 1 3.00 MLA
rijo ko Pani
17 U/Subansiri/Dumpo MOA&FW Har Khet Tunur koro to Angopu, Tunur kopen, 1 150 39.00 3 150.00 MLA
rijo ko Pani Dloe rijo, Yulkuri, Bumdi rijo, Gayan
rijo, Lipu, Yugi & Liba at New Richi

18 U/Subansiri/Dumpo MOA&FW Har Khet Tikli-Tikdo koro to Tokomebir rijo at 1 3.00 6.00 1 3.00 MLA
rijo ko Pani Jirpu.
19 U/Subansiri/Dumpo MOA&FW Har Khet Gir koro to Buru rijo at New Hane. 1 3.00 5.00 1 3.00 MLA
rijo ko Pani

20 U/Subansiri/Dumpo MOA&FW Har Khet Jaa koro to Jaarijo at Paksok. 1 3.00 6.00 1 3.00 MLA
rijo ko Pani

21 U/Subansiri/Dumpo MOA&FW Har Khet Jeek koro to Kiri rijo at Paja. 1 3.00 7.00 1 3.00 MLA
rijo ko Pani

22 U/Subansiri/Dumpo MOA&FW Har Khet Roh koro to Biker rijo at Mindi 1 7.00 37.00 1 7.00 MLA
rijo ko Pani

23 U/Subansiri/Dumpo MOA&FW Har Khet Jaa Koro to Bogbarijo at Yaipu. 1 6.00 17.00 1 6.00 MLA
rijo ko Pani

24 U/Subansiri/Dumpo MOA&FW Har Khet Jebe Koro to Kamurijo at Aranalo 1 5.00 16.00 1 5.00 MLA
rijo ko Pani

461 | P a g e
25 U/Subansiri/Dumpo MOA&FW Har Khet Risi koro to Tajumkopen at Mindi 1 3.00 12.00 1 3.00 MLA
rijo ko Pani

26 U/Subansiri/Dumpo MOA&FW Har Khet Rooh koro to Here rijo at Japorilo. 1 5.00 35.00 1 5.00 MLA
rijo ko Pani

27 U/Subansiri/Dumpo MOA&FW Har Khet Turu Koro to Taktir Muri & Rade rijo 1 45.00 46.00 3 45.00 MLA
rijo ko Pani at Paka
28 U/Subansiri/Dumpo MOA&FW Har Khet Ami koro to Leb rijo at New Riba 1 6.00 12.00 1 6.00 MLA
rijo ko Pani

29 U/Subansiri/Dumpo MOA&FW Har Khet Tur koro to Diligi rijo at Paka. 1 14.50 40.00 2 14.50 MLA
rijo ko Pani

30 U/Subansiri/Dumpo MOA&FW Har Khet Kote koro to Gian rijo at New Riba. 1 5.00 7.00 1 5.00 MLA
rijo ko Pani

31 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Sikinrijo at Bui. 1 5.00 200.00 1 5.00 MLA
rijo ko Pani
32 U/Subansiri/Dumpo MOA&FW Har Khet Dek koro to Hame Ruktum Ripa at 1 4.00 7.00 1 4.00 MLA
rijo ko Pani Bui.
33 U/Subansiri/Dumpo MOA&FW Har Khet Rie koro to Tagu rijo at Bulo. 1 3.00 8.00 1 3.00 MLA
rijo ko Pani
34 U/Subansiri/Dumpo MOA&FW Har Khet Sa koro to Sa rijo at Uli. 1 6.00 52.00 1 6.00 MLA
rijo ko Pani

35 U/Subansiri/Dumpo MOA&FW Har Khet Roh koro to Raririjo via Giamukhrijo 1 20.00 48.00 3 20.00 MLA
rijo ko Pani at Rari and Giamukh rijo
36 U/Subansiri/Dumpo MOA&FW Har Khet Puru koro to Rasik rijo at Bulo. 1 5.00 7.00 1 5.00 MLA
rijo ko Pani
37 U/Subansiri/Dumpo MOA&FW Har Khet Situ koro to Hego ledo at Uli 1 7.00 15.00 1 7.00 MLA
rijo ko Pani

38 U/Subansiri/Dumpo MOA&FW Har Khet CC lining from Racho Jile (Sinyum 1 10.00 281.00 1 10.00 MLA
rijo ko Pani Koro) to Pesekrijo at Dera Nalo

462 | P a g e
39 U/Subansiri/Dumpo MOA&FW Har Khet Jah koro to Kerter rijo at Digbak 1 4.00 164.00 1 4.00 MLA
rijo ko Pani

40 U/Subansiri/Dumpo MOA&FW Har Khet Jir koro to Ginirijo at New Rilo 1 20.00 15.00 2 20.00 MLA
rijo ko Pani

41 U/Subansiri/Dumpo MOA&FW Har Khet Rou koro to Bupu rijo at Japorilo 1 7.00 41.00 1 7.00 MLA
rijo ko Pani

42 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Ruplik rijo at Nasi. 1 3.50 12.00 1 3.50 MLA
rijo ko Pani

43 U/Subansiri/Dumpo MOA&FW Har Khet Kumarso koro to Kumarso rijo at 1 3.00 6.00 1 3.00 MLA
rijo ko Pani Nasi.
44 U/Subansiri/Dumpo MOA&FW Har Khet Koddum koro to Gote rijo at Bulo 1 4.00 9.00 1 4.00 MLA
rijo ko Pani
45 U/Subansiri/Dumpo MOA&FW Har Khet Roo koro to Bugdurijo & Uchirijo at 1 40.00 27.00 3 40.00 MLA
rijo ko Pani Dera
46 U/Subansiri/Dumpo MOA&FW Har Khet Roo Koro to Dedarijo at Dera. 1 20.00 29.00 2 20.00 MLA
rijo ko Pani

47 U/Subansiri/Dumpo MOA&FW Har Khet Roo koro to Yadak rijo at Dera. 1 10.00 30.00 1 10.00 MLA
rijo ko Pani

48 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Bairijo at Gusar. 1 10.00 47.00 1 10.00 MLA
rijo ko Pani

49 U/Subansiri/Dumpo MOA&FW Har Khet Payir koro Bijarijo att Jijrarilo 1 12.00 17.00 2 12.00 MLA
rijo ko Pani

50 U/Subansiri/Dumpo MOA&FW Har Khet Jaa koro to bogba rijo at Jirpu Nalo 1 7.00 10.00 1 7.00 MLA
rijo ko Pani

51 U/Subansiri/Dumpo MOA&FW Har Khet Tabum koro to Osar rijo at Nasi 1 9.00 11.00 1 9.00 MLA
rijo ko Pani

52 U/Subansiri/Dumpo MOA&FW Har Khet Junur koro to Gasirijo at New Richi 1 14 30.00 2 14.00 MLA
rijo ko Pani

463 | P a g e
53 U/Subansiri/Dumpo MOA&FW Har Khet Taka koro to Ampe Riktak at New 1 4 30.00 1 4.00 MLA
rijo ko Pani Richi
54 U/Subansiri/Dumpo MOA&FW Har Khet Taka Koro to Bumdirijo at Old Richi 1 10.00 17.00 1 10.00 MLA
rijo ko Pani

55 U/Subansiri/Dumpo MOA&FW Har Khet Yoo koro to Bokam rijo at Nidak 1 7.00 14.00 1 7.00 MLA
rijo ko Pani

56 U/Subansiri/Dumpo MOA&FW Har Khet Lebi koro to Buglinrijo at Nipu 1 5.00 16.00 1 5.00 MLA
rijo ko Pani

57 U/Subansiri/Dumpo MOA&FW Har Khet Takir Muri from Yar koro to Tab koro 1 10.00 15.00 1 10.00 MLA
rijo ko Pani at Pakarijo
58 U/Subansiri/Dumpo MOA&FW Har Khet Tur koro to Maram rijo at Paka. 1 4.00 35.00 1 4.00 MLA
rijo ko Pani

59 U/Subansiri/Dumpo MOA&FW Har Khet Jet Koro to Sakperijo at Paksok 1 10.00 47.00 1 10.00 MLA
rijo ko Pani

60 U/Subansiri/Dumpo MOA&FW Har Khet Jidi koro to Pero rijo at Gichi vill. 1 5.00 8.00 1 5.00 MLA
rijo ko Pani

61 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Kobokolok rijo at 1 20.00 317.00 2 20.00 MLA
rijo ko Pani Japorilo
62 U/Subansiri/Dumpo MOA&FW Har Khet Rushi rupin to Site ripa at Lebi 1 12.00 14.00 2 12.00 MLA
rijo ko Pani

63 U/Subansiri/Dumpo MOA&FW Har Khet Salo koro to Babirrijo at Bui 1 7.00 7.00 1 7.00 ZPM
rijo ko Pani
64 U/Subansiri/Dumpo MOA&FW Har Khet Hase Nllah to Haserijo at Bator 1 8.00 19.00 1 8.00 ZPM
rijo ko Pani
65 U/Subansiri/Dumpo MOA&FW Har Khet Hedum koro to Ngudukrijo at Bui 1 4.00 8.00 1 4.00 ZPM
rijo ko Pani
66 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Dadririjo at Nasi 1 4.00 13.00 1 4.00 ZPM
rijo ko Pani

464 | P a g e
67 U/Subansiri/Dumpo MOA&FW Har Khet Bogi koro to Bogirijo at Bui 1 4.00 7.00 1 4.00 ZPM
rijo ko Pani
68 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Kumderijo at Bui 1 5.00 9.00 1 5.00 ZPM
rijo ko Pani
69 U/Subansiri/Dumpo MOA&FW Har Khet Kobin koro to Booderijo at Uli 1 4.00 9.00 1 4.00 ZPM
rijo ko Pani

70 U/Subansiri/Dumpo MOA&FW Har Khet Guse koro to Guserijo at Dera 1 6.00 12.00 1 6.00 ZPM
rijo ko Pani

71 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Takter rijo at Bui 1 7.00 10.00 1 7.00 ZPM
rijo ko Pani
72 U/Subansiri/Dumpo MOA&FW Har Khet Re koro to Re Riddi at Riddi 1 5.00 12.00 1 5.00 ZPM
rijo ko Pani

73 U/Subansiri/Dumpo MOA&FW Har Khet Tuguina koro to Tuguina rijo at Riddi 1 5.00 14.00 1 5.00 ZPM
rijo ko Pani

74 U/Subansiri/Dumpo MOA&FW Har Khet Kujum Koro to Teli Namsi at Uli 1 4.00 10.00 1 4.00 ZPM
rijo ko Pani

75 U/Subansiri/Dumpo MOA&FW Har Khet Hote koro to Gekiorijo at Debom 1 6.00 26.00 1 6.00 ASM
rijo ko Pani

76 U/Subansiri/Dumpo MOA&FW Har Khet Sikin Koro to Pedepen at Bui 1 5.00 9.00 1 5.00 ZPM
rijo ko Pani
77 U/Subansiri/Dumpo MOA&FW Har Khet Lirium Koro to Gichi at Jabir vill 1 6.00 13.00 1 6.00 ASM
rijo ko Pani

78 U/Subansiri/Dumpo MOA&FW Har Khet Kyu koro to Jelum ripa Vill 1 6.00 13.00 1 6.00 ASM
rijo ko Pani

79 U/Subansiri/Dumpo MOA&FW Har Khet Yase koro to Kamirrijo at Kuporijo 1 5.00 34.00 1 5.00 ASM/Dugi
rijo ko Pani

80 U/Subansiri/Dumpo MOA&FW Har Khet Kobin koro to Hibirijo at Uli 1 2.00 11.00 1 2.00 ASM
rijo ko Pani

465 | P a g e
81 U/Subansiri/Dumpo MOA&FW Har Khet Si koro to Isspenrijo at Uli 1 2.00 19.00 1 2.00 ASM
rijo ko Pani

82 U/Subansiri/Dumpo MOA&FW Har Khet Tanur koro to Gasirijo at New Richi 1 5.00 19.00 1 5.00 ASM
rijo ko Pani

83 U/Subansiri/Dumpo MOA&FW Har Khet Kote koro to Gainrijo at New Richi 1 5.00 10.00 1 5.00 ASM
rijo ko Pani

84 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Lekarijo at Aki Nirin 1 20.00 45.00 2 20.00 ADC
rijo ko Pani Dumporijo
85 U/Subansiri/Dumpo MOA&FW Har Khet Ngok koro to Bijarijo at Ayamarde 1 2.00 15.00 1 2.00 ADC
rijo ko Pani Dumporijo
86 U/Subansiri/Dumpo MOA&FW Har Khet Tilkoro to Pinterijo at Aki Nirin 1 6.00 17.00 1 6.00 ADC
rijo ko Pani Dumporijo
87 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Takka rijo at Beyak 1 11.00 15.00 1 11.00 ADC
rijo ko Pani Dumporijo
88 U/Subansiri/Dumpo MOA&FW Har Khet Jeb Koro to Raju rijo at Ara Nalo 1 3.00 10.00 1 3.00 ADC
rijo ko Pani Dumporijo
89 U/Subansiri/Dumpo MOA&FW Har Khet Ja koro to Buhik rijo at Ara Nalo 1 3.00 11.00 1 3.00 ADC
rijo ko Pani Dumporijo
90 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Bukde rijo at Ara Nalo 1 3.00 9.00 1 3.00 ADC
rijo ko Pani Dumporijo
91 U/Subansiri/Dumpo MOA&FW Har Khet Jinar koro to Payirrijo at Aki Nirin 1 25.00 15.00 3 25.00 ADC
rijo ko Pani Dumporijo
92 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to KamuBokpen at Ara 1 3.00 7.00 1 3.00 ADC
rijo ko Pani Nalo Dumporijo
93 U/Subansiri/Dumpo MOA&FW Har Khet Yorge Koro to Kamurijo at Jirpu Nalo 1 6.00 14.00 1 6.00
rijo ko Pani
94 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Pinterijo at Aki Nirin 1 4.00 52.00 1 4.00 ADC
rijo ko Pani Dumporijo
95 U/Subansiri/Dumpo MOA&FW Har Khet Ngok koro to Ngokrijo at Ayamarde 1 4.00 14.00 1 4.00 ADC
rijo ko Pani Dumporijo
96 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Bijarijo at Ayamarde. 1 40.00 58.00 3 40.00 ADC
rijo ko Pani Dumporijo

466 | P a g e
97 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Beak rijo at Beyak 1 21.00 25.00 2 21.00 ADC
rijo ko Pani Dumporijo
98 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Taggu rijo at Gichi Nalo 1 15.00 18.00 2 15.00 ADC
rijo ko Pani Dumporijo
99 U/Subansiri/Dumpo MOA&FW Har Khet Pumsi koro to Bedi Dumpo at Ripo 1 4.00 11.00 1 4.00 CO Gusar
rijo ko Pani Bui
100 U/Subansiri/Dumpo MOA&FW Har Khet Tikh koro to Sulle rijo at Ripo Bui 1 4.00 10.00 1 4.00 CO Gusar
rijo ko Pani
101 U/Subansiri/Dumpo MOA&FW Har Khet Yorge koro to Kamurijo at Jirpu Nalo 1 2.00 10.00 1 2.00 ADC
rijo ko Pani Dumporijo
102 U/Subansiri/Dumpo MOA&FW Har Khet Peta koro to Liya rijo at Bui 1 4.00 12.00 1 4.00 CO Gusar
rijo ko Pani
103 U/Subansiri/Dumpo MOA&FW Har Khet Jeb Koro to Porbarijo at Gite Bage 1 23.00 18.00 2 23.00 ADC
rijo ko Pani Dumporijo
104 U/Subansiri/Dumpo MOA&FW Har Khet Roh koro to Bikkarijo Via Hereripa at 1 10.00 20.00 1 10.00 ADC
rijo ko Pani Dere Nalo Dumporijo
105 U/Subansiri/Dumpo MOA&FW Har Khet Juhik koro to Gichi ripa at Gichi Nalo 1 2.00 10.00 1 2.00 ADC
rijo ko Pani Dumporijo
106 U/Subansiri/Dumpo MOA&FW Har Khet Nallah Bojom to Ngudik rijo at Bui 1 4.00 13.00 1 4.00 CO Gusar
rijo ko Pani
107 U/Subansiri/Dumpo MOA&FW Har Khet Jaa koro to Rajurijo at Jirpu Nalo 1 5.00 19.00 1 5.00 ADC
rijo ko Pani Dumporijo
108 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Pojorijo at Gite Bage 1 22.00 16.00 2 22.00 ADC
rijo ko Pani Dumporijo
109 U/Subansiri/Dumpo MOA&FW Har Khet Jilum koro to Juli rijo at Mache 1 10.00 6.00 1 10.00 ADC
rijo ko Pani Marde Dumporijo
110 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Yarerijo at Gite Bage 1 16.00 15.00 2 16.00 ADC
rijo ko Pani Dumporijo

467 | P a g e
111 U/Subansiri/Dumpo MOA&FW Har Khet Richi koro to Tajum kupen at Mindi 1 2.00 9.00 1 2.00 ADC
rijo ko Pani Nalo Dumporijo
112 U/Subansiri/Dumpo MOA&FW Har Khet Jir koro to Kamu Bokpen at Jirpu 1 2.00 10.00 1 2.00 ADC
rijo ko Pani Nalo Dumporijo
113 U/Subansiri/Dumpo MOA&FW Har Khet Geo Koro to Jelekrijo at New Hali 1 3.00 9.00 1 3.00 ADC
rijo ko Pani Dumporijo
114 U/Subansiri/Dumpo MOA&FW Har Khet Jirum koro to Tamrijo at Jirpu Nalo 1 5.00 15.00 1 5.00 ADC
rijo ko Pani Dumporijo
115 U/Subansiri/Dumpo MOA&FW Har Khet Bame koro to Ruchi Nongo at Gite 1 3.00 16.00 1 3.00 CO Giteripa
rijo ko Pani Bage
116 U/Subansiri/Dumpo MOA&FW Har Khet Check dam at Lenyi vill 1 4.00 7.00 1 4.00 BDO
rijo ko Pani Dumporijo
117 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum River to Sinyum rijo at 1 50.00 352.00 3 50.00 ADC
rijo ko Pani Mache Marde Dumporijo
118 U/Subansiri/Dumpo MOA&FW Har Khet Lutak koro to Ali rijo at Mindi Nalo 1 15.00 21.00 2 15.00 ADC
rijo ko Pani Dumporijo
119 U/Subansiri/Dumpo MOA&FW Har Khet Mas koro to Poberrijo at New Hali 1 5.00 16.00 1 5.00 ADC
rijo ko Pani Dumporijo
120 U/Subansiri/Dumpo MOA&FW Har Khet Jhoo koro to Budripa at Mache 1 5.00 5.00 1 5.00 ADC
rijo ko Pani Marde Dumporijo
121 U/Subansiri/Dumpo MOA&FW Har Khet Talik koro to Raderijo at New Riba 1 8.00 17.00 1 8.00 ADC
rijo ko Pani Dumporijo
122 U/Subansiri/Dumpo MOA&FW Har Khet Gomte koro to Mecherijo at Mache 1 2.00 13.00 1 2.00 ADC
rijo ko Pani Marde Dumporijo
123 U/Subansiri/Dumpo MOA&FW Har Khet Jerek koro to Jerek rijo at New Hali 1 4.00 15.00 1 4.00 ADC
rijo ko Pani Dumporijo

468 | P a g e
124 U/Subansiri/Dumpo MOA&FW Har Khet Takek koro to Hikuliri at Mache 1 5.00 12.00 1 5.00 ADC
rijo ko Pani Marde Dumporijo
125 U/Subansiri/Dumpo MOA&FW Har Khet Sidumgekoro to Yaggi at New Richi 1 5.00 14.00 1 5.00 ADC
rijo ko Pani Dumporijo
126 U/Subansiri/Dumpo MOA&FW Har Khet Lile Koro to Jinberrijo at New Hane 1 2.00 11.00 1 2.00 ADC
rijo ko Pani Dumporijo
127 U/Subansiri/Dumpo MOA&FW Har Khet Kerse koro to Hene rijo at Mache 1 4.00 23.00 1 4.00 ADC
rijo ko Pani Marde Dumporijo
128 U/Subansiri/Dumpo MOA&FW Har Khet Pinch koro to Namaripa at Riddi 1 30.00 18.00 3 30.00 BDO
rijo ko Pani Dumporijo
129 U/Subansiri/Dumpo MOA&FW Har Khet Namchi koro to Jhooripa at Mache 1 1.00 9.00 1 1.00 ADC
rijo ko Pani Marde Dumporijo
130 U/Subansiri/Dumpo MOA&FW Har Khet Tunur Koro to Yogi yello at Nirpe 1 14.00 23.00 2 14.00 ADC
rijo ko Pani Libe Dumporijo
131 U/Subansiri/Dumpo MOA&FW Har Khet Ladu koro to Tugune at Mindi Nalo 1 2.00 10.00 1 2.00 ADC
rijo ko Pani Dumporijo
132 U/Subansiri/Dumpo MOA&FW Har Khet Kuy koro to Jilumripa at Mache 1 6.00 16.00 1 6.00 ADC
rijo ko Pani Marde Dumporijo
133 U/Subansiri/Dumpo MOA&FW Har Khet Uchi/Roh /Jidi koro to Herre via 1 45.00 25.00 3 45.00 ADC
rijo ko Pani Perorijo at Mindi Nalo. Dumporijo
134 U/Subansiri/Dumpo MOA&FW Har Khet Bogya koro to Taporijo at Mache 1 4.00 10.00 1 4.00 ADC
rijo ko Pani Marde Dumporijo
135 U/Subansiri/Dumpo MOA&FW Har Khet Rapre Koro Rapre rijo at New Hali 1 2.50 13.00 1 2.50 ADC
rijo ko Pani Dumporijo
136 U/Subansiri/Dumpo MOA&FW Har Khet Nyipo koro to Rukprijo at Mache 1 1.00 14.00 1 1.00 ADC
rijo ko Pani Marde Dumporijo

469 | P a g e
137 U/Subansiri/Dumpo MOA&FW Har Khet Mas Koro to Lie rijo at New Hali 1 4.00 12.00 1 4.00 ADC
rijo ko Pani Dumporijo
138 U/Subansiri/Dumpo MOA&FW Har Khet Jilijima koro to Tumperijo at Mache 1 4.00 12.00 1 4.00 ADC
rijo ko Pani Marde Dumporijo
139 U/Subansiri/Dumpo MOA&FW Har Khet Bane Koro to Dali rijo at New Hali 1 3.00 11.00 1 3.00 ADC
rijo ko Pani Dumporijo
140 U/Subansiri/Dumpo MOA&FW Har Khet Dema Koro to Chirji rijo at New Hane 1 3.00 10.00 1 3.00 ADC
rijo ko Pani Dumporijo
141 U/Subansiri/Dumpo MOA&FW Har Khet Rukpe koro to Rukpe Kopen at 1 3.00 15.00 1 3.00 ADC
rijo ko Pani Mache Marde Dumporijo
142 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum river to Amirijo at New Riba 1 4.00 15.00 1 4.00 ADC
rijo ko Pani Dumporijo
143 U/Subansiri/Dumpo MOA&FW Har Khet Mokam koro to Mokam Bokpen at 1 1.00 8.00 1 1.00 ADC
rijo ko Pani Mache Marde Dumporijo
144 U/Subansiri/Dumpo MOA&FW Har Khet Jhom koro to Radirijo at New Riba 1 3.00 12.00 1 3.00 ADC
rijo ko Pani Dumporijo
145 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Dodikrijo at Old Riba 1 20.00 350.00 2 20.00 ADC
rijo ko Pani Dumporijo
146 U/Subansiri/Dumpo MOA&FW Har Khet Rame koro to Tikripa at Mache 1 3.00 23.00 1 3.00 ADC
rijo ko Pani Marde Dumporijo
147 U/Subansiri/Dumpo MOA&FW Har Khet Tunur koro to Gianrijo at New Richi 1 16.00 21.00 2 16.00 ADC
rijo ko Pani Dumporijo
148 U/Subansiri/Dumpo MOA&FW Har Khet Reh koro to Rese ripa at New Riddi 1 6.00 34.00 1 6.00 CO Gusar
rijo ko Pani

149 U/Subansiri/Dumpo MOA&FW Har Khet Sello Koro to Ango rijo at New Hali 1 3.00 10.00 1 3.00 ADC
rijo ko Pani Dumporijo

470 | P a g e
150 U/Subansiri/Dumpo MOA&FW Har Khet Mokam Koro to Litak rijo at Old Hane 1 2.00 15.00 1 2.00 ADC
rijo ko Pani Dumporijo
151 U/Subansiri/Dumpo MOA&FW Har Khet Jilli koro to Haso rijo at Old Hali 1 3.00 16.00 1 3.00 ADC
rijo ko Pani Dumporijo
152 U/Subansiri/Dumpo MOA&FW Har Khet Tampin koro toPuse ripa at Old Riddi 1 5.00 13.00 1 5.00 CO Gusar
rijo ko Pani

153 U/Subansiri/Dumpo MOA&FW Har Khet Pinpik koro to Pinpik rijo at Old Hali 1 2.00 16.00 1 2.00 ADC
rijo ko Pani Dumporijo
154 U/Subansiri/Dumpo MOA&FW Har Khet Pinpik koro to Johi rijo at Old Hali 1 4.00 14.00 1 4.00 ADC
rijo ko Pani Dumporijo
155 U/Subansiri/Dumpo MOA&FW Har Khet Gima Koro to Ribi rijo at Paja 1 40.00 25.00 3 40.00 ADC
rijo ko Pani Dumporijo
156 U/Subansiri/Dumpo MOA&FW Har Khet Boro Koro to Karda Bumpen at Old 1 6.00 15.00 1 6.00 ADC
rijo ko Pani Hali Dumporijo
157 U/Subansiri/Dumpo MOA&FW Har Khet Jata koro to Jigige rijo at Paksok 1 2.00 15.00 1 2.00 ADC
rijo ko Pani Dumporijo
158 U/Subansiri/Dumpo MOA&FW Har Khet Boru koro to Pererijo at Old Hali 1 12.00 21.00 2 12.00 ADC
rijo ko Pani Dumporijo
159 U/Subansiri/Dumpo MOA&FW Har Khet Jenpu koro to taririjo (Igo) at Paja 1 6.00 10.00 1 6.00 BDO DJM
rijo ko Pani

160 U/Subansiri/Dumpo MOA&FW Har Khet Jelle Koro to Lerum rijo via Jabri rijo 1 13.00 15.00 2 13.00 ADC
rijo ko Pani at Hali Dumporijo
161 U/Subansiri/Dumpo MOA&FW Har Khet Pil koro to Jolrijo via Bogi at Old 1 18.00 21.00 2 18.00 ADC
rijo ko Pani Richi Dumporijo
162 U/Subansiri/Dumpo MOA&FW Har Khet Hap Koro to Haprijo at Old Hali 1 4.00 12.00 1 4.00 ADC
rijo ko Pani Dumporijo

471 | P a g e
163 U/Subansiri/Dumpo MOA&FW Har Khet Joe koro to Jaryarijo at Paksok 1 2.00 16.00 1 2.00 ADC
rijo ko Pani Dumporijo
164 U/Subansiri/Dumpo MOA&FW Har Khet Aka Koro to Jinberrijo at Old Hane 1 3.00 14.00 1 3.00 ADC
rijo ko Pani Dumporijo
165 U/Subansiri/Dumpo MOA&FW Har Khet Jikar Koro to Jilum rijo at Param 1 15.00 21.00 2 15.00 ADC
rijo ko Pani Dumporijo
166 U/Subansiri/Dumpo MOA&FW Har Khet Jipa koro to Jiparijo at Old Hali 1 5.00 19.00 1 5.00 ADC
rijo ko Pani Dumporijo
167 U/Subansiri/Dumpo MOA&FW Har Khet Kao koro to Damarijo at Old Hane 1 5.70 13.00 1 5.70 ADC
rijo ko Pani Dumporijo
168 U/Subansiri/Dumpo MOA&FW Har Khet Sike koro to Pilirijo at Old Richi 1 12.00 34.00 2 12.00 ADC
rijo ko Pani Dumporijo
169 U/Subansiri/Dumpo MOA&FW Har Khet Jup koro to Jarja ripa at Old Hali 1 15.00 20.00 2 15.00 ADC
rijo ko Pani Dumporijo
170 U/Subansiri/Dumpo MOA&FW Har Khet Reh koro to Yiri Namsi at Old Riddi 1 4.00 12.00 1 4.00 CO Gusar
rijo ko Pani

171 U/Subansiri/Dumpo MOA&FW Har Khet Je Koro to Gunerijo at Old Hane 1 17.00 25.00 2 17.00 ADC
rijo ko Pani Dumporijo
172 U/Subansiri/Dumpo MOA&FW Har Khet Masi koro to Materijo at Paja 1 25.00 30.00 3 25.00 ADC
rijo ko Pani Dumporijo
173 U/Subansiri/Dumpo MOA&FW Har Khet Tagurijorom Kyu koro to Jilumaripa 1 15.00 19.00 1 15.00 ADC
rijo ko Pani at Payir Rijo Dumporijo
174 U/Subansiri/Dumpo MOA&FW Har Khet Lite koro to Tal rijo at Paja 1 9.00 12.00 1 9.00 ADC
rijo ko Pani Dumporijo
175 U/Subansiri/Dumpo MOA&FW Har Khet Job Koro to Rokok rijo at Old Hane 1 2.50 11.00 1 2.50 ADC
rijo ko Pani Dumporijo

472 | P a g e
176 U/Subansiri/Dumpo MOA&FW Har Khet Jima Koro to maririjo (Nya) Paja 1 6.00 11.00 1 6.00 BDO DJM
rijo ko Pani

177 U/Subansiri/Dumpo MOA&FW Har Khet Tur koro to tartir Muri at Pakarijo 1 20.00 40.00 2 20.00 ADC
rijo ko Pani Dumporijo
178 U/Subansiri/Dumpo MOA&FW Har Khet Saru Koro to Saru rijo at Pomte 1 15.00 20.00 2 15.00 ADC
rijo ko Pani Bage Dumporijo
179 U/Subansiri/Dumpo MOA&FW Har Khet Yap koro to Pakarijo at Paksok 1 2.00 13.00 1 2.00 ADC
rijo ko Pani Dumporijo
180 U/Subansiri/Dumpo MOA&FW Har Khet Takar koro to Pagna Rijo at Tagogi 1 10.00 18.00 1 10.00 ADC
rijo ko Pani Dumporijo
181 U/Subansiri/Dumpo MOA&FW Har Khet Jiri koro to Paririjo at Param 1 30.00 20.00 3 30.00 ADC
rijo ko Pani Dumporijo
182 U/Subansiri/Dumpo MOA&FW Har Khet Lepu koro to Lepurijo at Pomte Bage 1 16.00 17.00 2 16.00 ADC
rijo ko Pani Dumporijo
183 U/Subansiri/Dumpo MOA&FW Har Khet Rilo koro to Lipurijo at Param 1 10.00 24.00 1 10.00 ADC
rijo ko Pani Dumporijo
184 U/Subansiri/Dumpo MOA&FW Har Khet Gerin koro to Pikrijo at Yudik 1 2.00 16.00 1 2.00 ADC
rijo ko Pani Dumporijo
185 U/Subansiri/Dumpo MOA&FW Har Khet Payir koro to Jabrijo at Payir Rijo 1 15.00 14.00 2 15.00 ADC
rijo ko Pani Dumporijo
186 U/Subansiri/Dumpo MOA&FW Har Khet Gerin koro to Totorijo at Yudik 1 2.00 18.00 1 2.00 ADC
rijo ko Pani Dumporijo
187 U/Subansiri/Dumpo MOA&FW Har Khet Tangap koro to Tangap rijo at Pomte 1 9.00 16.00 1 9.00 ADC
rijo ko Pani Bage Dumporijo
188 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Moterijo art Pomte Bage 1 35.00 20.00 3 35.00 ADC
rijo ko Pani Dumporijo

473 | P a g e
189 U/Subansiri/Dumpo MOA&FW Har Khet Jui koro to Jui rijo at Pomte Bage 1 15.00 21.00 2 15.00 ADC
rijo ko Pani Dumporijo
190 U/Subansiri/Dumpo MOA&FW Har Khet Yabe koro to Yaberijo at Pomte 1 10.00 19.00 1 10.00 ADC
rijo ko Pani Bage Dumporijo
191 U/Subansiri/Dumpo MOA&FW Har Khet Bogde koro to Riterijo at Param 1 20.00 25.00 2 20.00 ADC
rijo ko Pani Dumporijo
192 U/Subansiri/Dumpo MOA&FW Har Khet Yorge koro to Yorge rijo at Pomte 1 12.00 15.00 2 12.00 ADC
rijo ko Pani Bage Dumporijo
193 U/Subansiri/Dumpo MOA&FW Har Khet Tuku koro to Dikrijo at Yudik 1 2.00 15.00 1 2.00 ADC
rijo ko Pani Dumporijo
194 U/Subansiri/Dumpo MOA&FW Har Khet Sike koro to Tama Hari Ripa at 1 20.00 25.00 2 20.00 ADC
rijo ko Pani Tagogi Dumporijo
195 U/Subansiri/Dumpo MOA&FW Har Khet Gune koro to Silok rijo at Uli vill 1 4.00 9.00 1 4.00 CO
rijo ko Pani Dumporijo
196 U/Subansiri/Dumpo MOA&FW Har Khet Kulu koro to Gunrijo at Tagogi 1 3.00 16.00 1 3.00 ADC
rijo ko Pani Dumporijo
197 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum river to Tarrijo at Tajiparam 1 40.00 345.00 3 40.00 ADC
rijo ko Pani Dumporijo
198 U/Subansiri/Dumpo MOA&FW Har Khet Yape koro to Hufdirijo at Yudik 1 10.00 15.00 1 10.00 ADC
rijo ko Pani Dumporijo
199 U/Subansiri/Dumpo MOA&FW Har Khet Kobin koro to Bogde rijo at Uli vill 1 6.00 6.00 1 6.00 CO
rijo ko Pani Dumporijo
200 U/Subansiri/Dumpo MOA&FW Har Khet Rhu koro to Tikrijo at Rilo 1 10.0 12.0 1 10.00 GPM
rijo ko Pani

201 U/Subansiri/Dumpo MOA&FW Har Khet Jerkoro to Bukrijo at Yaipu. 1 5.0 14.0 1 5.00
rijo ko Pani

474 | P a g e
202 U/Subansiri/Dumpo MOA&FW Har Khet Yo koro to Kode rijo at Uli village 1 5.00 8.00 1 5.00 CO
rijo ko Pani Dumporijo
203 U/Subansiri/Dumpo MOA&FW Har Khet Sinium Koro to Dumpu rijo at Rilo 1 8.0 12.0 1 8.00 GPM
rijo ko Pani

204 U/Subansiri/Dumpo MOA&FW Har Khet Konju koro to Namprijo at Uli village 1 5.00 7.00 1 5.00 CO
rijo ko Pani Dumporijo
205 U/Subansiri/Dumpo MOA&FW Har Khet Jelak koro to Jonrijo at Yaipu 1 10.0 15.0 1 10.00 ADC
rijo ko Pani Dumporijo
206 U/Subansiri/Dumpo MOA&FW Har Khet Hasur Koro to Jojo rijo at Old Hali 1 3.00 16.00 1 3.00 ADC
rijo ko Pani Dumporijo
207 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Dumpojapo at New 1 2.0 12.0 1 2.00 ADC
rijo ko Pani Rilo Dumporijo
208 U/Subansiri/Dumpo MOA&FW Har Khet Hussi koro to Hussi rijo at Dera 1 15.00 23.00 2 15.00 9th Gusar
rijo ko Pani ACP
209 U/Subansiri/Dumpo MOA&FW Har Khet Rhu koro to Hererijo at Rillo 1 6.0 10.0 1 6.00 GPM
rijo ko Pani

210 U/Subansiri/Dumpo MOA&FW Har Khet Jele koro to Bijarijo at Rilo 1 6.0 10.0 1 6.00 GPM
rijo ko Pani

211 U/Subansiri/Dumpo MOA&FW Har Khet Rain harvesting at Essipu to irrigate 1 5.0 15.0 1 5.00 GPM
rijo ko Pani Hort. Crop at Rilo vill
212 U/Subansiri/Dumpo MOA&FW Har Khet Rhu koro to Bubrijo at Rilo 1 10.0 14.0 1 10.00 GPM
rijo ko Pani

213 U/Subansiri/Dumpo MOA&FW Har Khet Rain harvesting at Jekernogo to 1 5.0 12.0 1 5.00 GPM
rijo ko Pani irrigate Hort. At Rilo village
214 U/Subansiri/Dumpo MOA&FW Har Khet Jelekoro to Japorijo at Rilo 1 6.0 15.0 1 6.00 GPM
rijo ko Pani

475 | P a g e
215 U/Subansiri/Dumpo MOA&FW Har Khet Barak koro to Jurarijo at Rilo 1 5.0 14.0 1 5.00 GPM
rijo ko Pani

216 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Heka rijo at Agi Nirin. 1 4.00 42.00 1 4.00
rijo ko Pani
217 U/Subansiri/Dumpo MOA&FW Har Khet Aa Koro to Panpenrijo at Agi Nirin. 1 3.00 17.00 1 3.00
rijo ko Pani
218 U/Subansiri/Dumpo MOA&FW Har Khet Aa koro to Ruterijo at Agi Nirin 1 4.00 15.00 1 4.00
rijo ko Pani
219 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Rularijo at Aki Nirin. 1 3.00 46.00 1 3.00
rijo ko Pani
220 U/Subansiri/Dumpo MOA&FW Har Khet Ngod Koro to Taa rijo ar Aki Nirin 1 3.00 18.00 1 3.00
rijo ko Pani
221 U/Subansiri/Dumpo MOA&FW Har Khet Eka koro to Mirmarijo at Aki Nirin 1 9.00 15.00 1 9.00
rijo ko Pani
222 U/Subansiri/Dumpo MOA&FW Har Khet Muktekoro to Toririjo At Aki Nirin 1 3.00 14.00 1 3.00
rijo ko Pani
223 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Nampon rijo at Aki Nirin 1 4.00 49.00 1 4.00
rijo ko Pani
224 U/Subansiri/Dumpo MOA&FW Har Khet Jebe koro to Dungongk at Aranalo 1 3.00 92.00 1 3.00
rijo ko Pani
225 U/Subansiri/Dumpo MOA&FW Har Khet Jon koro to Jisir rijo at Aranalo. 1 3.00 8.00 1 3.00
rijo ko Pani
226 U/Subansiri/Dumpo MOA&FW Har Khet Jerekoro to Ragrijo at Aranalo 1 7.00 14.00 1 7.00
rijo ko Pani
227 U/Subansiri/Dumpo MOA&FW Har Khet Dere koro to Dere Rijo at Ara Nalo 1 6.00 10.00 1 6.00
rijo ko Pani vill
228 U/Subansiri/Dumpo MOA&FW Har Khet Jhakoro to Bogbarijo at Aranalo 1 8.00 12.00 1 8.00
rijo ko Pani
229 U/Subansiri/Dumpo MOA&FW Har Khet Jebekoro to Jisir rijo at AraNalo 1 5.00 15.00 1 5.00
rijo ko Pani
230 U/Subansiri/Dumpo MOA&FW Har Khet Jebe koro to Tajom Bagpen at Ara 1 7.00 10.00 1 7.00
rijo ko Pani Nalo
231 U/Subansiri/Dumpo MOA&FW Har Khet Rukukoro to Rukurijo at Ayamarde 1 1.00 14.00 1 1.00
rijo ko Pani

476 | P a g e
232 U/Subansiri/Dumpo MOA&FW Har Khet Pintekoro to Takomjoba at 1 12.00 62.00 2 12.00
rijo ko Pani Ayamarde
233 U/Subansiri/Dumpo MOA&FW Har Khet Rou koro to Takirijo at Ayamarde 1 2.00 16.00 1 2.00
rijo ko Pani
234 U/Subansiri/Dumpo MOA&FW Har Khet Hotu koro to Hegamarijo at 1 3.00 21.00 1 3.00
rijo ko Pani Ayamarde
235 U/Subansiri/Dumpo MOA&FW Har Khet Jele koro to Takomrijo at Aya Marde 1 3.00 12.00 1 3.00
rijo ko Pani
236 U/Subansiri/Dumpo MOA&FW Har Khet Jiniyar koro to Payirrijo at Aya Nirin 1 15.00 12.00 2 15.00
rijo ko Pani
237 U/Subansiri/Dumpo MOA&FW Har Khet Jocha Koro to Jochrijo at Aya Nirin 1 4.00 20.00 1 4.00
rijo ko Pani
238 U/Subansiri/Dumpo MOA&FW Har Khet Talik koro to Bokbarijo at Aya Nirin 1 6.00 17.00 1 6.00
rijo ko Pani
239 U/Subansiri/Dumpo MOA&FW Har Khet Hate Nallah to Haterijo at Bator 1 10.00 22.00 1 10.00
rijo ko Pani
240 U/Subansiri/Dumpo MOA&FW Har Khet Rukparijo at Belo 1 7.00 10.00 1 7.00
rijo ko Pani
241 U/Subansiri/Dumpo MOA&FW Har Khet Karga rengo at Belo 1 5.00 12.00 1 5.00
rijo ko Pani
242 U/Subansiri/Dumpo MOA&FW Har Khet Lirom rijo at Belo 1 8.00 11.00 1 8.00
rijo ko Pani
243 U/Subansiri/Dumpo MOA&FW Har Khet Yas rijo at Belo 1 7.00 42.00 1 7.00
rijo ko Pani
244 U/Subansiri/Dumpo MOA&FW Har Khet Sia rijo at Belo 1 6.00 82.00 1 6.00
rijo ko Pani
245 U/Subansiri/Dumpo MOA&FW Har Khet Ngoka rijo at Belo 1 2.00 18.00 1 2.00
rijo ko Pani
246 U/Subansiri/Dumpo MOA&FW Har Khet Bodopu rijo at Belo 1 2.00 12.00 1 2.00
rijo ko Pani
247 U/Subansiri/Dumpo MOA&FW Har Khet Koebokpen at Belo 1 3.00 13.00 1 3.00
rijo ko Pani
248 U/Subansiri/Dumpo MOA&FW Har Khet Tunur koro to Garik rijo at Belo 1 6.00 16.00 1 6.00
rijo ko Pani

477 | P a g e
249 U/Subansiri/Dumpo MOA&FW Har Khet Seya koro to Garik rijo at Belo 1 5.00 14.00 1 5.00
rijo ko Pani
250 U/Subansiri/Dumpo MOA&FW Har Khet Yase koro to Yase rijo at Belo 1 2.00 11.00 1 2.00
rijo ko Pani
251 U/Subansiri/Dumpo MOA&FW Har Khet Sha koro to Gagikrijo at Belo 1 3.00 12.00 1 3.00
rijo ko Pani
252 U/Subansiri/Dumpo MOA&FW Har Khet Nipo koro to Niporijo at Beyak 1 3.00 22.00 1 3.00
rijo ko Pani
253 U/Subansiri/Dumpo MOA&FW Har Khet Juakoro Bitrijo at Beyak 1 2.00 17.00 1 2.00
rijo ko Pani
254 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Ledukrijo at Beyak 1 2.00 120.00 1 2.00
rijo ko Pani
255 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Yorgerijo at Beyak 1 4.00 112.00 1 4.00
rijo ko Pani
256 U/Subansiri/Dumpo MOA&FW Har Khet Derekoro to Taprijo at Beyak 1 4.00 14.00 1 4.00
rijo ko Pani
257 U/Subansiri/Dumpo MOA&FW Har Khet Dere koro to Takar rijo at Beyak 1 4.00 12.00 1 4.00
rijo ko Pani
258 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Hepa rijo at Beyak 1 4.00 117.00 1 4.00
rijo ko Pani
259 U/Subansiri/Dumpo MOA&FW Har Khet Sisi koro to Land muri at Bui 1 3.00 16.00 1 3.00
rijo ko Pani
260 U/Subansiri/Dumpo MOA&FW Har Khet Ragbu koro to Bururijo at Bui 1 2.00 15.00 1 2.00
rijo ko Pani
261 U/Subansiri/Dumpo MOA&FW Har Khet Sarlo koro to Sarlorijo at Bui 1 3.00 18.00 1 3.00
rijo ko Pani
262 U/Subansiri/Dumpo MOA&FW Har Khet Sarlo koro to Tasorijo at Bui 1 1.00 16.00 1 1.00
rijo ko Pani
263 U/Subansiri/Dumpo MOA&FW Har Khet Rakbu koro to Darumsui at Bui 1 3.00 15.00 1 3.00
rijo ko Pani
264 U/Subansiri/Dumpo MOA&FW Har Khet Punpen koro to Pikperijo at Bui 1 3.00 13.00 1 3.00
rijo ko Pani
265 U/Subansiri/Dumpo MOA&FW Har Khet Hame koro to Garipa at Bui 1 1.00 15.50 1 1.00
rijo ko Pani

478 | P a g e
266 U/Subansiri/Dumpo MOA&FW Har Khet Sikin Koro to Babirijo at Bui 1 2.00 173.00 1 2.00
rijo ko Pani
267 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Bedidumpi at Bui 1 2.00 222.00 1 2.00
rijo ko Pani
268 U/Subansiri/Dumpo MOA&FW Har Khet Daren Koro to Darensui at Bui 1 1.00 34.00 1 1.00
rijo ko Pani
269 U/Subansiri/Dumpo MOA&FW Har Khet Punpenkoro to Punpenrijo at Bui 1 7.00 15.70 1 7.00
rijo ko Pani
270 U/Subansiri/Dumpo MOA&FW Har Khet Ham rutum to Dek koro at Bui 1 6.00 14.00 1 6.00
rijo ko Pani
271 U/Subansiri/Dumpo MOA&FW Har Khet Pumpen Nallah to Pakpi rijo at Bui 1 7.00 14.00 1 7.00
rijo ko Pani
272 U/Subansiri/Dumpo MOA&FW Har Khet Hidum Koro to karsi Karpen at Bui 1 7.00 12.00 1 7.00
rijo ko Pani
273 U/Subansiri/Dumpo MOA&FW Har Khet Hogo koro to Hagirijo at Bui 1 3.00 11.00 1 3.00
rijo ko Pani
274 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Simaria rijo at Bulo 1 8.00 102.00 1 8.00
rijo ko Pani
275 U/Subansiri/Dumpo MOA&FW Har Khet Lipik koro to Heeb at Bulo 1 5.00 16.00 1 5.00
rijo ko Pani
276 U/Subansiri/Dumpo MOA&FW Har Khet Sikin Koro to Goterijo at Bulo 1 5.00 89.00 1 5.00
rijo ko Pani
277 U/Subansiri/Dumpo MOA&FW Har Khet Nanikoro to Selakrijo at Bulo 1 7.00 16.00 1 7.00
rijo ko Pani
278 U/Subansiri/Dumpo MOA&FW Har Khet Magio koro to Magiorijo at Bulo 1 3.00 17.00 1 3.00
rijo ko Pani
279 U/Subansiri/Dumpo MOA&FW Har Khet Ree koro to Meerijo at Bulo 1 5.00 34.00 1 5.00
rijo ko Pani
280 U/Subansiri/Dumpo MOA&FW Har Khet Ree koro to Taiy Elu at Bulo. 1 4.50 30.00 1 4.50
rijo ko Pani
281 U/Subansiri/Dumpo MOA&FW Har Khet Situ koro to Domorijo at Bulo 1 6.00 23.00 1 6.00
rijo ko Pani
282 U/Subansiri/Dumpo MOA&FW Har Khet Rashek koro to Tulurijo at Bulo 1 6.00 26.00 1 6.00
rijo ko Pani

479 | P a g e
283 U/Subansiri/Dumpo MOA&FW Har Khet Mubi koro to Dukam rijo at New Bulo 1 6.00 19.00 1 6.00
rijo ko Pani
284 U/Subansiri/Dumpo MOA&FW Har Khet Nani koro to Dagnak rijo at New Bulo 1 6.00 17.00 1 6.00
rijo ko Pani
285 U/Subansiri/Dumpo MOA&FW Har Khet Giokoro to Tuldumpum at Debom 1 17.00 32.00 2 17.00
rijo ko Pani

286 U/Subansiri/Dumpo MOA&FW Har Khet Lenia Nallah to Tezorijo at Debom 1 7.00 21.00 1 7.00
rijo ko Pani

287 U/Subansiri/Dumpo MOA&FW Har Khet Dagam rijo at Debom 1 5.00 11.00 1 5.00
rijo ko Pani

288 U/Subansiri/Dumpo MOA&FW Har Khet Juba dulumpung at Debom 1 8.00 9.00 1 8.00
rijo ko Pani

289 U/Subansiri/Dumpo MOA&FW Har Khet Hara Dumpung at Debom 1 13.00 10.00 1 13.00
rijo ko Pani

290 U/Subansiri/Dumpo MOA&FW Har Khet Hupu seti at Debom 1 16.00 9.00 2 16.00
rijo ko Pani

291 U/Subansiri/Dumpo MOA&FW Har Khet Ruri Nallah to Ruri rijo at Debom 1 10.00 18.00 1 10.00
rijo ko Pani
292 U/Subansiri/Dumpo MOA&FW Har Khet Gio koro to Begiarijo at Debom 1 7.00 32.00 1 7.00
rijo ko Pani
293 U/Subansiri/Dumpo MOA&FW Har Khet Roo koro to Giarijo & Giamuk at 1 65.00 37.00 3 65.00
rijo ko Pani Debom
294 U/Subansiri/Dumpo MOA&FW Har Khet Ote Koro to Ochi rijo at Debom 1 3.00 21.00 1 3.00
rijo ko Pani
295 U/Subansiri/Dumpo MOA&FW Har Khet Lene kartu to to Giapen rijo at 1 5.00 19.00 1 5.00
rijo ko Pani Debom
296 U/Subansiri/Dumpo MOA&FW Har Khet Gio koro to Nule rijo at Debom. 1 4.00 29.00 1 4.00
rijo ko Pani

480 | P a g e
297 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Bai- Pyako rijo at 1 5.00 11.00 1 5.00
rijo ko Pani Gusar.
298 U/Subansiri/Dumpo MOA&FW Har Khet Roo koro to Giari rijo at Dera 1 4.00 27.00 1 4.00
rijo ko Pani

299 U/Subansiri/Dumpo MOA&FW Har Khet Kartu koro to Giapenrijo at Dera 1 5.00 18.00 1 5.00
rijo ko Pani

300 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Hererijo via 1 50.00 280.00 1 50.00
rijo ko Pani Ribrijo,Julirijo& Pesek rijo at Dere
Nalo,
301 U/Subansiri/Dumpo MOA&FW Har Khet Uchi/Roh koro to Pero rijo at Dere 1 47.00 51.00 3 47.00
rijo ko Pani Nalo.
302 U/Subansiri/Dumpo MOA&FW Har Khet Sha Koro to Kargarijo at Digbak 1 15.00 156.00 2 15.00
rijo ko Pani

303 U/Subansiri/Dumpo MOA&FW Har Khet Jaa koro to Paknarijo at Digbak 1 15.00 17.00 2 15.00
rijo ko Pani

304 U/Subansiri/Dumpo MOA&FW Har Khet Hutu koro to Poire at Digbak 1 5.00 22.00 1 5.00
rijo ko Pani

305 U/Subansiri/Dumpo MOA&FW Har Khet Hutu rijo at Digbak 1 3.00 24.00 1 3.00
rijo ko Pani

306 U/Subansiri/Dumpo MOA&FW Har Khet Balamkikeh at Digbak 1 3.00 9.00 1 3.00
rijo ko Pani

307 U/Subansiri/Dumpo MOA&FW Har Khet Hutu koro to Nangko at Digbak 1 2.00 19.00 1 2.00
rijo ko Pani

308 U/Subansiri/Dumpo MOA&FW Har Khet Hutu koro to Dego rijo at Digbak 1 6.00 20.00 1 6.00
rijo ko Pani

309 U/Subansiri/Dumpo MOA&FW Har Khet Hutu koro to Rijamrijo at Digbak 1 20.00 21.00 2 20.00
rijo ko Pani

481 | P a g e
310 U/Subansiri/Dumpo MOA&FW Har Khet Ngoduk koro to Palmuri at Digbak 1 5.00 20.00 1 5.00
rijo ko Pani

311 U/Subansiri/Dumpo MOA&FW Har Khet Saa koro to Nagom rijo at Digbak 1 6.00 162.00 1 6.00
rijo ko Pani

312 U/Subansiri/Dumpo MOA&FW Har Khet Kodemuri at Dugi 1 7.00 12.00 1 7.00
rijo ko Pani

313 U/Subansiri/Dumpo MOA&FW Har Khet Dumurijo at Dugi 1 11.00 11.00 2 11.00
rijo ko Pani

314 U/Subansiri/Dumpo MOA&FW Har Khet Sikar yerlo at Dugi 1 8.00 19.00 1 8.00
rijo ko Pani

315 U/Subansiri/Dumpo MOA&FW Har Khet Yas koro to Madin rijo at Dugi 1 6.00 17.00 1 6.00
rijo ko Pani

316 U/Subansiri/Dumpo MOA&FW Har Khet Yas koro to Kamyirrijo at Dugi 1 6.00 18.00 1 6.00
rijo ko Pani

317 U/Subansiri/Dumpo MOA&FW Har Khet Nyoke Koro to Amirijo at Dumporijo 1 30.00 21.00 3 30.00
rijo ko Pani

318 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Tungurijo at Gichi 1 4.00 138.00 1 4.00
rijo ko Pani

319 U/Subansiri/Dumpo MOA&FW Har Khet Jebikoro to Yipar at Gichi 1 5.00 29.00 1 5.00
rijo ko Pani

320 U/Subansiri/Dumpo MOA&FW Har Khet Juhikkoro to Gichi Nongo at Gichi 1 10.00 21.00 1 10.00
rijo ko Pani

321 U/Subansiri/Dumpo MOA&FW Har Khet Rijokoro to Rijiline at Gichi 1 7.00 18.00 1 7.00
rijo ko Pani

322 U/Subansiri/Dumpo MOA&FW Har Khet Bayom koro to Makpurijo at Gite 1 5.00 12.00 1 5.00
rijo ko Pani Bage

482 | P a g e
323 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Demibikpen at Gitebage 1 4.00 105.00 1 4.00
rijo ko Pani

324 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Jarmaduda at Gitebage 1 3.00 104.00 1 3.00
rijo ko Pani

325 U/Subansiri/Dumpo MOA&FW Har Khet Lipu koro to Takdulrijo at Gitebage 1 3.00 27.00 1 3.00
rijo ko Pani

326 U/Subansiri/Dumpo MOA&FW Har Khet Jarmakoro to Giterrijo at Gitebage 1 3.00 25.00 1 3.00
rijo ko Pani

327 U/Subansiri/Dumpo MOA&FW Har Khet Jarmakoro to Tenekirrijo at Gitebage 1 3.00 23.00 1 3.00
rijo ko Pani

328 U/Subansiri/Dumpo MOA&FW Har Khet Jupkoro to Yaaplitak at Gitebage 1 3.00 16.00 1 3.00
rijo ko Pani

329 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Gitrijo at Gitebage 1 3.00 101.00 1 3.00
rijo ko Pani

330 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Podeliken at Gitebage 1 12.00 107.00 2 12.00
rijo ko Pani

331 U/Subansiri/Dumpo MOA&FW Har Khet Jup koro to Juprijo at Gitebage 1 2.00 14.00 1 2.00
rijo ko Pani

332 U/Subansiri/Dumpo MOA&FW Har Khet Tabum koro to Tabum Jeta at 1 3.00 18.00 1 3.00
rijo ko Pani G/bage
333 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Jebbeju at Gitebage 1 3.00 109.00 1 3.00
rijo ko Pani

334 U/Subansiri/Dumpo MOA&FW Har Khet Tayum koro to Rubij at Gitebage 1 2.00 21.00 1 2.00
rijo ko Pani

335 U/Subansiri/Dumpo MOA&FW Har Khet Saru koro to Ampir at Gitebage 1 2.00 14.00 1 2.00
rijo ko Pani

483 | P a g e
336 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Jepi at Gitebage 1 3.00 108.00 1 3.00
rijo ko Pani

337 U/Subansiri/Dumpo MOA&FW Har Khet Saru koro to Parko rijo at Gite Bage 1 5.00 14.00 1 5.00
rijo ko Pani

338 U/Subansiri/Dumpo MOA&FW Har Khet Parko koro to Parko rijo at Gite Bage 1 7.00 14.00 1 7.00
rijo ko Pani

339 U/Subansiri/Dumpo MOA&FW Har Khet Saru koro to Betrijo at Gite Bage 1 3.00 12.00 1 3.00
rijo ko Pani

340 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Moryom lipik at Gite 1 5.00 100.00 1 5.00
rijo ko Pani Bage
341 U/Subansiri/Dumpo MOA&FW Har Khet Saru koro to Sarurijo at Gite Bage 1 7.00 15.00 1 7.00
rijo ko Pani

342 U/Subansiri/Dumpo MOA&FW Har Khet Saru koro to Julrijo at Gite Bage 1 6.00 17.00 1 6.00
rijo ko Pani

343 U/Subansiri/Dumpo MOA&FW Har Khet Ro koro to Lin rijo at Gite Bage 1 4.00 20.00 1 4.00
rijo ko Pani

344 U/Subansiri/Dumpo MOA&FW Har Khet Ro koro to Ro rijo at Gite Bage 1 3.00 17.00 1 3.00
rijo ko Pani

345 U/Subansiri/Dumpo MOA&FW Har Khet Gado koro to Kodo Geko at Gite 1 8.00 12.00 1 8.00
rijo ko Pani Bage
346 U/Subansiri/Dumpo MOA&FW Har Khet Lipu koro to Lumri rijo at Gite Bage 1 5.00 14.00 1 5.00
rijo ko Pani

347 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Beyak Bokpen at Gite 1 6.00 101.00 1 6.00
rijo ko Pani Bage
348 U/Subansiri/Dumpo MOA&FW Har Khet Lipu koro to Lipu Koterijo at Gite 1 3.00 15.00 1 3.00
rijo ko Pani Bage

484 | P a g e
349 U/Subansiri/Dumpo MOA&FW Har Khet Jerum koro to Jarma rijo at Gite 1 5.00 14.00 1 5.00
rijo ko Pani Bage
350 U/Subansiri/Dumpo MOA&FW Har Khet Sakpya Nalah to Pyako rijo at Gusar 1 7.00 26.00 1 7.00
rijo ko Pani

351 U/Subansiri/Dumpo MOA&FW Har Khet Yaa Nalah to Gairijo at Gusar 1 4.00 15.00 1 4.00
rijo ko Pani

352 U/Subansiri/Dumpo MOA&FW Har Khet Sakpya Nallah to Tererijo at Gusar 1 3.00 28.00 1 3.00
rijo ko Pani

353 U/Subansiri/Dumpo MOA&FW Har Khet Sakpya Nallah to Sakpiya rijo at 1 3.00 32.00 1 3.00
rijo ko Pani Gusar
354 U/Subansiri/Dumpo MOA&FW Har Khet Geo koro to begia rijo at Gusar 1 2.00 22.00 1 2.00
rijo ko Pani

355 U/Subansiri/Dumpo MOA&FW Har Khet Puru koro to rasik rijo at Gusar 1 3.00 22.00 1 3.00
rijo ko Pani

356 U/Subansiri/Dumpo MOA&FW Har Khet Sakpya Nallah to Amijrijo at Gusar 1 4.00 25.00 1 4.00
rijo ko Pani

357 U/Subansiri/Dumpo MOA&FW Har Khet Horo koro to Henelipik rijo at Horo 1 5.00 32.00 1 5.00
rijo ko Pani

358 U/Subansiri/Dumpo MOA&FW Har Khet Horo koro to Hororijo at Horo 1 5.00 30.00 1 5.00
rijo ko Pani

359 U/Subansiri/Dumpo MOA&FW Har Khet Horo koro to Darurijo at Horo 1 5.00 27.00 1 5.00
rijo ko Pani

360 U/Subansiri/Dumpo MOA&FW Har Khet Hesu koro to Rou rijo at Japrilo 1 10.00 16.00 1 10.00
rijo ko Pani

361 U/Subansiri/Dumpo MOA&FW Har Khet Rou koro to Murkorijo at Japorilo 1 12.00 39.00 1 12.00
rijo ko Pani

485 | P a g e
362 U/Subansiri/Dumpo MOA&FW Har Khet Jalekoro to Dumpoboggo at Jijrarilo 1 35.00 21.00 3 35.00
rijo ko Pani

363 U/Subansiri/Dumpo MOA&FW Har Khet Hirpi koro to Payir rijo at Jijrarilo 1 11.00 20.00 2 11.00
rijo ko Pani

364 U/Subansiri/Dumpo MOA&FW Har Khet Payir koro to Hadripa at Jijrarilo 1 50.00 18.00 3 50.00
rijo ko Pani

365 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Radirjo and Amirijo 1 26.00 302.00 2 26.00
rijo ko Pani at Jaririba
366 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Dodikrijo at Jaririba 1 21.00 323.00 2 21.00
rijo ko Pani

367 U/Subansiri/Dumpo MOA&FW Har Khet Jilak koro to Jonrijo at Jirpu 1 10.00 22.00 1 10.00
rijo ko Pani

368 U/Subansiri/Dumpo MOA&FW Har Khet Jisir koro to Godlinrijo at Jirpu 1 1.00 14.00 1 1.00
rijo ko Pani

369 U/Subansiri/Dumpo MOA&FW Har Khet Jebekoro to Kamubokpen at Jirpu 1 1.00 110.00 1 1.00
rijo ko Pani

370 U/Subansiri/Dumpo MOA&FW Har Khet Jerekoro to Bukrijo at Jirpu 1 1.00 17.00 1 1.00
rijo ko Pani

371 U/Subansiri/Dumpo MOA&FW Har Khet Jebe koro to Rajujiba at Jirpu 1 2.00 108.00 1 2.00
rijo ko Pani

372 U/Subansiri/Dumpo MOA&FW Har Khet Jebekoro to Jeberijo at Jirpu 1 1.00 104.00 1 1.00
rijo ko Pani

373 U/Subansiri/Dumpo MOA&FW Har Khet Jebkoro to Ragrijo at Jirpu 1 3.00 98.00 1 3.00
rijo ko Pani

374 U/Subansiri/Dumpo MOA&FW Har Khet Kamyir /sikar koro to Kuporijo at 1 40.00 32.00 3 40.00
rijo ko Pani Kuporijo

486 | P a g e
375 U/Subansiri/Dumpo MOA&FW Har Khet Yase koro to Yase rijo at Kuporijo 1 10.00 38.00 1 10.00
rijo ko Pani

376 U/Subansiri/Dumpo MOA&FW Har Khet Chok koro to Mote rijo at Kuporijo 1 6.00 18.00 1 6.00
rijo ko Pani

377 U/Subansiri/Dumpo MOA&FW Har Khet Yash koro to Makyir Pada at 1 5.00 33.00 1 5.00
rijo ko Pani Kuporijo
378 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Legirijo at Lega 1 15.00 21.00 2 15.00
rijo ko Pani

379 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Harurijo at Lega 1 7.00 19.00 1 7.00
rijo ko Pani

380 U/Subansiri/Dumpo MOA&FW Har Khet Lenyi koro to Bomdirijo at Lenyi 1 10.00 19.00 1 10.00
rijo ko Pani

381 U/Subansiri/Dumpo MOA&FW Har Khet Lenyi koro to Lenirijo at Lenyi 1 5.00 17.00 1 5.00
rijo ko Pani

382 U/Subansiri/Dumpo MOA&FW Har Khet Lenyi koro to Lenipasum at Lenyi 1 2.00 22.00 1 2.00
rijo ko Pani

383 U/Subansiri/Dumpo MOA&FW Har Khet Lebar koro to Lebarrijo at Libar 1 10.00 18.00 1 10.00
rijo ko Pani

384 U/Subansiri/Dumpo MOA&FW Har Khet Kammu koro to Gippe rijo at Libar 1 6.00 15.00 1 6.00
rijo ko Pani

385 U/Subansiri/Dumpo MOA&FW Har Khet Legi koro to Legirijo at Lua 1 9.00 16.00 1 9.00
rijo ko Pani

386 U/Subansiri/Dumpo MOA&FW Har Khet Lua koro to Namchirijo at Lua 1 5.00 14.00 1 5.00
rijo ko Pani

387 U/Subansiri/Dumpo MOA&FW Har Khet Gippi koro toTaporipa at Mache 1 4.00 16.00 1 4.00
rijo ko Pani Marde

487 | P a g e
388 U/Subansiri/Dumpo MOA&FW Har Khet Kyu koro to Digli ripa at Mache 1 6.00 15.00 1 6.00
rijo ko Pani Marde
389 U/Subansiri/Dumpo MOA&FW Har Khet Rup koro to Siniumrijo at Mache 1 5.00 9.00 1 5.00
rijo ko Pani marde
390 U/Subansiri/Dumpo MOA&FW Har Khet Buru koro to Jilum ripa at Mache 1 4.00 14.00 1 4.00
rijo ko Pani Marde
391 U/Subansiri/Dumpo MOA&FW Har Khet Ju koro to Botak rijo at Mache Marde 1 4.00 15.00 1 4.00
rijo ko Pani

392 U/Subansiri/Dumpo MOA&FW Har Khet Amsakra koro to Budu ripa at Mache 1 5.00 14.00 1 5.00
rijo ko Pani Marde
393 U/Subansiri/Dumpo MOA&FW Har Khet Rame koro to Gomte rijo at Mache 1 7.00 12.00 1 7.00
rijo ko Pani Marde
394 U/Subansiri/Dumpo MOA&FW Har Khet Mokam koro to Tikki ripa at Mache 1 9.00 11.00 1 9.00
rijo ko Pani Marde
395 U/Subansiri/Dumpo MOA&FW Har Khet Tayak koro to Hiku leri at Mache 1 6.00 13.00 1 6.00
rijo ko Pani Marde
396 U/Subansiri/Dumpo MOA&FW Har Khet Nipo koro to Rukpe kojen at Mache 1 10.00 12.00 1 10.00
rijo ko Pani Marde
397 U/Subansiri/Dumpo MOA&FW Har Khet Juli koro to Tumpe rijo at Mache 1 5.00 11.00 1 5.00
rijo ko Pani Marde
398 U/Subansiri/Dumpo MOA&FW Har Khet Taja koro to Lebe Geko at Mache 1 12.00 13.00 2 12.00
rijo ko Pani Marde
399 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum River to Dumpu Bokpen at 1 8.00 352.00 1 8.00
rijo ko Pani Mache Marde
400 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum/Subansiri River to Ruk rijo at 1 43.00 340.00 3 43.00
rijo ko Pani Mache Marde
401 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum River to Tar rijo at Mache 1 75.00 347.00 4 75.00
rijo ko Pani Marde

488 | P a g e
402 U/Subansiri/Dumpo MOA&FW Har Khet Nyoro koro to Diyu kopen at Mache 1 4.00 14.00 1 4.00
rijo ko Pani Marde
403 U/Subansiri/Dumpo MOA&FW Har Khet Jui koro to Jui rijo at Mindi 1 2.00 14.00 1 2.00
rijo ko Pani

404 U/Subansiri/Dumpo MOA&FW Har Khet Rente koro to Dasi rijo at Mindi 1 2.00 15.00 1 2.00
rijo ko Pani

405 U/Subansiri/Dumpo MOA&FW Har Khet Rente koro to Alari at Mindi 1 1.00 13.00 1 1.00
rijo ko Pani

406 U/Subansiri/Dumpo MOA&FW Har Khet Ushi koro to Pare rijo at Mindi 1 20.00 41.00 2 20.00
rijo ko Pani

407 U/Subansiri/Dumpo MOA&FW Har Khet Tugu koro to Jubi hari at Mindi 1 1.00 9.00 1 1.00
rijo ko Pani

408 U/Subansiri/Dumpo MOA&FW Har Khet Ote koro to Mindi rijo at Nasi 1 5.00 16.00 1 5.00
rijo ko Pani

409 U/Subansiri/Dumpo MOA&FW Har Khet Ochi koro to Row rijo at Nasi 1 10.00 19.00 1 10.00
rijo ko Pani

410 U/Subansiri/Dumpo MOA&FW Har Khet Baam,Bakam at Nasi 1 5.00 12.00 1 5.00
rijo ko Pani

411 U/Subansiri/Dumpo MOA&FW Har Khet Leku koro to Ochi rijo at Nasi 1 7.00 14.00 1 7.00
rijo ko Pani

412 U/Subansiri/Dumpo MOA&FW Har Khet Jirak koro to Jirak rijo at New Hali 1 10.00 17.00 1 10.00
rijo ko Pani

413 U/Subansiri/Dumpo MOA&FW Har Khet Rabre koro Rabre rijo at New Hali 1 3.00 11.00 1 3.00
rijo ko Pani

414 U/Subansiri/Dumpo MOA&FW Har Khet Jikki koro to Jikki rijo at New Hali 1 12.00 12.00 2 12.00
rijo ko Pani

489 | P a g e
415 U/Subansiri/Dumpo MOA&FW Har Khet Kaho koro to Dema rijo at New Hane 1 16.00 13.00 2 16.00
rijo ko Pani

416 U/Subansiri/Dumpo MOA&FW Har Khet Ley koro to Moya rijo at New Hane 1 4.00 12.00 1 4.00
rijo ko Pani

417 U/Subansiri/Dumpo MOA&FW Har Khet Liku koro to Liku rijo at New Lida 1 5.00 14.00 1 5.00
rijo ko Pani

418 U/Subansiri/Dumpo MOA&FW Har Khet Tab koro to Sot Kara Repa at New 1 10.00 13.00 1 10.00
rijo ko Pani Lida
419 U/Subansiri/Dumpo MOA&FW Har Khet Gaa koro to Solok rijo at New Lida 1 2.00 17.00 1 2.00
rijo ko Pani

420 U/Subansiri/Dumpo MOA&FW Har Khet Jenyum koro to Amirijo at New Riba 1 3.00 330.00 1 3.00
rijo ko Pani

421 U/Subansiri/Dumpo MOA&FW Har Khet Jum koro to Radi rijo at New Riba 1 12.00 14.00 2 12.00
rijo ko Pani

422 U/Subansiri/Dumpo MOA&FW Har Khet Talik/Namsi koro to Dedik rijo at New 1 9.00 16.00 1 9.00
rijo ko Pani Riba
423 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum river to Japorijo at New Riba 1 50.00 355.00 3 50.00
rijo ko Pani

424 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Radirijo at New Riba 1 25.00 357.00 2 25.00
rijo ko Pani

425 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Radhirijo at Old Riba 1 30.00 348.00 3 30.00
rijo ko Pani

426 U/Subansiri/Dumpo MOA&FW Har Khet Reh koro to Begia Ayor at New Riddi 1 3.00 31.00 1 3.00
rijo ko Pani

427 U/Subansiri/Dumpo MOA&FW Har Khet Selok koro to Yari Namsi at New 1 2.00 13.00 1 2.00
rijo ko Pani Riddi

490 | P a g e
428 U/Subansiri/Dumpo MOA&FW Har Khet Duli koro to Duli rijo at New Riddi 1 2.00 12.00 1 2.00
rijo ko Pani

429 U/Subansiri/Dumpo MOA&FW Har Khet Tan koro to Sarik Namsi at New 1 3.00 14.00 1 3.00
rijo ko Pani Riddi
430 U/Subansiri/Dumpo MOA&FW Har Khet Tampin koro to Nama ripa at New 1 2.00 12.00 1 2.00
rijo ko Pani Riddi
431 U/Subansiri/Dumpo MOA&FW Har Khet Dego koro to Ripe rijo at New Riddi 1 3.00 15.00 1 3.00
rijo ko Pani

432 U/Subansiri/Dumpo MOA&FW Har Khet Gorma koro to Gorma rijo at New 1 3.00 14.00 1 3.00
rijo ko Pani Riddi
433 U/Subansiri/Dumpo MOA&FW Har Khet Sarik koro to Sarik rijo at New Riddi 1 2.00 13.00 1 2.00
rijo ko Pani

434 U/Subansiri/Dumpo MOA&FW Har Khet Yaktek koro to Yaktek rijo at New 1 3.00 15.00 1 3.00
rijo ko Pani Riddi
435 U/Subansiri/Dumpo MOA&FW Har Khet Bu koro to Guma rijo at New Riddi 1 3.00 14.00 1 3.00
rijo ko Pani

436 U/Subansiri/Dumpo MOA&FW Har Khet Sikin Koro to Kumdi rijo at New Riddi 1 17.00 255.00 2 17.00
rijo ko Pani

437 U/Subansiri/Dumpo MOA&FW Har Khet Kobin koro to Nepo Nama rijo at 1 15.00 17.00 2 15.00
rijo ko Pani Nguki
438 U/Subansiri/Dumpo MOA&FW Har Khet Serik koro to Yubnerijo at Nguki 1 5.00 16.00 1 5.00
rijo ko Pani

439 U/Subansiri/Dumpo MOA&FW Har Khet Kokum koro to Chinyo rupu at Nguki 1 6.00 15.00 1 6.00
rijo ko Pani

440 U/Subansiri/Dumpo MOA&FW Har Khet Kanju koro to Lekurijo at Denri Nguki 1 6.00 12.00 1 6.00
rijo ko Pani

491 | P a g e
441 U/Subansiri/Dumpo MOA&FW Har Khet Si Koro to Dulerijo at Denri Nguki 1 6.00 17.00 1 6.00
rijo ko Pani

442 U/Subansiri/Dumpo MOA&FW Har Khet Yoo koro to Leku rijo at Nidak 1 7.00 16.00 1 7.00
rijo ko Pani

443 U/Subansiri/Dumpo MOA&FW Har Khet Yoo koro to Charpu rijo at Nidak 1 6.00 18.00 1 6.00
rijo ko Pani

444 U/Subansiri/Dumpo MOA&FW Har Khet Nimba Koba at Nidak 1 4.00 19.00 1 4.00
rijo ko Pani

445 U/Subansiri/Dumpo MOA&FW Har Khet Yago koro to Yo rijo at Nidak 1 6.00 12.00 1 6.00
rijo ko Pani

446 U/Subansiri/Dumpo MOA&FW Har Khet Kamri koro to Lingkung rijo at Nidak 1 5.00 14.00 1 5.00
rijo ko Pani

447 U/Subansiri/Dumpo MOA&FW Har Khet Rori Ro nallah to Rori Rijo at Nipu 1 6.00 16.00 1 6.00
rijo ko Pani

448 U/Subansiri/Dumpo MOA&FW Har Khet Ruri rijo at Nipu 1 4.00 18.00 1 4.00
rijo ko Pani

449 U/Subansiri/Dumpo MOA&FW Har Khet Nipu Namchi at Nipu 1 5.00 17.00 1 5.00
rijo ko Pani

450 U/Subansiri/Dumpo MOA&FW Har Khet Leru koro to Boklin rijo at Nipu 1 5.00 14.00 1 5.00
rijo ko Pani

451 U/Subansiri/Dumpo MOA&FW Har Khet Lene Pochak at Nipu 1 4.00 11.00 1 4.00
rijo ko Pani

452 U/Subansiri/Dumpo MOA&FW Har Khet Berek koro to Yeri rijo at Old Hali 1 5.00 15.00 1 5.00
rijo ko Pani

453 U/Subansiri/Dumpo MOA&FW Har Khet Jiru koro to Karda Bampen at Old 1 5.00 13.00 1 5.00
rijo ko Pani Hali

492 | P a g e
454 U/Subansiri/Dumpo MOA&FW Har Khet Jup koro to Jaja ripa at Old Hali 1 15.00 10.00 2 15.00
rijo ko Pani

455 U/Subansiri/Dumpo MOA&FW Har Khet Jup koro to Goja rijo at Old Hali 1 5.00 9.00 1 5.00
rijo ko Pani

456 U/Subansiri/Dumpo MOA&FW Har Khet Hakak koro to Hakak ripa at Old Hali 1 6.00 15.00 1 6.00
rijo ko Pani

457 U/Subansiri/Dumpo MOA&FW Har Khet Batak koro to Batak rijo at Old Hali 1 3.00 13.00 1 3.00
rijo ko Pani

458 U/Subansiri/Dumpo MOA&FW Har Khet Jip koro to Joporijo at old Hali 1 4.00 12.00 1 4.00
rijo ko Pani

459 U/Subansiri/Dumpo MOA&FW Har Khet Sello koro to Jajorijo at Old Hali 1 2.00 14.00 1 2.00
rijo ko Pani

460 U/Subansiri/Dumpo MOA&FW Har Khet Lile koro to Lekar rijo at Old Hane 1 3.00 14.00 1 3.00
rijo ko Pani

461 U/Subansiri/Dumpo MOA&FW Har Khet Sello koro to Hapar Suntak at Old 1 17.00 14.00 2 17.00
rijo ko Pani Hane
462 U/Subansiri/Dumpo MOA&FW Har Khet Nima koro to Lenyi rijo at Old Lida 1 5.00 21.00 1 5.00
rijo ko Pani

463 U/Subansiri/Dumpo MOA&FW Har Khet Ree koro to Gete ripa a Old Lida 1 5.00 17.00 1 5.00
rijo ko Pani

464 U/Subansiri/Dumpo MOA&FW Har Khet Duri koro to Gitu rijo at Old Lida 1 3.00 14.00 1 3.00
rijo ko Pani
465 U/Subansiri/Dumpo MOA&FW Har Khet Salikoro to Son Korarijo at Old Riddi 1 9.00 14.00 1 9.00
rijo ko Pani

466 U/Subansiri/Dumpo MOA&FW Har Khet Nanikoro to Nanirijo at Old Riddi 1 2.00 12.00 1 2.00
rijo ko Pani

493 | P a g e
467 U/Subansiri/Dumpo MOA&FW Har Khet Lenyi koro to Lenyi rijo at Old Riddi 1 2.00 14.00 1 2.00
rijo ko Pani

468 U/Subansiri/Dumpo MOA&FW Har Khet Selok koro to Selok rijo at Old Riddi 1 3.00 14.00 1 3.00
rijo ko Pani

469 U/Subansiri/Dumpo MOA&FW Har Khet Tigli koro to Pitakrijo at Old Riddi 1 2.00 13.00 1 2.00
rijo ko Pani

470 U/Subansiri/Dumpo MOA&FW Har Khet Mobikoro to Mobirijo at Old Riddi 1 2.00 11.00 1 2.00
rijo ko Pani

471 U/Subansiri/Dumpo MOA&FW Har Khet Mendikoro to Lib Lene rijo at Old 1 2.00 12.00 1 2.00
rijo ko Pani Riddi
472 U/Subansiri/Dumpo MOA&FW Har Khet Salikoro to Geturijo at Old Riddi 1 2.00 13.00 1 2.00
rijo ko Pani

473 U/Subansiri/Dumpo MOA&FW Har Khet Dumbe koro to Tib Lenerijo at Old 1 3.00 14.00 1 3.00
rijo ko Pani Riddi
474 U/Subansiri/Dumpo MOA&FW Har Khet Reh Koro to Kakar rijo at Old Riddi 1 3.00 29.00 1 3.00
rijo ko Pani

475 U/Subansiri/Dumpo MOA&FW Har Khet Pinch koro to Pinch rijo at Old Riddi 1 2.00 14.00 1 2.00
rijo ko Pani

476 U/Subansiri/Dumpo MOA&FW Har Khet Kora koro to Korarijo at Old Riddi 1 2.00 11.00 1 2.00
rijo ko Pani

477 U/Subansiri/Dumpo MOA&FW Har Khet Mendi koro to Mendirijo at Od Riddi 1 3.00 9.00 1 3.00
rijo ko Pani

478 U/Subansiri/Dumpo MOA&FW Har Khet Reg koro to Dumpu rijo at Old Riddi 1 3.00 11.00 1 3.00
rijo ko Pani

479 U/Subansiri/Dumpo MOA&FW Har Khet Puru Koro to Materijo at Paja 1 20.00 14.00 2 20.00
rijo ko Pani

494 | P a g e
480 U/Subansiri/Dumpo MOA&FW Har Khet Jirjo koro to Kolok rijo at Paja 1 5.00 12.00 1 5.00
rijo ko Pani

481 U/Subansiri/Dumpo MOA&FW Har Khet Jilum koro to Payir rijo at Paja 1 6.00 13.00 1 6.00
rijo ko Pani

482 U/Subansiri/Dumpo MOA&FW Har Khet Tur koro to Turrijo at Paka 1 26.00 30.00 2 26.00
rijo ko Pani

483 U/Subansiri/Dumpo MOA&FW Har Khet Rade koro to Pakrijo at Paka 1 17.00 17.00 2 17.00
rijo ko Pani

484 U/Subansiri/Dumpo MOA&FW Har Khet Tur koro to Jitum rijo at Pakarijo 1 4.00 46.00 1 4.00
rijo ko Pani
485 U/Subansiri/Dumpo MOA&FW Har Khet Lite koro to Tulmuri at Paksok 1 7.00 11.00 1 7.00
rijo ko Pani

486 U/Subansiri/Dumpo MOA&FW Har Khet Pararijo to Pararijo at Paksok 1 9.00 14.00 1 9.00
rijo ko Pani

487 U/Subansiri/Dumpo MOA&FW Har Khet Pupok koro to Jili rijo at Paksok 1 7.00 14.00 1 7.00
rijo ko Pani

488 U/Subansiri/Dumpo MOA&FW Har Khet Jirr koro to Paririjo at Param 1 10.00 16.00 1 10.00
rijo ko Pani

489 U/Subansiri/Dumpo MOA&FW Har Khet Jnyum koro to Pikk rijo at Param 1 15.00 3.00 2 15.00
rijo ko Pani

490 U/Subansiri/Dumpo MOA&FW Har Khet Ter koro to Terrijo at Payir Rijo 1 4.00 9.00 1 4.00
rijo ko Pani

491 U/Subansiri/Dumpo MOA&FW Har Khet Taru koro to Payir rijo at Payir rijo 1 20.00 17.00 2 20.00
rijo ko Pani

492 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Pojorijo at Pojorijo. 1 27.00 94.00 3 27.00
rijo ko Pani

495 | P a g e
493 U/Subansiri/Dumpo MOA&FW Har Khet Jerkoro to Rajurijo at Pomte Bage 1 9.00 11.00 1 9.00
rijo ko Pani

494 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Jebrijo at Pomte Bage 1 7.00 96.00 1 7.00
rijo ko Pani

495 U/Subansiri/Dumpo MOA&FW Har Khet Jer koro to Raagrijo at Pomte Bage 1 9.00 17.00 1 9.00
rijo ko Pani

496 U/Subansiri/Dumpo MOA&FW Har Khet Jer koro to Jerrijo at Pomte Bage 1 7.00 21.00 1 7.00
rijo ko Pani

497 U/Subansiri/Dumpo MOA&FW Har Khet Joo koro to Loyum rijo at Pomte 1 12.00 15.00 2 12.00
rijo ko Pani Bage
498 U/Subansiri/Dumpo MOA&FW Har Khet Joo koro to Joorijo at Pomte Bage 1 9.00 13.00 1 9.00
rijo ko Pani

499 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to Tamrijo at Pomte Bage 1 5.00 98.00 1 5.00
rijo ko Pani

500 U/Subansiri/Dumpo MOA&FW Har Khet Jela koro to Telak rijo at Pomte Bage 1 3.00 14.00 1 3.00
rijo ko Pani

501 U/Subansiri/Dumpo MOA&FW Har Khet Jeb koro to raju bokpen at Pomte 1 4.00 15.00 1 4.00
rijo ko Pani Bage
502 U/Subansiri/Dumpo MOA&FW Har Khet Jlak/Der koro Gite Gegdum at 1 6.00 19.00 1 6.00
rijo ko Pani Pomte Bage
503 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum koro to Tarrijo at Tajiparam 1 135.00 340.00 4 135.00
rijo ko Pani
504 U/Subansiri/Dumpo MOA&FW Har Khet Sinyum korom to Kedokrijo at 1 30.00 340.00 3 30.00
rijo ko Pani Tajiparam
505 U/Subansiri/Dumpo MOA&FW Har Khet Jirin koromto Ziri rijo at Tajiparam 1 22.00 17.00 2 22.00
rijo ko Pani

496 | P a g e
506 U/Subansiri/Dumpo MOA&FW Har Khet Jirin koro to Nokde rijo at Yudik 1 12.00 15.00 2 12.00
rijo ko Pani

507 U/Subansiri/Dumpo MOA&FW Har Khet Jirin koro to Nyogorijo at Yudik 1 3.00 20.00 1 3.00
rijo ko Pani

508 U/Subansiri/Dumpo MOA&FW Har Khet Gio koro to Pojorijo at Uli 1 15.00 24.00 2 15.00
rijo ko Pani

509 U/Subansiri/Dumpo MOA&FW Har Khet Taa koro to Buri rijo at Uli 1 7.00 17.00 1 7.00
rijo ko Pani

510 U/Subansiri/Dumpo MOA&FW Har Khet Gune oro to Sekirijo at Uli 1 15.00 14.00 2 15.00
rijo ko Pani

511 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Mote ripa at Uli 1 6.00 12.00 1 6.00
rijo ko Pani

512 U/Subansiri/Dumpo MOA&FW Har Khet Bu koro to SidumPunchup rijo at Uli 1 5.00 12.00 1 5.00
rijo ko Pani

513 U/Subansiri/Dumpo MOA&FW Har Khet Lipui koro to Rilo rijo at Kigi Mori 1 4.00 13.00 1 4.00
rijo ko Pani

514 U/Subansiri/Dumpo MOA&FW Har Khet Basse koro to Kigi rijo at Kigi Mori 1 20.00 15.00 2 20.00
rijo ko Pani

515 U/Subansiri/Dumpo MOA&FW Har Khet Putekoro to Jilum rijo at Kigi moi 1 2.00 12.00 1 2.00
rijo ko Pani

516 U/Subansiri/Dumpo MOA&FW Har Khet Koden koro to Hepa rijo at Kigi mori 1 3.00 11.00 1 3.00
rijo ko Pani

517 U/Subansiri/Dumpo MOA&FW Har Khet Rilu koro oto Bogde rijo at Kogi mori 1 2.00 10.00 1 2.00
rijo ko Pani

518 U/Subansiri/Dumpo MOA&FW Har Khet Holakoro to Koden rijo at Kigi Mori 1 3.00 12.00 1 3.00
rijo ko Pani

497 | P a g e
519 U/Subansiri/Dumpo MOA&FW Har Khet Goyekoro to Gour rijo at Kigi Mori 1 6.00 14.00 1 6.00
rijo ko Pani

520 U/Subansiri/Dumpo MOA&FW Har Khet Bakte koro to Peasik rijo at Takse 1 17.00 14.00 2 17.00
rijo ko Pani

521 U/Subansiri/Dumpo MOA&FW Har Khet Ruku koro to Miba rijo at Takse 1 10.00 12.00 1 10.00
rijo ko Pani

522 U/Subansiri/Dumpo MOA&FW Har Khet Ngok koro to Ngok rijo at Nipelibe 1 20.00 17.00 2 20.00
rijo ko Pani

523 U/Subansiri/Dumpo MOA&FW Har Khet Jhan koro to Didir rijo at Gun rijo 1 22.00 18.00 2 22.00
rijo ko Pani

524 U/Subansiri/Dumpo MOA&FW Har Khet Roo koro to Rari rijo at Raririjo 1 40.00 39.00 3 40.00
rijo ko Pani

525 U/Subansiri/Dumpo MOA&FW Har Khet Petom rijo at Tikry 1 15.00 14.00 2 15.00
rijo ko Pani

526 U/Subansiri/Dumpo MOA&FW Har Khet Kokam rijo ay Senya yorpu at Tikry 1 5.00 10.00 1 5.00
rijo ko Pani

527 U/Subansiri/Dumpo MOA&FW Har Khet Sisi koro to Tigri ripa at Tikry 1 10.00 11.00 1 10.00
rijo ko Pani

528 U/Subansiri/Dumpo MOA&FW Har Khet Riktum koro to Pari rijo at Tikry 1 12.00 14.00 2 12.00
rijo ko Pani

529 U/Subansiri/Dumpo MOA&FW Har Khet Haru Koro to Harurijo at Lebi 1 5.00 9.00 1 5.00
rijo ko Pani

530 U/Subansiri/Dumpo MOA&FW Har Khet Haru koro to Pitak rijo at Pitak 1 6.00 10.00 1 6.00
rijo ko Pani

531 U/Subansiri/Dumpo MOA&FW Har Khet Hassu koro to Tuli rijo at Pitak 1 9.00 14.00 1 9.00
rijo ko Pani

498 | P a g e
532 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Mendi rijo at Leyarijo 1 4.00 230.00 1 4.00
rijo ko Pani

533 U/Subansiri/Dumpo MOA&FW Har Khet Petakoro to Leya rijo at Leya rijo 1 3.00 10.00 1 3.00
rijo ko Pani

534 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Lekar rijo at Pai rijo 1 12.00 225.00 2 12.00
rijo ko Pani

535 U/Subansiri/Dumpo MOA&FW Har Khet Aridek koro to Hame riktum at Pairijo 1 2.00 9.00 1 2.00
rijo ko Pani

536 U/Subansiri/Dumpo MOA&FW Har Khet Nguka koro to Nguka rijo at Takte 1 2.00 9.00 1 2.00
rijo ko Pani

537 U/Subansiri/Dumpo MOA&FW Har Khet Hase koro to Rispa rijo at Takte 1 8.00 14.00 1 8.00
rijo ko Pani

538 U/Subansiri/Dumpo MOA&FW Har Khet Sok koro to Gippirij at Gipi 1 10.00 12.00 1 10.00
rijo ko Pani

539 U/Subansiri/Dumpo MOA&FW Har Khet Si koro to Dullerijo at Dinri 1 60.00 47.00 3 60.00
rijo ko Pani

540 U/Subansiri/Dumpo MOA&FW Har Khet Kamju koro to Lekurijo at Dinri 1 6.00 17.00 1 6.00
rijo ko Pani

541 U/Subansiri/Dumpo MOA&FW Har Khet Sikin koro to Roade rijo at Dinri 1 17.00 157.00 2 17.00
rijo ko Pani

542 U/Subansiri/Dumpo MOA&FW Har Khet Sisi koro to Dajamrijo at Denri. 1 5.00 11.00 1 5.00
rijo ko Pani

543 U/Subansiri/Dumpo MOA&FW Har Khet Kamju koro to Tali Namsi at Ngusi 1 9.00 14.00 1 9.00
rijo ko Pani

544 U/Subansiri/Dumpo MOA&FW Har Khet Kobin koro to Bookde rijo at Ngusi 1 12.00 16.00 2 12.00
rijo ko Pani

499 | P a g e
545 U/Subansiri/Dumpo MOA&FW Har Khet Liku koro to Bumdirijo at Lenyi annu 1 9.00 14.00 1 9.00
rijo ko Pani

546 U/Subansiri/Dumpo MOA&FW Har Khet Pinte koro to Yammarijo at Litenirin 1 8.00 72.00 1 8.00
rijo ko Pani

547 U/Subansiri/Dumpo MOA&FW Har Khet Tul koro to Bokpin at Lite Nirin 1 6.00 14.00 1 6.00
rijo ko Pani

548 U/Subansiri/Dumpo MOA&FW Har Khet Gutu koro to Lite rijo at Lite Nirin 1 9.00 13.00 1 9.00
rijo ko Pani

549 U/Subansiri/Dumpo MOA&FW Har Khet Talu koro to Tate rijo at Beli rijo 1 5.00 14.00 1 5.00
rijo ko Pani

550 U/Subansiri/Dumpo MOA&FW Har Khet Dara koro to Beli rijo at Belirijo 1 22.00 27.00 2 22.00
rijo ko Pani

551 U/Subansiri/Dumpo MOA&FW Har Khet Payir koro to Bija rijo at Rilo Village 1 15.0 15.0 1 15.00
rijo ko Pani

CAD NEW SCHEMES


Sl. Name of Concerned Component Activity (CAD for C/O MIP from) Total Command Catchment Period of Estimated Remarks
No. the Ministry/ Number Area/Irrigation Area Implementation cost(in
District/ Department (in ha) (Sq.Km.) Lakhs
Blocks Rs.)
1 Upper Har Khet MOA&FW Banyom Koro to Dego rijo at Bora ropuk vill 1 3.00 13.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
2 Upper Har Khet MOA&FW MI channel at Bomgi liri rijo at Baririjo 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo CE

500 | P a g e
3 Upper Har Khet MOA&FW Jete koro to Bogra rijo at Bora ropuk vill 1 4.00 16.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
4 Upper Har Khet MOA&FW Liba koro to Becha rijo at Bora ropuk vill 1 3.00 9.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
5 Upper Har Khet MOA&FW Jeda koro to Tumte rijo at Bora ropuk vill 1 3.00 23.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
6 Upper Har Khet MOA&FW Joli koro to Jolirijo at Bora ropuk vill 1 2.00 34.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
7 Upper Har Khet MOA&FW Jete koro to Lidhir rijo at Bora ropuk vill 1 3.00 45.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
8 Upper Har Khet MOA&FW Jurpe koro to Degorijo at Bora ropuk vill 1 2.00 23.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
9 Upper Har Khet MOA&FW Ribi koro to Iti Muri rijo at Baririjo 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
10 Upper Har Khet MOA&FW Degokoro to Dego rijo at Bora ropuk vill 1 3.00 32.00 1 3.00
Subansiri/ ko Pani
Baririjo
11 Upper Har Khet MOA&FW Jese River to Tabko A/field at Bora ropuk vill 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo
12 Upper Har Khet MOA&FW Jeri koro to Tali rijo at Bora ropuk vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
13 Upper Har Khet MOA&FW Banyom koro to Banyom rijo at Bora ropuk vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
14 Upper Har Khet MOA&FW Jarpu Koro to Dego rijo at Bora ropuk vill 1 3.00 8.00 1 3.00
Subansiri/ ko Pani
Baririjo

501 | P a g e
15 Upper Har Khet MOA&FW Rat Koro to heje rijo at Bora ropuk vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
16 Upper Har Khet MOA&FW Banyom Koro to Jeru rijo at Bora ropuk vill 1 4.00 11.00 1 4.00
Subansiri/ ko Pani
Baririjo
17 Upper Har Khet MOA&FW Jete koro to Rao jo at Bora ropuk vill 1 4.00 42.00 1 4.00
Subansiri/ ko Pani
Baririjo
18 Upper Har Khet MOA&FW Richi koro to Bogi rijo at Bora ropuk vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
19 Upper Har Khet MOA&FW Jolli koro to Jolli rijo at Bora ropuk vill 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
20 Upper Har Khet MOA&FW Jese koro to Jese rijo at Bora ropuk vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
21 Upper Har Khet MOA&FW Rama koro to Rama rijo at Bora ropuk vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
22 Upper Har Khet MOA&FW Rase koro to Namsi rijo at Bora ropuk vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
23 Upper Har Khet MOA&FW Jebe koro to Jebi rijo at Bora ropuk vill 1 3.00 17.00 1 3.00
Subansiri/ ko Pani
Baririjo
24 Upper Har Khet MOA&FW Jete koro to Hajo rijo at Bora ropuk vill 1 5.00 40.50 1 5.00
Subansiri/ ko Pani
Baririjo
25 Upper Har Khet MOA&FW Jeme koro to Jetu rijo at Bora ropuk vill 1 3.00 42.00 1 3.00
Subansiri/ ko Pani
Baririjo
26 Upper Har Khet MOA&FW Banyom Koro to Momey rijo at Chota Ropuk 1 3.00 15.40 1 3.00
Subansiri/ ko Pani
Baririjo

502 | P a g e
27 Upper Har Khet MOA&FW Momi koro to Momi rijo at Chota Ropuk 1 3.00 51.20 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
28 Upper Har Khet MOA&FW Jenung koro to Rina rijo at Chota Ropuk 1 3.00 15.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
29 Upper Har Khet MOA&FW Banyum koro to Some rijo at Chota Ropuk 1 2.50 16.00 1 2.50 CO Maro
Subansiri/ ko Pani
Baririjo
30 Upper Har Khet MOA&FW Jiga Koro to Ngubu rijo at Chota Ropuk 1 2.00 21.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
31 Upper Har Khet MOA&FW Banyum koro to Banyum rijo at Chota Ropuk 1 2.00 14.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
32 Upper Har Khet MOA&FW Tali koro to Momi rijo at Chota Ropuk 1 3.00 54.00 1 3.00
Subansiri/ ko Pani
Baririjo
33 Upper Har Khet MOA&FW Chere koro to Chere rijo at Dego vill 1 3.00 44.00 1 3.00 ADO Maro
Subansiri/ ko Pani
Baririjo
34 Upper Har Khet MOA&FW Chera stream to Cherarijo at Dego vill 1 2.00 35.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
35 Upper Har Khet MOA&FW Jite koro to Chererijo at Dego vill 1 2.00 13.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
36 Upper Har Khet MOA&FW Juru koro to Chere rite at Dego vill 1 4.00 76.00 1 4.00
Subansiri/ ko Pani
Baririjo
37 Upper Har Khet MOA&FW Sigen koro to Tariko rijo at Dego vill 1 3.00 265.00 1 3.00
Subansiri/ ko Pani
Baririjo
38 Upper Har Khet MOA&FW Sigen koro to Rakir Rayi at Dego vill 1 3.00 267.00 1 3.00
Subansiri/ ko Pani
Baririjo

503 | P a g e
39 Upper Har Khet MOA&FW Tidi koro to Tidi padum at Dego vill 1 3.00 45.00 1 3.00
Subansiri/ ko Pani
Baririjo
40 Upper Har Khet MOA&FW Tidi koro to Makmu rijo at Dego vill 1 3.00 43.00 1 3.00
Subansiri/ ko Pani
Baririjo
41 Upper Har Khet MOA&FW Pabu koro to Takogi rijo at Dego vill 1 3.00 46.00 1 3.00
Subansiri/ ko Pani
Baririjo
42 Upper Har Khet MOA&FW Rade koro to Digirijo at Digi 1 3.00 87.00 1 3.00 ADO Maro
Subansiri/ ko Pani
Baririjo
43 Upper Har Khet MOA&FW Jinium koro to Jinium rijo at Digi 1 2.00 248.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
44 Upper Har Khet MOA&FW Pente koro to Kudum rijo at Digi 1 3.00 65.00 1 3.00
Subansiri/ ko Pani
Baririjo
45 Upper Har Khet MOA&FW Penche koro to penche rijo at Digi 1 3.00 56.00 1 3.00
Subansiri/ ko Pani
Baririjo
46 Upper Har Khet MOA&FW Sinyum koro to Sinyum rijo at Digi 1 4.00 245.00 1 4.00
Subansiri/ ko Pani
Baririjo
47 Upper Har Khet MOA&FW Lerak koro to Geri ripa at Dula 1 4.00 20.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
48 Upper Har Khet MOA&FW Hano koro to Lomerijo at Dula 1 8.00 18.00 1 8.00 CO Maro
Subansiri/ ko Pani
Baririjo
49 Upper Har Khet MOA&FW Pege koro to Geriripa at Dula 1 10.00 25.00 2 10.00 CO Maro
Subansiri/ ko Pani
Baririjo
50 Upper Har Khet MOA&FW Lir koro to Lomeripa at Dula 1 6.00 23.00 1 6.00 CO Maro
Subansiri/ ko Pani
Baririjo

504 | P a g e
51 Upper Har Khet MOA&FW Kokek koro to Begerijo at Dula 1 3.00 31.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
52 Upper Har Khet MOA&FW Tain koro to Sebririjo at Dula 1 4.00 19.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
53 Upper Har Khet MOA&FW Jija koro to Jija rijo at Dula 1 4.00 23.00 1 4.00
Subansiri/ ko Pani
Baririjo
54 Upper Har Khet MOA&FW Lepa koro to Dapo ripa at Dula 1 5.00 22.00 1 5.00
Subansiri/ ko Pani
Baririjo
55 Upper Har Khet MOA&FW Hano koro to Tayen rijo at Dula 1 6.00 23.50 1 6.00
Subansiri/ ko Pani
Baririjo
56 Upper Har Khet MOA&FW Guruk koro to Chaklekrijo at Labak Gongo 1 3.00 17.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
57 Upper Har Khet MOA&FW Ru koro to Radi rijo at Gongo 1 3.00 49.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
58 Upper Har Khet MOA&FW Sigen koro to Tayerijo at Gongo 1 2.00 356.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
59 Upper Har Khet MOA&FW Pere koro to Milom Rikh at Gongo 1 3.00 23.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
60 Upper Har Khet MOA&FW Jiten koro to Tamen rijo at Gongo 1 2.00 12.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
61 Upper Har Khet MOA&FW Pere koro to Tachok rijo at Gongo 1 3.00 24.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
62 Upper Har Khet MOA&FW Sigen koro to Libarijo at Gongo 1 4.00 316.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo

505 | P a g e
63 Upper Har Khet MOA&FW Pere koro to Jitak koro at Dipu Gongo vill 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
64 Upper Har Khet MOA&FW Sigin Koro to Pere rijo at Gongo village 1 4.00 267.00 1 4.00
Subansiri/ ko Pani
Baririjo
65 Upper Har Khet MOA&FW Taliloma Koro to Dugirijo art Labak gongo 1 3.00 45.00 1 3.00
Subansiri/ ko Pani
Baririjo
66 Upper Har Khet MOA&FW Ru koro to Ru Hari at Gongo 1 2.00 47.00 1 2.00
Subansiri/ ko Pani
Baririjo
67 Upper Har Khet MOA&FW Ru koro to Ru Ahk rijo at Gongo 1 3.00 45.00 1 3.00
Subansiri/ ko Pani
Baririjo
68 Upper Har Khet MOA&FW Liren koro to Takajo Ridum at Gongo 1 3.00 37.00 1 3.00
Subansiri/ ko Pani
Baririjo
69 Upper Har Khet MOA&FW Sigen koro to Milom rikke rijo at Gongo 1 4.00 281.00 1 4.00
Subansiri/ ko Pani
Baririjo
70 Upper Har Khet MOA&FW Sigen koro to Sigen rijo at Gongo 1 3.00 283.00 1 3.00
Subansiri/ ko Pani
Baririjo
71 Upper Har Khet MOA&FW Sigen koro to Hakrikji at Gongo 1 4.00 284.00 1 4.00
Subansiri/ ko Pani
Baririjo
72 Upper Har Khet MOA&FW Sigen koro to Aki rite at Gongo 1 3.00 286.00 1 3.00
Subansiri/ ko Pani
Baririjo
73 Upper Har Khet MOA&FW Sigen koro to Aki ridum at Gongo 1 3.00 287.00 1 3.00
Subansiri/ ko Pani
Baririjo
74 Upper Har Khet MOA&FW Sigen koro to Kobene at Gongo 1 3.00 290.00 1 3.00
Subansiri/ ko Pani
Baririjo

506 | P a g e
75 Upper Har Khet MOA&FW Lakbak Koro to Labak Palen at Gongo 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
76 Upper Har Khet MOA&FW Pere koro to Jame rijo at Gongo 1 3.00 25.00 1 3.00
Subansiri/ ko Pani
Baririjo
77 Upper Har Khet MOA&FW Sigen koro to Lirerijo at Gongo 1 3.00 302.00 1 3.00
Subansiri/ ko Pani
Baririjo
78 Upper Har Khet MOA&FW Sigen koro to Komye rijo at Gongo 1 3.00 305.00 1 3.00
Subansiri/ ko Pani
Baririjo
79 Upper Har Khet MOA&FW Sigen koro to Tater rijo at Gongo 1 3.00 307.00 1 3.00
Subansiri/ ko Pani
Baririjo
80 Upper Har Khet MOA&FW Sigen koro to Yadi rijo at Gongo 1 3.00 309.00 1 3.00
Subansiri/ ko Pani
Baririjo
81 Upper Har Khet MOA&FW Sigen koro to Tajen rijo at Gongo 1 3.00 312.00 1 3.00
Subansiri/ ko Pani
Baririjo
82 Upper Har Khet MOA&FW Sigen koro to Jentu rijo at Gongo 1 3.00 315.00 1 3.00
Subansiri/ ko Pani
Baririjo
83 Upper Har Khet MOA&FW Jilok koro to Jilok Hari at Gongo 1 3.00 49.00 1 3.00
Subansiri/ ko Pani
Baririjo
84 Upper Har Khet MOA&FW Sigen koro to Ngunu rijo at Gongo 1 3.00 352.00 1 3.00
Subansiri/ ko Pani
Baririjo
85 Upper Har Khet MOA&FW Sigin koro to Bapu Yorlo at Gongo village 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
86 Upper Har Khet MOA&FW MI channel at Bokmarijo at Haider 1 3.00 9.00 1 3.00 CE
Subansiri/ ko Pani
Baririjo

507 | P a g e
87 Upper Har Khet MOA&FW MI channel at Kau rijo at Haider 1 3.00 7.00 1 3.00 CE
Subansiri/ ko Pani
Baririjo
88 Upper Har Khet MOA&FW MI channel at Rokpo rijo at Haider 1 3.00 10.00 1 3.00 CE
Subansiri/ ko Pani
Baririjo
89 Upper Har Khet MOA&FW Liku koro to Liku rijo at Haider 1 2.00 8.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
90 Upper Har Khet MOA&FW Jilak koro to Juirijo at Haider 1 3.00 34.00 1 3.00
Subansiri/ ko Pani
Baririjo
91 Upper Har Khet MOA&FW Jet koro to Jetrijo at Haider 1 5.00 37.00 1 5.00
Subansiri/ ko Pani
Baririjo
92 Upper Har Khet MOA&FW Jet koro to Belak-pu at Haider village 1 4.00 39.00 1 4.00
Subansiri/ ko Pani
Baririjo
93 Upper Har Khet MOA&FW Jike stream to Rege Rijo at Haider 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
94 Upper Har Khet MOA&FW Namji koro to Gaserijo at Hyder village 1 3.00 17.00 1 3.00
Subansiri/ ko Pani
Baririjo
95 Upper Har Khet MOA&FW Jetkoro to Gacherijo at Haider village 1 4.00 33.00 1 4.00
Subansiri/ ko Pani
Baririjo
96 Upper Har Khet MOA&FW Dar Koro to Dar rijo at Haider 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo
97 Upper Har Khet MOA&FW Jet koro to Mirko rijo at Haider 1 5.00 56.00 1 5.00
Subansiri/ ko Pani
Baririjo
98 Upper Har Khet MOA&FW Jet koro to Take rijo at Haider 1 5.00 58.00 1 5.00
Subansiri/ ko Pani
Baririjo

508 | P a g e
99 Upper Har Khet MOA&FW Ser koro to Ser rijo at Haider 1 3.00 18.00 1 3.00
Subansiri/ ko Pani
Baririjo
100 Upper Har Khet MOA&FW Jelak koro to Bogma rijo at Haider 1 3.00 35.00 1 3.00
Subansiri/ ko Pani
Baririjo
101 Upper Har Khet MOA&FW Jelak koro to Jumpak rijo at Haider 1 3.00 37.00 1 3.00
Subansiri/ ko Pani
Baririjo
102 Upper Har Khet MOA&FW Sinye koro to Jinye rijo at Haider 1 4.00 23.00 1 4.00
Subansiri/ ko Pani
Baririjo
103 Upper Har Khet MOA&FW Tayen Koche to Tayen ripa at Haider 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
104 Upper Har Khet MOA&FW Jet koro to Kirto rijo at Haider 1 3.00 43.00 1 3.00
Subansiri/ ko Pani
Baririjo
105 Upper Har Khet MOA&FW Jelak koro to Migi rijo at Haider 1 5.00 34.00 1 5.00
Subansiri/ ko Pani
Baririjo
106 Upper Har Khet MOA&FW Jet Koro to liku rijo at Haider 1 5.00 46.00 1 5.00
Subansiri/ ko Pani
Baririjo
107 Upper Har Khet MOA&FW Jet koro to Rokpo rijo at Haider 1 5.00 49.00 1 5.00
Subansiri/ ko Pani
Baririjo
108 Upper Har Khet MOA&FW Jiro koro to Koro rijo at Haider 1 3.00 13.00 1 3.00
Subansiri/ ko Pani
Baririjo
109 Upper Har Khet MOA&FW Dar Koro to Chiku rijo at Haider 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
110 Upper Har Khet MOA&FW Tapnanmchi Nallah to Rotupaka at Korarijo 1 3.00 14.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo

509 | P a g e
111 Upper Har Khet MOA&FW Jilu koro to Rete rijo at Korarijo 1 1.00 91.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
112 Upper Har Khet MOA&FW Lenyo koro to Pute rijo at Korarijo 1 2.00 14.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
113 Upper Har Khet MOA&FW Lenye koro to Pute rijo at Korarijo 1 4.00 10.00 1 4.00
Subansiri/ ko Pani
Baririjo
114 Upper Har Khet MOA&FW Ngor Koro to Korarijo at Korarijo Vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
115 Upper Har Khet MOA&FW Jilu koro to Pega rikme at Korarijo 1 4.00 89.00 1 4.00
Subansiri/ ko Pani
Baririjo
116 Upper Har Khet MOA&FW Tagom koro to New Kulo at New Kulo vill 1 10.00 16.00 1 10.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
117 Upper Har Khet MOA&FW Ribi koro to Rago Mori at Kulo 1 10.00 11.00 2 10.00 CO Maro
Subansiri/ ko Pani
Baririjo
118 Upper Har Khet MOA&FW Aag koro to Yache rijo at Kulo 1 3.00 15.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
119 Upper Har Khet MOA&FW Ribi koro to Iti Mori at Kulo 1 10.00 16.00 2 10.00 CO Maro
Subansiri/ ko Pani
Baririjo
120 Upper Har Khet MOA&FW Tache koro to Riyirijo at Kulo 1 3.00 13.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
121 Upper Har Khet MOA&FW Dodo koro to Dodo rijo at Kulo vill 1 3.00 11.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
122 Upper Har Khet MOA&FW Jaa koro to Pekirrijo at Kulo 1 4.00 21.00 1 4.00
Subansiri/ ko Pani
Baririjo

510 | P a g e
123 Upper Har Khet MOA&FW Aag Koro to Kamrekrijo at New Kulo 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
124 Upper Har Khet MOA&FW Kuchum Koro to Tamdurijo at Old Kulo 1 4.00 16.00 1 4.00
Subansiri/ ko Pani
Baririjo
125 Upper Har Khet MOA&FW Tute koro to Riyi rijo at Kulo vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
126 Upper Har Khet MOA&FW Ruri koro to Yache rijo at Kulo vill 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
127 Upper Har Khet MOA&FW Rok muri koro to Muri rijo at Kulo vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
128 Upper Har Khet MOA&FW Ruri koro to Ruri rijo at Kulo vill 1 4.00 15.00 1 4.00
Subansiri/ ko Pani
Baririjo
129 Upper Har Khet MOA&FW Dodo koro to Dodo ko rijo at Kulo vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
130 Upper Har Khet MOA&FW Tachak koro to Kulo rijo at Kulo vill 1 4.00 11.00 1 4.00
Subansiri/ ko Pani
Baririjo
131 Upper Har Khet MOA&FW Rebe koro to rebe rijo at Kulo vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
132 Upper Har Khet MOA&FW Tare koro to Laigirijo at Laigi vill 1 10.00 14.00 1 10.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
133 Upper Har Khet MOA&FW Gombo koro to Dai rijo at Laigi vill 1 4.00 10.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
134 Upper Har Khet MOA&FW Radkoro to Radrijo at Laigi vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo

511 | P a g e
135 Upper Har Khet MOA&FW Sik koro to Sibri rijo at Laigi Vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
136 Upper Har Khet MOA&FW Gombo koro to Deey rijo at Laigi Vill 1 3.00 8.00 1 3.00
Subansiri/ ko Pani
Baririjo
137 Upper Har Khet MOA&FW Choch koro to Choche rijo at Laigi Vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
138 Upper Har Khet MOA&FW Siip koro to Kulo repe rijo at Laigi Vill 1 3.00 7.00 1 3.00
Subansiri/ ko Pani
Baririjo
139 Upper Har Khet MOA&FW Chere koro to Mehari rijo at Laigi Vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
140 Upper Har Khet MOA&FW Chere koro to Chere rijo at Laigi Vill 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo
141 Upper Har Khet MOA&FW Hagrik Koro to Hagrik rijo at Laigi Vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
142 Upper Har Khet MOA&FW Rade rijo at Laigi village 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
143 Upper Har Khet MOA&FW Ngokko koro to Biram mori at Laigi Vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
144 Upper Har Khet MOA&FW Parke koro to Parke rijo at Laigi Vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
145 Upper Har Khet MOA&FW Rade koro to Taktir rijo at Laigi Vill 1 3.00 19.00 1 3.00
Subansiri/ ko Pani
Baririjo
146 Upper Har Khet MOA&FW Sipi koro to Kodum rijo at Laigi Vill 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo

512 | P a g e
147 Upper Har Khet MOA&FW Sipou koro to Rade rijo at Laigi Vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
148 Upper Har Khet MOA&FW Chichi koro to Chichi rijo at Laigi Vill 1 4.00 9.00 1 4.00
Subansiri/ ko Pani
Baririjo
149 Upper Har Khet MOA&FW Kopen koro to Dira Namchi at Laigi Vill 1 3.00 8.00 1 3.00
Subansiri/ ko Pani
Baririjo
150 Upper Har Khet MOA&FW Yach Koro to Tangone Rijo at Lebri vill 1 3.00 9.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
151 Upper Har Khet MOA&FW Mete koro to Nyipo ko rijo at Lebri vill 1 4.00 13.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
152 Upper Har Khet MOA&FW Labe koro to Labe rijo at Lebri vill 1 2.00 14.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
153 Upper Har Khet MOA&FW Yachi koro to Marak rijo at Lebri vill 1 4.00 16.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
154 Upper Har Khet MOA&FW Lebe stream to Leberijo at Lebri vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
155 Upper Har Khet MOA&FW Maglam koro to Maglam rijo at Lebri vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
156 Upper Har Khet MOA&FW Mete koro to Mete rijo at Lebri vill 1 2.00 12.00 1 2.00
Subansiri/ ko Pani
Baririjo
157 Upper Har Khet MOA&FW Meche koro to Tikru rijo at Lebri vill 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
158 Upper Har Khet MOA&FW Tumlongou koro to Tumloko at Lebri vill 1 2.00 16.00 1 2.00
Subansiri/ ko Pani
Baririjo

513 | P a g e
159 Upper Har Khet MOA&FW Lebe koro to Lebe rijo at Lebri vill 1 2.00 23.00 1 2.00
Subansiri/ ko Pani
Baririjo
160 Upper Har Khet MOA&FW Siiti koro to Sikri rijo at Lebri vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
161 Upper Har Khet MOA&FW Gohi koro to Komleri at Lebri vill 1 2.00 11.00 1 2.00
Subansiri/ ko Pani
Baririjo
162 Upper Har Khet MOA&FW Paye koro to Silik rijo at Lebri vill 1 3.00 24.00 1 3.00
Subansiri/ ko Pani
Baririjo
163 Upper Har Khet MOA&FW Silik koro to Silikgi rijo at Lebri vill 1 3.00 16.00 1 3.00
Subansiri/ ko Pani
Baririjo
164 Upper Har Khet MOA&FW Silik koro to Peda rijo at Lebri vill 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
165 Upper Har Khet MOA&FW Paya koro to Paya rijo at Lebri vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
166 Upper Har Khet MOA&FW Paya koro to Bikar Namchi at Lebri vill 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
167 Upper Har Khet MOA&FW Leh koro to Kosak Konyak at Lebri 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo
168 Upper Har Khet MOA&FW Dere Koro to Tayer rijo at Lipu 1 4.00 12.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
169 Upper Har Khet MOA&FW Kapjikoro to Taji rijo at Lipu 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
170 Upper Har Khet MOA&FW Lipu koro to lipu rijo at Lipu 1 2.00 14.00 1 2.00
Subansiri/ ko Pani
Baririjo

514 | P a g e
171 Upper Har Khet MOA&FW Jilu Koro to Tar Rijo at Luchi 1 4.00 78.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
172 Upper Har Khet MOA&FW Nyer Koro to Kamya rijo at Luchi 1 5.00 21.30 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
173 Upper Har Khet MOA&FW CC lining from Jilu koro to Dabrijo at Luchi 1 50.00 61.00 3 50.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
174 Upper Har Khet MOA&FW Jilu koro to Tabarijo at Luchi 1 4.00 76.00 1 4.00
Subansiri/ ko Pani
Baririjo
175 Upper Har Khet MOA&FW Pase koro to Jampu rijo at Luchi 1 5.00 10.00 1 5.00
Subansiri/ ko Pani
Baririjo
176 Upper Har Khet MOA&FW Nyer koro to Jone rijo at Luchi 1 3.00 15.60 1 3.00
Subansiri/ ko Pani
Baririjo
177 Upper Har Khet MOA&FW Jiren Koro to Jiren rijo at Luchi village 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
178 Upper Har Khet MOA&FW Gaj koro to Pasi rijo at Luchi 1 3.00 19.00 1 3.00
Subansiri/ ko Pani
Baririjo
179 Upper Har Khet MOA&FW Jeren koro to Pili rijo at Luchi 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
180 Upper Har Khet MOA&FW Kasak koro to lape rijo at Luchi 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo
181 Upper Har Khet MOA&FW Jibu koro to Pasi rijo at Luchi 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
182 Upper Har Khet MOA&FW Jibu koro to Jibu rijo at Luchi 1 4.00 15.00 1 4.00
Subansiri/ ko Pani
Baririjo

515 | P a g e
183 Upper Har Khet MOA&FW Sim koro to Lepe rijo at Luchi 1 3.00 13.00 1 3.00
Subansiri/ ko Pani
Baririjo
184 Upper Har Khet MOA&FW Tab Koro to Jerne rijo at Luchi 1 4.00 11.00 1 4.00
Subansiri/ ko Pani
Baririjo
185 Upper Har Khet MOA&FW Jilu koro to Tare rijo at Luchi 1 4.00 79.00 1 4.00
Subansiri/ ko Pani
Baririjo
186 Upper Har Khet MOA&FW Jilu koro to Jinir rijo at Luchi 1 4.00 81.00 1 4.00
Subansiri/ ko Pani
Baririjo
187 Upper Har Khet MOA&FW Nyare koro to Takek rijo at Luchi 1 5.00 21.00 1 5.00
Subansiri/ ko Pani
Baririjo
188 Upper Har Khet MOA&FW Ritum koro to Hakar rijo at Maro 1 3.00 12.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
189 Upper Har Khet MOA&FW Jelak koro to Magra rijo at Maro 1 3.00 27.00 1 3.00 ADO Maro
Subansiri/ ko Pani
Baririjo
190 Upper Har Khet MOA&FW Bijir koro to Rite rijo at Maro 1 2.00 12.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
191 Upper Har Khet MOA&FW Jelak koro to Jelak rijo at Maro 1 3.00 22.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
192 Upper Har Khet MOA&FW Jelak Koro to Riktumko at Maro 1 4.00 21.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
193 Upper Har Khet MOA&FW Jelak koro to Dumar rijo at Maro 1 3.00 20.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
194 Upper Har Khet MOA&FW Taram Koche to Jirek rijo at Maro 1 3.00 14.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo

516 | P a g e
195 Upper Har Khet MOA&FW Tanjo river to Tanjo at Maro 1 2.00 9.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
196 Upper Har Khet MOA&FW Hito koro to Minyomrijo at Maro 1 2.00 16.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
197 Upper Har Khet MOA&FW Dalo koro to Kingamrijo at Maro 1 2.00 18.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
198 Upper Har Khet MOA&FW Jelak koro to Kokak rijo at Maro 1 1.00 26.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
199 Upper Har Khet MOA&FW Jelak koro to Riterijo at Maro 1 1.00 26.50 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
200 Upper Har Khet MOA&FW Neoro koro to Bamenrijo at Maro 1 1.00 10.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
201 Upper Har Khet MOA&FW Jha koro to Bage rijo at Maro 1 2.00 21.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
202 Upper Har Khet MOA&FW Jha koro to Jigo Larjo rijo at Maro 1 2.00 23.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
203 Upper Har Khet MOA&FW Tur koro to Jheer Pata at Maro 1 3.00 11.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
204 Upper Har Khet MOA&FW Jelak koro to Gekir rijo at Maro 1 1.00 25.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
205 Upper Har Khet MOA&FW Jelak Koro to Ruter rijo at Maro 1 1.00 26.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
206 Upper Har Khet MOA&FW CC lining from Ritumrijo to Hakerrijo at Maro 1 4.00 24.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo

517 | P a g e
207 Upper Har Khet MOA&FW Nide koro to Jigorijo at Maro 1 4.00 22.00 1 4.00
Subansiri/ ko Pani
Baririjo
208 Upper Har Khet MOA&FW Yama Koro to Jharijo at Maro 1 3.00 19.80 1 3.00
Subansiri/ ko Pani
Baririjo
209 Upper Har Khet MOA&FW Jelak rijo at Maro village 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
210 Upper Har Khet MOA&FW Radir koro to Radir Rijo at Maro village 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
211 Upper Har Khet MOA&FW Lepa koro to Leparijo at under Maro circle 1 3.00 27.60 1 3.00
Subansiri/ ko Pani
Baririjo
212 Upper Har Khet MOA&FW Limik Koro to Tode rijo under Maro circle. 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
213 Upper Har Khet MOA&FW Dil Koro to Dilrijo at Maro circle. 1 3.00 16.00 1 3.00
Subansiri/ ko Pani
Baririjo
214 Upper Har Khet MOA&FW Bomtarijo WRC field at (Lote Bongo)Maro 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
215 Upper Har Khet MOA&FW Jha koro to Yamah rijo at Maro vill. 1 4.00 24.00 1 4.00
Subansiri/ ko Pani
Baririjo
216 Upper Har Khet MOA&FW Jelak koro to Buchi rijo at Maro 1 4.00 23.00 1 4.00
Subansiri/ ko Pani
Baririjo
217 Upper Har Khet MOA&FW Nyor koro to Nyor rijo at Maro 1 3.00 13.00 1 3.00
Subansiri/ ko Pani
Baririjo
218 Upper Har Khet MOA&FW Jelak koro to Bijir rijo at Maro 1 3.00 24.00 1 3.00
Subansiri/ ko Pani
Baririjo

518 | P a g e
219 Upper Har Khet MOA&FW Jelak koro to Jilak bokpen at Maro 1 3.00 25.00 1 3.00
Subansiri/ ko Pani
Baririjo
220 Upper Har Khet MOA&FW Jha koro to Jaarijo at Maro 1 3.00 22.00 1 3.00
Subansiri/ ko Pani
Baririjo
221 Upper Har Khet MOA&FW Jha koro to Marerijo at Maro 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
222 Upper Har Khet MOA&FW Jelak Bokche to Tager rijo at Maro 1 5.00 18.00 1 5.00
Subansiri/ ko Pani
Baririjo
223 Upper Har Khet MOA&FW Jha koro to Mabom rijo at Maro 1 8.00 19.00 2 8.00
Subansiri/ ko Pani
Baririjo
224 Upper Har Khet MOA&FW Banyom Koro to Banyom rijo at Nijomote 1 4.00 10.00 1 4.00
Subansiri/ ko Pani
Baririjo
225 Upper Har Khet MOA&FW Bamyom to Ruku Koro at Nijo Mote 1 4.00 12.00 1 4.00
Subansiri/ ko Pani
Baririjo
226 Upper Har Khet MOA&FW Tung Koro to Radrijo at Haji 1 2.00 11.00 1 2.00 MLA
Subansiri/ ko Pani
Baririjo
227 Upper Har Khet MOA&FW Rad koro to Puche Putu at New Haji 1 4.00 16.00 1 4.00 ADO Maro
Subansiri/ ko Pani
Baririjo
228 Upper Har Khet MOA&FW Dese koro to Talirijo at New Haji 1 5.00 10.00 2 5.00 ADO Maro
Subansiri/ ko Pani
Baririjo
229 Upper Har Khet MOA&FW Komjum nallah to Eli Tanorijo at New Haji 1 2.00 8.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
230 Upper Har Khet MOA&FW Rade koro to Bumro Koro at Repe Haji 1 5.00 15.00 1 5.00 CO Maro
Subansiri/ ko Pani
Baririjo

519 | P a g e
231 Upper Har Khet MOA&FW Tangh koro to Raderijo at New Haji 1 2.50 10.00 1 2.50 CO Maro
Subansiri/ ko Pani
Baririjo
232 Upper Har Khet MOA&FW Jupkoro to Lelerijo at Old Haji. 1 2.00 8.00 1 2.00
Subansiri/ ko Pani
Baririjo
233 Upper Har Khet MOA&FW Talumkoro to Bogbarijo at Old Haji village 1 2.00 9.00 1 2.00
Subansiri/ ko Pani
Baririjo
234 Upper Har Khet MOA&FW Rade koro to Pente rijo at New Haji 1 2.00 11.39 1 2.00
Subansiri/ ko Pani
Baririjo
235 Upper Har Khet MOA&FW Rade Koro to Bogdurijo at New Haji 1 4.00 10.50 1 4.00
Subansiri/ ko Pani
Baririjo
236 Upper Har Khet MOA&FW Dike koro to Yachugii at New Haji 1 2.00 12.00 1 2.00
Subansiri/ ko Pani
Baririjo
237 Upper Har Khet MOA&FW Mida Sike Koro to Mida sike at New Haji 1 2.00 9.00 1 2.00
Subansiri/ ko Pani
Baririjo
238 Upper Har Khet MOA&FW Tangu koro to Tangu rijo at New Haji 1 2.00 14.00 1 2.00
Subansiri/ ko Pani
Baririjo
239 Upper Har Khet MOA&FW Desh Nyolo stream to Desh Nyolo at new Haji 1 2.00 8.00 1 2.00
Subansiri/ ko Pani
Baririjo
240 Upper Har Khet MOA&FW Rade koro to Kukum rijo at New Haji 1 4.00 13.00 1 4.00
Subansiri/ ko Pani
Baririjo
241 Upper Har Khet MOA&FW Desh koro to Rat Bokpen at New Haji 1 2.00 8.00 1 2.00
Subansiri/ ko Pani
Baririjo
242 Upper Har Khet MOA&FW Desh koro to Tangu Nyoche at New Haji 1 3.00 9.00 1 3.00
Subansiri/ ko Pani
Baririjo

520 | P a g e
243 Upper Har Khet MOA&FW Desh koro to Bugde rijo at New Haji 1 3.00 9.40 1 3.00
Subansiri/ ko Pani
Baririjo
244 Upper Har Khet MOA&FW Puru Koro to Puru rijo at New Haji 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
245 Upper Har Khet MOA&FW Rade Koro to Rade rijo at New Haji 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
246 Upper Har Khet MOA&FW Puru Koro to Yachugi at New Haji 1 3.00 16.00 1 3.00
Subansiri/ ko Pani
Baririjo
247 Upper Har Khet MOA&FW Yachugi koro to Telgi rijo at New Haji 1 3.00 8.00 1 3.00
Subansiri/ ko Pani
Baririjo
248 Upper Har Khet MOA&FW Siji koro to Kamli rijo at Old Haji 1 3.00 16.00 1 3.00
Subansiri/ ko Pani
Baririjo
249 Upper Har Khet MOA&FW Siji koro to Ribi rijo at Old Haji 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
250 Upper Har Khet MOA&FW Sigen Koro to Puhe Rijo at Old Haji 1 4.00 199.80 1 4.00
Subansiri/ ko Pani
Baririjo
251 Upper Har Khet MOA&FW Pobom koro to Bogba rijo at Old Haji 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
252 Upper Har Khet MOA&FW Sigen koro to Garta rijo at Old Haji 1 3.00 200.00 1 3.00
Subansiri/ ko Pani
Baririjo
253 Upper Har Khet MOA&FW Rine Koro to Guba rijo at New Haji 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
254 Upper Har Khet MOA&FW Rade koro to Bejor rijo at New Haji 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo

521 | P a g e
255 Upper Har Khet MOA&FW Desh koro to Rade rijo at New Haji 1 3.00 18.00 1 3.00
Subansiri/ ko Pani
Baririjo
256 Upper Har Khet MOA&FW Sinyum koro to Tajum rijo at Nuk 1 6.00 330.00 2 6.00 CO Maro
Subansiri/ ko Pani
Baririjo
257 Upper Har Khet MOA&FW Lomgo koro to Jesir rijo at Nuk 1 4.00 22.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
258 Upper Har Khet MOA&FW Sinyum koro to Tajum Bukri at Nuk 1 3.00 361.00 1 3.00
Subansiri/ ko Pani
Baririjo
259 Upper Har Khet MOA&FW Sinyum koro to Jisir rijo at Nuk 1 3.00 378.00 1 3.00
Subansiri/ ko Pani
Baririjo
260 Upper Har Khet MOA&FW Sinyum koro to Rade rijo at Nuk 1 3.00 369.00 1 3.00
Subansiri/ ko Pani
Baririjo
261 Upper Har Khet MOA&FW Subansiri river to Tamarijo at Nuk 1 3.00 4569.00 1 3.00
Subansiri/ ko Pani
Baririjo
262 Upper Har Khet MOA&FW Subansiri river to Takarijo at Nuk 1 3.00 4569.00 1 3.00
Subansiri/ ko Pani
Baririjo
263 Upper Har Khet MOA&FW Subansiri river to Namkorijo at Nuk 1 3.00 4569.00 2 3.00
Subansiri/ ko Pani
Baririjo
264 Upper Har Khet MOA&FW Subansiri river to Raderijo at Nuk 1 3.00 4569.00 1 3.00
Subansiri/ ko Pani
Baririjo
265 Upper Har Khet MOA&FW Subansiri river to Tain pub at Nuk 1 5.00 4569.00 1 5.00
Subansiri/ ko Pani
Baririjo
266 Upper Har Khet MOA&FW Subansiri river to Jeser rijo at Nuk 1 4.00 4569.00 1 4.00
Subansiri/ ko Pani
Baririjo

522 | P a g e
267 Upper Har Khet MOA&FW Subansiri river to Ruk rijo at Nuk 1 3.00 4569.00 1 3.00
Subansiri/ ko Pani
Baririjo
268 Upper Har Khet MOA&FW Subansiri river to Rode rijo at Nuk 1 3.00 4569.00 1 3.00
Subansiri/ ko Pani
Baririjo
269 Upper Har Khet MOA&FW Jisir koro to Jisir rijo at Nuk 1 5.00 25.00 1 5.00
Subansiri/ ko Pani
Baririjo
270 Upper Har Khet MOA&FW Lungo Koro to Rukrijo at Nuk 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
271 Upper Har Khet MOA&FW Ruk koro to Ruk rijo at Nuk 1 7.00 14.00 1 7.00
Subansiri/ ko Pani
Baririjo
272 Upper Har Khet MOA&FW Rade koro to Panimuri rijo at Panimuri 1 2.00 20.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
273 Upper Har Khet MOA&FW Rade koro to Tigli rite at Pani Muri 1 3.00 19.00 1 3.00
Subansiri/ ko Pani
Baririjo
274 Upper Har Khet MOA&FW Til Koro to Tilrijo at Pani muri 1 3.00 15.00 1 3.00
Subansiri/ ko Pani
Baririjo
275 Upper Har Khet MOA&FW Rade koro to Peka rijo at Pani Muri 1 3.00 24.00 1 3.00
Subansiri/ ko Pani
Baririjo
276 Upper Har Khet MOA&FW Rade koro to Dojar riji at Pani Muri 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
277 Upper Har Khet MOA&FW Til Koro to Yamik rijo at Pani muri 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
278 Upper Har Khet MOA&FW Til Koro to Tikli rijo at Pani muri 1 3.00 18.00 1 3.00
Subansiri/ ko Pani
Baririjo

523 | P a g e
279 Upper Har Khet MOA&FW Hulu Koro to Yalom rijo at Panimuri 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
280 Upper Har Khet MOA&FW Hulu Koro to Tadom rijo at Panimuri 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
281 Upper Har Khet MOA&FW Hulu Koro to Jumbuk rijo at Panimuri 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
282 Upper Har Khet MOA&FW Hulu Koro to Kemporijo at Panimuri 1 5.00 16.00 1 5.00
Subansiri/ ko Pani
Baririjo
283 Upper Har Khet MOA&FW Rade koro to Takir rijo at Pani Muri 1 4.00 23.00 1 4.00
Subansiri/ ko Pani
Baririjo
284 Upper Har Khet MOA&FW Rade koro to Yayo rijo at Pani Muri 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
285 Upper Har Khet MOA&FW Rade koro to Punia rijo at Pani Muri 1 3.00 19.00 1 3.00
Subansiri/ ko Pani
Baririjo
286 Upper Har Khet MOA&FW Rade koro to Dora rijo at Pani Muri 1 3.00 22.00 1 3.00
Subansiri/ ko Pani
Baririjo
287 Upper Har Khet MOA&FW Pigi koro to Pigi rijo at Riko 1 4.00 12.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
288 Upper Har Khet MOA&FW Dego koro to Dagi rijo at Riko vill 1 3.00 16.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
289 Upper Har Khet MOA&FW Niba Koro to Dagi rijo at Riko vill 1 3.00 8.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
290 Upper Har Khet MOA&FW Pipum koro to Pipum rijo at Riko vill 1 3.00 13.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo

524 | P a g e
291 Upper Har Khet MOA&FW Puche koro to Tajurijo at Riko vill 1 10.00 10.00 1 10.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
292 Upper Har Khet MOA&FW Yam koro to Yamrijo at Riko vill 1 15.00 13.00 2 15.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
293 Upper Har Khet MOA&FW Pobom koro to Pobomrijo at Riko 1 4.00 9.00 1 4.00 ADO Maro
Subansiri/ ko Pani
Baririjo
294 Upper Har Khet MOA&FW Dikgi koro to Pikgi rijo at Riko vill 1 7.00 9.00 2 7.00 CO Maro
Subansiri/ ko Pani
Baririjo
295 Upper Har Khet MOA&FW Jingi koro to Jingi rijo at Riko vill 1 4.00 6.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
296 Upper Har Khet MOA&FW Sil koro to Boarijo at Riko vill 1 3.00 8.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
297 Upper Har Khet MOA&FW Jutekoro to Jucherijo at Riko village 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
298 Upper Har Khet MOA&FW Pekgi stream to Pegki rijo at Riko village 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
299 Upper Har Khet MOA&FW Rochi koro to WRC field at Riko 1 3.00 13.00 1 3.00
Subansiri/ ko Pani
Baririjo
300 Upper Har Khet MOA&FW Puche koro to Jute rijo at Riko 1 3.00 11.00 1 3.00
Subansiri/ ko Pani
Baririjo
301 Upper Har Khet MOA&FW Jute Koro to Juse rijo at Riko vill 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
302 Upper Har Khet MOA&FW Pimpu koro to rite rijo at Riko 1 4.00 14.00 1 4.00
Subansiri/ ko Pani
Baririjo

525 | P a g e
303 Upper Har Khet MOA&FW Bute koro to Chiku namchi Riko 1 3.00 12.00 1 3.00
Subansiri/ ko Pani
Baririjo
304 Upper Har Khet MOA&FW Lilekoro to Namsi rijo at Riko 1 3.00 14.00 1 3.00
Subansiri/ ko Pani
Baririjo
305 Upper Har Khet MOA&FW Hid koro to Kuchi rijo at Riko vill 1 4.00 8.00 1 4.00
Subansiri/ ko Pani
Baririjo
306 Upper Har Khet MOA&FW Roper koro to Lupa rijo at Riko vill 1 4.00 9.00 1 4.00
Subansiri/ ko Pani
Baririjo
307 Upper Har Khet MOA&FW Tago koro to Tago rijo at Riko vill 1 4.00 7.00 1 4.00
Subansiri/ ko Pani
Baririjo
308 Upper Har Khet MOA&FW Pobom koro to Dumchi rijo at Riko vill 1 5.00 8.00 1 5.00
Subansiri/ ko Pani
Baririjo
309 Upper Har Khet MOA&FW Jute koro to Taju rijo at Riko vill 1 4.00 15.00 1 4.00
Subansiri/ ko Pani
Baririjo
310 Upper Har Khet MOA&FW Pete koro to Pete rijo at Riko vill 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo
311 Upper Har Khet MOA&FW Sinyum koro to Nyumsen rijo at Ronya 1 4.00 275.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
312 Upper Har Khet MOA&FW Toru koro to Toru rijo at Ronya 1 3.00 6.00 1 3.00
Subansiri/ ko Pani
Baririjo
313 Upper Har Khet MOA&FW Tali koro to Talirijo at Ronya 1 2.00 9.00 1 2.00
Subansiri/ ko Pani
Baririjo
314 Upper Har Khet MOA&FW Som koro to Banyom rijo at Ronya 1 2.00 11.00 1 2.00
Subansiri/ ko Pani
Baririjo

526 | P a g e
315 Upper Har Khet MOA&FW Liba koro to Liba rijo at Ronya 1 2.00 14.00 1 2.00
Subansiri/ ko Pani
Baririjo
316 Upper Har Khet MOA&FW Banyom koro to Yanya rijo at Ronya 1 2.00 49.00 1 2.00
Subansiri/ ko Pani
Baririjo
317 Upper Har Khet MOA&FW Banyom koro to Liba rijo at Ronya 1 2.00 51.00 1 2.00
Subansiri/ ko Pani
Baririjo
318 Upper Har Khet MOA&FW Yomdo koro to yomdo rijo at Ronya 1 3.00 21.00 1 3.00
Subansiri/ ko Pani
Baririjo
319 Upper Har Khet MOA&FW Jorpi koro to Dego rijo at Ronya 1 2.00 13.00 1 2.00
Subansiri/ ko Pani
Baririjo
320 Upper Har Khet MOA&FW Liga koro to Bopu rijo at Ronya 1 2.00 11.00 1 2.00
Subansiri/ ko Pani
Baririjo
321 Upper Har Khet MOA&FW Jirum koro to Jully rijo Rumte village 1 3.00 38.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
322 Upper Har Khet MOA&FW Sirum koro to Sirumrijo at Rumte vill 1 20.00 16.00 2 20.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
323 Upper Har Khet MOA&FW Bopum koro to Bopumrijo at Rumte vill 1 10.00 14.00 1 10.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
324 Upper Har Khet MOA&FW Bapum Stream to Gamrarijo at Rumte 1 6.00 13.00 2 6.00 ADO Maro
Subansiri/ ko Pani
Baririjo
325 Upper Har Khet MOA&FW Sinyo nallah to Lero at Rumte 1 4.00 14.00 1 4.00 ADO Maro
Subansiri/ ko Pani
Baririjo
326 Upper Har Khet MOA&FW Takgem nallah to Pache rijo at Rumte 1 5.00 11.00 2 5.00 ADO Maro
Subansiri/ ko Pani
Baririjo

527 | P a g e
327 Upper Har Khet MOA&FW Gipon koro to Nyigom rijo at Rumte 1 2.00 12.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
328 Upper Har Khet MOA&FW Sinyo koro to Bagarijo at Rumte 1 1.00 10.00 1 1.00 ADO Maro
Subansiri/ ko Pani
Baririjo
329 Upper Har Khet MOA&FW Kote koro to Raterijo at Rumte 1 2.00 13.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
330 Upper Har Khet MOA&FW Jile koro to Jajerijo at Rumte vill 1 10.00 32.00 1 10.00 CO Maro
Subansiri/ ko Pani
Baririjo
331 Upper Har Khet MOA&FW Pira koro to Rumteripa at Rumte vill 1 1.00 14.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
332 Upper Har Khet MOA&FW Rojum rijo to Nyoi Koro Rumte vill 1 3.00 56.00 1 3.00
Subansiri/ ko Pani
Baririjo
333 Upper Har Khet MOA&FW Doyom koro to Doyom rijo at Rumte. 1 4.00 58.00 1 4.00
Subansiri/ ko Pani
Baririjo
334 Upper Har Khet MOA&FW Meche koro to Meche rijo at Rumte vill 1 3.00 67.00 1 3.00
Subansiri/ ko Pani
Baririjo
335 Upper Har Khet MOA&FW Jinyi Koro to Gerta rijo at Rumte vill 1 3.00 54.00 1 3.00
Subansiri/ ko Pani
Baririjo
336 Upper Har Khet MOA&FW Lero Aji to Tador Hari at Rumte vill 1 3.00 66.00 1 3.00
Subansiri/ ko Pani
Baririjo
337 Upper Har Khet MOA&FW Lero Aji to Mobara Hari at Rumte vill 1 3.00 60.00 1 3.00
Subansiri/ ko Pani
Baririjo
338 Upper Har Khet MOA&FW Lero aji to Modi rijo at Rumte vill 1 3.00 66.00 1 3.00
Subansiri/ ko Pani
Baririjo

528 | P a g e
339 Upper Har Khet MOA&FW Lero koro to lero kochum at Rumte vill 1 3.00 69.00 1 3.00
Subansiri/ ko Pani
Baririjo
340 Upper Har Khet MOA&FW Lero aji to Pache rijo at Rumte vill 1 3.00 61.00 1 3.00
Subansiri/ ko Pani
Baririjo
341 Upper Har Khet MOA&FW Sinyo koro to Sinyo Hari at Rumte vill 1 3.00 24.00 1 3.00
Subansiri/ ko Pani
Baririjo
342 Upper Har Khet MOA&FW Sinyo koro to Epona at Rumte vill 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
343 Upper Har Khet MOA&FW Sinyo koro to Rumte rijo at Rumte vill 1 3.00 29.00 1 3.00
Subansiri/ ko Pani
Baririjo
344 Upper Har Khet MOA&FW Sirum koro to Juli hari at Rumte vill 1 5.00 164.00 1 5.00
Subansiri/ ko Pani
Baririjo
345 Upper Har Khet MOA&FW Sirum koro to Mirma rijo at Rumte vill 1 5.00 174.00 1 5.00
Subansiri/ ko Pani
Baririjo
346 Upper Har Khet MOA&FW Sirum koro to Bolek rijo at Rumte vill 1 4.00 167.00 1 4.00
Subansiri/ ko Pani
Baririjo
347 Upper Har Khet MOA&FW Bupum koro to Gamra rijo at Rumte vill 1 3.00 32.00 1 3.00
Subansiri/ ko Pani
Baririjo
348 Upper Har Khet MOA&FW Lero koro to lero rijo at Rumte vill 1 4.00 62.00 1 4.00
Subansiri/ ko Pani
Baririjo
349 Upper Har Khet MOA&FW Likke Koro to Jaje rite at Rumte vill 1 3.00 23.00 1 3.00
Subansiri/ ko Pani
Baririjo
350 Upper Har Khet MOA&FW Kamdi koro to Kamdi Namsi at Rumte vill 1 3.00 36.00 1 3.00
Subansiri/ ko Pani
Baririjo

529 | P a g e
351 Upper Har Khet MOA&FW Kerto koro to Kutu rijo at Rumte vill 1 3.00 62.00 1 3.00
Subansiri/ ko Pani
Baririjo
352 Upper Har Khet MOA&FW Nyapik Rijo to Mirma Koro Rumte vill 1 3.00 76.00 1 3.00
Subansiri/ ko Pani
Baririjo
353 Upper Har Khet MOA&FW Sinyum koro to Rinarijo at Tabarijo 1 4.00 274.60 1 4.00
Subansiri/ ko Pani
Baririjo
354 Upper Har Khet MOA&FW Sinyum koro to Ngobi rijo at Tabarijo 1 3.00 273.30 1 3.00
Subansiri/ ko Pani
Baririjo
355 Upper Har Khet MOA&FW Kose Koro to Kose Rijo at Tabarijo 1 3.00 53.00 1 3.00
Subansiri/ ko Pani
Baririjo
356 Upper Har Khet MOA&FW Jiga koro to Yapak rijo at Tabarijo 1 3.00 56.00 1 3.00
Subansiri/ ko Pani
Baririjo
357 Upper Har Khet MOA&FW Jiga koro to Yanya rijo at Tabarijo 1 3.00 59.00 1 3.00
Subansiri/ ko Pani
Baririjo
358 Upper Har Khet MOA&FW Jiga koro to Yanyumrijo at Tabarijo 1 3.00 60.50 1 3.00
Subansiri/ ko Pani
Baririjo
359 Upper Har Khet MOA&FW Jiga koro to Jiga rijo at Tabarijo 1 3.00 61.10 1 3.00
Subansiri/ ko Pani
Baririjo
360 Upper Har Khet MOA&FW Jinyum koro to Nyumsen rijo at Tabarijo 1 5.00 272.00 1 5.00
Subansiri/ ko Pani
Baririjo
361 Upper Har Khet MOA&FW Jiga koro to Tabarijo at Tabarijo 1 3.00 65.00 1 3.00
Subansiri/ ko Pani
Baririjo
362 Upper Har Khet MOA&FW Jekjek koro to Jibum Pasum at Tama Ripa 1 4.00 24.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo

530 | P a g e
363 Upper Har Khet MOA&FW Nyanye Koro to Kibo rijo at Tama Ripa 1 4.00 28.00 1 4.00 Feasible
Subansiri/ ko Pani
Baririjo
364 Upper Har Khet MOA&FW Moro koro to Guri Rijo at Tama Ripa 1 4.00 20.00 1 4.00
Subansiri/ ko Pani
Baririjo
365 Upper Har Khet MOA&FW Ruche koro to Baterijo at tamaripa 1 5.00 11.00 3 5.00
Subansiri/ ko Pani
Baririjo
366 Upper Har Khet MOA&FW Lipu-koche to Guririjo at Tamaripa 1 4.00 10.00 3 4.00
Subansiri/ ko Pani
Baririjo
367 Upper Har Khet MOA&FW Nyanye koro to Kiborijo at Tamaripa 1 4.00 10.00 3 4.00
Subansiri/ ko Pani
Baririjo
368 Upper Har Khet MOA&FW Nyanye koro to Pegyarijo at tamaripa 1 4.00 11.00 3 4.00
Subansiri/ ko Pani
Baririjo
369 Upper Har Khet MOA&FW Jishi koro to Jishi rijo at Tapi 1 4.00 26.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
370 Upper Har Khet MOA&FW Kulu koro to Basirijo at Tapi vill 1 4.00 21.20 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
371 Upper Har Khet MOA&FW Sinyi koro to Kanya rijo at Tapi vill 1 3.00 12.00 1 3.00 MLA
Subansiri/ ko Pani
Baririjo
372 Upper Har Khet MOA&FW Yapak koro to Biperrijo at Tapi 1 30.00 16.00 3 30.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
373 Upper Har Khet MOA&FW Yapak koro to Neperijo at Tapi 1 3.00 14.00 1 3.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
374 Upper Har Khet MOA&FW Jilu koro to Henne rijo/Morik at Tapi 1 3.00 81.00 1 3.00 ADO Maro
Subansiri/ ko Pani
Baririjo

531 | P a g e
375 Upper Har Khet MOA&FW Kolu koro to Basirijo at Tapi 1 2.00 15.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
376 Upper Har Khet MOA&FW Jilu koro to Ligirijo at Tapi Luchi Vill 1 3.00 89.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
377 Upper Har Khet MOA&FW Jilu koro to Kojerijo at Tapi Luchi Vill 1 2.00 91.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
378 Upper Har Khet MOA&FW Jilu koro to Kamyarijo at Tapi Luchi Vill 1 4.00 93.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
379 Upper Har Khet MOA&FW Jilu koro to Jilurijo at Tapi Luchi Vill 1 2.00 93.50 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
380 Upper Har Khet MOA&FW Jilu koro to Pillirijo at Tapi Luchi Vill 1 1.00 94.50 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
381 Upper Har Khet MOA&FW Nyar koro to Basirijo at Tapi 1 5.00 24.00 1 5.00
Subansiri/ ko Pani
Baririjo
382 Upper Har Khet MOA&FW Jilu nallah to Jilurijo at Tapi 1 5.00 85.00 1 5.00
Subansiri/ ko Pani
Baririjo
383 Upper Har Khet MOA&FW Nyar koro to Basirijo at Tapi 1 4.00 21.00 1 4.00
Subansiri/ ko Pani
Baririjo
384 Upper Har Khet MOA&FW Dei koro to Dei rijo at Tapi vill 1 4.00 15.00 1 4.00
Subansiri/ ko Pani
Baririjo
385 Upper Har Khet MOA&FW Silu koro to kukso rijo at Tapi vill 1 4.00 86.00 1 4.00
Subansiri/ ko Pani
Baririjo
386 Upper Har Khet MOA&FW Silu koro to Lak rijo at Tapi vill 1 5.00 88.00 1 5.00
Subansiri/ ko Pani
Baririjo

532 | P a g e
387 Upper Har Khet MOA&FW Yaro koro to Jampu rijo at Tapi vill 1 3.00 16.00 1 3.00
Subansiri/ ko Pani
Baririjo
388 Upper Har Khet MOA&FW Raga koro to raga rijo at Tapi vill 1 3.00 13.00 1 3.00
Subansiri/ ko Pani
Baririjo
389 Upper Har Khet MOA&FW Dii koro to Dii rijo at Tapi 1 2.00 10.00 1 2.00
Subansiri/ ko Pani
Baririjo
390 Upper Har Khet MOA&FW Ruche koro to Ruche rijo at Tasi Doni 1 5.00 19.80 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
391 Upper Har Khet MOA&FW Rute koro to Ruche rijo at Tasi Doni 1 5.00 19.60 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
392 Upper Har Khet MOA&FW Nyanye Koro to Tare rijo at at Tasi Doni 1 5.00 24.00 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
393 Upper Har Khet MOA&FW Ruche koro to Bate rijo at Tasidoni 1 5.00 21.00 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
394 Upper Har Khet MOA&FW Tabom Koro (Nallah) to Yajum rijo at Tasi Doni 1 3.00 12 1 3.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
395 Upper Har Khet MOA&FW Jekek koro to Tajaripa at Tasidoni 1 3.00 25 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
396 Upper Har Khet MOA&FW Dapo koro to Nyagamrijo at Tasidoni 1 2.00 21 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
397 Upper Har Khet MOA&FW Namya koro to Didi ripa at Tasidoni 1 4.00 32 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
398 Upper Har Khet MOA&FW Pigyak koro to Depenrijo at Tasidoni 1 2.00 16 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo

533 | P a g e
399 Upper Har Khet MOA&FW Jenga koro to Tonyagenrijo at Tasidoni 1 2.00 14 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
400 Upper Har Khet MOA&FW Tape koro to Yanya rijo at Tasi doni 1 5.00 12.00 1 5.00
Subansiri/ ko Pani
Baririjo
401 Upper Har Khet MOA&FW Nyanya Koro to Gararijo at Tasidoni 1 5.00 26.00 1 5.00
Subansiri/ ko Pani
Baririjo
402 Upper Har Khet MOA&FW Mat Koro to Bat rijo at Tasi Doni village 1 4.00 20.00 1 4.00
Subansiri/ ko Pani
Baririjo
403 Upper Har Khet MOA&FW Lipu Guri WRC field at Tasidoni. 1 4.00 19.70 1 4.00
Subansiri/ ko Pani
Baririjo
404 Upper Har Khet MOA&FW Namya koro to Didi rijo at Tasidoni 1 4.00 22.80 1 4.00
Subansiri/ ko Pani
Baririjo
405 Upper Har Khet MOA&FW Pak koro to Pak rijo at Tasidoni 1 5.00 27.50 1 5.00
Subansiri/ ko Pani
Baririjo
406 Upper Har Khet MOA&FW Didi koro to Didi rijo at Tasidoni 1 5.00 20.00 1 5.00
Subansiri/ ko Pani
Baririjo
407 Upper Har Khet MOA&FW Nyanye koro to Nyanye rijo at Tasidoni 1 5.00 19.50 1 5.00
Subansiri/ ko Pani
Baririjo
408 Upper Har Khet MOA&FW Nyanye koro to Tatum ripa at Tasidoni 1 5.00 19.10 1 5.00
Subansiri/ ko Pani
Baririjo
409 Upper Har Khet MOA&FW Nyanye koro to pupi haksi at Tasidoni 1 4.00 18.60 1 4.00
Subansiri/ ko Pani
Baririjo
410 Upper Har Khet MOA&FW Guri koro to Guririjo at Tasidoni 1 5.00 15.00 2 5.00
Subansiri/ ko Pani
Baririjo

534 | P a g e
411 Upper Har Khet MOA&FW Nyanye koro to Pikyarijo at Tasidoni 1 5.00 13.00 2 5.00
Subansiri/ ko Pani
Baririjo
412 Upper Har Khet MOA&FW Guri koro to Jibum Palen 1 5.00 16.00 2 5.00
Subansiri/ ko Pani
Baririjo
413 Upper Har Khet MOA&FW Nyanye koro to Jenge rijo at Tasidoni 1 4.00 18.40 1 4.00
Subansiri/ ko Pani
Baririjo
414 Upper Har Khet MOA&FW Nyanye koro to Didi Ripa at Tasidoni 1 6.00 19.90 1 6.00
Subansiri/ ko Pani
Baririjo
415 Upper Har Khet MOA&FW Nyanye koro to Taka ripa at Tasidoni 1 4.00 19.00 1 4.00
Subansiri/ ko Pani
Baririjo
416 Upper Har Khet MOA&FW Nyanye koro to Tamar rijo at Tasidoni 1 4.00 19.40 1 4.00
Subansiri/ ko Pani
Baririjo
417 Upper Har Khet MOA&FW Didi koro to Lukdam rijo at Tasidoni 1 4.00 17.00 1 4.00
Subansiri/ ko Pani
Baririjo
418 Upper Har Khet MOA&FW Jekjek koro to Guri rijo at Tasidoni 1 5.00 16.00 1 5.00
Subansiri/ ko Pani
Baririjo
419 Upper Har Khet MOA&FW Mase koro to Tana ripa at Tasidoni 1 5.00 21 1 5.00
Subansiri/ ko Pani
Baririjo
420 Upper Har Khet MOA&FW Mar koro to bat rijo at Tasidoni 1 4.00 11.1 1 4.00
Subansiri/ ko Pani
Baririjo
421 Upper Har Khet MOA&FW Jekjek koro to Lipu rijo at Tasidoni 1 5.00 23.5 1 5.00
Subansiri/ ko Pani
Baririjo

535 | P a g e
422 Upper Har Khet MOA&FW Rute koro and Ruche koro to Batrijo at Tasidoni 1 3.00 35 1 3.00
Subansiri/ ko Pani
Baririjo
423 Upper Har Khet MOA&FW Limi koro to Lepa rijo at Tode 1 6.00 22.7 1 6.00 MLA
Subansiri/ ko Pani
Baririjo
424 Upper Har Khet MOA&FW CC Lining from Lepa koro top Jikirijo at Tode 1 15.00 20.00 2 15.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
425 Upper Har Khet MOA&FW Lepa Koro to Jeba rijo at Tode 1 4.00 22.40 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
426 Upper Har Khet MOA&FW Limik koro to Limik rijo at Tode 1 4.00 23.50 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
427 Upper Har Khet MOA&FW Jilu koro to Liparijo at Tode 1 4.00 96.50 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
428 Upper Har Khet MOA&FW Lepa Koro to Tayen rijo at Tode 1 5.00 23.20 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
429 Upper Har Khet MOA&FW Limi koro to Jilu koro Padum at Tode 1 4.00 23.00 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
430 Upper Har Khet MOA&FW Koken koro to Bigerijo at Tode 1 4.00 22.80 1 4.00 MLA
Subansiri/ ko Pani
Baririjo
431 Upper Har Khet MOA&FW Silu koro to Pokrerijo at Tode 1 20.00 94.00 2 20.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo
432 Upper Har Khet MOA&FW Limik koro to Lepa rijo at Tode 1 3.00 19.00 1 3.00 ZPM/Baririjo
Subansiri/ ko Pani
Baririjo

536 | P a g e
433 Upper Har Khet MOA&FW Jilu koro to Jilu rijo at Tode 1 4.00 97.80 1 4.00 ADO Maro
Subansiri/ ko Pani
Baririjo
434 Upper Har Khet MOA&FW Jilu koro to Jumluk rijo at Tode 1 2.00 91.00 1 2.00 ADO Maro
Subansiri/ ko Pani
Baririjo
435 Upper Har Khet MOA&FW Jilukoro to Yircho rihjo at Tode vill 1 7.00 15.00 1 7.00 GPM
Subansiri/ ko Pani
Baririjo
436 Upper Har Khet MOA&FW Hahi koro to Kamde rijo at Tode 1 6.00 12.00 1 6.00 GPM
Subansiri/ ko Pani
Baririjo
437 Upper Har Khet MOA&FW Silu koro to Yari rijo at Tode vill 1 7.00 10.00 1 7.00 GPM
Subansiri/ ko Pani
Baririjo
438 Upper Har Khet MOA&FW Lirak koro to Giri ripa at Tode 1 4.00 23.00 1 4.00
Subansiri/ ko Pani
Baririjo
439 Upper Har Khet MOA&FW Jilu koro to Jiba rijo at Tode 1 4.00 96.00 1 4.00
Subansiri/ ko Pani
Baririjo
440 Upper Har Khet MOA&FW Lepa Koro to Taying rijo at Tode 1 5.00 23.20 1 5.00
Subansiri/ ko Pani
Baririjo
441 Upper Har Khet MOA&FW Tipa Koro to Tayen rijo at Tode 1 5.00 22.60 1 5.00
Subansiri/ ko Pani
Baririjo
442 Upper Har Khet MOA&FW Kakar koro to Bige Rijo at Tode 1 4.00 23.60 1 4.00
Subansiri/ ko Pani
Baririjo
443 Upper Har Khet MOA&FW Jilu koro to Bege rijo at Tode 1 4.00 97.00 1 4.00
Subansiri/ ko Pani
Baririjo

537 | P a g e
444 Upper Har Khet MOA&FW Jilu koro to Nyirso rijo at Tode 1 4.00 98.40 1 4.00
Subansiri/ ko Pani
Baririjo
445 Upper Har Khet MOA&FW Tayu koro to Kamda rijo at Tode 1 4.00 24.00 1 4.00
Subansiri/ ko Pani
Baririjo
446 Upper Har Khet MOA&FW Jilu koro to Lepa rijo at Tode 1 5.00 99.00 1 5.00
Subansiri/ ko Pani
Baririjo
447 Upper Har Khet MOA&FW Haye koro to Kamdarijo at Tode village 1 5.00 15.00 1 5.00 MLA
Subansiri/ ko Pani
Baririjo
448 Upper Har Khet MOA&FW Siren koro to Sirenrijo at Yatekripa 1 2.00 25.00 1 2.00 MLA
Subansiri/ ko Pani
Baririjo
449 Upper Har Khet MOA&FW CC lining from Jiren rijo to Yatekripa at Yatekripa 1 3.00 23.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo
450 Upper Har Khet MOA&FW Jilu koro to Leperijo at Yatekripa 1 5.00 67.00 1 5.00 ADO Maro
Subansiri/ ko Pani
Baririjo
451 Upper Har Khet MOA&FW Koma koro to Liberipa at Yoka 1 6.00 14.00 1 6.00 ADO Maro
Subansiri/ ko Pani
Baririjo
452 Upper Har Khet MOA&FW Hatu koro to Haturijo at Yoka 1 4.00 10.00 1 4.00 ADO Maro
Subansiri/ ko Pani
Baririjo
453 Upper Har Khet MOA&FW Tayen koro to Jilu Ringo at Yoka 1 3.00 9.00 1 3.00 ADO Maro
Subansiri/ ko Pani
Baririjo
454 Upper Har Khet MOA&FW Koma Koro to Koma rijo at Yoka vill 1 3.00 15.00 1 3.00 CO Maro
Subansiri/ ko Pani
Baririjo

538 | P a g e
455 Upper Har Khet MOA&FW Lepa koro to Mubrijo at Yoka 1 2.00 16.00 1 2.00 CO Maro
Subansiri/ ko Pani
Baririjo
456 Upper Har Khet MOA&FW Jinye koro to Libe ripa at Yoka 1 4.00 17.00 1 4.00 CO Maro
Subansiri/ ko Pani
Baririjo
457 Upper Har Khet MOA&FW Jinye koro to Pegom ripa at Yoka 1 1.00 18.00 1 1.00 CO Maro
Subansiri/ ko Pani
Baririjo
458 Upper Har Khet MOA&FW Henya Koro to Cheririjo at Yoka 1 4.00 13.00 1 4.00
Subansiri/ ko Pani
Baririjo
459 Upper Har Khet MOA&FW Cherkoro to Lekbarijo at Yoka 1 3.00 10.00 1 3.00
Subansiri/ ko Pani
Baririjo

CAD FOR OTHER INTERVENTIONS


Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Distribution Total Command Catchment Period of Estimated
the Ministry / Tank & Check dams.) Number area / area implementation cost in Lakhs
District/ Department Irrigation (Sq.Km.) (year)
Block (ha)
Lemiking MOA&FW Per drop 1 7 10 2 7.00
more
1 crops(Other Nava haring at Nava village
invertantion)

539 | P a g e
Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
Nacho MOA&FW Har Khet Ko
Pani(Other
1 invertantion) Keojaring at Meyaba village

1 10 15 1 10.00
Nacho MOA&FW Har Khet Ko
2 Pani(Other Paktung moring at Meyaba village
invertantion) 1 4 10 1 4.00
Nacho MOA&FW Har Khet Ko
3 Pani(Other MIP at Cheke
invertantion) 1 5 8 1 5.00
Nacho MOA&FW Har Khet Ko
4 Pani(Other Gonung Nallah at Ebya
invertantion) 1 10 15 1 10.00
Nacho MOA&FW Har Khet Ko
5 Pani(Other Dawne at Aying Muring vill
invertantion) 1 8 10 1 8.00
Nacho MOA&FW Har Khet Ko
6 Pani(Other Sato Nallah aty Cheke
invertantion) 1 5 9 1 5.00
Nacho MOA&FW Har Khet Ko
7 Pani(Other Noh Nallah at Gyate
invertantion) 1 5 8 1 5.00
Nacho MOA&FW Har Khet Ko
Giding Nallah to Daching Haring at
8 Pani(Other
Ebiya
invertantion) 1 5 9 1 5.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

540 | P a g e
Siyum MOA&FW Har Khet Ko
Pani(Other
1 invertantion) Row Nallah to Piluha at Jingba Rai

1 5 8 1 5.00
Siyum MOA&FW Har Khet Ko
2 Pani(Other Row to Sungba at Eru.
invertantion) 1 5 9 1 5.00
Siyum MOA&FW Har Khet Ko
3 Pani(Other Baki at Siyum
invertantion) 1 5 8 1 5.00
Siyum MOA&FW Har Khet Ko
4 Pani(Other Zingmoring
invertantion) 1 4 9 1 4.00
Siyum MOA&FW Har Khet Ko
5 Pani(Other Erung Nallah at Tayom
invertantion) 1 4 8 1 4.00
Siyum MOA&FW Har Khet Ko
6 Pani(Other Row Nallah at Page Nalo
invertantion) 1 7 12 1 7.00
Siyum MOA&FW Har Khet Ko
7 Pani(Other Kaungring at Page Nalo
invertantion) 1 8 10 1 8.00
Siyum MOA&FW Har Khet Ko
8 Pani(Other Siren at Dui
invertantion) 1 3 8 1 3.00
Siyum MOA&FW Har Khet Ko
9 Pani(Other Sigian Nallah at Dui
invertantion) 1 4 7 1 4.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

541 | P a g e
Taliha MOA&FW Har Khet Ko
Pani(Other
1 invertantion) Todro koro to Soli rongo at Tiljaring

1 6 10 1 6.00
Taliha MOA&FW Har Khet Ko
2 Pani(Other Higneshow to Dalilrijo at Dagiam 1 8
invertantion) 11 1 8.00
Taliha MOA&FW Har Khet Ko
3 Pani(Other Royo Nallah to Rajemoring at Konia 1 3
invertantion) 8 1 3.00
Taliha MOA&FW Har Khet Ko
4 Pani(Other Yeo Nallah to Sinamsing 1 8
invertantion) 12 1 8.00
Taliha MOA&FW Har Khet Ko
5 Pani(Other Noh Nallah to Chokda 1 7
invertantion) 8 1 7.00
Taliha MOA&FW Har Khet Ko
6 Pani(Other Nah Nallah to Si- Joring at Kodak 1 7
invertantion) 9 1 7.00
Taliha MOA&FW Har Khet Ko
7 Pani(Other Bombumjobe at Lingram 1 15
invertantion) 20 2 15.00
Taliha MOA&FW Har Khet Ko
8 Pani(Other Janiunk to Ledi at Ningtemoring 1 5
invertantion) 9 1 5.00
Taliha MOA&FW Har Khet Ko
9 Pani(Other Joho Nallah to Lepajaring at Liljaring 1 20
invertantion) 35 2 20.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

542 | P a g e
Paying MOA&FW Har Khet Ko
Pani(Other
1 invertantion) MIP at Paktung

1 4 7 1 4.00
Paying MOA&FW Har Khet Ko
2 Pani(Other MIP at Achingmoring 1 5
invertantion) 9 1 5.00
Paying MOA&FW Har Khet Ko
3 Pani(Other MIP at Esso 1 5
invertantion) 8 1 5.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
1 Giba MOA&FW Har Khet Ko
Pani(Other
invertantion)
Leya koro to Leyarijo at Leya vill 1 11 16 1 11.00

Giba MOA&FW Har Khet Ko


2 Pani(Other Singo koro to Punialitak at Leriak vill 1 5 1 5.00
invertantion) 7

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
Chetam MOA&FW Har Khet Ko
Pani(Other
1 invertantion) Kochamrijo Mip at Belu vill

1 10 12 2 10.00

543 | P a g e
Chetam MOA&FW Har Khet Ko
2 Pani(Other Sha koro to Puyarongo at Sari vill 1 10 2 10.00
invertantion) 15
Chetam MOA&FW Har Khet Ko
3 Pani(Other Lechin koro to Pegarijo at Siga vill 1 9 1 9.00
invertantion) 17
Chetam MOA&FW Har Khet Ko
4 Pani(Other Machi koro to Bogikrijo at Soki vill 1 10 10.00
invertantion) 14 2

CAD FOR OTHER INTERVENTIONS


Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Distribution Total Command Catchment Period of Estimated
the Ministry / Tank & Check dams.) Number area / area implementation cost in Lakhs
District/ Department Irrigation (Sq.Km.) (year)
Block (ha)
Daporijo MOA&FW Har Khet Ko
Pani(Other
1 invertantion) Ginchikoro to Sikarijo at Sikarijo village

1 12 15 2 12.00
Daporijo MOA&FW Har Khet Ko
2 Pani(Other Mech koro to Mech rijo at Sikarijo vill 1 18 2
invertantion) 8 18.00
Daporijo MOA&FW Har Khet Ko
3 Pani(Other Ginchi koro to Paktun rijo at Sikarijo vill 1 4 1
invertantion) 16 4.00
Daporijo MOA&FW Har Khet Ko
4 Pani(Other Ginchi koro to Maturongo at Sikarijo 1 4
invertantion) 15 1 4.00
Daporijo MOA&FW Har Khet Ko
5 Pani(Other Duni koro to Ritumrijo at Sikom 1 15
invertantion) 9 2 15.00
Daporijo MOA&FW Har Khet Ko
6 Pani(Other Sige koro to Sui rijo at Baja vill 1 20
invertantion) 25 2 20.00

544 | P a g e
Daporijo MOA&FW Har Khet Ko
7 Pani(Other Met nallah to Sikarijo at Babla vill 1 15
invertantion) 30 2 15.00
Daporijo MOA&FW Har Khet Ko
8 Pani(Other Suk koro to Sharijo at Dakpe 1 8
invertantion) 12 1 8.00
Daporijo MOA&FW Har Khet Ko
9 Pani(Other Sik koro to Kagerijo at Don vill 1 8
invertantion) 10 1 8.00
Daporijo MOA&FW Har Khet Ko
10 Pani(Other Pil koro to Giterijo at Giterijo vill 1 25
invertantion) 30 3 25.00
Daporijo MOA&FW Har Khet Ko
11 Pani(Other Suk koro to Tumprijo at Lilidong vill 1 50
invertantion) 40 3 50.00
Daporijo MOA&FW Har Khet Ko
12 Pani(Other Debi koro to Debirijo at Mona vill 1 10
invertantion) 8 1 10.00
Daporijo MOA&FW Har Khet Ko
13 Pani(Other Gash koro to Gashrijo at Mona Baja vill 1 8
invertantion) 12 1 8.00
Daporijo MOA&FW Har Khet Ko
14 Pani(Other Say koro to Bonarijo at Hangkar vill 1 12
invertantion) 10 2 12.00
Daporijo MOA&FW Har Khet Ko
15 Pani(Other Mad koro to Tugru koro at Hangkar vill 1 10
invertantion) 8 1 10.00
Daporijo MOA&FW Har Khet Ko
16 Pani(Other Sigen koro to Burrijo at hangkar vill 1 20
invertantion) 140 2 20.00
Daporijo MOA&FW Har Khet Ko
17 Pani(Other Murmenkoro to Murmenrijo at Ligu vill 1 30
invertantion) 80 3 30.00
Daporijo MOA&FW Har Khet Ko
18 Pani(Other Ru koro to Rurijo at Ligu vill 1 10
invertantion) 12 1 10.00

545 | P a g e
Daporijo MOA&FW Har Khet Ko
19 Pani(Other Tir koro to Dillidi rijo at Liruk vill 1 20
invertantion) 24 2 20.00
Daporijo MOA&FW Har Khet Ko
20 Pani(Other Sogum koro to Sogumrijo at Liruk. Vill 1 10
invertantion) 18 1 10.00
Daporijo MOA&FW Har Khet Ko
21 Pani(Other Saya koro to Sayarijo at Mite vill 1 12
invertantion) 14 2 12.00
Daporijo MOA&FW Har Khet Ko
22 Pani(Other Suk Nallah to Pokperijo at Mite vill 1 60
invertantion) 80 3 60.00
Daporijo MOA&FW Har Khet Ko
23 Pani(Other See Nallah to Serijo at Niji 1 8
invertantion) 15 1 8.00
Daporijo MOA&FW Har Khet Ko
24 Pani(Other 1
invertantion) Perkoro to Perrijo at Niji 6 8 1 6.00
Daporijo MOA&FW Har Khet Ko
25 Pani(Other 1
invertantion) Sin koro to Tabarijo at Pobo vill 12 18 2 12.00
Daporijo MOA&FW Har Khet Ko
26 Pani(Other 1
invertantion) Sigen koro to Sirrijo at Pobo 10 120 1 10.00
Daporijo MOA&FW Har Khet Ko
27 Pani(Other 1
invertantion) Siga nalla to Silo rijo at Yitor 16 50 2 16.00
Daporijo MOA&FW Har Khet Ko
Pani(Other 1
28 invertantion) Sik Nallah to Porakyarb at Bomikoto 14 20 2 14.00
Daporijo MOA&FW Har Khet Ko
Pani(Other 1
29 invertantion) Per koro to Tayerijo at Ade vill 8 10 1 8.00

546 | P a g e
Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
Puchigeko MOA&FW Har Khet Ko
Pani(Other
Haglenkoro to Heglenrijo at Ango
1 invertantion)
Lomdak vill
1 12 10 2 12.00
Puchigeko MOA&FW Har Khet Ko
2 Pani(Other Sit koro to Hero Malin at Muri vill. 1 9 1
invertantion) 8 9.00
Puchigeko MOA&FW Har Khet Ko
3 Pani(Other Suk river to Moramrijo at Sikipotu vill. 1 10 1
invertantion) 80 10.00
Puchigeko MOA&FW Har Khet Ko
4 Pani(Other Titi koro to Echi Balak at Gichi Lomdak 1 8
invertantion) 15 1 8.00
Puchigeko MOA&FW Har Khet Ko
Gay koro to Hagekkayo rijo at Gami
5 Pani(Other 1 5
vill
invertantion) 12 1 5.00
Puchigeko MOA&FW Har Khet Ko
6 Pani(Other Gip koro to Gigi rijo at Balakmuri vill 1 8
invertantion) 10 1 8.00
Puchigeko MOA&FW Har Khet Ko
7 Pani(Other Tab Nallah to Gepenrijo at Balakmuri 1 6
invertantion) 12 1 6.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)

547 | P a g e
1 Dumporijo MOA&FW Har Khet Ko
Pani(Other
invertantion) Shakoro to Sharijo at Belo vill

1 20 35 3 20.00
Dumporijo MOA&FW Har Khet Ko
2 Pani(Other Yash koro to Kanrijo at Belo vill
invertantion) 1 10 15 1 10.00
Dumporijo MOA&FW Har Khet Ko
3 Pani(Other Shakoro to Palmuri at Digbak vill
invertantion) 1 50 37 3 50.00
Dumporijo MOA&FW Har Khet Ko
4 Pani(Other Sikin koro to Ngoduk rijo at Bui vill
invertantion) 1 17 72 2 17.00
Dumporijo MOA&FW Har Khet Ko
5 Pani(Other Raju rijo MIP at Pumtebage/Aranalo vill
invertantion) 1 20 21 2 20.00
Dumporijo MOA&FW Har Khet Ko
6 Pani(Other Jalekoro to Dumporijo at Rilo vill
invertantion) 1 30 17 3 30.00
Dumporijo MOA&FW Har Khet Ko
Jhum koro to Sinyum rijo at Tajiparam
7 Pani(Other
vill
invertantion) 1 15 12 2 15.00

Sl.No. Name of Concerned Component Activity (CAD for Storage tank, Total Command Catchment Period of Estimated
the Ministry / Distribution Tank & Check dams.) Number area / area implementation cost in
District/ Department Irrigation (Sq.Km.) (year) Lakhs
Block (ha)
1 Baririjo MOA&FW Har Khet Ko
Pani(Other Luchi koro to Baat rijo at Tasidoni vill
invertantion) 1 30 21 3 30.00
Baririjo MOA&FW Har Khet Ko
Jiring koro to Jiring rijo & Pigirijo at Luchi
2 Pani(Other
vill
invertantion) 1 20 17 3 20.00
Baririjo MOA&FW Har Khet Ko
3 Pani(Other Silu koro to Jikirijo at Tode village
invertantion) 1 17 67 2 17.00

548 | P a g e
CAD FOR(RENOVATION)
Name Command
Concerned Catchment Period of Estimated
of the Activity (CAD for Renovation of MIP Total area /
Sl.No. Ministry / Component area implementation cost in Remarks
District/
Department from) Number Irrigation
(Sq.Km.) (year) Lakhs
Block (ha)
Har Khet ko
Pani
1 MOA&FW (Renovation)
Nacho
Keo nallah to keojaring at keojaring 1 5.00 1 1 5.00 MLA
Har Khet ko
Pani
2 MOA&FW (Renovation)
Nacho Keo nallah to paktung moring at
meyaba rai 1 2.00 2 1 2.00
Har Khet ko
Pani
3 MOA&FW (Renovation)
Nacho
Keo stream to keojaring at meyaba 1 10.00 6 1 10.00 ASM
Har Khet ko
Pani
4 MOA&FW (Renovation)
Nacho
Jetak nallah at nacho hq 1 3.00 2 1 3.00
Har Khet ko
Pani
5 MOA&FW (Renovation) Ribi sikio to digo rongo at nacho hq
Nacho
1 10.00 5 1 10.00 ASM
Har Khet ko
Pani Singkingne sekio to lingrine jobe at
6 MOA&FW (Renovation)
Nacho kyamdo
1 11.00 6 2 11.00

CAD FOR(RENOVATION)

549 | P a g e
Command
Name Concerned Catchment Period of Estimated
Total area /
Sl.No. of the Ministry / Component Activity (CAD for Renovation of MIP from) Number Irrigation
area implementation cost in Remarks
Block Department (Sq.Km.) (year) Lakhs
(ha)

Har Khet ko
Pani
Siyum MOA&FW (Renovation)

1 CC lining sikiu nallah to engba at dagu 1 5.00 2 1 5.00 ASM


Har Khet ko
Pani
Siyum MOA&FW (Renovation)
CC lining sellam nallah to ore jobe at
2 ekke 1 5.00 4 1 5.00 ASM
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
3 cc lining to zode nallah at pakling riaku 1 10.00 3 1 10.00 AB
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
4 sellam nallah to bogia at bogia 1 10.00 3 1 10.00 ASM
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
5 Rebi nallah to rebi jube at dui 1 5.00 1 1 5.00 ASM
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
6 Sellam nallah to aying jobe at ekke 1 8.00 3 1 8.00
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
7 Ro nallah to sungba at eru 1 4.00 1 1 4.00

550 | P a g e
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
8 Ko sekio to janering at takiongpuring 1 8.00 2 1 8.00
Har Khet ko nyalone to nyalone at zingmuring
Pani
9 Siyum MOA&FW (Renovation) 1 3.00 3
1 3.00
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
10 . Sijing nallah to ering rongo at ering 1 5.00 2 1 5.00
Har Khet ko
Pani
Siyum MOA&FW (Renovation)
11 CC lining old kojen to sindak at sindak 1 6.00 5 1 6.00 GPM

CAD FOR(RENOVATION)
Component Total Command Catchment
Name Concerned Number area / area Period of Estimated
Activity (CAD for Renovation of MIP
Sl.No. of the Ministry / Irrigation (Sq.Km.) implementation cost in Remarks
Block Department from) (year) Lakhs
(ha)

Har Khet ko
Pani
(Renovation)
1 Taliha MOA&FW
higneshow to dalik rijo at
lepajaring 1 15.00 5 2 15.00
Har Khet ko
Pani
2 Taliha MOA&FW (Renovation) Ngokoro to bogra jobe at bogne 1 3.00 6 1 ASM
3.00

551 | P a g e
Har Khet ko
Pani
3 Taliha MOA&FW (Renovation) CC lining sob nallah to pakring
moring at kamlo 1 4.00 2 1 4.00
Har Khet ko
Pani
4 Taliha MOA&FW (Renovation)
Jamiak karo to ledi(nioching)at
ningtemori 1 5.00 2 1 5.00
Har Khet ko
Pani Sinamaching siko to sinamaching at
5 Taliha MOA&FW (Renovation) 1 20.00 1 2 ASM
sinamching
20.00
Har Khet ko
Pani
6 Taliha MOA&FW (Renovation)
Todro koro at tiljaring 1 5.00 4 1 5.00 MLA
Har Khet ko
Pani
7 Taliha MOA&FW (Renovation) extension of joho nallah at tilijaring
1 35.00 2 3 35.00 MLA
Har Khet ko
Pani
8 Taliha MOA&FW (Renovation)
Kebaso to si moring at podo mara 1 20.00 1 2 20.00

CAD FOR(RENOVATION)
Command
Name Concerned Catchment Period of Estimated
Activity (CAD for Renovation Total area /
Sl.No. of the Ministry / Component area implementation cost in
Block Department of MIP from) Number Irrigation
(Sq.Km.) (year) Lakhs
(ha)
Har Khet ko
Pani Reno. cc linening sob nallah
1 Paying MOA&FW (Renovation) 1 4.00 2 1 4.00
to pakring moring at kamlo

552 | P a g e
Har Khet ko
Pani
2 Paying MOA&FW (Renovation) reno.sili nallah at Jami village 1 4.00 2 1 4.00

CAD FOR(RENOVATION)

Command
Name of Concerned Catchment Period of Estimated
Total area /
Sl.No. the Ministry / Component Activity (CAD for Renovation of MIP from) area implementation cost in
Number Irrigation
Block Department (Sq.Km.) (year) Lakhs
(ha)

Har Khet ko Tabu koro to Kochamrijo at Belu. 1 10.00 17.00 1 10.00


1 Giba MOA&FW Pani
(Renovation)

CAD
FOR(RENOVATION)
Command
Name of Concerned Catchment Period of Estimated
Activity (CAD for Total area /
Sl.No. the Ministry / Component area implementation cost in
Block Department Renovation of MIP from) Number Irrigation
(Sq.Km.) (year) Lakhs
(ha)
Har Khet ko Tabu koro to Kochamrijo at 1 10.00 17.00 1 10.00
Pani Belu.
1 Chetam MOA&FW (Renovation)

Har Khet ko Pello koro to Radirijo at Lote 1 6.00 6.00 1 6.00


Pani vill.
2 Chetam MOA&FW (Renovation)

CAD FOR(RENOVATION)

553 | P a g e
Name of Command
Concerned Catchmen Period of Estimated
Sl.No the Activity (CAD for Renovation of MIP Total area /
Ministry / Component t area implementatio cost in Remarks
. District/ from) Number Irrigation
Department (Sq.Km.) n (year) Lakhs
Block (ha)
1 Daporijo MOA&F Har Khet ko Reno Ginchi koro to Sikarijo at
W Pani Sikarijo-I
(Renovation
)
1 50.00 57.00 3 50.00 Jal Gram
2 Daporijo MOA&F Har Khet ko Reno Ginchi koro to Takam
W Pani Tamak rijo at Sikarijo-I
(Renovation
)
1 8.00 6.00 1 8.00 Jal Gram
3 Daporijo MOA&F Har Khet ko Reno.. of Sik koro to Tumpe
W Pani Rijo at Lilidong village
(Renovation
)
1 60.00 30 3 60.00 Jal Gram
4 Daporijo MOA&F Har Khet ko Reno Barak koro to Lutak at
W Pani Motu
(Renovation
)
1 9.00 12.00 1 9.00 MLA Daporijo
5 Daporijo MOA&F Har Khet ko Reno.of MIP from Saya koro
W Pani to Sayarijo agril field at Mite
(Renovation vill
) 1 12.00 12 2 12.00 MLA (Raga)
6 Daporijo MOA&F Har Khet ko Reno Suk Nallah to Pokperijo
W Pani agril field at Mite.
(Renovation
) 1 60.00 30 3 60.00 MLA (Raga)
7 Daporijo MOA&F Har Khet ko Reno of See Nallah to Seerijo
W Pani agril field at Niji vill
(Renovation
)
1 18.00 10 2 18.00 MLA (Raga)

554 | P a g e
8 Daporijo MOA&F Har Khet ko Reno.of Sin koro to Towrijo at
W Pani Pobo
(Renovation
)
1 10.00 3 1 10.00 MLA (Raga)
9 Daporijo MOA&F Har Khet ko Reno. of Sikka nallah to
W Pani Porakyorb agril field at
(Renovation Bomikoto vill
)
1 10.00 3 1 10.00 MLA (Raga)
10 Daporijo MOA&F Har Khet ko Reno. of Perkoro to Taye rijo
W Pani agril field at Ade vill
(Renovation
) 1 10.00 8 1 10.00 MLA (Raga)
11 Daporijo MOA&F Har Khet ko Ren. Of MIP from Sige Nallah
W Pani to suirijo at Baja vill
(Renovation
)
1 8.00 6 1 8.00 MLA (Raga)
12 Daporijo MOA&F Har Khet ko Reno. of MIP from Pil koro to
W Pani Giterijo at Giterijo vill
(Renovation
)
1 40.00 18 3 40.00 MLA (Raga)
13 Daporijo MOA&F Har Khet ko Reno. of Siga Nallah to Solo
W Pani rijo at Yitor vill
(Renovation
)
1 10.00 9 1 10.00 MLA (Raga)
14 Daporijo MOA&F Har Khet ko Reno.Siri koro to Amji rijo at
W Pani Jeram.
(Renovation
) 1 7.00 25.00 1 7.00
15 Daporijo MOA&F Har Khet ko Reno. Sorguha nallah to
W Pani Amirijo at Batak
(Renovation
) 1 8.00 24.00 1 8.00

555 | P a g e
16 Daporijo MOA&F Har Khet ko Reno Sey koro to Lotak &
W Pani Tamburijo at Motu
(Renovation
)
1 20.00 22.00 2 20.00
17 Daporijo MOA&F Har Khet ko Reno Sey koro to Kotak at
W Pani Motu
(Renovation
)
1 8.00 18.00 1 8.00
18 Daporijo MOA&F Har Khet ko Pote koro to Kirumrijo at Motu.
W Pani
(Renovation
) 1 7.00 11.00 1 7.00
19 Daporijo MOA&F Har Khet ko Reno Impt. Of Rakte koro to
W Pani Berak rijo at Motu
(Renovation
)
1 12.00 14.00 2 12.00
20 Daporijo MOA&F Har Khet ko Reno Impt. Of Minto koro to
W Pani Tablarijo at Pisa.
(Renovation
)
1 10.00 375.00 1 10.00
21 Daporijo MOA&F Har Khet ko Reno Doni koro to Rite rijo at
W Pani Sikam
(Renovation
)
1 20.00 32.00 3 20.00
22 Daporijo MOA&F Har Khet ko Reno Dol koro to Dol rijo at
W Pani Yekar
(Renovation
)
1 40.00 42.00 3 40.00
23 Daporijo MOA&F Har Khet ko Reno Reno of She koro to
W Pani Bonarijo at Hangkar
(Renovation
) 1 10.00 5 1 10.00

556 | P a g e
24 Daporijo MOA&F Har Khet ko Reno.of Sigin river to Burrijo at
W Pani Hangkar
(Renovation
)
1 15.00 150 2 15.00
25 Daporijo MOA&F Har Khet ko Reno.of mad koro to Tuguru
W Pani rijo at Hangker
(Renovation
)
1 5.00 8 1 5.00
26 Daporijo MOA&F Har Khet ko Reno. of Sey Nallah to
W Pani Tamirijo aty Jigi
(Renovation
) 1 9.00 4 1 9.00
27 Daporijo MOA&F Har Khet ko Reno.of Murmenkoro to
W Pani Murmenrijo at Ligu
(Renovation
)
1 30.00 18 3 30.00
28 Daporijo MOA&F Har Khet ko Reno of Sigin koro to
W Pani Murmenrijo at Ligu
(Renovation
)
1 16.00 150 2 16.00
29 Daporijo MOA&F Har Khet ko Reno of Teer koro to Dillidi-
W Pani rijo at Liruk
(Renovation
)
1 14.00 8 2 14.00
30 Daporijo MOA&F Har Khet ko Reno of Sogum koro to
W Pani Sogum rijo at Liruk
(Renovation
)
1 8.00 5 1 8.00
31 Daporijo MOA&F Har Khet ko Reno . Of MIP fromSika nallah
W Pani to Porok yorb a/field at Porak
(Renovation yarb vill
)
1 10.00 6 1 10.00

557 | P a g e
32 Daporijo MOA&F Har Khet ko Ren. Of MIP fromRapu Nallah
W Pani to Rapu rijo at Baja village
(Renovation
)
1 8.00 5 1 8.00
33 Daporijo MOA&F Har Khet ko Ren. Of MIP fromsodik koro
W Pani to Ta ripa at Dakpe
(Renovation
)
1 8.00 5 1 8.00
34 Daporijo MOA&F Har Khet ko Reno. Of MIP from Sikkoro to
W Pani Kagerijo at Don vill
(Renovation
) 1 8.00 6 1 8.00
35 Daporijo MOA&F Har Khet ko
W Pani
(Renovation
Reno Met Nallah to Sikarijo at
)
Sika Babla 1 16.00 9 2 16.00
36 Daporijo MOA&F Har Khet ko Reno.suk koro to Sha rijo at
W Pani Dakpe
(Renovation
)
1 7.00 7 1 7.00

CAD FOR(RENOVATION)

Name of Command
Concerned Catchment Period of Estimated
the Total area /
Sl.No. Ministry / Component Activity (CAD for Renovation of MIP from) area implementation cost in
District/ Number Irrigation
Department (Sq.Km.) (year) Lakhs
Block (ha)

1 Har Khet ko Haglen koro to Haglen rijo at Ango Lomdak


Pani
Puchigeko MOA&FW (Renovation)
1 12.00 8 2 12.00

558 | P a g e
2 Har Khet ko Reno. Of MIP fromTitik koro to Silirijo at Gichi
Pani Lomdak
Puchigeko MOA&FW (Renovation)
1 8.00 4 1 8.00
3 Har Khet ko
Pani
Puchigeko MOA&FW (Renovation)
Reno. Sit koro to hiromlin at muri 1 8.00 8 1 8.00

CAD FOR(RENOVATION)
Command
Concerned Catchment Period of Estimated
Name of Activity (CAD for Renovation of MIP Total area /
Sl.No. Ministry / Component area implementation cost in Remarks
the Block
Department from) Number Irrigation
(Sq.Km.) (year) Lakhs
(ha)
Dumporijo MOA&FW Har Khet ko
Pani
1 (Renovation)
Sha koro to Palmuri at Digbak 1 60.00 161.00 3 60.00 ADC Dmj
Dumporijo MOA&FW Har Khet ko Sha koro to Sharijo at Belo 1 22.00 102.00 3
Pani
2 (Renovation)
22.00
Dumporijo MOA&FW Har Khet ko Jeb koro to Rajurijo,Tugu rijo & Beyak rijo at
Pani Beyak.
3 (Renovation)
1 43.00 122.00 3 43.00 MLA
Dumporijo MOA&FW Har Khet ko Sikin koro to Pedi Phen at Bui 1 10.00 212.00 1 MLA / ZPM
Pani
4 (Renovation)
10.00
Dumporijo MOA&FW Har Khet ko Hase Nallah to Risparijo at Bator 1 12.00 18.00 1 MLA
Pani
5 (Renovation)
12.00

559 | P a g e
Dumporijo MOA&FW Har Khet ko 1
Pani
6 (Renovation)
Jir koro to Geni rijo at Jijrarilo. 17.00 22.00 2 17.00 MLA
Dumporijo MOA&FW Har Khet ko
Pani
7 (Renovation) 1 20.00 25.00 2

Sa koro to Rite Muri at Old Richi 20.00 ADC Dmj


Dumporijo MOA&FW Har Khet ko 1 155.00 2
Pani
8 (Renovation)
Jha koro to Kerter rijo at Digbak 20.00 20.00
Dumporijo MOA&FW Har Khet ko Sikin koro to Ngudukrijo at Bui 1 30.00 212.00 3
Pani
9 (Renovation)
30.00
Dumporijo MOA&FW Har Khet ko Yas koro to Kanrijo at Belo 1 15.00 39.00 2
10 Pani
(Renovation) 15.00
Dumporijo MOA&FW Har Khet ko 1
Pani
11 (Renovation)
Sike koro to Paknarijo at Tagogi 25.00 21.00 3 25.00
Dumporijo MOA&FW Har Khet ko 1
Pani
12 (Renovation)
Leku koro to Denri rijo at Denri. 7.00 18.00 1 7.00
Dumporijo MOA&FW Har Khet ko koro to Tulurijo at Bulo 1 15.00 86.00 2
Pani
13 (Renovation)
15.00
Dumporijo MOA&FW Har Khet ko 1
Pani
14 (Renovation)
Lenyi koro to Lenyirijo at Lenyi 15.00 21.00 2 15.00

560 | P a g e
Dumporijo MOA&FW Har Khet ko 1 4.00 11.00 1
Pani
15 (Renovation)
Nima koro to Pogarijo at New Lida 4.00
Dumporijo MOA&FW Har Khet ko 1 17.00 21.00 2
Pani
16 (Renovation)
Jeye koro to Gunnerijo at Old Hane 17.00
Dumporijo MOA&FW Har Khet ko
Pani
17 (Renovation) 1 18.00 31.00 2

Reh koro to Puteripa at Old Riddi 18.00


Dumporijo MOA&FW Har Khet ko 1
Pani
18 (Renovation)
Ima koro to Tade rijo at Paja 30.00 22.00 3 30.00
Dumporijo MOA&FW Har Khet ko 1
Pani
19 (Renovation)
Palsakrijo at Paksok 15.00 21.00 2 15.00
Dumporijo MOA&FW Har Khet ko Joonkoro to Joonrijo at Yaipu. 1 4.00 11.00 1
Pani
20 (Renovation)
4.00

CAD
FOR(RENOVATION)
Sl.No. Name Command
Concerned Activity (CAD for Catchment Period of Estimated
of the Total area /
Ministry / Component Renovation of MIP area implementation cost in Remarks
District/ Number Irrigation
Department from) (Sq.Km.) (year) Lakhs
Block (ha)

561 | P a g e
1 Baririjo MOA&FW Har Khet ko Impt from Sigin river to 1 8.00 23.00 1 8.00 MLA
Pani Perekoro rijo at Lakbak
(Renovation) Gongo

2 Baririjo MOA&FW Har Khet ko CC lining from Lepa 1 15.00 12.00 2 15.00
Pani koro to Jiki rijo at Tode
(Renovation)
3 Baririjo MOA&FW Har Khet ko Renovation work from 1 10.00 14.00 2 10.00 MLA
Pani Hano koro to Sibri rijo at
(Renovation) Dula

4 Baririjo MOA&FW Har Khet ko C.C lining from Gabe 1 17.00 11.00 2 17.00 MLA
Pani Koro to Yada Chabi at
(Renovation) Old Haji

5 Baririjo MOA&FW Har Khet ko CC lining from Lepa 1 10.00 16.00 1 10.00 MLA
Pani koro to Lepa rijo at
(Renovation) Tode

6 Baririjo MOA&FW Har Khet ko CC lining from Jilu koro 1 20.00 94.00 2 20.00 MLA
Pani to Jiku rijo at Tapi
(Renovation)

7 Baririjo MOA&FW Har Khet ko CC lining from Jiben 1 18.00 33.00 2 18.00 MLA
Pani koro to Jiben rijo at
(Renovation) Luchi

8 Baririjo MOA&FW Har Khet ko CC lining from Linyak 1 15.00 12.00 2 15.00 MLA
Pani Koro to Kachharijo at
(Renovation) Borarupak
9 Baririjo MOA&FW Har Khet ko CC Lining and head 1 24.00 23.00 3 24.00 MLA
Pani work from Hulu Koro to
(Renovation) Payirijo at Panimuri

562 | P a g e
10 Baririjo MOA&FW Har Khet ko CC Lining from Jilu 1 10.00 91.00 1 10.00 MLA
Pani Koro to Bugdi rijo at
(Renovation) Korarijo
11 Baririjo MOA&FW Har Khet ko CC lining from Radeh 1 23.00 15.00 2 23.00 MLA
Pani koro to Tikli rijo at Digi
(Renovation) vill

12 Baririjo MOA&FW Har Khet ko CC lining from Pobom 1 60.00 33.00 3 60.00 CO Maro /
Pani koro to Ridumrijo at ZPM/Baririjo
(Renovation) Riko vill

13 Baririjo MOA&FW Har Khet ko CC lining from Jilu koro 1 50.00 96.00 3 50.00 ZPM/Baririjo
Pani to Dabrijo at Luchi
(Renovation)

14 Baririjo MOA&FW Har Khet ko Renovation work from 1 10.00 15.00 1 10.00 CO Maro
Pani Ruche koro to Baterijo
(Renovation) at Tasidoni.

15 Baririjo MOA&FW Har Khet ko CC lining from Tasi 1 15.00 13.00 2 15.00
Pani Koro to Mendirijo at
(Renovation) Tamaripa

16 Baririjo MOA&FW Har Khet ko CC Drain for MIP 1 20.00 10.00 2 20.00
Pani Libarijo at Gongo
(Renovation)
17 Baririjo MOA&FW Har Khet ko Renovation of MIP from 1 15.00 12.00 2 15.00
Pani Jessekoro to Yatekripa
(Renovation) at Tapi village

CAD FOR SPILLOVER SCHEMES


Concerned Catchment Period of Estimated
Total Command
Sl.No. Ministry / Component Activity (CAD for ) area implementation cost in
Number area /
Department (Sq.Km.) (year) Lakhs

563 | P a g e
Irrigation
(ha)

MOA&FW AIBP NACHO SUB-DIV

Cluster of MIP under Nacho & Siyum (2012-13)


1 MOA&FW AIBP C/o Rampe Nallah to Doniumpu A/F at Nilo Vill 1 30 3 30
2 MOA&FW AIBP C/o Taru Nallah to Bochok A/F at Nava Vill 1 17 2 17
3 MOA&FW AIBP C/o Yol Nallah to Loke A/F at Loke Village 1 25 3 25
3 72 0 8 72
Cluster of MIP under Lmkng,Nacho & Siyum (2013-14) 50 3 50
1 MOA&FW AIBP MIP from Aying Hanung Nallah to Sackving field at Aying 1 2.50 1 2.5
2 MOA&FW AIBP MIP Kete Nallah to Odejobe at Orak 1 2.50 1 2.5
3 MOA&FW AIBP MIP Chingrong Nallah to Ringmi Rengo at Cheke 1 2.50 1 2.5
4 MOA&FW AIBP Nyalone Nallah to Nyalone Ringjo at Zingmuring vill 1 2.50 1 2.5
5 MOA&FW AIBP Nho Nalllah to Byana at Gyate Vill 1 2.50 1 2.5
6 MOA&FW AIBP Byaying Nalllah to Sogi A/F at Row Vill 1 2.50 1 2.5
7 MOA&FW AIBP Sijing Sikio to Matak Rengo at Ering Mosu Vill 1 2.50 1 2.5
8 MOA&FW AIBP Bero Nallah to Nama A/F at Kajiring Vill 1 2.50 1 2.5
9 MOA&FW AIBP C/O from Suha Nallah to Hojuring at Rava Vill 1 2.50 1 2.5
10 MOA&FW AIBP C/o MIP Gamchi Nallah to Gyadu Lingdi area at Dui vill 1 2.50 1 2.5
11 MOA&FW AIBP C/o MIP Erung Nallah to Erung Rungo at Tayom Vill. 1 2.50 1 2.5
12 MOA&FW AIBP Se-Siko to Nallah to Pillaring A/F at Dui Vill. 1 3.00 1 3
13 MOA&FW AIBP Kitte Nallah to Moser A/F at Dui Vill 1 14.00 1 14
14 MOA&FW AIBP Lumtak Nallah to Hakirengo at Ekke Vill 1 3.50 1 3.5
15 MOA&FW AIBP C/O MIP from Dilo Nallah to Ejupa A/F at Chep Rai vill 1 3.00 1 3

564 | P a g e
16 MOA&FW AIBP C/o Sipung Linglim Nallah to Tayor areas at Sarta Vill. 1 3.50 1 3.5

CAD FOR SPILLOVER SCHEMES


ANEXURE - 1 Cluster of MIP under Paying Circle (2013-14)
Command
Concerned Catchment Period of Estimated
Total area /
Sl.No. Ministry / Component Activity (CAD for ) area implementation cost in
Number Irrigation
Department (Sq.Km.) (year) Lakhs
(ha)
1 MOA&FW AIBP C/o Rio Nallah to Bomdom at Bomdom Vill 1 2.50 1 2.50
2 MOA&FW AIBP C/o Kokpu nallah to Pakpu village at Kokpu Vill. 1 2.50 1 2.50
3 MOA&FW AIBP C/o Momi Nallah to Momirijo at Konia Village 1 2.50 1 2.50
4 MOA&FW AIBP C/o Roho Nallah to Lepanguring A/F at Poda Mara 1 3.00 1 3.00
5 MOA&FW AIBP C/o Echingso koro to Maperikling at Lingram Village 1 4.00 1 4.00
6 MOA&FW AIBP C/o Biate Nallah to Degam A/Field at Pogia Mara 1 3.00 1 3.00
7 MOA&FW AIBP C/o Raso koro to Ledirijo at Nintemoring Village 1 3.00 1 3.00
8 MOA&FW AIBP C/o Aya siku to Take Esirengo at Mo-Mara Village 1 2.00 1 2.00
9 MOA&FW AIBP Dungda Koro to Gingda at Doyom Vill 1 2.50 1 2.50
10 MOA&FW AIBP Singrige Nallah to Jipurijo at Maying 1 3 1 3.00
11 MOA&FW AIBP C/o Singcho Nallah Jokpiring at Ebo Village 1 2.5 1 2.50
12 MOA&FW AIBP Kobumara Singya Nallah to Bokching at Poda Mara. 1 3 1 3.00
13 MOA&FW AIBP C/o Kido Nallah to Pachumoring at Jeba Village 1 5 1 5.00
14 MOA&FW AIBP C/o Silu River to Kagar Rongo A/F MIP at Pakpu 1 2.50 1 2.50
15 MOA&FW AIBP C/o Bate Nallah to Baring A/F at Baring Village 1 2.50 1 2.50
16 MOA&FW AIBP Yari Sapuk Nallah to Pegamoring at Doyom Vill. 1 2.50 1 2.50
17 MOA&FW AIBP Hignesho to Dalikrijo at Lepajaring vill 1 3.00 1 3.00
18 MOA&FW AIBP Takutatrak Nallah to Sobamoring at Duchok Vill 1 3.00 1 3.00
19 MOA&FW AIBP Cheba koro to Niara rengo at Nayam Vill 1 2.00 1 2.00
20 MOA&FW AIBP Janiakkoro to Tachmori at Radding vill 1 3.00 1 3.00
21 MOA&FW AIBP C/o Setom Bobing Nallah to bogne Mara at Mara 1 3.00 1 3.00

565 | P a g e
CAD for SPILLOVER SCHEMES
Chetam/Daporijo/Giba Circle ANEXURE - 1
Command
Concerned Catchment Period of Estimated
Total area /
Sl.No. Ministry / Component Activity (CAD for ) area implementation cost in
Number Irrigation
Department (Sq.Km.) (year) Lakhs
(ha)
Cluster of MIP under daporijo Circle
(2013-14) 55.8
1 MoWR AIBP C/O MIP at Dai village 9.00 9.00
2 MoWR AIBP C/O MIP at Jeke village 8.00 9.00
3 MoWR AIBP C/O MIP at Sera village 9.00 10.00
4 MoWR AIBP C/O MIP at Siga Village 9.00 10.00
5 MoWR AIBP C/O MIP at Battak village 8.00 9.00
C/o MIP from Tabu Koro to 1.00 1.50
6 MoWR AIBP Jmporijo at Magria village
C/O MIP from Sero Koro to 1.00 1.00
7 MoWR AIBP Bamerijo at Dumpin village
C/O MIP from hate Koro to 1.00 1.00
8 MoWR AIBP Hamrijo at Sebing village
C/O MIP from Bumi Nallah to 2.00 2.80
9 MoWR AIBP Seirijo at Rikung village
C/O MIP from Hayung Koro to 2.00 2.50
10 MoWR AIBP Hayungrijo at Dadi village

CAD for SPILLOVER SCHEMES


ANEXURE - 1
Command
Concerned Catchment Period of Estimated
Total area /
Sl.No. Ministry / Component Activity (CAD for ) area implementation cost in
Number Irrigation
Department (Sq.Km.) (year) Lakhs
(ha)
Cluster of MIP pochigeko Circle (2013-14)

566 | P a g e
1 MoWR AIBP Puelkoro to giterijo MIP at Geetu Village 15.00 2 15.00
2 MoWR AIBP MIP from Tugru Koro to Tugruse at Dai-Baja 2.50 1 2.50
3 MoWR AIBP Suk Koro to Rampe-ayor at Angolomdak 2.50 1 2.50
4 MoWR AIBP Rek Koro nto Paremrijo at Lily dong village 2.50 1 2.50
5 MoWR AIBP Moya Koro to Moyarijo at Mugli village 2.00 1 2.00
Sim Koro to Tagekrijo at Pega Lomdak village 2.00 2.00
6 MoWR AIBP 1
7 MoWR AIBP Sik Koro to Dugulrijo at Gigi village 2.00 1 2.00
Lerum Koro to Upper Miberijo at Hankar village 2.00 2.00
8 MoWR AIBP 1
9 MoWR AIBP Sima Koro to Simarijo at Bomikoto village 2.00 1 2.00
Tapa Koro to Anyarijo at Nguri village 2.00 2.00
10 MoWR AIBP 1
11 MoWR AIBP Sigum Koor to Ekkarijo at Derma Don village 2.00 1 2.00
12 MoWR AIBP Dun Koro to Nemchi Attak at Laa Village 2.00 1 2.00
Sikh Nallah to Sikharijo at Dek-Dakpe village 2.00 2.00
13 MoWR AIBP 1
Loya Koro to Yabomrijo at Mona village 2.50
2.50
14 MoWR AIBP 1
Sikkoro to sirijo at Hiyi-Don village 2.00 2.00
15 MoWR AIBP 1
16 MoWR AIBP Tadrijo MIP at Muri village 3.50 1 3.50

CAD for SPILLOVER SCHEMES


Dumporijo/Gusar/Baririjo Circle
ANEXURE - 1
Sl.No. Concerned Component Total Command Catchment Period of Estimated
Ministry / Number area / area implementation cost in
Department Activity (CAD for ) Irrigation (Sq.Km.) (year) Lakhs
(ha)

567 | P a g e
Cluster of MIP under Dumporijo Circle
(2013-14)
1 Hutu Koro to Julirijo at Digbak 1 6.00 6.00
MoWR AIBP village 1
2 Dere Koro to Beyak rijo at Ara 1 5.00 5.00
MoWR AIBP nalo village 1
3 MoWR AIBP Tale rijo at Aya Nirin Village 1 5.00 1 5.00
4 Rakh Koro to tillirijo at New 1 5.00 5.00
MoWR AIBP Haji village 1
5 Chello Koro to Anggo Jiga at 1 6.00 5.00
MoWR AIBP Hali Village 1
6 Som Koche to Yapa rijo at 1 5.00 5.00
MoWR AIBP Maro village 1
7 Jet Koro to Boje Muri at Haider 1 5.00 5.00
MoWR AIBP village` 1
8 Sikin Koro to Ngudak rijo at Bui 1 2.00 2.50
MoWR AIBP village 1
9 Jinin Koro to Bogpen rijo at 1 5.00 5.00
MoWR AIBP Yudik village 1
10 Koro to Jinyum rijo at Mech 1 2.00 2.50
MoWR AIBP Marde village 1
11 Jike Koro to Bege rijo at Tode 1 4.00 4.00
MoWR AIBP village 1

NEW SCHEMES
Sl. Name of Concerned Componen Activity Total Command Catchmen Period of Estimate Remarks/
No the Ministry/ t (C/o. MIP from ……….) Numbe Area/Irrigatio t Area Implementatio d cost Recommende
. District/ Departmen r n (in Ha) (Sq.Km.) n (Rs. in d by
Blocks t lakh)

568 | P a g e
1 U/ MOA&FW Har Khet Ging Seko To Gelejing At Bodok 1 7.00 6 3 17.50 ZPM
Subansar ko Pani
i
Limeking
2 U/ MOA&FW Har Khet Kacha nallah to kacha Horti. Field at Kacha Vill 1 5.00 4 3 12.50 MLA
Subansar ko Pani
i
Limeking
3 U/ MOA&FW Har Khet Bidak stream to redding A/F at Redding camp Vill 1 15.00 9 3 37.50 ZPM
Subansar ko Pani
i
Limeking
4 U/ MOA&FW Har Khet Esmi nallah to gumsing Tayeng H/Field at 1 5.00 5 3 12.50 MLA
Subansar ko Pani G/Taying
i
Limeking
5 U/ MOA&FW Har Khet Kahong river to sapnarang at Nava Vill 1 9.00 8 3 22.50
Subansar ko Pani
i
Limeking
6 U/ MOA&FW Har Khet Esnia Nallah to Isnia Horti Field at Taksing Vill 1 3.00 3 3 7.50 MLA
Subansar ko Pani
i
Limeking
7 U/ MOA&FW Har Khet Redding stream to redding jobe at Redding camp 1 6.00 6 3 15.00 MLA
Subansar ko Pani
i
Limeking
8 U/ MOA&FW Har Khet Redding Nallah to redding Horti.Field at Redding 1 6.00 6 3 15.00 ZPM
Subansar ko Pani Vill
i
Limeking
9 U/ MOA&FW Har Khet Nyare stream to Nyare A/Field at Nyare Vill 1 12.00 9 3 30.00
Subansar ko Pani
i
Limeking

569 | P a g e
10 U/ MOA&FW Har Khet Tree nallah to chi-haring at Nava Vill 1 5.00 3 3 12.50
Subansar ko Pani
i
Limeking
11 U/ MOA&FW Har Khet Yaza nallah to Yaza horti./field at kacha Vill 1 6.00 6 3 15.00 MLA
Subansar ko Pani
i
Limeking
12 U/ MOA&FW Har Khet Lingbing nallah to Lingbing H/Field at Lingbing Vill 1 6.00 6 3 15.00 MLA
Subansar ko Pani
i
Limeking
13 U/ MOA&FW Har Khet Harak nallah to gebak at Ngoju Vill 1 5.00 6 3 12.50
Subansar ko Pani
i
Limeking
14 U/ MOA&FW Har Khet Esmi nallah to Doloring Jobe at Doloring Vill 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking
15 U/ MOA&FW Har Khet Esmi stream to gelemo at Gelemo Vill 1 15.00 6 3 37.50 ZPM
Subansar ko Pani
i
Limeking
16 U/ MOA&FW Har Khet Radingngo Nallah to Reding H/Field at Reddy Vill. 1 8.00 6 3 20.00 MLA
Subansar ko Pani
i
Limeking
17 U/ MOA&FW Har Khet Esim seko to doloring at Doloring 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking
18 U/ MOA&FW Har Khet Water Harvesting structures for Nava-Haring at 1 12.00 8 3 30.00
Subansar ko Pani Nava vill
i
Limeking

570 | P a g e
19 U/ MOA&FW Har Khet Bojuk nallah to bojuk haring at Nava vill 1 5.00 6 3 12.50
Subansar ko Pani
i
Limeking
20 U/ MOA&FW Har Khet Ging seko to joki at Bodok 1 5.00 4 3 12.50 ZPM
Subansar ko Pani
i
Limeking
21 U/ MOA&FW Har Khet Badok seko to badok at Bodok 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking
22 U/ MOA&FW Har Khet Sousu Jachar-ne to Sapna jobe at Nilo Vill 1 3.00 3 3 7.50 ASM
Subansar ko Pani
i
Limeking
23 U/ MOA&FW Har Khet Gajne nallah to lingrine at Bogum 1 5.00 4 3 12.50
Subansar ko Pani
i
Limeking
24 U/ MOA&FW Har Khet Dania nallah to bogum at Bogum 1 7.00 6 3 17.50
Subansar ko Pani
i
Limeking
25 U/ MOA&FW Har Khet Gejne nallah to lingrime at Bogong 1 4.00 5 3 10.00
Subansar ko Pani
i
Limeking
26 U/ MOA&FW Har Khet MIP at Orak Under Orak anchal segment. 1 4.00 3 2 10.00
Subansar ko Pani
i
Limeking
27 U/ MOA&FW Har Khet Yackte river to Darjing 1 2.00 2 2 5.00 MLA
Subansar ko Pani
i
Limeking

571 | P a g e
28 U/ MOA&FW Har Khet Ojugo Nallah to Ojugo Horti./Field at Ojugo 1 3.00 2 2 7.50 MLA
Subansar ko Pani Vill
i
Limeking
29 U/ MOA&FW Har Khet Tave chung stream to leso jerbay at Tama chung 1 8.00 4 3 20.00 ZPM
Subansar ko Pani vill
i
Limeking
30 U/ MOA&FW Har Khet Ging seko to ging at Ging Vill 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking
31 U/ MOA&FW Har Khet Ging nallah to julaying at Ging Vill 1 4.00 3 3 10.00 ZPM
Subansar ko Pani
i
Limeking
32 U/ MOA&FW Har Khet Tave chung stream to tave chung at Tama chung 1 10.00 3 3 25.00
Subansar ko Pani
i
Limeking
33 U/ MOA&FW Har Khet Esmi stream to jebok jobe at Gelemo 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking
34 U/ MOA&FW Har Khet Esmi nallah to Gelomo jobe at Gelomo 1 5.00 3 3 12.50
Subansar ko Pani
i
Limeking
35 U/ MOA&FW Har Khet Gelemo to Modergo Nallah at Gelemo 1 5.00 2 3 12.50
Subansar ko Pani
i
Limeking
36 U/ MOA&FW Har Khet Esmi stream to hokrio at Gelemo 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking

572 | P a g e
37 U/ MOA&FW Har Khet Badok seko to kelu at Bodok 1 8.00 6 3 20.00 ZPM
Subansar ko Pani
i
Limeking
38 U/ MOA&FW Har Khet Jitak Nallah to Jitak moring Taying 1 4.00 5 3 10.00
Subansar ko Pani
i
Limeking
39 U/ MOA&FW Har Khet Kacha nallah to kacha jobe at Kacha 1 5.00 5 3 12.50
Subansar ko Pani
i
Limeking
40 U/ MOA&FW Har Khet Mekedu stream to mekedu at Limeking 1 8.00 5 2 20.00 ZPM
Subansar ko Pani
i
Limeking
41 U/ MOA&FW Har Khet Kofer nallah to sarava at Limeking 1 10.00 6 3 25.00 ZPM
Subansar ko Pani
i
Limeking
42 U/ MOA&FW Har Khet Lingbing vill. 1 2.00 2 2 5.00
Subansar ko Pani
i
Limeking
43 U/ MOA&FW Har Khet Muri sream to guching at Muri 1 8.00 3 3 20.00 ZPM
Subansar ko Pani
i
Limeking
44 U/ MOA&FW Har Khet Gedak seko to muri at Muri 1 6.00 4 3 15.00 ZPM
Subansar ko Pani
i
Limeking
45 U/ MOA&FW Har Khet Gedak nallah to chandi at Muri Vill 1 5.00 3 3 12.50 ZPM
Subansar ko Pani
i
Limeking

573 | P a g e
46 U/ MOA&FW Har Khet Mepu stream to mepu at Mepu Vill 1 9.00 6 2 22.50 ZPM
Subansar ko Pani
i
Limeking
47 U/ MOA&FW Har Khet Kemsi nallah to orak at orak Vill 1 8.00 6 3 20.00 ZPM
Subansar ko Pani
i
Limeking
48 U/ MOA&FW Har Khet Teru nallah to nava at Nava Vill 1 5.00 2 3 12.50 MLA
Subansar ko Pani
i
Limeking
49 U/ MOA&FW Har Khet Tree nallah to nava haring at Nava Vill 1 10.00 6 3 25.00
Subansar ko Pani
i
Limeking
50 U/ MOA&FW Har Khet Oro nallah to mukang jobe at sere Vill 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking
51 U/ MOA&FW Har Khet Raw seko to hejing at Raw 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking
52 U/ MOA&FW Har Khet Peyi jobe to kapi nallah at Nilo 1 5.00 2 3 12.50 ASM
Subansar ko Pani
i
Limeking
53 U/ MOA&FW Har Khet Libi nallah to nilo agri-field at Nilo 1 3.00 3 2 7.50 MLA
Subansar ko Pani
i
Limeking
54 U/ MOA&FW Har Khet zingkongi to zing nallah at Ngoju 1 3.00 3 3 7.50
Subansar ko Pani
i
Limeking

574 | P a g e
55 U/ MOA&FW Har Khet Kofer nallah to yapong yaching 1 12.00 6 3 30.00 ZPM
Subansar ko Pani
i
Limeking
56 U/ MOA&FW Har Khet Doniongpu jobe to sousu kaumg nallah at Nilo vill 1 5.00 3 3 12.50 ASM
Subansar ko Pani
i
Limeking
57 U/ MOA&FW Har Khet Pakme seku to pakme seku jobe at Redding camp 1 6.00 3 3 15.00 ZPM
Subansar ko Pani
i
Limeking
58 U/ MOA&FW Har Khet Haa nallah to mebri at Ngoju 1 10.00 6 3 25.00
Subansar ko Pani
i
Limeking
59 U/ MOA&FW Har Khet Bidak stream to bidak rango at Redding camp 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking
60 U/ MOA&FW Har Khet Lingbing nallah to singling jobe at Lingbing 1 4.00 3 3 10.00
Subansar ko Pani
i
Limeking
61 U/ MOA&FW Har Khet Kete sream to kete jobe at orak 1 7.00 6 3 17.50 ZPM
Subansar ko Pani
i
Limeking
62 U/ MOA&FW Har Khet Kemsi nallah to kemshi jobe at orak 1 5.00 3 3 12.50 ZPM
Subansar ko Pani
i
Limeking
63 U/ MOA&FW Har Khet Keme nallah to oda jobe at Orak 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking

575 | P a g e
64 U/ MOA&FW Har Khet Tachono Nallah to Bate Hort. Area at Nilo 1 8.00 3 3 20.00
Subansar ko Pani
i
Limeking
65 U/ MOA&FW Har Khet Bate agri field to nilo at Nilo 1 2.00 3 2 5.00
Subansar ko Pani
i
Limeking
66 U/ MOA&FW Har Khet Raw seko to raw at Raw 1 3.00 3 3 7.50 ZPM
Subansar ko Pani
i
Limeking
67 U/ MOA&FW Har Khet Raw seko to kochi at Raw 1 3.00 4 3 7.50 ZPM
Subansar ko Pani
i
Limeking

NEW SCHEMES
Sl. Name of the Concerne Compone Activity Total Command Catchme Period of Estimate Remarks/
No District/ Blocks d Ministry/ nt (C/o. MIP from ……….) Numbe Area/Irrigatio nt Area Implementatio d cost Recommende
. Departme r n (in Ha) (Sq.Km.) n (Rs. in d by
nt lakh)
1 upper MOA&FW Har Khet CC Linning of Keo Nallah MIP to keojaring at 1 7.00 6 3 17.50
subansari/Nac ko Pani Meyaba Vill
ho Block

2 upper MOA&FW Har Khet Gunong nallah to Ebya at Ebya vill 1 6.00 4 3 15.00 MLA
subansari/Nac ko Pani
ho Block
3 upper MOA&FW Har Khet CC Linning of Keo nallah MIP at keojaring vill 1 6.00 4 3 15.00
subansari/Nac ko Pani
ho Block
4 upper MOA&FW Har Khet Sejo nallah to ririjobe at Charu-1 1 10.00 6 3 25.00 MLA/GC
subansari/Nac ko Pani
ho Block

576 | P a g e
5 upper MOA&FW Har Khet Reno.of MIP Bate nallah under at keojaring 1 4.00 3 3 10.00
subansari/Nac ko Pani
ho Block
6 upper MOA&FW Har Khet Nacho to WRD Complex under Nacho Hqtr. 1 3 3 2 7.50
subansari/Nac ko Pani
ho Block
7 upper MOA&FW Har Khet CC Linning of Gonung Nallah MIP at Ebya Vill 1 7.00 4 3 17.50
subansari/Nac ko Pani
ho Block
8 upper MOA&FW Har Khet CC linning Paktungmoring MIP at Meyaba Vill 1 4.00 2 3 10.00
subansari/Nac ko Pani
ho Block
9 upper MOA&FW Har Khet Rite Nallah to gongrak jobe at Gingba Vill 1 2.00 2 3 5.00 MLA
subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Sato nallah at Dingsar 1 3.00 3 2 7.50 ZPM
subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Rungdo Nallah to Koduk at Keojaring 1 3 6 2 7.50
subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Kio nallah to anong agri field at Aying Muri vill 1 2.00 2 1 5.00 MLA/GPM
subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Keo stream to keojaring at keojaring vill 1 4.00 2 3 10.00 MLA
subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Talo Nalah to sikin joring at yeba Vill 1 4.00 2 3 10.00 MLA
subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Khud Nallah to tage seriu at Chetam Vill 1 3.00 2 3 7.50 MLA
subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Sejo nallah to byatok at Charu-1 Vill 1 5.00 2 3 12.50 MLA/GC
subansari/Nac ko Pani
ho Block

577 | P a g e
17 upper MOA&FW Har Khet Ramde nallah under Neing village 1 2.00 5 2 5.00 ZPM
subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Pario nallah MIP Under Doginalo vill 1 5.00 2 3 12.50 ZPM
subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Epo sikio to kiamsok rongo at Cheke Vill 1 1.00 1 3 2.50 ASM
subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Taro nallah to Ringmi at Cheke Vill 1 3.00 2 3 7.50 MLA
subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Aying Anong nallah to aying agri field Aying Muri 1 4.00 3 1 10.00 GPM
subansari/Nac ko Pani vill
ho Block
22 upper MOA&FW Har Khet Ramde Nallah under Neing vill 1 4.00 3 3 10.00 ZPM
subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Kepe Nallah to Ayingjori at Jibaying Vill 1 10.00 8 3 25.00 Ex-ZPM
subansari/Nac ko Pani /ASM
ho Block
24 upper MOA&FW Har Khet Singkinne Nallah to Ringmi Rimgte at Kojin vill 1 3.00 3 3 7.50
subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Joying nallah to joying ringo at Doilingdi 1 10.00 9 3 25.00 ASM
subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Takini Nallah to Chalinringo at Chalin Vill 1 3.00 1 3 7.50 MLA
subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Aying Nallah to heting sikiring at Aying Moring 1 3.00 5 3 7.50
subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Nguduk Nallah to Tading-Ringo at Kargam 1 2.00 2 3 5.00 MLA/ASM
subansari/Nac ko Pani
ho Block

578 | P a g e
29 upper MOA&FW Har Khet Aying Anong nallah to Aying Anong A/F at Aying 1 3.00 8 2 7.50
subansari/Nac ko Pani muri
ho Block
30 upper MOA&FW Har Khet Segiumtam to Ragiajobe at Kyamdo Vill 1 2.00 6 3 5.00
subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Medu nallah to merliring-jobe at Medamba Rai 1 8.00 8 3 20.00 MLA/ASM
subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Kow nallah to ringu agri field at Aying Muri 1 3.00 6 3 7.50 GPM
subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet khud Nallah to Ringte at Daying vill 1 9.00 7 3 22.50 MLA/GC
subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Tikre Nallah to Tikrerijo at Aying Muri Vill 1 2.00 6 1 5.00 GB
subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Koduk river to keojaring 1 4.00 2 3 10.00 MLA
subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Gereh nallah to kupak jobe at loke vill 1 4.00 1 3 10.00 MLA
subansari/Nac ko Pani
ho Block
37 upper MOA&FW Har Khet Khud Nallah to ringmi at Daying vill 1 8.00 4 3 20.00 MLA/GC
subansari/Nac ko Pani
ho Block
38 upper MOA&FW Har Khet Pumpa nallah to ringu agri field at Aying Muri 1 3.00 3 3 7.50 GPM
subansari/Nac ko Pani
ho Block
39 upper MOA&FW Har Khet Yolu nallah to loke at loke 1 5.00 2 3 12.50 MLA
subansari/Nac ko Pani
ho Block

579 | P a g e
40 upper MOA&FW Har Khet Niami Nallah Kodongharing and Jokpeparingo at 1 6.00 5 3 15.00 MLA
subansari/Nac ko Pani Mosing vill.
ho Block
41 upper MOA&FW Har Khet Gonung Nallah to Ringmi at Ebya vill 1 4.00 2 3 10.00 MLA
subansari/Nac ko Pani
ho Block
42 upper MOA&FW Har Khet Sato nallah to sato-2 at Aying muri 1 2.00 5 1 5.00 GPM
subansari/Nac ko Pani
ho Block
43 upper MOA&FW Har Khet Gonung Nallah under WRC land at Ebya vill 1 3.00 2 3 7.50 MLA
subansari/Nac ko Pani
ho Block
44 upper MOA&FW Har Khet Mabin nallah to Taging-ne at Chingring vill. 1 2.00 3 1 5.00 ZPM
subansari/Nac ko Pani
ho Block
45 upper MOA&FW Har Khet Sopin Nallah to Sopinrengo at Nacho 1 3.00 6 3 7.50 Ex-ZPM
subansari/Nac ko Pani
ho Block
46 upper MOA&FW Har Khet Jiba nallah to jiba ringo at jebaying 1 12.00 6 3 30.00 ASM
subansari/Nac ko Pani
ho Block
47 upper MOA&FW Har Khet Dogi Konsin Nallah To Dogi Konsinb at Dogi 1 2 3 2 5.00
subansari/Nac ko Pani nalo
ho Block
48 upper MOA&FW Har Khet Gio nallah to Aying moring at Aying moring 1 2.00 2 2 5.00 MLA
subansari/Nac ko Pani
ho Block
49 upper MOA&FW Har Khet Charung sikio to Bepia jobe at Kyamdo 1 5.00 3 3 12.50
subansari/Nac ko Pani
ho Block
50 upper MOA&FW Har Khet Lingruk nallah to singruk ne at nacho Hq 1 8.00 5 3 20.00 ASM
subansari/Nac ko Pani
ho Block

580 | P a g e
51 upper MOA&FW Har Khet Pate nallah to kupen ringho at nacho Hq 1 8.00 5 3 20.00
subansari/Nac ko Pani
ho Block
52 upper MOA&FW Har Khet Lingbar nallah to pakha ringo at Aki 1 5.00 5 1 12.50
subansari/Nac ko Pani
ho Block
53 upper MOA&FW Har Khet Selungso nallah to byania at Byania 1 5.00 3 3 12.50 ASM
subansari/Nac ko Pani
ho Block
54 upper MOA&FW Har Khet Nyomi nallah to bos rai i jobe at Bosi Rai 1 3.00 2 3 7.50 GC
subansari/Nac ko Pani
ho Block
55 upper MOA&FW Har Khet Kobit Nallah to Dumpujobe at Dingsar vill 1 3.00 2 3 7.50
subansari/Nac ko Pani
ho Block
56 upper MOA&FW Har Khet Kubu nallah to kubo ringjo at Bosi Rai 1 3.00 3 3 7.50 GC
subansari/Nac ko Pani
ho Block
57 upper MOA&FW Har Khet Tagopu Nallah To Singime Moba At 1 7.00 5 3 17.50
subansari/Nac ko Pani Doilingdi
ho Block
58 upper MOA&FW Har Khet Reno.of MIP Bite nallah to Taktring under Rava 1 2.00 1 1 5.00 ZPM
subansari/Nac ko Pani vill
ho Block
59 upper MOA&FW Har Khet CC lining pugpu nallah to pugpu yorbe at 1 10.00 9 3 25.00
subansari/Nac ko Pani Chaklik
ho Block
60 upper MOA&FW Har Khet Ringu nallah to ringu agri field at Aying Muri 1 3.00 5 3 7.50 ASM
subansari/Nac ko Pani
ho Block
61 upper MOA&FW Har Khet Sejo nallah to pashane at Charu-1 1 5.00 1 3 12.50 GC
subansari/Nac ko Pani
ho Block

581 | P a g e
62 upper MOA&FW Har Khet Nilallso Nallah to amchok rizyo at Diri 1 7.00 4 3 17.50 ASM
subansari/Nac ko Pani
ho Block
63 upper MOA&FW Har Khet Kujin river to Jojo WRC agril field at Diri vill 1 2.00 3 2 5.00 MLA
subansari/Nac ko Pani
ho Block
64 upper MOA&FW Har Khet Dori nallah to sete lengpe at Charu-1 1 10.00 9 3 25.00 GC
subansari/Nac ko Pani
ho Block
65 upper MOA&FW Har Khet Hopen nallah to sihaba at Charu-1 1 5.00 1 3 12.50 GC
subansari/Nac ko Pani
ho Block
66 upper MOA&FW Har Khet Jitak Nallah to Jitakmoring at Kidulingdi 1 2.00 1 3 5.00
subansari/Nac ko Pani
ho Block
67 upper MOA&FW Har Khet Hopen nallah to Napak moha at Charu-1 1 5.00 3 3 12.50 GC
subansari/Nac ko Pani
ho Block
68 upper MOA&FW Har Khet Ngulo nallah to Gloring at Charu 1 5.00 2 3 12.50 MLA
subansari/Nac ko Pani
ho Block
69 upper MOA&FW Har Khet Niami stream to kodom haring at Chingring 1 6.00 5 3 15.00 ASM
subansari/Nac ko Pani
ho Block
70 upper MOA&FW Har Khet Sirung nallah to mokam ringo at Cheke 1 2.00 1 3 5.00 ASM
subansari/Nac ko Pani
ho Block
71 upper MOA&FW Har Khet Ringte ringo to Singku sikio at Cheke 1 3.00 2 3 7.50
subansari/Nac ko Pani
ho Block
72 upper MOA&FW Har Khet Korkiso to Baba yorbe at Charu-2 1 8.00 8 3 20.00 GC
subansari/Nac ko Pani
ho Block

582 | P a g e
73 upper MOA&FW Har Khet Hepo Nallah to Pakring village Cheke vill 1 2.00 2 3 5.00
subansari/Nac ko Pani
ho Block
74 upper MOA&FW Har Khet Kobit Nallah MIP at Dape under Dingsar vill 1 3.00 3 1 7.50 ZPM
subansari/Nac ko Pani
ho Block
75 upper MOA&FW Har Khet Hepong Sekio to Rebirengo at Cheke vill 1 2.00 4 3 5.00
subansari/Nac ko Pani
ho Block
76 upper MOA&FW Har Khet Korkiso to Lokba jobe at Charu-2 1 4.00 4 3 10.00 GC
subansari/Nac ko Pani
ho Block
77 upper MOA&FW Har Khet Chokar nallah to chokar ringo at Chokar 1 8.00 3 3 20.00 ASM
subansari/Nac ko Pani
ho Block
78 upper MOA&FW Har Khet Nyomi nallah to nyomi jobe at Bosi Rai 1 3.00 1 3 7.50 GC
subansari/Nac ko Pani
ho Block
79 upper MOA&FW Har Khet Kubu nallah to singloring jobe at Bosi Rai 1 4.00 2 3 10.00 GC
subansari/Nac ko Pani
ho Block
80 upper MOA&FW Har Khet Pungda nallah to Rakin jobe at Cheke 1 5 3 3 12.50
subansari/Nac ko Pani
ho Block
81 upper MOA&FW Har Khet Kubu nallah to jojo jobe at Bosi Rai 1 5.00 2 3 12.50 GC
subansari/Nac ko Pani
ho Block
82 upper MOA&FW Har Khet Sogak nallah at Chingring 1 2.00 1 2 5.00
subansari/Nac ko Pani
ho Block
83 upper MOA&FW Har Khet Khot nallah to sars rengo at Chetam 1 3.00 2 3 7.50
subansari/Nac ko Pani
ho Block

583 | P a g e
84 upper MOA&FW Har Khet Talik song nallah to lingpine at Chetam 1 3.00 1 3 7.50
subansari/Nac ko Pani
ho Block
85 upper MOA&FW Har Khet Giji nallah to dedar at Chokar 1 10.00 6 3 25.00
subansari/Nac ko Pani
ho Block
86 upper MOA&FW Har Khet Singyer yurange to singyer yurange at ragmi 1 10.00 6 3 25.00
subansari/Nac ko Pani
ho Block
87 upper MOA&FW Har Khet Joki nallah to chokar ringo at Chokar 1 8.00 6 3 20.00
subansari/Nac ko Pani
ho Block
88 upper MOA&FW Har Khet Kud nallah to papi seriu at Chetam 1 5.00 3 3 12.50
subansari/Nac ko Pani
ho Block
89 upper MOA&FW Har Khet Tonyi nallah to toniyer ringo at Doilingdi 1 10.00 6 3 25.00 ASM
subansari/Nac ko Pani
ho Block
90 upper MOA&FW Har Khet Kobu nallah to kobu jaring at Cheke 1 1.00 1 3 2.50
subansari/Nac ko Pani
ho Block
91 upper MOA&FW Har Khet Dogi Nallah to Dogi koksin at Doginalo vill 1 3.00 3 3 7.50
subansari/Nac ko Pani
ho Block
92 upper MOA&FW Har Khet Rakle nallah to rakle yaya at nacho hq. 1 7.00 4 3 17.50 ASM
subansari/Nac ko Pani
ho Block
93 upper MOA&FW Har Khet Singku sikio to taniogingdo at Cheke 1 2.00 2 3 5.00 ASM
subansari/Nac ko Pani
ho Block
94 upper MOA&FW Har Khet Zingpu nallah to cheke ringo at Cheke 1 12.00 9 3 30.00 ASM
subansari/Nac ko Pani
ho Block

584 | P a g e
95 upper MOA&FW Har Khet Poying Jaring at Loke 1 2.00 2 1 5.00 GPM
subansari/Nac ko Pani
ho Block
96 upper MOA&FW Har Khet MIP at Aying under Ayingmuri Vill 1 3.00 2 1 7.50
subansari/Nac ko Pani
ho Block
97 upper MOA&FW Har Khet Korkiso to Geloring at Charu-2 1 11.00 6 3 27.50 GC
subansari/Nac ko Pani
ho Block
98 upper MOA&FW Har Khet Korkiso to Emen harcha at Charu-2 1 6.00 6 3 15.00 GC
subansari/Nac ko Pani
ho Block
99 upper MOA&FW Har Khet Hepo Nallah to Pakring village Cheke vill 1 2.00 2 1 5.00
subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Tajum nallah to Tajum agri field at Aying Muri 1 2.00 4 1 5.00 GPM
0 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Dapo nallah to ringte ringo at Cheke 1 10.00 7 3 25.00 ASM
1 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Kow nallah to jorong agr.field at Aying Muri 1 3.00 6 1 7.50 GPM
2 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Jimi nallah to jimi ringo at Doilingdi 1 10.00 7 3 25.00 ASM
3 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Khud nallah to khud jobe at Daying 1 12.00 8 3 30.00 GC
4 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Khud nallah to khud ringjo at Daying 1 12.00 8 3 30.00 GC
5 subansari/Nac ko Pani
ho Block

585 | P a g e
10 upper MOA&FW Har Khet Korkiso to Rakya at Charu-2 1 6.00 6 3 15.00 GC
6 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Aying Anong Nallah to Tajum Agri Field Aying 1 6.00 6 3 15.00 GPM
7 subansari/Nac ko Pani Muri
ho Block
10 upper MOA&FW Har Khet Ringmi nallah to daying jobe at Daying 1 10.00 6 3 25.00 GC
8 subansari/Nac ko Pani
ho Block
10 upper MOA&FW Har Khet Ringmi nallah to ringte jobe at Daying 1 10.00 6 3 25.00 GC
9 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Kering nallah to mepung rizyo at Diri 1 10.00 7 3 25.00 ASM
0 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Kite stream to taling haring at mosing village 1 5.00 1 3 12.50 ASM
1 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Namde nallah to jojo rizyo at Diri 1 9.00 8 3 22.50 ASM
2 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Baming nallah to Bamiringo at Kidulingdi 1 2.00 1 1 5.00
3 subansari/Nac ko Pani vill
ho Block
11 upper MOA&FW Har Khet Jojibu Sekio to Pungmi Rengo at Diri village 1 2.00 1 1 5.00
4 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Jojbu nallah to puzgte rizyo at Diri 1 7.00 8 3 17.50 ASM
5 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Paisozy nallah to lorompa rizyo at Diri 1 8.00 8 3 20.00 ASM
6 subansari/Nac ko Pani
ho Block

586 | P a g e
11 upper MOA&FW Har Khet Hopen nallah to siha at Charu-1 1 5.00 1 3 12.50 GC
7 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Khot nallah to ampering at Chetam 1 10.00 8 3 25.00
8 subansari/Nac ko Pani
ho Block
11 upper MOA&FW Har Khet Khot nallah to lingpine at Chetam 1 6.00 5 3 15.00
9 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Pega lingne to Pega rengo at old Gingba Vill 1 5.00 3 3 12.50
0 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Sangku nallah to tanio gingdo at Cheke 1 2.00 1 3 5.00 ASM
1 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Zingpu nallah to tanio ringo at Cheke 1 5.00 9 3 12.50
2 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Dapo nallah to ringte ringo at Cheke 1 4.00 9 3 10.00
3 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Jitak nallah to jatak moring at Kidulingdi Vill 1 5.00 4 3 12.50
4 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Kud nallah to aupering Rijo at Diri vill 1 7.00 3 3 17.50 ASM
5 subansari/Nac ko Pani
ho Block
12 upper MOA&FW Har Khet Singho Nallah to Taya-Chechungrongo at 1 1.00 1 1 2.50
6 subansari/Nac ko Pani Ayingmuri vill
ho Block
12 upper MOA&FW Har Khet Kuth Nallah to Sarsimoring at Chetam vill 1 6.00 3 3 15.00
7 subansari/Nac ko Pani
ho Block

587 | P a g e
12 upper MOA&FW Har Khet Kojab Nallah to haktak rengo at Kidulingdi 1 2.00 3 3 5.00
8 subansari/Nac ko Pani vill
ho Block
12 upper MOA&FW Har Khet Rigodak Nallah to Giyak Rongo at 1 3.00 1 3 7.50
9 subansari/Nac ko Pani Ayingmuri vill
ho Block
13 upper MOA&FW Har Khet Ningpo stream to kudukring at keojaring vill 1 3.00 1 3 7.50 ASM
0 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Bebo Nallah to Sehurikching agro field at Ringling 1 4.00 2 3 10.00
1 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Bale nallah to bale ringo at Ringling vill 1 6.00 2 3 15.00 ASM
2 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Pumpa nallah to pukyaube at Ebya vill 1 4.00 1 3 10.00
3 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Dogi Konsin Nallah To Dogi Konsin 1 2.00 3 2 5.00
4 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Ruw nallah to under Dingsi vill 1 1.00 4 1 2.50 GPM
5 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Gonung nallah to seal jube at Ebya vill 1 5.00 1 3 12.50 ASM
6 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Ruw nallah to chaging agri field at Dingsi 1 2.00 2 1 5.00 GPM
7 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Goyu nallah to lengpatebyio at Ebya 1 4.00 2 3 10.00
8 subansari/Nac ko Pani
ho Block
13 upper MOA&FW Har Khet Taro nallah to Paprijo at Tabe namching 1 2.00 2 1 5.00
9 subansari/Nac ko Pani
ho Block

588 | P a g e
14 upper MOA&FW Har Khet Lepaso Nallah to Pakjoin agro field at Koba 1 6.00 3 3 15.00
village
0 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Talu seko to lingbing at koba 1 8.00 4 3 20.00
1 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Goyu nallah to lengpatebyio at Ebya village 1 5.00 4 3 12.50
2 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Gyeda nallah to gyamu at Jibaying 1 3.00 1 3 7.50 ASM
3 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Pumpa nallah to pukjube at Ebya 1 5.00 1 3 12.50
4 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Mampi nallah to kopin agri field at Dingsi 1 2.00 3 1 5.00 GPM
5 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Taruha nallah to taruha ringo at kyamdo 1 4.00 2 3 10.00
6 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Biokium po nallah to bio kium at kurungba 1 8.00 3 3 20.00
7 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Joki nallah to Jokuring at Mederopu vill 1 2.00 2 2 5.00
8 subansari/Nac ko Pani
ho Block
14 upper MOA&FW Har Khet Renba nallah to sapene jobe ringo at Neing 1 4.00 3 3 10.00
9 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Kang nallah to jorung agri field at Dingsi 1 5.00 6 1 12.50 GPM
0 subansari/Nac ko Pani
ho Block

589 | P a g e
15 upper MOA&FW Har Khet Dapo nallah to dapo ringo at Dingsi 1 3.00 1 1 7.50
1 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Kobit nallah at Dape at Dingsi 1 2.00 3 1 5.00
2 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Bite nallah to lingrine at keojaring 1 4.00 1 3 10.00
3 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Dapo nallah to paying rizyo at payingmoring 1 5.00 1 3 12.50 GC
4 subansari/Nac ko Pani VILL
ho Block
15 upper MOA&FW Har Khet Ringu nallah to kaya agri field at Aying muri 1 2.00 3 1 5.00 GPM
5 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Chaklik po nallah to chaklik at kurungba 1 9.00 5 3 22.50 ASM
6 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Kuo nallah to Dide at Doginalo Vill 1 5.00 2 3 12.50 ASM
7 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Dog nallah to ringu agri field at Dingsi 1 1.00 2 1 2.50 GPM
8 subansari/Nac ko Pani
ho Block
15 upper MOA&FW Har Khet Kuo nallah to yakra pongchok at Doginalo 1 5.00 2 3 12.50 ASM
9 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Kuo nallah to dogi yorbe at Doginalo 1 5.00 2 3 12.50 ASM
0 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Kuo nallah to yorbe ringo at Doginalo 1 6.00 3 3 15.00 ASM
1 subansari/Nac ko Pani
ho Block

590 | P a g e
16 upper MOA&FW Har Khet Sejing nallah to digium at Digium 1 5.00 5 3 12.50 ASM
2 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Jampu kayang nallah to jampu at Ragmi 1 20.00 15 3 50.00
3 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Gonung nallah to ringmi at Ebya 1 4.00 3 3 10.00
4 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Gunong nallah to Sebiya at Ebya 1 3.00 5 3 7.50
5 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Dapo nallah to Dape ringo at Dingsar 1 2.00 2 1 5.00
6 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Rat nallah to gozujube at Ebya 1 4.00 2 3 10.00
7 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet Retaning nallah to gonung at Ebya 1 4.00 2 3 10.00
8 subansari/Nac ko Pani
ho Block
16 upper MOA&FW Har Khet No nallah to seal jube at Ebya 1 4.00 1 3 10.00
9 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Kali nallah to wang agri field at Dingsi 1 2.00 4 1 5.00 GPM
0 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Dombin nallah to seal jube at Ebya 1 5.00 1 3 12.50 ASM
1 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Ninge stream to tawne at Rava 1 7.00 4 3 17.50
2 subansari/Nac ko Pani
ho Block

591 | P a g e
17 upper MOA&FW Har Khet Gonung nallah to ringmi at Ebya 1 5.00 3 3 12.50
3 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Lingbar nallah to jampu ringo at Ragmi 1 5.00 3 3 12.50
4 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Bam nallah to bameroko agri field to dingsi 1 5.00 6 1 12.50
5 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Ruw nallah to gumpa agri field at Dingsi 1 1.00 3 1 2.50 GPM
6 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Medeba nallah to janangring at medamba Rai 1 5.00 2 3 12.50 ASM
7 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Gonung nallah to seal jobe at Ebya 1 4.00 2 3 10.00
8 subansari/Nac ko Pani
ho Block
17 upper MOA&FW Har Khet Dombia nallah to sede jobe at Ebya 1 4.00 2 3 10.00
9 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Tobil nallah to chokar ringo at Chokar 1 15.00 6 3 37.50
0 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Gonung Nallah at Ebiya village 1 3.00 2 3 7.50
1 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Sibia WRC land at Ebiya 1 3.00 2 3 7.50
2 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Lingdarso to pegiyasi at neing-1 1 6.00 6 3 15.00 ASM
3 subansari/Nac ko Pani
ho Block

592 | P a g e
18 upper MOA&FW Har Khet Neging tachok nallah to neging tachok at 1 5.00 2 3 12.50
4 subansari/Nac ko Pani Jibaying
ho Block
18 upper MOA&FW Har Khet Tariha nallah to Tariha rengo at Gingba 1 2.00 2 1 5.00
5 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Rite nalo to bongrak ringo at gingba 1 2.00 2 1 5.00
6 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Tasam nallah to tamchi rengo at gingba 1 3.00 2 3 7.50
7 subansari/Nac ko Pani
ho Block
18 upper MOA&FW Har Khet Singyeryurange nallah to singyeryurange at 1 11.00 6 3 27.50 ASM
8 subansari/Nac ko Pani Ragmi
ho Block
18 upper MOA&FW Har Khet Rakle nallah to rakle tapong at nacho hq 1 8.00 7 3 20.00
9 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Retaning nallah to gonung at Ebya 1 4.00 1 3 10.00
0 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet No nallah to sebea jube at Ebya 1 4.00 1 3 10.00
1 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Hapung sekio to rebi rango at Cheke 1 2.00 3 1 5.00
2 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Gyeda nallah to geda rengo at Jibaying 1 3.00 1 3 7.50 ASM
3 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Kepe nallah to kakar at Jibaying 1 3.00 4 3 7.50 ASM
4 subansari/Nac ko Pani
ho Block

593 | P a g e
19 upper MOA&FW Har Khet Kepe nallah to ayingsong at Jibaying 1 4.00 4 3 10.00 ASM
5 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Kepe nallah to ziba yorlo at Jibaying 1 5.00 4 3 12.50 ASM
6 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Aying anong nallah to tajum agri field at Dingsi 1 1.00 5 1 2.50 ASM
7 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Gada siko to kadapipo rongo at Jibaying 1 5.00 2 2 12.50
8 subansari/Nac ko Pani
ho Block
19 upper MOA&FW Har Khet Talsipa kayang nallah to talsipa at kurungba 1 8.00 5 3 20.00 ASM
9 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Rungdo stream to kodok jaring at keojaring 1 5.00 4 3 12.50 ASM
0 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Kud nallah to Tage seriu at Chetam 1 5.00 3 3 12.50
1 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Bite nallah to lingrine at keojaring 1 5.00 2 3 12.50 ASM
2 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Keo stream to keojaring at keojaring 1 5.00 3 3 12.50 ASM
3 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Bame nallah to bami rengo at Kidulingdi 1 5.00 4 3 12.50
4 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Rite nallah to Gongrak jobe at Gingba vill 1 3.00 2 3 7.50
5 subansari/Nac ko Pani
ho Block

594 | P a g e
20 upper MOA&FW Har Khet Akia sikio to namah at keojaring 1 2.00 2 3 5.00
6 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Digo nallah to digo ringo at Keojaring 1 2.00 3 3 5.00
7 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet keo Sekio to talinkom at keojaring 1 3.00 3 3 7.50
8 subansari/Nac ko Pani
ho Block
20 upper MOA&FW Har Khet Rek nallah to Rek Rango at Aying muri 1 2.00 4 3 5.00
9 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Byamang kayang nallah to byamangdai at 1 5.00 1 3 12.50
0 subansari/Nac ko Pani kurungba
ho Block
21 upper MOA&FW Har Khet Opin nallah to opin ringo at kargam 1 6.00 1 3 15.00 ASM
1 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Chachi nallah to chada lingni at kargam 1 3.00 2 3 7.50
2 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Piya kotom lingram nallah to piya at kurungba 1 9.00 3 3 22.50
3 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Raik kising nallah to piya at kurungba 1 9.00 1 3 22.50
4 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Ribi sekio to rebi jobe rongo at koba 1 3.00 1 3 7.50
5 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Leme peri nallah to kupen ringo at koba 1 11.00 6 3 27.50
6 subansari/Nac ko Pani
ho Block

595 | P a g e
21 upper MOA&FW Har Khet Chego nallah to cheyong Jobe at Dingsar 1 2.00 2 1 5.00
7 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Lengtak so to rakle ringo at koba 1 11.00 6 3 27.50
8 subansari/Nac ko Pani
ho Block
21 upper MOA&FW Har Khet Dori nallah to lingione jobe at neing -1 1 5.00 5 3 12.50
9 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Kow nallah to chaging agri field at Aying muri 1 2.00 6 1 5.00 GPM
0 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Rakle nallah to rakle ringo at ringling 1 5.00 4 3 12.50
1 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Popara under Ringling village 1 3.00 4 3 7.50
2 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Kowso nallah to singriyor at Ragmi vill 1 6.00 6 3 15.00
3 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Chigo sekio to derong jobe at kobit 1 5.00 2 3 12.50 ASM
4 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Paying rengio at kobit 1 5.00 2 3 12.50 ASM
5 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Tabing nallah to ngodo jote at Kyamdo 1 4.00 3 3 10.00
6 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Singkin nallah to ringte ringme at kyamdo 1 4.00 4 3 10.00
7 subansari/Nac ko Pani
ho Block

596 | P a g e
22 upper MOA&FW Har Khet Niakne Pin to Sene nallah to Tachiring village 1 5.00 2 3 12.50
8 subansari/Nac ko Pani
ho Block
22 upper MOA&FW Har Khet Taruha nallah to ngodo at kyamdo 1 4.00 3 3 10.00
9 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Tasibihr nallah to badolingne at kyamdo 1 4.00 3 3 10.00
0 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Kade nallah to Naying moring at Kiidulingdi 1 5.00 4 3 12.50
1 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Chingrong soo nallah to Bipia 1 5.00 4 3 12.50
2 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Meniaki nallah at Kodung Haring 1 3.00 2 3 7.50
3 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Dori sekio to neing jobe at Neing -1 1 4.00 2 3 10.00 ASM
4 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Chalin nallah to ring agri field at Dingsi 1 2.00 4 1 5.00 GPM
5 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Genio nallah to pirak at Loke 1 4.00 5 3 10.00
6 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Genio nallah to changdi at Loke 1 4.00 2 3 10.00
7 subansari/Nac ko Pani
ho Block
23 upper MOA&FW Har Khet Bang nallah to pumpa agri field at Aying muri 1 2.00 3 1 5.00 GPM
8 subansari/Nac ko Pani
ho Block

597 | P a g e
23 upper MOA&FW Har Khet Bang nallah to gato agri field at Aying muri 1 2.00 2 1 5.00 GPM
9 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Gereh nallah to juring at Loke 1 5.00 1 3 12.50
0 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Nyacha-rikha at Loke 1 2.00 3 1 5.00
1 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Poying Jaring at Loke 1 2.00 3 1 5.00
2 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet WRC field at Loke village 1 3.00 2 3 7.50
3 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Rari nallah to poying ringo at Loke 1 2.00 3 3 5.00
4 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Singkingne Sekio to Lingrine Jobe 1 3.00 3 3 7.50
5 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Keo nallah to paktung jori at Mayabai 1 4.00 6 3 10.00
6 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Gele nallah to gele jobe at meyaba Rai 1 5.00 1 3 12.50 ASM
7 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Lele nallah to patage jobe at meyaba Rai 1 10.00 6 3 25.00
8 subansari/Nac ko Pani
ho Block
24 upper MOA&FW Har Khet Medu nallah to meliring jobe at meyaba Rai 1 5.00 2 3 12.50
9 subansari/Nac ko Pani
ho Block

598 | P a g e
25 upper MOA&FW Har Khet Medeba nallah to janangring at meyaba Rai 1 5.00 3 3 12.50 ASM
0 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Ramde stream to ramde at meyaba Rai 1 12.00 8 3 30.00 ASM
1 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Keo stream to keoring at meyaba Rai 1 5.00 1 3 12.50 ASM
2 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Meddu nallah to ringkar at medamba Rai 1 10.00 8 3 25.00
3 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Kali nallah to harang agri field at Dingsi 1 2.00 3 1 5.00 GPM
4 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Mampi nallah to ringu agri field at Dingsi 1 2.00 3 1 5.00 GPM
5 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Sejing nallah to taying at Taying vill 1 10.00 8 3 25.00 ASM
6 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Dog nallah to yuopon agri field at Dingsi 1 2.00 3 1 5.00 GPM
7 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Ribi nallah to lakrong ringo at nacho hq. 1 9.00 5 3 22.50 ASM
8 subansari/Nac ko Pani
ho Block
25 upper MOA&FW Har Khet Lintak nallah sd nallah to dibi ringo at nacho hq. 1 9.00 3 3 22.50 ASM
9 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Kow nallah to sackving agri field at Aying muri 1 5.00 4 1 12.50 GPM
0 subansari/Nac ko Pani
ho Block

599 | P a g e
26 upper MOA&FW Har Khet Pate yeba to dibi ringho at nacho hq. 1 3.00 3 3 7.50
1 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Rakhae nallah to ope rongo at medamba Rai 1 6.00 7 3 15.00
2 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Kaying nallah to talusipa at Ragmi vill 1 5.00 3 3 12.50 ASM
3 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Sars Nalah to Tage selu at Ragmi village 1 5.00 3 3 12.50
4 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Lingtakso to lingtak yading at nacho hq 1 8.00 8 3 20.00 ASM
5 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Uuzg nallah to pungmi rizyo at Diri 1 7.00 4 3 17.50 ASM
6 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Suha nallah to dordufha at Rava 1 6.00 6 3 15.00
7 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Riyir sekio to ramdi jobe at neing-1 1 3.00 3 3 7.50 ASM
8 subansari/Nac ko Pani
ho Block
26 upper MOA&FW Har Khet Hop sekio to neing jobe at neing -1 1 5.00 2 3 12.50 ASM
9 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Kyoso to banya jobe at neing-1 1 4.00 1 3 10.00 ASM
0 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Ngolo sekio to gamring jobe neing-1 1 5.00 4 3 12.50 ASM
1 subansari/Nac ko Pani
ho Block

600 | P a g e
27 upper MOA&FW Har Khet Ringu nallah to Ringu agri field at Aying muri 1 2.00 2 1 5.00 GPM
2 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Ngolo sekio to sapene jobe at neing -1 1 4.00 4 3 10.00
3 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Nilam nalo to rite at Tabe Namsing Vill 1 5.00 2 3 12.50
4 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Sato nallah to sato agri field at Dingsi 1 2.00 1 1 5.00 GPM
5 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Rat nallah to guzujube at Ebya vill 1 4.00 1 3 10.00
6 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Jampu kayang nallah to jampu at Ragmi 1 11.00 6 3 27.50 ASM
7 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Genio nallah to poying at piba 1 10.00 8 3 25.00
8 subansari/Nac ko Pani
ho Block
27 upper MOA&FW Har Khet Genio nallah to sehu at piba 1 8.00 8 3 20.00 GC
9 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Kipa nallah to terepoing at piba 1 10.00 6 3 25.00 GC
0 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Kipa nallah to akingpiba & taso tanio at piba 1 10.00 5 3 25.00 GC
1 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Paniu nallah to poba ringo at poba 1 6.00 6 3 15.00 GC
2 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Riching nallah to poba ringo at poba 1 2.00 2 1 5.00 GC
3 subansari/Nac ko Pani
ho Block

601 | P a g e
28 upper MOA&FW Har Khet Poging nallah to poba ringo at poba 1 5.00 3 3 12.50
4 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Kangkia nallah to pochak at pochak 1 6.00 6 3 15.00 ASM
5 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Mip ho sekio sekio to takiong at payingmoring 1 4.00 1 3 10.00 GC
6 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Chalin nallah to joku agri field at Dingsi 1 1.00 4 1 2.50 GPM
7 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Dapo nallah to paying rizyo at payingmoring 1 4.00 2 3 10.00
8 subansari/Nac ko Pani
ho Block
28 upper MOA&FW Har Khet Bebo nallah to topu ringo at Ringling 1 5.00 2 3 12.50 ASM
9 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Badi Nallah to Bale agro field at Ringling 1 3.00 2 3 7.50
0 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Meli nallah to meli ringo at Ringling 1 5.00 3 3 12.50 ASM
1 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Ringdo nallah to giane taktring at Rava 1 2.00 1 1 5.00 ASM
2 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Rille nallah to taw ne at Rava 1 3.00 1 3 7.50 ASM
3 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Dori sekio to rinba at Neing -1 1 4.00 6 3 10.00 ASM
4 subansari/Nac ko Pani
ho Block

602 | P a g e
29 upper MOA&FW Har Khet Hodo sekio to nibe rikha at Neing-1 1 4.00 5 3 10.00 GC
5 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Bebo nallah to bebo ringo at Ringling vill 1 12.00 6 3 30.00
6 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Heling nalo to hate moring at Ragmi vill 1 5.00 3 3 12.50
7 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Sato nallah to chaging agri field a Dingsi 1 2.00 1 1 5.00 GPM
8 subansari/Nac ko Pani
ho Block
29 upper MOA&FW Har Khet Pate seko to sow lingtak at koba vill 1 11.00 6 3 27.50
9 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Baming nallah to jumpo agri field at Dingsi 1 1.00 5 1 2.50 GPM
0 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Kochiso nallah to jeke ringo at Ragmi 1 6.00 6 3 15.00
1 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Aying Anong Nallah to Tajum field at Ayingmuri 1 5.00 6 3 12.50
vill
2 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Raji nallah to Singchibia at Aying moring 1 2.00 3 1 5.00
3 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet MIP under Mede Vill under Nacho 1 1.00 3 1 2.50
4 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Remi At Limi Padding Vill 1 2.00 2 2 5.00
5 subansari/Nac ko Pani
ho Block

603 | P a g e
30 upper MOA&FW Har Khet Rava sakio stream to taktering at Rava 1 3.00 5 3 7.50 ASM
6 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Bimi steam to taling kyamding at Rava 1 3.00 4 3 7.50 ASM
7 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Mip ningde steam to tawne at Rava vill 1 2.00 3 3 5.00 ASM
8 subansari/Nac ko Pani
ho Block
30 upper MOA&FW Har Khet Sua nallah to dorduka at Rava 1 3.00 2 3 7.50 ASM
9 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Kaw Joring to Kane Sikio at Gingba 1 2.00 3 2 5.00
0 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Kam nallah to dong agri field at Dingsi 1 2.00 3 1 5.00 GPM
1 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Mip kudomha nallah to Rava 1 6.00 6 3 15.00
2 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Mip leya nallah to Rava 1 2.00 2 1 5.00 ASM
3 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Sirom nallah to Rava 1 2.00 2 1 5.00
4 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Amirha at uper Rava 1 2.00 1 2 5.00
5 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Kow nallah to Ringu field 1 3.00 1 3 7.50
6 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Sumbuko Nallah nto Kelering Raiku village 1 2.00 1 3 5.00
7 subansari/Nac ko Pani
ho Block

604 | P a g e
31 upper MOA&FW Har Khet Mede Nallah to Lukarijo at Rungba vill 1 2.00 1 3 5.00
8 subansari/Nac ko Pani
ho Block
31 upper MOA&FW Har Khet Seppe nallah to Rava 1 5.00 2 3 12.50
9 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Mip sirom nallah to Rava 1 4.00 3 3 10.00
0 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Baming nallah to gorung agri field at Dingsi 1 2.00 5 1 5.00 GPM
1 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Baming nallah to Baming agri field at Dingsi 1 2.00 4 1 5.00 GPM
2 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Pario Nallah under Dogi-Nalo Vill 1 3.00 3 3 7.50 ZPM
3 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Ropu Nallah To Kichane Jaring At 1 3.00 3 3 7.50
4 subansari/Nac ko Pani Mederopu vill
ho Block
32 upper MOA&FW Har Khet Radara To Ripin Sikio At Pading 1 2.00 2 1 5.00
5 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Rite Nallah To Ambin Dursen At Pading 1 2.00 3 1 5.00
6 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Ngoo Nallah To Gebang and Ngoying 1 3.00 2 3 7.50
7 subansari/Nac ko Pani
ho Block
32 upper MOA&FW Har Khet Hoho Nallah To Lingpung Tachi Jaring at 1 2.00 3 2 5.00
8 subansari/Nac ko Pani Yeba vill
ho Block

605 | P a g e
32 upper MOA&FW Har Khet Duri Sikio Nallah To Sete Lingpe Rengo At 1 2.00 2 2 5.00
9 subansari/Nac ko Pani Neing
ho Block
33 upper MOA&FW Har Khet Neing Sikio Nallah To Neing Jobe At Neing 1 2.00 2 2 5.00
0 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Renba Nallah to Sapane jobe Rengo at Neing 1 2.00 2 2 5.00
1 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Singcho-Kogo To Singlok Moring at Kyamdo 1 2.00 2 2 5.00
2 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Tanap -pu Nallah to Yingso-Nipung At Kyamdo 1 2.00 2 2 5.00
3 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Chandi Nallah To Chada Lingu At Kargam 1 2.00 3 2 5.00
4 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Bod Lingnee Rengo Joring to lingnee sikio at 1 2.00 3 2 5.00
5 subansari/Nac ko Pani Gingba vill
ho Block
33 upper MOA&FW Har Khet Rimi to Rimi Sikio Nallah at Dengsar 1 2.00 3 2 5.00
6 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Gio Nallah To Ngoduk at Gingba 1 2.00 3 2 5.00
7 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Kang Nallah To Sacring Agri Field At Dingsi 1 2.00 2 2 5.00
8 subansari/Nac ko Pani
ho Block
33 upper MOA&FW Har Khet Bameto Suruha Rengo At Dindsi 1 2.00 2 2 5.00
9 subansari/Nac ko Pani
ho Block

606 | P a g e
34 upper MOA&FW Har Khet Bame Nallah To Sedong Rungbung At Dingsi 1 2.00 2 2 5.00
0 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Kut Nallah To Talom Rungo At Dingsi 1 2.00 2 2 5.00
1 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Taki Nallah To Baki Rigyar At Dingsi 1 2.00 2 2 5.00
2 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Hampering Rengo To Kut Sekio At Diri 1 3.00 2 2 7.50
3 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Pungmi Sekio to Ningporing at Diri 1 2.00 2 2 5.00
4 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Beri Sekio to Ringmi at Diri 1 2.00 2 2 5.00
5 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Pungmi Sekio to Mimpung Rengo at Diri 1 2.00 2 2 5.00
6 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Chejo Nallah to Sapana Ringo at Duilangdi 1 3.00 3 3 7.50
7 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Taking Nallah To Ringte At Ebiya 1 2.00 2 2 5.00
8 subansari/Nac ko Pani
ho Block
34 upper MOA&FW Har Khet Daching Haring Ringo to Gikding Nallah to Ebiya 1 3.00 2 2 7.50
9 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Sibiya Ringo to Ganung Nallah at Ebiya 1 2.00 2 2 5.00
0 subansari/Nac ko Pani
ho Block

607 | P a g e
35 upper MOA&FW Har Khet Taraba Jobe to Chandi siko at Doginalo 1 2.00 3 3 5.00
1 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Ngulo Nallah To Ngulo Rengo At Charu 1 2.00 2 2 5.00
2 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Dur Nallah To Ngulo Rengo At Charu 1 2.00 2 2 5.00
3 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Yatop Nallah To Yatop Rungo At Aying muri 1 2.00 2 2 5.00
4 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Lining Yenngte Nallah To Aying Muri 1 2.00 2 2 5.00
5 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Pongyi Naching Nallah To Aying Sikio at Aying 1 2.00 3 2 5.00
6 subansari/Nac ko Pani Muri
ho Block
35 upper MOA&FW Har Khet Dawnee Nallah to Gio Sikio at Aying Muri vill 1 2.00 3 2 5.00
7 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Jirniakar Nallah To Jirniakar Moring At Doilingdi 1 5.00 5 2 12.50
Vill
8 subansari/Nac ko Pani
ho Block
35 upper MOA&FW Har Khet Ko-Sikio To Jekey -Ring At Ragmi Vill 1 1.00 3 1 2.50
9 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Epyo Sikio To Talam Yurbe At Ragmi 1 1.00 3 1 2.50
0 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Ko Sikio To Sora At Ragmi Vill 1 1.00 2 1 2.50
1 subansari/Nac ko Pani
ho Block

608 | P a g e
36 upper MOA&FW Har Khet Mimpak Sikio To Jampu At Ragmi 1 1.00 2 1 2.50
2 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Keode Soko To Tabongna At Kidulingdi 1 3.00 2 3 7.50
3 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Khadin Soko To Aying jobong At Aying Rigia 1 3.00 4 3 7.50
4 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Khadin Soko To Putung Moring 1 3.00 4 3 7.50
5 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Khadin Soko To Momo Moring 1 3.00 4 3 7.50
6 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Khadin Soko To Gay Moring 1 3.00 4 3 7.50
7 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet Gada Nallah to Kelaring at Duilangdi 1 2.00 3 2 5.00
8 subansari/Nac ko Pani
ho Block
36 upper MOA&FW Har Khet 1 2.00 3 2 5.00
9 subansari/Nac ko Pani
ho Block Habung nallah to Lingione Agri-field at Cheke
37 upper MOA&FW Har Khet 1 2.00 5 2 5.00
0 subansari/Nac ko Pani
ho Block Reno.Sato nallah to Sato agri-field at Cheke
37 upper MOA&FW Har Khet 1 2.00 4 2 5.00
1 subansari/Nac ko Pani
ho Block Rete nallah at Gingba Vill
upper MOA&FW Har Khet
37
subansari/Nac ko Pani Rib nallah to chingiam at Cheke 1 10.00 3 3 25.00
2
ho Block

609 | P a g e
NEW SCHEMES
Sl. Name of Concerned Componen Activity Total Command Catchmen Period of Estimate Remarks/
No. the Ministry/ t (C/o. MIP from ……….) Numbe Area/Irrigatio t Area Implementatio d cost Recommende
District/ Departmen r n (in Ha) (Sq.Km.) n (Rs. in d by
Blocks t lakh)
1 Upper MOA&FW Har Khet CC lining of Kojok Nallah MIP at Sindak Vill 1 12.00 9 3 30.00 MLA & Ex-
Subansir ko Pani ASM
i siyum
2 Upper MOA&FW Har Khet Darsi - Darne Nallah to Seren at Dui vill 1 10.00 9 1 25.00 ASM
Subansir ko Pani
i siyum
3 Upper MOA&FW Har Khet CC Linning Giamchi nallah to Giadu lengdi at Dui 1 8.00 6 3 20.00 ASM
Subansir ko Pani
i siyum
4 Upper MOA&FW Har Khet Sikiu Nallah to Rai at Jingba Rai vill 1 15.00 8 3 37.50 MLA & ASM
Subansir ko Pani
i siyum
5 Upper MOA&FW Har Khet Saato Nallah to Bugia at Kajiring vill 1 10.00 8 3 25.00 MLA
Subansir ko Pani
i siyum
6 Upper MOA&FW Har Khet Selam nallah to aying Agri-field at Ekke 1 8.00 9 3 20.00 MLA
Subansir ko Pani
i siyum
7 Upper MOA&FW Har Khet Lingke nallah to Janering at Linke Vill 1 10.00 8 3 25.00 MLA
Subansir ko Pani
i siyum
8 Upper MOA&FW Har Khet Sepong Nallah to Sarta A/F at Sarta vill 1 15.00 9 3 37.50 MLA
Subansir ko Pani
i siyum
9 Upper MOA&FW Har Khet Riote Sikiu to Akingseku at zingmuring vill 1 3.00 3 3 7.50 MLA
Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet CC Linning of Zode nallah to Pakring at Riaku Vill 1 8.00 5 3 20.00 MLA
Subansir ko Pani
i siyum

610 | P a g e
11 Upper MOA&FW Har Khet CC Linning of Koh nallah at Takiopuring Vill 1 6.00 5 3 15.00
Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Erung nallah to Bame rengio(Tapa) at Tayum Vill 1 4.00 5 3 10.00
Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Sejing nallah to Gyaling bong at Mosu vill 1 6.00 5 1 15.00 ASM
Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Archu nallah to Engbajobe at Dagu vill 1 5.00 5 1 12.50 MLA & ASM
Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Sepung nallah to sepung jobe at sarta 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Pogo nallah to singo-ne at Kampung 1 3.00 3 3 7.50 ASM
Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Ragmi to motung -mobia at Kampung 1 3.00 3 3 7.50 ASM
Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Hote nallah to zimba agri-field at Rai village 1 5.00 1 3 12.50 MLA
Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Debia nallah to taking puring at Takiong puring 1 2.00 2 1 5.00 MLA
Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Pugru sikio Nallah Sinamching vill Takiongpuring 1 2.00 2 1 5.00
Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Sappe ne sikio to lingtung rongo at Takiong puring 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Rigu sotu to Takiong puring 1 2.00 2 1 5.00
Subansir ko Pani
i siyum

611 | P a g e
23 Upper MOA&FW Har Khet Lingte Nallah to Dilling rongo at Dilling 1 2.00 2 1 5.00 MLA & ASM
Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Otte nallah to mosu agri-field at Mosu Vill 1 4.00 5 3 10.00 MLA
Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Durguso nallah to bogia at Bogia Vill 1 1.00 3 3 2.50 ASM
Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Sikit nallah to ringji jobe at jingaba Rai 1 10.00 9 3 25.00 ASM
Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Tasulungru to tikdo rongo at Atte Vill 1 4.00 2 3 10.00
Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet CC Linning Ribisekio to Ribijobe at Dui vill 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Biro nallah to gyai at bogia Bogia 1 5.00 5 3 12.50 ASM
Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Ching-ching nallah to Lingdurong at Byaching 1 4.00 6 3 10.00
Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Kepin kete nallah to Longliba at Byaaching 1 4.00 6 3 10.00
Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Eyo nallah to hoching A/F at jenering vill 1 4.00 4 3 10.00 MLA
Subansir ko Pani
i siyum
33 Upper MOA&FW Har Khet CC linning Row nallah to sungba at Eru vill 1 4.00 4 3 10.00
Subansir ko Pani
i siyum
34 Upper MOA&FW Har Khet Nibu pakio sekio to topu rengo at Byamar 1 3.00 7 3 7.50
Subansir ko Pani
i siyum

612 | P a g e
35 Upper MOA&FW Har Khet Hoo nallah sekio to lengren rengo at Byamar 1 3.00 8 3 7.50
Subansir ko Pani
i siyum
36 Upper MOA&FW Har Khet Sejing nallah to gyalingbong at Ering 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
37 Upper MOA&FW Har Khet Sejing nallah to gyarine at Ering 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
38 Upper MOA&FW Har Khet Dole Nallah to Epe-Lingne at Talingha Vill 1 5.00 3 3 12.50
Subansir ko Pani
i siyum
39 Upper MOA&FW Har Khet Lingia Nallah to Jakar A/F at Eyum Vill 1 5.00 2 3 12.50 MLA
Subansir ko Pani
i siyum
40 Upper MOA&FW Har Khet Magi sekio to Ate renglo at Atte Vill 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
41 Upper MOA&FW Har Khet Mip Tamo nallah to bichugki jobe at Dagu vill 1 4.00 3 3 10.00
Subansir ko Pani
i siyum
42 Upper MOA&FW Har Khet Yaktak to Yaktakrongo at Page Nalo vill 1 3.00 4 3 7.50
Subansir ko Pani
i siyum
43 Upper MOA&FW Har Khet Sik Nanching to Tabam at Page Nalo Vill 1 3.00 4 3 7.50
Subansir ko Pani
i siyum
44 Upper MOA&FW Har Khet Ote nallah to Kitche Rai at kiche Rai Vill 1 8.00 4 3 20.00 MLA
Subansir ko Pani
i siyum
45 Upper MOA&FW Har Khet Pego Nallah to Pegoringo at Kampong vill 1 3.00 4 3 7.50 MLA
Subansir ko Pani
i siyum
46 Upper MOA&FW Har Khet Lengi sekio nallah to Takiong puring Byamar 1 3.00 3 3 7.50
Subansir ko Pani
i siyum

613 | P a g e
47 Upper MOA&FW Har Khet Koo sekio nallah to janering rengo at Byamar 1 2.00 5 3 5.00
Subansir ko Pani
i siyum
48 Upper MOA&FW Har Khet Row nallah to row lingbe at Baki 1 2.00 3 1 5.00
Subansir ko Pani
i siyum
49 Upper MOA&FW Har Khet Hapin Nallah to Ghai-Ne (Panam) at Ering vill 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
50 Upper MOA&FW Har Khet Bengking sekio to harubalong at Dui 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
51 Upper MOA&FW Har Khet Kete siko to keba at Dui 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
52 Upper MOA&FW Har Khet Singruba nallah to bogia Bogia 1 2.00 5 1 5.00 GCP
Subansir ko Pani
i siyum
53 Upper MOA&FW Har Khet Hote nallah to Gikom Jobe at Ekke village 1 4.00 5 1 10.00
Subansir ko Pani
i siyum
54 Upper MOA&FW Har Khet Boma Sikio to Kaungring at Kaungring vill 1 3.00 2 3 7.50
Subansir ko Pani
i siyum
55 Upper MOA&FW Har Khet Ningpolingru to Lingi-ne at Kaungring vill 1 3.00 2 3 7.50
Subansir ko Pani
i siyum
56 Upper MOA&FW Har Khet Gingri nallah to sirin at Dui Vill 1 6.00 4 3 15.00
Subansir ko Pani
i siyum
57 Upper MOA&FW Har Khet Se-nallah to peileriing at Dui vill 1 3.00 3 3 7.50 GPM
Subansir ko Pani
i siyum
58 Upper MOA&FW Har Khet Segiam nallah to tongyring muri at dui 1 2.00 4 1 5.00 GPM
Subansir ko Pani
i siyum

614 | P a g e
59 Upper MOA&FW Har Khet Singruba nallah to bogia at Bogia Vill 1 5.00 2 3 12.50 GCP
Subansir ko Pani
i siyum
60 Upper MOA&FW Har Khet Seriu Nallah to Lingya-Ne at Nyogin vill 1 4.00 2 3 10.00
Subansir ko Pani
i siyum
61 Upper MOA&FW Har Khet Noh Sikio to Nohjobe at Dilling vill 1 2.00 2 2 5.00
Subansir ko Pani
i siyum
62 Upper MOA&FW Har Khet Hambine nallah to juring at Dui 1 5.00 1 3 12.50
Subansir ko Pani
i siyum
63 Upper MOA&FW Har Khet Kette nallah to sike jobe at Dui 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
64 Upper MOA&FW Har Khet Lingdam Seriu to Daterijo at Dilling vill 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
65 Upper MOA&FW Har Khet Siri Nallah to siri jobe at Duku vill 1 2.00 2 1 5.00 MLA & ASM
Subansir ko Pani
i siyum
66 Upper MOA&FW Har Khet Koji Nallah to Jakarjobe at Eyum Vill 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
67 Upper MOA&FW Har Khet Karam sikio to lingrine rongo at karam Vill 1 3.00 3 3 7.50 MLA
Subansir ko Pani
i siyum
68 Upper MOA&FW Har Khet Makpia nallah to nonging moring at Duku 1 7.00 6 3 17.50 MLA
Subansir ko Pani
i siyum
69 Upper MOA&FW Har Khet Kango nallah to Agung A/field at Duku 1 3.00 1 3 7.50
Subansir ko Pani
i siyum
70 Upper MOA&FW Har Khet Singriney to TabioRiko A/Field at Duku 1 3.00 1 3 7.50
Subansir ko Pani
i siyum

615 | P a g e
71 Upper MOA&FW Har Khet Mip asing nallah to yingan rengo at Dingdopa 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
72 Upper MOA&FW Har Khet Mip singruba nallah to singri rengo at dingdopa 1 5.00 1 3 12.50 ASM
Subansir ko Pani
i siyum
73 Upper MOA&FW Har Khet Perong nallah to dendo rengo at Dingdopa vill 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
74 Upper MOA&FW Har Khet Selungso nallah to singlokring at singlokring vill 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
75 Upper MOA&FW Har Khet Rebi nallah to Rebi jobe at Dui village 1 3.00 4 3 7.50
Subansir ko Pani
i siyum
76 Upper MOA&FW Har Khet Darsi nallah to (Sekio) Sirin at Dui vill 1 3.00 4 3 7.50
Subansir ko Pani
i siyum
77 Upper MOA&FW Har Khet Omi nallah to omijobe at Dui vill 1 5.00 2 3 12.50 MLA
Subansir ko Pani
i siyum
78 Upper MOA&FW Har Khet Gokar Nallah at Kicherai vill 1 3.00 3 3 7.50 MLA
Subansir ko Pani
i siyum
79 Upper MOA&FW Har Khet Mip archu nallah to sepering jobe at dagu 1 5.00 2 3 12.50
Subansir ko Pani
i siyum
80 Upper MOA&FW Har Khet Lingi Nallah to Sora at Takionpuring vill 1 3.00 3 3 7.50
Subansir ko Pani
i siyum
81 Upper MOA&FW Har Khet Lingte sikio to boona jobe at dilling 1 2.00 2 1 5.00 ASM
Subansir ko Pani
i siyum
82 Upper MOA&FW Har Khet Ho-sikio to hagong at duku 1 4.00 3 3 10.00 ASM
Subansir ko Pani
i siyum

616 | P a g e
83 Upper MOA&FW Har Khet Liyu nallah to liyu agri field at chapcha 1 3.00 3 3 7.50 GPM
Subansir ko Pani
i siyum
84 Upper MOA&FW Har Khet Mip hap nallah to bame rangio at Tayum 1 1.00 2 1 2.50
Subansir ko Pani
i siyum
85 Upper MOA&FW Har Khet Ningpoko Nallah to Lumtak at Baki vill 1 2.00 2 3 5.00
Subansir ko Pani
i siyum
86 Upper MOA&FW Har Khet Lumak sikio to lumak rongo at Dilling 1 3.00 4 3 7.50 ASM
Subansir ko Pani
i siyum
87 Upper MOA&FW Har Khet Kodumha Nallah to Soringha at Chep rai 1 2.00 4 3 5.00
Subansir ko Pani
i siyum
88 Upper MOA&FW Har Khet Beying sikio to namching rongo at Dilling 1 3.00 5 3 7.50
Subansir ko Pani
i siyum
89 Upper MOA&FW Har Khet Bengking sekio to harubalong at Dui 1 6.00 5 3 15.00
Subansir ko Pani
i siyum
90 Upper MOA&FW Har Khet Sirin nallah to ribe jobe at Dui 1 3.00 4 1 7.50 asm
Subansir ko Pani
i siyum
91 Upper MOA&FW Har Khet Osing nallah to yingam rengo at Dingdopa 1 2.00 3 1 5.00 ASM
Subansir ko Pani
i siyum
92 Upper MOA&FW Har Khet Lingte sikio to Beying rongo at Dilling 1 3.00 2 3 7.50 ASM
Subansir ko Pani
i siyum
93 Upper MOA&FW Har Khet Patin nallah to tayur at sarta 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
94 Upper MOA&FW Har Khet Rukpi nallah to mokum at sarta 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum

617 | P a g e
95 Upper MOA&FW Har Khet Tumlingne nallah to tumya at sarta 1 5.00 2 3 12.50 ASM
Subansir ko Pani
i siyum
96 Upper MOA&FW Har Khet Pogo Nallah to Pogo ringo at Kampong vill 1 4.00 2 3 10.00
Subansir ko Pani
i siyum
97 Upper MOA&FW Har Khet Rakmi nallah to motung mobia at kampung 1 6.00 6 3 15.00
Subansir ko Pani
i siyum
98 Upper MOA&FW Har Khet Mokam Nallah to Pakring at Sarta vill 1 3.00 2 3 7.50
Subansir ko Pani
i siyum
99 Upper MOA&FW Har Khet CC Linning old Sikiu to Engba at Dagu vill 1 6.00 6 3 15.00
Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Talidsong nallah to doma raktak jobe at ekke 1 3.00 4 3 7.50
0 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Ore nallah to ore jobe at ekke village 1 3.00 4 3 7.50
1 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Pia sikio to langyone at pirong 1 10.00 6 3 25.00 ASM
2 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Pira nallah to pirong at pirong 1 1.00 2 1 2.50 ASM
3 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Tatum-ne to Moboklengne at Sarta 1 4.00 2 3 10.00
4 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Sipia nallah to giamering at pakling riaku 1 4.00 3 3 10.00
5 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Singruwa nallah to perung moring at kajiring 1 9.00 6 3 22.50
6 Subansir ko Pani
i siyum

618 | P a g e
10 Upper MOA&FW Har Khet Kuj nallah to jukar at Eyum 1 10.00 6 3 25.00 AC
7 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Longkerong to Tabinpurong at Eyum vill 1 3.00 3 3 7.50
8 Subansir ko Pani
i siyum
10 Upper MOA&FW Har Khet Daw sikio to Jakar Jobe agril field at Eyum vill 1 3.00 3 3 7.50
9 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Mip sure paga sekio to kawngring at kawngring 1 13.00 9 3 32.50 ASM
0 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Lingkurang to tabinpomlo at eyum 1 5.00 2 3 12.50 AC
1 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Row nallah to tayin abe at Eru 1 4.00 3 3 10.00 ASM
2 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Chinba nallah to sedemsi at Eru 1 4.00 1 3 10.00 ASM
3 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Pinging nallah to Nina at papi village 1 4.00 1 3 10.00 ASM
4 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Limak sikio to tate yorda nallah at ketha 1 3.00 1 2 7.50
5 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Motung nallah to sungba at Eru 1 4.00 4 3 10.00 ASM
6 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Tayor Nallah to Lingirongo at Sarta vill. 1 4.00 4 3 10.00
7 Subansir ko Pani
i siyum
11 Upper MOA&FW Har Khet Pinging nallah to rapke rengo at papi village 1 5.00 3 3 12.50 ASM
8 Subansir ko Pani
i siyum

619 | P a g e
11 Upper MOA&FW Har Khet Biro sekio to chiyor sebia rango at kajiring 1 2.00 2 2 5.00
9 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Oching nallah to kajiring moring at kajiring 1 9.00 9 3 22.50
0 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Pogo nallah to talitsung at kampung vill 1 5.00 3 3 12.50
1 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Pogo nallah to pogo mode at kampung Vill 1 4.00 2 3 10.00
2 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Oching nallah to Kamrak Rengo at Eba 1 2.00 3 2 5.00 ASM
3 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Rigu so Sorarijo to Takiong puring vill 1 3.00 3 2 7.50
4 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Modi Lingtene to Sora at Takionpuring vill 1 3.00 3 2 7.50
5 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Rime nallah to akang rime at jenering 1 5.00 1 3 12.50
6 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Eba nallah to gumnaring nallah at jenering 1 3.00 4 3 7.50
7 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Now nallah to jarling at Gyate Vill 1 4.00 4 3 10.00 ASM
8 Subansir ko Pani
i siyum
12 Upper MOA&FW Har Khet Lingkorung to Yarchum Koro at Gyate village 1 3.00 2 2 7.50
9 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Ling kurong to yorchum at gyate 1 3.00 3 3 7.50
0 Subansir ko Pani
i siyum

620 | P a g e
13 Upper MOA&FW Har Khet Ling kurong to lingra at gyate 1 4.00 2 3 10.00
1 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Longkerong to Yarchun at Gyate vill 1 2.00 2 2 5.00
2 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Ling kurong to sppering at gyate 1 3.00 2 3 7.50
3 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Lingte sikio to sappe rongo at dilling 1 3.00 4 3 7.50 ASM
4 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Noh nallah to bame at Garam 1 5.00 6 3 12.50
5 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Hatum nallah to hoching rango at jenering 1 3.00 2 3 7.50
6 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Janering nallah to lingpung nallah at jenering 1 5.00 2 3 12.50
7 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Selho nallah to ruying taaging tam at jingba rai 1 5.00 3 3 12.50
8 Subansir ko Pani
i siyum
13 Upper MOA&FW Har Khet Ago nallah to mengke at jingaba rai 1 6.00 8 3 15.00
9 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Hoching nallah to hakang mingpiring at jenering 1 4.00 4 3 10.00
0 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Janering nallah to ningporing at jenering 1 3.00 5 3 7.50
1 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Loying nallah to loying rijo at jimbarai 1 3.00 5 3 7.50
2 Subansir ko Pani
i siyum

621 | P a g e
14 Upper MOA&FW Har Khet Rakni nallah to cheprai at jingba rai 1 5.00 4 3 12.50
3 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Simba nallah to Saring Jobe at Jingba Rai 1 4.00 5 3 10.00
4 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Silloh Nallah to Tachiring At Jingba Rai 1 2.00 5 3 5.00
5 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Hinba Rongo at Dagu 1 2.00 3 2 5.00
6 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Mip tapo nallah to pungteyor jobe at dagu 1 3.00 2 3 7.50
7 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Tagosho Nallah at Jingbarai vill 1 2.00 2 2 5.00
8 Subansir ko Pani
i siyum
14 Upper MOA&FW Har Khet Ruyng nallah to syaled okra at jingba rai 1 3.00 6 3 7.50
9 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Sua nallah to dorduka at Raba 1 2.00 3 1 5.00 ASM
0 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Lingpune nallah to giayine at linke 1 3.00 2 3 7.50
1 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Sikiu Nallah to Jingba Rai 1 3.00 2 2 7.50
2 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Rakni nallah to cheprai at jingaba rai Vill 1 4.00 1 3 10.00
3 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Kojok Nallah to kojenjobe at Singdak Vill 1 3.00 4 3 7.50
4 Subansir ko Pani
i siyum

622 | P a g e
15 Upper MOA&FW Har Khet Durdu nallah to bongia at bogia 1 10.00 8 3 25.00 GCP
5 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Mip durgusu nallah to dorgusu at bogia 1 3.00 2 3 7.50 ASM
6 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Makpiya to nongying muri at duku 1 5.00 1 3 12.50 asm
7 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Ratung Nallah to Ratungrongo at Sarta 1 8.00 6 3 20.00
8 Subansir ko Pani
i siyum
15 Upper MOA&FW Har Khet Sejing koro to puyu rega at Laklam 1 4.00 6 3 10.00
9 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Ko nallah to Amriya rengo at Lingi 1 4.00 6 3 10.00
0 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Selungso to peyu rega at laklam 1 5.00 3 3 12.50 ASM
1 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Ramya nallah to ramya jobe at ketha 1 7.00 5 3 17.50
2 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Kojok Nallah to Daying jobe agril field at Eyum 1 3.00 3 3 7.50
3 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Tate nallah to tate jobe at ketha 1 5.00 2 3 12.50
4 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Janering nallah to lower janering rongo at yebe 1 5.00 2 3 12.50
5 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Yahoo nallah to upper bochung rongo at yebe 1 8.00 6 3 20.00 AB
6 Subansir ko Pani
i siyum

623 | P a g e
16 Upper MOA&FW Har Khet Lower jamring sikio to reme take rongo at yebe 1 8.00 6 3 20.00 ASM
7 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Mip namding nallah to bame rangio at Tayum 1 1.00 2 1 2.50
8 Subansir ko Pani
i siyum
16 Upper MOA&FW Har Khet Karam sikio to lingrine rongo at karam 1 2.00 2 3 5.00
9 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to kuhak rongo at karam 1 2.00 1 1 5.00
0 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to sebe lingpik rongo at karam 1 2.00 1 1 5.00
1 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to tahi lingpik rongo at karam 1 2.00 3 1 5.00 AB
2 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Motung nallah to sungba at Eru 1 4.00 5 3 10.00
3 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to dano rongo at karam 1 2.00 2 1 5.00 AB
4 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to harak rongo at karam 1 2.00 4 1 5.00
5 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Tagung Tam Nallah to Topulengne at Pakring vill 1 3.00 2 2 7.50
6 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Ngo nallah to pilu maying jobe at rungba 1 12.00 6 3 30.00 ASM
7 Subansir ko Pani
i siyum
17 Upper MOA&FW Har Khet Karam sikio to dago rongo at karam 1 2.00 4 1 5.00
8 Subansir ko Pani
i siyum

624 | P a g e
17 Upper MOA&FW Har Khet Karam sikio to ngotum rongo at karam 1 2.00 6 1 5.00
9 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Karam sikio to kopin rongo at karam 1 2.00 5 1 5.00
0 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Yoo river to Kamrak Rongo 1 2.00 5 2 5.00
1 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Gokar Nallah at Kicherai vill 1 2.00 5 2 5.00
2 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Tapo nallah to namme moring at kajiring 1 2.00 4 2 5.00
3 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Tapo sekio to gyai singrit at kajiring 1 3.00 2 3 7.50
4 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Singruba nallah to singri rengo at Dingdopa 1 5.00 1 3 12.50 ASM
5 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Tangte nallah to tangte romgo at Rungba 1 5.00 4 3 12.50 ASM
6 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Karam sikio to niamo rongo at karam 1 2.00 3 1 5.00 AB
7 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Pera nallah to perung moring at kajiring 1 4.00 2 3 10.00
8 Subansir ko Pani
i siyum
18 Upper MOA&FW Har Khet Tapo sikio to Sapering at Dagu 1 2.00 3 2 5.00
9 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Hiyo nallah to Eche at Eba 1 2.00 3 2 5.00
0 Subansir ko Pani
i siyum

625 | P a g e
19 Upper MOA&FW Har Khet Togeo nallah to linkgke rongo at LinKe 1 5.00 3 3 12.50
1 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Lingke nallah to tagio nallah at Linke 1 5.00 5 3 12.50
2 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Lingke seko to paka rega at Linke 1 7.00 4 3 17.50
3 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Atum Sokio To Jumnering At Eba 1 2.00 2 2 5.00
4 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet selungso to laklam at Laklam 1 5.00 3 3 12.50 ASM
5 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Oching nallah to kamrak koi rongo at yebe 1 7.00 4 3 17.50
6 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Yarik siko to pakring at Linke 1 3.00 5 3 7.50
7 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Selum Nallah to Lumtak 1 2.00 5 1 5.00
8 Subansir ko Pani
i siyum
19 Upper MOA&FW Har Khet Linke nallah to Jorung jorbe at Linke 1 2.00 4 2 5.00
9 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Sosar rongo art Linke 1 3.00 5 3 7.50
0 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Tomin nallah to charu lingne at Linke 1 2.00 3 2 5.00
1 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Hoching nallah to row lingbe at Baki 1 2.00 3 2 5.00
2 Subansir ko Pani
i siyum

626 | P a g e
20 Upper MOA&FW Har Khet Hiyo Nallah to Eche at Eba 1 2.00 3 3 5.00
3 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Linke nallah to Siberrijo at Byaching 1 4.00 6 3 10.00
4 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Rakte nallah to chakerring at Byaching 1 4.00 6 3 10.00
5 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Ho sikio to Siki Namching 1 2.00 2 2 5.00
6 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Seru nallah to lingyane at Neogin 1 9.00 8 3 22.50
7 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Zode Nallah to Pakring village 1 5.00 5 3 12.50
8 Subansir ko Pani
i siyum
20 Upper MOA&FW Har Khet Yaling nallah to yacharikpa at pakling Riaku Vill 1 4.00 4 3 10.00
9 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Yaling nallah to tadung at pakling Riaku 1 3.00 2 3 7.50 AB
0 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Omiu nallah to sogi at pakling Riaku 1 4.00 1 3 10.00 AB
1 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Bempung belung nallah to laklek ringo at talingha 1 2.00 5 1 5.00 ASM
2 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Kamchoko nallah to kozingba at pakling Riaku 1 5.00 2 3 12.50 ASM
3 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet CC lining to zode nallah at pakling Riaku 1 10.00 8 3 25.00 AB
4 Subansir ko Pani
i siyum

627 | P a g e
21 Upper MOA&FW Har Khet Hoching nallah to tapum jobe at pakling Riaku 1 3.00 5 3 7.50
5 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Ningpoko Nallah to Petak at Riaku vill 1 5.00 5 3 12.50
6 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Sumbuko nallah to kelering at Riaku 1 4.00 5 3 10.00
7 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Lingke nallah to yaruk nallah at Linke 1 2.00 2 1 5.00
8 Subansir ko Pani
i siyum
21 Upper MOA&FW Har Khet Eyo-sekio to Giummering at Eba 1 2.00 5 2 5.00 ASM
9 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Tangoring nallah to dungi at Papi 1 2.00 3 3 5.00
0 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Atum Koro To Papi Kubong At Papi 1 2.00 3 1 5.00
1 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Row to Biyana at Eru village 1 2.00 5 1 5.00
2 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Janering nallah to lower janering at Eba 1 2.00 3 2 5.00 ASM
3 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Oyu nallah to pirong at pirong 1 2.00 2 1 5.00 ASM
4 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Okin nallah to mokum jobe at Ekke 1 4.00 1 3 10.00
5 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Riaga nallah to budlingne jobe at Ekke 1 6.00 8 3 15.00 AC
6 Subansir ko Pani
i siyum

628 | P a g e
22 Upper MOA&FW Har Khet Karam sikio to karam rongo at karam 1 2.00 4 1 5.00
7 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Karam sikio to kaha rongo at karam 1 2.00 2 1 5.00
8 Subansir ko Pani
i siyum
22 Upper MOA&FW Har Khet Sirom nallah to rava village 1 2.00 2 1 5.00 GC
9 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Suha nallah to dordukha at Rava 1 4.00 2 3 10.00 GC
0 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Kudamha nallah to Rava 1 2.00 5 1 5.00 GPM
1 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Taw Tajo to Lecharpung at Row vill 1 2.00 5 1 5.00
2 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Kamchogi Nallah to Komi at Row Vill 1 2.00 5 1 5.00
3 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Tango sikio to Dagi Lingtum at Row 1 2.50 6 2 6.25
4 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Nime Siriu Nallah To Pirung Rengo At Dingdopa 1 2.00 2 2 5.00
5 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Kojok Nallah to Singlok Jobe at Sindak village 1 2.00 2 1 5.00
6 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Ahte Nallah to Chokneng Yobe under Sindak vill 1 2.00 2 1 5.00
7 Subansir ko Pani
i siyum
23 Upper MOA&FW Har Khet Hate nallah to chukmin jobe at Sindak 1 5.00 2 3 12.50
8 Subansir ko Pani
i siyum

629 | P a g e
23 Upper MOA&FW Har Khet Hate nallah to chukmin at Sindak 1 10.00 11 3 25.00
9 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Takiung puring to pugru sikio at Sinamching 1 2.00 2 2 5.00
0 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Chokmin Jobe to Hate Nallah Sindak vill 1 5.00 3 3 12.50
1 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Tapo Nallah To Sapering Rengo At Dingdopa 1 2.00 2 2 5.00
2 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Kyapung nallah to laklik rango Talingha 1 2.00 3 2 5.00 ASM
3 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Binpung bilung nallah to opii-lengne rengo 1 2.00 3 2 5.00 ASM
4 Subansir ko Pani Talingha
i siyum
24 Upper MOA&FW Har Khet Kiampung Nallah to Pelengna at Talingha 1 4.00 2 3 10.00
5 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Seru nallah to tado singring at Taring 1 10.00 11 3 25.00
6 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Lingi sekio to sura at Takionpuring 1 6.00 8 3 15.00 AB
7 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet Ho sekio to sura at takiong puring 1 8.00 7 1 20.00
8 Subansir ko Pani
i siyum
24 Upper MOA&FW Har Khet No nallah to hap rongo at Tayem 1 1.00 3 1 2.50 AB
9 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Talam riktak rongo to hopin sikio at Zingmuring 1 2.00 6 1 5.00
0 Subansir ko Pani
i siyum

630 | P a g e
25 Upper MOA&FW Har Khet Oching sekio to mingporing at Eba 1 2.00 6 2 5.00 ASM
1 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Now nallah to byana at Gyate 1 5.00 6 3 12.50
2 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Now nallah to now chabiya at Gyate 1 5.00 2 3 12.50
3 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Now nallah to chalin at Gyate 1 4.00 5 3 10.00
4 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Bikiak sikio to lingbe rongo at Tayum vill 1 1.00 4 1 2.50
5 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Bikiak sikio to lingdi lingtum rongo at Tayum vill 1 1.00 5 1 2.50
6 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Bikiak sikio to bakap rongo at Tayum vill 1 2.00 5 1 5.00
7 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Bikiak sikio to pinging rongo at Tayum 1 2.00 4 1 5.00
8 Subansir ko Pani
i siyum
25 Upper MOA&FW Har Khet Karam sikio to biake rongo at karam 1 2.00 4 1 5.00
9 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Karam sikio to lingdi rongo at karam 1 2.00 4 1 5.00
0 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Kodamha Nallah To Namah Rengo At Dingdopa 1 2.00 2 2 5.00
1 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Bikiak sikio to singrit namching rongo at Tayum 1 2.00 6 1 5.00
2 Subansir ko Pani
i siyum

631 | P a g e
26 Upper MOA&FW Har Khet Bikiak sikio to namching rongo at Tayum 1 1.00 1 1 2.50
3 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Mip erung nallah to bame rangio at Tayum 1 1.00 1 1 2.50
4 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Lingte sikio to heeche rongo at Dilling 1 2.00 1 1 5.00 ASM
5 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Lingte sikio to hape rongo at Dilling 1 2.00 3 1 5.00
6 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Lingte sikio to Beying rongo at Dilling 1 3.00 1 3 7.50
7 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Chenper Chingni To Pailering Rongo At Dui 1 2.00 2 2 5.00
8 Subansir ko Pani
i siyum
26 Upper MOA&FW Har Khet Mip Noh Nallah to Erung at Tayum Vill 1 3.00 2 1 7.50
9 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Mip kiute nallah to nyachu jobe at dagu 1 4.00 1 3 10.00
0 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Mip kiopen nallah to sepe jobe at dagu 1 4.00 4 3 10.00 ASM
1 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Akia Sokio to Namha at Kajiring -2 1 2.00 2 2 5.00
2 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Horo nallah to dindo rengo at Dingdopa 1 1.00 3 1 2.50 GC
3 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Oching nallah to yengnu rengo at Dingdopa 1 1.00 3 1 2.50 GC
4 Subansir ko Pani
i siyum

632 | P a g e
27 Upper MOA&FW Har Khet Yoo nallah to akeng jamering at yebe 1 3.00 5 3 7.50
5 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Jamering nallah to lower jamering a yebe 1 3.00 6 3 7.50
6 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Yahoo nallah to reme at yebe 1 7.00 4 3 17.50
7 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Yahoo nallah to lower remeat at yebe 1 5.00 3 3 12.50 ASM
8 Subansir ko Pani
i siyum
27 Upper MOA&FW Har Khet Yoo nallah to kamra rongo at yebe 1 2.00 4 1 5.00
9 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Lower yoo nallah to Taching rongo at Yebe 1 7.00 3 3 17.50
0 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Hoching sikio to lower mengporing tali rongo at 1 8.00 2 3 20.00
1 Subansir ko Pani yebe
i siyum
28 Upper MOA&FW Har Khet Haki nallah to haki jobe at Ekke village 1 4.00 2 3 10.00
2 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Hote nallah to gikam jobe at Ekke 1 4.00 2 3 10.00
3 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Perong Nallah To Pakluk Rengo At Pirong 1 2.00 2 2 5.00
4 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Eba nallah to lower eba bochung rongo at yebe 1 5.00 1 3 12.50 ASM
5 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Singburing Nallah to Pamtak yorbe 1 4.00 3 3 10.00
6 Subansir ko Pani
i siyum

633 | P a g e
28 Upper MOA&FW Har Khet at Sato Nallah to Yinyu 1 6.00 6 3 15.00
7 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Biyline rongo to hopin sikio at Zingmuring 1 2.00 3 1 5.00 ASM
8 Subansir ko Pani
i siyum
28 Upper MOA&FW Har Khet Kosing nallah to kichu riga at Zingmuring 1 1.00 3 1 2.50 ASM
9 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Patik lingpin nallah to kopin at Zingmuring 1 2.00 2 1 5.00 ASM
0 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Kow nallah to zingporing at Zingmuring 1 1.00 2 1 2.50 ASM
1 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Kosing nallah to yapam signe at Zingmuring 1 1.00 1 1 2.50 ASM
2 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Sartum nallah to korpu rongo at Zingmuring 1 2.00 1 1 5.00 GCP
3 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Aking seko nallah to niakrim sung at Zingmuring 1 1.00 1 1 2.50
4 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Ruomi siku nallah to riote siku at Zingmuring 1 1.00 1 1 2.50
5 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Riote siku nallah to aking seku at Zingmuring 1 1.00 3 1 2.50
6 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Zingpake rongo to hopin sikio at Zingmuring 1 1.00 3 1 2.50
7 Subansir ko Pani
i siyum
29 Upper MOA&FW Har Khet Doli lingne rongo to hopin sikio at Zingmuring 1 1.00 4 1 2.50
8 Subansir ko Pani
i siyum

634 | P a g e
29 Upper MOA&FW Har Khet Pintung rongo to hopin sikio at Zingmuring 1 1.00 5 1 2.50 GC
9 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Pirak lingpik rongo to hopin sikio at Zingmuring 1 2.00 6 1 5.00 GC
0 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Kyampung nallah to ape lingne rengo at Talingha 1 2.00 2 1 5.00
1 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Yoh nallah to rime at Eba 1 2.00 3 1 5.00
2 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Osing nallh to dool rengo Talingha 1 2.00 3 1 5.00 GC
3 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Mada lingia nallah to talengga rengo at Talingha 1 9.00 10 3 22.50 GC
4 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Horo nallah to tumroba rengo at Talingha 1 9.00 10 3 22.50
5 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Talumha nawa to songba at Eru 1 4.00 3 3 10.00
6 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Yimending nallah to chinba at Eru 1 4.00 11 3 10.00
7 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Bikiak sikio to joki rongo at Tayum 1 1.00 4 1 2.50
8 Subansir ko Pani
i siyum
30 Upper MOA&FW Har Khet Bikiak sikio to takia hamching rongo at Tayum 1 1.00 5 1 2.50
9 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Ramya nallah to seber jobe at Ketha 1 5.00 3 3 12.50
0 Subansir ko Pani
i siyum

635 | P a g e
31 Upper MOA&FW Har Khet Karam sikio to rakle rongo at Karam 1 5.00 5 3 12.50
1 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Birek nallah to Zingmoring jobe at Zingmoring vill 1 2.00 5 1 5.00
2 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Atum nallah to linke mori at Linke 1 3.00 1 3 7.50
3 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Parik lingpik to kopin sakio at Zingmoring vill 1 2.00 5 1 5.00
4 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Lingi Nallah To Renuso At Takiong Puring 1 2.00 2 2 5.00
5 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Bame yoridum rongo to hopin sikio at Zingmoring 1 1.00 5 1 2.50
6 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Ringpa rongo to hopin sikio at Zingmoring 1 1.00 4 1 2.50
7 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Nialo rongo to hopin sikio at Zingmoring 1 2.00 3 1 5.00
8 Subansir ko Pani
i siyum
31 Upper MOA&FW Har Khet Kahi tarka rongo to hopin sikio at Zingmoring 1 1.00 4 1 2.50
9 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Ojju rigyi rongo to hopin sikio at Zingmoring 1 2.00 6 1 5.00
0 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Sinyu-Siku Nallah to Biki Rongo at Gingba 1 2.00 2 2 5.00
1 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Lumak nallah to Bame Yordum at Garam 1 3.00 2 3 7.50
2 Subansir ko Pani
i siyum

636 | P a g e
32 Upper MOA&FW Har Khet Simba Nallah to Saring Jobe at Jingba Rai 1 2.00 3 3 5.00
3 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Silloh Nallah to Tachiring at Jingba Rai 1 3.00 3 3 7.50
4 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Siching Nallah to Digo Liyo at Kiche Rai 1 2.00 3 3 5.00
5 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Linke Nallah to Jorung Jorbe at Linke 1 5.00 3 3 12.50
6 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Lingpa Sikio To Togio Rengo At Linke 1 2.00 2 2 5.00
7 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Tanium Sikio To Kepen Rengo At Linke 1 2.00 2 2 5.00
8 Subansir ko Pani
i siyum
32 Upper MOA&FW Har Khet Si-Nallah to Gyamo Ringo at Pakring 1 3.00 2 2 7.50
9 Subansir ko Pani
i siyum
33 Upper MOA&FW Har Khet Atum Koro to Papi Kubong at Papi 1 2.00 3 3 5.00
0 Subansir ko Pani
i siyum
33 Upper MOA&FW Har Khet Mangam Nallah To Dapo Rengo At Papi 1 2.00 2 2 5.00
1 Subansir ko Pani
i siyum
33 Upper MOA&FW Har Khet Togio Nallah To Borong Rengo At Papi 1 2.00 2 2 5.00
2 Subansir ko Pani
i siyum
33 Upper MOA&FW Har Khet 7.50
3 Subansir ko Pani
i siyum CC lining Sigiam nallah to Tonging moring at Duku 1 3.00 4 3
33 Upper MOA&FW Har Khet 5.00
4 Subansir ko Pani
i siyum Seka Sikio to Tapu Rijo at Lingi 1 2.00 2 2

637 | P a g e
33 Upper MOA&FW Har Khet 7.50
5 Subansir ko Pani
i siyum Omi nallah to Digo-Liyo agri-field at Kitche Rai 1 3.00 3 3
33 Upper MOA&FW Har Khet Row nallah to Beburing at Eru,(seg-1) 7.50
6 Subansir ko Pani
i siyum 1 3.00 5 3
33 Upper MOA&FW Har Khet 17.50
7 Subansir ko Pani
i siyum Noh-Koro to Yigu jobe at Gyate vill 1 7.00 6 3
33 Upper MOA&FW Har Khet 30.00
8 Subansir ko Pani
i siyum Hote Nallah at Jingba Rai 1 12.00 5 3
33 Upper MOA&FW Har Khet 25.00
9 Subansir ko Pani
i siyum mip at Mosu vill 1 10.00 9 3
34 Upper MOA&FW Har Khet 25.00
0 Subansir ko Pani Sato Nallah at Bogia
i siyum 1 10.00 5 3
34 Upper MOA&FW Har Khet Ore nallah at Ekke 25.00
1 Subansir ko Pani
i siyum 1 10.00 6 3
34 Upper MOA&FW Har Khet 30.00
2 Subansir ko Pani Tungying to Makpia at Dui
i siyum 1 12.00 5 3
34 Upper MOA&FW Har Khet 20.00
3 Subansir ko Pani Tapo nallah to Namne moring at Kajring
i siyum 1 8.00 2 3
34 Upper MOA&FW Har Khet 12.50
4 Subansir ko Pani
i siyum Singruwa Nallah to perung at kajring 1 5.00 2 3
34 Upper MOA&FW Har Khet 12.50
5 Subansir ko Pani
i siyum Sigiam nallah at Dui 1 5.00 2 3
34 Upper MOA&FW Har Khet Sipi nallah to Koying at Byania 5.00
6 Subansir ko Pani
i siyum 1 2.00 2 2

638 | P a g e
34 Upper MOA&FW Har Khet Noh Nala to Bame at Tayum vill 20.00
7 Subansir ko Pani
i siyum 1 8.00 3 2
34 Upper MOA&FW Har Khet Koh Nala to Dilling at Dilling vill 20.00
8 Subansir ko Pani
i siyum 1 8.00 3 2
34 Upper MOA&FW Har Khet Boma Nallah to Check dam at Dilling and Tayum 20.00
9 Subansir ko Pani vill
i siyum 1 8.00 3 2
35 Upper MOA&FW Har Khet Daw Nala to Jakar Jobe at Eyum vill 20.00
0 Subansir ko Pani
i siyum 1 8.00 4 2
35 Upper MOA&FW Har Khet Lingia Nala to Daying Jobe at Eyum vill 20.00
1 Subansir ko Pani
i siyum 1 8.00 4 2
35 Upper MOA&FW Har Khet 20.00
2 Subansir ko Pani
i siyum Kui Nallah to Check dam at Eyum to Gyate vill 1 8.00 4 2
35 Upper MOA&FW Har Khet 17.50
3 Subansir ko Pani
i siyum Kungkia Nallah to Tabiu yorko at Pochak 1 7.00 5 2
35 Upper MOA&FW Har Khet 20.00
4 Subansir ko Pani
i siyum Hagia Nallah to :Lingione at Pochak 1 8.00 6 2
35 Upper MOA&FW Har Khet 12.50
5 Subansir ko Pani
i siyum Kete Nallah to Sikiu rong at Dui vill 1 5.00 5 2
35 Upper MOA&FW Har Khet 10.00
6 Subansir ko Pani
i siyum Taning to Taningne at Mosu vill 1 4.00 7 2

NEW SCHEMES
Sl. Name of Concerned Componen Activity Total Command Catchmen Period of Estimate Remarks/
No. the Ministry/ t (C/o. MIP from ……….) Numbe Area/Irrigatio t Area Implementatio d cost Recommende
District/ Departmen r n (in Ha) (Sq.Km.) n (Rs. in d by
Blocks t lakh)

639 | P a g e
1 Upper MOA&FW Har Khet Renov.of Joho Nallah to Tiljaring at Tiljaring Vill 1 20.00 11 3 50.00 MLA&ASM
Subansir ko Pani
i Taliha
2 Upper MOA&FW Har Khet Ogu-sho Nallah to Bobomjobe at Lingram Vill 1 15.00 9 2 37.50 MLA & ASM
Subansir ko Pani
i Taliha
3 Upper MOA&FW Har Khet Chingchibong to Momi under Mara vill 1 10.00 6 3 25.00 MLA
Subansir ko Pani
i Taliha
4 Upper MOA&FW Har Khet Joho Nallah to Lepajaring under Lepajaring vill 1 12.00 7 1 30.00 MLA
Subansir ko Pani
i Taliha
5 Upper MOA&FW Har Khet Kebaso to Si-Joring at Kebaso Mara vill 1 12.00 7 3 30.00 MLA&ASM
Subansir ko Pani
i Taliha
6 Upper MOA&FW Har Khet Tarekoro to Bairingjo at Setumbobing Mara vill 1 6.00 5 3 15.00 ASM
Subansir ko Pani
i Taliha
7 Upper MOA&FW Har Khet Raba to Kiora at Dagiam Vill 1 4.00 3 2 10.00 MLA&ASM
Subansir ko Pani
i Taliha
8 Upper MOA&FW Har Khet Taying Nallah to Taayingmoring at Tabomna vill 1 12.00 9 3 30.00 CE&MLA
Subansir ko Pani
i Taliha
9 Upper MOA&FW Har Khet Siding Nallah to upper Chotam at Tili-jaring vill 1 3.00 3 3 7.50 MLA
Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Tona ochi to Tonarongo at Ngute vill 1 4.00 1 3 10.00 HCM
Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Moku Nallah to Si-Jobe at Kodak Vill 1 7.00 6 2 17.50 ASM
Subansir ko Pani
i Taliha

640 | P a g e
12 Upper MOA&FW Har Khet CC linning of Yeo Nallah to Sinamching at 1 15.00 1 3 37.50 MLA,CE &
Subansir ko Pani Sinamsing vill ASM
i Taliha
13 Upper MOA&FW Har Khet Neelakseko at Gyasing vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Enchi nallah to Maki at Maki vill 1 3.00 1 1 7.50 MLA& AC
Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Rachitso Tachor moring under Lingram Vill 1 5.00 2 2 12.50 MLA
Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Kio Nallah to Si-Joring Agri Field(Kow) at Kodak 1 5.00 3 2 12.50
Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Roh Koro to Nguring at Mara vill 1 18.00 15 3 45.00 MLA
Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Kido nallah under Jiba vill 1 4.00 2 2 10.00 MLA
Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Kote nallah at Mering under Mering Vill 1 6.00 5 3 15.00 MLA&ASM
Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Siriso Nallah to Porbujobe at Dupit vill 1 4.00 2 2 10.00 MLA
Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Ngo koro to Bokra under Mara Vill 1 5.00 7 3 12.50 MLA
Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Raso karo to Nadarengo at Ningtemori Vill 1 3.00 2 3 7.50
Subansir ko Pani
i Taliha

641 | P a g e
23 Upper MOA&FW Har Khet Rayo Nallah to Konia(Teji konia) at konia Vill 1 3.00 5 1 7.50 HCM
Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Ratak Nallah to Amperiktak at Mo-Mara 1 4.00 5 1 10.00 MLA
Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Ngo koro to Bognejobe at Bogne Mara Vill 1 4.00 5 1 10.00 MLA
Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Jamiak karo to Nintemori at Nintemori Vill 1 3.00 1 3 7.50 MLA
Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Yoh nallah to Rajebong at sinamsing vill 1 3.00 3 3 7.50 MLA&ASM
Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Kebaso Nallah to chebamoring at Chebamara vill 1 10.00 6 1 25.00 MLA & ex-
Subansir ko Pani ASM
i Taliha
29 Upper MOA&FW Har Khet Tada koro to Namching at Cheba Mara Vill 1 2.00 2 3 5.00 MLA
Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet khadin soko to aying jobey at Aying Rigia vill 1 7.00 6 3 17.50
Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Jigiam Nallah to Giamdu at Siriring Vill 1 3.00 2 3 7.50 MLA
Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Jamiak karo to Bolinrijo at Nintemori Vill 1 3.00 2 3 7.50 MLA
Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Ongying Moring under Jeba Vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha

642 | P a g e
34 Upper MOA&FW Har Khet Raje Nallah to Si-Joring 1 5.00 1 1 12.50 MLA
Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Bharatjoring at Bogne Mara vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Khadin soko to putung jobey at Aying Rigia vill 1 4.00 1 3 10.00 ex-asm
Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Rikmo to Chinku at Rigia vii 1 3.00 1 3 7.50 MLA
Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Kokpu Nallah under Aging Konia 1 2.00 1 3 5.00 MLA
Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Aya siku to Takke Esi-Rongo at Mo-Mara 1 4.00 1 3 10.00 MLA
Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Kopin soko to Kaksu Lakpin at Mering Mara 1 4.00 2 2 10.00 MLA
Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Tare kro to bairingjo at setum at bobing mara 1 10.00 6 3 25.00 ASM
Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Dungda sho to kiakung moring at Doyum vill 1 4.00 1 3 10.00 MLA
Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Khadin soko to momo moring at Aying Rigia vill 1 3.00 1 1 7.50 ex-asm
Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet Nbo Silco to Heehe village at Heehe area 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha

643 | P a g e
45 Upper MOA&FW Har Khet Enchi nallah to enchi moring at ahging konia 1 2.00 4 1 5.00 AC
Subansir ko Pani
i Taliha
46 Upper MOA&FW Har Khet Todrokoro to Jaring at Tiljaring vill 1 3.00 4 1 7.50 MLA
Subansir ko Pani
i Taliha
47 Upper MOA&FW Har Khet C/O Water harvesting structures at Nayam vill 1 10.00 8 3 25.00
Subansir ko Pani
i Taliha
48 Upper MOA&FW Har Khet Enchi nallah to Nideme at Ahging Konia vill 1 2.00 3 1 5.00 ex-asm
Subansir ko Pani
i Taliha
49 Upper MOA&FW Har Khet Enchi nallah to chingku konia at Ahging konia vill 1 3.00 2 1 7.50 ex-asm
Subansir ko Pani
i Taliha
50 Upper MOA&FW Har Khet Enchi nallah to aging konia at ahging konia vill 1 2.00 2 1 5.00 GPM
Subansir ko Pani
i Taliha
51 Upper MOA&FW Har Khet Sorung Nallah to Aya Ringjo village Heya Mara vill 1 4.00 2 3 10.00 MLA
Subansir ko Pani
i Taliha
52 Upper MOA&FW Har Khet Tona koro to Tonarongo at Ngute vill 1 5.00 2 3 12.50 MLA
Subansir ko Pani
i Taliha
53 Upper MOA&FW Har Khet Reing seko to Lukpejobe at Mo-Mara vill 1 5.00 2 3 12.50 MLA
Subansir ko Pani
i Taliha
54 Upper MOA&FW Har Khet Lingam Rongo at Timba vill 1 4.00 1 3 10.00
Subansir ko Pani
i Taliha
55 Upper MOA&FW Har Khet Miyonsikio to Eboporing at Ebo Vill 1 3.00 2 3 7.50 Ex-ZPC
Subansir ko Pani
i Taliha

644 | P a g e
56 Upper MOA&FW Har Khet Cheta Sikio to Edenmoring at Ebo vill 1 3.00 2 3 7.50 Ex-ZPC
Subansir ko Pani
i Taliha
57 Upper MOA&FW Har Khet Kamcho koro to yagtakrijo at BagbiVill 1 6.00 6 3 15.00 GPM
Subansir ko Pani
i Taliha
58 Upper MOA&FW Har Khet Eichingmoring(taka) under Mara vill 1 5.00 2 3 12.50 Ex-ASM
Subansir ko Pani
i Taliha
59 Upper MOA&FW Har Khet C/O Water harvesting structures at Radiing vill 1 10.00 9 3 25.00
Subansir ko Pani
i Taliha
60 Upper MOA&FW Har Khet Enchi nallah to Ema siku at Ahging konia 1 2.00 1 1 5.00 AC
Subansir ko Pani
i Taliha
61 Upper MOA&FW Har Khet Senchar-ne to Raba at Lepajaring Vill 1 5.00 1 1 12.50
Subansir ko Pani
i Taliha
62 Upper MOA&FW Har Khet Eching-mari to bogne at Bogne 1 3.00 3 3 7.50 ASM
Subansir ko Pani
i Taliha
63 Upper MOA&FW Har Khet Riukpuu Nallah under Timba vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha
64 Upper MOA&FW Har Khet Chebakh koro Lengpajobe at Pakpa village 1 3.00 2 2 7.50 HM,WRD
Subansir ko Pani
i Taliha
65 Upper MOA&FW Har Khet Bogching koro to Bogching at Bogne Vill 1 2.00 4 3 5.00
Subansir ko Pani
i Taliha
66 Upper MOA&FW Har Khet Rote koro to digi at Bogne 1 3.00 5 3 7.50
Subansir ko Pani
i Taliha

645 | P a g e
67 Upper MOA&FW Har Khet Enchi nallah to Enba jobe at Ahging konia 1 3.00 2 1 7.50
Subansir ko Pani
i Taliha
68 Upper MOA&FW Har Khet Riago soko to hagang at Papa Vill 1 4.00 5 3 10.00 ASM
Subansir ko Pani
i Taliha
69 Upper MOA&FW Har Khet Yormi koro to Paktam ringjo at Papa Vill 1 4.00 3 3 10.00
Subansir ko Pani
i Taliha
70 Upper MOA&FW Har Khet Sijako to bokra at Bogne 1 3.00 1 3 7.50
Subansir ko Pani
i Taliha
71 Upper MOA&FW Har Khet Enchi nallah to nite siku at Ahging konia 1 2.00 1 1 5.00 AC
Subansir ko Pani
i Taliha
72 Upper MOA&FW Har Khet Tada seko to bhui moring at Cheba Mara 1 2.00 2 3 5.00 MLA
Subansir ko Pani
i Taliha
73 Upper MOA&FW Har Khet Ongying nallah to Ongying Moring under Timba 1 3.00 2 2 7.50
Subansir ko Pani Vill
i Taliha
74 Upper MOA&FW Har Khet Nho siko to chokda moring at Chokda 1 10.00 5 3 25.00
Subansir ko Pani
i Taliha
75 Upper MOA&FW Har Khet Yogo Tarak Nallah, Bimpak vill 1 3.00 3 3 7.50
Subansir ko Pani
i Taliha
76 Upper MOA&FW Har Khet Kojin nallah to radin kote moring at Dupit vill 1 3.00 3 3 7.50
Subansir ko Pani
i Taliha
77 Upper MOA&FW Har Khet Dikdo-koro nallah to sinik-jobe at Dupit 1 4.00 1 3 10.00
Subansir ko Pani
i Taliha

646 | P a g e
78 Upper MOA&FW Har Khet Kebaso to Cheba Mara vill 1 2.00 3 3 5.00
Subansir ko Pani
i Taliha
79 Upper MOA&FW Har Khet Songs soko to pakpak ringjo at Chebamara 1 12.00 6 3 30.00 Ex-ZPC
Subansir ko Pani
i Taliha
80 Upper MOA&FW Har Khet Pabi nallah to Himbamoring at Dukom Vil 1 3.00 2 3 7.50
Subansir ko Pani
i Taliha
81 Upper MOA&FW Har Khet Rachitso to Bubomjobe at Lingram vill 1 5.00 2 3 12.50
Subansir ko Pani
i Taliha
82 Upper MOA&FW Har Khet Ningporing nallah under Duchok vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha
83 Upper MOA&FW Har Khet Enchihi nallah to Eba moring at Ahging konia 1 3.00 4 1 7.50 ex-asm
Subansir ko Pani
i Taliha
84 Upper MOA&FW Har Khet Tada koro to namching rijo at Cheba mara 1 5.00 3 3 12.50 MLA
Subansir ko Pani
i Taliha
85 Upper MOA&FW Har Khet Omi Nallah under Putung Dui vill 1 3.00 2 2 7.50 MLA
Subansir ko Pani
i Taliha
86 Upper MOA&FW Har Khet Nilaksikio to Oying at Jiba vill 1 3.00 2 7.50
Subansir ko Pani
i Taliha
87 Upper MOA&FW Har Khet Sorchi lahak under Timba village 1 4.00 2 3 10.00
Subansir ko Pani
i Taliha
88 Upper MOA&FW Har Khet Gyasi koro to Gyasirijo at Gyasing vill 1 5.00 2 3 12.50 GPM
Subansir ko Pani
i Taliha

647 | P a g e
89 Upper MOA&FW Har Khet water Harvesting structure at Kodak vill 1 3.00 3 2 7.50
Subansir ko Pani
i Taliha
90 Upper MOA&FW Har Khet Tokdik Nallah under Darba vill 1 2.00 2 2 5.00 MLA
Subansir ko Pani
i Taliha
91 Upper MOA&FW Har Khet Oching koro to gepe at lari Dagiam 1 2.00 1 2 5.00
Subansir ko Pani
i Taliha
92 Upper MOA&FW Har Khet Namching koro to rakeramching at lari Dagiam 1 2.00 2 1 5.00
Subansir ko Pani
i Taliha
93 Upper MOA&FW Har Khet Saba koro to sobarijo at Gyasing vill 1 3.00 6 3 7.50
Subansir ko Pani
i Taliha
94 Upper MOA&FW Har Khet Buru Hote to Ongying Jeba vill 1 3.00 2 3 7.50
Subansir ko Pani
i Taliha
95 Upper MOA&FW Har Khet Dikgi sow to digi at Bogne Vill 1 3.00 2 3 7.50 ex-ZPC
Subansir ko Pani
i Taliha
96 Upper MOA&FW Har Khet Daro nallah to Eche vill 1 4.00 4 3 10.00 ASM
Subansir ko Pani
i Taliha
97 Upper MOA&FW Har Khet Roje Nallah sijoring Mara 1 4.00 2 2 10.00 MLA
Subansir ko Pani
i Taliha
98 Upper MOA&FW Har Khet Jedu nallah to koro moring at Dukum vill 1 5.00 5 3 12.50 GPM
Subansir ko Pani
i Taliha
99 Upper MOA&FW Har Khet Tango sikio lingtum at Row 1 3.00 1.2 3 7.50 MLA
Subansir ko Pani
i Taliha

648 | P a g e
10 Upper MOA&FW Har Khet Home ote to palin rengo at Ganga camp 1 3.00 1 3 7.50 GPM
0 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Jate koro to seja at Bogne Vill 1 3.00 1 3 7.50
1 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Kurmingho to Maringa at Darba vill 1 2.00 2 2 5.00 MLA
2 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Hakang so to ayen jobung at Darba 1 1.00 4 1 2.50
3 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Taying Nallah to Taying moring at Kodak Vill 1 5.00 5 3 12.50 ASM
4 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Mew soko to mering rengo at Ganga camp 1 3.00 3 3 7.50 GPM
5 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Siching siko to diring jobe at Darba 1 1.00 1 1 2.50 GPM
6 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Darpin nallah to nisiraga at Darba 1 2.00 3 1 5.00
7 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Kakpu nallah to koro moring at Dukum 1 3.00 1 1 7.50
8 Subansir ko Pani
i Taliha
10 Upper MOA&FW Har Khet Pabi nallah to papi yorbe at Dukum 1 3.00 2 3 7.50
9 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Homi ote to yaku bangri at Putung dui 1 3.00 4 3 7.50 GPM
0 Subansir ko Pani
i Taliha

649 | P a g e
11 Upper MOA&FW Har Khet Koro nallah to koro moring at Dukum 1 4.00 3 3 10.00 GPM
1 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Daro nallah to nisiraga at Darba 1 5.00 2 3 12.50 ASM
2 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Jaho nallah to Porii-Larbu Rongo at Tili-jaring 1 2.00 3 3 5.00
3 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Lingling nallah to Dukum 1 4.00 2 1 10.00
4 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Dumpung Kuro to Siching Moring at Dumpung vill 1 4.00 2 2 10.00
5 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Jho nallah to jukring at Doyum vill 1 4.00 3 3 10.00 ex-asm
6 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Nalo sha nallah to juling at Damba 1 3.00 3 3 7.50 ZPC
7 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Kojin nallah to kojin riktak at Duchok 1 4.00 2 1 10.00 ASM
8 Subansir ko Pani
i Taliha
11 Upper MOA&FW Har Khet Damo nallah to ejimha moring at Damba 1 2.00 4 1 5.00 ZPC
9 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Saturing at Dupit village 1 4.00 3 2 10.00
0 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Riga moring to kengpin lengpak at damba 1 3.00 5 3 7.50 ASM
1 Subansir ko Pani
i Taliha

650 | P a g e
12 Upper MOA&FW Har Khet Mew seko to yeke rengo at putung dui 1 3.00 2 2 7.50 MLA
2 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet anin seko to Ranin rengo at Putung dui 1 3.00 2 2 7.50 MLA
3 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Omi seko to chingku rango at Putung dui 1 3.00 2 2 7.50 MLA
4 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Darpen siko to lipu yorbe at Darba 1 2.00 3 1 5.00 GPM
5 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Yarang sho to Gingba Yorbe at Doyum vill 1 3.00 4 3 7.50 ex-asm
6 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Oching ote to lower damba at Damba vill 1 2.00 1 1 5.00 GPM
7 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Homi ote to ramsing rengo at Ganga camp 1 3.00 5 3 7.50 ASM
8 Subansir ko Pani
i Taliha
12 Upper MOA&FW Har Khet Hami soko to dew rengo at Ganga camp 1 3.00 2 3 7.50 ASM
9 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Paking Nallah under Dedu vill 1 5.00 2 3 12.50 MLA
0 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Rijo nallah to lingpi-ne moring at Dupit 1 3.00 3 3 7.50
1 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Tona koro to chiku Rongo at Ngute vill 1 6.00 6 3 15.00 ASM
2 Subansir ko Pani
i Taliha

651 | P a g e
13 Upper MOA&FW Har Khet Tona koro to Taria Rongo at Ngute vill 1 6.00 6 3 15.00 ASM
3 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Rachit Soo to Tochor Moring under Lingram vill 1 5.00 2 2 12.50
4 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Bilak so to pilu ha at Darba 1 1.00 5 1 2.50 GPM
5 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Rio-nallah to taine moring at Darba 1 1.00 6 1 2.50
6 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Rio nallah to saturing moring at dupit 1 2.00 1 1 5.00
7 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Water Harvesting structure at Timba vill 1 4.00 6 3 10.00
8 Subansir ko Pani
i Taliha
13 Upper MOA&FW Har Khet Siri-so nallah to a.l.c taliha at Dupit 1 3.00 2 3 7.50
9 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Goying to rikching at Lingram 1 2.00 3 3 5.00 GPM
0 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Hengnesoh, Lepajaring 1 2.00 3 1 5.00 MLA
1 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Kojin nallah to laklam pu jobe at Dupit 1 3.00 1 3 7.50 ASM
2 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Riva nallah to takering moring at Dupit 1 2.00 6 1 5.00 ASM
3 Subansir ko Pani
i Taliha

652 | P a g e
14 Upper MOA&FW Har Khet Kebaso to Tikringka at Mara vill 1 8.00 4 3 20.00 ASM
4 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet CC Linning Jamiak karo to Niochu Ledirijo at 1 10.00 6 3 25.00
5 Subansir ko Pani Nintemori Vill
i Taliha
14 Upper MOA&FW Har Khet Nelakseko to Tabiriu at Jiba Vill 1 2.00 6 3 5.00
6 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Ongying nallah to Ongying(Yapak) at Timba Vill 1 2.00 6 3 5.00
7 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Sigo Seko to Siriring at Siriring Vill 1 2.00 6 3 5.00
8 Subansir ko Pani
i Taliha
14 Upper MOA&FW Har Khet Jorong-sho to padi moring at Lingram 1 2.00 3 2 5.00
9 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Nelom-so nallah to mokling moring at Damba 1 1.00 2 2.50
0 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Joho Nallah to Hojutak 1 2.00 1 3 5.00 MLA
1 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Nho siko to hechey rangngo at Damba 1 2.00 2 5.00
2 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Paking Nallah to Taba Pocha Moring at Damba vill 1 2.00 2 5.00
3 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Kojin nallah to sow jobe at Duchok 1 3.00 4 3 7.50 ex-asm
4 Subansir ko Pani
i Taliha

653 | P a g e
15 Upper MOA&FW Har Khet Yoh nallah to dopu rigor at Sinamsing 1 2.00 4 3 5.00 ASM
5 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Kojin nallah to rappu at Duchok 1 3.00 2 3 7.50 ex-asm
6 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Mape moring to Dakar at Timba village 1 6.00 6 3 15.00
7 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Kaku tarak nallah to soba moring at Duchok 1 3.00 2 3 7.50 ASM
8 Subansir ko Pani
i Taliha
15 Upper MOA&FW Har Khet Hagking Soko to No Koyum Mo Mara 1 2.00 2 2 5.00
9 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Gungba sho to Rangu at Doyum vill 1 3.00 2 3 7.50 ex-asm
0 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Kyakung nallah to bokli yorbe at Doyum 1 3.00 1 3 7.50 ZPC
1 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Jokding Nallah to Ringu - Moring at Doyom vill 1 2.00 3 1 5.00
2 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Gungbaso to Rangu at Doyom vill 1 2.00 3 1 5.00 ASM
3 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Sidang sho to ringme rikia rongo at Doyum 1 3.00 3 3 7.50 ASM
4 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Siriso nallah to pakbu jobe at Dupit 1 2.00 2 2 5.00
5 Subansir ko Pani
i Taliha

654 | P a g e
16 Upper MOA&FW Har Khet Gote koro to chebarijo at Bagbi Vill 1 3.00 2 3 7.50 GPM
6 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Sipung kro to si moring at Deling Mara 1 25.00 16 3 62.50 ASM
7 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Kapia nallah to deling at Deling Mara vill 1 12.00 11 3 30.00
8 Subansir ko Pani
i Taliha
16 Upper MOA&FW Har Khet Kojin nallah to yallu tak at Duchok 1 2.00 3 1 5.00 ex-asm
9 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Soko Nallah to Ranin rengo at Putung Dui Vill 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Mew Soko to Yeke Rengo at Dui 1 2.00 2 5.00 GPM
1 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Ranin soko ro Ranin Rengo 1 2.00 2 2 5.00 GPM
2 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Paking nallah to Taba picha moring at Damba vill 1 2.00 2 2 5.00
3 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Siri-sow to pakbu jobe at Dupit 1 2.00 2 2 5.00
4 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Epo soku to Galeng pu at Dupit 1 2.00 2 2 5.00
5 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Omi seko to putung rengo at Putung Dui 1 2.00 2 3 5.00 MLA
6 Subansir ko Pani
i Taliha

655 | P a g e
17 Upper MOA&FW Har Khet Homi soko to Chengku Rengo at Putung Dui 1 2.00 2 2 5.00 GPM
7 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Dumpung koro to siching moring at Dumpung 1 2.00 2 2 5.00 MLA
8 Subansir ko Pani
i Taliha
17 Upper MOA&FW Har Khet Hemi seko to Potung Rengo. 1 3.00 3 2 7.50 GPM
9 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Cheta siko to eden rongo at Ebo 1 2.00 1 1 5.00 GPM
0 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Ebo siko to tabiyoha moring at Ebo 1 2.00 4 1 5.00 GPM
1 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Ju nallah to ujutak at Ebo 1 5.00 1 3 12.50 ASM
2 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Nipung lineng to tene juling moring at Ebo 1 5.00 2 3 12.50
3 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Jo nallah to kedering at Ebo 1 5.00 3 3 12.50 ASM
4 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Miyong siko to ebo poring at Ebo 1 5.00 3 3 12.50 GPM
5 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Kojing nallah to Ebo moring via Tabiuha at Ebo 1 2.00 2 2 5.00
6 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Kanggo nallah to moging jobe at Eche 1 4.00 4 3 10.00 ASM
7 Subansir ko Pani
i Taliha

656 | P a g e
18 Upper MOA&FW Har Khet Peroko nallah to bokchein jobe at Eche 1 4.00 1 3 10.00 ASM
8 Subansir ko Pani
i Taliha
18 Upper MOA&FW Har Khet Periko nallah to noh jobe at Eche 1 3.00 1 3 7.50 ASM
9 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Yeching Nallah to Jungba 1 2.00 5 1 5.00
0 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Atung Nallah to Dara Moring agril field at Konia 1 2.00 2 2 5.00
1 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Mibia siko to Lowe5r Gyapin Moring 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Richi Siko to Gyapin Moring 1 2.00 2 2 5.00
3 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Homi ote to yaku bumgri at Ganga camp 1 3.00 6 3 7.50 ASM
4 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Ranin soko to ranin rengo at Ganga camp 1 2.00 4 1 5.00 ASM
5 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Mio nallah to Riago at Regia Vill 1 2.00 2 2 5.00
6 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Hariso nallah to chinku moring at Rigia vill 1 5.00 4 3 12.50
7 Subansir ko Pani
i Taliha
19 Upper MOA&FW Har Khet Nogi Jobe at Talomriktak village 1 3.00 1 3 7.50
8 Subansir ko Pani
i Taliha

657 | P a g e
19 Upper MOA&FW Har Khet Jaho nallah to jaho moring at Tili-jaring 1 3.00 1 3 7.50
9 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Homi ote to yaku bumgri at Ganga camp 1 3.00 1 3 7.50
0 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Ranen nallah to Ranen Rengo at Ganga camp 1 3.00 5 3 7.50 GPM
1 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Lera koro to nesu suta at Gyasing 1 5.00 4 3 12.50 GPM
2 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Upper Nayam at Damba Vill 1 2.00 4 3 5.00
3 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Sejah koro to bogra at Bogne Vill 1 2.00 3 1 5.00
4 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Moso nallah to byate moring at Mo mara 1 3.00 3 3 7.50
5 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Seju sikio to busemore at Timba 1 4.00 3 3 10.00
6 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Sirong to raba at Jaring 1 5.00 2 3 12.50
7 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Zoo nallah to degengyor at Jaring 1 9.00 3 3 22.50
8 Subansir ko Pani
i Taliha
20 Upper MOA&FW Har Khet Enchi nallah to kokpu konia at Ahging Konia vill 1 1.00 1 1 2.50 GPM
9 Subansir ko Pani
i Taliha

658 | P a g e
21 Upper MOA&FW Har Khet Merik nallah to siri rongo at Doyum 1 3.00 5 3 7.50 ex-asm
0 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Sincherne koro to kaika at Jaring 1 5.00 4 3 12.50 ASM
1 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Likung siku to raba at Jaring 1 8.00 4 3 20.00
2 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet CC Linning Kido Nallah to Ongying 1 4.00 4 3 10.00
3 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Pumi nallah to bipu moring at Maki vill 1 1.00 2 3 2.50 ASM
4 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Jaho nallah to jaho moring at Tili-jaring 1 3.00 3 3 7.50
5 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Riokpi nallah to to yeba at Yeba moring 1 5.00 1 3 12.50
6 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Kara koro to raba at Jaring 1 5.00 1 3 12.50 ASM
7 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Kaing pering to dompiorio moring at Jeba 1 2.00 2 1 5.00 ASM
8 Subansir ko Pani
i Taliha
21 Upper MOA&FW Har Khet Kido nallah to pachu moring at Jeba 1 2.00 3 1 5.00
9 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Jiling nallah to aying-moring at Jeba 1 2.00 2 1 5.00
0 Subansir ko Pani
i Taliha

659 | P a g e
22 Upper MOA&FW Har Khet Hakhak nallah to yorlo moring at Jeba 1 2.00 4 1 5.00
1 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Hoying nallah at Jeba Vill 1 1.00 1 1 2.50
2 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Tumte Koro to chotum rijo at Tilijaring 1 2.00 2 2 5.00 MLA
3 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Enchi nallah to darpane moring at Maki vill 1 2.00 5 3 5.00 ASM
4 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Singcher - ne Nallah to Raba Lepajaring village 1 5.00 3 3 12.50
5 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Moku nallah to si-jobee at Kodak 1 6.00 9 3 15.00 ASM
6 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Zoo Nallah to Degengyor at Jaring vill 1 10.00 11 3 25.00
7 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Riokpi nallah to Sirune moring at Kodak 1 3.00 4 2 7.50 ASM
8 Subansir ko Pani
i Taliha
22 Upper MOA&FW Har Khet Jow koro to raba at Lepajaring 1 2.00 1 1 5.00
9 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Tanyo Koro to Kopin Agril field at Lepajaring 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Hignesow to Dereriong at Lepajaring vill 1 2.00 1 1 5.00 GPM
1 Subansir ko Pani
i Taliha

660 | P a g e
23 Upper MOA&FW Har Khet Joh koro to rasa rijo bagu at Lepajaring 1 2.00 1 1 5.00 GPM
2 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Hingnesew to Dalik rijo at Lepajaring vill 1 2.00 1 2 5.00
3 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Singchar-ne koro to raba at Lepajaring 1 2.00 5 1 5.00 GC
4 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Linglin nallah to Nak jobee at Kodak 1 7.00 11 3 17.50 ASM
5 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Yorte koro to yorte at lepajaring Vill 1 2.00 2 1 5.00 GC
6 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Kopin koro to yama lamda at Lepajaring vill 1 2.00 4 2 5.00
7 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Nho siko to Darba at Darba 1 1.00 5 1 2.50 GPM
8 Subansir ko Pani
i Taliha
23 Upper MOA&FW Har Khet Mow soko to yake rengo at putung dui 1 2.00 3 3 5.00 ASM
9 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Pokung seku to galing podor at Lepajaring 1 2.00 2 1 5.00 GC
0 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Setend koro to taloring at Lepajaring 1 2.00 4 1 5.00 GC
1 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Rio nallah to Mogu jobe at Kodak vill 1 19.00 13 3 47.50 ASM
2 Subansir ko Pani
i Taliha

661 | P a g e
24 Upper MOA&FW Har Khet Hengneso to raba at Lepajaring 1 2.00 3 1 5.00
3 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Singcher -ne nallah to Raba village Lepajaring 1 3.00 2 3 7.50 MLA
4 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Kopin koro to kopin rongo at Lepajaring 1 1.50 3 2 3.75
5 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Raba koro to punke rengo at Lepajaring 1 1.50 2 1 3.75
6 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Row koro to nguring rinko at Mara Vill 1 2.00 6 3 5.00 CE WRD
7 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Bomlo-sho to padi moring at Lingram 1 3.00 1 3 7.50 Ex-ZPC
8 Subansir ko Pani
i Taliha
24 Upper MOA&FW Har Khet Jaamiak Nallah under Nintemori vill 1 2.00 2 3 5.00 MLA
9 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Yinchi to yinvhi jobe at Maki 1 2.00 1 3 5.00 ZPM
0 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Pomi nallah to bate moring at Eche vill 1 5.00 2 3 12.50 ASM
1 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Degom siko to payeng moring at Regia 1 4.00 1 3 10.00 Ex-ZPC
2 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Bami koro to bami at Lepajaring 1 2.00 4 2 5.00
3 Subansir ko Pani
i Taliha

662 | P a g e
25 Upper MOA&FW Har Khet Bakap-horo to lingrine moring jobe at Lingram vill 1 2.00 1 3 5.00 ex-asm
4 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Sipung kro to si moring at Deling mara 1 10.00 6 3 25.00 ASM
5 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Dharo siko to bate yorbe at Darba 1 1.00 4 1 2.50 GPM
6 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Dokio koro to laring at lari Dagiam 1 1.00 3 1 2.50
7 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Didu koro to didu at lari Dagiam 1 1.00 3 1 2.50
8 Subansir ko Pani
i Taliha
25 Upper MOA&FW Har Khet Nampu seku to laring(east) at lari Dagiam 1 1.00 4 1 2.50
9 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Sincherne koro to raba at Jaring 1 9.00 6 3 22.50
0 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Jorong nallah to jorong ring at Lingram 1 4.00 4 2 10.00
1 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Mebia Sow at Lepajaring vill 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Zoo nallah to degengyor at Jaring 1 8.00 5 3 20.00
3 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Siling simia to raba at Jaring 1 7.00 1 3 17.50
4 Subansir ko Pani
i Taliha

663 | P a g e
26 Upper MOA&FW Har Khet Nia koro to bana at lari Dagiam 1 1.00 4 1 2.50
5 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Jegok siko to biba jobe at Darba vill 1 2.00 1 1 5.00 GPM
6 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Jetung nallah to rakring ringo at Lepajaring 1 2.00 3 1 5.00
7 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Enchi nallah to darpome at Ahging konia 1 2.00 3 1 5.00 ex-asm
8 Subansir ko Pani
i Taliha
26 Upper MOA&FW Har Khet Jho siko to bubum moring at Lingram 1 2.00 1 3 5.00 GPM
9 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Saju nallah to motung moring at motung 1 5.00 3 3 12.50 GPM
0 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Saju nallah to motung moring at motung 1 5.00 2 3 12.50
1 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Tona koro to tolar rongo at ngute 1 4.00 1 3 10.00 GPM
2 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Eche so to dharsing at Darba vill 1 1.00 1 1 2.50 GPM
3 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Berikso nallah to Maperikring at Lingram 1 2.00 2 2 5.00
4 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Gyate-sho to beri moring at Lingram Vill 1 2.00 2 3 5.00 ex-asm
5 Subansir ko Pani
i Taliha

664 | P a g e
27 Upper MOA&FW Har Khet Water Harvesting structure at Ledirijo vill 1 5.00 4 3 12.50
6 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Hote lingtak to sigang at Regia 1 4.00 2 3 10.00 ASM
7 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet Pediko nallah to bokte nobe at Eche 1 5.00 4 3 12.50 ASM
8 Subansir ko Pani
i Taliha
27 Upper MOA&FW Har Khet From nogi siko to nogi ring at nogi 1 8.00 6 3 20.00
9 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Payor koro to nagi rinjo at Nogi 1 3.00 2 2 7.50
0 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Yormi nallah to linging moring at papa 1 2.00 1 3 5.00 GC
1 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Rachit siko to paktak moring at papa 1 3.00 4 3 7.50 GPM
2 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Kojin nallah to ningporing moring at Dochuk 1 2.00 5 1 5.00 ASM
3 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Tungrung nallah to solu moring at Dochuk 1 3.00 5 3 7.50 ex-asm
4 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Niho nallah to eba moring at Dochuk 1 3.00 1 3 7.50 ex-asm
5 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Nima nallah to lebya moring at Dochuk 1 3.00 3 3 7.50 ex-asm
6 Subansir ko Pani
i Taliha

665 | P a g e
28 Upper MOA&FW Har Khet Moso Nallah to morkoring under Mara Vill 1 6.00 6 3 15.00
7 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Nia koro to bana at Lari Dagiam 1 1.00 2 1 2.50
8 Subansir ko Pani
i Taliha
28 Upper MOA&FW Har Khet Mibia sow to lepa at Lari dagiam vill 1 2.00 3 2 5.00
9 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Jorong nallah to jorong ring at Lingram 1 2.00 1 2 5.00 ex-asm
0 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Takering to dupit at Dupit 1 3.00 4 3 7.50 ASM
1 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Noh Koro to Koung at Tabomna 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Siya honghe to makba yorbe at Tabomna 1 2.00 1 3 5.00
3 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Rering soko to rering moring at mo mara 1 9.00 6 3 22.50
4 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Moso nallah to morkojoring at Mo mara 1 10.00 6 3 25.00
5 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Akeng soku to mo kotom at mo mara 1 9.00 6 3 22.50
6 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Pachang nallah to paking moring at Dedu 1 5.00 6 3 12.50
7 Subansir ko Pani
i Taliha

666 | P a g e
29 Upper MOA&FW Har Khet Rio nallah to takering at Dupit 1 4.00 5 3 10.00
8 Subansir ko Pani
i Taliha
29 Upper MOA&FW Har Khet Mew soko to maring rengo at putung Dui 1 7.00 7 3 17.50
9 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Moku Nallah to Si Jobe 1 4.00 2 2 10.00
0 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Ratak soko to hamperiktak at mo mara 1 8.00 2 3 20.00
1 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Mosoh koro to Lengtejaring at Mo-mara 1 3.00 2 2 7.50
2 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Rering seko to lukpe esi-rengo at Mo-mara 1 4.00 3 3 10.00
3 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Kiring nallah to Timba 1 5.00 5 3 12.50
4 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Lera karo to madarijo at Ninte mori 1 3.00 1 3 7.50
5 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Jeling nallah to machi moring at Jeba 1 2.00 6 1 5.00 AC
6 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Rio nallah to peli jobe at Maki 1 2.00 4 3 5.00 ASM
7 Subansir ko Pani
i Taliha
30 Upper MOA&FW Har Khet Row koro to didu bado at lari Dagiam 1 2.00 3 1 5.00
8 Subansir ko Pani
i Taliha

667 | P a g e
30 Upper MOA&FW Har Khet Joru karo to joru at Nintemori Vill 1 2.00 4 3 5.00
9 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Jamiak karo to jamirijo at Nintemuri Vill 1 2.00 3 3 5.00
0 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Tikre siko to echeng namcheng at Darba 1 1.00 4 1 2.50 GPM
1 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Jahow koro to takunibar at lari Dagiam 1 2.00 3 1 5.00
2 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Row koro to nguring at Mara 1 2.00 2 3 5.00
3 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Ngokoro siko to nguri ngjobe at Mara 1 15.00 3.2 3 37.50
4 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Yagling moring to Eching moring at Mara 1 5.00 2 2 12.50
5 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Ngokoro siko to bogra jobe at Mara 1 5.00 1 3 12.50
6 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Ngokoro siko to bogne at Mara 1 5.00 2 3 12.50
7 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Kebaso to si moring at Mara 1 10.00 6 3 25.00
8 Subansir ko Pani
i Taliha
31 Upper MOA&FW Har Khet Ngo koro to yani bokra at Mara 1 3.00 3 3 7.50
9 Subansir ko Pani
i Taliha

668 | P a g e
32 Upper MOA&FW Har Khet Tareko seko to yasiko at Nora Mara Vill 1 5.00 5 3 12.50
0 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Nbo sikio to heehe village 1 2.00 2 2 5.00
1 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Yaho koro to bukdu joring at Mara 1 2.00 3 1 5.00
2 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Kebaso to degamoring at Mara 1 10.00 4 3 25.00 ASM
3 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Dabam koro to dabom at lari Dagiam 1 2.00 1 2 5.00 ex-asm
4 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Dabam koro to dabom at lari Dagiam 1 2.00 1 2 5.00 ex-asm
5 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Himba nallah to himba yorbe at Dukum 1 4.00 3 3 10.00
6 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Hagang so to dharo jobe at Darba 1 1.00 2 1 2.50
7 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Jorung so to Maying Namching 1 2.00 2 2 5.00
8 Subansir ko Pani
i Taliha
32 Upper MOA&FW Har Khet Mowching soko to yake rengo at putung Dui vill 1 2.00 2 3 5.00 GPM
9 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Yagling Moring to Aching Moring at Mara vill. 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha

669 | P a g e
33 Upper MOA&FW Har Khet Jorpi nallah to hactak jobe at Mara 1 2 2 2 5.00
1 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Dame Sepok to Duyin Moring at Rongkia 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Noh river to noh jobe at Maki 1 2.00 7 3 5.00 ASM
3 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Yoh Nallah to Maki vill 1 1.00 6 3 2.50 ASM
4 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Enchi nallah to darpane moring at Maki 1 1.00 6 3 2.50 ASM
5 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Enchi Nallah to Maki village 1 3.00 5 3 7.50
6 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Rakpi nallah to pengom pete at Jeba 1 2.00 1 1 5.00
7 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Pering nallah to bamba yorl at Jeba 1 2.00 5 1 5.00
8 Subansir ko Pani
i Taliha
33 Upper MOA&FW Har Khet Hongkin nallah to hakhak moring at Jeba 1 2.00 4 1 5.00 AC
9 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Dumai Moring village Rongkia Land protection 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Rio nallah to mani reklum jobe at Maki 1 2.00 4 3 5.00 ASM
1 Subansir ko Pani
i Taliha

670 | P a g e
34 Upper MOA&FW Har Khet Yenchi nallah to lingdu ractor moring at Maki 1 2.00 3 3 5.00 ASM
2 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Tari nallah to lingba moring at Maki Vill 1 1.00 1 3 2.50 ASM
3 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Jamiak nallah to sinik jobe at Ningtemuri vill 1 5.00 2 3 12.50
4 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Hote nallah to biba moring at Maki 1 1.00 1 3 2.50
5 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Mow soko to kesing soko at putung Dui vill 1 2.00 2 3 5.00 GPM
6 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Soko soko to yake rengo at putung Dui vill 1 3.00 3 3 7.50 GPM
7 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Mew soko to tachu rengo at putung Dui vill 1 5.00 1 3 12.50
8 Subansir ko Pani
i Taliha
34 Upper MOA&FW Har Khet Miyo nallah to Dui at Putung Dui Vill 1 3.00 3 3 7.50 GPM
9 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Linging seko to papa moring at Papa vill 1 4.00 6 3 10.00
0 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Papa horo to riago at Papa Vill 1 3.00 1 3 7.50
1 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Kamchik nallah to hakang at Papa 1 3.00 3 3 7.50
2 Subansir ko Pani
i Taliha

671 | P a g e
35 Upper MOA&FW Har Khet Rikmo siko to clinbku moring at Rigia vill 1 4.00 3 3 10.00 GPM
3 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Mio siko to rilum pu at Rigia 1 4.00 3 3 10.00 GPM
4 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Riso siko to clingku yorbe at Rigia 1 4.00 4 3 10.00
5 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Chingku at Rigia village 1 2.00 2 2 5.00
6 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Joh koro to dikgingyor at Lepajaring 1 2.00 2 2 5.00
7 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Enchi nallah to dukum at Ahging konia 1 2.00 2 1 5.00 ex-asm
8 Subansir ko Pani
i Taliha
35 Upper MOA&FW Har Khet Darpome to dukum at Ahging konia 1 2.00 5 1 5.00 ex-asm
9 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Sangpor Joring under Poda Mara 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Ngo koro to ngwing at poda Mara 1 8.00 9 3 20.00
1 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Tater ringo nallah to Pengpe moring 1 6.00 11 3 15.00
2 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Moso to Morko rijo tat Pogia Mara 1 2.00 2 2 5.00
3 Subansir ko Pani
i Taliha

672 | P a g e
36 Upper MOA&FW Har Khet Chojor siku to degam maring at podo mara 1 8.00 9 3 20.00 ASM
4 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Kapia siku to jorpi moring at podo mara 1 8.00 9 3 20.00 ASM
5 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Todoro nallah (upper)to ngojing moring at 1 2.00 1.6 3 5.00
6 Subansir ko Pani Tilijaring
i Taliha
36 Upper MOA&FW Har Khet Todoro nallah (lower)to jaring rijo at tTilijaring 1 2.00 4 3 5.00
7 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Yah nallah to leneger jebe at maki 1 2.00 5 3 5.00 ASM
8 Subansir ko Pani
i Taliha
36 Upper MOA&FW Har Khet Godo nallah to taying moring at maki 1 2.00 5 3 5.00 ASM
9 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Raba sow to jow at Lepajaring 1 2.00 6 1 5.00 GC
0 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Siri seedi Nallah at Tilijaring 1 2.00 3 2 5.00
1 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Ramding nallah to raje at Sinamsing 1 3.00 1 3 7.50 ASM
2 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Enchi nallah to tari at ahging Ahging konia 1 2.00 5 1 5.00
3 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Enchi nallah to zingolingpo at Ahging konia 1 2.00 3.5 1 5.00 ex-asm
4 Subansir ko Pani
i Taliha

673 | P a g e
37 Upper MOA&FW Har Khet Oh nallah to nambong moring at Sinamsing vill 1 2.00 4 3 5.00 GPM
5 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Yinvhi nallah to tabom jobe at Sinamsing vill 1 2.00 1 3 5.00
6 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Enchi nallah to emba moring at Sinamsing 1 2.00 2 3 5.00
7 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Dogi koro to Galipu at Bagbi Vill 1 2.00 5 3 5.00
8 Subansir ko Pani
i Taliha
37 Upper MOA&FW Har Khet Kia koro to sekirijo at Gyasing 1 5.00 5 3 12.50
9 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Pedonghe siko to diring jobe at Darba 1 1.00 2 1 2.50 GPM
0 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Nhosho koro to tabamna moring at Talomriktak 1 5.00 2 3 12.50
1 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Yah nallah to bokdu jobe at Maki 1 1.00 5 3 2.50 ASM
2 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Siya honghe to chinku moring at Tabomna 1 2.00 4 3 5.00
3 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Sugo Nallah to Ringsu Moring at Siri Ring vill 1 3.00 4 3 7.50
4 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Takte Nallah to Pio Jobe at Siri Ring village 1 3.00 4 3 7.50
5 Subansir ko Pani
i Taliha

674 | P a g e
38 Upper MOA&FW Har Khet Mo nallah to talom riktak at Tabomna vill 1 2.00 3 3 5.00
6 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Siya honghe to tabomna moring at Tabomna 1 2.00 3 3 5.00
7 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Mo nallah to mo jobe at tabomna 1 2.00 5 3 5.00
8 Subansir ko Pani
i Taliha
38 Upper MOA&FW Har Khet Mo nallah to rupji punghe at tabomna 1 2.00 5 3 5.00
9 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Hiching nallah to goying rikching at lingram 1 2.00 3 3 5.00
0 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Tanio koro to kopin at lari dagiam 1 3.00 2 2 7.50 GPM
1 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Rasing koro to rasing at lari dagiam 1 1.00 5 1 2.50
2 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Taying nallah to same ringhe at tabomna 1 1.00 1 3 2.50
3 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Letak koro to Namchi hari at Bagbi Vill 1 7.00 3 3 17.50 GPM
4 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Jurpi nallah to haktak at yakling moring vill 1 12.00 1 3 30.00
5 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Siching siko to dumpong moring at Darba 1 2.00 2 1 5.00 GPM
6 Subansir ko Pani
i Taliha

675 | P a g e
39 Upper MOA&FW Har Khet Dompung moring to darba jobe at Darba 1 1.00 3 1 2.50 GPM
7 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Yillo lingne to damba at damba 1 2.00 2 2 5.00
8 Subansir ko Pani
i Taliha
39 Upper MOA&FW Har Khet Topune moring to riga moring at Dedu vill 1 10.00 12 3 25.00
9 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Pitak koro to lepa at Lepajaring 1 2.00 5 1 5.00 GC
0 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Kereng seku to kereng at lepajaring 1 2.00 5 1 5.00
1 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet No Nallah river at Talomriktak village 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet No nallah to jobey moring at talomriktak 1 5.00 2 3 12.50
3 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Chami koro to ketamrijo at Bagbi Vill 1 2.00 4 3 5.00
4 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Leke karo to lekerijo at Nintemori Vill 1 12.00 15 3 30.00
5 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Lera karo to Nintemoring at Nintemori Vill 1 8.00 11 3 20.00
6 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Dharing siko to bipu yorbe at darba 1 1.00 1 1 2.50 GPM
7 Subansir ko Pani
i Taliha

676 | P a g e
40 Upper MOA&FW Har Khet Siku siko to Siching jobe at Darba vill 1 2.00 1 1 5.00 GPM
8 Subansir ko Pani
i Taliha
40 Upper MOA&FW Har Khet Tareko Nallah To Nartam Rengo At Mo Mara 1 4.00 3 3 10.00
9 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Kebaso Nallah To Yukba Rengo At Mo Mara 1 3.00 2 2 7.50
0 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Miyo Nallah To Dui At Potung Dui 1 2.00 2 2 5.00
1 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Inchi Nallah At Maki Vill 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Mo nallah to bidak joring at tabomna 1 2.00 2 3 5.00
3 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Mo nallah to bate jorbe at tabomna 1 2.00 3 3 5.00
4 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Tabamna to Sinia Nallah at Chokda 1 3.00 2 2 7.50
5 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Tabomna To Janjoring at Chokda 1 3.00 2 2 7.50
6 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Jow Koro To Ape Regha At Dagiam 1 2.00 2 2 5.00
7 Subansir ko Pani
i Taliha
41 Upper MOA&FW Har Khet Ranen Nallah To Ranen Rengo At Ganga Camp 1 2.00 2 2 5.00
8 Subansir ko Pani
i Taliha

677 | P a g e
41 Upper MOA&FW Har Khet Taying Jobe At Kodak 1 7.00 5 3 17.50 MLA
9 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Si-Moring At Kodak Village 1 2.00 2 2 5.00
0 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Dsub Nallah To Pakring Moring At Kamlo 1 2.00 2 2 5.00
1 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Kaku Nallah To Amria Jobe At kamlo 1 2.00 2 2 5.00
2 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Sob Nallah To Joying Moring At Kamlo 1 2.00 2 2 5.00
3 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Ldin Nallah To Edu Moring At Kamlo 1 2.00 2 2 5.00
4 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Penpu Nallah To Ruring Moring At Kamlo 1 2.00 2 2 5.00
5 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Eding Nallah To Eding Moring At Kamlo 1 2.00 2 2 5.00
6 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Dan Nallah To Jobe At Kamlo 1 2.00 2 2 5.00
7 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Sub To Pakring Moring At Kamlo 1 2.00 2 2 5.00
8 Subansir ko Pani
i Taliha
42 Upper MOA&FW Har Khet Lung Nallah To Lung Jobe At Kamlo 1 2.00 2 2 5.00
9 Subansir ko Pani
i Taliha

678 | P a g e
43 Upper MOA&FW Har Khet Kebaso Nallah To Rale Pama Rengo At Mora 1 4.00 3 3 10.00
0 Subansir ko Pani Mara
i Taliha
43 Upper MOA&FW Har Khet Tareko Nallah To Bate Rengo At Mora Mara 1 3.00 2 3 7.50
1 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Kebaso Nallah To Talipudar Rengo At Mora Mara 1 4.00 3 3 10.00
2 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet No-Jobe At Talam Rikta Vill 1 2.00 2 2 5.00
3 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Riokpi Nallah to Leduha Moring at SiNamsing 1 2.00 2 2 5.00
4 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Si-Namsing Moring At SiNamsing Vill 1 2.00 2 2 5.00
5 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Si-Nallah To Lingrak At Takiongpuring 1 2.00 2 2 5.00
6 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Rikpi Nallah To Heba Moring At Konia 1 3.00 3 2 7.50
7 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Tater Nallah To Pungpe Moring Konia At Konia 1 3.00 3 2 7.50
8 Subansir ko Pani
i Taliha
43 Upper MOA&FW Har Khet Taaying Nallah To Taying Moring At Tabomna Vill 1 15.00 11 3 37.50 SE WRD
9 Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet Sorki nallah to Aba Rengo at Riamuk 1 2.00 6 1 5.00
0 Subansir ko Pani
i Taliha

679 | P a g e
44 Upper MOA&FW Har Khet Dara Seko to Tarimori at Konia village 1 3.00 7 1 7.50
1 Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet Byete Nallah to Si-Degam at Mara 1 3 2 3 7.50
2 Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet Pisehio nallah At Tabinmoring 1 5 3.5 3 12.50
3 Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet CC Drain at Hao Nallah to Aching Mori vill 1 5 10 2 12.50 MLA
4 Subansir ko Pani
i Taliha
44 Upper MOA&FW Har Khet MIP at Papa Village( Sake Mayeng) 1 20 30 3 50.00 MLA
5 Subansir ko Pani
i Taliha

NEW SCHEMES
Sl. Name Concerned Component Activity Total Command Catchment Period of Estimated Remarks/
No. of the Ministry/ (C/o. MIP from ……….) Number Area/Irrigation Area Implementation cost Recommended
District/ Department (in Ha) (Sq.Km.) (Rs. in by
Blocks lakh)
1 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning vill 1 3.00 2 2 7.50 MLA
ko Pani
2 Paying MOA&FW Har Khet Sepung Nallah under Kamsar vill 1 3.00 2 2 7.50 MLA
ko Pani
3 Paying MOA&FW Har Khet Bamdom Nallah to Kaji at Bomdom Vill 1 8.00 9 3 20.00 MLA
ko Pani
4 Paying MOA&FW Har Khet Honing sikio to jarjo moring at raimuk 1 4.00 1 3 10.00 MLA
ko Pani
5 Paying MOA&FW Har Khet Yoh Nallah under Ramsing Vill 1 3.00 3 1 7.50 MLA
ko Pani
6 Paying MOA&FW Har Khet Sekit Nallah to Kalaring Moring under Maling 1 4.00 2 3 10.00 ZPM
ko Pani

680 | P a g e
7 Paying MOA&FW Har Khet Siral nallah to upper mengio at Paktung 1 3.00 3 2 7.50 ASM
ko Pani
8 Paying MOA&FW Har Khet Kagar nallah to Chilaring at Pakpu maling 1 3.00 3 3 7.50 MLA
ko Pani
9 Paying MOA&FW Har Khet Henge nallah to Jate moring at Jami vill 1 6.00 6 3 15.00 MLA
ko Pani
10 Paying MOA&FW Har Khet Amria Nallah to Amriamoring at Nyompu vill 1 6.00 6 3 15.00 MLA
ko Pani
11 Paying MOA&FW Har Khet Haye nallah to Tadok-Hayemoring at Lingri 1 3.00 2 3 7.50 MLA
ko Pani
12 Paying MOA&FW Har Khet Yorching Nallah to setok Joring at Kaji Vill 1 4.00 4 2 10.00 HM,WRD
ko Pani
13 Paying MOA&FW Har Khet Sirit nallah to chido jobe at Paktung vill. 1 2.00 6 3 5.00 ASM
ko Pani
14 Paying MOA&FW Har Khet Polo Nallah to Lingo-Lingne under Maling 1 3.00 2 3 7.50 ZPM
ko Pani
15 Paying MOA&FW Har Khet Siching siko to Bokdu moring at Dagam 1 2.00 2 2 5.00 ASM
ko Pani
16 Paying MOA&FW Har Khet Seka siko to karing jobe at Lingri 1 2.00 2 2 5.00
ko Pani
17 Paying MOA&FW Har Khet Popung Nallah ,Pakpu malling 1 2.00 2 3 5.00 MLA
ko Pani
18 Paying MOA&FW Har Khet Water Harvesting pound to Hering at Ramsing 1 5.00 2 1 12.50 ASM
ko Pani
19 Paying MOA&FW Har Khet How nallah to Aching moring at WRC field at Aching 1 5.00 3 3 12.50
ko Pani moring
20 Paying MOA&FW Har Khet Yoh siko to Hering moring at Ramching vill 1 1.00 3 1 2.50
ko Pani
21 Paying MOA&FW Har Khet Ami Nallah to Nartak at Paying Vill 1 5.00 2 3 12.50 MLA
ko Pani
22 Paying MOA&FW Har Khet Siching siko to Ringte moring at Chingring moring 1 2.00 6 3 5.00 ASM
ko Pani
23 Paying MOA&FW Har Khet Bokdu Koro to Yo Joring at Ramching 1 2.00 3 1 5.00
ko Pani

681 | P a g e
24 Paying MOA&FW Har Khet Kamda Nallah under Kamda Vill 1 3.00 2 2 7.50 MLA
ko Pani
25 Paying MOA&FW Har Khet Yayo koro to Yak at Ramsing 1 1.00 3 1 2.50 MLA
ko Pani
26 Paying MOA&FW Har Khet Bomdom Nallah under Kaji Vill 1 3.00 2 3 7.50 MLA
ko Pani
27 Paying MOA&FW Har Khet Litto nallah to singjoring at Kaji 1 3.00 2 3 7.50
ko Pani
28 Paying MOA&FW Har Khet Ringte Moring to Sine Nallah at Pakba village 1 5.00 3 3 12.50 MLA
ko Pani
29 Paying MOA&FW Har Khet Sichi nallah to bororing at Kamda 1 2.00 3 1 5.00 ASM
ko Pani
30 Paying MOA&FW Har Khet Sirit Koro to Namching moring at Dagam 1 2.00 3 3 5.00 ASM
ko Pani
31 Paying MOA&FW Har Khet Geri sekio to tegdo at Aching moring 1 4.00 3 2 10.00
ko Pani
32 Paying MOA&FW Har Khet Sikit Nallah under Ginglo vill 1 3.00 4 3 7.50 MLA
ko Pani
33 Paying MOA&FW Har Khet Sera Nallah toi Bodomko at Badam Puring 1 5.00 2 3 12.50
ko Pani
34 Paying MOA&FW Har Khet CC Linning MIP under Tarba Vill 1 5.00 2 3 12.50
ko Pani
35 Paying MOA&FW Har Khet Bamdom Nallah to Ningporing at Bomdom 1 20.00 15 3 50.00
ko Pani
36 Paying MOA&FW Har Khet Grii Nallah Under Esso vill 1 2.00 2 2 5.00 MLA
ko Pani
37 Paying MOA&FW Har Khet Poktung nallah to Meniapuring at Paktung 1 2.00 2 3 5.00
ko Pani
38 Paying MOA&FW Har Khet Nigchi nallah to muglung putung at Baring 1 2.00 3 1 5.00 ASM
ko Pani
39 Paying MOA&FW Har Khet Chingam Nallah to Cheyang at Bibe Riamuk vill 1 3.00 4 3 7.50
ko Pani
40 Paying MOA&FW Har Khet Bamdom Nallah to Ningporing at Bomdom 1 6.00 9 3 15.00 MLA
ko Pani

682 | P a g e
41 Paying MOA&FW Har Khet Mopi jobe soko to Mopi at Tajering Vill 1 5.00 2 3 12.50
ko Pani
42 Paying MOA&FW Har Khet Siching siko to ringchi moring at Chingring moring Vill 1 3.00 5 3 7.50 ASM
ko Pani
43 Paying MOA&FW Har Khet Sewhen nallah to Bibe at Bibe Riamuk vill 1 3.00 1 3 7.50
ko Pani
44 Paying MOA&FW Har Khet Yo siko to Hering Moring 1 4.00 1 3 10.00 MLA
ko Pani
45 Paying MOA&FW Har Khet Parung Nallah to Chido moring at Jami Vill 1 6.00 9 3 15.00
ko Pani
46 Paying MOA&FW Har Khet Sibah nallah to sapu moring at Baring 1 2.00 3 1 5.00 ASM
ko Pani
47 Paying MOA&FW Har Khet Paktung soko at Tajering Vill 1 5.00 2 3 12.50
ko Pani
48 Paying MOA&FW Har Khet Bokba siko to Ringchi moring at Dagam 1 2.00 2 3 5.00
ko Pani
49 Paying MOA&FW Har Khet Sirit siko Namching moring at Dagam vill 1 2.00 2 3 5.00
ko Pani
50 Paying MOA&FW Har Khet Bate nallah at Tarba 1 5.00 3 3 12.50 ASM
ko Pani
51 Paying MOA&FW Har Khet Rua nallah to Rua moring at Lingri 1 2.00 2 3 5.00
ko Pani
52 Paying MOA&FW Har Khet Ribia nallah to Eden moring at Lingri 1 2.00 2 3 5.00
ko Pani
53 Paying MOA&FW Har Khet Raring nallah to raring Moring at Doloripu 1 2.00 5 3 5.00
ko Pani
54 Paying MOA&FW Har Khet Mibia siko to Deba moring 1 2.00 4 2 5.00
ko Pani
55 Paying MOA&FW Har Khet Sorki nallah to Rukpu lingne at Bibe Riamuk vill 1 4.00 4 2 10.00 ASM
ko Pani
56 Paying MOA&FW Har Khet Kagar sikio to pinchi lingruk at Kagar maling 1 4.00 3 3 10.00
ko Pani
57 Paying MOA&FW Har Khet Sirit Koro to payir moring at Dagam 1 3.00 2 3 7.50
ko Pani

683 | P a g e
58 Paying MOA&FW Har Khet Toku nallah to Rering moring at Paktung 1 3.00 3 3 7.50
ko Pani
59 Paying MOA&FW Har Khet Siri nallah to siri rijo at Esso Vill 1 7.00 9 3 17.50
ko Pani
60 Paying MOA&FW Har Khet Keda nallah to ringte -lingyo-ne at Esso vill 1 5.00 2 3 12.50
ko Pani
61 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning 1 3.00 2 2 7.50
ko Pani
62 Paying MOA&FW Har Khet Siri Nallah to Siri Jobe at Giri Esso vill. 1 3.00 2 2 7.50
ko Pani
63 Paying MOA&FW Har Khet Kagar Nala to tokpak moring at Pakpu maling 1 3.00 3 3 7.50
ko Pani
64 Paying MOA&FW Har Khet Oching nallah to kamrung at Ginglo 1 3.00 4 3 7.50 ASM
ko Pani
65 Paying MOA&FW Har Khet Pakne-pin Nallah to Tachila at Kamsar Vill 1 4.00 4 3 10.00
ko Pani
66 Paying MOA&FW Har Khet Keda nallah to siku harrya at Esso vill 1 4.00 2 3 10.00
ko Pani
67 Paying MOA&FW Har Khet Ribia Nallah to Eden Moring 1 3.00 2 3 7.50
ko Pani
68 Paying MOA&FW Har Khet Mibia siko to lower Gyapin moring 1 3.00 2 3 7.50
ko Pani
69 Paying MOA&FW Har Khet Kocho nalah to Kocho jobe at Haning 1 5.00 1 3 12.50
ko Pani
70 Paying MOA&FW Har Khet Tungku nallah to Chukring moring at Haning 1 5.00 1 3 12.50
ko Pani
71 Paying MOA&FW Har Khet Water Harvesting pound to Hering at Ramsing 1 5.00 1 3 12.50
ko Pani
72 Paying MOA&FW Har Khet Seka soko to karing Jobe at Lingri 1 5.00 2 3 12.50
ko Pani
73 Paying MOA&FW Har Khet Mape Siku to Joki Moring at Jaring 1 5.00 2 3 12.50
ko Pani
74 Paying MOA&FW Har Khet Ngochisi nallah to Tamarmoring at Jaring 1 5.00 2 3 12.50
ko Pani

684 | P a g e
75 Paying MOA&FW Har Khet Jening Nallah under Ngaba vill 1 2.00 5 3 5.00
ko Pani
76 Paying MOA&FW Har Khet Bokpin nallah to Bokpin jobe at Lingri vill 1 2.00 2 3 5.00
ko Pani
77 Paying MOA&FW Har Khet Sicharing Nallah to Singjoring at Tarba 1 14.00 5 3 35.00
ko Pani
78 Paying MOA&FW Har Khet Shahtoda to Keyilindi pengge at jaring 1 5.00 3 3 12.50
ko Pani
79 Paying MOA&FW Har Khet Ragi nallah to Bodomko at Badam puring 1 3.00 2 3 7.50
ko Pani
80 Paying MOA&FW Har Khet Talikseku to Singkapombetimba ay jaring 1 5.00 3 3 12.50
ko Pani
81 Paying MOA&FW Har Khet Dsob nallah to Pakring moring at Kamlo 1 3.00 4 3 7.50
ko Pani
82 Paying MOA&FW Har Khet Tempin nallah to Roring jobe at Paktung 1 2.00 2 3 5.00
ko Pani
83 Paying MOA&FW Har Khet Eding Nallah to Ewding moring at Kamlo 1 2.00 2 3 5.00
ko Pani
84 Paying MOA&FW Har Khet Doh nallah to Doh jobe at Kamlo 1 4.00 2 3 10.00
ko Pani
85 Paying MOA&FW Har Khet Rete nallah to Haging moring at Baring 1 3.00 3 1 7.50
ko Pani
86 Paying MOA&FW Har Khet Martak nallah to Lingream at Bibe Riamuk vill 1 5.00 2 3 12.50
ko Pani
87 Paying MOA&FW Har Khet Babak nallah to Ambung moring at Nyompu 1 4.00 1 3 10.00
ko Pani
88 Paying MOA&FW Har Khet Gambung Siritseko to Gambung Pachung at jaring 1 5.00 6 3 12.50
ko Pani
89 Paying MOA&FW Har Khet How nallah at Aching moring 1 4.00 3 2 10.00
ko Pani
90 Paying MOA&FW Har Khet Sirit Nalah to Chingku at Kaji 1 3.00 2 3 7.50 ASM
ko Pani
91 Paying MOA&FW Har Khet Sili nallah to Linge moring at Jami 1 6.00 5 3 15.00
ko Pani

685 | P a g e
92 Paying MOA&FW Har Khet Sili Nallah at Jami Vill 1 4.00 2 3 10.00
ko Pani
93 Paying MOA&FW Har Khet Jatemoring to Sili Nallah at Jami 1 3.00 2 3 7.50
ko Pani
94 Paying MOA&FW Har Khet Mutung puring river to jarjo 1 5.00 2 3 12.50
ko Pani
95 Paying MOA&FW Har Khet Haye nallah to Ringe at Lingri Vill 1 2.00 2 3 5.00
ko Pani
96 Paying MOA&FW Har Khet Degiam to Takong at Kamra 1 3.00 2 3 7.50
ko Pani
97 Paying MOA&FW Har Khet Sorong to Domring at Kamra 1 2.00 2 3 5.00
ko Pani
98 Paying MOA&FW Har Khet Oje Nallah to Nam changba at Kamra 1 2.00 2 3 5.00
ko Pani
99 Paying MOA&FW Har Khet Punchi nallah to Tunuha at Kamra 1 3.00 3 3 7.50
ko Pani
100 Paying MOA&FW Har Khet Sirong to Namching at Kamra. 1 2.00 4 3 5.00
ko Pani
101 Paying MOA&FW Har Khet Jorung seko to Pariyorlo rato tobe at jaring 1 5.00 3 3 12.50
ko Pani
102 Paying MOA&FW Har Khet Amria jobe to Kaku naila at Kamlo 1 3.00 2 3 7.50
ko Pani
103 Paying MOA&FW Har Khet Runing moring to pimpu lalla at Kamlo vill 1 2.00 2 3 5.00
ko Pani
104 Paying MOA&FW Har Khet Toku nallah to Tanam riktam at Tajering 1 5.00 2 3 12.50
ko Pani
105 Paying MOA&FW Har Khet Mopi nallah to Kudam Kakra at Tajering 1 5.00 2 3 12.50
ko Pani
106 Paying MOA&FW Har Khet Sob nallah to pakming moring at Kamlo 1 3.00 2 3 7.50
ko Pani
107 Paying MOA&FW Har Khet Luring nallah to Luring jobe at Kamlo 1 3.00 2 3 7.50
ko Pani
108 Paying MOA&FW Har Khet Bidak nallah to saki lamte at Ginglo 1 3.00 4 3 7.50
ko Pani

686 | P a g e
109 Paying MOA&FW Har Khet Siluk Nalah to Kaji 1 4.00 5 3 10.00
ko Pani
110 Paying MOA&FW Har Khet Leo Nalah to Yangampu at Kaji 1 4.00 3 3 10.00
ko Pani
111 Paying MOA&FW Har Khet Ranik Nalah to Modom at Kaji 1 3.00 2 3 7.50
ko Pani
112 Paying MOA&FW Har Khet Yalang Nallah to Bomdom at Kaji 1 3.00 2 3 7.50
ko Pani
113 Paying MOA&FW Har Khet Pomi nalah to Takam Namching at Kaji 1 3.00 1 3 7.50
ko Pani
114 Paying MOA&FW Har Khet Sampu moring to homi at Baring vill 1 3.00 3 3 7.50
ko Pani
115 Paying MOA&FW Har Khet Sikiak siko to Bipu moring at Dagam 1 3.00 2 3 7.50
ko Pani
116 Paying MOA&FW Har Khet Richi siko to Gyapin moring at Dagam 1 2.00 2 3 5.00
ko Pani
117 Paying MOA&FW Har Khet Mibia siko to Deba moring at Dagam 1 3.00 2 3 7.50
ko Pani
118 Paying MOA&FW Har Khet Sesi to dego at Kamda 1 4.00 2 2 10.00
ko Pani
119 Paying MOA&FW Har Khet Gewnhring nallah to Tage moring at Lingri 1 2.00 2 3 5.00 ASM
ko Pani
120 Paying MOA&FW Har Khet Rekpuseko to Rakda yorbe at Jaring 1 5.00 2 3 12.50
ko Pani
121 Paying MOA&FW Har Khet Kadin Siko to Deba Moring 1 2.00 5 3 5.00
ko Pani
122 Paying MOA&FW Har Khet Giri nallah to giri esso at Esso vIll 1 6.00 9 3 15.00
ko Pani
123 Paying MOA&FW Har Khet Sinbha nallah to Sumbuko moring at Lingri 1 2.00 2 3 5.00
ko Pani
124 Paying MOA&FW Har Khet Beku nallah to Martak moring at Lingri 1 2.00 2 3 5.00
ko Pani
125 Paying MOA&FW Har Khet Yowo nallah to hoding at Ramsing 1 2.00 3 1 5.00
ko Pani

687 | P a g e
126 Paying MOA&FW Har Khet Yo siko to hering moring at Ramsing 1 3.00 2 1 7.50
ko Pani
127 Paying MOA&FW Har Khet Hodin koro to palaring at ramsing 1 2.00 3 1 5.00
ko Pani
128 Paying MOA&FW Har Khet Jaying moring to sop nallah at Kamlo 1 3.00 2 3 7.50
ko Pani
129 Paying MOA&FW Har Khet Lingpa nallah to Blingpa jobe at Lingri 1 1.00 3 3 2.50
ko Pani
130 Paying MOA&FW Har Khet Tingchi nallah to Tingchi moring at Lingri 1 2.00 2 3 5.00
ko Pani
131 Paying MOA&FW Har Khet Singking nallah to singking jobe at Lingri 1 2.00 3 3 5.00
ko Pani
132 Paying MOA&FW Har Khet Siring nallah to Kaba jobe at Lingri 1 2.00 2 3 5.00
ko Pani
133 Paying MOA&FW Har Khet Bema kura to Reging moring at Madardui 1 4.00 3 3 10.00
ko Pani
134 Paying MOA&FW Har Khet Sikuniming nallah to klaring rango at Maling 1 3.00 3 3 7.50
ko Pani
135 Paying MOA&FW Har Khet Chingkeng nallah to Single jobe at Lingri 1 2.00 3 3 5.00
ko Pani
136 Paying MOA&FW Har Khet Ridi nallah to Pitak jobe at Lingri 1 2.00 2 3 5.00 ASM
ko Pani
137 Paying MOA&FW Har Khet Adiu moring to idin olaala at kamlo 1 3.00 2 3 7.50
ko Pani
138 Paying MOA&FW Har Khet Kabak sekio to kabak jobe at Moying Moring 1 4.00 2 3 10.00 ASM
ko Pani
139 Paying MOA&FW Har Khet Ome nallah to Koto moring at Kamra 1 3.00 3 3 7.50
ko Pani
140 Paying MOA&FW Har Khet Yenpine to Degiam at Kamra 1 2.00 3 3 5.00
ko Pani
141 Paying MOA&FW Har Khet Lomnringhoching nallah to Make Jobe at Jaring 1 5.00 2 3 12.50
ko Pani
142 Paying MOA&FW Har Khet Klering Nallah to Bode Moring at Jaring 1 5.00 2 3 12.50
ko Pani

688 | P a g e
143 Paying MOA&FW Har Khet Paramsiko to Tapung Yorbe at jaring 1 5.00 2 3 12.50
ko Pani
144 Paying MOA&FW Har Khet Hopen pering to Gertepacham at jaring 1 5.00 2 3 12.50 GPC
ko Pani
145 Paying MOA&FW Har Khet Geye nallah to lingbya at Esso 1 3.00 2 3 7.50
ko Pani
146 Paying MOA&FW Har Khet Bodung nallah to Kingnuk at Tarba 1 5.00 2 3 12.50
ko Pani
147 Paying MOA&FW Har Khet Kambe nala to latak moring at Nyompu 1 8.00 9 3 20.00
ko Pani
148 Paying MOA&FW Har Khet Sira nalah to tai riktak at Nyompu 1 3.00 2 3 7.50
ko Pani
149 Paying MOA&FW Har Khet Lingsak nallah to Hanging jobe at Lingri 1 2.00 2 3 5.00
ko Pani
150 Paying MOA&FW Har Khet Taku siring nallah to Taku siring moring at Lingri 1 2.00 2 3 5.00
ko Pani
151 Paying MOA&FW Har Khet Ribu nallah to Lingnia moring at Lingri 1 2.00 4 3 5.00
ko Pani
152 Paying MOA&FW Har Khet Sika-sikio to tapu rijo at Lingri 1 2.00 4 3 5.00
ko Pani
153 Paying MOA&FW Har Khet Haye nallah to Haye moring at Lingri 1 1.00 4 3 2.50
ko Pani
154 Paying MOA&FW Har Khet Hapsing nallah to Hapsing moring at Lingri 1 1.00 5 3 2.50
ko Pani
155 Paying MOA&FW Har Khet sika sikio to karing jobe at lingri 1 2.00 2 3.00 5.00
ko Pani
156 Paying MOA&FW Har Khet Silu river to Loguring A/field 1 3.00 2 3.00 7.50
ko Pani
157 Paying MOA&FW Har Khet Dongchi nallah to Bilang rikga moring at Lable. 1 15.00 8 3 37.50
ko Pani
158 Paying MOA&FW Har Khet Kioki Nallah to Lable moring at Lable. 1 15.00 8 3 37.50
ko Pani
159 Paying MOA&FW Har Khet Kadin siko to lable maring at Lable 1 5.00 5 3 12.50
ko Pani

689 | P a g e
160 Paying MOA&FW Har Khet Sichi nallah to chc moring at Lable 1 3.00 3 1 7.50
ko Pani
161 Paying MOA&FW Har Khet Siku to to mebia jobe at Paktung 1 2.00 3 3 5.00
ko Pani
162 Paying MOA&FW Har Khet Kabak sekio to kabak jobe at Moying Moring 1 4.00 2 3 10.00 ASM
ko Pani
163 Paying MOA&FW Har Khet Peri nanikoro to Bate at Ramsing 1 3.00 1 1 7.50
ko Pani
164 Paying MOA&FW Har Khet Daching Koro to Rekpu at Ramsing 1 2.00 2 1 5.00
ko Pani
165 Paying MOA&FW Har Khet Yago koro to Yojorijo at Ramsing 1 2.00 3 1 5.00
ko Pani
166 Paying MOA&FW Har Khet Sichak Seko to Yappi rijo at Tarba village 1 3.00 2 3 7.50 ASM
ko Pani
167 Paying MOA&FW Har Khet Kambe/Taroku nallah at Lapak at Nimpu 1 5.00 2 3 12.50 ASM
ko Pani
168 Paying MOA&FW Har Khet Nichi Nio to liya at Liya Ngunu 1 2.00 2 3 5.00
ko Pani
169 Paying MOA&FW Har Khet Giri nallah to ringte moring at Esso 1 3.00 2 2 7.50
ko Pani
170 Paying MOA&FW Har Khet Sichak nallah to Mokum Rango at Maling 1 3.00 3 3 7.50
ko Pani
171 Paying MOA&FW Har Khet Jote nallah to Lopata moring at Nyompu 1 5.00 2 3 12.50
ko Pani
172 Paying MOA&FW Har Khet Kingumpu to Rakmi jobe at Pakba 1 5.00 3 3 12.50
ko Pani
173 Paying MOA&FW Har Khet Tongin nallah to Bikar at Paktung 1 2.00 3 3 5.00
ko Pani
174 Paying MOA&FW Har Khet Beku Osing nallah to Beku jobe at Lingri 1 1.00 2 3 2.50
ko Pani
175 Paying MOA&FW Har Khet Ribia sikio nallah to ribia moring at Lingri 1 2.00 2 3 5.00
ko Pani
176 Paying MOA&FW Har Khet sippik nallah to rapu moring at pillung moring 1 4.00 1 3 10.00
ko Pani

690 | P a g e
177 Paying MOA&FW Har Khet Pirik Sikoi to Leba moring at pillung Malimng 1 3.00 1 3 7.50
ko Pani
178 Paying MOA&FW Har Khet Bima nallah to Paye jobe at Nyompu 1 7.00 9 3 17.50
ko Pani
179 Paying MOA&FW Har Khet Chido nallah to chido moring at paktung 1 3.00 2 3 7.50
ko Pani
180 Paying MOA&FW Har Khet Paring nallah to chido at Paktung 1 4.00 2 3 10.00 MLA
ko Pani
181 Paying MOA&FW Har Khet Sira nallah to mengio at Paktung 1 3.00 3 2 7.50 ASM
ko Pani
182 Paying MOA&FW Har Khet Bimaku Nallah to Sirung moring at Nyompu 1 8.00 6 3 20.00 ASM
ko Pani
183 Paying MOA&FW Har Khet Nyumpu Nallah, Nyumpu 1 5.00 2 2 12.50 ASM
ko Pani
184 Paying MOA&FW Har Khet Eyo nallah to dering moring at Nyumpu 1 2.00 3 2 5.00 MLA
ko Pani
185 Paying MOA&FW Har Khet Jote nallah to sadam moring at Nyumpu 1 2.00 3 2 5.00
ko Pani
186 Paying MOA&FW Har Khet Sara nallah to yara at Nyumpu 1 2.00 3 2 5.00
ko Pani
187 Paying MOA&FW Har Khet Bate nallah to Bami moring at pillung Maling 1 4.00 3 3 10.00
ko Pani
188 Paying MOA&FW Har Khet Tabom nallah to Apopo moring at pillung Maling 1 3.00 2 3 7.50
ko Pani
189 Paying MOA&FW Har Khet Sira Nallah to Raring jobe at Nyompu vill 1 5.00 3 3 12.50
ko Pani
190 Paying MOA&FW Har Khet Ayo nalah to Diring moring at Nyompu vill 1 10.00 8 3 25.00
ko Pani
191 Paying MOA&FW Har Khet Namin nallah to Pakring at Nyompu vill 1 6.00 2 3 15.00 MLA
ko Pani
192 Paying MOA&FW Har Khet Sirung nallah to Ringi moring at Nyompu vill 1 5.00 1 3 12.50
ko Pani
193 Paying MOA&FW Har Khet Sika to Takung at Kamra vill 1 2.00 2 3 5.00
ko Pani

691 | P a g e
194 Paying MOA&FW Har Khet Ote to Puring at Karma vill 1 2.00 2 3 5.00
ko Pani
195 Paying MOA&FW Har Khet Noh koro to kaung at Tabomna 1 3.00 2 3 7.50
ko Pani
196 Paying MOA&FW Har Khet Nungnu Nallah Nungnu 1 2.00 2 3 5.00
ko Pani
197 Paying MOA&FW Har Khet Siocghing to Yarte at Ngugnu 1 2.00 2 3 5.00
ko Pani
198 Paying MOA&FW Har Khet Pali to Degiam at Ngugnu 1 2.00 2 3 5.00
ko Pani
199 Paying MOA&FW Har Khet Dabongdarong to Lingjaring at Ngugnu 1 2.00 2 3 5.00
ko Pani
200 Paying MOA&FW Har Khet Amrah to sacku yord at Ngugnu 1 2.00 2 3 5.00
ko Pani
201 Paying MOA&FW Har Khet Hote to Dadung at Ngugnu 1 2.00 2 3 5.00
ko Pani
202 Paying MOA&FW Har Khet Lingpa to Tochiyo at Ngugnu 1 3.00 6 3 7.50
ko Pani
203 Paying MOA&FW Har Khet Kadin nallah to Lipa moring at Chingku Dagam vill 1 3.00 4 3 7.50
ko Pani
204 Paying MOA&FW Har Khet Salung nallah to hoparijo at Nungnu Vill 1 3.00 7.50
ko Pani
205 Paying MOA&FW Har Khet Hoching Nallah to Nirinejobe at Pakba Vill 1 3.00 7.50
ko Pani
206 Paying MOA&FW Har Khet Sirit Siko to West Namching Moring 1 5.00 2 3 12.50
ko Pani
207 Paying MOA&FW Har Khet Paking nallah to bapiring at Paktung 1 3.00 3 2 7.50 ASM
ko Pani
208 Paying MOA&FW Har Khet Bimpak nallah to bimpak moring at jaring 1 5.00 2 3 12.50
ko Pani
209 Paying MOA&FW Har Khet Reku to Reru jobe at Pakba 1 4.00 3 3 10.00
ko Pani
210 Paying MOA&FW Har Khet Karbom ro karbo mn karlum nallah at Pakba 1 10.00 5 3 25.00
ko Pani

692 | P a g e
211 Paying MOA&FW Har Khet Rariw Agril field at Bomdom village 1 5.00 2 3 12.50
ko Pani
212 Paying MOA&FW Har Khet wall at Silog joreng Bomdom 1 5.00 2 3 12.50
ko Pani
213 Paying MOA&FW Har Khet Oching nallah to lingring moring at Kagar 1 3.00 7.50
ko Pani
214 Paying MOA&FW Har Khet Hamring moring at Arma vill 1 5.00 1 3 12.50
ko Pani
215 Paying MOA&FW Har Khet Yoo siko to panama Moring at Ramsing 1 3.00 2 1 7.50 ASM
ko Pani
216 Paying MOA&FW Har Khet Yoh siko to tali moring at Ramsing 1 3.00 2 1 7.50 ASM
ko Pani
217 Paying MOA&FW Har Khet Paking nallah to bikar at Paktung vill 1 4.00 3 2 10.00 ASM
ko Pani
218 Paying MOA&FW Har Khet Sirung nallah to Apopo moring at pillung maling vill 1 3.00 3 3 7.50
ko Pani
219 Paying MOA&FW Har Khet Bate Nallah to koje jobe at Pillung Maling 1 3.00 3 3 7.50
ko Pani
220 Paying MOA&FW Har Khet Moriseku to Chingku Timbariatak at jaring 1 5.00 3 3 12.50
ko Pani
221 Paying MOA&FW Har Khet Bimpak nallah to bimpak moring at jaring 1 4.00 3 3 10.00
ko Pani
222 Paying MOA&FW Har Khet Sirit nallah to siluk jobe at jaring 1 3.00 3 3 7.50
ko Pani
223 Paying MOA&FW Har Khet Tarak nallah to Dimon jobe at Paktung 1 4.00 3 3 10.00
ko Pani
224 Paying MOA&FW Har Khet Siko nallah to Lower Mibering at Paktung 1 3.00 3 3 7.50
ko Pani
225 Paying MOA&FW Har Khet Sera nallah to Sedumko at paktung 1 3.00 3 3 7.50
ko Pani
226 Paying MOA&FW Har Khet Tongpin nallah to Paktung 1 3.00 3 3 7.50
ko Pani
227 Paying MOA&FW Har Khet Paktung anllah to Bikarjobe at Paktung 1 4.00 3 3 10.00
ko Pani

693 | P a g e
228 Paying MOA&FW Har Khet Siko sigo nallah to Lower mebiaring at Paktung 1 2.00 3 3 5.00
ko Pani
229 Paying MOA&FW Har Khet Sikit koro to giadap sukunium at pakpu maling 1 2.00 1 3 5.00
ko Pani
230 Paying MOA&FW Har Khet Taipu koro to linggo lingne mori at pakpu maling 1 2.00 1 3 5.00
ko Pani
231 Paying MOA&FW Har Khet Sillu nallah to mokam moring at Pakpu maling 1 2.00 5.00
ko Pani
232 Paying MOA&FW Har Khet Rio Nallah to Togu moring at Pakpu Maling 1 2.00 3 3 5.00
ko Pani
233 Paying MOA&FW Har Khet Sika sikio nallah to Ringhi Rinhka at Pakpu Maling 1 2.00 3 3 5.00
ko Pani
234 Paying MOA&FW Har Khet Sirit nallah to Daro chita at Pakpu Maling 1 2.00 2 3 5.00
ko Pani
235 Paying MOA&FW Har Khet Taipu Nallah to Rinknya ringo at pakpu maling 1 2.00 2 3 5.00
ko Pani
236 Paying MOA&FW Har Khet Talamha seko to Yelutak-ringo at Pakpu Maling 1 2.00 2 3 5.00
ko Pani
237 Paying MOA&FW Har Khet Bokdu Koro to Yo Joring at Ramsing 1 2.00 2 1 5.00
ko Pani
238 Paying MOA&FW Har Khet Taipu nallah to Singkintam at pakpu maling 1 2.00 2 3 5.00
ko Pani
239 Paying MOA&FW Har Khet Silu sikio nallah to yormi ringo at Pakpu maling 1 2.00 2 3 5.00
ko Pani
240 Paying MOA&FW Har Khet Kapor Nallah to Pakpu Maling village 1 2.00 2 3 5.00
ko Pani
241 Paying MOA&FW Har Khet Silu siko nallah to Talomha rongo at Pakpu maling 1 2.00 3 3 5.00
ko Pani
242 Paying MOA&FW Har Khet Silu siko nallah to Yerja Lungpu Ringo at Pakpu maling 1 2.00 3 3 5.00
ko Pani
243 Paying MOA&FW Har Khet sikit nallah to doro chit at Pakpu maling 1 3.00 7.50
ko Pani
244 Paying MOA&FW Har Khet Silu siko nallah to yormi rango at Pakpu maling 1 3.00 2 2 7.50
ko Pani

694 | P a g e
245 Paying MOA&FW Har Khet Gyiba sikyo to Sala rega at pakpu maling 1 2.00 3 3 5.00
ko Pani
246 Paying MOA&FW Har Khet Silu siko nallah to Doching Tering Ringo at Pakpu maling 1 1.00 3 3 2.50
ko Pani
247 Paying MOA&FW Har Khet Sepung Nallah Sepung vill 1 2.00 4 2 5.00
ko Pani
248 Paying MOA&FW Har Khet Sikit nallah to Luduwa moring at Pakpu malling 1 1.00 3 3 2.50
ko Pani
249 Paying MOA&FW Har Khet Sipik nallah to Tame Moring at pillung Maling 1 2.00 4 2 5.00
ko Pani
250 Paying MOA&FW Har Khet Sichi kobung nallah to gobia at Paying 1 3.00 3 2 7.50 ASM
ko Pani
251 Paying MOA&FW Har Khet Ote nallah to tungpa rupu at Paying 1 3.00 3 2 7.50 ASM
ko Pani
252 Paying MOA&FW Har Khet Honing sikio to jarjo moring at raimuk 1 3.00 2 3 7.50
ko Pani
253 Paying MOA&FW Har Khet Ringsing nallah to Narbom at Jorjo Raimuk 1 5.00 1 3 12.50
ko Pani
254 Paying MOA&FW Har Khet Ching moring at Raimuk 1 3.00 2 2 7.50
ko Pani
255 Paying MOA&FW Har Khet Narak nallah to Bungkung moring at pillung Maling 1 4.00 2 3 10.00
ko Pani
256 Paying MOA&FW Har Khet Niakne -pin to sene nallah at Tachiring 1 5.00 2 2 12.50
ko Pani
257 Paying MOA&FW Har Khet Aerung seku to Tadiktalu pacham 1 5.00 2 3 12.50
ko Pani
258 Paying MOA&FW Har Khet Bate nallah at Pillung maling 1 3.00 3 3 7.50 ASM
ko Pani
259 Paying MOA&FW Har Khet Tobom sikio to tabom sibia at pillung maling 1 3.00 3 3 7.50 GPM
ko Pani
260 Paying MOA&FW Har Khet Gaya Nallah to Ringte Moring at Esso 1 3.00 2 2 7.50
ko Pani
261 Paying MOA&FW Har Khet Sipung Nallah To Sichi Jobe At Haching moring 1 2.00 4 2 5.00
ko Pani

695 | P a g e
262 Paying MOA&FW Har Khet Sipung Nallah To Habia Jobe Haching Moring 1 2.00 4 2 5.00
ko Pani
263 Paying MOA&FW Har Khet Yoo Siko to Panama Moring 1 5.00 2 3 12.50
ko Pani
264 Paying MOA&FW Har Khet Sorki nallah to Ddabang darunk at Lingruk Raimuk 1 3.00 2 3 7.50
ko Pani
265 Paying MOA&FW Har Khet Sorki to sebia moring at Lingruk Raimuk 1 3.00 3 1 7.50
ko Pani
266 Paying MOA&FW Har Khet Sorkinia nallah to Haba at Jorjo Raimuk 1 4.00 2 3 10.00
ko Pani
267 Paying MOA&FW Har Khet Sorchi nallah to jarjo riamuk rijo at Riamuk 1 4.00 10.00
ko Pani
268 Paying MOA&FW Har Khet Sibne Nallah to Haba at Jorjo Raimuk 1 5.00 2 3 12.50
ko Pani
269 Paying MOA&FW Har Khet Tabom sibia to Lingpa Lobia at Jorjo raimuk 1 4.00 2 3 10.00
ko Pani
270 Paying MOA&FW Har Khet Mutung puring to jorjo raimuk 1 3.00 2 3 7.50
ko Pani
271 Paying MOA&FW Har Khet Lingpakoro to Bapdin at Ramsing 1 2.00 1 1 5.00
ko Pani
272 Paying MOA&FW Har Khet Bachi Koro to Rakur at Ramsing 1 2.00 4 1 5.00
ko Pani
273 Paying MOA&FW Har Khet Yoh Nallah Ramching 1 2.00 3 2 5.00
ko Pani
274 Paying MOA&FW Har Khet Yoyo Koro to Hering at Ramsing 1 2.00 3 1 5.00
ko Pani
275 Paying MOA&FW Har Khet Sikuniming Nallah To Klaring At Maling 1 2.00 2 2 5.00
ko Pani
276 Paying MOA&FW Har Khet Sichak Nallah To Mokum Rengo At Maling 1 2.00 2 2 5.00
ko Pani
277 Paying MOA&FW Har Khet Pakba Suku To Surung At Pakba 1 2.00 2 2 5.00
ko Pani
278 Paying MOA&FW Har Khet Niakne Pin Sokio Nallah To Hadring Moring At 1 2.00 2 2 5.00
ko Pani Tachiring

696 | P a g e
279 Paying MOA&FW Har Khet Suku sokio Nallah To Ringte Moring At Tachiring 1 2.00 2 2 5.00
ko Pani
280 Paying MOA&FW Har Khet Water collection pound to litona yorbe at Ramsing 1 1.00 2 1 2.50
ko Pani
281 Paying MOA&FW Har Khet Yagio koro to lingpa at Ramsing 1 2.00 2 1 5.00
ko Pani
282 Paying MOA&FW Har Khet Siluk Nallah To Bimpik(left side) At Tarba 1 1.50 3 1 3.75
ko Pani
283 Paying MOA&FW Har Khet Yo Koro to Patom Jobe at Ramsing village 1 2.00 2 1 5.00
ko Pani
284 Paying MOA&FW Har Khet Nirinew to Ringte at Ngugnu 1 2.00 2 3 5.00
ko Pani
285 Paying MOA&FW Har Khet Sorong to Gering at Ngugnu 1 2.00 2 3 5.00
ko Pani
286 Paying MOA&FW Har Khet Soring to Yapu moring at Ngugnu 1 2.00 2 3 5.00
ko Pani
287 Paying MOA&FW Har Khet Sorong to Degiam at Ngugnu 1 1.00 2 3 2.50
ko Pani
288 Paying MOA&FW Har Khet Kabong to Degiam at Ngugnu 1 1.00 2 3 2.50
ko Pani
289 Paying MOA&FW Har Khet Hodinso koro to Seki at Ramsing 1 2.00 3 1 5.00
ko Pani
290 Paying MOA&FW Har Khet Reping moring at Arma 1 3.00 2 3 7.50
ko Pani
291 Paying MOA&FW Har Khet Sepa moring at Arma 1 3.00 2 3 7.50
ko Pani
292 Paying MOA&FW Har Khet Hakar moring at Arma. 1 4.00 2 3 10.00
ko Pani
293 Paying MOA&FW Har Khet Siching nallah to Repina Moring at Arma 1 6.00 4 3 15.00
ko Pani
294 Paying MOA&FW Har Khet Sinbha Nalah to Sombuko Moring 1 4.00 2 3 10.00
ko Pani
295 Paying MOA&FW Har Khet Punchi nallah to sipung at Sepung 1 10.00 2 3 25.00
ko Pani

697 | P a g e
296 Paying MOA&FW Har Khet Yoo Siko to Tali Moring 1 2.00 2 3 5.00
ko Pani
297 Paying MOA&FW Har Khet Toku nallah to tanam rintak at jering 1 4.00 3 3 10.00
ko Pani
298 Paying MOA&FW Har Khet Lingye nallah to kodom at jaring 1 2.00 3 3 5.00
ko Pani
299 Paying MOA&FW Har Khet Silu Nallah To Mokum Moring At Pakpu Maling 1 2.00 2 2 5.00
ko Pani
300 Paying MOA&FW Har Khet Siku Nimum Nallah To Kalaring At Pakpu Maling 1 2.00 2 2 5.00
ko Pani
301 Paying MOA&FW Har Khet Silu Nallah To Liguring At Pakpu Maling 1 2.00 2 2 5.00
ko Pani
302 Paying MOA&FW Har Khet Selu Nallah To Pakpu Rengo At Pakpu Maling 1 2.00 2 2 5.00
ko Pani
303 Paying MOA&FW Har Khet Lingye nallah to dimi at jaring 1 3.00 3 3 7.50
ko Pani
304 Paying MOA&FW Har Khet Lingga Koro to Killing tode at jaring 1 5.00 3 3 12.50
ko Pani
305 Paying MOA&FW Har Khet Siluk Nallah To Bimpik At Tarba 1 1.50 3 1 3.75
ko Pani
306 Paying MOA&FW Har Khet Bate Nallah To Bimak At Tarba 1 1.50 3 1 3.75
ko Pani
307 Paying MOA&FW Har Khet Bongring Nallah To Siluk Joring At Tarba 1 1.50 3 1 3.75
ko Pani
308 Paying MOA&FW Har Khet Kadin siko to Deba moring at Dagam 1 2.00 4 3 5.00 ASM
ko Pani
309 Paying MOA&FW Har Khet Masar Nallah to Ayu Arung at Pakba village 1 4.00 8 1 10.00
ko Pani

NEW SCHEMES

698 | P a g e
Sl. Name Concerned Componen Activity Total Command Catchmen Period of Estimate Remarks/
No. of the Ministry/ t (C/o. MIP from ……….) Numbe Area/Irrigatio t Area Implementatio d cost Recommended by
District Departmen r n (in Ha) (Sq.Km.) n (Rs. in
/ t lakh)
Blocks
1 GIBA Har Khet MOA&FW Oto koro to Jorung rijo at Jarjori 1 5.00 9.00 2 12.50 MLA
ko Pani
2 GIBA Har Khet MOA&FW Yagik koro to Pudarijo at Liriak 1 3.00 8.00 1 7.50 -do-
ko Pani
3 GIBA Har Khet MOA&FW Minta koro to Cheterijo at Dumpin 1 4.00 12.00 1 10.00 -do-
ko Pani
4 GIBA Har Khet MOA&FW Jelang nallah to Kamrung rejo at Jari 1 3.00 5.00 2 7.50 -do-
ko Pani
5 GIBA Har Khet MOA&FW Riau koro to Radisiri Gaperijo at Leya 1 6.00 9.00 2 15.00 -do-
ko Pani
6 GIBA Har Khet MOA&FW Tiklikoro to Muririjo at Muri Dignium 1 4.00 7.00 1 10.00 -do-
ko Pani
7 GIBA Har Khet MOA&FW Gigne Koro to Tadarijo at Bate 1 5.00 9.00 2 12.50 -do-
ko Pani
8 GIBA Har Khet MOA&FW Gargik koro to Dallu Singgu at Jitu 1 5.00 11.00 2 12.50 -do-
ko Pani
9 GIBA Har Khet MOA&FW Khaa koro to Tangki rijo at Menga Dignium 1 15.00 12.00 3 37.50 -do-
ko Pani
10 GIBA Har Khet MOA&FW Romi koro to Pingging rijo at Bate 1 5.00 8.00 2 12.50 -do-
ko Pani
11 GIBA Har Khet MOA&FW Takisi koro to Ringmirijo at Jari 1 4.00 7.00 2 10.00 -do-
ko Pani
12 GIBA Har Khet MOA&FW Sigo koro to Puniarijo at Leriak 1 8.00 11.00 2 20.00 -do-
ko Pani
13 GIBA Har Khet MOA&FW Oching Koro to Taririjo at Pigia 1 4.00 8.00 2 10.00 -do-
ko Pani
14 GIBA Har Khet MOA&FW Mokli koro Moklirijo at Leya 1 4.00 10.00 2 10.00 -do-
ko Pani
15 GIBA Har Khet MOA&FW Talikso koro to Nayam (Nyaru) rijo at Leriak 1 5.00 12.00 2 12.50 -do-
ko Pani

699 | P a g e
16 GIBA Har Khet MOA&FW Liru koro to Yorko rijo at Yolu 1 7.00 8.00 2 17.50 -do-
ko Pani
17 GIBA Har Khet MOA&FW Hapin koro to Neporijo at Sogum vill 1 10.00 9.00 3 25.00 -do-
ko Pani
18 GIBA Har Khet MOA&FW Dolo koro to Pekam Chalinrijo at Natam 1 5.00 12.00 2 12.50 -do-
ko Pani
19 GIBA Har Khet MOA&FW Gamgte koro to Dargung rijo at dargung 1 4.00 6.00 1 10.00 -do-
ko Pani
20 GIBA Har Khet MOA&FW Takia leba koro to Muri Yorio at Sorum 1 3.00 5.00 1 7.50 -do-
ko Pani
21 GIBA Har Khet MOA&FW Going Koro to Hatok rijo at Giba 1 3.00 6.00 1 7.50 -do-
ko Pani
22 GIBA Har Khet MOA&FW Jelang Koro to Kamrungrijo at Jari 1 4.00 8.00 1 10.00 -do-
ko Pani
23 GIBA Har Khet MOA&FW Boklin koro to Okhasiri rijo at Jari 1 6.00 8.00 2 15.00 -do-
ko Pani
24 GIBA Har Khet MOA&FW Honikoro to Hamirijo at Peya 1 3.00 7.00 1 7.50 -do-
ko Pani
25 GIBA Har Khet MOA&FW Tunri koro to Sarakpung rijo at Lingdam 1 5.00 8.00 2 12.50 -do-
ko Pani
26 GIBA Har Khet MOA&FW Hami So to Tadarrijo at Piya 1 1.00 12.00 1 2.50 -do-
ko Pani
27 GIBA Har Khet MOA&FW Otte koro to Miiring rijo at Rebi 1 15.00 18.00 2 37.50 -do-
ko Pani
28 GIBA Har Khet MOA&FW Tabu koro to Harak rijo at Sakarpung 1 3.00 14.00 1 7.50 -do-
ko Pani
29 GIBA Har Khet MOA&FW Ote koro to Tikdo Goyar at Rebi 1 6.00 15.00 2 15.00 -do-
ko Pani
30 GIBA Har Khet MOA&FW Beo koro to Bibarijo at Dumpin 1 4.00 7.00 1 10.00 -do-
ko Pani
31 GIBA Har Khet MOA&FW Kijamso to Kiyungrijo at Marging 1 2.00 9.00 2 5.00 -do-
ko Pani
32 GIBA Har Khet MOA&FW Lakbung koro to Darung rijo at Leriak 1 6.00 9.00 2 15.00 -do-
ko Pani

700 | P a g e
33 GIBA Har Khet MOA&FW Hayengsow koro to Hagam rijo at Rebi 1 6.00 12.00 2 15.00 -do-
ko Pani
34 GIBA Har Khet MOA&FW Momisho koro to Darta Paddy field at Sogum 1 3.00 4.00 1 7.50 -do-
ko Pani
35 GIBA Har Khet MOA&FW Koktak sow koro to Jagorkirijo at Jitak 1 3.00 4.00 1 7.50 -do-
ko Pani
36 GIBA Har Khet MOA&FW Sigo koro to Sigo Totokrijo at Leriak 1 3.00 10.00 2 7.50 -do-
ko Pani
37 GIBA Har Khet MOA&FW Boklin koro Jirorijo at Leya 1 7.00 12.00 2 17.50 -do-
ko Pani
38 GIBA Har Khet MOA&FW Amhjor koro to Bilamrijo at Sorum 1 3.00 11.00 2 7.50 -do-
ko Pani
39 GIBA Har Khet MOA&FW Maki koro to Maki rijo at Bate 1 3.00 10.00 1 7.50 -do-
ko Pani
40 GIBA Har Khet MOA&FW Bate Siriu to Egarporing at Lingdam 1 5.00 10.00 2 12.50 -do-
ko Pani
41 GIBA Har Khet MOA&FW Pobe koro to Kamting rijo at Rago 1 4.00 7.00 2 10.00 -do-
ko Pani
42 GIBA Har Khet MOA&FW Rakching Koro to Raksa rijo at New Rava 1 3.00 9.00 1 7.50 -do-
ko Pani
43 GIBA Har Khet MOA&FW Nilak koro to Kiakamrijo at Lungte 1 15.00 7.00 3 37.50 -do-
ko Pani
44 GIBA Har Khet MOA&FW Nyepo koro to Tangke rijo at Dignium 1 6.00 11.00 2 15.00 -do-
ko Pani
45 GIBA Har Khet MOA&FW Bichi koro to Biorijo at Dumpin 1 4.00 10.00 1 10.00 -do-
ko Pani
46 GIBA Har Khet MOA&FW Lingrisow koro to Lamchummoring rijo at 1 5.00 9.00 2 12.50 -do-
ko Pani Luchi
47 GIBA Har Khet MOA&FW Tabiu koro to Takjirijo at Lingdam 1 7.00 12.00 2 17.50 -do-
ko Pani
48 GIBA Har Khet MOA&FW Rachit so koro to Kokcho rijo at Marging 1 3.00 4.00 1 7.50 -do-
ko Pani
49 GIBA Har Khet MOA&FW Todo koro to Dalorijo at Lomigaling Vill 1 3.00 3.00 1 7.50 -do-
ko Pani

701 | P a g e
50 GIBA Har Khet MOA&FW Oching koro to Lomirijo at Jitu vill 1 4.00 5.00 1 10.00 -do-
ko Pani
51 GIBA Har Khet MOA&FW Gongte Nallah to Dargungrijo at Dargung 1 5.00 8.00 2 12.50 ZPC/BDO Giba
ko Pani
52 GIBA Har Khet MOA&FW Haguro koro to Gope rijo at Dignium 1 6.00 9.00 2 15.00 ZPC
ko Pani
53 GIBA Har Khet MOA&FW Bichi koro to Biorijo at Dumpin 1 5.00 11.00 2 12.50 ZPC
ko Pani
54 GIBA Har Khet MOA&FW Oching koro to Lomi rijo at Jitu 1 4.00 6.00 2 10.00 ZPC
ko Pani
55 GIBA Har Khet MOA&FW Radi koro to Harap rijo at Kikik 1 6.00 8.00 2 15.00 ZPC
ko Pani
56 GIBA Har Khet MOA&FW Tungri koro to Sarakpung rijo at Lingdam 1 6.00 11.00 2 15.00 ZPC
ko Pani
57 GIBA Har Khet MOA&FW Otto koro Darungrijo at Leriak 1 15.00 14.00 2 37.50 ZPC/BDO Giba
ko Pani
58 GIBA Har Khet MOA&FW Riau koro to Radisiri Geperijo at Leya 1 12.00 16.00 3 30.00 ZPC
ko Pani
59 GIBA Har Khet MOA&FW Todo koro to Dalo rijo at Lomigaling 1 8.00 9.00 2 20.00 ZPC
ko Pani
60 GIBA Har Khet MOA&FW Sigo koro to Puniya rijo at Leriak. 1 3.00 17.00 5 7.50 ZPC/BDO Giba
ko Pani
61 GIBA Har Khet MOA&FW Nielak soho to Kiakam rijo at Lungte 1 3.00 6.00 2 7.50 ZPC
ko Pani
62 GIBA Har Khet MOA&FW Richitso koro to Kokcho rijo at Marging 1 4.00 9.00 2 10.00 ZPC
ko Pani
63 GIBA Har Khet MOA&FW Yagik Koro to Pudarijo at Leriak 1 5.00 7.00 2 12.50 ZPC
ko Pani
64 GIBA Har Khet MOA&FW Khaa koro to Tangkirijo at Menga Dignium 1 6.00 12.00 2 15.00 ZPC
ko Pani
65 GIBA Har Khet MOA&FW Takialebe koro to Muri Yorio at Sorum 1 5.00 8.00 2 12.50 ZPC
ko Pani
66 GIBA Har Khet MOA&FW Tungri koro to Sengbe rijo at Sherakpung 1 5.00 8.00 2 12.50 ZPC
ko Pani

702 | P a g e
67 GIBA Har Khet MOA&FW Ochi koro to Pakpirijo at Leriak 1 4.00 12.00 2 10.00 ZPC
ko Pani
68 GIBA Har Khet MOA&FW Tabu koro to Harak rijo at Sherakpung 1 5.00 9.00 2 12.50 ZPC
ko Pani
69 GIBA Har Khet MOA&FW Tikli koro to Muririjo at Muri Dignium 1 5.00 7.00 2 12.50 ZPC
ko Pani
70 GIBA Har Khet MOA&FW Hami koro to Tade rijo at Piya 1 5.00 8.00 2 12.50 ZPC
ko Pani
71 GIBA Har Khet MOA&FW Tasar koro to Yorterijo at Rago 1 4.00 8.00 2 10.00 ZPC
ko Pani
72 GIBA Har Khet MOA&FW Hami koro to Hami rijo at Piya 1 6.00 9.00 2 15.00 ZPC
ko Pani
73 GIBA Har Khet MOA&FW Sigo koro to Puniya rijo at Puda Vill 1 6.00 9.00 2 15.00 ZPC
ko Pani
74 GIBA Har Khet MOA&FW Nahara koro to Piya rijo at Rava 1 5.00 8.00 2 12.50 ZPC
ko Pani
75 GIBA Har Khet MOA&FW Ote koro to Ruorijo at Rebi 1 6.00 16.00 2 15.00 ZPC
ko Pani
76 GIBA Har Khet MOA&FW Liru koro to Yorkorijo at Yolu 1 3.00 5.00 1 7.50 ZPC
ko Pani
77 GIBA Har Khet MOA&FW Soki nallah to Tabarijo at Bate 1 2.00 14.00 3 5.00 BDO Giba
ko Pani
78 GIBA Har Khet MOA&FW Ote koro to Mering rijo at Rebi 1 20.00 12.00 2 50.00 ZPC/BDO Giba
ko Pani
79 GIBA Har Khet MOA&FW Bate Nallah to Kodumrijo at Bate 1 4.00 20.00 2 10.00 BDO Giba
ko Pani
80 GIBA Har Khet MOA&FW Gipu nallah to Singmepurijo at Rago 1 5.00 9.00 2 12.50 BDO Giba
ko Pani
81 GIBA Har Khet MOA&FW Sengrung koro to Bamerijo at Dumpin 1 7.00 14.00 2 17.50 BDO Giba
ko Pani
82 GIBA Har Khet MOA&FW Nilum siku to Nilum rijo at Dargung 1 3.00 7.00 1 7.50 BDO Giba
ko Pani
83 GIBA Har Khet MOA&FW Bate nallah to Kadam rijo at Bate 1 1.00 16.00 1 2.50 BDO Giba
ko Pani

703 | P a g e
84 GIBA Har Khet MOA&FW Siso nallah to Si Rango at Bami 1 2.50 10.00 1 6.25 BDO Giba
ko Pani
85 GIBA Har Khet MOA&FW Deri Dera nallah to Otejobe at Dargung 1 6.00 9.00 3 15.00 BDO Giba
ko Pani
86 GIBA Har Khet MOA&FW Biyach koro to Biyach rijo at Bate 1 1.00 14.00 1 2.50 BDO Giba
ko Pani
87 GIBA Har Khet MOA&FW Gichi koro to Tankirijo at Dignium 1 5.00 12.00 2 12.50 BDO Giba
ko Pani
88 GIBA Har Khet MOA&FW Ladung koro to Dungchi rijo at Dumpin 1 8.00 9.00 2 20.00 BDO Giba
ko Pani
89 GIBA Har Khet MOA&FW Bisar koro to Bisar rijo at Bate 1 1.00 10.00 1 2.50 BDO Giba
ko Pani
90 GIBA Har Khet MOA&FW Haging Soh to Chedam Pobe at Jitak 1 7.00 6.00 2 17.50 BDO Giba
ko Pani
91 GIBA Har Khet MOA&FW Taibu nallah to Harak rijo at Dobin 1 10.00 13.00 3 25.00 BDO Giba
ko Pani
92 GIBA Har Khet MOA&FW Konu koro to Konu rijo at Bate 1 3.00 8.00 1 7.50 BDO Giba
ko Pani
93 GIBA Har Khet MOA&FW Tikre Sow to Oka Seriu at Jari- II 1 15.00 11.00 2 37.50 BDO Giba
ko Pani
94 GIBA Har Khet MOA&FW Yormi koro to Koktak rijo at Dumpin 1 10.00 10.00 2 25.00 BDO Giba
ko Pani
95 GIBA Har Khet MOA&FW Siso koro to Si rijo at Bate 1 4.00 11.00 2 10.00 BDO Giba
ko Pani
96 GIBA Har Khet MOA&FW Chingrung nallah to Dokio Puring at Bami 1 3.00 12.00 1 7.50 BDO Giba
ko Pani
97 GIBA Har Khet MOA&FW Tabiu Sow nallah to Mengarijo at Lingdam 1 9.00 8.00 3 22.50 ASM/ BDO Giba
ko Pani
98 GIBA Har Khet MOA&FW Romi koro to Romi rijo at Bate 1 1.50 7.00 1 3.75 BDO Giba
ko Pani
99 GIBA Har Khet MOA&FW Siso nallah to Bate Ringo at Bami 1 2.00 11.00 1 5.00 BDO Giba
ko Pani
10 GIBA Har Khet MOA&FW Riak Nallah to Riak rijo at Dargung 1 7.00 12.00 3 17.50 BDO Giba
0 ko Pani
10 GIBA Har Khet MOA&FW Rinba Sikio to Gipe Moring at Lingdam 1 9.00 10.00 3 22.50 ASM/ BDO Giba
1 ko Pani

704 | P a g e
10 GIBA Har Khet MOA&FW Hagu koro to Hagurijo at Dignium 1 3.00 10.00 1 7.50 BDO Giba
2 ko Pani
10 GIBA Har Khet MOA&FW Tungri nallah to Ching Kubang at Bami 1 2.00 8.00 1 5.00 BDO Giba
3 ko Pani
10 GIBA Har Khet MOA&FW Lepar koro to Lepar rijo at Dignium 1 3.00 8.00 1 7.50 BDO Giba
4 ko Pani
10 GIBA Har Khet MOA&FW Margung Nalah to Tosi rijo at Lomigaling. 1 12.00 7.00 2 30.00 BDO Giba
5 ko Pani
10 GIBA Har Khet MOA&FW Sego koro to Lekar Kachirijo at Leriak- I 1 15.00 15.00 3 37.50 BDO Giba
6 ko Pani
10 GIBA Har Khet MOA&FW Bate nallah to Baterijo at Bate 1 5.00 17.00 2 12.50 ASM/ BDO Giba
7 ko Pani
10 GIBA Har Khet MOA&FW Gingir Nallah to Yrpi rijo at Dobin 1 16.00 7.00 3 40.00 BDO Giba
8 ko Pani
10 GIBA Har Khet MOA&FW Dungchi koro to Pakpu rijo at Dumpin 1 10.00 12.00 2 25.00 BDO Giba
9 ko Pani
11 GIBA Har Khet MOA&FW Cheniaso to Gungte rijo at Dargung 1 4.00 6.00 2 10.00 BDO Giba
0 ko Pani
11 GIBA Har Khet MOA&FW Biring koro to Darchi rijo at Dumpin 1 8.00 8.00 2 20.00 BDO Giba
1 ko Pani
11 GIBA Har Khet MOA&FW Begam koro to Begam rijo at Dignium 1 4.00 9.00 2 10.00 BDO Giba
2 ko Pani
11 GIBA Har Khet MOA&FW Ringri koro to Gialamrijo at Luchi 1 12.00 8.00 3 30.00 BDO Giba
3 ko Pani
11 GIBA Har Khet MOA&FW Bering nallah to Kotum rijo at Dumpin 1 10.00 9.00 2 25.00 BDO Giba
4 ko Pani
11 GIBA Har Khet MOA&FW Pagisow to Kamrung at Jari- I 1 25.00 9.00 2 62.50 BDO Giba
5 ko Pani
11 GIBA Har Khet MOA&FW Nepo koro to Gope rijo at Dignium 1 5.00 13.00 2 12.50 BDO Giba
6 ko Pani
11 GIBA Har Khet MOA&FW Momiso koro to Si-Jori at Jarjori 1 20.00 11.00 3 50.00 BDO Giba
7 ko Pani
11 GIBA Har Khet MOA&FW Siso to Bami Hora at Jitak 1 6.00 7.00 2 15.00 BDO Giba
8 ko Pani

705 | P a g e
11 GIBA Har Khet MOA&FW Ote koro to Ote rijo at Lomigaling. 1 8.00 10.00 3 20.00 BDO Giba
9 ko Pani
12 GIBA Har Khet MOA&FW Oksu so to Oksu rijo at Marging 1 1.50 8.00 1 3.75 BDO Giba
0 ko Pani
12 GIBA Har Khet MOA&FW Banesow to Ghairijo at Jitu 1 11.00 10.00 2 27.50 BDO Giba
1 ko Pani
12 GIBA Har Khet MOA&FW Toniom koro to Namdumrijo at Luchi 1 10.00 10.00 3 25.00 BDO Giba
2 ko Pani
12 GIBA Har Khet MOA&FW Koring Sow to Tamar rijo at Makba 1 5.00 7.00 2 12.50 BDO Giba
3 ko Pani
12 GIBA Har Khet MOA&FW Koriasow to Koriarijo at Jitu 1 3.00 8.00 1 7.50 BDO Giba
4 ko Pani
12 GIBA Har Khet MOA&FW Bami nallah to Yaktange at Bami 1 1.50 9.00 1 3.75 BDO Giba
5 ko Pani
12 GIBA Har Khet MOA&FW Gingri so to Hami Hate rijo at Lingdam 1 10.00 9.00 3 25.00 ASM/ BDO Giba
6 ko Pani
12 GIBA Har Khet MOA&FW Makhu koro to Makba rijo at Makba 1 10.00 8.00 3 25.00 BDO Giba
7 ko Pani
12 GIBA Har Khet MOA&FW Sego koro to Lakarrijo at Leriak 1 20.00 8.00 2 50.00 BDO Giba
8 ko Pani
12 GIBA Har Khet MOA&FW Namdum koro to Damirijo at Leriak- II 1 9.50 12.00 2 23.75 BDO Giba
9 ko Pani
13 GIBA Har Khet MOA&FW Seko koro to Darding rijo at Jitu 1 10.00 11.00 3 25.00 BDO Giba
0 ko Pani
13 GIBA Har Khet MOA&FW Oto koro to Damirijo at Leriak 1 5.00 10.00 2 12.50 BDO Giba
1 ko Pani
13 GIBA Har Khet MOA&FW Ginging Nallah to Joko Ringjo at Jitak 1 4.00 8.00 2 10.00 BDO Giba
2 ko Pani
13 GIBA Har Khet MOA&FW Mayeng Oching to Lomirijo at Lomigaling. 1 10.00 8.00 2 25.00 BDO Giba
3 ko Pani
13 GIBA Har Khet MOA&FW Charmi nallah to Charmirijo at Markia 1 10.00 13.00 3 25.00 BDO Giba
4 ko Pani
13 GIBA Har Khet MOA&FW Toshi koro to Toshi rijo at Lomigaling. 1 10.00 9.00 3 25.00 BDO Giba
5 ko Pani

706 | P a g e
13 GIBA Har Khet MOA&FW Leya koro to Bakaprijo at Luchi 1 8.00 9.00 3 20.00 BDO Giba
6 ko Pani
13 GIBA Har Khet MOA&FW Ghaiseku to Pipu rijo at Jitu 1 1.00 7.00 1 2.50 BDO Giba
7 ko Pani
13 GIBA Har Khet MOA&FW Hami so nallah to Aye Duke at Engpu Marging 1 2.00 9.00 1 5.00 BDO Giba
8 ko Pani
13 GIBA Har Khet MOA&FW Tabom nallah to Hatak rijo at Lungte 1 10.00 9.00 3 25.00 BDO Giba
9 ko Pani
14 GIBA Har Khet MOA&FW Romi So to Romijobe at Piya 1 2.00 9.00 1 5.00 BDO Giba
0 ko Pani
14 GIBA Har Khet MOA&FW Muglih nallah to Yorkorijo at Pute 1 16.00 8.00 2 40.00 BDO Giba
1 ko Pani
14 GIBA Har Khet MOA&FW Singchi koro to Singchi rijo at Lute 1 10.00 7.00 3 25.00 BDO Giba
2 ko Pani
14 GIBA Har Khet MOA&FW Marung koro to Lote rijo at Natam 1 9.00 12.00 3 22.50 BDO Giba
3 ko Pani
14 GIBA Har Khet MOA&FW Tabum koro to Bate rijo at Makba 1 8.00 6.00 3 20.00 BDO Giba
4 ko Pani
14 GIBA Har Khet MOA&FW Yurmi koro to Pekam rijo at Natam 1 10.00 9.00 2 25.00 BDO Giba
5 ko Pani
14 GIBA Har Khet MOA&FW Serik koro to Serik rijo at Muri Dignium 1 4.00 7.00 2 10.00 BDO Giba
6 ko Pani
14 GIBA Har Khet MOA&FW Lingke koro to Makba rijo at Makba 1 5.00 10.00 2 12.50 BDO Giba
7 ko Pani
14 GIBA Har Khet MOA&FW Oching nallah to Engpu rijo at Engpu Marging 1 2.00 9.00 2 5.00 ASM/ BDO Giba
8 ko Pani
14 GIBA Har Khet MOA&FW Si-so nallah to Tase Pagit at Marging 1 3.00 12.00 2 7.50 ASM/ BDO Giba
9 ko Pani
15 GIBA Har Khet MOA&FW Ningpo koro to Rutasi at Marging 1 1.00 11.00 2 2.50 ASM/ BDO Giba
0 ko Pani
15 GIBA Har Khet MOA&FW Lepu nallah to Kumpok rijo at Markia 1 5.00 11.00 2 12.50 BDO Giba
1 ko Pani
15 GIBA Har Khet MOA&FW Oching koro to Lengpung rijo at Natam 1 5.00 15.00 2 12.50 BDO Giba
2 ko Pani

707 | P a g e
15 GIBA Har Khet MOA&FW Yakpo so nallah to Yakpo rijo at Marging 1 2.00 6.00 1 5.00 BDO Giba
3 ko Pani
15 GIBA Har Khet MOA&FW Lute koro to Rapirijo at Lute 1 20.00 8.00 3 50.00 BDO Giba
4 ko Pani
15 GIBA Har Khet MOA&FW Siso nallah to Ete Pobe rijo at Ete Pobe 1 3.00 10.00 1 7.50 BDO Giba
5 ko Pani Marging
15 GIBA Har Khet MOA&FW Lepu koro to Umpra rijo at Markia 1 10.00 12.00 3 25.00 BDO Giba
6 ko Pani
15 GIBA Har Khet MOA&FW Loma koro to Taririjo at Pagia 1 20.00 10.00 1 50.00 BDO Giba
7 ko Pani
15 GIBA Har Khet MOA&FW Hate So to Taji Yorbe at Piya 1 1.50 10.00 1 3.75 BDO Giba
8 ko Pani
15 GIBA Har Khet MOA&FW Ote Nallah to Poring Namching at Rago 1 3.00 10.00 1 7.50 BDO Giba
9 ko Pani
16 GIBA Har Khet MOA&FW Niko nallah to Lomi Lote rijo at Natam 1 8.00 8.00 2 20.00 BDO Giba
0 ko Pani
16 GIBA Har Khet MOA&FW Tabom Siku to Singriha rijo at Markia 1 5.00 11.00 2 12.50 BDO Giba
1 ko Pani
16 GIBA Har Khet MOA&FW Jaho nallah to Chimba rijo at Pigia 1 9.00 8.00 2 22.50 BDO Giba
2 ko Pani
16 GIBA Har Khet MOA&FW Lekar koro to Karter rijo at Puda 1 18.00 10.00 3 45.00 BDO Giba
3 ko Pani
16 GIBA Har Khet MOA&FW Oppe koro to Hoggo rijo at Rago 1 2.00 6.00 1 5.00 BDO Giba
4 ko Pani
16 GIBA Har Khet MOA&FW Singha nallah to Lingter rijo at Markia 1 5.00 9.00 2 12.50 BDO Giba
5 ko Pani
16 GIBA Har Khet MOA&FW Nialak koro to Takmirijo at Lute 1 3.00 6.00 1 7.50 BDO Giba
6 ko Pani
16 GIBA Har Khet MOA&FW Singha nallah to Amte Muring at Markia 1 5.00 7.00 2 12.50 BDO Giba
7 ko Pani
16 GIBA Har Khet MOA&FW Pagi nallah to Parerijo at Pigia 1 18.00 12.00 3 45.00 BDO Giba
8 ko Pani
16 GIBA Har Khet MOA&FW Tikli koro to Tiklirijo at Muri Dignium 1 3.00 8.00 1 7.50 BDO Giba
9 ko Pani

708 | P a g e
17 GIBA Har Khet MOA&FW Taba so nallah to Tabarijo at Marging 1 2.00 7.00 1 5.00 BDO Giba
0 ko Pani
17 GIBA Har Khet MOA&FW Dote koro to Dote rijo at Muri Dignium 1 8.00 9.00 3 20.00 BDO Giba
1 ko Pani
17 GIBA Har Khet MOA&FW Biri koro to Lomi rijo at Natam 1 15.00 8.00 3 37.50 BDO Giba
2 ko Pani
17 GIBA Har Khet MOA&FW Komma koro to Singring rijo at Makba 1 5.00 9.00 2 12.50 BDO Giba
3 ko Pani
17 GIBA Har Khet MOA&FW Birap koro to Kiaki rijo at Natam 1 7.00 10.00 2 17.50 BDO Giba
4 ko Pani
17 GIBA Har Khet MOA&FW Charto koro to Noshi rijo at Markia 1 15.00 9.00 3 37.50 BDO Giba
5 ko Pani
17 GIBA Har Khet MOA&FW Ote Siku to Takia rijo at Markia 1 5.00 8.00 2 12.50 BDO Giba
6 ko Pani
17 GIBA Har Khet MOA&FW Dargit nallah to Helle rijo at Natam 1 15.00 10.00 3 37.50 BDO Giba
7 ko Pani
17 GIBA Har Khet MOA&FW Moglih koro to Merum rijo at Pute 1 7.00 9.00 2 17.50 BDO Giba
8 ko Pani
17 GIBA Har Khet MOA&FW Lingling koro to Yaterijo at Pigia 1 25.00 9.00 2 62.50 BDO Giba
9 ko Pani
18 GIBA Har Khet MOA&FW Mahung nallah to Hirruha rijo at Markia 1 10.00 6.00 3 25.00 BDO Giba
0 ko Pani
18 GIBA Har Khet MOA&FW Oching koro to Yamirijo at Pigia 1 3.00 7.00 1 7.50 BDO Giba
1 ko Pani
18 GIBA Har Khet MOA&FW Ote koro to Jigam rijo at Rago 1 3.00 8.00 1 7.50 BDO Giba
2 ko Pani
18 GIBA Har Khet MOA&FW Oching koro to Hejupuh at Rebi 1 3.00 12.00 1 7.50 BDO Giba
3 ko Pani
18 GIBA Har Khet MOA&FW Kahun nallah to Kijamrijo at Marging 1 6.00 7.00 2 15.00 ASM
4 ko Pani
18 GIBA Har Khet MOA&FW Sigia koro to Yaprung rijo at Pigia 1 10.00 11.00 2 25.00 BDO Giba
5 ko Pani
18 GIBA Har Khet MOA&FW Hami so to Piya rijo at Piya 1 4.00 6.00 2 10.00 BDO Giba
6 ko Pani

709 | P a g e
18 GIBA Har Khet MOA&FW Narra Nallah to Edeha rijo at Rava 1 10.00 8.00 3 25.00 BDO Giba
7 ko Pani
18 GIBA Har Khet MOA&FW Tungri nallah to Jigioporing at Sherakpung 1 6.00 8.00 2 15.00 ASM/BDO Giba
8 ko Pani
18 GIBA Har Khet MOA&FW Hami So to Kongkiora at Piya 1 2.50 13.00 1 6.25 BDO Giba
9 ko Pani
19 GIBA Har Khet MOA&FW Gipu Sow to Simme rijo at Rago 1 5.00 7.00 1 12.50 BDO Giba
0 ko Pani
19 GIBA Har Khet MOA&FW Okching Sow to Pekdarijo at Pute 1 8.00 10.00 1 20.00 BDO Giba
1 ko Pani
19 GIBA Har Khet MOA&FW Jiji Sow to Jaring rijo at Rebi 1 5.00 7.00 1 12.50 BDO Giba
2 ko Pani
19 GIBA Har Khet MOA&FW Taliksiting koro to Liking rijo at Pigia 1 6.00 9.00 2 15.00 BDO Giba
3 ko Pani
19 GIBA Har Khet MOA&FW Raksha koro to Sappe rijo at Rago 1 10.00 8.00 1 25.00 BDO Giba
4 ko Pani
19 GIBA Har Khet MOA&FW Domda nallah to Tamchok Tama rijo at Rava 1 12.00 7.00 3 30.00 BDO Giba
5 ko Pani
19 GIBA Har Khet MOA&FW Seko koro to Neporing rijo at Rebi 1 10.00 9.00 2 25.00 BDO Giba
6 ko Pani
19 GIBA Har Khet MOA&FW Tachar nallah to Paning Moring at Rago 1 5.00 6.00 2 12.50 BDO Giba
7 ko Pani
19 GIBA Har Khet MOA&FW Sik koro to Yagik rijo at Siyorbe 1 4.00 10.00 1 10.00 BDO Giba
8 ko Pani
19 GIBA Har Khet MOA&FW Gingri koro to Yarte rijo at Rago 1 3.00 11.00 1 7.50 BDO Giba
9 ko Pani
20 GIBA Har Khet MOA&FW Yellu koro to Meosar rijo at Rava 1 10.00 8.00 3 25.00 BDO Giba
0 ko Pani
20 GIBA Har Khet MOA&FW Sibeng koro to Narra rijo at Rago 1 5.00 9.00 2 12.50 BDO Giba
1 ko Pani
20 GIBA Har Khet MOA&FW Gungte nallah to Dargungrijo at Dargung 1 5.00 8.00 1 12.50 ASM
2 ko Pani
20 GIBA Har Khet MOA&FW Ringa nallah to Terte rijo at Rago 1 5.00 8.00 2 12.50 BDO Giba
3 ko Pani

710 | P a g e
20 GIBA Har Khet MOA&FW Cherte nallah to Chebarijo at Rago 1 5.00 10.00 2 12.50 BDO Giba
4 ko Pani
20 GIBA Har Khet MOA&FW Nagi nallah to Tana Taharijo at Rago 1 5.00 12.00 2 12.50 BDO Giba
5 ko Pani
20 GIBA Har Khet MOA&FW Pobe nallah to Donyi Rikha at Rava 1 6.00 7.00 2 15.00 BDO Giba
6 ko Pani
20 GIBA Har Khet MOA&FW Nilak koro to Kamling Muri at Rava 1 6.00 9.00 2 15.00 BDO Giba
7 ko Pani
20 GIBA Har Khet MOA&FW Bokle koro to Takar Rikyar at Rava 1 5.00 6.00 2 12.50 BDO Giba
8 ko Pani
20 GIBA Har Khet MOA&FW Ope koro to Narpi Dumcho at Rava 1 10.00 10.00 3 25.00 BDO Giba
9 ko Pani
21 GIBA Har Khet MOA&FW Ote koro to Rava rijo at Rava 1 10.00 9.00 3 25.00 BDO Giba
0 ko Pani
21 GIBA Har Khet MOA&FW Take nallah to Sibe rijo at Rava 1 5.00 11.00 2 12.50 BDO Giba
1 ko Pani
21 GIBA Har Khet MOA&FW Pobe Sow to Dumda rijo at Rago 1 4.00 7.00 1 10.00 BDO Giba
2 ko Pani
21 GIBA Har Khet MOA&FW Narra koro to Piya rijo at Rava 1 4.00 7.00 2 10.00 BDO Giba
3 ko Pani
21 GIBA Har Khet MOA&FW Narra nallah to Piria rijo at Rava 1 8.00 9.00 3 20.00 BDO Giba
4 ko Pani
21 GIBA Har Khet MOA&FW Kamling sow to Dardu rijo at Rago 1 3.00 8.00 1 7.50 BDO Giba
5 ko Pani
21 GIBA Har Khet MOA&FW Kimi nallah to Kite rijo at Rava 1 8.00 6.00 3 20.00 BDO Giba
6 ko Pani
21 GIBA Har Khet MOA&FW Tungri anllah to Loklamrijo at Bami 1 5.00 7.00 2 12.50 ASM
7 ko Pani
21 GIBA Har Khet MOA&FW Opin koro to Opinrijo at Rebi 1 6.00 10.00 1 15.00 BDO Giba
8 ko Pani
21 GIBA Har Khet MOA&FW Bate Nallah to Bisarijo at Bate 1 5.00 13.00 2 12.50 ASM
9 ko Pani
22 GIBA Har Khet MOA&FW Lingra koro to Gapherijo at Rebi 1 25.00 8.00 1 62.50 BDO Giba
0 ko Pani

711 | P a g e
22 GIBA Har Khet MOA&FW Ote koro to Lumtak rijo at Sogum 1 10.00 11.00 3 25.00 BDO Giba
1 ko Pani
22 GIBA Har Khet MOA&FW Harak nallah to Hoju rijo at Ribi 1 20.00 11.00 3 50.00 BDO Giba
2 ko Pani
22 GIBA Har Khet MOA&FW Pesa koro to Maaki rijo at Bate 1 3.00 9.00 1 7.50 BDO Giba
3 ko Pani
22 GIBA Har Khet MOA&FW Sopun nallah to Rania rijo at Ribi 1 10.00 14.00 3 25.00 BDO Giba
4 ko Pani
22 GIBA Har Khet MOA&FW Row koro to Makri rijo at Bate 1 2.00 7.00 1 5.00 BDO Giba
5 ko Pani
22 GIBA Har Khet MOA&FW Peyu koro to Peyurijo at Sedu vill 1 2.00 11.00 1 5.00 BDO Giba
6 ko Pani
22 GIBA Har Khet MOA&FW Sigia So to Tabiu-Ring rijo at Sherakpung 1 8.00 7.00 2 20.00 ASM/BDO Giba
7 ko Pani
22 GIBA Har Khet MOA&FW Baich Nallah to Baterijo at Bate 1 6.00 15.00 2 15.00 ASM
8 ko Pani
22 GIBA Har Khet MOA&FW Chingrung Kobong Nallah to Bami rijo at Bami 1 5.00 13.00 2 12.50 ASM
9 ko Pani
23 GIBA Har Khet MOA&FW Bate Nalla to Baterijo at Bate 1 15.00 17.00 3 37.50 ASM
0 ko Pani
23 GIBA Har Khet MOA&FW Oching nallah to Oksu Rijo at Marging 1 4.00 15.00 2 10.00 ASM
1 ko Pani
23 GIBA Har Khet MOA&FW Dumda koro to Gippu rijo at Rago 1 5.00 9.00 1 12.50 BDO Giba
2 ko Pani
23 GIBA Har Khet MOA&FW Magri nallah to Magririjo at Bate 1 5.00 9.00 2 12.50
3 ko Pani
23 GIBA Har Khet MOA&FW Issaso to Makirijo at Bate 1 5.00 12.00 2 12.50
4 ko Pani
23 GIBA Har Khet MOA&FW Bate/Mengekoro to Markrijo at Bate 1 5.00 9.00 2 12.50
5 ko Pani
23 GIBA Har Khet MOA&FW Si so nallah to Bami rijo at Bami 1 4.00 9.00 2 10.00
6 ko Pani
23 GIBA Har Khet MOA&FW Pisaso to Rimgiora at Bami 1 5.00 8.00 2 12.50
7 ko Pani
23 GIBA Har Khet MOA&FW Bate Nallah to Kangrijo at Bami 1 5.00 10.00 2 12.50
8 ko Pani

712 | P a g e
23 GIBA Har Khet MOA&FW Yaktak Nallah to Yaktakrijo at Bami 1 5.00 11.00 2 12.50
9 ko Pani
24 GIBA Har Khet MOA&FW Sinsi nallah to Singmala at Dargung 1 9.00 15.00 3 22.50
0 ko Pani
24 GIBA Har Khet MOA&FW Dargong rijo to gongte nallah at Dargung 1 2.00 11.00 3 5.00
1 ko Pani
24 GIBA Har Khet MOA&FW Deri Dera koro to Jube at Darung 1 6.00 12.00 2 15.00
2 ko Pani
24 GIBA Har Khet MOA&FW Gonte nallah to Gongte rijo at Dargung 1 8.00 12.00 3 20.00
3 ko Pani
24 GIBA Har Khet MOA&FW Senjuso to senjurijo at Dargung 1 5.00 9.00 2 12.50
4 ko Pani
24 GIBA Har Khet MOA&FW Binju koro to Binju rijo at Dignium 1 4.00 12.00 2 10.00
5 ko Pani
24 GIBA Har Khet MOA&FW Lumlita so to Guha rijo at Dobin 1 5.00 6.00 2 12.50
6 ko Pani
24 GIBA Har Khet MOA&FW Bami Hora to Tumling poring at Dobin 1 3.00 7.00 2 7.50
7 ko Pani
24 GIBA Har Khet MOA&FW Gengri so to Amtum rijo at Dobin 1 3.00 6.00 2 7.50
8 ko Pani
24 GIBA Har Khet MOA&FW Dungchi koro to Tala rijo at Dumpin 1 4.00 9.00 1 10.00
9 ko Pani
25 GIBA Har Khet MOA&FW Dunchi koro to Bamerijo at Dumpin 1 3.00 8.00 2 7.50
0 ko Pani
25 GIBA Har Khet MOA&FW Sengrong kobong to Tamlingrijo at Dumpin 1 4.00 6.00 2 10.00
1 ko Pani
25 GIBA Har Khet MOA&FW Dungchi koro to Yormi oching at Dumpin 1 4.00 7.00 2 10.00
2 ko Pani
25 GIBA Har Khet MOA&FW Diring oching to Biorijo at Dumpin 1 5.00 7.00 3 12.50
3 ko Pani
25 GIBA Har Khet MOA&FW Dongchi koro to bam rijo at Dumpin 1 2.00 6.00 3 5.00
4 ko Pani
25 GIBA Har Khet MOA&FW Ruje rukar to kutom rijo at Dumpin 1 5.00 6.00 3 12.50
5 ko Pani

713 | P a g e
25 GIBA Har Khet MOA&FW Oching koro to Pakpurijo at Dumpin 1 9.00 10.00 3 22.50
6 ko Pani
25 GIBA Har Khet MOA&FW Darte koro to Darchirijo at Dumpin 1 4.00 8.00 2 10.00
7 ko Pani
25 GIBA Har Khet MOA&FW Ruchekoro to Kotam rijo at Dumpin 1 2.00 6.00 1 5.00
8 ko Pani
25 GIBA Har Khet MOA&FW Dungchi koro to Ladung rijo at Dumpin. 1 3.00 10.00 1 7.50
9 ko Pani
26 GIBA Har Khet MOA&FW Ramri koro to Songrong kubung at Dumpin 1 12.00 15.00 2 30.00
0 ko Pani
26 GIBA Har Khet MOA&FW Nambiya river at engpung Marging 1 5.00 11.00 3 12.50
1 ko Pani
26 GIBA Har Khet MOA&FW Sigiaso to Ramdirijo at Giba HQ 1 12.00 14.00 3 30.00
2 ko Pani
26 GIBA Har Khet MOA&FW Takisi to Tarangurak at Giba HQ 1 18.00 17.00 3 45.00
3 ko Pani
26 GIBA Har Khet MOA&FW Nepo koro to Tanki rijo at Gichi Dignium 1 30.00 24.00 3 75.00
4 ko Pani
26 GIBA Har Khet MOA&FW Petosmakria rijo at Gichi Dignium 1 8.00 14.00 3 20.00
5 ko Pani
26 GIBA Har Khet MOA&FW Peyu koro to Sedurijo at Gichi Dignium 1 10.00 15.00 3 25.00
6 ko Pani
26 GIBA Har Khet MOA&FW Sigo koro to Segorijo at Gichi Dignium 1 6.00 9.00 3 15.00
7 ko Pani
26 GIBA Har Khet MOA&FW Begam& Baharijo at Gichi Dignium 1 11.00 10.00 3 27.50
8 ko Pani
26 GIBA Har Khet MOA&FW Namdam & Lepar rijo at Gite Dignium 1 12.00 15.00 3 30.00
9 ko Pani
27 GIBA Har Khet MOA&FW Page koro to Hatok rijo at Jari 1 7.00 10.00 2 17.50
0 ko Pani
27 GIBA Har Khet MOA&FW Page koro to Remi rijo at Jari 1 9.00 11.00 3 22.50
1 ko Pani
27 GIBA Har Khet MOA&FW Pote Nala to Pute rijo at Jari. 1 3.00 7.00 1 7.50
2 ko Pani

714 | P a g e
27 GIBA Har Khet MOA&FW Page koro to Jilling Kamning rijo at Jaring 1 6.00 8.00 2 15.00
3 ko Pani
27 GIBA Har Khet MOA&FW Page koro to Okaseirijo at Jaring 1 10.00 12.00 3 25.00
4 ko Pani
27 GIBA Har Khet MOA&FW Oto Koro to Nikpori rijo at Jarjori 1 3.00 8.00 2 7.50
5 ko Pani
27 GIBA Har Khet MOA&FW Gungung Koro to Jorung rijo at Jarjori 1 4.00 7.00 2 10.00
6 ko Pani
27 GIBA Har Khet MOA&FW Momisou to Jarjoririjo at Jarjori 1 6.00 7.00 2 15.00
7 ko Pani
27 GIBA Har Khet MOA&FW Momisou to Hakriarijo at Jarjori 1 5.00 12.00 2 12.50
8 ko Pani
27 GIBA Har Khet MOA&FW Momisou to Tajerijo at Jarjori 1 3.00 8.00 2 7.50
9 ko Pani
28 GIBA Har Khet MOA&FW Haging to Hapu Lingdam at Jitak 1 2.00 6.00 1 5.00
0 ko Pani
28 GIBA Har Khet MOA&FW Oching ote koro to Jitak rijo at Jitak 1 3.00 7.00 2 7.50
1 ko Pani
28 GIBA Har Khet MOA&FW Ginging so to Koktak rijo at Jitak 1 5.00 7.00 2 12.50
2 ko Pani
28 GIBA Har Khet MOA&FW Jiji Sinu to Damte Pobe at Jitak 1 4.00 6.00 2 10.00
3 ko Pani
28 GIBA Har Khet MOA&FW Rimi koro to Tabe rijo at Jitak 1 4.00 7.00 2 10.00
4 ko Pani
28 GIBA Har Khet MOA&FW Raga so to Sobing Joring at Jitak 1 5.00 7.00 2 12.50
5 ko Pani
28 GIBA Har Khet MOA&FW Siso to Babi Yerdum at Jitak 1 2.00 6.00 1 5.00
6 ko Pani
28 GIBA Har Khet MOA&FW Marung koro to Toshi rijo at Jitu 1 6.00 7.00 2 15.00
7 ko Pani
28 GIBA Har Khet MOA&FW Galling koro to Lingpung rijo at Jitu 1 5.00 8.00 2 12.50
8 ko Pani
28 GIBA Har Khet MOA&FW Maying oching to Lingcho kotung at Jitu 1 4.00 6.00 2 10.00
9 ko Pani

715 | P a g e
29 GIBA Har Khet MOA&FW Dalo snow koro to Dalo Yorbe at Jitu 1 2.00 8.00 1 5.00
0 ko Pani
29 GIBA Har Khet MOA&FW Yote Yorbe koro to Parong at Jitu 1 2.00 10.00 1 5.00
1 ko Pani
29 GIBA Har Khet MOA&FW Bane koro to Jitu rijo at Jitu. 1 4.00 9.00 1 10.00
2 ko Pani
29 GIBA Har Khet MOA&FW Pete koro & Pemi koro to Kikukpu rijo at Kikik 1 6.00 8.00 2 15.00
3 ko Pani
29 GIBA Har Khet MOA&FW Tabiu koro to Sarakpung at Lingdam 1 5.00 12.00 2 12.50
4 ko Pani
29 GIBA Har Khet MOA&FW Tabin so Nallah to Meggarijo at Lingdam 1 3.00 6.00 2 7.50
5 ko Pani
29 GIBA Har Khet MOA&FW Taso nallah to Tungriba at Lingdam 1 5.00 8.00 2 12.50
6 ko Pani
29 GIBA Har Khet MOA&FW Jeling sirbing at Miokam rungo at Lingdam 1 4.00 7.00 2 10.00
7 ko Pani
29 GIBA Har Khet MOA&FW Sigiasokororo to Tabiu rij at Lingdam 1 4.00 9.00 2 10.00
8 ko Pani
29 GIBA Har Khet MOA&FW Rimbasi koro to Gepemoring at Lingdam 1 3.00 5.00 2 7.50
9 ko Pani
30 GIBA Har Khet MOA&FW Ningposo koro to Yerching yerte at Lingdam 1 3.00 6.00 2 7.50
0 ko Pani
30 GIBA Har Khet MOA&FW Rinte babing ngong to Tumgbia kotum at 1 1.00 6.00 2 2.50
1 ko Pani Lingdam
30 GIBA Har Khet MOA&FW Sidum sich tabluring at Lingdam 1 4.00 7.00 2 10.00
2 ko Pani
30 GIBA Har Khet MOA&FW Ochingso to Ering yorbe at Lingdam 1 3.00 9.00 2 7.50
3 ko Pani
30 GIBA Har Khet MOA&FW Singri koro to Haterijo at Lingdam 1 4.00 6.00 2 10.00
4 ko Pani
30 GIBA Har Khet MOA&FW Siso to Bamiora at Lingdam 1 3.00 8.00 2 7.50
5 ko Pani
30 GIBA Har Khet MOA&FW Yangunpopso to Taiyer at Lingdam 1 3.00 7.00 2 7.50
6 ko Pani

716 | P a g e
30 GIBA Har Khet MOA&FW Sejerso koro to Hamirijo at Lingdam 1 3.00 6.00 2 7.50
7 ko Pani
30 GIBA Har Khet MOA&FW Lakmukso koro to Dachingporing at Lingdam 1 4.00 8.00 2 10.00
8 ko Pani
30 GIBA Har Khet MOA&FW Kiori Moikg to Raporijo at Lingdam 1 4.00 9.00 2 10.00
9 ko Pani
31 GIBA Har Khet MOA&FW Rambasekio to Rimpidai at Lingdam 1 3.00 8.00 2 7.50
0 ko Pani
31 GIBA Har Khet MOA&FW Lumlita so to Guharijo at Lingdam 1 5.00 10.00 2 12.50
1 ko Pani
31 GIBA Har Khet MOA&FW Bamihora to Tumlingporing at Lingdam 1 3.00 7.00 2 7.50
2 ko Pani
31 GIBA Har Khet MOA&FW Gengriso to Amtumrijo at Lingdam 1 3.00 9.00 2 7.50
3 ko Pani
31 GIBA Har Khet MOA&FW Riok koro to Yagampu at Lingdam vill. 1 12.00 20.00 2 30.00
4 ko Pani
31 GIBA Har Khet MOA&FW Uda koro to Daru rijo at Leriak 1 22.00 18.00 3 55.00
5 ko Pani
31 GIBA Har Khet MOA&FW Puda koro to Talunama at Leriak 1 9.00 15.00 3 22.50
6 ko Pani
31 GIBA Har Khet MOA&FW Puda koro to Belutam at Leriak 1 8.00 14.00 3 20.00
7 ko Pani
31 GIBA Har Khet MOA&FW Sogo koro to Damirijo at Leriak 1 3.00 15.00 2 7.50
8 ko Pani
31 GIBA Har Khet MOA&FW Sogo koro to Pagajohu at Leriak 1 3.00 18.00 2 7.50
9 ko Pani
32 GIBA Har Khet MOA&FW Darung rijo at Leriak 1 2.00 12.00 2 5.00
0 ko Pani
32 GIBA Har Khet MOA&FW Sogo koro to Hegetum at Leriak 1 4.00 16.00 2 10.00
1 ko Pani
32 GIBA Har Khet MOA&FW Sigo koro to Sigo rijo at Leriak 1 6.00 16.00 2 15.00
2 ko Pani
32 GIBA Har Khet MOA&FW Chogo Sho to Hacham Pate at Leya 1 5.00 8.00 2 12.50 74 - ASM Menga
3 ko Pani IV

717 | P a g e
32 GIBA Har Khet MOA&FW Boklin koro to Godarijo at Leya 1 5.00 10.00 2 12.50 74 - ASM Menga
4 ko Pani IV
32 GIBA Har Khet MOA&FW Tasamsoh koro to Yorkorijo at Leya 1 9.00 14.00 2 22.50
5 ko Pani
32 GIBA Har Khet MOA&FW Tasum koro to Mugli rijo at Leya 1 3.00 14.00 2 7.50
6 ko Pani
32 GIBA Har Khet MOA&FW Rew koro to Toprijo at Leya 1 4.00 24.00 2 10.00
7 ko Pani
32 GIBA Har Khet MOA&FW Terisatum koro Rinurijo at Leya 1 2.00 7.00 1 5.00
8 ko Pani
32 GIBA Har Khet MOA&FW Chogo koro to Chogopah at Leya 1 7.00 9.00 2 17.50
9 ko Pani
33 GIBA Har Khet MOA&FW Tasumso to Tariorijo at Leya 1 4.00 11.00 2 10.00
0 ko Pani
33 GIBA Har Khet MOA&FW Garget koro to Bera jobe at Lomigaling 1 5.00 7.00 2 12.50
1 ko Pani
33 GIBA Har Khet MOA&FW Bri koro to Lingkit at Lomigaling 1 3.00 5.00 2 7.50
2 ko Pani
33 GIBA Har Khet MOA&FW Lengling so to Gite rijo at Lomigaling 1 15.00 19.00 3 37.50
3 ko Pani
33 GIBA Har Khet MOA&FW Jiling soh to chambarijo at Luchi 1 9.00 9.00 3 22.50
4 ko Pani
33 GIBA Har Khet MOA&FW Lingrisoh to Gilam rijo at Luchi 1 4.00 8.00 2 10.00
5 ko Pani
33 GIBA Har Khet MOA&FW Rakpesoh to Rakperijo at Luchi 1 3.00 6.00 2 7.50
6 ko Pani
33 GIBA Har Khet MOA&FW Luchisoh to Namdum at Luchi 1 4.00 7.00 2 10.00
7 ko Pani
33 GIBA Har Khet MOA&FW Toniom koro to Namching rijo at Luchi 1 3.00 9.00 2 7.50
8 ko Pani
33 GIBA Har Khet MOA&FW Lochosoh to Yorkorijo at Luchi 1 6.00 8.00 2 15.00
9 ko Pani
34 GIBA Har Khet MOA&FW Seku koro to Bapak rijo at Luchi 1 3.00 7.00 2 7.50
0 ko Pani

718 | P a g e
34 GIBA Har Khet MOA&FW Kapsarsoh to Kapsarrijo at Luchi 1 3.00 6.00 2 7.50
1 ko Pani
34 GIBA Har Khet MOA&FW Luchisoh to Bikchum rijo at Luchi 1 3.00 12.00 2 7.50
2 ko Pani
34 GIBA Har Khet MOA&FW Lunchi soh to Maying rijo at Luchi 1 5.00 10.00 2 12.50
3 ko Pani
34 GIBA Har Khet MOA&FW Neya koro to Tumririjo at Lungte 1 2.00 6.00 1 5.00
4 ko Pani
34 GIBA Har Khet MOA&FW Luchisoho to Namdamrijo at Lungte 1 3.00 12.00 2 7.50
5 ko Pani
34 GIBA Har Khet MOA&FW Lumtesoho to Bdedrijo at Lungte 1 3.00 9.00 2 7.50
6 ko Pani
34 GIBA Har Khet MOA&FW Nielak soho to Tasurega at Lungte 1 4.00 8.00 2 10.00
7 ko Pani
34 GIBA Har Khet MOA&FW Opensaho to Lungte rijo at Lungte 1 4.00 9.00 2 10.00
8 ko Pani
34 GIBA Har Khet MOA&FW Jelling to Hatak takmi at Lungte 1 3.00 7.00 2 7.50
9 ko Pani
35 GIBA Har Khet MOA&FW Ragasoho to sengchi at Lungte 1 3.00 8.00 2 7.50
0 ko Pani
35 GIBA Har Khet MOA&FW Rosi soho to Kochum at Lungte 1 3.00 6.00 2 7.50
1 ko Pani
35 GIBA Har Khet MOA&FW Lugchi soho to Kokukrijo at Lungte 1 4.00 9.00 2 10.00
2 ko Pani
35 GIBA Har Khet MOA&FW Lungte soho to Raperijo at Lungte 1 6.00 8.00 2 15.00
3 ko Pani
35 GIBA Har Khet MOA&FW Koto koro to Yepak rijo at Marging 1 4.00 11.00 2 10.00
4 ko Pani
35 GIBA Har Khet MOA&FW Kijamso to Etepobe at Marging 1 7.00 11.00 2 17.50
5 ko Pani
35 GIBA Har Khet MOA&FW Ochingso to Ochingrongo at Marging 1 7.00 9.00 2 17.50
6 ko Pani
35 GIBA Har Khet MOA&FW Oching so to Oksujbe at Marging 1 8.00 12.00 2 20.00
7 ko Pani

719 | P a g e
35 GIBA Har Khet MOA&FW Rachik so to Rakperijo at Marging 1 6.00 8.00 2 15.00
8 ko Pani
35 GIBA Har Khet MOA&FW Pakpuso to Pakpurijo at Marging 1 4.00 7.00 2 10.00
9 ko Pani
36 GIBA Har Khet MOA&FW Perisekuso to Hagorijo at Marging 1 3.00 8.00 2 7.50
0 ko Pani
36 GIBA Har Khet MOA&FW Jasing so to Jasingrijo at Marging 1 3.00 6.00 2 7.50
1 ko Pani
36 GIBA Har Khet MOA&FW Cheba Nallah to Tabarijo at Marging 1 3.00 7.00 2 7.50
2 ko Pani
36 GIBA Har Khet MOA&FW Sikso nallah to Chamirijo at Marging 1 4.00 7.00 2 10.00
3 ko Pani
36 GIBA Har Khet MOA&FW Seso nallah to Tase Pagitrijo at Marging 1 4.00 12.00 2 10.00
4 ko Pani
36 GIBA Har Khet MOA&FW Nigpo koro to Rotasirijo at Marging 1 5.00 7.00 2 12.50
5 ko Pani
36 GIBA Har Khet MOA&FW Seso nalah to Emipoberijo at Marging 1 3.00 8.00 2 7.50
6 ko Pani
36 GIBA Har Khet MOA&FW Yapo nalah to Paro rijo at Marging 1 4.00 7.00 2 10.00
7 ko Pani
36 GIBA Har Khet MOA&FW Kiong Nalah to Kijamrijo at Marging 1 5.00 6.00 2 12.50
8 ko Pani
36 GIBA Har Khet MOA&FW Oching nallah to Humporijo at Marging 1 7.00 8.00 2 17.50
9 ko Pani
37 GIBA Har Khet MOA&FW Leppu koro Kumpok rijo Markia 1 3.00 11.00 2 7.50
0 ko Pani
37 GIBA Har Khet MOA&FW Leppu koro Nalo Yorbe at Markia 1 2.00 8.00 1 5.00
1 ko Pani
37 GIBA Har Khet MOA&FW Leppu koro Umpra rijo at Markia 1 2.00 14.00 1 5.00
2 ko Pani
37 GIBA Har Khet MOA&FW Chorta koro Tarmi rijo at Markia 1 3.00 10.00 2 7.50
3 ko Pani
37 GIBA Har Khet MOA&FW Chato koro Charto rijo at Markia 1 4.00 7.00 2 10.00
4 ko Pani

720 | P a g e
37 GIBA Har Khet MOA&FW Singha koro Lingtar rijo at Markia 1 3.00 9.00 2 7.50
5 ko Pani
37 GIBA Har Khet MOA&FW Tachak Sipper Siku Takta rijo at Markia 1 4.00 6.00 2 10.00
6 ko Pani
37 GIBA Har Khet MOA&FW Tabom koro Singri Nampo at Markia 1 3.00 5.00 2 7.50
7 ko Pani
37 GIBA Har Khet MOA&FW Singha koro Jiggo Ring Ngo at Markia 1 4.00 7.00 2 10.00
8 ko Pani
37 GIBA Har Khet MOA&FW Mahung/Luppu koro Herru Ha Ritak at Markia 1 5.00 8.00 2 12.50
9 ko Pani
38 GIBA Har Khet MOA&FW Charto/Lepu koro Yarung rijo at Markia 1 7.00 7.00 2 17.50
0 ko Pani
38 GIBA Har Khet MOA&FW Si koro Noshi rijo at Markia 1 3.00 6.00 2 7.50
1 ko Pani
38 GIBA Har Khet MOA&FW Pario Pare koro Pario Pare rijo at Markia 1 4.00 7.00 2 10.00
2 ko Pani
38 GIBA Har Khet MOA&FW Yaho koro Kennu rijo at Markia 1 3.00 6.00 2 7.50
3 ko Pani
38 GIBA Har Khet MOA&FW Ote siku Ringte Ringo at Markia 1 3.00 6.00 2 7.50
4 ko Pani
38 GIBA Har Khet MOA&FW Ote siku Kirong Ringo at Markia 1 3.00 8.00 2 7.50
5 ko Pani
38 GIBA Har Khet MOA&FW Chartoo nallah to Tarmi rijo at Markia 1 3.00 6.00 2 7.50
6 ko Pani
38 GIBA Har Khet MOA&FW Maung nallah to Eru rijo at Markia 1 10.00 7.00 2 25.00
7 ko Pani
38 GIBA Har Khet MOA&FW Pappak nallah to Mew rijo at Markia 1 11.00 9.00 2 27.50
8 ko Pani
38 GIBA Har Khet MOA&FW Lipu nallah to Markia at Markia 1 4.00 10.00 2 10.00
9 ko Pani
39 GIBA Har Khet MOA&FW Bogdu rijo at Mosi 1 2.00 7.00 1 5.00
0 ko Pani
39 GIBA Har Khet MOA&FW Sippi river Maji rijo at Mosi 1 5.00 270.00 2 12.50
1 ko Pani

721 | P a g e
39 GIBA Har Khet MOA&FW Sippi river Mori Ramme at Mosi 1 5.00 285.00 2 12.50
2 ko Pani
39 GIBA Har Khet MOA&FW Mali Maji Rakya rijo at Mosi 1 8.00 10.00 3 20.00
3 ko Pani
39 GIBA Har Khet MOA&FW Tikli koro to Dacho rijo at Muri Dignium 1 5.00 6.00 2 12.50
4 ko Pani
39 GIBA Har Khet MOA&FW Serik rijo at Muri Dignium 1 4.00 6.00 2 10.00
5 ko Pani
39 GIBA Har Khet MOA&FW Lipik & Hallo koro to Namch rijo at Namchi 1 4.00 9.00 2 10.00
6 ko Pani
39 GIBA Har Khet MOA&FW Gyamkam koro to Gyakam rijo at Namchi 1 2.00 6.00 1 5.00
7 ko Pani
39 GIBA Har Khet MOA&FW Nallo koro to Didu Kochaom at Namchi 1 2.00 7.00 1 5.00
8 ko Pani
39 GIBA Har Khet MOA&FW Tania koro to Rama Myodu at Namchi 1 5.00 9.00 2 12.50
9 ko Pani
40 GIBA Har Khet MOA&FW Lipik koro to Pago Lekin at Namchi 1 15.00 17.00 3 37.50
0 ko Pani
40 GIBA Har Khet MOA&FW Biri koro Pekamchalen rijo at Natam 1 9.00 12.00 3 22.50
1 ko Pani
40 GIBA Har Khet MOA&FW Dungchi koro to pakpu rijo at Natam 1 2.00 11.00 3 5.00
2 ko Pani
40 GIBA Har Khet MOA&FW Marong koro Yaling rijo at Natam 1 7.00 9.00 3 17.50
3 ko Pani
40 GIBA Har Khet MOA&FW Tosi koro Ale rijo at Natam 1 3.00 6.00 2 7.50
4 ko Pani
40 GIBA Har Khet MOA&FW Seru koro Lingdam rijo at Natam 1 12.00 14.00 3 30.00
5 ko Pani
40 GIBA Har Khet MOA&FW Beri koro to Galling rijo at Natam 1 3.00 13.00 2 7.50
6 ko Pani
40 GIBA Har Khet MOA&FW Seging koro to Lote rijo at Natam. 1 4.00 7.00 2 10.00
7 ko Pani
40 GIBA Har Khet MOA&FW Bami rijo to jachi koromat Pigia 1 3.00 6.00 3 7.50
8 ko Pani

722 | P a g e
40 GIBA Har Khet MOA&FW Radung Seru Nallah to Jachi rijo at Pigia 1 2.00 5.50 1 5.00
9 ko Pani
41 GIBA Har Khet MOA&FW Alecseteng to Narpu rijo at Pigia 1 9.00 10.00 3 22.50
0 ko Pani
41 GIBA Har Khet MOA&FW Alecsetengto Pare rijo at Pigia 1 8.00 8.00 2 20.00
1 ko Pani
41 GIBA Har Khet MOA&FW Takuso koro to yate rijo at Pigia 1 6.00 6.00 2 15.00
2 ko Pani
41 GIBA Har Khet MOA&FW Tari rijo to Tari rijo at Pigia 1 12.00 14.00 3 30.00
3 ko Pani
41 GIBA Har Khet MOA&FW Sugu river to Ramching at Pigia 1 7.00 12.00 3 17.50
4 ko Pani
41 GIBA Har Khet MOA&FW Soegia river to Yami rijo at Pigia 1 5.00 8.00 2 12.50
5 ko Pani
41 GIBA Har Khet MOA&FW Stum river to Lomi rijo at Pigia 1 10.00 14.00 3 25.00
6 ko Pani
41 GIBA Har Khet MOA&FW Ngui river to Bageng rijo at Pigia 1 11.00 12.00 3 27.50
7 ko Pani
41 GIBA Har Khet MOA&FW Taku river to Yate & Yake at Pigia 1 8.00 9.00 2 20.00
8 ko Pani
41 GIBA Har Khet MOA&FW Sugu koro to Yaprung rijo at Pigia 1 7.00 11.00 2 17.50
9 ko Pani
42 GIBA Har Khet MOA&FW Romi Nallah to Romi rijo at Piya 1 5.00 8.00 2 12.50
0 ko Pani
42 GIBA Har Khet MOA&FW Ro Nallah to Ro rijo at Piya 1 3.00 12.00 2 7.50
1 ko Pani
42 GIBA Har Khet MOA&FW Hami so to Domi Riktak at Piya 1 3.00 10.00 2 7.50
2 ko Pani
42 GIBA Har Khet MOA&FW Hate Nallah to Hai Doke at Piya 1 4.00 9.00 2 10.00
3 ko Pani
42 GIBA Har Khet MOA&FW Konki Nallah to Konki orto at Piya 1 4.00 6.00 2 10.00
4 ko Pani
42 GIBA Har Khet MOA&FW Romi So to Romi rijo at Piya 1 5.00 8.00 2 12.50
5 ko Pani

723 | P a g e
42 GIBA Har Khet MOA&FW Mugli koro to Mugli rijo at Pute 1 4.00 7.00 2 10.00
6 ko Pani
42 GIBA Har Khet MOA&FW Page koro to Tain Lepek at Pute 1 5.00 11.00 2 12.50
7 ko Pani
42 GIBA Har Khet MOA&FW Page koro to Merum rijo at Pute 1 5.00 9.00 2 12.50
8 ko Pani
42 GIBA Har Khet MOA&FW Page koro to Leba rijo at Pute 1 4.00 19.00 2 10.00
9 ko Pani
43 GIBA Har Khet MOA&FW Page koro to Meri Lene at Pute 1 3.00 15.00 2 7.50
0 ko Pani
43 GIBA Har Khet MOA&FW Page koro to Tikdo serio at Pute 1 6.00 14.00 2 15.00
1 ko Pani
43 GIBA Har Khet MOA&FW Page koro to Sarne Yorlo at Pute 1 8.00 17.00 2 20.00
2 ko Pani
43 GIBA Har Khet MOA&FW Momi-so to Lekar -rijo at Puda Leriak 1 3.00 17.00 2 7.50
3 ko Pani
43 GIBA Har Khet MOA&FW Mogli koro to Pute rijo at Pute. 1 3.00 9.00 1 7.50
4 ko Pani
43 GIBA Har Khet MOA&FW Pobe/Ote sukh Nalah to Kamleng rijo at Rago 1 4.00 7.00 2 10.00
5 ko Pani
43 GIBA Har Khet MOA&FW Charmi Nalah to Pani muri rijo at Rago 1 5.00 7.00 2 12.50
6 ko Pani
43 GIBA Har Khet MOA&FW Pobe/Opeso Nalah to Dumda Yorbe at Rago 1 10.00 10.00 3 25.00
7 ko Pani
43 GIBA Har Khet MOA&FW Kamcho Nalah to Tarte rijo at Rago 1 5.00 9.00 2 12.50
8 ko Pani
43 GIBA Har Khet MOA&FW Gepu so Nalah to Sebe rang rijo at Rago 1 4.00 7.00 2 10.00
9 ko Pani
44 GIBA Har Khet MOA&FW Take so Nalah to Pakiya rijo at Rago 1 12.00 13.00 3 30.00
0 ko Pani
44 GIBA Har Khet MOA&FW Dumba/Nagi Nalah to Singmepung at Rago 1 4.00 7.00 2 10.00
1 ko Pani
44 GIBA Har Khet MOA&FW Ope/Take so Nalah to Jigam Yartak at Rago 1 7.00 9.00 2 17.50
2 ko Pani

724 | P a g e
44 GIBA Har Khet MOA&FW Palato nallah to gingre at Rago 1 3.00 8.00 2 7.50
3 ko Pani
44 GIBA Har Khet MOA&FW Charte Nalah to Yarte rijo at Rago 1 2.00 5.00 2 5.00
4 ko Pani
44 GIBA Har Khet MOA&FW Dani rijo to ari rijo at rago 1 3.00 5.00 2 7.50
5 ko Pani
44 GIBA Har Khet MOA&FW Upper Raksha Nalah to Saape ha at Rago 1 9.00 11.00 3 22.50
6 ko Pani
44 GIBA Har Khet MOA&FW Rakchen Raksha Nalah to Hashiya rijo at 1 6.00 7.00 2 15.00
7 ko Pani Rago
44 GIBA Har Khet MOA&FW Take so Nalah to Si Tak rijo at Rago 1 4.00 6.00 2 10.00
8 ko Pani
44 GIBA Har Khet MOA&FW Tacher Nalah to Singri Yorbe at Rago 1 3.00 5.00 2 7.50
9 ko Pani
45 GIBA Har Khet MOA&FW Hobom Nalah to Kingte Rijo at Rago 1 4.00 7.00 2 10.00
0 ko Pani
45 GIBA Har Khet MOA&FW Ringa Nalah to Kingmi rijo at Rago 1 3.00 7.00 2 7.50
1 ko Pani
45 GIBA Har Khet MOA&FW Doni Nalah to Heriha rijo at Rago 1 2.00 6.00 1 5.00
2 ko Pani
45 GIBA Har Khet MOA&FW Pakne Nalah to Panning Moring at Rago 1 2.00 5.00 1 5.00
3 ko Pani
45 GIBA Har Khet MOA&FW Biote Nalah to Biochin Biote at Rago 1 3.00 9.00 2 7.50
4 ko Pani
45 GIBA Har Khet MOA&FW Raji koro to Dedam rijo at Raji 1 15.00 14.00 3 37.50
5 ko Pani
45 GIBA Har Khet MOA&FW Herong koro to Rapi rijo at Rapi 1 15.00 17.00 3 37.50
6 ko Pani
45 GIBA Har Khet MOA&FW Doni koro to Eringha rijo at Rava 1 5.00 10.00 2 12.50
7 ko Pani
45 GIBA Har Khet MOA&FW Rakching nallah to Raksha Rijo at Rava 1 4.00 5.00 2 10.00
8 ko Pani
45 GIBA Har Khet MOA&FW Nara Nallah to Piya rijo at Rava 1 6.00 7.00 2 15.00
9 ko Pani

725 | P a g e
46 GIBA Har Khet MOA&FW Raksha Nallah to Hedeha rijo at Rava 1 5.00 8.00 2 12.50
0 ko Pani
46 GIBA Har Khet MOA&FW Piya Nallah to Rab Yorbe rijo at Rava 1 3.00 6.00 2 7.50
1 ko Pani
46 GIBA Har Khet MOA&FW Dachak Dariak Nallah to Kimi rijo at Rava 1 3.00 6.00 2 7.50
2 ko Pani
46 GIBA Har Khet MOA&FW Nagi Nallah to Pochak rijo at Rava 1 3.00 7.00 2 7.50
3 ko Pani
46 GIBA Har Khet MOA&FW Jiguk Nallah to Jiguk rijo at Rava 1 3.00 5.00 2 7.50
4 ko Pani
46 GIBA Har Khet MOA&FW Pikya Nallah to Taku rijo at Rava 1 2.00 6.00 1 5.00
5 ko Pani
46 GIBA Har Khet MOA&FW Rakte Nallah to Raksha rijo at Rava 1 2.00 7.00 1 5.00
6 ko Pani
46 GIBA Har Khet MOA&FW Piya Nallah to Lingiha rijo at Rava 1 5.00 7.00 2 12.50
7 ko Pani
46 GIBA Har Khet MOA&FW Rakching Nallah to Naraha rijo at Rava 1 4.00 6.00 2 10.00
8 ko Pani
46 GIBA Har Khet MOA&FW Gipu/Takke Nallah to Sibe rijo at Rava 1 2.00 6.00 1 5.00
9 ko Pani
47 GIBA Har Khet MOA&FW Mahasa koro to piyanjo at Rava1 1 2.00 6.00 1 5.00
0 ko Pani
47 GIBA Har Khet MOA&FW Narha Nallah to Narpu rijo at Rava 1 2.00 6.00 1 5.00
1 ko Pani
47 GIBA Har Khet MOA&FW Kamling Nallah to Leya rijo at Rava 1 2.00 5.00 1 5.00
2 ko Pani
47 GIBA Har Khet MOA&FW Dachak Dariak Nallah to Tikdo rijo at Rava 1 2.00 6.00 1 5.00
3 ko Pani
47 GIBA Har Khet MOA&FW Pobe Nallah to Hotak rijo at Rava 1 2.00 5.00 1 5.00
4 ko Pani
47 GIBA Har Khet MOA&FW Take Nallah to Ope rijo at Rava 1 1.00 4.00 1 2.50
5 ko Pani
47 GIBA Har Khet MOA&FW Gipu Nallah to Gipu rijo at Rava 1 1.00 5.00 1 2.50
6 ko Pani

726 | P a g e
47 GIBA Har Khet MOA&FW Hote Nallah to Yama Pakha rijo at Rava 1 2.00 6.00 1 5.00
7 ko Pani
47 GIBA Har Khet MOA&FW Sigum Nallah to Sigum rijo at Rava 1 1.00 5.00 1 2.50
8 ko Pani
47 GIBA Har Khet MOA&FW Nahara koro to Riya rijo at Rava 1 5.00 6.00 2 12.50
9 ko Pani
48 GIBA Har Khet MOA&FW Pako Nallah to Pigya Rijo at Rava 1 1.00 4.00 1 2.50
0 ko Pani
48 GIBA Har Khet MOA&FW Dachak Dariak Nallah to Pindo peo rijo at 1 1.00 4.00 1 2.50
1 ko Pani Rava
48 GIBA Har Khet MOA&FW Ope koro to Meri rijo at Rebi 1 6.00 17.00 3 15.00
2 ko Pani
48 GIBA Har Khet MOA&FW Ote koro to Gepe rijo at Rebi 1 4.00 17.00 3 10.00
3 ko Pani
48 GIBA Har Khet MOA&FW Gonia koro to pisa magria at Rebi 1 5.00 17.00 3 12.50
4 ko Pani
48 GIBA Har Khet MOA&FW Lekukobu koro to sha rijo at Rebi 1 6.00 17.00 3 15.00
5 ko Pani
48 GIBA Har Khet MOA&FW Oto koro to goke rengo at Rebi 1 5.00 17.00 3 12.50
6 ko Pani
48 GIBA Har Khet MOA&FW Nengporijg koro to Nengporijg rijo at Rebi 1 3.00 6.00 2 7.50
7 ko Pani
48 GIBA Har Khet MOA&FW Lengra Koro to Gaphe rijo at Rebi 1 3.00 7.00 2 7.50
8 ko Pani
48 GIBA Har Khet MOA&FW Haging so koro to Yabia rijo at Rebi 1 8.00 9.00 3 20.00
9 ko Pani
49 GIBA Har Khet MOA&FW Nengpo koro to Kaktak rijo at Rebi 1 15.00 13.00 3 37.50
0 ko Pani
49 GIBA Har Khet MOA&FW Ote koro to Oyu runge at Rebi. 1 3.00 14.00 1 7.50
1 ko Pani
49 GIBA Har Khet MOA&FW Ote koro to Hapung rijo at Rebi. 1 3.00 11.00 1 7.50
2 ko Pani
49 GIBA Har Khet MOA&FW Ote koro to Nering rijo at Rebi 1 3.00 8.00 2 7.50
3 ko Pani

727 | P a g e
49 GIBA Har Khet MOA&FW Tungri nallah to Sengbe rijo at Sherakpung 1 3.00 11.00 2 7.50
4 ko Pani
49 GIBA Har Khet MOA&FW Tabiu Nallah to Tabiu Rengo at Sherakpung 1 6.00 7.00 2 15.00
5 ko Pani
49 GIBA Har Khet MOA&FW Sete koro to Cheke rijo at Sherakpung 1 15.00 11.00 3 37.50
6 ko Pani
49 GIBA Har Khet MOA&FW Tongri Nallah to Harak rijo at Sherakpung 1 7.00 11.00 2 17.50
7 ko Pani
49 GIBA Har Khet MOA&FW Singbe rijo at Sherakpung 1 3.00 10.00 2 7.50
8 ko Pani
49 GIBA Har Khet MOA&FW Tongri Nallah to Hingne rijo at Sherakpung 1 16.00 17.00 3 40.00
9 ko Pani
50 GIBA Har Khet MOA&FW Makbia Moring at Sherakpung 1 3.00 8.00 2 7.50
0 ko Pani
50 GIBA Har Khet MOA&FW Siku Kubing at Sherakpung 1 3.00 8.00 2 7.50
1 ko Pani
50 GIBA Har Khet MOA&FW Riokpu Nallah to Duni rijo at Sherakpung 1 6.00 8.00 2 15.00
2 ko Pani
50 GIBA Har Khet MOA&FW Harak Nallah to Riampi Rengo at Sherakpung 1 3.00 6.00 2 7.50
3 ko Pani
50 GIBA Har Khet MOA&FW Siku Kubung to Jegio porijg at Sherakpung 1 3.00 5.00 2 7.50
4 ko Pani
50 GIBA Har Khet MOA&FW Siku Kubung to Chely rijo at Sherakpung 1 3.00 5.00 2 7.50
5 ko Pani
50 GIBA Har Khet MOA&FW Sidum si to Kumpok rijo at Sherakpung 1 4.00 7.00 2 10.00
6 ko Pani
50 GIBA Har Khet MOA&FW Eachi koro to Tabe rijo at Sera Tapapu 1 10.00 12.00 3 25.00
7 ko Pani
50 GIBA Har Khet MOA&FW Uyi Roo to Retum rijo at Serne Yorlo, Giba 1 9.00 14.00 2 22.50
8 ko Pani
50 GIBA Har Khet MOA&FW Sarmen koro to Pagiasuri rijo at Sera Tapapu 1 5.00 12.00 2 12.50
9 ko Pani
51 GIBA Har Khet MOA&FW Pete koro to Riokam rijo at Sera Tapapu 1 15.00 16.00 3 37.50
0 ko Pani

728 | P a g e
51 GIBA Har Khet MOA&FW Pemi koro to Batambale rijo at Sera Tapapu 1 12.00 13.00 3 30.00
1 ko Pani
51 GIBA Har Khet MOA&FW Tabe koro to Giamde rijo at Sera Tapapu. 1 5.00 7.00 2 12.50
2 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Lamtak rijo at Sorum 1 4.00 9.00 2 10.00
3 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Takte rijo at Sorum 1 4.00 10.00 2 10.00
4 ko Pani
51 GIBA Har Khet MOA&FW Momi koro to Si-rijo at Sorum 1 3.00 6.00 2 7.50
5 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Lekar rijo at Sorum 1 5.00 8.00 2 12.50
6 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Takria rijo at Sorum 1 5.00 6.00 2 12.50
7 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Darta rijo at Sorum 1 4.00 7.00 2 10.00
8 ko Pani
51 GIBA Har Khet MOA&FW Outo koro to Siri rijo at Sorum 1 3.00 8.00 2 7.50
9 ko Pani
52 GIBA Har Khet MOA&FW Kioram koro to Ahmjor rijo at Sorum 1 2.00 6.00 2 5.00
0 ko Pani
52 GIBA Har Khet MOA&FW Riami koro to Chogo rijo at Sorum 1 2.00 5.00 1 5.00
1 ko Pani
52 GIBA Har Khet MOA&FW Goda rijo at Sorum 1 2.00 4.00 1 5.00
2 ko Pani
52 GIBA Har Khet MOA&FW Amjor rijo to kioram so at Sorum 1 2.00 5.00 1 5.00
3 ko Pani
52 GIBA Har Khet MOA&FW Ranggi koro to Raha rijo at Sorum 1 2.00 5.00 1 5.00
4 ko Pani
52 GIBA Har Khet MOA&FW Uhiru koro to Belam rijo at Sorum 1 2.00 6.00 1 5.00
5 ko Pani
52 GIBA Har Khet MOA&FW Niari soh koro to Beria rijo at Sorum 1 2.00 4.00 1 5.00
6 ko Pani
52 GIBA Har Khet MOA&FW Menko nallah to Menko rijo at Sorum 1 5.00 6.00 1 12.50
7 ko Pani

729 | P a g e
52 GIBA Har Khet MOA&FW Chogoso koro to Yorko rijo at Sorum 1 2.00 7.00 1 5.00
8 ko Pani
52 GIBA Har Khet MOA&FW Riami koro to Gote rijo at Sorum 1 3.00 7.00 1 7.50
9 ko Pani
53 GIBA Har Khet MOA&FW Ginchi koro to matu rango at Sikarijo 1 2.00 4.00 1 5.00
0 ko Pani
53 GIBA Har Khet MOA&FW Pagi koro to Dapin Yorbe at Yolu 1 15.00 16.00 3 37.50
1 ko Pani
53 GIBA Har Khet MOA&FW Limi koro to Sa-Yorbe at Yolu 1 15.00 14.00 3 37.50
2 ko Pani
53 GIBA Har Khet MOA&FW Lite koro to Bokpen Yorbe at Yolu 1 10.00 12.00 3 25.00
3 ko Pani
53 GIBA Har Khet MOA&FW Kamchi so koro to Kamchi Yorbe at Yolu 1 25.00 19.00 3 62.50
4 ko Pani
53 GIBA Har Khet MOA&FW Nyonio koro to Seku Tam at Yolu 1 15.00 14.00 3 37.50
5 ko Pani
53 GIBA Har Khet MOA&FW Sebin koro to Yorko Yolu at Yolu 1 8.00 10.00 2 20.00
6 ko Pani
53 GIBA Har Khet MOA&FW Si koro to Yak Yor Yolu at Yolu 1 4.00 6.00 2 10.00
7 ko Pani
53 GIBA Har Khet MOA&FW Jaow koro to ampu Yamba at Yolu 1 3.00 5.00 2 7.50
8 ko Pani
53 GIBA Har Khet MOA&FW Pikar koro to Hami Yolu at Yolu 1 8.00 10.00 2 20.00
9 ko Pani
54 GIBA Har Khet MOA&FW Chamio koro to Bokpin Niyokam at Yolu 1 2.00 6.00 1 5.00
0 ko Pani
54 GIBA Har Khet MOA&FW Pare koro to Kamte Nyokam at Yolu 1 3.00 7.00 2 7.50
1 ko Pani
54 GIBA Har Khet MOA&FW Lora koro to Yorko rijo at Yolu 1 6.00 9.00 2 15.00
2 ko Pani
54 GIBA Har Khet MOA&FW Suw koro to Tumdi rijo at Yolu 1 4.00 7.00 2 10.00
3 ko Pani
54 GIBA Har Khet MOA&FW Riaw koro to Hate Yorbe at Yolu. 1 7.00 9.00 2 17.50
4 ko Pani

730 | P a g e
54 GIBA Har Khet MOA&FW Gapu koro to Bate rijo at Yolu 1 4.00 6.00 2 10.00
5 ko Pani
54 GIBA Har Khet MOA&FW Heya koro to Hate rijo at Yolu 1 5.00 6.50 2 12.50
6 ko Pani
54 GIBA Har Khet MOA&FW Paa koro to Paa rijo at Lokar rijo 1 3.00 6.00 2 7.50
7 ko Pani
54 GIBA Har Khet MOA&FW Bhai koro to Bhai rijo at Lokar rijo 1 7.00 9.00 2 17.50
8 ko Pani
54 GIBA Har Khet MOA&FW Ote koro to Mana rijo at Lokar rijo 1 6.00 8.00 2 15.00
9 ko Pani
55 GIBA Har Khet MOA&FW Hayang Nallah to Gianching rijo at Henge 1 7.00 9.00 2 17.50
0 ko Pani Doke
55 GIBA Har Khet MOA&FW Lintak koro to Lintak rijo at Henge Doke 1 10.00 11.00 2 25.00
1 ko Pani
55 GIBA Har Khet MOA&FW Hayang rijo at Henge Doke 1 6.00 8.00 2 15.00
2 ko Pani
55 GIBA Har Khet MOA&FW Jigok koro to Chikiorijo at Henge Doke. 1 4.00 7.00 2 10.00
3 ko Pani
55 GIBA Har Khet MOA&FW Talek koro to Hamariga rijo at Hamrijo 1 3.00 6.00 2 7.50
4 ko Pani
55 GIBA Har Khet MOA&FW Lebar koro to Kirum rijo at Molo 1 9.00 11.00 3 22.50
5 ko Pani
55 GIBA Har Khet MOA&FW Pak koro to Chetam rijo at Molo 1 7.00 9.00 2 17.50
6 ko Pani
55 GIBA Har Khet MOA&FW Sorku koro to Nyalo rijo at Molo 1 5.00 6.00 2 12.50
7 ko Pani
55 GIBA Har Khet MOA&FW Motu koro to Pirapu at Molo 1 10.00 12.00 3 25.00
8 ko Pani
55 GIBA Har Khet MOA&FW Kancho koro to Ango Yorlo at Molo 1 12.00 15.00 3 30.00
9 ko Pani
56 GIBA Har Khet MOA&FW So Nalha to Tabarijo at Yakpo 1 5.00 8.00 2 12.50
0 ko Pani
56 GIBA Har Khet MOA&FW Binju koro to Binju rijo at Patum village 1 5.00 6.00 2 12.50
1 ko Pani

731 | P a g e
NEW SCHEMES
Sl. Name of Concerned Component Activity Total Command Catchment Period of Estimated Remarks/
No. the Ministry/ (C/o. MIP from ……….) Number Area/Irrigation Area Implementation cost Recommended
District/ Department (in Ha) (Sq.Km.) (Rs. in by
Blocks lakh)
1 Chetam Har Khet MOA&FW Row koro to Bukdorijo at Jeke 1 3.00 12.00 1 7.50 MLA
ko Pani
2 Chetam Har Khet MOA&FW Miriong koro to Rongmi rijo at Jeke 1 3.00 14.00 1 7.50 MLA
ko Pani
3 Chetam Har Khet MOA&FW Kungtam koro to Nacha rijo at Magria 1 5.00 12.00 2 12.50 MLA
ko Pani
4 Chetam Har Khet MOA&FW Raw koro to Kamrik rijo at Jeke 1 1.00 15.00 1 2.50 MLA
ko Pani
5 Chetam Har Khet MOA&FW Hakra koro to Mendingrijo at Dasi 1 5.00 13.00 2 12.50 MLA
ko Pani
6 Chetam Har Khet MOA&FW Pelo koro to Korarijo at Lomi Lote 1 3.00 13.00 1 7.50 MLA
ko Pani
7 Chetam Har Khet MOA&FW Hakpi koro to Maje rijo at Boging 1 4.00 12.00 2 10.00 MLA
ko Pani
8 Chetam Har Khet MOA&FW Kamcho koro to Kamchorijo at Dasi 1 4.00 12.00 2 10.00 MLA
ko Pani
9 Chetam Har Khet MOA&FW Rapri koro to Neoringrijo at Marbom 1 6.00 13.00 2 15.00 MLA
ko Pani
10 Chetam Har Khet MOA&FW Cheta Koro to Saramrijo at Daru village 1 6.00 12.00 2 15.00 MLA
ko Pani

732 | P a g e
11 Chetam Har Khet MOA&FW Taje Koro to Lekurijo at Sebing 1 5.00 12.00 2 12.50 MLA
ko Pani
12 Chetam Har Khet MOA&FW Sigum koro to Sepa rijo at Rikung 1 3.00 15.00 1 7.50 MLA
ko Pani
13 Chetam Har Khet MOA&FW Hate koro to Hami rijo at Dai 1 4.00 11.00 2 10.00 MLA
ko Pani
14 Chetam Har Khet MOA&FW Moya koro to Moyarijo at Raji 1 6.00 15.00 2 15.00 MLA
ko Pani
15 Chetam Har Khet MOA&FW Riokpu to Mayarijo at Moyaraji vill 1 5.0 10.0 2 12.5 MLA
ko Pani
16 Chetam Har Khet MOA&FW Jikchum riju at Raha vill 1 3.00 9.00 1 7.50 MLA
ko Pani
17 Chetam Har Khet MOA&FW Saha koro to Rukapakrijo at Sari 1 4.00 11.00 1 10.00 MLA
ko Pani
18 Chetam Har Khet MOA&FW Badung koro to Leke rijo at Jeke 1 2.00 14.00 1 5.00 MLA
ko Pani
19 Chetam Har Khet MOA&FW Tajum koro to Tajum rijo at Dadi 1 4.00 9.00 2 10.00 MLA
ko Pani
20 Chetam Har Khet MOA&FW Tatak Nallah to Jinarijo at Guha vill 1 10.00 12.00 2 25.00 MLA
ko Pani
21 Chetam Har Khet MOA&FW Nyo koro to Nyorijo at Nilling vill 1 4.00 8.00 2 10.00 MLA
ko Pani
22 Chetam Har Khet MOA&FW Bokpu koro to Namdum rijo at Sera 1 4.00 13.00 1 10.00 MLA
ko Pani
23 Chetam Har Khet MOA&FW Tabe koro to Giamde rijo at Tapapu. 1 5.00 7.00 2 12.50 DC
ko Pani
24 Chetam Har Khet MOA&FW Jiri koro to Bogirijo at Soki 1 5.00 12.00 2 12.50 MLA
ko Pani
25 Chetam Har Khet MOA&FW Mali-Maji koro to Chii Moririjo at Mosi 1 5.00 9.00 2 12.50 MLA
ko Pani
26 Chetam Har Khet MOA&FW Sbila koro to Hiya rijo at Duni 1 4.00 11.00 1 10.00 MLA
ko Pani
27 Chetam Har Khet MOA&FW Sippi koro to Dedo Bokpenrijo at Batam 1 6.00 227.00 2 15.00 MLA
ko Pani

733 | P a g e
28 Chetam Har Khet MOA&FW Dolo koro to Chorta rijo at Bayor 1 8.00 12.00 3 20.00 MLA
ko Pani
29 Chetam Har Khet MOA&FW Pekching koro to Magria Ringio at 1 6.00 11.00 2 15.00 MLA
ko Pani Magria
30 Chetam Har Khet MOA&FW Maji koro to Maji Saget Ringio at Dayam 1 4.00 12.00 2 10.00 MLA
ko Pani
31 Chetam Har Khet MOA&FW Kare koro to Hinjurijo at Hinju 1 4.00 8.00 2 10.00 MLA
ko Pani
32 Chetam Har Khet MOA&FW Molo koro to Jeli rijo at Kare vill 1 5.00 9.00 2 12.50 MLA
ko Pani
33 Chetam Har Khet MOA&FW Hakra koro to Dimirijo at Dasi 1 4.00 11.00 2 10.00 MLA
ko Pani
34 Chetam Har Khet MOA&FW Omme koro to Tamet rijo at Sebing vill 1 5.00 9.00 2 12.50 MLA
ko Pani
35 Chetam Har Khet MOA&FW Kore koro to Hinjurijo at Hinju 1 4.00 8.00 2 10.00 MLA
ko Pani
36 Chetam Har Khet MOA&FW Hakpe koro to Majirijo at Boging vill 1 4.00 7.00 1 10.00 MLA
ko Pani
37 Chetam Har Khet MOA&FW Darmi koro to Tabin rijo at Dabu 1 4.00 13.00 2 10.00 MLA
ko Pani
38 Chetam Har Khet MOA&FW Mirong koro to rongmi rijo at Jeke vill 1 5.00 10.00 2 12.50 MLA
ko Pani
39 Chetam Har Khet MOA&FW Tabu koro to Maniarijo at Belu 1 4.00 12.00 2 10.00 MLA
ko Pani
40 Chetam Har Khet MOA&FW Paching koro to Miyo rijo at Boiging vill 1 3.00 6.00 1 7.50 MLA
ko Pani
41 Chetam Har Khet MOA&FW Kamcho koro to Molorijo at Dasi 1 15.00 15.00 3 37.50 MLA
ko Pani
42 Chetam Har Khet MOA&FW Talo koro to Mopoin rijo at Dai vill 1 4.00 7.00 2 10.00 MLA
ko Pani
43 Chetam Har Khet MOA&FW Kochak koro to Talirijo at Dai vill 1 3.00 6.00 2 7.50 MLA
ko Pani
44 Chetam Har Khet MOA&FW Hakpi koro to Sippiringio at Boging 1 4.00 10.00 2 10.00 MLA
ko Pani

734 | P a g e
45 Chetam Har Khet MOA&FW Jite Sirio koro to Hamiringjo at Lingking 1 4.00 11.00 2 10.00 MLA
ko Pani
46 Chetam Har Khet MOA&FW Otte koro to Holinrijo at Daru 1 4.00 12.00 1 10.00 MLA
ko Pani
47 Chetam Har Khet MOA&FW Kopo koro to Gingchakrijo at Nilling 1 4.00 9.00 3 10.00 MLA
ko Pani
48 Chetam Har Khet MOA&FW Kungtahm koro to Vijayrijo at Dai 1 4.00 7.00 2 10.00 MLA
ko Pani
49 Chetam Har Khet MOA&FW Chichi chene koro to Rochu rijo at Belu 1 4.00 6.00 3 10.00 MLA
ko Pani
50 Chetam Har Khet MOA&FW Cheta koro to Saram rijo at Daru. 1 2.00 8.00 1 5.00 ZPM
ko Pani
51 Chetam Har Khet MOA&FW Chusi koro to Nitarijo at Lote 1 4.00 11.00 1 10.00 ZPM
ko Pani
52 Chetam Har Khet MOA&FW Bipo koro to Libirijo at Ruji 1 4.00 10.00 2 10.00 ZPM
ko Pani
53 Chetam Har Khet MOA&FW Leku koro to Pakha rijo at Sari 1 4.00 9.00 2 10.00 ZPM
ko Pani
54 Chetam Har Khet MOA&FW Sogum koro to Separijo at Rikung 1 4.00 15.00 1 10.00 ZPM
ko Pani
55 Chetam Har Khet MOA&FW Chichi Chine koro to Rokchu rijo at Belu. 1 4.00 8.00 2 10.00 ZPM
ko Pani
56 Chetam Har Khet MOA&FW Loho koro to Napenrijo (Porgiam) at 1 4.00 12.00 1 10.00 ZPC
ko Pani Sera
57 Chetam Har Khet MOA&FW Boging koro to Boging rijo at Boging 1 2.00 15.00 1 5.00 CO Nilling
ko Pani
58 Chetam Har Khet MOA&FW Hama koro to Lintaksiku at Hagne Doke 1 2.00 10.00 1 5.00 CO Niling
ko Pani
59 Chetam Har Khet MOA&FW Hama koro to Tajak rijo at Dadi 1 1.00 12.00 1 2.50 CO Nilling
ko Pani
60 Chetam Har Khet MOA&FW Tanamso to Raring Ringjo at Daru. 1 2.00 10.00 1 5.00 CO Nilling
ko Pani
61 Chetam Har Khet MOA&FW Nyo koro to Nyo rijo at Boging 1 4.00 11.00 2 10.00 CO Nilling
ko Pani

735 | P a g e
62 Chetam Har Khet MOA&FW Hachi koro to Hachi Nyoring at Cheging 1 8.00 13.00 2 20.00 CO Nilling
ko Pani
63 Chetam Har Khet MOA&FW Noi koro to Hoya rijo at Ningpin 1 2.00 10.00 1 5.00 CO Niling
ko Pani
64 Chetam Har Khet MOA&FW Sippi koro to Dering rijo at Dayam 1 1.50 226.00 1 3.75 CO Nilling
ko Pani
65 Chetam Har Khet MOA&FW Gimok koro to Riamriang rijo at Dadi 1 1.00 12.00 1 2.50 CO Nilling
ko Pani
66 Chetam Har Khet MOA&FW Riksar koro to Guha rijo at Guha 1 2.00 20.00 1 5.00 CO Nilling
ko Pani
67 Chetam Har Khet MOA&FW Rabong koro to Jelirijo at Boging 1 5.00 9.00 2 12.50 CO Nilling
ko Pani
68 Chetam Har Khet MOA&FW Basi koro to Gimok rijo at Dadi 1 1.50 11.00 1 3.75 CO Nilling
ko Pani
69 Chetam Har Khet MOA&FW Hutey koro to Homi rijo at Raha vill 1 1.00 14.00 1 2.50 CO Niling
ko Pani
70 Chetam Har Khet MOA&FW Merong koro to Merong rijo at Jeke 1 1.00 10.00 1 2.50 CO Nilling
ko Pani
71 Chetam Har Khet MOA&FW Nyo koro to Tengin Haring at Boging 1 3.00 8.00 2 7.50 CO Nilling
ko Pani
72 Chetam Har Khet MOA&FW Sippi koro to Paa rijo at Dadi 1 1.00 15.00 1 2.50 CO Nilling
ko Pani
73 Chetam Har Khet MOA&FW Nudung koro to Leme rijo at Guha 1 2.00 15.00 1 5.00 CO Nilling
ko Pani
74 Chetam Har Khet MOA&FW Nambung koro to Basi rijo 1 3.00 9.00 1 7.50 CO Nilling
ko Pani
75 Chetam Har Khet MOA&FW Domching koro to Rasing rijo at Daru. 1 5.00 9.00 3 12.50 CO Nilling
ko Pani
76 Chetam Har Khet MOA&FW Haging koro to Haging Rijo at Rikung 1 2.00 14.00 1 5.00 CO Niling
ko Pani
77 Chetam Har Khet MOA&FW Butu koro to Hotak rijo at Guha 1 6.00 13.00 2 15.00 CO Nilling
ko Pani
78 Chetam Har Khet MOA&FW Hachi koro Haching Nyoring at Cheging 1 1.00 11.00 1 2.50 CO Nilling
ko Pani

736 | P a g e
79 Chetam Har Khet MOA&FW Lebakoro to Lebarijo at Dayam 1 8.00 10.00 3 20.00 CO Nilling
ko Pani
80 Chetam Har Khet MOA&FW Rao koro to Nangko rijo at Jeke 1 1.00 11.00 1 2.50 CO Nilling
ko Pani
81 Chetam Har Khet MOA&FW Chadak koro to Singha rijo at Lingsa 1 1.00 15.00 1 2.50 CO Nilling
ko Pani
82 Chetam Har Khet MOA&FW Gima koro to Riamte rijo at Dadi 1 1.50 10.00 1 3.75 CO Nilling
ko Pani
83 Chetam Har Khet MOA&FW Bhaiso koro to Leba See at Dayam 1 1.00 12.00 1 2.50 CO Nilling
ko Pani
84 Chetam Har Khet MOA&FW Riksar koro to Guharijo at Guha 1 20.00 22.00 3 50.00 CO Nilling
ko Pani
85 Chetam Har Khet MOA&FW Ote koro to Ringchi Ringte at Lokar rijo 1 2.00 9.00 1 5.00 CO Niling
ko Pani
86 Chetam Har Khet MOA&FW Pikching koro to Pikching rijo at Magria 1 1.00 14.00 1 2.50 CO Nilling
ko Pani
87 Chetam Har Khet MOA&FW Tiksikso koro to Giadu Nioring at Niling 1 3.00 7.00 1 7.50 CO Niling
ko Pani
88 Chetam Har Khet MOA&FW Hayung koro to Doyik rijo at Dadi 1 2.00 12.00 1 5.00 CO Nilling
ko Pani
89 Chetam Har Khet MOA&FW Leba koro to Yumgiam rijo at Dayam 1 1.00 11.00 1 2.50 CO Nilling
ko Pani
90 Chetam Har Khet MOA&FW Riksar koro to Leme rijo at Guha 1 4.00 19.00 1 10.00 CO Nilling
ko Pani
91 Chetam Har Khet MOA&FW Linking koro to Nyoko rijo at Linking 1 1.00 10.00 1 2.50 CO Nilling
ko Pani
92 Chetam Har Khet MOA&FW Nyo koro to Nyorijo at Daru. 1 2.00 11.00 1 5.00 CO Nilling
ko Pani
93 Chetam Har Khet MOA&FW Tatak koro to Guha rijo at Guha 1 3.00 14.00 1 7.50 CO Nilling
ko Pani
94 Chetam Har Khet MOA&FW Yorpi koro to Dokte rijo at Rikung 1 1.00 10.00 1 2.50 CO Niling
ko Pani
95 Chetam Har Khet MOA&FW Hutey koro to Soi rijo at Ningpin 1 3.00 11.00 1 7.50 CO Niling
ko Pani

737 | P a g e
96 Chetam Har Khet MOA&FW Bodu koro to Lumtak rijo at Dasi 1 4.00 12.00 2 10.00 ASM
ko Pani
97 Chetam Har Khet MOA&FW Tatak koro to Dekio rijo at Guha 1 1.00 14.00 1 2.50 CO Nilling
ko Pani
98 Chetam Har Khet MOA&FW Tengin Sow to Rage rijo at Jeke 1 5.00 11.00 2 12.50 CO Nilling
ko Pani
99 Chetam Har Khet MOA&FW Leba koro to Bimpak rijo at Dayam 1 1.50 13.00 1 3.75 CO Nilling
ko Pani
100 Chetam Har Khet MOA&FW Raho koro to Rengmi rijo at Jeke 1 3.00 13.00 2 7.50 CO Nilling
ko Pani
101 Chetam Har Khet MOA&FW Sippi river to Chichi Bokpin at Batam/ 1 2.00 258.00 1 5.00 ASM
ko Pani Belu
102 Chetam Har Khet MOA&FW Punggu koro to Mardo rijo at Guha 1 2.00 12.00 1 5.00 CO Nilling
ko Pani
103 Chetam Har Khet MOA&FW Haching Bhai to Lingsa Rapi rijo at 1 10.00 14.00 3 25.00 CO Nilling
ko Pani Lingsa
104 Chetam Har Khet MOA&FW Dimi koro to Dimirijo at Dasi vill 1 4.00 11.00 2 10.00 ASM
ko Pani
105 Chetam Har Khet MOA&FW Pitak koro to Lingsa rijo at Lingsa 1 2.00 10.00 1 5.00 CO Nilling
ko Pani
106 Chetam Har Khet MOA&FW Darmi koro to Tararijo at Dabu 1 3.00 10.00 2 7.50 ASM
ko Pani
107 Chetam Har Khet MOA&FW Tatak koro to Guha rijo at Guha 1 1.00 11.00 2 2.50 CO Nilling
ko Pani
108 Chetam Har Khet MOA&FW Pakpi koro to Pakpi rijo at Lingsa 1 1.00 9.00 1 2.50 CO Nilling
ko Pani
109 Chetam Har Khet MOA&FW Homi koro to Magria rijo at Magria 1 8.00 11.00 2 20.00 CO Nilling
ko Pani
110 Chetam Har Khet MOA&FW Koposo koro to Nio rijo at Niling 1 3.00 8.00 1 7.50 CO Niling
ko Pani
111 Chetam Har Khet MOA&FW Otey koro to Piktey rijo at Magria 1 1.00 10.00 1 2.50 CO Nilling
ko Pani
112 Chetam Har Khet MOA&FW Sigum koro to Pokpitering at Guha 1 7.00 14.00 2 17.50 CO Nilling
ko Pani

738 | P a g e
113 Chetam Har Khet MOA&FW Pikching koro to Piktey Yorbe at Magria 1 1.00 12.00 1 2.50 CO Nilling
ko Pani
114 Chetam Har Khet MOA&FW Jitey koro to Yorte rijo at Linking 1 1.00 15.00 1 2.50 CO Nilling
ko Pani
115 Chetam Har Khet MOA&FW Hachi koro to Pakkam rijo at Niling 1 6.00 8.00 2 15.00 CO Niling
ko Pani
116 Chetam Har Khet MOA&FW Ngudung koro to See rijo at Rikung 1 2.00 9.00 1 5.00 CO Niling
ko Pani
117 Chetam Har Khet MOA&FW Riksar koro to Hagung rijo at Guha 1 2.00 18.00 1 5.00 CO Nilling
ko Pani
118 Chetam Har Khet MOA&FW Longte koro to Kadakrijo at Niling 1 2.00 10.00 1 5.00 CO Niling
ko Pani
119 Chetam Har Khet MOA&FW Sorong koro to Yorko rijo at Magria 1 1.00 9.00 1 2.50 CO Nilling
ko Pani
120 Chetam Har Khet MOA&FW Nio koro to Pajok rijo at Niling 1 2.00 9.00 1 5.00 CO Niling
ko Pani
121 Chetam Har Khet MOA&FW Mara Rakching koro to Hake rijo at 1 1.00 11.00 1 2.50 CO Niling
ko Pani Niling
122 Chetam Har Khet MOA&FW Mending koro to Sahu rijo at Niling 1 1.00 7.00 1 2.50 CO Niling
ko Pani
123 Chetam Har Khet MOA&FW Homi koro to Homi rijo at Niling 1 1.00 6.00 1 2.50 CO Niling
ko Pani
124 Chetam Har Khet MOA&FW Ommi koro to Yorte rijo at Linking 1 5.00 13.00 2 12.50 CO Nilling
ko Pani
125 Chetam Har Khet MOA&FW Butu koro to Doji rijo at Guha 1 1.00 11.00 1 2.50 CO Nilling
ko Pani
126 Chetam Har Khet MOA&FW Kamya koro to Gongo Nioring at Niling 1 3.00 9.00 1 7.50 CO Niling
ko Pani
127 Chetam Har Khet MOA&FW Pakpi koro to Pakpi rijo at Linking 1 2.00 14.00 1 5.00 CO Nilling
ko Pani
128 Chetam Har Khet MOA&FW Laktung koro to Hami rijo at Linking 1 2.00 11.00 1 5.00 CO Nilling
ko Pani
129 Chetam Har Khet MOA&FW Oching koro to Pokpetering at Rikung 1 10.00 11.00 3 25.00 CO Niling
ko Pani

739 | P a g e
130 Chetam Har Khet MOA&FW Sippi koro to Sopen rijo at Guha 1 2.00 231.00 1 5.00 CO Nilling
ko Pani
131 Chetam Har Khet MOA&FW Hoching koro to Raikrijo at Rikung 1 2.00 11.00 1 5.00 CO Niling
ko Pani
132 Chetam Har Khet MOA&FW Sarmiso koro to Takmi rijo at Niling 1 1.00 8.00 1 2.50 CO Niling
ko Pani
133 Chetam Har Khet MOA&FW Sebing koro to Sogum koro rijo 1 2.00 12.00 1 5.00 CO Niling
ko Pani (Dupung) at Rikung
134 Chetam Har Khet MOA&FW Lodo koro to Saa rijo at Rikung 1 3.00 12.00 1 7.50 CO Niling
ko Pani
135 Chetam Har Khet MOA&FW Soo koro to Sorijo at Rikung 1 2.00 11.00 1 5.00 CO Niling
ko Pani
136 Chetam Har Khet MOA&FW Rikli koro to Chotamtami at Dasi vill 1 4.00 7.00 2 10.00 ASM
ko Pani
137 Chetam Har Khet MOA&FW Oching koro to Pokpetering (Lakam rijo) 1 2.00 13.00 1 5.00 CO Niling
ko Pani at Rikung
138 Chetam Har Khet MOA&FW Hutey koro to Minding rijo at Ningpin 1 2.00 10.00 1 5.00 CO Niling
ko Pani
139 Chetam Har Khet MOA&FW Homi koro to Nogam Homi rijo at 1 4.00 7.00 1 10.00 CO Niling
ko Pani Ningpin
140 Chetam Har Khet MOA&FW Talit koro to Hama riga at Dadi 1 2.00 13.00 1 5.00 CO Nilling
ko Pani
141 Chetam Har Khet MOA&FW Noi koro to Naru rijo at Ningpin 1 2.00 11.00 1 5.00 CO Niling
ko Pani
142 Chetam Har Khet MOA&FW Hutey koro to Soi rijo at Raha vill 1 2.00 12.00 1 5.00 CO Niling
ko Pani
143 Chetam Har Khet MOA&FW Rasing koro to Rasing rijo at Jeke 1 2.00 9.00 1 5.00 CO Nilling
ko Pani
144 Chetam Har Khet MOA&FW Biaso koro to Bai rijo at Lokar rijo 1 2.00 10.00 1 5.00 CO Niling
ko Pani
145 Chetam Har Khet MOA&FW Singha koro to Tamirijo at Lingsa 1 1.00 11.00 1 2.50 CO Nilling
ko Pani
146 Chetam Har Khet MOA&FW Hayong koro to Hayungrijo at Hagne 1 2.00 8.00 1 5.00 CO Niling
ko Pani Doke

740 | P a g e
147 Chetam Har Khet MOA&FW Tombom koro to Tombom rijo at 1 3.00 15.00 1 7.50 CO Nilling
ko Pani Cheging
148 Chetam Har Khet MOA&FW Hayung koro to Giaching rijo at Hagne 1 2.00 11.00 1 5.00 CO Niling
ko Pani Doke
149 Chetam Har Khet MOA&FW Gingju koro to Hamarijo at Hamariga 1 2.00 8.00 1 5.00 CO Niling
ko Pani
150 Chetam Har Khet MOA&FW Nyo koro to Hakpi rijo at Boging 1 4.00 16.00 2 10.00 CO Nilling
ko Pani
151 Chetam Har Khet MOA&FW Sebia koro to Hapi rijo at Dadi 1 1.50 9.00 1 3.75 CO Nilling
ko Pani
152 Chetam Har Khet MOA&FW Tari koro to Darurijo at Daru. 1 2.00 13.00 1 5.00 CO Nilling
ko Pani
153 Chetam Har Khet MOA&FW Sippi Koro to Sugia rijo at Guha 1 7.00 230.00 2 17.50 CO Nilling
ko Pani
154 Chetam Har Khet MOA&FW Singlok koro to Singlok rijo at Magria 1 1.00 13.00 1 2.50 CO Nilling
ko Pani
155 Chetam Har Khet MOA&FW Jitey koro to Yorte rijo at Lingsa 1 1.00 12.00 1 2.50 CO Nilling
ko Pani
156 Chetam Har Khet MOA&FW Biachi koro to Biachirijo at Batam 1 10.00 17.00 3 25.00 ASM
ko Pani
157 Chetam Har Khet MOA&FW Lift irrg from Sippi river to Dido Bokpin at 1 10.00 255.00 3 25.00 ASM
ko Pani Batam
158 Chetam Har Khet MOA&FW Sippi river to Dido at Batam/ Belu 1 10.00 256.00 3 25.00 ASM
ko Pani
159 Chetam Har Khet MOA&FW Sena Koro to Naririjo riko at Siga 1 2.00 10.00 2 5.00 ASM
ko Pani
160 Chetam Har Khet MOA&FW Lift irr from Sippi river to Kocharijo at 1 10.00 260.00 3 25.00 ASM
ko Pani Batam/Belu
161 Chetam Har Khet MOA&FW Tabukoro to Taburijo at Belu 1 2.00 11.00 1 5.00 ASM
ko Pani
162 Chetam Har Khet MOA&FW Girgik koro to Mending rijo at Dai 1 4.00 12.00 1 10.00 ASM
ko Pani
163 Chetam Har Khet MOA&FW Kia koro to Sedum Puchup rijo at Dai 1 4.00 7.00 1 10.00 ASM
ko Pani

741 | P a g e
164 Chetam Har Khet MOA&FW Boduso koro to Tamarijo at Dasi vill 1 4.00 9.00 2 10.00 ASM
ko Pani
165 Chetam Har Khet MOA&FW Bipo koro to Serik rijo at Hina 1 4.00 6.00 2 10.00 ASM
ko Pani
166 Chetam Har Khet MOA&FW Lide koro to Liderijo at Dasi vill 1 4.00 13.00 2 10.00 ASM
ko Pani
167 Chetam Har Khet MOA&FW Lomtak koro to Hiririjo at Hinju 1 8.00 10.00 3 20.00 ASM
ko Pani
168 Chetam Har Khet MOA&FW Kamcho koro to Pakleri at Dasi vill 1 4.00 9.00 2 10.00 ASM
ko Pani
169 Chetam Har Khet MOA&FW Sorjo koro to Dalorijo at Kare vill 1 2.00 7.00 1 5.00 ASM
ko Pani
170 Chetam Har Khet MOA&FW Kambia Koro to Takiorijo at Doni vill 1 4.00 13.00 2 10.00 ASM
ko Pani
171 Chetam Har Khet MOA&FW Dabu koro to Dabu rijo at Dabu 1 5.00 7.00 2 12.50 ASM
ko Pani
172 Chetam Har Khet MOA&FW Sippi koro to Sumpirijo at Namchi 1 2.00 11.00 2 5.00 ASM
ko Pani
173 Chetam Har Khet MOA&FW Tanio koro to Meterijo at Harak vill 1 2.00 12.00 1 5.00 ASM
ko Pani
174 Chetam Har Khet MOA&FW Chusi koro toBalorijo at Hina 1 4.00 7.00 2 10.00 ASM
ko Pani
175 Chetam Har Khet MOA&FW Naloh koro to Namchi rijo at Namchi 1 2.00 9.00 2 5.00 ASM
ko Pani
176 Chetam Har Khet MOA&FW Papak koro to Joru rijo at Sera 1 5.00 12.00 2 12.50 ASM
ko Pani
177 Chetam Har Khet MOA&FW Bupu koro to Delirijo at Kare vill 1 8.00 8.00 2 20.00 ASM
ko Pani
178 Chetam Har Khet MOA&FW Letor koro to Nangko rijo at Hina 1 4.00 8.00 2 10.00 ASM
ko Pani
179 Chetam Har Khet MOA&FW Yiarko Koro to Riamring rijo at Dadi 1 8.00 13.00 2 20.00 GPC
ko Pani
180 Chetam Har Khet MOA&FW China koro to Jedoum rijo at Batam 1 15.00 13.00 3 37.50
ko Pani

742 | P a g e
181 Chetam Har Khet MOA&FW Gumgum so to Silu rijo at Silu vill 1 3.00 10.00 2 7.50 ASM
ko Pani
182 Chetam Har Khet MOA&FW Pajok koro to Hinju rijo at Hinju vill 1 4.00 7.00 2 10.00 ASM
ko Pani
183 Chetam Har Khet MOA&FW Molo koro to Molorijo at Kare vill 1 1.50 10.00 1 3.75 ASM
ko Pani
184 Chetam Har Khet MOA&FW Hidam seram koro to Jetegote at Kare 1 5.00 6.00 2 12.50 ASM
ko Pani
185 Chetam Har Khet MOA&FW Radhi koro to Radhirijo at Hina 1 4.00 11.00 2 10.00 ASM
ko Pani
186 Chetam Har Khet MOA&FW Teri koro to Teri Pyakar at Siga vill 1 2.00 7.00 2 5.00 ASM
ko Pani
187 Chetam Har Khet MOA&FW Tani suku to Jererijo at Kare vill 1 3.00 9.00 1 7.50 ASM
ko Pani
188 Chetam Har Khet MOA&FW Dapo koro to Bogi Bida at Lechin 1 3.00 7.00 2 7.50 ASM
ko Pani
189 Chetam Har Khet MOA&FW Chemio koro to Pakba at Bayor vill 1 11.00 12.00 3 27.50 -do-
ko Pani
190 Chetam Har Khet MOA&FW Moji koro to Ragyar rijo at Mosi vill 1 4.00 9.00 2 10.00 ASM
ko Pani
191 Chetam Har Khet MOA&FW Lepu koro to Namchirijo at Namchi 1 2.00 12.00 2 5.00 ASM
ko Pani
192 Chetam Har Khet MOA&FW Lomi koro to Tudhi rijo at Hina 1 4.00 10.00 2 10.00 ASM
ko Pani
193 Chetam Har Khet MOA&FW Tigri koro to Napin rijo at Namchi 1 2.00 7.00 2 5.00 ASM
ko Pani
194 Chetam Har Khet MOA&FW Loh koro to Tonari rijo at Siga vill 1 3.00 11.00 2 7.50 ASM
ko Pani
195 Chetam Har Khet MOA&FW Loho koro to Omik Lepik at Namchi 1 2.00 8.00 2 5.00 ASM
ko Pani
196 Chetam Har Khet MOA&FW Sha koro to Saririjo at Sari 1 2.00 6.00 1 5.00 ASM
ko Pani
197 Chetam Har Khet MOA&FW Sameen koro to Jeberijo at Sera 1 4.00 6.00 2 10.00 ASM
ko Pani

743 | P a g e
198 Chetam Har Khet MOA&FW Kolu koro to Kolu rijo at Sebing 1 6.00 8.00 2 15.00 ASM
ko Pani
199 Chetam Har Khet MOA&FW Papak koro to Pyakar rijo at Sera 1 5.00 16.00 2 12.50 ASM
ko Pani
200 Chetam Har Khet MOA&FW Lomikoro to Sippi rijo art Hina 1 4.00 12.00 2 10.00 ASM
ko Pani
201 Chetam Har Khet MOA&FW Loh koro to Napin rijo at Sera 1 4.00 8.00 2 10.00 ASM
ko Pani
202 Chetam Har Khet MOA&FW Sippi river to Sumpirijo at Siga 1 3.00 306.00 2 7.50 ASM
ko Pani
203 Chetam Har Khet MOA&FW Shakoro to Sayor rijo at Marbom 1 8.00 5.00 3 20.00 -do-
ko Pani
204 Chetam Har Khet MOA&FW Lomdi koro to Papak rijo at Sera 1 4.00 7.00 2 10.00 ASM
ko Pani
205 Chetam Har Khet MOA&FW Kiri koro to Jamirijo at Batam 1 10.00 12.00 3 25.00
ko Pani
206 Chetam Har Khet MOA&FW Loh koro to Nusi rijo at Sera 1 4.00 11.00 2 10.00 ASM
ko Pani
207 Chetam Har Khet MOA&FW Semin koro to Pagia suri rijo(Nonia) at 1 4.00 12.00 2 10.00 ASM
ko Pani Sera Tapapu
208 Chetam Har Khet MOA&FW Papak koro to Tabom rijo at Sera 1 4.00 8.00 2 10.00 ASM
ko Pani
209 Chetam Har Khet MOA&FW Malikoro to Laberijo at Sera vill 1 4.00 11.00 2 10.00 ASM
ko Pani
210 Chetam Har Khet MOA&FW Semin koro to Taberijo at Sera Tapapu 1 4.00 11.00 2 10.00 ASM
ko Pani
211 Chetam Har Khet MOA&FW Semin koro to Pagia suri rijo(Genam) at 1 5.00 12.00 2 12.50 ASM
ko Pani Sera Tapapu
212 Chetam Har Khet MOA&FW Sena koro to Mako Naririjo at Siga 1 7.00 8.00 2 17.50 ZPM
ko Pani
213 Chetam Har Khet MOA&FW Harbasi koro to Harbarijo at Marbom 1 10.00 9.00 3 25.00 -do-
ko Pani
214 Chetam Har Khet MOA&FW Napin ochi koro to Naririjo( Rira) at Siga 1 2.00 9.00 2 5.00 ASM
ko Pani

744 | P a g e
215 Chetam Har Khet MOA&FW Papak koro to Gayi rijo at Sera 1 4.00 11.00 2 10.00 ASM
ko Pani
216 Chetam Har Khet MOA&FW Pelokoro to Khenyi rijo at Hina 1 4.00 9.00 2 10.00 ASM
ko Pani
217 Chetam Har Khet MOA&FW Jalikoro to Jama at Siga 1 2.00 13.00 2 5.00 ASM
ko Pani
218 Chetam Har Khet MOA&FW Nar koro to Gyakamat Siga 1 2.00 12.00 2 5.00 ASM
ko Pani
219 Chetam Har Khet MOA&FW Hoso koro to Ringipitak at Siga vill 1 2.00 9.00 2 5.00 ASM
ko Pani
220 Chetam Har Khet MOA&FW Paga koro to Lechin at Lechin vill 1 2.00 9.00 2 5.00 ASM
ko Pani
221 Chetam Har Khet MOA&FW Rama Koro to Rama myodu at Siga 1 3.00 6.00 2 7.50 ASM
ko Pani
222 Chetam Har Khet MOA&FW Pitak koroto Phitak at Siga 1 3.00 10.00 2 7.50 ASM
ko Pani
223 Chetam Har Khet MOA&FW Pete koro to Riokam rijo at Sera Tapapu 1 15.00 16.00 3 37.50 ASM
ko Pani
224 Chetam Har Khet MOA&FW Tabin koro to Tabinrijo at Silu vill 1 4.00 8.00 2 10.00 ASM
ko Pani
225 Chetam Har Khet MOA&FW Shaa koro to Shaa rijo at Sari 1 3.00 11.00 1 7.50 ASM
ko Pani
226 Chetam Har Khet MOA&FW Silu koro to Silurijo at Silu village 1 4.00 8.00 2 10.00 ASM
ko Pani
227 Chetam Har Khet MOA&FW Sebiu koro to Bogikrijo at Soki 1 6.00 10.00 2 15.00 ASM
ko Pani
228 Chetam Har Khet MOA&FW Kahakoro to Takki at Bayor vill 1 10.00 12.00 3 25.00 G /Chairperson
ko Pani
229 Chetam Har Khet MOA&FW Loh koro to Gyakam rijo at Sera vill 1 4.00 10.00 2 10.00 ASM
ko Pani
230 Chetam Har Khet MOA&FW Si koro to Yaperijo at Bayor 1 5.00 14.00 3 12.50 -do-
ko Pani
231 Chetam Har Khet MOA&FW Liru koro to Chetiarijo at Chortorijo 1 5.00 10.00 2 12.50 G/Chairperson
ko Pani

745 | P a g e
232 Chetam Har Khet MOA&FW Basi koro to Giamok rijo at Dadi 1 7.00 15.00 2 17.50 GPC
ko Pani
233 Chetam Har Khet MOA&FW Loh koro to Naririjo at Sera 1 4.00 9.00 2 10.00 ASM
ko Pani
234 Chetam Har Khet MOA&FW Kama koro to Hami rijo at Dai 1 6.00 12.00 2 15.00 GPC
ko Pani
235 Chetam Har Khet MOA&FW Sha koro to Tapiumrijo at Marbom 1 10.00 8.00 3 25.00 Gram
ko Pani Chairperson
236 Chetam Har Khet MOA&FW Naloom Koro to Sayorrijo at Marbom 1 6.00 8.00 3 15.00 -do-
ko Pani
237 Chetam Har Khet MOA&FW SeIi koro Takirik dum at Marbom 1 9.00 12.00 3 22.50 -do-
ko Pani
238 Chetam Har Khet MOA&FW Tasum koro to Dedirijo at Marbom 1 10.00 10.00 3 25.00 -do-
ko Pani
239 Chetam Har Khet MOA&FW Petin koro to Bido rijo at Batam 1 15.00 14.00 3 37.50
ko Pani
240 Chetam Har Khet MOA&FW Ramdukoro to Taminrijo at Batam 1 15.00 14.00 3 37.50
ko Pani
241 Chetam Har Khet MOA&FW Gigi koro to Memerijo at Marbom 1 12.00 3.00 3 30.00 GPC
ko Pani
242 Chetam Har Khet MOA&FW Chiri koro to Bijey rijo at Batam 1 5.00 7.00 2 12.50
ko Pani
243 Chetam Har Khet MOA&FW Ochak koro to Tikio rijo at Batam 1 5.00 9.00 2 12.50
ko Pani
244 Chetam Har Khet MOA&FW Otekoro to Toburijo at Batam 1 15.00 12.00 3 37.50
ko Pani
245 Chetam Har Khet MOA&FW Tabu koro to Nidim rijo at Batam 1 15.00 15.00 3 37.50
ko Pani
246 Chetam Har Khet MOA&FW Darlo koro to Dayi rijo at Bayor 1 6.00 10.00 2 15.00
ko Pani
247 Chetam Har Khet MOA&FW Namchi koro to Baterijo at Bayor 1 8.00 11.00 3 20.00
ko Pani
248 Chetam Har Khet MOA&FW Kocham koro to Jepurijo at Belu 1 12.00 13.00 3 30.00
ko Pani

746 | P a g e
249 Chetam Har Khet MOA&FW Nalo koro to Tayumrijo at Belu 1 5.00 7.00 2 12.50
ko Pani
250 Chetam Har Khet MOA&FW Nio Koro to Hakperijo at Boging 1 3.00 6.00 2 7.50
ko Pani
251 Chetam Har Khet MOA&FW Hakpe koro to Takamharijo at Boging 1 4.00 8.00 2 10.00
ko Pani
252 Chetam Har Khet MOA&FW Sippi koro to Sippirijo at Boging 1 10.00 225.00 3 25.00
ko Pani
253 Chetam Har Khet MOA&FW Sisi koro to Doku rijo at Boging 1 8.00 14.00 3 20.00
ko Pani
254 Chetam Har Khet MOA&FW Nio Koro to Niorijo at Boging 1 5.00 6.50 2 12.50
ko Pani
255 Chetam Har Khet MOA&FW Pachung nallah to Bogingrijo at Boging 1 10.00 13.00 3 25.00
ko Pani
256 Chetam Har Khet MOA&FW Doku nallah to Rabongrijo at Boging 1 4.00 10.00 2 10.00
ko Pani
257 Chetam Har Khet MOA&FW Cheging koro to Nalamrijo at Cheging 1 3.00 8.00 2 7.50
ko Pani
258 Chetam Har Khet MOA&FW Hari river to Hachi rijo at Cheging 1 7.00 12.00 3 17.50
ko Pani
259 Chetam Har Khet MOA&FW Hachi river to cheging rijo at Cheging 1 8.00 12.00 3 20.00
ko Pani
260 Chetam Har Khet MOA&FW Tombom koro to tobbom rijo at Cheging 1 5.00 10.00 2 12.50
ko Pani
261 Chetam Har Khet MOA&FW Tombom koro to Delerijo at Cheging 1 9.00 14.00 3 22.50
ko Pani
262 Chetam Har Khet MOA&FW Motu koro to Chetam Dumtorijo at 1 13.00 17.00 3 32.50
ko Pani Chetam
263 Chetam Har Khet MOA&FW Tani koro to Tejirijo at Chetam 1 12.00 13.00 3 30.00
ko Pani
264 Chetam Har Khet MOA&FW Tabu koro to Pirarijo at Chetam 1 8.00 9.00 3 20.00
ko Pani
265 Chetam Har Khet MOA&FW Tani koro to Rojenrijo at Chetam 1 7.00 11.00 3 17.50
ko Pani

747 | P a g e
266 Chetam Har Khet MOA&FW Tani koro to Tummuhari at Chetam 1 5.00 10.00 2 12.50
ko Pani
267 Chetam Har Khet MOA&FW Bapik koro to Molo at Chetam 1 6.00 9.00 2 15.00
ko Pani
268 Chetam Har Khet MOA&FW Sorjo koro to Mukji rijo at Chetam 1 12.00 11.00 2 30.00
ko Pani
269 Chetam Har Khet MOA&FW Sippi river to Rammemori at Chetia 1 6.00 9.00 2 15.00
ko Pani
270 Chetam Har Khet MOA&FW Mali Maji to Chetiarijo at Chetia 1 5.00 7.50 2 12.50
ko Pani
271 Chetam Har Khet MOA&FW Mali koro to Nyakam rijo at Chetia 1 4.00 9.00 2 10.00
ko Pani
272 Chetam Har Khet MOA&FW Ramso koro to Muririjo at Chetia 1 4.00 10.00 2 10.00
ko Pani
273 Chetam Har Khet MOA&FW Nambum koro to Daterrijo at Dadi 1 3.00 8.00 2 7.50
ko Pani
274 Chetam Har Khet MOA&FW Sibia koro to Takjakrijo at Dadi 1 3.00 7.00 2 7.50
ko Pani
275 Chetam Har Khet MOA&FW Ngorak koro to Yagok rijo at Dadi 1 4.00 9.00 2 10.00
ko Pani
276 Chetam Har Khet MOA&FW Nambung koro to Haporijo at Dadi 1 2.00 6.00 2 5.00
ko Pani
277 Chetam Har Khet MOA&FW Richiringle koro to Rinchiringlerijo at 1 5.00 11.00 2 12.50
ko Pani Dadi
278 Chetam Har Khet MOA&FW Nambum koro to Basirijo at Dadi 1 5.00 12.00 2 12.50
ko Pani
279 Chetam Har Khet MOA&FW Tashisou koro to Ratey yorbe at Dadi 1 6.00 10.00 3 15.00
ko Pani
280 Chetam Har Khet MOA&FW Lokar koto to Lkar rijo at Dadi 1 5.00 9.00 3 12.50
ko Pani
281 Chetam Har Khet MOA&FW Sebia koro to Sebia rijo at Dadi 1 8.00 14.00 3 20.00
ko Pani
282 Chetam Har Khet MOA&FW Hapa koro to Hapak rijo at Dadi 1 4.00 11.00 1 10.00
ko Pani

748 | P a g e
283 Chetam Har Khet MOA&FW Sibia koro to Sibia rijo at Dadi vill. 1 5.00 12.00 2 12.50
ko Pani
284 Chetam Har Khet MOA&FW Rongte koro to Boksu rijo at Dai 1 4.00 8.00 2 10.00
ko Pani
285 Chetam Har Khet MOA&FW Sippi river to Tamerijo at Dai 1 10.00 215.00 3 25.00
ko Pani
286 Chetam Har Khet MOA&FW Kongtam koro to Kongtam rijo at Dai 1 3.00 7.00 2 7.50
ko Pani
287 Chetam Har Khet MOA&FW Mending koro to Mending rijo at Dai 1 5.00 9.00 2 12.50
ko Pani
288 Chetam Har Khet MOA&FW Niotu Koro to Chalikrijo at Dai 1 10.00 12.00 3 25.00
ko Pani
289 Chetam Har Khet MOA&FW Niosar koro to Lengda rijo at Dai 1 2.00 8.00 1 5.00
ko Pani
290 Chetam Har Khet MOA&FW Pemakoro to Tengkam rijo at Dai 1 2.00 7.00 1 5.00
ko Pani
291 Chetam Har Khet MOA&FW Nanko koro to Sedung pochup at Dai 1 5.00 6.00 2 12.50
ko Pani
292 Chetam Har Khet MOA&FW Gargik koro to Kargikrijo at Dai 1 5.00 9.00 2 12.50
ko Pani
293 Chetam Har Khet MOA&FW Kia koro to Dairijo at Dai 1 2.00 12.00 1 5.00
ko Pani
294 Chetam Har Khet MOA&FW Tome koro to Tome rijo at Dai 1 2.00 13.00 1 5.00
ko Pani
295 Chetam Har Khet MOA&FW Tanamso to Suku rijo at Daru 1 4.00 6.00 2 10.00
ko Pani
296 Chetam Har Khet MOA&FW Tarekor to Teringtere at Daru 1 5.00 8.00 2 12.50
ko Pani
297 Chetam Har Khet MOA&FW Niumpu koro to Rasing Hare at Daru 1 10.00 14.00 3 25.00
ko Pani
298 Chetam Har Khet MOA&FW Dunching koro to Rasingrijo at Daru 1 4.00 8.00 2 10.00
ko Pani
299 Chetam Har Khet MOA&FW Tare koro to Jiting at Daru 1 10.00 12.00 3 25.00
ko Pani

749 | P a g e
300 Chetam Har Khet MOA&FW Nasu koro to Nasusahu at Daru 1 5.00 10.00 2 12.50
ko Pani
301 Chetam Har Khet MOA&FW Damrijo at Daru 1 5.00 9.00 2 12.50
ko Pani
302 Chetam Har Khet MOA&FW Tanamso to Bedaraga at Daru 1 10.00 7.00 3 25.00
ko Pani
303 Chetam Har Khet MOA&FW Lidi koro to Lidirijo at Dasi 1 10.00 14.00 3 25.00
ko Pani
304 Chetam Har Khet MOA&FW Dite koro to Molo rijo at Dasi 1 5.00 9.00 3 12.50
ko Pani
305 Chetam Har Khet MOA&FW Dimi koro to Mindi rijo at Dasi 1 2.00 11.00 2 5.00
ko Pani
306 Chetam Har Khet MOA&FW Dimi koro to Bojum rijo at Dasi 1 2.00 11.00 2 5.00
ko Pani
307 Chetam Har Khet MOA&FW Kamcho koro to yobu-bolo rijo at Dasi 1 2.00 11.00 2 5.00
ko Pani
308 Chetam Har Khet MOA&FW Lomtak koro to Lumtakrijo at Dasi 1 5.00 11.00 2 12.50
ko Pani
309 Chetam Har Khet MOA&FW Demi koro to Mindi rijo at Dasi 1 20.00 21.00 3 50.00
ko Pani
310 Chetam Har Khet MOA&FW Make koro to Yima rijo at Dasi 1 4.00 12.00 2 10.00
ko Pani
311 Chetam Har Khet MOA&FW Hokdi koro to Kolupung rijo at Dasi 1 4.00 10.00 2 10.00
ko Pani
312 Chetam Har Khet MOA&FW Leba Koro to Lebarijo at Dayam 1 4.00 14.00 1 10.00
ko Pani
313 Chetam Har Khet MOA&FW Sha koro to to Pakba rijo at Debi vill 1 2.00 12.00 1 5.00
ko Pani
314 Chetam Har Khet MOA&FW Maasi koro to Pootepatlin at Duni 1 8.00 10.00 3 20.00
ko Pani
315 Chetam Har Khet MOA&FW Sibin koro to Takkiomori at Duni 1 4.00 14.00 2 10.00
ko Pani
316 Chetam Har Khet MOA&FW Gunekoro to Kioko at Duni 1 5.00 14.00 2 12.50
ko Pani

750 | P a g e
317 Chetam Har Khet MOA&FW Kangil sii koro to Kangkii yorbe at Duni 1 4.00 11.00 2 10.00
ko Pani
318 Chetam Har Khet MOA&FW Bupusii koro to Bupu rijo at Duni 1 4.00 10.00 2 10.00
ko Pani
319 Chetam Har Khet MOA&FW Darmi koro to Ta rijo at Dabu 1 1.00 11.00 2 2.50
ko Pani
320 Chetam Har Khet MOA&FW Togi koro to Togi rijo ar Dabu 1 1.00 12.00 2 2.50
ko Pani
321 Chetam Har Khet MOA&FW Su koro to Jedik rijo at Dabu 1 3.00 12.00 2 7.50
ko Pani
322 Chetam Har Khet MOA&FW Pajok koro to Pajok rijo at Dabu 1 2.00 12.00 2 5.00
ko Pani
323 Chetam Har Khet MOA&FW Dabu koro to Boklin rijo at Dabu 1 2.00 11.00 2 5.00
ko Pani
324 Chetam Har Khet MOA&FW Darmi koro to Dikpe rijo at Dabu 1 1.00 11.00 2 2.50
ko Pani
325 Chetam Har Khet MOA&FW Kechu koro to Togi Yorlo at Dabu 1 4.00 7.00 2 10.00
ko Pani
326 Chetam Har Khet MOA&FW Su koro to Taha rijo at Dabu 1 9.00 10.00 3 22.50
ko Pani
327 Chetam Har Khet MOA&FW Rate koro to Tagam rijo at Dabu 1 4.00 7.00 2 10.00
ko Pani
328 Chetam Har Khet MOA&FW Kamnia koro to Kamnia rijo at Dabu 1 4.00 6.00 2 10.00
ko Pani
329 Chetam Har Khet MOA&FW Jokte koro to Raksa rijo at Dabu 1 4.00 6.00 2 10.00
ko Pani
330 Chetam Har Khet MOA&FW Hotakrijo at Guha 1 25.00 21.00 3 62.50
ko Pani
331 Chetam Har Khet MOA&FW Pungusoh to Mardo rijo at Guha 1 16.00 16.00 3 40.00
ko Pani
332 Chetam Har Khet MOA&FW Sippi river to Sugya rijo at Guha 1 15.00 227.00 3 37.50
ko Pani
333 Chetam Har Khet MOA&FW Sippi river to Charak rijo at Guha 1 6.00 228.00 3 15.00
ko Pani

751 | P a g e
334 Chetam Har Khet MOA&FW Riksar koro to Guharijo at Guha 1 20.00 22.00 3 50.00
ko Pani
335 Chetam Har Khet MOA&FW Butu river to Guhalimerijo at Guha 1 7.00 10.00 2 17.50
ko Pani
336 Chetam Har Khet MOA&FW Riksar koro to Lime rijo at Guha 1 6.00 20.00 2 15.00
ko Pani
337 Chetam Har Khet MOA&FW Hayung koro to Hane rijo at Hene Duku 1 4.00 12.00 1 10.00
ko Pani
338 Chetam Har Khet MOA&FW Bingam koro to Bingam rijo at Hina 1 10.00 10.50 3 25.00
ko Pani
339 Chetam Har Khet MOA&FW Hesor koro to Hesor rijo at Hina 1 5.00 7.00 2 12.50
ko Pani
340 Chetam Har Khet MOA&FW Dochi koro to Dochi rijo at Hina 1 10.00 10.00 3 25.00
ko Pani
341 Chetam Har Khet MOA&FW Pio koro to Pio rijo at Hina 1 15.00 19.00 3 37.50
ko Pani
342 Chetam Har Khet MOA&FW Namchi koro to Namachi rijo at Hina 1 6.00 8.00 2 15.00
ko Pani
343 Chetam Har Khet MOA&FW Karba koro to Karba rijo at Hina 1 6.00 7.00 2 15.00
ko Pani
344 Chetam Har Khet MOA&FW Ngamdu Sete to Nyamdu rijo at Hina 1 5.00 6.00 2 12.50
ko Pani
345 Chetam Har Khet MOA&FW Pelo koro to Pelo rijo at Hina 1 4.00 7.00 2 10.00
ko Pani
346 Chetam Har Khet MOA&FW Haso koro to Piorijo at Hina 1 10.00 14.00 3 25.00
ko Pani
347 Chetam Har Khet MOA&FW Kow koro to Pobe at Hinju 1 4.00 7.00 2 10.00
ko Pani
348 Chetam Har Khet MOA&FW Komar koro to Lochilori at Hinju 1 7.00 9.00 3 17.50
ko Pani
349 Chetam Har Khet MOA&FW Paknekoro to Hinjupobeo at Hinju 1 6.00 7.00 2 15.00
ko Pani
350 Chetam Har Khet MOA&FW Korekoro to Niapung rijo at Hinju 1 5.00 6.00 2 12.50
ko Pani

752 | P a g e
351 Chetam Har Khet MOA&FW Pojok koro to Rami at Hinju 1 6.00 8.00 2 15.00
ko Pani
352 Chetam Har Khet MOA&FW Dunikoro to Lomirijo at Hinju 1 9.00 10.00 3 22.50
ko Pani
353 Chetam Har Khet MOA&FW Rami koro to Pakgumori at Hinju 1 8.00 9.00 3 20.00
ko Pani
354 Chetam Har Khet MOA&FW Nianing koro to Poniarijo at Hinju 1 7.00 9.00 3 17.50
ko Pani
355 Chetam Har Khet MOA&FW Kasi koro to Kairijo at Hinju 1 4.00 8.00 2 10.00
ko Pani
356 Chetam Har Khet MOA&FW Like rijo at Jeke vill 1 5.00 12.00 2 12.50 PR
ko Pani
357 Chetam Har Khet MOA&FW Sippi koro to Lekerijo at Jeke 1 6.00 235.00 2 15.00
ko Pani
358 Chetam Har Khet MOA&FW Rahu koro to Rahurijo at Jeke 1 5.00 9.00 2 12.50
ko Pani
359 Chetam Har Khet MOA&FW Paagberin to Ragerijo at Jeke 1 5.00 8.00 2 12.50
ko Pani
360 Chetam Har Khet MOA&FW Taming sow to Moming rijo at Jeke 1 6.00 10.00 2 15.00
ko Pani
361 Chetam Har Khet MOA&FW Boghin koro to Tarungtarerijo at Jeke 1 5.00 14.00 2 12.50
ko Pani
362 Chetam Har Khet MOA&FW Sehin koro to Bogding rijo at Jeke 1 7.00 9.00 3 17.50
ko Pani
363 Chetam Har Khet MOA&FW Rahin koro to Saharijo at Jeke 1 5.00 10.00 2 12.50
ko Pani
364 Chetam Har Khet MOA&FW Jeke koro to Paching rijo at Jeke 1 5.00 16.00 2 12.50
ko Pani
365 Chetam Har Khet MOA&FW Jeke koro to Renga rijo at Jeke 1 6.00 12.00 2 15.00
ko Pani
366 Chetam Har Khet MOA&FW Tode koro to Serik rijo at Kare 1 10.00 12.00 3 25.00
ko Pani
367 Chetam Har Khet MOA&FW Sorjo koro to Dalirijo at Kare 1 15.00 16.00 3 37.50
ko Pani

753 | P a g e
368 Chetam Har Khet MOA&FW Molo koro to Derlo rijo at Kare 1 7.00 9.00 3 17.50
ko Pani
369 Chetam Har Khet MOA&FW Molo koro to Sarkumori at Kare 1 4.00 9.00 3 10.00
ko Pani
370 Chetam Har Khet MOA&FW Motu koro to Meba rijo at Kare 1 9.00 12.00 3 22.50
ko Pani
371 Chetam Har Khet MOA&FW Riyum koro to Nimpe rijo at Kare 1 8.00 12.00 3 20.00
ko Pani
372 Chetam Har Khet MOA&FW Kare koro to Sorjorijo at Kare 1 5.00 9.00 2 12.50
ko Pani
373 Chetam Har Khet MOA&FW Sari koro to Posarijo at Kare 1 12.00 14.00 3 30.00
ko Pani
374 Chetam Har Khet MOA&FW Sarjo koro to Ritukoo to at Kare 1 6.00 9.00 2 15.00
ko Pani
375 Chetam Har Khet MOA&FW Dapo koro to Bogi rijo at Lechin 1 3.00 8.00 2 7.50
ko Pani
376 Chetam Har Khet MOA&FW Chinte koro to Lechin Chindum at Lechin 1 4.00 7.00 2 10.00
ko Pani
377 Chetam Har Khet MOA&FW Hosoh koro to Lechin at Lechin 1 3.50 6.00 2 8.75
ko Pani
378 Chetam Har Khet MOA&FW Linring koro to Biyungpi rijo at Lingsa 1 6.00 8.00 2 15.00
ko Pani
379 Chetam Har Khet MOA&FW Lingsa koro to Lingsarijo at Lingsa 1 10.00 12.00 3 25.00
ko Pani
380 Chetam Har Khet MOA&FW Jitey koro to Hatey rijo at Lingsa 1 11.00 13.00 3 27.50
ko Pani
381 Chetam Har Khet MOA&FW Pimpi koro to Paberijo at Lingsa 1 15.00 16.00 3 37.50
ko Pani
382 Chetam Har Khet MOA&FW Herong koro to Laklamrijo at Lingsa 1 12.00 15.00 3 30.00
ko Pani
383 Chetam Har Khet MOA&FW Tachocho koro to Nachorijo at Lingsa 1 3.00 12.00 1 7.50
ko Pani
384 Chetam Har Khet MOA&FW Ote koro to Darung rijo at Lingsa 1 4.00 10.00 2 10.00
ko Pani

754 | P a g e
385 Chetam Har Khet MOA&FW Tedu koro to Tedurijo at Lote 1 10.00 11.00 3 25.00
ko Pani
386 Chetam Har Khet MOA&FW Pelo koro to Radirijo at Lote 1 10.00 13.00 3 25.00
ko Pani
387 Chetam Har Khet MOA&FW Radi koro to Loterijo at Lote 1 15.00 15.00 3 37.50
ko Pani
388 Chetam Har Khet MOA&FW Lomi koro to Lomirijo at Lote 1 16.00 12.00 3 40.00
ko Pani
389 Chetam Har Khet MOA&FW Pelo koro to Gamsonrijo at Lote 1 4.00 9.00 2 10.00
ko Pani
390 Chetam Har Khet MOA&FW Radi koro to Dalorijo at Lote 1 4.00 8.00 2 10.00
ko Pani
391 Chetam Har Khet MOA&FW CC linning from Pelo koro to Redding 1 5.00 5.00 3 12.50
ko Pani rijo at Lote
392 Chetam Har Khet MOA&FW Chusi koro to Mundi rijo at Lote. 1 10.00 47.00 4 25.00
ko Pani
393 Chetam Har Khet MOA&FW Jenpa nallah to Haparijo at Magria 1 4.00 7.00 2 10.00
ko Pani
394 Chetam Har Khet MOA&FW Nangko to Bokenrijo at Magria 1 3.00 8.00 2 7.50
ko Pani
395 Chetam Har Khet MOA&FW Niami koto to Binrakrijo at Magria 1 6.00 9.00 2 15.00
ko Pani
396 Chetam Har Khet MOA&FW Dila koro to Ladung rijo at Magria 1 9.00 10.00 3 22.50
ko Pani
397 Chetam Har Khet MOA&FW Laba koro to Binij rijo at Magria 1 2.00 7.00 1 5.00
ko Pani
398 Chetam Har Khet MOA&FW Malikoro to Ralomrijo at Magria 1 4.00 8.00 2 10.00
ko Pani
399 Chetam Har Khet MOA&FW Jutkoro to Botomrijo at Magria 1 5.00 9.00 2 12.50
ko Pani
400 Chetam Har Khet MOA&FW Hagikoro to Logingjet Tejo at Magria 1 6.00 8.00 2 15.00
ko Pani
401 Chetam Har Khet MOA&FW Hapikoro to Rate rijo at Magria 1 6.00 7.00 2 15.00
ko Pani

755 | P a g e
402 Chetam Har Khet MOA&FW Seko sebiakoro to Jebomrijo at Magria 1 9.00 10.00 3 22.50
ko Pani
403 Chetam Har Khet MOA&FW Namching Namko koro to Raklenrijo at 1 6.00 7.00 2 15.00
ko Pani Magria
404 Chetam Har Khet MOA&FW Nachkoro to Teporijo at Magria 1 6.00 9.00 2 15.00
ko Pani
405 Chetam Har Khet MOA&FW Magria nallah to Magriarijo at Magria 1 10.00 11.00 3 25.00
ko Pani
406 Chetam Har Khet MOA&FW Pikte Nalah to Pikterijo at Magria 1 5.00 8.00 2 12.50
ko Pani
407 Chetam Har Khet MOA&FW Kama koro to Kama rij at Magria 1 6.00 8.00 2 15.00
ko Pani
408 Chetam Har Khet MOA&FW Omi nallah to Omirijo at Margria 1 6.00 7.00 2 15.00
ko Pani
409 Chetam Har Khet MOA&FW Piji nallah to Piji rijo at Magria 1 5.00 9.00 2 12.50
ko Pani
410 Chetam Har Khet MOA&FW Gigi koro to Meme rijo at Marbom 1 15.00 18.00 3 37.50
ko Pani
411 Chetam Har Khet MOA&FW Tasung koro to Tajayorbe rijo at Marbom 1 12.00 13.00 3 30.00
ko Pani
412 Chetam Har Khet MOA&FW Shah koro to Tapinkochamrijo at 1 13.00 14.00 3 32.50
ko Pani Marbom
413 Chetam Har Khet MOA&FW Melum koro to Seyorijo at Marbom 1 10.00 11.00 3 25.00
ko Pani
414 Chetam Har Khet MOA&FW Taikshow koro to Takirikdumrijo at 1 8.00 12.00 3 20.00
ko Pani Marbom
415 Chetam Har Khet MOA&FW Sachar koro to Chogo rijo at Marbom 1 8.00 9.00 3 20.00
ko Pani
416 Chetam Har Khet MOA&FW Erbasaku koro to Larjarijo at Marbom 1 5.00 7.00 2 12.50
ko Pani
417 Chetam Har Khet MOA&FW Seli koro to Bachirijo (Pakba) at Marbom 1 8.00 8.00 3 20.00
ko Pani
418 Chetam Har Khet MOA&FW Talikshow koro to Chemio rijo at 1 8.00 8.00 3 20.00
ko Pani Marbom

756 | P a g e
419 Chetam Har Khet MOA&FW Saha koro to Ridumrijo at ,Marbom 1 6.00 10.00 2 15.00
ko Pani
420 Chetam Har Khet MOA&FW Mali Maji to Rakyar rijo & Lebe rijo at 1 8.00 10.00 3 20.00
ko Pani Mosi
421 Chetam Har Khet MOA&FW Bogdu rijo at Mosi 1 2.00 7.00 1 5.00
ko Pani
422 Chetam Har Khet MOA&FW Sippi river to Maji rijo at Mosi 1 5.00 270.00 2 12.50
ko Pani
423 Chetam Har Khet MOA&FW Sippi river to Mori Ramme at Mosi 1 5.00 285.00 2 12.50
ko Pani
424 Chetam Har Khet MOA&FW Hayong koro to Lokak rijo at Niling 1 3.00 7.00 2 7.50
ko Pani
425 Chetam Har Khet MOA&FW Teksik so to Mapo rijo at Niling 1 3.00 7.00 2 7.50
ko Pani
426 Chetam Har Khet MOA&FW Kadak river to Kadak rijoat Niling 1 4.00 8.00 2 10.00
ko Pani
427 Chetam Har Khet MOA&FW Hachi koro to Rapr rijo at Niling 1 4.00 8.00 2 10.00
ko Pani
428 Chetam Har Khet MOA&FW Mara Rakching koro to Talum Haa at 1 3.00 6.00 2 7.50
ko Pani Niling
429 Chetam Har Khet MOA&FW Relung koro to Relung rijo at Niling 1 5.00 7.00 2 12.50
ko Pani
430 Chetam Har Khet MOA&FW Nio koro to Rasing rijo at Niling 1 2.00 5.00 1 5.00
ko Pani
431 Chetam Har Khet MOA&FW Tako Ngong koro to Hetak Niodi rijo at 1 3.00 6.00 2 7.50
ko Pani Niling
432 Chetam Har Khet MOA&FW Hayong koro to Gengo Nioring at Niling 1 3.00 7.00 2 7.50
ko Pani
433 Chetam Har Khet MOA&FW Sengrik koro to Seku rijo at Niling 1 3.00 6.00 2 7.50
ko Pani
434 Chetam Har Khet MOA&FW Lungchi koro to Sengo reko at Niling 1 2.00 5.00 1 5.00
ko Pani
435 Chetam Har Khet MOA&FW Yabi koro toYabi Seram at Niling 1 3.00 8.00 2 7.50
ko Pani

757 | P a g e
436 Chetam Har Khet MOA&FW senchak koro to Humi rijo at Niling 1 3.00 8.00 2 7.50
ko Pani
437 Chetam Har Khet MOA&FW Humi koro to Niako rijo at Niling 1 4.00 7.50 2 10.00
ko Pani
438 Chetam Har Khet MOA&FW Darin koro to Darinrijo at Nilling 1 3.00 8.00 1 7.50
ko Pani
439 Chetam Har Khet MOA&FW Nio koro to Nioringjo at Nilling 1 3.00 11.00 1 7.50
ko Pani
440 Chetam Har Khet MOA&FW Humi nallah to Memper Rijo at Raha. 1 7.00 8.50 2 17.50
ko Pani
441 Chetam Har Khet MOA&FW Delo koro to Rage rijo at Rage vill 1 3.00 12.00 1 7.50
ko Pani
442 Chetam Har Khet MOA&FW Raji koro to Dedam rijo at Raji 1 15.00 14.00 3 37.50
ko Pani
443 Chetam Har Khet MOA&FW Ampu koro to Doirijo at Raji 1 2.00 12.00 1 5.00
ko Pani
444 Chetam Har Khet MOA&FW Sha koro to Haterrijo at Raji 1 2.00 9.00 1 5.00
ko Pani
445 Chetam Har Khet MOA&FW Rameso koro to Sagiam rijo at Rame 1 5.00 10.00 1 12.50
ko Pani
446 Chetam Har Khet MOA&FW Sogum koro to Lakam rijo at Rikung 1 16.00 16.00 3 40.00
ko Pani
447 Chetam Har Khet MOA&FW Sogum koro to Dupung rijo at Rikung 1 14.00 14.00 3 35.00
ko Pani
448 Chetam Har Khet MOA&FW Soh koro to Megu rijoat Rikung 1 17.00 17.00 3 42.50
ko Pani
449 Chetam Har Khet MOA&FW Dicho koro to Hakra rijo at Ruji 1 14.00 12.00 3 35.00
ko Pani
450 Chetam Har Khet MOA&FW Bipo koro to Jile rijo at Ruji 1 8.00 9.00 2 20.00
ko Pani
451 Chetam Har Khet MOA&FW Crow koro to Serik rijo at Ruji 1 5.00 8.00 2 12.50
ko Pani
452 Chetam Har Khet MOA&FW Pigya koro to Pigia rijo at Ruji 1 5.00 7.50 2 12.50
ko Pani

758 | P a g e
453 Chetam Har Khet MOA&FW Segum koro to Segum rijo at Ruji 1 7.00 8.00 2 17.50
ko Pani
454 Chetam Har Khet MOA&FW Boglin koro to Lebi rijo at Ruji 1 6.00 7.00 2 15.00
ko Pani
455 Chetam Har Khet MOA&FW Ragyi rijo at Ruji 1 7.00 8.00 2 17.50
ko Pani
456 Chetam Har Khet MOA&FW Chow koro to Seriok rijo at Ruji 1 4.00 9.00 2 10.00
ko Pani
457 Chetam Har Khet MOA&FW Sha koro to Puyar Rongo at Sari 1 6.00 9.00 3 15.00
ko Pani
458 Chetam Har Khet MOA&FW Sari koro to Telo rijo at Sari 1 15.00 16.00 3 37.50
ko Pani
459 Chetam Har Khet MOA&FW Ampa koro to Doi rijo at Sari 1 2.00 4.00 2 5.00
ko Pani
460 Chetam Har Khet MOA&FW Saha koro to Sako rijo at Sari 1 1.00 4.00 1 2.50
ko Pani
461 Chetam Har Khet MOA&FW Shema koro to Sakorijo at Sari 1 2.00 8.00 1 5.00
ko Pani
462 Chetam Har Khet MOA&FW Kore koro to Seive rijo at Sebing 1 6.00 7.00 2 15.00
ko Pani
463 Chetam Har Khet MOA&FW Kama koro to Mudi rijo at Sebing 1 2.00 6.00 2 5.00
ko Pani
464 Chetam Har Khet MOA&FW Niosar koro to Kiden rijo at Sebing 1 2.00 6.00 2 5.00
ko Pani
465 Chetam Har Khet MOA&FW Midia koro to Midi rijo at Sebing 1 3.00 7.00 2 7.50
ko Pani
466 Chetam Har Khet MOA&FW Sebing koro to Kodin rijo at Sebing 1 6.00 7.00 2 15.00
ko Pani
467 Chetam Har Khet MOA&FW Muju koro to Muju rijo at Sebing 1 7.00 8.00 2 17.50
ko Pani
468 Chetam Har Khet MOA&FW Miosar koro to Miosar rijo at Sebing 1 5.00 7.00 2 12.50
ko Pani
469 Chetam Har Khet MOA&FW Miomi koro to Miomi rijo at Sebing 1 3.00 6.00 2 7.50
ko Pani

759 | P a g e
470 Chetam Har Khet MOA&FW Mapak koro to Mapak rijoat Sebing 1 7.00 9.00 2 17.50
ko Pani
471 Chetam Har Khet MOA&FW Motu koro to Motu rijo at Sebing 1 5.00 7.00 2 12.50
ko Pani
472 Chetam Har Khet MOA&FW Siling koro to Siling rijo at Sebing 1 3.00 6.00 2 7.50
ko Pani
473 Chetam Har Khet MOA&FW Tenin so koro to Meru rijo at Sebing 1 4.00 7.00 2 10.00
ko Pani
474 Chetam Har Khet MOA&FW Lida koro to Lida rijo at Sebing 1 4.00 6.00 2 10.00
ko Pani
475 Chetam Har Khet MOA&FW Sagi koro to Hegi rijo at Sebing 1 5.00 9.00 2 12.50
ko Pani
476 Chetam Har Khet MOA&FW Kokio koro to Kokio rijo at Sebing 1 5.00 9.00 2 12.50
ko Pani
477 Chetam Har Khet MOA&FW Hate koro to Hate rijo at Sebing 1 4.00 8.00 2 10.00
ko Pani
478 Chetam Har Khet MOA&FW Biken koro to Lene rijo at Sebing 1 5.00 8.00 2 12.50
ko Pani
479 Chetam Har Khet MOA&FW Hami koro to Hami rijo at Sebing 1 5.00 6.00 3 12.50
ko Pani
480 Chetam Har Khet MOA&FW Niotu koro to Palin rijo at Sebing . 1 3.00 17.00 1 7.50
ko Pani
481 Chetam Har Khet MOA&FW Sepe koro to Maw rijo at Sebing 1 4.00 12.00 2 10.00
ko Pani
482 Chetam Har Khet MOA&FW Selu river to Dekio rijo at Sebing 1 4.00 21.00 2 10.00
ko Pani
483 Chetam Har Khet MOA&FW Sarmen koro to Gai rijo at Sera 1 3.00 7.00 2 7.50
ko Pani
484 Chetam Har Khet MOA&FW Sarmen koro to Jeb rijo at Sera 1 6.00 9.00 2 15.00
ko Pani
485 Chetam Har Khet MOA&FW Papak koro to Papak rijo at Sera 1 7.00 9.00 2 17.50
ko Pani
486 Chetam Har Khet MOA&FW Papak koro to Gay rijo at Sera 1 7.00 16.00 2 17.50
ko Pani

760 | P a g e
487 Chetam Har Khet MOA&FW Loh koro & Lumdik koro to Gyakam rijo 1 7.00 15.00 2 17.50
ko Pani at Sera
488 Chetam Har Khet MOA&FW Loh koro & Sena koro to Nari rijo at Sera 1 9.00 13.00 3 22.50
ko Pani
489 Chetam Har Khet MOA&FW Loh koro & Lumdik koro to Nusi rijo at 1 9.00 11.00 3 22.50
ko Pani Sera
490 Chetam Har Khet MOA&FW Papak koro to Pindi rijo at Sera 1 8.00 10.00 2 20.00
ko Pani
491 Chetam Har Khet MOA&FW Sarmen koro to Miri rijo at Sera 1 6.00 9.00 2 15.00
ko Pani
492 Chetam Har Khet MOA&FW Semin koro to Jebe rijo at Sera 1 4.00 9.00 2 10.00
ko Pani
493 Chetam Har Khet MOA&FW Eachi koro to Tabe rijo at Sera Tapapu 1 10.00 12.00 3 25.00
ko Pani
494 Chetam Har Khet MOA&FW Sarmen koro to Pagiasuri rijo at Sera 1 5.00 12.00 2 12.50
ko Pani Tapapu
495 Chetam Har Khet MOA&FW Pemi koro to Batambale rijo at Sera 1 12.00 13.00 3 30.00
ko Pani Tapapu
496 Chetam Har Khet MOA&FW Sena & Loh koro to Nari rijo at Siga 1 4.00 9.00 2 10.00
ko Pani
497 Chetam Har Khet MOA&FW Pitak koro to Pitak rijo at Siga 1 4.00 7.00 2 10.00
ko Pani
498 Chetam Har Khet MOA&FW Loh koro to Napin rijo at Siga 1 2.00 8.00 1 5.00
ko Pani
499 Chetam Har Khet MOA&FW Tiri koro to Leriak Habu at Siga 1 2.50 10.00 1 6.25
ko Pani
500 Chetam Har Khet MOA&FW Tiri koro to Tiri Pyakar at Siga 1 2.00 8.00 1 5.00
ko Pani
501 Chetam Har Khet MOA&FW Tiri koro to Bhirap at Siga 1 3.00 7.00 1 7.50
ko Pani
502 Chetam Har Khet MOA&FW Tiri koro to Riktam pu at Siga 1 3.00 14.00 1 7.50
ko Pani
503 Chetam Har Khet MOA&FW Jali koro to Jama Yorlo at Siga 1 3.00 7.00 1 7.50
ko Pani

761 | P a g e
504 Chetam Har Khet MOA&FW Sippi koro to Sampi rijo at Siga 1 35.00 305.00 3 87.50
ko Pani
505 Chetam Har Khet MOA&FW Naloh koro to Pikda Lepik at Siga 1 2.00 5.00 1 5.00
ko Pani
506 Chetam Har Khet MOA&FW Sippi koro to Ringi Rochi at Siga 1 20.00 310.00 3 50.00
ko Pani
507 Chetam Har Khet MOA&FW Sena stream to Makokaririjo at Siga 1 7.00 10.00 2 17.50
ko Pani
508 Chetam Har Khet MOA&FW Soo koro to Silu rijo at Silu 1 8.00 10.00 2 20.00
ko Pani
509 Chetam Har Khet MOA&FW Darmi koro to Vimpu rijo at Silu 1 8.00 11.00 2 20.00
ko Pani
510 Chetam Har Khet MOA&FW Silu koro to Pedu rijo at Silu 1 5.00 10.00 2 12.50
ko Pani
511 Chetam Har Khet MOA&FW Satgum koro to Pepo rijo at Silu 1 8.00 11.00 2 20.00
ko Pani
512 Chetam Har Khet MOA&FW Gumgum soo to Jentum rijo at Silu. 1 5.00 7.50 2 12.50
ko Pani
513 Chetam Har Khet MOA&FW Boken koro to Silu rijo at Silu 1 4.00 2.00 2 10.00
ko Pani
514 Chetam Har Khet MOA&FW Sippi River to Machi rijo at Soki 1 15.00 347.00 3 37.50
ko Pani
515 Chetam Har Khet MOA&FW Sippi River to Bogik rijo at Soki 1 25.00 335.00 3 62.50
ko Pani
516 Chetam Har Khet MOA&FW Sippi River to Mopin rijo at Soki 1 12.00 320.00 3 30.00
ko Pani
517 Chetam Har Khet MOA&FW Sippi River to Chihi rijo at Soki 1 10.00 325.00 3 25.00
ko Pani
518 Chetam Har Khet MOA&FW Sebu koro to Jai rijo at Soki 1 8.00 317.00 2 20.00
ko Pani
519 Chetam Har Khet MOA&FW Sebu koro to Sebu rijo at Soki 1 3.00 8.00 2 7.50
ko Pani
520 Chetam Har Khet MOA&FW Sebu koro to Takio rijo at Soki 1 1.00 5.00 2 2.50
ko Pani

762 | P a g e
521 Chetam Har Khet MOA&FW Pete koro & Pemi koro to Kikukpu rijo at 1 6.00 8.00 2 15.00
ko Pani Kikik
522 Chetam Har Khet MOA&FW Radi koro to Harap rijo Kikik 1 6.00 8.00 2 15.00
ko Pani
523 Chetam Har Khet MOA&FW Semin koro to Gayirijo at Kikik 1 4.00 9.00 2 10.00
ko Pani
524 Chetam Har Khet MOA&FW Shah koro to Tara rijo at Shak 1 3.00 9.00 1 7.50
ko Pani
525 Chetam Har Khet MOA&FW Sete koro to Cheke rijo at Shak 1 15.00 11.00 3 37.50
ko Pani
526 Chetam Har Khet MOA&FW Herong koro to Rapi rijo at Rapi 1 15.00 17.00 3 37.50
ko Pani
527 Chetam Har Khet MOA&FW Hakra so to Mengnia rijo at Megnia 1 6.00 8.00 2 15.00
ko Pani
528 Chetam Har Khet MOA&FW Lidi so to Demi rijo at Megnia 1 8.00 10.00 2 20.00
ko Pani
529 Chetam Har Khet MOA&FW Budi koro to Date rijo at Megnia 1 15.00 17.00 3 37.50
ko Pani
530 Chetam Har Khet MOA&FW Lomtak koro to Talom rijo at Megnia 1 8.00 10.00 2 20.00
ko Pani
531 Chetam Har Khet MOA&FW Talom koro to Tamar rijo at Megnia 1 15.00 16.00 3 37.50
ko Pani
532 Chetam Har Khet MOA&FW Paa koro to Paa rijo at Lokar rijo 1 3.00 6.00 2 7.50
ko Pani
533 Chetam Har Khet MOA&FW Bhai koro to Bhai rijo at Lokar rijo 1 7.00 9.00 2 17.50
ko Pani
534 Chetam Har Khet MOA&FW Ote koro to Mana rijo at Lokar rijo 1 6.00 8.00 2 15.00
ko Pani
535 Chetam Har Khet MOA&FW Hayang Nallah to Gianching rijo at 1 7.00 9.00 2 17.50
ko Pani Hagne Doke
536 Chetam Har Khet MOA&FW Lintak koro to Lintak rijo at Hagne Doke 1 10.00 11.00 2 25.00
ko Pani
537 Chetam Har Khet MOA&FW Hayang rijo at Hagne Doke 1 6.00 8.00 2 15.00
ko Pani

763 | P a g e
538 Chetam Har Khet MOA&FW Jigok koro to Chikiorijo at Hagne Doke 1 4.00 7.00 2 10.00
ko Pani
539 Chetam Har Khet MOA&FW Talek koro to Hamariga rijo at Hamrijo 1 3.00 6.00 2 7.50
ko Pani
540 Chetam Har Khet MOA&FW Lebar koro to Kirum rijo at Molo 1 9.00 11.00 3 22.50
ko Pani
541 Chetam Har Khet MOA&FW Pak koro to Chetam rijo at Molo 1 7.00 9.00 2 17.50
ko Pani
542 Chetam Har Khet MOA&FW Sorku koro to Nyalo rijo at Molo 1 5.00 6.00 2 12.50
ko Pani
543 Chetam Har Khet MOA&FW Motu koro to Pirapu at Molo 1 10.00 12.00 3 25.00
ko Pani
544 Chetam Har Khet MOA&FW Kancho koro to Ango Yorlo at Molo 1 12.00 15.00 3 30.00
ko Pani
545 Chetam Har Khet MOA&FW Morkik rijo to Morkik rijo at Chorta rijo 1 12.00 17.00 3 30.00
ko Pani
546 Chetam Har Khet MOA&FW Senik koro to Yaklupu rijo at Chorta rijo 1 10.00 12.00 3 25.00
ko Pani
547 Chetam Har Khet MOA&FW Rakyar rijo to Leber rijo at Mosi 1 6.00 11.00 3 15.00
ko Pani
548 Chetam Har Khet MOA&FW Jigi koro to Bogikrijo of Nambasoki, 1 20.00 21.00 3 50.00
ko Pani Duni, Soki, Machirijo and Naacha
549 Chetam Har Khet MOA&FW Nioko rijo MIP at Majirijo vill under 1 3.00 10.00 7.50
ko Pani Chetam.

NEW SCHEMES
Sl. Name of the Concerned Component Activity Total Command Catchment Period of Estimated Remarks/
No. District/ Ministry/ (C/o. MIP from ……….) Number Area/Irrigation Area Implementation cost Recommended
Blocks Department (in Ha) (Sq.Km.) (Rs. in by
lakh)
Daporijo Har Khet ko MOA&FW She koro to Dakda rijo at Pegarijo, Sikarijo I, 1 60.00 10.00 2 150.00
1 Block Pani Sikarijo II, Sikarijo III, Yekar, Lejirijo Jal Gram
(Sigen-I)

764 | P a g e
Daporijo Har Khet ko MOA&FW Sigenkoro to Tak rijo at Sikarijo I 1 5.00 34.00 2 12.50
2 Block Pani
(Sigen-I) MLA Daporijo
Daporijo Har Khet ko MOA&FW Sehkoro to Dakdarijo at Sikarijo II 1 5.00 12.00 2 12.50
3 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Magrak Koro to Neeru setu at Sikar-II 1 10.00 12.00 1 25.00
4 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sikar koro to Sikar WRC field at Sikar-I 1 5.00 10.00 1 12.50
5 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sikar koro to Pagalepu at Sikar-II 1 10.00 12.00 1 25.00
6 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Ginchi Koro to Takrijo at Sikar-I 1 5.00 40.00 1 12.50
7 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Komu koro to Dakdarijo at Sikar-II 1 10.00 10.00 1 25.00
8 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Duni river to Rite rijo at Rite 1 15.00 60.00 2 37.50
9 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Pote koro to Kirum rijo at Motu vill 1 7.00 17.00 2 17.50
10 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sik koro to Ngindi rijo at Dulom 1 5.00 11.00 2 12.50
11 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sippi koro to Tamiririjo at Sikom 1 5.00 381.00 2 12.50
12 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW See koro to Taluk rijo at Lejirijo. 1 6.00 15.00 2 15.00
13 Block Pani
(Sigen-I) -do-

765 | P a g e
Daporijo Har Khet ko MOA&FW Dol koro to Taponurijo at Yekar 1 4.00 8.00 2 10.00
14 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Kamu koro to Tikjirijo at Dulom 1 5.00 12.00 2 12.50
15 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Kommar koro to Kammurijo at Yekar 1 5.00 9.00 2 12.50
16 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW CC lining from Shee koro to Tute rijo at Motu 1 9.00 12.00 3 22.50
17 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Mod koro to Monarijo at Nima vill 1 7.00 13.00 2 17.50
18 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Nyepo koro to Tachi rijo at Pisa-I vill 1 6.00 10.00 2 15.00
19 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Siri Lebar Nallah to Yararijo at Jeram 1 5.00 25.00 2 12.50
20 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Dado koro to Dadorijo (Yajarijo )at Nima vill 1 7.00 5.00 3 17.50
21 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Daruk koro to Batakrijo at Batak 1 4.00 7.00 2 10.00
22 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Yanam koro to Ngudar rijo at Ngudar 1 10.00 7.00 2 25.00
23 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Modi koro to Namdam rijo at Dubi 1 7.00 11.00 2 17.50
24 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Hachi koro to Hachi rijo at Lamdik village 1 15.00 12.00 2 37.50
25 Block Pani
(Sigen-I) -do-

766 | P a g e
Daporijo Har Khet ko MOA&FW CC Lining at Ridumrijo at Sikom 1 9.00 12.00 2 22.50
26 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Namchi rijo to Namchi rijo at Jeram vill. 1 8 14 2 20.00
27 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Rigi koro to Tablerijo at Pissa II 1 5.00 12.00 2 12.50
28 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Ledu koro to Pakdam rijo at Patum vill 1 4.00 8.00 2 10.00
29 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Bomyir koro to Bomyir rijo at Pagerijo 1 12.00 14.00 3 30.00
30 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sitin koro to Doli rijo at Lamdik 1 25.00 10.00 3 62.50
31 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Duni river to Ridum rijo at Sikom 1 25.00 60.00 3 62.50
32 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sitin koro to Boxrijo at Lamdik 1 20.00 10.00 3 50.00
33 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sitin river to Sokarijo at Lamdik 1 25.00 10.00 3 62.50
34 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Dodo koro to Leilirijo at Motu 1 20.00 8.00 3 50.00
35 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Tekesi koro to Mio at Dubi vill 1 3.00 8.00 1 7.50
36 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Pochikoro to Ngudirrijo at Ngudir. 1 3.00 9.00 1 7.50
37 Block Pani
(Sigen-I) -do-

767 | P a g e
Daporijo Har Khet ko MOA&FW Ngoi koro to Tah rijo at Dubi 1 3.00 10.00 1 7.50
38 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sippi koro to Tabelerijo at karda 1 6.00 120.00 1 15.00
39 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Ngu koro to Dagirijo at Dubi vill 1 2.00 8.00 1 5.00
40 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Niumte Koro to Kardarijo at karda 1 4.00 9.00 1 10.00
41 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Kom koro to Uyemo rijo at Yekar 1 6.00 10.00 1 15.00
42 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Se-koro to Yorsi rijo at leji rijo 1 5.00 12.00 1 12.50
43 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Komu koro to Ley-len rijo at Yekar 1 12.00 10.00 2 30.00
44 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sey koro to Sey rijo at lejirijo 1 15.00 12.00 2 37.50
45 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Dol koro to Dolrijo at Yekar vill 1 12.00 14.00 2 30.00
46 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Malso koro to Malso rijo at Lamdik 1 6.00 9.00 2 15.00
47 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Mintu koro to Table rijo at Karda 1 5.00 9.00 2 12.50
48 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW See koro to Taluk rijo at Lejirijo 1 6.00 11.00 2 15.00
49 Block Pani
(Sigen-I) -do-

768 | P a g e
Daporijo Har Khet ko MOA&FW Lejio koro to Leji Dumpum at Legirijo 1 6.00 13.00 2 15.00
50 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Pote koro to Kirumrijo at Motu 1 5.00 9.00 2 12.50
51 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Jigi koro to Bogik rijo at Soki, Namba Soki 1 5.00 8.00 3 12.50
52 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Ledu koro to Pakdam rijo at Patum 1 5.00 11.00 3 12.50
53 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Neypokoro to Tachirijo at Pissa I 1 4.00 11.00 2 10.00
54 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Duni koro to Riterijo at Sikom 1 5.00 11.00 2 12.50
55 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Ginchin Koro to Matu Rongo at Sikarijo 1 2.00 5.00 1 5.00
56 Block Pani
(Sigen-I) ZPC
Daporijo Har Khet ko MOA&FW Dado koro to Apirijo at Nima vill. 1 12.00 9.00 3 30.00 MLA (Raga ST)
57 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Mud Koro to Taka rijo at Nima vill. 1 8.00 8.00 3 20.00 MLA (Raga ST)
58 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Mod koro to Bona rijo at Nima vill. 1 9.00 7.00 22.50 MLA (Raga ST)
59 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dodo koro to Kampu Haririjo at Ripe Nima 1 9.00 6.00 3 22.50 MLA (Raga ST)
60 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Puna koro to Pular rijo at Ripe Nima 1 8.00 5.00 3 20.00 MLA (Raga ST)
61 Block Pani
(Sigen-I)

769 | P a g e
Daporijo Har Khet ko MOA&FW Mad koro to Monarijo at Nima vill 1 6.00 5.00 3 15.00 MLA Daporijo
62 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kombo koro to Kamlik rijo at Patum 1 20.00 10.00 3 50.00 CO/Member
63 Block Pani secy
(Sigen-I)
Daporijo Har Khet ko MOA&FW Tarum koro to Sippi-I 1 3.00 10.00 1 7.50
64 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Siri koro to Depak Namchi at Jeram vill. 1 5.00 9.00 1 12.50
65 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Shekek koro to Payir rijo at Dulom vill 1 2.00 8.00 1 5.00
66 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Dodo koro to Boyen Yollow via Morak sillo at Nima 1 5.00 8.00 1 12.50
67 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Batak koro to Amji rijo at Jeram 1 15.00 11.00 2 37.50
68 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Modi koro to Namnum Batak at Batak vill 1 5.00 9.00 1 12.50
69 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Niomchi koro to Nampam Pamlo at Patum 1 5.00 6.00 1 12.50
70 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Dodo koro to Yorarijo at Jeram vill. 1 10.00 8.00 1 25.00
71 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Sippi koro to Jugdi sippi-III 1 2.00 140.00 1 5.00
72 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Lebar koro to Yararijo at Jeram vill 1 10.00 7.00 1 25.00
73 Block Pani
(Sigen-I) -do-

770 | P a g e
Daporijo Har Khet ko MOA&FW Diki koro to Sippirijo at Sippi-II 1 4.00 12.00 1 10.00
74 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Payir koro to Payir rijo at Dulom vill 1 3.00 9.00 1 7.50
75 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Leli koro to Kotar rijo at Jeram vill 1 20.00 12.00 3 50.00
76 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Rut river koro to Rutrijo at Dulom vill 1 9.00 10.00 1 22.50
77 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Bona koro to Regam WRC field at Nima 1 5.00 12.00 1 12.50
78 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Kino koro to Bomte Ritak at Dulom vill 1 4.00 7.00 1 10.00
79 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Siri koro to Diki Pomdo rijo at Batak. 1 6.00 9.00 2 15.00
80 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Rut sekek , Payir koro to Namsi rijo at Dulom 1 5.00 9.00 1 12.50
81 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Nima koro to Katurijo at Nima 1 6.00 10.00 1 15.00
82 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Rat koro to Ratrijo at Nima 1 4.00 11.00 1 10.00
83 Block Pani
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Mud koro to Rogamrijo to Katurijo and Nima 1 7.00 9.00 1 17.50
84 Block Pani Bumboi via Ratrijo
(Sigen-I) -do-
Daporijo Har Khet ko MOA&FW Doni river to Tikri rijo at Sikom vill 1 5.00 11.00 2 12.50
85 Block Pani
(Sigen-I) GPC/ASM

771 | P a g e
Daporijo Har Khet ko MOA&FW CC Lining at Ridum rijo at Sikom 1 8.00 12.00 3 20.00
86 Block Pani
(Sigen-I) GPC/ASM
Daporijo Har Khet ko MOA&FW CC Lining at Yajir rijo at Sikom 1 8.00 13.00 3 20.00
87 Block Pani
(Sigen-I) GPC/ASM
Daporijo Har Khet ko MOA&FW Kuri nallah to Dapor Rijo at Batak 1 7.00 6.00 3 17.50
88 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kamu koro to Depak Nachi rijo at Batak 1 7.00 10.00 2 17.50
89 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kori koro to Yegi rijo at Batak 1 10.00 14.00 3 25.00
90 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Siri koro to Riokpu at Batak. 1 5.00 12.00 2 12.50
91 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sik koro to Sik rijo at Dulom 1 15.00 20.00 3 37.50
92 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ginchi koro to Namsi rijo at Dulom 1 16.00 25.00 3 40.00
93 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ginchi koro to Rub rijo at Dulom 1 18.00 23.00 3 45.00
94 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ginchi koro to Bayor rijo at Dulom 1 17.00 21.00 3 42.50
95 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ginchi koro to Tani Sipanju at Dulom 1 25.00 20.00 3 62.50
96 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kulu koro to Bumterijo at Dulom 1 10.00 15.00 3 25.00
97 Block Pani
(Sigen-I)

772 | P a g e
Daporijo Har Khet ko MOA&FW Seke koro to Tago Nikro rijo at Dulom 1 8.00 12.00 2 20.00
98 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kamu koro to Gijo rijo at Dulom 1 4.00 10.00 1 10.00
99 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Siri koro to Siri rijo at Jeram 1 15.00 17.00 3 37.50
100 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dodo koro to Jeram rijo at Jeram 1 25.00 21.00 3 62.50
101 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lebar koro to Lebar rijo at Jeram 1 15.00 17.00 3 37.50
102 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lili koro to Gichak rijo (Yora) at Jeram. 1 7.00 10.00 2 17.50
103 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Puto koro to Yomrorijo at Karda 1 6.00 8.00 2 15.00
104 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Jada koro to Jada rijo at Karda 1 9.00 12.00 3 22.50
105 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Yama koro to Yama rijo at Karda 1 8.00 10.00 2 20.00
106 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Otte koro to Karda rijo at Karda 1 9.00 12.00 3 22.50
107 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ngoye koro to Pakdam rijo at Kopin vill 1 5.00 12.00 2 12.50
108 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Melsho koro to Bamru rijo at Lamdik 1 2.00 6.00 1 5.00
109 Block Pani
(Sigen-I)

773 | P a g e
Daporijo Har Khet ko MOA&FW Sitin koro to Boxi rijo at Lamdik 1 5.00 8.00 2 12.50
110 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Koje koro to Hachi rijo at Lamdik 1 7.00 9.00 2 17.50
111 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Gitu koro to Amagi rijo at Lamdik 1 10.00 12.00 3 25.00
112 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Melso river to Namchirijo at Lamdik 1 6.00 7.00 2 15.00
113 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sitin river to Doli Hachiri at Lamdik 1 6.00 9.00 2 15.00
114 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Yorse koro to Sey rijo at Lejirijo 1 5.00 9.00 2 12.50
115 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Tulum koro to Tulum rijo at Lejirijo 1 10.00 11.00 3 25.00
116 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lete koro to Leji reepa at Lejirijo 1 5.00 7.00 2 12.50
117 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dedo koro to Timb rijo at Motu 1 10.00 11.00 3 25.00
118 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dedo koro to kota rijo at Motu 1 10.00 13.00 3 25.00
119 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lili koro to Lili rijo at Motu 1 10.00 12.00 3 25.00
120 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kamlik koro to Kamchak rijo at Patum 1 8.00 10.00 2 20.00
121 Block Pani
(Sigen-I)

774 | P a g e
Daporijo Har Khet ko MOA&FW Niumchi koro to Rimpu yelo at Patum 1 35.00 27.00 3 87.50
122 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kambu koro to Niumbu rijo at Patum 1 7.00 10.00 2 17.50
123 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Binju koro to Binju rijo at Patum 1 6.00 11.00 2 15.00
124 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Niumchi koro to Tumb rijo at Patum 1 5.00 7.00 2 12.50
125 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Kamlik koro to Saa rijo at Patum 1 6.00 12.00 2 15.00
126 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sorga koro to Sirilaktu at Patum 1 5.00 8.00 2 12.50
127 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Rimpu nallah to Mapap Rengo at Rimpu Yorbe at 1 4.00 11.00 2 10.00
128 Block Pani Patum Vill
(Sigen-I)
Daporijo Har Khet ko MOA&FW Numtekoro to Pissa rijo at Pisa 1 25.00 22.00 3 62.50
129 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Belo koro to Rapenrijo at Riterijo 1 12.00 13.00 3 30.00
130 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Duni koro to Repin rijo at Sikom 1 5.00 12.00 2 12.50
131 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Duni koro to Tudde sere at Sikom 1 5.00 8.00 2 12.50
132 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Komra koro to Mele rijo at Sikom 1 5.00 9.00 2 12.50
133 Block Pani
(Sigen-I)

775 | P a g e
Daporijo Har Khet ko MOA&FW Doni koro to Lamlam rijo at Sikom 1 4.00 10.00 2 10.00
134 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Raa koro to Raa rijo at Sikom 1 3.00 7.00 2 7.50
135 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Neeru koro to Neeru Setu at Sikar-II 1 10.00 13.00 3 25.00
136 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Magrak koro to Magrak rijo at Sikar-II 1 10.00 16.00 3 25.00
137 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lete koro to Leterijo at Sikarijo 1 5.00 7.00 2 12.50
138 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Pissa koro to Datrijo at Sippi 1 6.00 9.00 2 15.00
139 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sippi River to Sippi rijo at Sippi 1 30.00 382.00 3 75.00
140 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Chokar rijo at Sippi 1 10.00 12.00 3 25.00
141 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Saa koro to Saa rijo at Sippi 1 15.00 16.00 3 37.50
142 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Jeli koro to Jele rijo at Sippi 1 8.00 10.00 2 20.00
143 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Jeli koro to Regi rijo at Sippi 1 7.00 9.00 2 17.50
144 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ledi koro to Tai rijo at Sippi 1 2.00 6.00 1 5.00
145 Block Pani
(Sigen-I)

776 | P a g e
Daporijo Har Khet ko MOA&FW Komo koro to lejlen rijo at Yekar 1 10.00 15.00 3 25.00
146 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Pate koro & Lerip koro to Lerip rijo at Yekar 1 5.00 8.00 2 12.50
147 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Komu koro to Komu rijo at Yekar 1 5.00 12.00 2 12.50
148 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Komar koro to Komar rijo at Yekar 1 7.00 11.00 2 17.50
149 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Ginchi to Katu rijo at Yekar 1 50.00 24.00 2 125.00
150 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Yekar koro to Taka rijo at Yekar 1 30.00 12.00 3 75.00
151 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Tasum koro to Mudar rijo at Ngudar 1 25.00 19.00 3 62.50
152 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Mio koro to Kopin rijo at Dubi 1 3.00 6.00 2 7.50
153 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sippi River to Dagi rijo at Dubi 1 9.00 372.00 3 22.50
154 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sochak koro to Lable rijo at Dubi 1 5.00 9.00 2 12.50
155 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Daat koro to Daat rijo at Daterijo 1 10.00 14.00 3 25.00
156 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Duni koro to Tigri rijo at Rite 1 10.00 13.00 3 25.00
157 Block Pani
(Sigen-I)

777 | P a g e
Daporijo Har Khet ko MOA&FW Duni river to Ritrrijo at Rite 1 6.00 14.00 2 15.00
158 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Numte koro to Pisa rijo at Pissa-II 1 25.00 21.00 3 62.50
159 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Lebar koro to Lebar rijo at Lebar 1 15.00 16.00 3 37.50
160 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Liduk koro to Pakdam rijo at Pakdam 1 4.00 9.00 2 10.00
161 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dodo koro to Hemum Mumku at Repen Nima 1 5.00 5.00 3 12.50
162 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Dado Koro to Rath rijo At Morak Nima 1 8.00 5.00 3 20.00
163 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Morak Nallah To Rath rijo at Morak Nima 1 6.00 5.00 3 15.00
164 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Morak Nallah to Morak rijo at Morak Nima 1 5.00 7.00 3 12.50
165 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Nima Koro Boomdi WRC field at Nima 1 7.00 9.00 3 17.50
166 Block Pani
(Sigen-I)
Daporijo Har Khet ko MOA&FW Sigen Koro To Bonye yolo at Nima 1 6.00 6.00 3 15.00
167 Block Pani
(Sigen-I)

NEW SCHEMES
Sl. Name of Concerned Componen Activity Total Command Catchmen Period of Estimate Remarks/
No. the Ministry/ t (C/o. MIP from ……….) Numbe Area/Irrigatio t Area Implementatio d cost Recommende
District/ Departmen r n (in Ha) (Sq.Km.) n (Rs. in d by
Blocks t lakh)

778 | P a g e
1 Puchigek MOA&FW Har Khet Suk koro to Ramrijo at Ango Lomdak 1 10 6 3 25.00 MLA
o Block ko Pani
2 Puchigek MOA&FW Har Khet Sibe koro to Tairijo at Balakmuri 1 30 3 3 75.00 MLA
o Block ko Pani
3 Puchigek MOA&FW Har Khet Sibe koro to Taniarijo at Balakmuri 1 6 4 3 15.00 MLA
o Block ko Pani
4 Puchigek MOA&FW Har Khet Ngoka Koro toTapakrijo at Bopi 1 12 7 3 30.00 MLA
o Block ko Pani
5 Puchigek MOA&FW Har Khet Omle koro to Gitumuri at Bopi 1 10 6 3 25.00 MLA
o Block ko Pani
6 Puchigek MOA&FW Har Khet Beak nallah to Bodorijo a/field at Gami vill 1 10 6 3 25.00 MLA
o Block ko Pani
7 Puchigek MOA&FW Har Khet Gayak koro to Boarijo at Gami vill 1 10 7 3 25.00 MLA
o Block ko Pani
8 Puchigek MOA&FW Har Khet Tichi koro to Toich litrijo at Gichi lomdak 1 10 6 3 25.00 MLA
o Block ko Pani
9 Puchigek MOA&FW Har Khet Titti koro to Pobu rijo at Gichi Lomdak vill 1 12 7 3 30.00 MLA
o Block ko Pani
10 Puchigek MOA&FW Har Khet Titik koro to Putuko rijo at Gich Potu. 1 7 5 3 17.50 MLA
o Block ko Pani
11 Puchigek MOA&FW Har Khet Suk river to Sukrijo at Laa 1 14 6 3 35.00 MLA
o Block ko Pani
12 Puchigek MOA&FW Har Khet Selege to Reechrijo at Laa 1 10 6 3 25.00 MLA
o Block ko Pani
13 Puchigek MOA&FW Har Khet Hankoro to Tigli Paglet at Pidi laa vill 1 8 9 3 20.00 MLA
o Block ko Pani
14 Puchigek MOA&FW Har Khet Moyakoro to Moyarijo at Mugli 1 8 6 3 20.00 MLA(C/level)
o Block ko Pani
15 Puchigek MOA&FW Har Khet Timakoro to Pitak rijo at Mugli 1 6 3 3 15.00 MLA
o Block ko Pani
16 Puchigek MOA&FW Har Khet Amperkoro to Asmperrijo at Yongi Mugli 1 6 4 3 15.00 MLA
o Block ko Pani
17 Puchigek MOA&FW Har Khet Rey koro to Meme agarrijo at Muri 1 9 6 3 22.50 MLA
o Block ko Pani

779 | P a g e
18 Puchigek MOA&FW Har Khet Garak koro to Nika Nimsi at Muri 1 8 6 3 20.00 MLA/ (C/level)
o Block ko Pani
19 Puchigek MOA&FW Har Khet Yorge koro to Himpom rijo at Nika Muri vill 1 17 12 3 42.50 MLA
o Block ko Pani
20 Puchigek MOA&FW Har Khet Ge river to Siletech rijo at Nika Muri Vill 1 15 10 3 37.50 MLA/ (C/level)
o Block ko Pani
21 Puchigek MOA&FW Har Khet Sit koro to Mimme yagarrijo at Lol Muri 1 12 6 3 30.00 MLA
o Block ko Pani
22 Puchigek MOA&FW Har Khet Tigirkoro to Sumorijo at Pega Lomdak 1 6 5 3 15.00 MLA
o Block ko Pani
23 Puchigek MOA&FW Har Khet Sum nallah to Riyirijo at Pega Lomdak vill 1 5 4 3 12.50 MLA
o Block ko Pani
24 Puchigek MOA&FW Har Khet Sim river to Koch rijo at Pega kotu vill 1 9 8 3 22.50 MLA
o Block ko Pani
25 Puchigek MOA&FW Har Khet Techakkoro to Putrijo at Puchigeko 1 7 5 3 17.50 MLA
o Block ko Pani
26 Puchigek MOA&FW Har Khet Kalegikoro to Nigma area at Puchigeko 1 8 6 3 20.00 MLA/ (C/level)
o Block ko Pani
27 Puchigek MOA&FW Har Khet Suksim river to Yalerijo at Sikipatu vill 1 14 7 3 35.00 MLA
o Block ko Pani
28 Puchigek MOA&FW Har Khet Tab nallah to Bokpalitak at Sikipotu vill 1 12 6 3 30.00 MLA
o Block ko Pani
29 Puchigek MOA&FW Har Khet Suk River to sipopochok at Tidirgi vill 1 5 5 3 12.50 MLA
o Block ko Pani
30 Puchigek MOA&FW Har Khet Kach koro to Ekkipato agrifield at Keda 1 5 4 3 12.50 MLA
o Block ko Pani
31 Puchigek MOA&FW Har Khet Sibe Nallah to Siberijo at Balak muri vill 1 10 6 3 25.00 MLA
o Block ko Pani
32 Puchigek MOA&FW Har Khet Tab Nallah to Gipenrijo at Balakmuri 1 6 4 3 15.00 MLA
o Block ko Pani
33 Puchigek MOA&FW Har Khet Suk river toTapaso agril field at Bopi 1 8 6 3 20.00 MLA
o Block ko Pani
34 Puchigek MOA&FW Har Khet Berak Koro to Badakrijo at Gami vill 1 12 6 3 30.00 MLA/ (C/level)
o Block ko Pani

780 | P a g e
35 Puchigek MOA&FW Har Khet Berak koro to Yetor at Gami vill. 1 10 6 3 25.00 MLA
o Block ko Pani
36 Puchigek MOA&FW Har Khet Tatik koro toDukrijo agril field at Gichi Lomdak 1 14 8 3 35.00 MLA
o Block ko Pani
37 Puchigek MOA&FW Har Khet Kock koro to tich litak at Gichi lomdak 1 12 7 3 30.00 MLA
o Block ko Pani
38 Puchigek MOA&FW Har Khet Sukh koro to Dsukhrijo at Laa 1 12 7 3 30.00 MLA
o Block ko Pani
39 Puchigek MOA&FW Har Khet Kach koro to Ekki Patu at Mugli vill 1 4 2 2 10.00 MLA
o Block ko Pani
40 Puchigek MOA&FW Har Khet Sibe koro to Richrijo at Mugli 1 9 7 3 22.50 MLA
o Block ko Pani
41 Puchigek MOA&FW Har Khet Midik koro to Komarijo at Muri 1 7 5 3 17.50 MLA
o Block ko Pani
42 Puchigek MOA&FW Har Khet Nigenkoro to Kalakrijo at Muri 1 6 4 3 15.00 MLA
o Block ko Pani
43 Puchigek MOA&FW Har Khet Suk river toTapasorijo agril field at Pega Lomdak 1 12 10 3 30.00 MLA/ (C/level)
o Block ko Pani vill
44 Puchigek MOA&FW Har Khet Chipak koro to Talrijo at Pega Lomdak 1 9 6 3 22.50 MLA
o Block ko Pani
45 Puchigek MOA&FW Har Khet Tab nallah to Gokpa litak at Sikipotu vill 1 10 8 3 25.00 MLA
o Block ko Pani
46 Puchigek MOA&FW Har Khet Tab nallah to Maromrijo at Sikipotu vill 1 16 8 3 40.00 MLA
o Block ko Pani
47 Puchigek MOA&FW Har Khet Kolagi to Ro- Nigme at Puchigeko 1 6 4 3 15.00 MLA
o Block ko Pani
48 Puchigek MOA&FW Har Khet Puchi koro to Tage Rijo At Puchigeko 1 5 5 3 12.50 MLA/ZPM
o Block ko Pani
49 Puchigek MOA&FW Har Khet Tap Koro to Bgiperrijo at Balakmuri 1 5 3 2 12.50 MLA
o Block ko Pani
50 Puchigek MOA&FW Har Khet Gip Koro to Gigi rijo at Balakmuri 1 6 4 3 15.00 MLA
o Block ko Pani
51 Puchigek MOA&FW Har Khet Sim river to Tayalrijo at Pega Lomdak vill 1 8 6 3 20.00 MLA
o Block ko Pani

781 | P a g e
52 Puchigek MOA&FW Har Khet Suk River to lirum Agri field At Tidirgi Vill 1 5 5 3 12.50 MLA
o Block ko Pani
53 Puchigek MOA&FW Har Khet Sibe river to Nona at Gami vill 1 10 6 2 25.00 MLA
o Block ko Pani
54 Puchigek MOA&FW Har Khet Gayak koro to Taken at Gami vill 1 12 8 2 30.00 MLA
o Block ko Pani
55 Puchigek MOA&FW Har Khet Koch koro to Kutu rijo at Gichi Lomdak 1 6 5 3 15.00 MLA
o Block ko Pani
56 Puchigek MOA&FW Har Khet Tadakoro to Tadarijo at Mugli 1 8 6 3 20.00 MLA(C/level)
o Block ko Pani
57 Puchigek MOA&FW Har Khet Gamkoro to Put atak at Mugli 1 6 5 3 15.00 MLA
o Block ko Pani
58 Puchigek MOA&FW Har Khet Timakoro to Ekki patu at Mugli 1 8 6 3 20.00 MLA
o Block ko Pani
59 Puchigek MOA&FW Har Khet Sit koro to Mimeyegerrijo at Muri 1 4 2 3 10.00 MLA/ (C/level)
o Block ko Pani
60 Puchigek MOA&FW Har Khet Purukoro to Richrijo at Muri 1 8 5 3 20.00 MLA
o Block ko Pani
61 Puchigek MOA&FW Har Khet Sim nallah to Rikchirijo at Pega lomdak 1 8 5 3 20.00 MLA/ (C/level)
o Block ko Pani
62 Puchigek MOA&FW Har Khet Kock koro to Kochrijo at Pegalomdak 1 7 5 3 17.50 MLA
o Block ko Pani
63 Puchigek MOA&FW Har Khet Ngoi nallah to Moramrijo at Sikipotu vill 1 10 6 3 25.00 MLA
o Block ko Pani
64 Puchigek MOA&FW Har Khet Libakoro to Liba rijo at Balakmuri 1 4 3 2 10.00 MLA
o Block ko Pani
65 Puchigek MOA&FW Har Khet Sibe Nallah to siberijo via Kayokoro at Gami 1 4 8 2 10.00 MLA
o Block ko Pani
66 Puchigek MOA&FW Har Khet Yarge Koro to Yarge atak at Mugli 1 7 5 3 17.50 MLA
o Block ko Pani
67 Puchigek MOA&FW Har Khet Pitak koro to Lala lasa at Mugli vill 1 5 8 3 12.50 MLA
o Block ko Pani
68 Puchigek MOA&FW Har Khet Sit Koro to Noke Nemchi at Muri 1 5 3 2 12.50 MLA
o Block ko Pani

782 | P a g e
69 Puchigek MOA&FW Har Khet Kolagi stream to Nablak rijo at Puchigeko 1 4 6 3 10.00 MLA/ZPM
o Block ko Pani
70 Puchigek MOA&FW Har Khet Sibe river to Gayrijo at Gami vill 1 12 7 3 30.00 MLA
o Block ko Pani
71 Puchigek MOA&FW Har Khet Nyapu koro to Yaminrijo at Mugli 1 4 9 3 10.00 MLA
o Block ko Pani
72 Puchigek MOA&FW Har Khet Yaro Nallah to Nalo rijo at Mugli 1 3 8 3 7.50 MLA
o Block ko Pani
73 Puchigek MOA&FW Har Khet Nyalo Nalla to Nyalo rijo at Mugli 1 4 6 3 10.00 MLA
o Block ko Pani
74 Puchigek MOA&FW Har Khet Nyalo Nallah to Tamakrijo at Mugli vill 1 6 6 3 15.00 MLA
o Block ko Pani
75 Puchigek MOA&FW Har Khet Digbak koro to Digbakrijo at Muri village 1 4 2 2 10.00 MLA
o Block ko Pani
76 Puchigek MOA&FW Har Khet Sit koro to Higi Ningo at Muri village 1 5 3 2 12.50 MLA
o Block ko Pani
77 Puchigek MOA&FW Har Khet Sit koro to Ninamo at Muri vill 1 25 3 3 62.50 MLA/ (C/level)
o Block ko Pani
78 Puchigek MOA&FW Har Khet Pisik temkoro to Nyaburijo at Mugli 1 5 8 3 12.50 ZPM
o Block ko Pani
79 Puchigek MOA&FW Har Khet Sim koro to Malar tarik rijo at Gichi Lomdak 1 4 7 3 10.00 ZPM
o Block ko Pani
80 Puchigek MOA&FW Har Khet Sim koro to Nyalarijo at Gichi Lomdak 1 14 8 3 35.00 ZPM
o Block ko Pani
81 Puchigek MOA&FW Har Khet Gay koro to Yumrijo at Gami vill 1 4 6 3 10.00 ZPM
o Block ko Pani
82 Puchigek MOA&FW Har Khet Gay koro to Hagekayo rijo at Gami 1 5 8 3 12.50 ZPM
o Block ko Pani
83 Puchigek MOA&FW Har Khet Sibi Koro To Machu at Balakmuri 1 6 3 3 15.00 ZPM
o Block ko Pani
84 Puchigek MOA&FW Har Khet Pakba koro to Ngethmuri at Bopi vill 1 6 6 3 15.00 GPM
o Block ko Pani
85 Puchigek MOA&FW Har Khet Sukh koro to Tomrijo at Laa vill 1 4 8 3 10.00 ZPM
o Block ko Pani

783 | P a g e
86 Puchigek MOA&FW Har Khet Henkoro to Tore rijo at Laa vill 1 3 9 3 7.50 ZPM
o Block ko Pani
87 Puchigek MOA&FW Har Khet Yumdi koro to Makenrijo at Laa 1 5 7 3 12.50 ZPM
o Block ko Pani
88 Puchigek MOA&FW Har Khet Suk koro to Aniakrijo at Laa 1 3 6 3 7.50 ZPM
o Block ko Pani
89 Puchigek MOA&FW Har Khet Suk River to sipopochok at Ango Lomak 1 5 4 3 12.50 C/level
o Block ko Pani
90 Puchigek MOA&FW Har Khet Lirumkoro to Sipopachep at Ango lomdak vill 1 7 3 3 17.50 C/level
o Block ko Pani
91 Puchigek MOA&FW Har Khet Tumle Koro to Tumle rijo at Balakmuri 1 6 3 3 15.00 (C/level)
o Block ko Pani
92 Puchigek MOA&FW Har Khet Bugri koro to Pagarijo at Balakmuri 1 8 4 3 20.00 C/Level.)
o Block ko Pani
93 Puchigek MOA&FW Har Khet Tap Koro to Rekpe rijo at Balakmuri 1 6 3 3 15.00 C/level
o Block ko Pani
94 Puchigek MOA&FW Har Khet Suk Koro to Suk Rijo at Bopi Vill 1 5 4 3 12.50 C/level
o Block ko Pani
95 Puchigek MOA&FW Har Khet Titti koro To Echi Black at Gichi Lomdak 1 6 6 3 15.00 C/level
o Block ko Pani
96 Puchigek MOA&FW Har Khet Koch Koro to Sili Rijo at Gichi Lomdak 1 5 6 3 12.50 C/level
o Block ko Pani
97 Puchigek MOA&FW Har Khet Titik koro to Pubu Rijo at Gich Potu 1 6 5 3 15.00 C/level
o Block ko Pani
98 Puchigek MOA&FW Har Khet Hen kor to Hen Rijo at Laa vill 1 5 4 3 12.50 C/level
o Block ko Pani
99 Puchigek MOA&FW Har Khet Kulagi to Kulagi Rijo at Laa Vill 1 4 3 3 10.00 C/level
o Block ko Pani
10 Puchigek MOA&FW Har Khet Koj Koro to Eki at Mugli vill 1 4 6 3 10.00 C/level
0 o Block ko Pani
10 Puchigek MOA&FW Har Khet Sonyo Koro to Sonyorijo at mugli 1 5 4 3 12.50 C/level
1 o Block ko Pani
10 Puchigek MOA&FW Har Khet Rich Nallah to Richrit at Lut Mugli vill 1 15 6 3 37.50 C/level
2 o Block ko Pani

784 | P a g e
10 Puchigek MOA&FW Har Khet Sige nallah to Richrit at Lut Mugli vill 1 20 5 3 50.00 C/level
3 o Block ko Pani
10 Puchigek MOA&FW Har Khet Boa Koro to Boarijo at lut mugli 1 3 4 3 7.50 C/level
4 o Block ko Pani
10 Puchigek MOA&FW Har Khet Kachakat koro to Pui rijo at Pega Lomdak 1 5 6 3 12.50 C/level
5 o Block ko Pani
10 Puchigek MOA&FW Har Khet Rob koro to Sukrijo at Ango lomdak 1 7 5 3 17.50
6 o Block ko Pani
10 Puchigek MOA&FW Har Khet Suk river to Moramrijo at Ango lomdak 1 7 4 3 17.50
7 o Block ko Pani
10 Puchigek MOA&FW Har Khet Suk river to Kolakrijo at Ango lomdak vill 1 6 3 3 15.00
8 o Block ko Pani
10 Puchigek MOA&FW Har Khet Suk river to Haglenrijo at Ango lomdak vill 1 12 7 3 30.00
9 o Block ko Pani
11 Puchigek MOA&FW Har Khet Suk river to Bogduliutu at Ango lomdak vill 1 10 5 3 25.00
0 o Block ko Pani
11 Puchigek MOA&FW Har Khet Rakepin koro to Page rijo at Balakmuri vill 1 8 5 3 20.00
1 o Block ko Pani
11 Puchigek MOA&FW Har Khet Titik koro to Silirijo at Gichi Lomdak 1 5 8 3 12.50
2 o Block ko Pani
11 Puchigek MOA&FW Har Khet Tati koro to Putukorijo at Gichi Lomdak 1 6 5 3 15.00
3 o Block ko Pani
11 Puchigek MOA&FW Har Khet Suk Koro To Namrak Rijo At Pidi Laa Vill 1 8 9 3 20.00
4 o Block ko Pani
11 Puchigek MOA&FW Har Khet Sit Koro Bage Rijo at Muri 1 6 4 3 15.00
5 o Block ko Pani
11 Puchigek MOA&FW Har Khet Ge river to Kolokrijo at Nika Muri Vill 1 20 15 3 50.00
6 o Block ko Pani
11 Puchigek MOA&FW Har Khet Tigri koro to Sumorijo at Pega Lomdak 1 6 4 3 15.00
7 o Block ko Pani
11 Puchigek MOA&FW Har Khet Suk river to Rablerijo at Pega Lomdak 1 6 4 3 15.00
8 o Block ko Pani
11 Puchigek MOA&FW Har Khet Tali koro to Simrijo at Pega Lomdak 1 4 5 2 10.00
9 o Block ko Pani

785 | P a g e
12 Puchigek MOA&FW Har Khet Nimchi koro to Rajrijo at Pega Lomdak 1 4 7 2 10.00
0 o Block ko Pani
12 Puchigek MOA&FW Har Khet Rupa koro to Didrijo at Pega Lomdak 1 4 6 2 10.00
1 o Block ko Pani
12 Puchigek MOA&FW Har Khet Kat nallah to Nehru rijo (Sim rijo) at Pega Lomdak 1 3 8 1 7.50
2 o Block ko Pani
12 Puchigek MOA&FW Har Khet Koch koro to Pui rijo at Pega Lomdak 1 8 6 3 20.00
3 o Block ko Pani
12 Puchigek MOA&FW Har Khet Sim river to Rebokrijo at Pega Lomdak vill 1 7 5 3 17.50
4 o Block ko Pani
12 Puchigek MOA&FW Har Khet Silum koro to Giterijo at Pega Lomdak vill 1 7 4 3 17.50
5 o Block ko Pani
12 Puchigek MOA&FW Har Khet Heche koro to Sukrijo at Pega Lomdak 1 8 8 3 20.00
6 o Block ko Pani
12 Puchigek MOA&FW Har Khet Suk river to Ngoilerijo at Pega lomdak 1 6 6 3 15.00
7 o Block ko Pani
12 Puchigek MOA&FW Har Khet Tail koro to Simrijo at Pegalomdak. 1 4 5 3 10.00
8 o Block ko Pani
12 Puchigek MOA&FW Har Khet Suk river to Sonyi rijo at pegaKoto vill 1 7 6 3 17.50
9 o Block ko Pani
13 Puchigek MOA&FW Har Khet Tai koro to Tapaso rijo at Pega Koto vill 1 7 5 3 17.50
0 o Block ko Pani
13 Puchigek MOA&FW Har Khet Kath koro to Kathrijo at Pega Koto vill 1 8 4 3 20.00
1 o Block ko Pani
13 Puchigek MOA&FW Har Khet Tel koro to Deed Namchi at Pega Koto vill 1 6 8 3 15.00
2 o Block ko Pani
13 Puchigek MOA&FW Har Khet Sim river to Bukpenrijo at Pegakoto vill 1 7 7 3 17.50
3 o Block ko Pani
13 Puchigek MOA&FW Har Khet Jesaputu at Puchigeko 1 4 5 3 10.00
4 o Block ko Pani
13 Puchigek MOA&FW Har Khet Giyi koro to tayen puru at Puchigeko 1 4 5 3 10.00
5 o Block ko Pani
13 Puchigek MOA&FW Har Khet Suk Nallah to Tijir Rijo at Sikipotu 1 5 5 3 12.50
6 o Block ko Pani

786 | P a g e
13 Puchigek MOA&FW Har Khet Barak koro to Bami Namchi at Bodak vill 1 10 6 3 25.00
7 o Block ko Pani
13 Puchigek MOA&FW Har Khet Ngoi nallah to Marom rijo at Sikipatu vill 1 12 9 3 30.00
8 o Block ko Pani
13 Puchigek MOA&FW Har Khet Mech Nala to Mipenrijo at Pitak vill 1 8 6 3 20.00
9 o Block ko Pani
14 Puchigek MOA&FW Har Khet Suk river to Matrijo at TakeK Bate 1 7 4 3 17.50
0 o Block ko Pani

NEW SCHEMES
Sl. Name of the District/ Concerne Compone Activity Total Command Catchme Period of Estimate Remarks/
No. Blocks d Ministry/ nt (C/o. MIP from ……….) Numbe Area/Irrigati nt Area Implementati d cost Recommended
Departme r on (in Ha) (Sq.Km.) on (Rs. in by
nt lakh)
1 U/Subansiri/Dumpor MOA&F Har Khet Sha koro to Moro Gee, Lodam, Batak 1 120.00 52.00 3 300.00 MLA
ijo W ko Pani Ripa, Reet Muri, Hivindee, Yakrak &
Gimp Ripa at Old Richi

2 U/Subansiri/Dumpor MOA&F Har Khet Jesir/jebkoro to Jisir rijo at Pomte 1 14.00 15.00 3 35.00 MLA
ijo W ko Pani Bage
3 U/Subansiri/Dumpor MOA&F Har Khet Pinru to Jaa rijo at Dere vill (Beyak). 1 4.00 6.00 2 10.00 MLA
ijo W ko Pani
4 U/Subansiri/Dumpor MOA&F Har Khet Si Koro to Dulirijo at Nguki 1 25.00 16.00 2 62.50 MLA
ijo W ko Pani

5 U/Subansiri/Dumpor MOA&F Har Khet Jelak koro to Jidik rijo at Pomte Bage. 1 6.00 15.00 2 15.00 MLA
ijo W ko Pani

6 U/Subansiri/Dumpor MOA&F Har Khet Masi koro to Pebrijo at New Hali. 1 4.00 8.00 2 10.00 MLA
ijo W ko Pani

7 U/Subansiri/Dumpor MOA&F Har Khet Jeet koro to Tugu rijo at Paksok. 1 4.00 7.00 2 10.00 MLA
ijo W ko Pani

787 | P a g e
8 U/Subansiri/Dumpor MOA&F Har Khet Dere koro to Dererijo at Beyak 1 5.00 24.00 2 12.50 MLA
ijo W ko Pani
9 U/Subansiri/Dumpor MOA&F Har Khet Lile koro to Jinbe rijo at Old Hane. 1 4.00 12.00 2 10.00 MLA
ijo W ko Pani

10 U/Subansiri/Dumpor MOA&F Har Khet Biam koro to Mokam rijo at Gite Bage. 1 4.00 8.00 2 10.00 MLA
ijo W ko Pani

11 U/Subansiri/Dumpor MOA&F Har Khet Rilum koro to Rite Bomdi at Param. 1 5.00 7.00 2 12.50 MLA
ijo W ko Pani

12 U/Subansiri/Dumpor MOA&F Har Khet Kamju koro to Denri rijo at Denri Nguki 1 5.00 13.00 2 12.50 MLA
ijo W ko Pani

13 U/Subansiri/Dumpor MOA&F Har Khet Jipin koro to Lirum rijo at Dere Nalo. 1 5.00 10.00 2 12.50 MLA
ijo W ko Pani

14 U/Subansiri/Dumpor MOA&F Har Khet Jinyar koro to Beli rijo at Aya Nirin. 1 10.00 14.00 3 25.00 MLA
ijo W ko Pani
15 U/Subansiri/Dumpor MOA&F Har Khet Pint koro to Pikrijo at Aki Nirin. 1 5.00 50.00 2 12.50 MLA
ijo W ko Pani
16 U/Subansiri/Dumpor MOA&F Har Khet Pinte koro to Eka rijo at Aki Nirin. 1 3.00 42.00 1 7.50 MLA
ijo W ko Pani
17 U/Subansiri/Dumpor MOA&F Har Khet Tunur koro to Angopu, Tunur kopen, 1 150 39.00 3 375.00 MLA
ijo W ko Pani Dloe rijo, Yulkuri, Bumdi rijo, Gayan
rijo, Lipu, Yugi & Liba at New Richi

18 U/Subansiri/Dumpor MOA&F Har Khet Tikli-Tikdo koro to Tokomebir rijo at 1 3.00 6.00 1 7.50 MLA
ijo W ko Pani Jirpu.
19 U/Subansiri/Dumpor MOA&F Har Khet Gir koro to Buru rijo at New Hane. 1 3.00 5.00 1 7.50 MLA
ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Jaa koro to Jaarijo at Paksok. 1 3.00 6.00 1 7.50 MLA
ijo W ko Pani

788 | P a g e
21 U/Subansiri/Dumpor MOA&F Har Khet Jeek koro to Kiri rijo at Paja. 1 3.00 7.00 1 7.50 MLA
ijo W ko Pani

22 U/Subansiri/Dumpor MOA&F Har Khet Roh koro to Biker rijo at Mindi 1 7.00 37.00 2 17.50 MLA
ijo W ko Pani

23 U/Subansiri/Dumpor MOA&F Har Khet Jaa Koro to Bogbarijo at Yaipu. 1 6.00 17.00 3 15.00 MLA
ijo W ko Pani

24 U/Subansiri/Dumpor MOA&F Har Khet Jebe Koro to Kamurijo at Aranalo 1 5.00 16.00 1 12.50 MLA
ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Risi koro to Tajumkopen at Mindi 1 3.00 12.00 2 7.50 MLA
ijo W ko Pani

26 U/Subansiri/Dumpor MOA&F Har Khet Rooh koro to Here rijo at Japorilo. 1 5.00 35.00 2 12.50 MLA
ijo W ko Pani

27 U/Subansiri/Dumpor MOA&F Har Khet Turu Koro to Taktir Muri & Rade rijo at 1 45.00 46.00 3 112.50 MLA
ijo W ko Pani Paka
28 U/Subansiri/Dumpor MOA&F Har Khet Ami koro to Leb rijo at New Riba 1 6.00 12.00 3 15.00 MLA
ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Tur koro to Diligi rijo at Paka. 1 14.50 40.00 4 36.25 MLA
ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Kote koro to Gian rijo at New Riba. 1 5.00 7.00 2 12.50 MLA
ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Sikinrijo at Bui. 1 5.00 200.00 2 12.50 MLA
ijo W ko Pani
32 U/Subansiri/Dumpor MOA&F Har Khet Dek koro to Hame Ruktum Ripa at 1 4.00 7.00 2 10.00 MLA
ijo W ko Pani Bui.
33 U/Subansiri/Dumpor MOA&F Har Khet Rie koro to Tagu rijo at Bulo. 1 3.00 8.00 2 7.50 MLA
ijo W ko Pani
34 U/Subansiri/Dumpor MOA&F Har Khet Sa koro to Sa rijo at Uli. 1 6.00 52.00 2 15.00 MLA
ijo W ko Pani

789 | P a g e
35 U/Subansiri/Dumpor MOA&F Har Khet Roh koro to Raririjo via Giamukhrijo at 1 20.00 48.00 3 50.00 MLA
ijo W ko Pani Rari and Giamukh rijo
36 U/Subansiri/Dumpor MOA&F Har Khet Puru koro to Rasik rijo at Bulo. 1 5.00 7.00 2 12.50 MLA
ijo W ko Pani
37 U/Subansiri/Dumpor MOA&F Har Khet Situ koro to Hego ledo at Uli 1 7.00 15.00 3 17.50 MLA
ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet CC lining from Racho Jile (Sinyum 1 10.00 281.00 3 25.00 MLA
ijo W ko Pani Koro) to Pesekrijo at Dera Nalo
39 U/Subansiri/Dumpor MOA&F Har Khet Jah koro to Kerter rijo at Digbak 1 4.00 164.00 2 10.00 MLA
ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Jir koro to Ginirijo at New Rilo 1 20.00 15.00 2 50.00 MLA
ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Rou koro to Bupu rijo at Japorilo 1 7.00 41.00 3 17.50 MLA
ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Ruplik rijo at Nasi. 1 3.50 12.00 2 8.75 MLA
ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Kumarso koro to Kumarso rijo at Nasi. 1 3.00 6.00 1 7.50 MLA
ijo W ko Pani
44 U/Subansiri/Dumpor MOA&F Har Khet Koddum koro to Gote rijo at Bulo 1 4.00 9.00 2 10.00 MLA
ijo W ko Pani
45 U/Subansiri/Dumpor MOA&F Har Khet Roo koro to Bugdurijo & Uchirijo at 1 40.00 27.00 1 100.00 MLA
ijo W ko Pani Dera
46 U/Subansiri/Dumpor MOA&F Har Khet Roo Koro to Dedarijo at Dera. 1 20.00 29.00 3 50.00 MLA
ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Roo koro to Yadak rijo at Dera. 1 10.00 30.00 3 25.00 MLA
ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Bairijo at Gusar. 1 10.00 47.00 3 25.00 MLA
ijo W ko Pani

790 | P a g e
49 U/Subansiri/Dumpor MOA&F Har Khet Payir koro Bijarijo att Jijrarilo 1 12.00 17.00 3 30.00 MLA
ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Jaa koro to bogba rijo at Jirpu Nalo 1 7.00 10.00 3 17.50 MLA
ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Tabum koro to Osar rijo at Nasi 1 9.00 11.00 3 22.50 MLA
ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Junur koro to Gasirijo at New Richi 1 14 30.00 2 35.00 MLA
ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Taka koro to Ampe Riktak at New 1 4 30.00 2 10.00 MLA
ijo W ko Pani Richi
54 U/Subansiri/Dumpor MOA&F Har Khet Taka Koro to Bumdirijo at Old Richi 1 10.00 17.00 2 25.00 MLA
ijo W ko Pani

55 U/Subansiri/Dumpor MOA&F Har Khet Yoo koro to Bokam rijo at Nidak 1 7.00 14.00 3 17.50 MLA
ijo W ko Pani

56 U/Subansiri/Dumpor MOA&F Har Khet Lebi koro to Buglinrijo at Nipu 1 5.00 16.00 2 12.50 MLA
ijo W ko Pani

57 U/Subansiri/Dumpor MOA&F Har Khet Takir Muri from Yar koro to Tab koro 1 10.00 15.00 2 25.00 MLA
ijo W ko Pani at Pakarijo
58 U/Subansiri/Dumpor MOA&F Har Khet Tur koro to Maram rijo at Paka. 1 4.00 35.00 2 10.00 MLA
ijo W ko Pani

59 U/Subansiri/Dumpor MOA&F Har Khet Jet Koro to Sakperijo at Paksok 1 10.00 47.00 3 25.00 MLA
ijo W ko Pani

60 U/Subansiri/Dumpor MOA&F Har Khet Jidi koro to Pero rijo at Gichi vill. 1 5.00 8.00 2 12.50 MLA
ijo W ko Pani

61 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Kobokolok rijo at 1 20.00 317.00 3 50.00 MLA
ijo W ko Pani Japorilo

791 | P a g e
62 U/Subansiri/Dumpor MOA&F Har Khet Rushi rupin to Site ripa at Lebi 1 12.00 14.00 3 30.00 MLA
ijo W ko Pani

63 U/Subansiri/Dumpor MOA&F Har Khet Salo koro to Babirrijo at Bui 1 7.00 7.00 2 17.50 ZPM
ijo W ko Pani
64 U/Subansiri/Dumpor MOA&F Har Khet Hase Nllah to Haserijo at Bator 1 8.00 19.00 2 20.00 ZPM
ijo W ko Pani
65 U/Subansiri/Dumpor MOA&F Har Khet Hedum koro to Ngudukrijo at Bui 1 4.00 8.00 2 10.00 ZPM
ijo W ko Pani
66 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Dadririjo at Nasi 1 4.00 13.00 2 10.00 ZPM
ijo W ko Pani

67 U/Subansiri/Dumpor MOA&F Har Khet Bogi koro to Bogirijo at Bui 1 4.00 7.00 2 10.00 ZPM
ijo W ko Pani
68 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Kumderijo at Bui 1 5.00 9.00 2 12.50 ZPM
ijo W ko Pani
69 U/Subansiri/Dumpor MOA&F Har Khet Kobin koro to Booderijo at Uli 1 4.00 9.00 2 10.00 ZPM
ijo W ko Pani

70 U/Subansiri/Dumpor MOA&F Har Khet Guse koro to Guserijo at Dera 1 6.00 12.00 2 15.00 ZPM
ijo W ko Pani

71 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Takter rijo at Bui 1 7.00 10.00 2 17.50 ZPM
ijo W ko Pani
72 U/Subansiri/Dumpor MOA&F Har Khet Re koro to Re Riddi at Riddi 1 5.00 12.00 2 12.50 ZPM
ijo W ko Pani

73 U/Subansiri/Dumpor MOA&F Har Khet Tuguina koro to Tuguina rijo at Riddi 1 5.00 14.00 2 12.50 ZPM
ijo W ko Pani

74 U/Subansiri/Dumpor MOA&F Har Khet Kujum Koro to Teli Namsi at Uli 1 4.00 10.00 2 10.00 ZPM
ijo W ko Pani

75 U/Subansiri/Dumpor MOA&F Har Khet Hote koro to Gekiorijo at Debom 1 6.00 26.00 1 15.00 ASM
ijo W ko Pani

76 U/Subansiri/Dumpor MOA&F Har Khet Sikin Koro to Pedepen at Bui 1 5.00 9.00 2 12.50 ZPM
ijo W ko Pani

792 | P a g e
77 U/Subansiri/Dumpor MOA&F Har Khet Lirium Koro to Gichi at Jabir vill 1 6.00 13.00 2 15.00 ASM
ijo W ko Pani

78 U/Subansiri/Dumpor MOA&F Har Khet Kyu koro to Jelum ripa Vill 1 6.00 13.00 1 15.00 ASM
ijo W ko Pani

79 U/Subansiri/Dumpor MOA&F Har Khet Yase koro to Kamirrijo at Kuporijo 1 5.00 34.00 2 12.50 ASM/Dugi
ijo W ko Pani

80 U/Subansiri/Dumpor MOA&F Har Khet Kobin koro to Hibirijo at Uli 1 2.00 11.00 1 5.00 ASM
ijo W ko Pani

81 U/Subansiri/Dumpor MOA&F Har Khet Si koro to Isspenrijo at Uli 1 2.00 19.00 1 5.00 ASM
ijo W ko Pani

82 U/Subansiri/Dumpor MOA&F Har Khet Tanur koro to Gasirijo at New Richi 1 5.00 19.00 2 12.50 ASM
ijo W ko Pani

83 U/Subansiri/Dumpor MOA&F Har Khet Kote koro to Gainrijo at New Richi 1 5.00 10.00 2 12.50 ASM
ijo W ko Pani

84 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Lekarijo at Aki Nirin 1 20.00 45.00 2 50.00 ADC
ijo W ko Pani Dumporijo
85 U/Subansiri/Dumpor MOA&F Har Khet Ngok koro to Bijarijo at Ayamarde 1 2.00 15.00 1 5.00 ADC
ijo W ko Pani Dumporijo
86 U/Subansiri/Dumpor MOA&F Har Khet Tilkoro to Pinterijo at Aki Nirin 1 6.00 17.00 1 15.00 ADC
ijo W ko Pani Dumporijo
87 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Takka rijo at Beyak 1 11.00 15.00 2 27.50 ADC
ijo W ko Pani Dumporijo
88 U/Subansiri/Dumpor MOA&F Har Khet Jeb Koro to Raju rijo at Ara Nalo 1 3.00 10.00 2 7.50 ADC
ijo W ko Pani Dumporijo
89 U/Subansiri/Dumpor MOA&F Har Khet Ja koro to Buhik rijo at Ara Nalo 1 3.00 11.00 2 7.50 ADC
ijo W ko Pani Dumporijo
90 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Bukde rijo at Ara Nalo 1 3.00 9.00 2 7.50 ADC
ijo W ko Pani Dumporijo
91 U/Subansiri/Dumpor MOA&F Har Khet Jinar koro to Payirrijo at Aki Nirin 1 25.00 15.00 2 62.50 ADC
ijo W ko Pani Dumporijo

793 | P a g e
92 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to KamuBokpen at Ara Nalo 1 3.00 7.00 2 7.50 ADC
ijo W ko Pani Dumporijo
93 U/Subansiri/Dumpor MOA&F Har Khet Yorge Koro to Kamurijo at Jirpu Nalo 1 6.00 14.00 2 15.00
ijo W ko Pani
94 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Pinterijo at Aki Nirin 1 4.00 52.00 1 10.00 ADC
ijo W ko Pani Dumporijo
95 U/Subansiri/Dumpor MOA&F Har Khet Ngok koro to Ngokrijo at Ayamarde 1 4.00 14.00 1 10.00 ADC
ijo W ko Pani Dumporijo
96 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Bijarijo at Ayamarde. 1 40.00 58.00 3 100.00 ADC
ijo W ko Pani Dumporijo
97 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Beak rijo at Beyak 1 21.00 25.00 2 52.50 ADC
ijo W ko Pani Dumporijo
98 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Taggu rijo at Gichi Nalo 1 15.00 18.00 2 37.50 ADC
ijo W ko Pani Dumporijo
99 U/Subansiri/Dumpor MOA&F Har Khet Pumsi koro to Bedi Dumpo at Ripo Bui 1 4.00 11.00 2 10.00 CO Gusar
ijo W ko Pani
10 U/Subansiri/Dumpor MOA&F Har Khet Tikh koro to Sulle rijo at Ripo Bui 1 4.00 10.00 2 10.00 CO Gusar
0 ijo W ko Pani
10 U/Subansiri/Dumpor MOA&F Har Khet Yorge koro to Kamurijo at Jirpu Nalo 1 2.00 10.00 1 5.00 ADC
1 ijo W ko Pani Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Peta koro to Liya rijo at Bui 1 4.00 12.00 2 10.00 CO Gusar
2 ijo W ko Pani
10 U/Subansiri/Dumpor MOA&F Har Khet Jeb Koro to Porbarijo at Gite Bage 1 23.00 18.00 2 57.50 ADC
3 ijo W ko Pani Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Roh koro to Bikkarijo Via Hereripa at 1 10.00 20.00 3 25.00 ADC
4 ijo W ko Pani Dere Nalo Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Juhik koro to Gichi ripa at Gichi Nalo 1 2.00 10.00 2 5.00 ADC
5 ijo W ko Pani Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Nallah Bojom to Ngudik rijo at Bui 1 4.00 13.00 2 10.00 CO Gusar
6 ijo W ko Pani

794 | P a g e
10 U/Subansiri/Dumpor MOA&F Har Khet Jaa koro to Rajurijo at Jirpu Nalo 1 5.00 19.00 2 12.50 ADC
7 ijo W ko Pani Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Pojorijo at Gite Bage 1 22.00 16.00 2 55.00 ADC
8 ijo W ko Pani Dumporijo
10 U/Subansiri/Dumpor MOA&F Har Khet Jilum koro to Juli rijo at Mache Marde 1 10.00 6.00 2 25.00 ADC
9 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Yarerijo at Gite Bage 1 16.00 15.00 2 40.00 ADC
0 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Richi koro to Tajum kupen at Mindi 1 2.00 9.00 2 5.00 ADC
1 ijo W ko Pani Nalo Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Jir koro to Kamu Bokpen at Jirpu 1 2.00 10.00 1 5.00 ADC
2 ijo W ko Pani Nalo Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Geo Koro to Jelekrijo at New Hali 1 3.00 9.00 2 7.50 ADC
3 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Jirum koro to Tamrijo at Jirpu Nalo 1 5.00 15.00 1 12.50 ADC
4 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Bame koro to Ruchi Nongo at Gite 1 3.00 16.00 1 7.50 CO Giteripa
5 ijo W ko Pani Bage
11 U/Subansiri/Dumpor MOA&F Har Khet Check dam at Lenyi vill 1 4.00 7.00 1 10.00 BDO
6 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Sinyum River to Sinyum rijo at Mache 1 50.00 352.00 3 125.00 ADC
7 ijo W ko Pani Marde Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Lutak koro to Ali rijo at Mindi Nalo 1 15.00 21.00 2 37.50 ADC
8 ijo W ko Pani Dumporijo
11 U/Subansiri/Dumpor MOA&F Har Khet Mas koro to Poberrijo at New Hali 1 5.00 16.00 2 12.50 ADC
9 ijo W ko Pani Dumporijo

795 | P a g e
12 U/Subansiri/Dumpor MOA&F Har Khet Jhoo koro to Budripa at Mache Marde 1 5.00 5.00 2 12.50 ADC
0 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Talik koro to Raderijo at New Riba 1 8.00 17.00 2 20.00 ADC
1 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Gomte koro to Mecherijo at Mache 1 2.00 13.00 1 5.00 ADC
2 ijo W ko Pani Marde Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Jerek koro to Jerek rijo at New Hali 1 4.00 15.00 2 10.00 ADC
3 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Takek koro to Hikuliri at Mache Marde 1 5.00 12.00 2 12.50 ADC
4 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Sidumgekoro to Yaggi at New Richi 1 5.00 14.00 1 12.50 ADC
5 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Lile Koro to Jinberrijo at New Hane 1 2.00 11.00 2 5.00 ADC
6 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Kerse koro to Hene rijo at Mache 1 4.00 23.00 2 10.00 ADC
7 ijo W ko Pani Marde Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Pinch koro to Namaripa at Riddi 1 30.00 18.00 3 75.00 BDO
8 ijo W ko Pani Dumporijo
12 U/Subansiri/Dumpor MOA&F Har Khet Namchi koro to Jhooripa at Mache 1 1.00 9.00 1 2.50 ADC
9 ijo W ko Pani Marde Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Tunur Koro to Yogi yello at Nirpe Libe 1 14.00 23.00 3 35.00 ADC
0 ijo W ko Pani Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Ladu koro to Tugune at Mindi Nalo 1 2.00 10.00 2 5.00 ADC
1 ijo W ko Pani Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Kuy koro to Jilumripa at Mache Marde 1 6.00 16.00 2 15.00 ADC
2 ijo W ko Pani Dumporijo

796 | P a g e
13 U/Subansiri/Dumpor MOA&F Har Khet Uchi/Roh /Jidi koro to Herre via 1 45.00 25.00 2 112.50 ADC
3 ijo W ko Pani Perorijo at Mindi Nalo. Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Bogya koro to Taporijo at Mache 1 4.00 10.00 2 10.00 ADC
4 ijo W ko Pani Marde Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Rapre Koro Rapre rijo at New Hali 1 2.50 13.00 2 6.25 ADC
5 ijo W ko Pani Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Nyipo koro to Rukprijo at Mache 1 1.00 14.00 1 2.50 ADC
6 ijo W ko Pani Marde Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Mas Koro to Lie rijo at New Hali 1 4.00 12.00 2 10.00 ADC
7 ijo W ko Pani Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Jilijima koro to Tumperijo at Mache 1 4.00 12.00 2 10.00 ADC
8 ijo W ko Pani Marde Dumporijo
13 U/Subansiri/Dumpor MOA&F Har Khet Bane Koro to Dali rijo at New Hali 1 3.00 11.00 2 7.50 ADC
9 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Dema Koro to Chirji rijo at New Hane 1 3.00 10.00 2 7.50 ADC
0 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Rukpe koro to Rukpe Kopen at Mache 1 3.00 15.00 1 7.50 ADC
1 ijo W ko Pani Marde Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Sinyum river to Amirijo at New Riba 1 4.00 15.00 2 10.00 ADC
2 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Mokam koro to Mokam Bokpen at 1 1.00 8.00 1 2.50 ADC
3 ijo W ko Pani Mache Marde Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Jhom koro to Radirijo at New Riba 1 3.00 12.00 2 7.50 ADC
4 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Dodikrijo at Old Riba 1 20.00 350.00 2 50.00 ADC
5 ijo W ko Pani Dumporijo

797 | P a g e
14 U/Subansiri/Dumpor MOA&F Har Khet Rame koro to Tikripa at Mache Marde 1 3.00 23.00 1 7.50 ADC
6 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Tunur koro to Gianrijo at New Richi 1 16.00 21.00 2 40.00 ADC
7 ijo W ko Pani Dumporijo
14 U/Subansiri/Dumpor MOA&F Har Khet Reh koro to Rese ripa at New Riddi 1 6.00 34.00 2 15.00 CO Gusar
8 ijo W ko Pani

14 U/Subansiri/Dumpor MOA&F Har Khet Sello Koro to Ango rijo at New Hali 1 3.00 10.00 2 7.50 ADC
9 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Mokam Koro to Litak rijo at Old Hane 1 2.00 15.00 2 5.00 ADC
0 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Jilli koro to Haso rijo at Old Hali 1 3.00 16.00 2 7.50 ADC
1 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Tampin koro toPuse ripa at Old Riddi 1 5.00 13.00 2 12.50 CO Gusar
2 ijo W ko Pani

15 U/Subansiri/Dumpor MOA&F Har Khet Pinpik koro to Pinpik rijo at Old Hali 1 2.00 16.00 1 5.00 ADC
3 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Pinpik koro to Johi rijo at Old Hali 1 4.00 14.00 2 10.00 ADC
4 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Gima Koro to Ribi rijo at Paja 1 40.00 25.00 3 100.00 ADC
5 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Boro Koro to Karda Bumpen at Old 1 6.00 15.00 2 15.00 ADC
6 ijo W ko Pani Hali Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Jata koro to Jigige rijo at Paksok 1 2.00 15.00 1 5.00 ADC
7 ijo W ko Pani Dumporijo
15 U/Subansiri/Dumpor MOA&F Har Khet Boru koro to Pererijo at Old Hali 1 12.00 21.00 2 30.00 ADC
8 ijo W ko Pani Dumporijo

798 | P a g e
15 U/Subansiri/Dumpor MOA&F Har Khet Jenpu koro to taririjo (Igo) at Paja 1 6.00 10.00 3 15.00 BDO DJM
9 ijo W ko Pani

16 U/Subansiri/Dumpor MOA&F Har Khet Jelle Koro to Lerum rijo via Jabri rijo at 1 13.00 15.00 2 32.50 ADC
0 ijo W ko Pani Hali Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Pil koro to Jolrijo via Bogi at Old Richi 1 18.00 21.00 3 45.00 ADC
1 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Hap Koro to Haprijo at Old Hali 1 4.00 12.00 2 10.00 ADC
2 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Joe koro to Jaryarijo at Paksok 1 2.00 16.00 1 5.00 ADC
3 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Aka Koro to Jinberrijo at Old Hane 1 3.00 14.00 2 7.50 ADC
4 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Jikar Koro to Jilum rijo at Param 1 15.00 21.00 2 37.50 ADC
5 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Jipa koro to Jiparijo at Old Hali 1 5.00 19.00 2 12.50 ADC
6 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Kao koro to Damarijo at Old Hane 1 5.70 13.00 2 14.25 ADC
7 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Sike koro to Pilirijo at Old Richi 1 12.00 34.00 3 30.00 ADC
8 ijo W ko Pani Dumporijo
16 U/Subansiri/Dumpor MOA&F Har Khet Jup koro to Jarja ripa at Old Hali 1 15.00 20.00 2 37.50 ADC
9 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Reh koro to Yiri Namsi at Old Riddi 1 4.00 12.00 2 10.00 CO Gusar
0 ijo W ko Pani

17 U/Subansiri/Dumpor MOA&F Har Khet Je Koro to Gunerijo at Old Hane 1 17.00 25.00 2 42.50 ADC
1 ijo W ko Pani Dumporijo

799 | P a g e
17 U/Subansiri/Dumpor MOA&F Har Khet Masi koro to Materijo at Paja 1 25.00 30.00 3 62.50 ADC
2 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Tagurijorom Kyu koro to Jilumaripa at 1 15.00 19.00 3 37.50 ADC
3 ijo W ko Pani Payir Rijo Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Lite koro to Tal rijo at Paja 1 9.00 12.00 2 22.50 ADC
4 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Job Koro to Rokok rijo at Old Hane 1 2.50 11.00 2 6.25 ADC
5 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Jima Koro to maririjo (Nya) Paja 1 6.00 11.00 3 15.00 BDO DJM
6 ijo W ko Pani

17 U/Subansiri/Dumpor MOA&F Har Khet Tur koro to tartir Muri at Pakarijo 1 20.00 40.00 3 50.00 ADC
7 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Saru Koro to Saru rijo at Pomte Bage 1 15.00 20.00 2 37.50 ADC
8 ijo W ko Pani Dumporijo
17 U/Subansiri/Dumpor MOA&F Har Khet Yap koro to Pakarijo at Paksok 1 2.00 13.00 1 5.00 ADC
9 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Takar koro to Pagna Rijo at Tagogi 1 10.00 18.00 2 25.00 ADC
0 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Jiri koro to Paririjo at Param 1 30.00 20.00 2 75.00 ADC
1 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Lepu koro to Lepurijo at Pomte Bage 1 16.00 17.00 2 40.00 ADC
2 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Rilo koro to Lipurijo at Param 1 10.00 24.00 2 25.00 ADC
3 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Gerin koro to Pikrijo at Yudik 1 2.00 16.00 1 5.00 ADC
4 ijo W ko Pani Dumporijo

800 | P a g e
18 U/Subansiri/Dumpor MOA&F Har Khet Payir koro to Jabrijo at Payir Rijo 1 15.00 14.00 3 37.50 ADC
5 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Gerin koro to Totorijo at Yudik 1 2.00 18.00 1 5.00 ADC
6 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Tangap koro to Tangap rijo at Pomte 1 9.00 16.00 2 22.50 ADC
7 ijo W ko Pani Bage Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Moterijo art Pomte Bage 1 35.00 20.00 2 87.50 ADC
8 ijo W ko Pani Dumporijo
18 U/Subansiri/Dumpor MOA&F Har Khet Jui koro to Jui rijo at Pomte Bage 1 15.00 21.00 2 37.50 ADC
9 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Yabe koro to Yaberijo at Pomte Bage 1 10.00 19.00 2 25.00 ADC
0 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Bogde koro to Riterijo at Param 1 20.00 25.00 2 50.00 ADC
1 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Yorge koro to Yorge rijo at Pomte 1 12.00 15.00 2 30.00 ADC
2 ijo W ko Pani Bage Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Tuku koro to Dikrijo at Yudik 1 2.00 15.00 1 5.00 ADC
3 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Sike koro to Tama Hari Ripa at Tagogi 1 20.00 25.00 3 50.00 ADC
4 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Gune koro to Silok rijo at Uli vill 1 4.00 9.00 2 10.00 CO Dumporijo
5 ijo W ko Pani

19 U/Subansiri/Dumpor MOA&F Har Khet Kulu koro to Gunrijo at Tagogi 1 3.00 16.00 2 7.50 ADC
6 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Sinyum river to Tarrijo at Tajiparam 1 40.00 345.00 3 100.00 ADC
7 ijo W ko Pani Dumporijo

801 | P a g e
19 U/Subansiri/Dumpor MOA&F Har Khet Yape koro to Hufdirijo at Yudik 1 10.00 15.00 3 25.00 ADC
8 ijo W ko Pani Dumporijo
19 U/Subansiri/Dumpor MOA&F Har Khet Kobin koro to Bogde rijo at Uli vill 1 6.00 6.00 2 15.00 CO Dumporijo
9 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Rhu koro to Tikrijo at Rilo 1 10.0 12.0 2 25.00 GPM
0 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Jerkoro to Bukrijo at Yaipu. 1 5.0 14.0 1 12.50
1 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Yo koro to Kode rijo at Uli village 1 5.00 8.00 2 12.50 CO Dumporijo
2 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Sinium Koro to Dumpu rijo at Rilo 1 8.0 12.0 2 20.00 GPM
3 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Konju koro to Namprijo at Uli village 1 5.00 7.00 2 12.50 CO Dumporijo
4 ijo W ko Pani

20 U/Subansiri/Dumpor MOA&F Har Khet Jelak koro to Jonrijo at Yaipu 1 10.0 15.0 1 25.00 ADC
5 ijo W ko Pani Dumporijo
20 U/Subansiri/Dumpor MOA&F Har Khet Hasur Koro to Jojo rijo at Old Hali 1 3.00 16.00 2 7.50 ADC
6 ijo W ko Pani Dumporijo
20 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Dumpojapo at New 1 2.0 12.0 1 5.00 ADC
7 ijo W ko Pani Rilo Dumporijo
20 U/Subansiri/Dumpor MOA&F Har Khet Hussi koro to Hussi rijo at Dera 1 15.00 23.00 3 37.50 9th Gusar
8 ijo W ko Pani ACP
20 U/Subansiri/Dumpor MOA&F Har Khet Rhu koro to Hererijo at Rillo 1 6.0 10.0 2 15.00 GPM
9 ijo W ko Pani

21 U/Subansiri/Dumpor MOA&F Har Khet Jele koro to Bijarijo at Rilo 1 6.0 10.0 2 15.00 GPM
0 ijo W ko Pani

802 | P a g e
21 U/Subansiri/Dumpor MOA&F Har Khet Rain harvesting at Essipu to irrigate 1 5.0 15.0 2 12.50 GPM
1 ijo W ko Pani Hort. Crop at Rilo vill
21 U/Subansiri/Dumpor MOA&F Har Khet Rhu koro to Bubrijo at Rilo 1 10.0 14.0 2 25.00 GPM
2 ijo W ko Pani

21 U/Subansiri/Dumpor MOA&F Har Khet Rain harvesting at Jekernogo to 1 5.0 12.0 2 12.50 GPM
3 ijo W ko Pani irrigate Hort. At Rilo village
21 U/Subansiri/Dumpor MOA&F Har Khet Jelekoro to Japorijo at Rilo 1 6.0 15.0 2 15.00 GPM
4 ijo W ko Pani

21 U/Subansiri/Dumpor MOA&F Har Khet Barak koro to Jurarijo at Rilo 1 5.0 14.0 2 12.50 GPM
5 ijo W ko Pani

21 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Heka rijo at Agi Nirin. 1 4.00 42.00 2 10.00
6 ijo W ko Pani
21 U/Subansiri/Dumpor MOA&F Har Khet Aa Koro to Panpenrijo at Agi Nirin. 1 3.00 17.00 1 7.50
7 ijo W ko Pani
21 U/Subansiri/Dumpor MOA&F Har Khet Aa koro to Ruterijo at Agi Nirin 1 4.00 15.00 2 10.00
8 ijo W ko Pani
21 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Rularijo at Aki Nirin. 1 3.00 46.00 1 7.50
9 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Ngod Koro to Taa rijo ar Aki Nirin 1 3.00 18.00 1 7.50
0 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Eka koro to Mirmarijo at Aki Nirin 1 9.00 15.00 3 22.50
1 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Muktekoro to Toririjo At Aki Nirin 1 3.00 14.00 1 7.50
2 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Nampon rijo at Aki Nirin 1 4.00 49.00 2 10.00
3 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Jebe koro to Dungongk at Aranalo 1 3.00 92.00 1 7.50
4 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Jon koro to Jisir rijo at Aranalo. 1 3.00 8.00 1 7.50
5 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Jerekoro to Ragrijo at Aranalo 1 7.00 14.00 2 17.50
6 ijo W ko Pani

803 | P a g e
22 U/Subansiri/Dumpor MOA&F Har Khet Dere koro to Dere Rijo at Ara Nalo vill 1 6.00 10.00 2 15.00
7 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Jhakoro to Bogbarijo at Aranalo 1 8.00 12.00 2 20.00
8 ijo W ko Pani
22 U/Subansiri/Dumpor MOA&F Har Khet Jebekoro to Jisir rijo at AraNalo 1 5.00 15.00 2 12.50
9 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Jebe koro to Tajom Bagpen at Ara 1 7.00 10.00 1 17.50
0 ijo W ko Pani Nalo
23 U/Subansiri/Dumpor MOA&F Har Khet Rukukoro to Rukurijo at Ayamarde 1 1.00 14.00 1 2.50
1 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Pintekoro to Takomjoba at Ayamarde 1 12.00 62.00 3 30.00
2 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Rou koro to Takirijo at Ayamarde 1 2.00 16.00 1 5.00
3 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Hotu koro to Hegamarijo at Ayamarde 1 3.00 21.00 1 7.50
4 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Jele koro to Takomrijo at Aya Marde 1 3.00 12.00 1 7.50
5 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Jiniyar koro to Payirrijo at Aya Nirin 1 15.00 12.00 3 37.50
6 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Jocha Koro to Jochrijo at Aya Nirin 1 4.00 20.00 2 10.00
7 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Talik koro to Bokbarijo at Aya Nirin 1 6.00 17.00 2 15.00
8 ijo W ko Pani
23 U/Subansiri/Dumpor MOA&F Har Khet Hate Nallah to Haterijo at Bator 1 10.00 22.00 2 25.00
9 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Rukparijo at Belo 1 7.00 10.00 2 17.50
0 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Karga rengo at Belo 1 5.00 12.00 2 12.50
1 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Lirom rijo at Belo 1 8.00 11.00 2 20.00
2 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Yas rijo at Belo 1 7.00 42.00 2 17.50
3 ijo W ko Pani

804 | P a g e
24 U/Subansiri/Dumpor MOA&F Har Khet Sia rijo at Belo 1 6.00 82.00 2 15.00
4 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Ngoka rijo at Belo 1 2.00 18.00 1 5.00
5 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Bodopu rijo at Belo 1 2.00 12.00 1 5.00
6 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Koebokpen at Belo 1 3.00 13.00 1 7.50
7 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Tunur koro to Garik rijo at Belo 1 6.00 16.00 2 15.00
8 ijo W ko Pani
24 U/Subansiri/Dumpor MOA&F Har Khet Seya koro to Garik rijo at Belo 1 5.00 14.00 1 12.50
9 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Yase koro to Yase rijo at Belo 1 2.00 11.00 1 5.00
0 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Sha koro to Gagikrijo at Belo 1 3.00 12.00 1 7.50
1 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Nipo koro to Niporijo at Beyak 1 3.00 22.00 2 7.50
2 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Juakoro Bitrijo at Beyak 1 2.00 17.00 1 5.00
3 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Ledukrijo at Beyak 1 2.00 120.00 1 5.00
4 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Yorgerijo at Beyak 1 4.00 112.00 1 10.00
5 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Derekoro to Taprijo at Beyak 1 4.00 14.00 2 10.00
6 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Dere koro to Takar rijo at Beyak 1 4.00 12.00 2 10.00
7 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Hepa rijo at Beyak 1 4.00 117.00 2 10.00
8 ijo W ko Pani
25 U/Subansiri/Dumpor MOA&F Har Khet Sisi koro to Land muri at Bui 1 3.00 16.00 2 7.50
9 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Ragbu koro to Bururijo at Bui 1 2.00 15.00 1 5.00
0 ijo W ko Pani

805 | P a g e
26 U/Subansiri/Dumpor MOA&F Har Khet Sarlo koro to Sarlorijo at Bui 1 3.00 18.00 2 7.50
1 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Sarlo koro to Tasorijo at Bui 1 1.00 16.00 1 2.50
2 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Rakbu koro to Darumsui at Bui 1 3.00 15.00 2 7.50
3 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Punpen koro to Pikperijo at Bui 1 3.00 13.00 2 7.50
4 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Hame koro to Garipa at Bui 1 1.00 15.50 1 2.50
5 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Sikin Koro to Babirijo at Bui 1 2.00 173.00 1 5.00
6 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Bedidumpi at Bui 1 2.00 222.00 1 5.00
7 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Daren Koro to Darensui at Bui 1 1.00 34.00 1 2.50
8 ijo W ko Pani
26 U/Subansiri/Dumpor MOA&F Har Khet Punpenkoro to Punpenrijo at Bui 1 7.00 15.70 3 17.50
9 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Ham rutum to Dek koro at Bui 1 6.00 14.00 2 15.00
0 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Pumpen Nallah to Pakpi rijo at Bui 1 7.00 14.00 2 17.50
1 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Hidum Koro to karsi Karpen at Bui 1 7.00 12.00 2 17.50
2 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Hogo koro to Hagirijo at Bui 1 3.00 11.00 2 7.50
3 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Simaria rijo at Bulo 1 8.00 102.00 3 20.00
4 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Lipik koro to Heeb at Bulo 1 5.00 16.00 2 12.50
5 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Sikin Koro to Goterijo at Bulo 1 5.00 89.00 2 12.50
6 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Nanikoro to Selakrijo at Bulo 1 7.00 16.00 3 17.50
7 ijo W ko Pani

806 | P a g e
27 U/Subansiri/Dumpor MOA&F Har Khet Magio koro to Magiorijo at Bulo 1 3.00 17.00 1 7.50
8 ijo W ko Pani
27 U/Subansiri/Dumpor MOA&F Har Khet Ree koro to Meerijo at Bulo 1 5.00 34.00 2 12.50
9 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Ree koro to Taiy Elu at Bulo. 1 4.50 30.00 2 11.25
0 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Situ koro to Domorijo at Bulo 1 6.00 23.00 2 15.00
1 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Rashek koro to Tulurijo at Bulo 1 6.00 26.00 2 15.00
2 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Mubi koro to Dukam rijo at New Bulo 1 6.00 19.00 2 15.00
3 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Nani koro to Dagnak rijo at New Bulo 1 6.00 17.00 2 15.00
4 ijo W ko Pani
28 U/Subansiri/Dumpor MOA&F Har Khet Giokoro to Tuldumpum at Debom 1 17.00 32.00 3 42.50
5 ijo W ko Pani

28 U/Subansiri/Dumpor MOA&F Har Khet Lenia Nallah to Tezorijo at Debom 1 7.00 21.00 3 17.50
6 ijo W ko Pani

28 U/Subansiri/Dumpor MOA&F Har Khet Dagam rijo at Debom 1 5.00 11.00 3 12.50
7 ijo W ko Pani

28 U/Subansiri/Dumpor MOA&F Har Khet Juba dulumpung at Debom 1 8.00 9.00 3 20.00
8 ijo W ko Pani

28 U/Subansiri/Dumpor MOA&F Har Khet Hara Dumpung at Debom 1 13.00 10.00 3 32.50
9 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Hupu seti at Debom 1 16.00 9.00 3 40.00
0 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Ruri Nallah to Ruri rijo at Debom 1 10.00 18.00 3 25.00
1 ijo W ko Pani
29 U/Subansiri/Dumpor MOA&F Har Khet Gio koro to Begiarijo at Debom 1 7.00 32.00 3 17.50
2 ijo W ko Pani

807 | P a g e
29 U/Subansiri/Dumpor MOA&F Har Khet Roo koro to Giarijo & Giamuk at 1 65.00 37.00 3 162.50
3 ijo W ko Pani Debom
29 U/Subansiri/Dumpor MOA&F Har Khet Ote Koro to Ochi rijo at Debom 1 3.00 21.00 2 7.50
4 ijo W ko Pani
29 U/Subansiri/Dumpor MOA&F Har Khet Lene kartu to to Giapen rijo at Debom 1 5.00 19.00 1 12.50
5 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Gio koro to Nule rijo at Debom. 1 4.00 29.00 1 10.00
6 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Bai- Pyako rijo at Gusar. 1 5.00 11.00 12.50
7 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Roo koro to Giari rijo at Dera 1 4.00 27.00 2 10.00
8 ijo W ko Pani

29 U/Subansiri/Dumpor MOA&F Har Khet Kartu koro to Giapenrijo at Dera 1 5.00 18.00 2 12.50
9 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Hererijo via 1 50.00 280.00 5 125.00
0 ijo W ko Pani Ribrijo,Julirijo& Pesek rijo at Dere
Nalo,
30 U/Subansiri/Dumpor MOA&F Har Khet Uchi/Roh koro to Pero rijo at Dere 1 47.00 51.00 5 117.50
1 ijo W ko Pani Nalo.
30 U/Subansiri/Dumpor MOA&F Har Khet Sha Koro to Kargarijo at Digbak 1 15.00 156.00 3 37.50
2 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Jaa koro to Paknarijo at Digbak 1 15.00 17.00 3 37.50
3 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Hutu koro to Poire at Digbak 1 5.00 22.00 2 12.50
4 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Hutu rijo at Digbak 1 3.00 24.00 2 7.50
5 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Balamkikeh at Digbak 1 3.00 9.00 2 7.50


6 ijo W ko Pani

808 | P a g e
30 U/Subansiri/Dumpor MOA&F Har Khet Hutu koro to Nangko at Digbak 1 2.00 19.00 1 5.00
7 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Hutu koro to Dego rijo at Digbak 1 6.00 20.00 2 15.00
8 ijo W ko Pani

30 U/Subansiri/Dumpor MOA&F Har Khet Hutu koro to Rijamrijo at Digbak 1 20.00 21.00 2 50.00
9 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Ngoduk koro to Palmuri at Digbak 1 5.00 20.00 2 12.50
0 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Saa koro to Nagom rijo at Digbak 1 6.00 162.00 2 15.00
1 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Kodemuri at Dugi 1 7.00 12.00 3 17.50


2 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Dumurijo at Dugi 1 11.00 11.00 3 27.50


3 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Sikar yerlo at Dugi 1 8.00 19.00 3 20.00
4 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Yas koro to Madin rijo at Dugi 1 6.00 17.00 2 15.00
5 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Yas koro to Kamyirrijo at Dugi 1 6.00 18.00 2 15.00
6 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Nyoke Koro to Amirijo at Dumporijo 1 30.00 21.00 2 75.00
7 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Tungurijo at Gichi 1 4.00 138.00 2 10.00
8 ijo W ko Pani

31 U/Subansiri/Dumpor MOA&F Har Khet Jebikoro to Yipar at Gichi 1 5.00 29.00 2 12.50
9 ijo W ko Pani

809 | P a g e
32 U/Subansiri/Dumpor MOA&F Har Khet Juhikkoro to Gichi Nongo at Gichi 1 10.00 21.00 3 25.00
0 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Rijokoro to Rijiline at Gichi 1 7.00 18.00 3 17.50
1 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Bayom koro to Makpurijo at Gite Bage 1 5.00 12.00 2 12.50
2 ijo W ko Pani
32 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Demibikpen at Gitebage 1 4.00 105.00 2 10.00
3 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Jarmaduda at Gitebage 1 3.00 104.00 2 7.50
4 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Lipu koro to Takdulrijo at Gitebage 1 3.00 27.00 2 7.50
5 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Jarmakoro to Giterrijo at Gitebage 1 3.00 25.00 2 7.50
6 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Jarmakoro to Tenekirrijo at Gitebage 1 3.00 23.00 2 7.50
7 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Jupkoro to Yaaplitak at Gitebage 1 3.00 16.00 2 7.50
8 ijo W ko Pani

32 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Gitrijo at Gitebage 1 3.00 101.00 2 7.50
9 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Podeliken at Gitebage 1 12.00 107.00 3 30.00
0 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Jup koro to Juprijo at Gitebage 1 2.00 14.00 1 5.00
1 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Tabum koro to Tabum Jeta at G/bage 1 3.00 18.00 2 7.50
2 ijo W ko Pani

810 | P a g e
33 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Jebbeju at Gitebage 1 3.00 109.00 2 7.50
3 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Tayum koro to Rubij at Gitebage 1 2.00 21.00 1 5.00
4 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Saru koro to Ampir at Gitebage 1 2.00 14.00 1 5.00
5 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Jepi at Gitebage 1 3.00 108.00 2 7.50
6 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Saru koro to Parko rijo at Gite Bage 1 5.00 14.00 2 12.50
7 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Parko koro to Parko rijo at Gite Bage 1 7.00 14.00 3 17.50
8 ijo W ko Pani

33 U/Subansiri/Dumpor MOA&F Har Khet Saru koro to Betrijo at Gite Bage 1 3.00 12.00 1 7.50
9 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Moryom lipik at Gite Bage 1 5.00 100.00 2 12.50
0 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Saru koro to Sarurijo at Gite Bage 1 7.00 15.00 3 17.50
1 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Saru koro to Julrijo at Gite Bage 1 6.00 17.00 3 15.00
2 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Ro koro to Lin rijo at Gite Bage 1 4.00 20.00 2 10.00
3 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Ro koro to Ro rijo at Gite Bage 1 3.00 17.00 2 7.50
4 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Gado koro to Kodo Geko at Gite Bage 1 8.00 12.00 3 20.00
5 ijo W ko Pani

811 | P a g e
34 U/Subansiri/Dumpor MOA&F Har Khet Lipu koro to Lumri rijo at Gite Bage 1 5.00 14.00 2 12.50
6 ijo W ko Pani

34 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Beyak Bokpen at Gite 1 6.00 101.00 3 15.00
7 ijo W ko Pani Bage
34 U/Subansiri/Dumpor MOA&F Har Khet Lipu koro to Lipu Koterijo at Gite 1 3.00 15.00 2 7.50
8 ijo W ko Pani Bage
34 U/Subansiri/Dumpor MOA&F Har Khet Jerum koro to Jarma rijo at Gite Bage 1 5.00 14.00 2 12.50
9 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Sakpya Nalah to Pyako rijo at Gusar 1 7.00 26.00 3 17.50
0 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Yaa Nalah to Gairijo at Gusar 1 4.00 15.00 2 10.00
1 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Sakpya Nallah to Tererijo at Gusar 1 3.00 28.00 2 7.50
2 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Sakpya Nallah to Sakpiya rijo at 1 3.00 32.00 2 7.50
3 ijo W ko Pani Gusar
35 U/Subansiri/Dumpor MOA&F Har Khet Geo koro to begia rijo at Gusar 1 2.00 22.00 2 5.00
4 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Puru koro to rasik rijo at Gusar 1 3.00 22.00 2 7.50
5 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Sakpya Nallah to Amijrijo at Gusar 1 4.00 25.00 2 10.00
6 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Horo koro to Henelipik rijo at Horo 1 5.00 32.00 2 12.50
7 ijo W ko Pani

35 U/Subansiri/Dumpor MOA&F Har Khet Horo koro to Hororijo at Horo 1 5.00 30.00 2 12.50
8 ijo W ko Pani

812 | P a g e
35 U/Subansiri/Dumpor MOA&F Har Khet Horo koro to Darurijo at Horo 1 5.00 27.00 2 12.50
9 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Hesu koro to Rou rijo at Japrilo 1 10.00 16.00 3 25.00
0 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Rou koro to Murkorijo at Japorilo 1 12.00 39.00 3 30.00
1 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Jalekoro to Dumpoboggo at Jijrarilo 1 35.00 21.00 3 87.50
2 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Hirpi koro to Payir rijo at Jijrarilo 1 11.00 20.00 3 27.50
3 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Payir koro to Hadripa at Jijrarilo 1 50.00 18.00 3 125.00
4 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Radirjo and Amirijo at 1 26.00 302.00 3 65.00
5 ijo W ko Pani Jaririba
36 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Dodikrijo at Jaririba 1 21.00 323.00 3 52.50
6 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Jilak koro to Jonrijo at Jirpu 1 10.00 22.00 3 25.00
7 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Jisir koro to Godlinrijo at Jirpu 1 1.00 14.00 1 2.50
8 ijo W ko Pani

36 U/Subansiri/Dumpor MOA&F Har Khet Jebekoro to Kamubokpen at Jirpu 1 1.00 110.00 1 2.50
9 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Jerekoro to Bukrijo at Jirpu 1 1.00 17.00 1 2.50
0 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Jebe koro to Rajujiba at Jirpu 1 2.00 108.00 1 5.00
1 ijo W ko Pani

813 | P a g e
37 U/Subansiri/Dumpor MOA&F Har Khet Jebekoro to Jeberijo at Jirpu 1 1.00 104.00 1 2.50
2 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Jebkoro to Ragrijo at Jirpu 1 3.00 98.00 2 7.50
3 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Kamyir /sikar koro to Kuporijo at 1 40.00 32.00 3 100.00
4 ijo W ko Pani Kuporijo
37 U/Subansiri/Dumpor MOA&F Har Khet Yase koro to Yase rijo at Kuporijo 1 10.00 38.00 3 25.00
5 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Chok koro to Mote rijo at Kuporijo 1 6.00 18.00 2 15.00
6 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Yash koro to Makyir Pada at Kuporijo 1 5.00 33.00 2 12.50
7 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Legirijo at Lega 1 15.00 21.00 3 37.50
8 ijo W ko Pani

37 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Harurijo at Lega 1 7.00 19.00 3 17.50
9 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Lenyi koro to Bomdirijo at Lenyi 1 10.00 19.00 3 25.00
0 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Lenyi koro to Lenirijo at Lenyi 1 5.00 17.00 2 12.50
1 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Lenyi koro to Lenipasum at Lenyi 1 2.00 22.00 1 5.00
2 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Lebar koro to Lebarrijo at Libar 1 10.00 18.00 3 25.00
3 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Kammu koro to Gippe rijo at Libar 1 6.00 15.00 2 15.00
4 ijo W ko Pani

814 | P a g e
38 U/Subansiri/Dumpor MOA&F Har Khet Legi koro to Legirijo at Lua 1 9.00 16.00 3 22.50
5 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Lua koro to Namchirijo at Lua 1 5.00 14.00 3 12.50
6 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Gippi koro toTaporipa at Mache 1 4.00 16.00 2 10.00
7 ijo W ko Pani Marde
38 U/Subansiri/Dumpor MOA&F Har Khet Kyu koro to Digli ripa at Mache Marde 1 6.00 15.00 3 15.00
8 ijo W ko Pani

38 U/Subansiri/Dumpor MOA&F Har Khet Rup koro to Siniumrijo at Mache 1 5.00 9.00 3 12.50
9 ijo W ko Pani marde
39 U/Subansiri/Dumpor MOA&F Har Khet Buru koro to Jilum ripa at Mache 1 4.00 14.00 2 10.00
0 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Ju koro to Botak rijo at Mache Marde 1 4.00 15.00 2 10.00
1 ijo W ko Pani

39 U/Subansiri/Dumpor MOA&F Har Khet Amsakra koro to Budu ripa at Mache 1 5.00 14.00 1 12.50
2 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Rame koro to Gomte rijo at Mache 1 7.00 12.00 3 17.50
3 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Mokam koro to Tikki ripa at Mache 1 9.00 11.00 3 22.50
4 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Tayak koro to Hiku leri at Mache 1 6.00 13.00 3 15.00
5 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Nipo koro to Rukpe kojen at Mache 1 10.00 12.00 3 25.00
6 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Juli koro to Tumpe rijo at Mache 1 5.00 11.00 2 12.50
7 ijo W ko Pani Marde
39 U/Subansiri/Dumpor MOA&F Har Khet Taja koro to Lebe Geko at Mache 1 12.00 13.00 3 30.00
8 ijo W ko Pani Marde

815 | P a g e
39 U/Subansiri/Dumpor MOA&F Har Khet Sinyum River to Dumpu Bokpen at 1 8.00 352.00 3 20.00
9 ijo W ko Pani Mache Marde
40 U/Subansiri/Dumpor MOA&F Har Khet Sinyum/Subansiri River to Ruk rijo at 1 43.00 340.00 3 107.50
0 ijo W ko Pani Mache Marde
40 U/Subansiri/Dumpor MOA&F Har Khet Sinyum River to Tar rijo at Mache 1 75.00 347.00 3 187.50
1 ijo W ko Pani Marde
40 U/Subansiri/Dumpor MOA&F Har Khet Nyoro koro to Diyu kopen at Mache 1 4.00 14.00 2 10.00
2 ijo W ko Pani Marde
40 U/Subansiri/Dumpor MOA&F Har Khet Jui koro to Jui rijo at Mindi 1 2.00 14.00 1 5.00
3 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Rente koro to Dasi rijo at Mindi 1 2.00 15.00 1 5.00
4 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Rente koro to Alari at Mindi 1 1.00 13.00 1 2.50
5 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Ushi koro to Pare rijo at Mindi 1 20.00 41.00 3 50.00
6 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Tugu koro to Jubi hari at Mindi 1 1.00 9.00 1 2.50
7 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Ote koro to Mindi rijo at Nasi 1 5.00 16.00 2 12.50
8 ijo W ko Pani

40 U/Subansiri/Dumpor MOA&F Har Khet Ochi koro to Row rijo at Nasi 1 10.00 19.00 3 25.00
9 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Baam,Bakam at Nasi 1 5.00 12.00 2 12.50


0 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Leku koro to Ochi rijo at Nasi 1 7.00 14.00 3 17.50
1 ijo W ko Pani

816 | P a g e
41 U/Subansiri/Dumpor MOA&F Har Khet Jirak koro to Jirak rijo at New Hali 1 10.00 17.00 3 25.00
2 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Rabre koro Rabre rijo at New Hali 1 3.00 11.00 2 7.50
3 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Jikki koro to Jikki rijo at New Hali 1 12.00 12.00 3 30.00
4 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Kaho koro to Dema rijo at New Hane 1 16.00 13.00 3 40.00
5 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Ley koro to Moya rijo at New Hane 1 4.00 12.00 2 10.00
6 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Liku koro to Liku rijo at New Lida 1 5.00 14.00 2 12.50
7 ijo W ko Pani

41 U/Subansiri/Dumpor MOA&F Har Khet Tab koro to Sot Kara Repa at New 1 10.00 13.00 3 25.00
8 ijo W ko Pani Lida
41 U/Subansiri/Dumpor MOA&F Har Khet Gaa koro to Solok rijo at New Lida 1 2.00 17.00 1 5.00
9 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Jenyum koro to Amirijo at New Riba 1 3.00 330.00 2 7.50
0 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Jum koro to Radi rijo at New Riba 1 12.00 14.00 3 30.00
1 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Talik/Namsi koro to Dedik rijo at New 1 9.00 16.00 3 22.50
2 ijo W ko Pani Riba
42 U/Subansiri/Dumpor MOA&F Har Khet Sinyum river to Japorijo at New Riba 1 50.00 355.00 2 125.00
3 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Radirijo at New Riba 1 25.00 357.00 2 62.50
4 ijo W ko Pani

817 | P a g e
42 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Radhirijo at Old Riba 1 30.00 348.00 2 75.00
5 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Reh koro to Begia Ayor at New Riddi 1 3.00 31.00 2 7.50
6 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Selok koro to Yari Namsi at New Riddi 1 2.00 13.00 1 5.00
7 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Duli koro to Duli rijo at New Riddi 1 2.00 12.00 1 5.00
8 ijo W ko Pani

42 U/Subansiri/Dumpor MOA&F Har Khet Tan koro to Sarik Namsi at New Riddi 1 3.00 14.00 2 7.50
9 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Tampin koro to Nama ripa at New 1 2.00 12.00 1 5.00
0 ijo W ko Pani Riddi
43 U/Subansiri/Dumpor MOA&F Har Khet Dego koro to Ripe rijo at New Riddi 1 3.00 15.00 2 7.50
1 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Gorma koro to Gorma rijo at New 1 3.00 14.00 2 7.50
2 ijo W ko Pani Riddi
43 U/Subansiri/Dumpor MOA&F Har Khet Sarik koro to Sarik rijo at New Riddi 1 2.00 13.00 1 5.00
3 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Yaktek koro to Yaktek rijo at New 1 3.00 15.00 2 7.50
4 ijo W ko Pani Riddi
43 U/Subansiri/Dumpor MOA&F Har Khet Bu koro to Guma rijo at New Riddi 1 3.00 14.00 2 7.50
5 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Sikin Koro to Kumdi rijo at New Riddi 1 17.00 255.00 3 42.50
6 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Kobin koro to Nepo Nama rijo at Nguki 1 15.00 17.00 3 37.50
7 ijo W ko Pani

818 | P a g e
43 U/Subansiri/Dumpor MOA&F Har Khet Serik koro to Yubnerijo at Nguki 1 5.00 16.00 3 12.50
8 ijo W ko Pani

43 U/Subansiri/Dumpor MOA&F Har Khet Kokum koro to Chinyo rupu at Nguki 1 6.00 15.00 2 15.00
9 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Kanju koro to Lekurijo at Denri Nguki 1 6.00 12.00 2 15.00
0 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Si Koro to Dulerijo at Denri Nguki 1 6.00 17.00 2 15.00
1 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Yoo koro to Leku rijo at Nidak 1 7.00 16.00 2 17.50
2 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Yoo koro to Charpu rijo at Nidak 1 6.00 18.00 3 15.00
3 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Nimba Koba at Nidak 1 4.00 19.00 3 10.00
4 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Yago koro to Yo rijo at Nidak 1 6.00 12.00 2 15.00
5 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Kamri koro to Lingkung rijo at Nidak 1 5.00 14.00 2 12.50
6 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Rori Ro nallah to Rori Rijo at Nipu 1 6.00 16.00 2 15.00
7 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Ruri rijo at Nipu 1 4.00 18.00 3 10.00
8 ijo W ko Pani

44 U/Subansiri/Dumpor MOA&F Har Khet Nipu Namchi at Nipu 1 5.00 17.00 3 12.50
9 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Leru koro to Boklin rijo at Nipu 1 5.00 14.00 3 12.50
0 ijo W ko Pani

819 | P a g e
45 U/Subansiri/Dumpor MOA&F Har Khet Lene Pochak at Nipu 1 4.00 11.00 3 10.00
1 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Berek koro to Yeri rijo at Old Hali 1 5.00 15.00 3 12.50
2 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Jiru koro to Karda Bampen at Old Hali 1 5.00 13.00 2 12.50
3 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Jup koro to Jaja ripa at Old Hali 1 15.00 10.00 3 37.50
4 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Jup koro to Goja rijo at Old Hali 1 5.00 9.00 2 12.50
5 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Hakak koro to Hakak ripa at Old Hali 1 6.00 15.00 3 15.00
6 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Batak koro to Batak rijo at Old Hali 1 3.00 13.00 2 7.50
7 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Jip koro to Joporijo at old Hali 1 4.00 12.00 2 10.00
8 ijo W ko Pani

45 U/Subansiri/Dumpor MOA&F Har Khet Sello koro to Jajorijo at Old Hali 1 2.00 14.00 1 5.00
9 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Lile koro to Lekar rijo at Old Hane 1 3.00 14.00 2 7.50
0 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Sello koro to Hapar Suntak at Old 1 17.00 14.00 3 42.50
1 ijo W ko Pani Hane
46 U/Subansiri/Dumpor MOA&F Har Khet Nima koro to Lenyi rijo at Old Lida 1 5.00 21.00 2 12.50
2 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Ree koro to Gete ripa a Old Lida 1 5.00 17.00 2 12.50
3 ijo W ko Pani

820 | P a g e
46 U/Subansiri/Dumpor MOA&F Har Khet Duri koro to Gitu rijo at Old Lida 1 3.00 14.00 1 7.50
4 ijo W ko Pani
46 U/Subansiri/Dumpor MOA&F Har Khet Salikoro to Son Korarijo at Old Riddi 1 9.00 14.00 3 22.50
5 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Nanikoro to Nanirijo at Old Riddi 1 2.00 12.00 1 5.00
6 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Lenyi koro to Lenyi rijo at Old Riddi 1 2.00 14.00 1 5.00
7 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Selok koro to Selok rijo at Old Riddi 1 3.00 14.00 2 7.50
8 ijo W ko Pani

46 U/Subansiri/Dumpor MOA&F Har Khet Tigli koro to Pitakrijo at Old Riddi 1 2.00 13.00 1 5.00
9 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Mobikoro to Mobirijo at Old Riddi 1 2.00 11.00 1 5.00
0 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Mendikoro to Lib Lene rijo at Old Riddi 1 2.00 12.00 1 5.00
1 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Salikoro to Geturijo at Old Riddi 1 2.00 13.00 1 5.00
2 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Dumbe koro to Tib Lenerijo at Old 1 3.00 14.00 2 7.50
3 ijo W ko Pani Riddi
47 U/Subansiri/Dumpor MOA&F Har Khet Reh Koro to Kakar rijo at Old Riddi 1 3.00 29.00 2 7.50
4 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Pinch koro to Pinch rijo at Old Riddi 1 2.00 14.00 1 5.00
5 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Kora koro to Korarijo at Old Riddi 1 2.00 11.00 1 5.00
6 ijo W ko Pani

821 | P a g e
47 U/Subansiri/Dumpor MOA&F Har Khet Mendi koro to Mendirijo at Od Riddi 1 3.00 9.00 2 7.50
7 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Reg koro to Dumpu rijo at Old Riddi 1 3.00 11.00 2 7.50
8 ijo W ko Pani

47 U/Subansiri/Dumpor MOA&F Har Khet Puru Koro to Materijo at Paja 1 20.00 14.00 3 50.00
9 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Jirjo koro to Kolok rijo at Paja 1 5.00 12.00 2 12.50
0 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Jilum koro to Payir rijo at Paja 1 6.00 13.00 3 15.00
1 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Tur koro to Turrijo at Paka 1 26.00 30.00 3 65.00
2 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Rade koro to Pakrijo at Paka 1 17.00 17.00 3 42.50
3 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Tur koro to Jitum rijo at Pakarijo 1 4.00 46.00 2 10.00
4 ijo W ko Pani
48 U/Subansiri/Dumpor MOA&F Har Khet Lite koro to Tulmuri at Paksok 1 7.00 11.00 3 17.50
5 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Pararijo to Pararijo at Paksok 1 9.00 14.00 3 22.50
6 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Pupok koro to Jili rijo at Paksok 1 7.00 14.00 3 17.50
7 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Jirr koro to Paririjo at Param 1 10.00 16.00 3 25.00
8 ijo W ko Pani

48 U/Subansiri/Dumpor MOA&F Har Khet Jnyum koro to Pikk rijo at Param 1 15.00 3.00 3 37.50
9 ijo W ko Pani

822 | P a g e
49 U/Subansiri/Dumpor MOA&F Har Khet Ter koro to Terrijo at Payir Rijo 1 4.00 9.00 2 10.00
0 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Taru koro to Payir rijo at Payir rijo 1 20.00 17.00 3 50.00
1 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Pojorijo at Pojorijo. 1 27.00 94.00 3 67.50
2 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jerkoro to Rajurijo at Pomte Bage 1 9.00 11.00 3 22.50
3 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Jebrijo at Pomte Bage 1 7.00 96.00 3 17.50
4 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jer koro to Raagrijo at Pomte Bage 1 9.00 17.00 3 22.50
5 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jer koro to Jerrijo at Pomte Bage 1 7.00 21.00 3 17.50
6 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Joo koro to Loyum rijo at Pomte Bage 1 12.00 15.00 3 30.00
7 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Joo koro to Joorijo at Pomte Bage 1 9.00 13.00 3 22.50
8 ijo W ko Pani

49 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to Tamrijo at Pomte Bage 1 5.00 98.00 2 12.50
9 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Jela koro to Telak rijo at Pomte Bage 1 3.00 14.00 2 7.50
0 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Jeb koro to raju bokpen at Pomte 1 4.00 15.00 2 10.00
1 ijo W ko Pani Bage
50 U/Subansiri/Dumpor MOA&F Har Khet Jlak/Der koro Gite Gegdum at Pomte 1 6.00 19.00 3 15.00
2 ijo W ko Pani Bage

823 | P a g e
50 U/Subansiri/Dumpor MOA&F Har Khet Sinyum koro to Tarrijo at Tajiparam 1 135.00 340.00 3 337.50
3 ijo W ko Pani
50 U/Subansiri/Dumpor MOA&F Har Khet Sinyum korom to Kedokrijo at 1 30.00 340.00 3 75.00
4 ijo W ko Pani Tajiparam
50 U/Subansiri/Dumpor MOA&F Har Khet Jirin koromto Ziri rijo at Tajiparam 1 22.00 17.00 3 55.00
5 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Jirin koro to Nokde rijo at Yudik 1 12.00 15.00 3 30.00
6 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Jirin koro to Nyogorijo at Yudik 1 3.00 20.00 2 7.50
7 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Gio koro to Pojorijo at Uli 1 15.00 24.00 3 37.50
8 ijo W ko Pani

50 U/Subansiri/Dumpor MOA&F Har Khet Taa koro to Buri rijo at Uli 1 7.00 17.00 3 17.50
9 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Gune oro to Sekirijo at Uli 1 15.00 14.00 3 37.50
0 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Mote ripa at Uli 1 6.00 12.00 2 15.00
1 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Bu koro to SidumPunchup rijo at Uli 1 5.00 12.00 2 12.50
2 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Lipui koro to Rilo rijo at Kigi Mori 1 4.00 13.00 3 10.00
3 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Basse koro to Kigi rijo at Kigi Mori 1 20.00 15.00 3 50.00
4 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Putekoro to Jilum rijo at Kigi moi 1 2.00 12.00 1 5.00
5 ijo W ko Pani

824 | P a g e
51 U/Subansiri/Dumpor MOA&F Har Khet Koden koro to Hepa rijo at Kigi mori 1 3.00 11.00 2 7.50
6 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Rilu koro oto Bogde rijo at Kogi mori 1 2.00 10.00 1 5.00
7 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Holakoro to Koden rijo at Kigi Mori 1 3.00 12.00 2 7.50
8 ijo W ko Pani

51 U/Subansiri/Dumpor MOA&F Har Khet Goyekoro to Gour rijo at Kigi Mori 1 6.00 14.00 3 15.00
9 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Bakte koro to Peasik rijo at Takse 1 17.00 14.00 3 42.50
0 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Ruku koro to Miba rijo at Takse 1 10.00 12.00 3 25.00
1 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Ngok koro to Ngok rijo at Nipelibe 1 20.00 17.00 3 50.00
2 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Jhan koro to Didir rijo at Gun rijo 1 22.00 18.00 3 55.00
3 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Roo koro to Rari rijo at Raririjo 1 40.00 39.00 3 100.00
4 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Petom rijo at Tikry 1 15.00 14.00 3 37.50
5 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Kokam rijo ay Senya yorpu at Tikry 1 5.00 10.00 2 12.50
6 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Sisi koro to Tigri ripa at Tikry 1 10.00 11.00 3 25.00
7 ijo W ko Pani

52 U/Subansiri/Dumpor MOA&F Har Khet Riktum koro to Pari rijo at Tikry 1 12.00 14.00 3 30.00
8 ijo W ko Pani

825 | P a g e
52 U/Subansiri/Dumpor MOA&F Har Khet Haru Koro to Harurijo at Lebi 1 5.00 9.00 2 12.50
9 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Haru koro to Pitak rijo at Pitak 1 6.00 10.00 3 15.00
0 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Hassu koro to Tuli rijo at Pitak 1 9.00 14.00 3 22.50
1 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Mendi rijo at Leyarijo 1 4.00 230.00 2 10.00
2 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Petakoro to Leya rijo at Leya rijo 1 3.00 10.00 2 7.50
3 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Lekar rijo at Pai rijo 1 12.00 225.00 3 30.00
4 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Aridek koro to Hame riktum at Pairijo 1 2.00 9.00 1 5.00
5 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Nguka koro to Nguka rijo at Takte 1 2.00 9.00 1 5.00
6 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Hase koro to Rispa rijo at Takte 1 8.00 14.00 3 20.00
7 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Sok koro to Gippirij at Gipi 1 10.00 12.00 3 25.00
8 ijo W ko Pani

53 U/Subansiri/Dumpor MOA&F Har Khet Si koro to Dullerijo at Dinri 1 60.00 47.00 3 150.00
9 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Kamju koro to Lekurijo at Dinri 1 6.00 17.00 3 15.00
0 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Sikin koro to Roade rijo at Dinri 1 17.00 157.00 3 42.50
1 ijo W ko Pani

826 | P a g e
54 U/Subansiri/Dumpor MOA&F Har Khet Sisi koro to Dajamrijo at Denri. 1 5.00 11.00 2 12.50
2 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Kamju koro to Tali Namsi at Ngusi 1 9.00 14.00 3 22.50
3 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Kobin koro to Bookde rijo at Ngusi 1 12.00 16.00 3 30.00
4 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Liku koro to Bumdirijo at Lenyi annu 1 9.00 14.00 3 22.50
5 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Pinte koro to Yammarijo at Litenirin 1 8.00 72.00 3 20.00
6 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Tul koro to Bokpin at Lite Nirin 1 6.00 14.00 3 15.00
7 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Gutu koro to Lite rijo at Lite Nirin 1 9.00 13.00 3 22.50
8 ijo W ko Pani

54 U/Subansiri/Dumpor MOA&F Har Khet Talu koro to Tate rijo at Beli rijo 1 5.00 14.00 2 12.50
9 ijo W ko Pani

55 U/Subansiri/Dumpor MOA&F Har Khet Dara koro to Beli rijo at Belirijo 1 22.00 27.00 3 55.00
0 ijo W ko Pani

55 U/Subansiri/Dumpor MOA&F Har Khet Payir koro to Bija rijo at Rilo Village 1 15.0 15.0 2 37.50
1 ijo W ko Pani

NEW SCHEMES
Sl. Name of Concerned Component Activity Total Command Catchment Period of Estimated Remarks/
No. the Ministry/ (C/o. MIP from ……….) Number Area/Irrigation Area Implementation cost Recommended
District/ Department (in Ha) (Sq.Km.) (Rs. in by
Blocks lakh)

827 | P a g e
1 Upper Har Khet MOA&FW Limi koro to Lepa rijo at Tode 1 6.00 22.7 2 15.00 H/MLA
Subansiri ko Pani.
Baririjo
2 Upper Har Khet MOA&FW CC Lining from Lepa koro top Jikirijo at Tode 1 15.00 20.00 3 37.50 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
3 Upper Har Khet MOA&FW Nyanye Koro to Tare rijo at at Tasi Doni 1 5.00 24.00 1 12.50 H/MLA
Subansiri ko Pani.
Baririjo
4 Upper Har Khet MOA&FW Jirum koro to Jully rijo Rumte village 1 3.00 38.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
5 Upper Har Khet MOA&FW Banyom Koro to Dego rijo at Bora ropuk vill 1 3.00 13.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
6 Upper Har Khet MOA&FW MI channel at Bomgi liri rijo at Baririjo 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo CE
7 Upper Har Khet MOA&FW Guruk koro to Chaklekrijo at Labak Gongo 1 3.00 17.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
8 Upper Har Khet MOA&FW Tapnanmchi Nallah to Rotupaka at Korarijo 1 3.00 14.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
9 Upper Har Khet MOA&FW Tare koro to Laigirijo at Laigi vill 1 10.00 14.00 3 25.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
10 Upper Har Khet MOA&FW Ruche koro to Bate rijo at Tasidoni 1 5.00 21.00 2 12.50 H/MLA
Subansiri ko Pani.
Baririjo
11 Upper Har Khet MOA&FW Kulu koro to Basirijo at Tapi vill 1 4.00 21.20 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
12 Upper Har Khet MOA&FW Dere Koro to Tayer rijo at Lipu 1 4.00 12.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo

828 | P a g e
13 Upper Har Khet MOA&FW Jilu Koro to Tar Rijo at Luchi 1 4.00 78.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
14 Upper Har Khet MOA&FW Nyanye Koro to Kibo rijo at Tama Ripa 1 4.00 28.00 1 10.00 Feasible
Subansiri ko Pani.
Baririjo
15 Upper Har Khet MOA&FW Nyer Koro to Kamya rijo at Luchi 1 5.00 21.30 1 12.50 H/MLA
Subansiri ko Pani.
Baririjo
16 Upper Har Khet MOA&FW Ritum koro to Hakar rijo at Maro 1 3.00 12.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
17 Upper Har Khet MOA&FW CC lining from Jilu koro to Dabrijo at Luchi 1 50.00 61.00 3 125.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
18 Upper Har Khet MOA&FW Yach Koro to Tangone Rijo at Lebri vill 1 3.00 9.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
19 Upper Har Khet MOA&FW Pigi koro to Pigi rijo at Riko 1 4.00 12.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
20 Upper Har Khet MOA&FW Koken koro to Bigerijo at Tode 1 4.00 22.80 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
21 Upper Har Khet MOA&FW Ruche koro to Ruche rijo at Tasi Doni 1 5.00 19.80 2 12.50 H/MLA
Subansiri ko Pani.
Baririjo
22 Upper Har Khet MOA&FW Dego koro to Dagi rijo at Riko vill 1 3.00 16.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
23 Upper Har Khet MOA&FW Tung Koro to Radrijo at Haji 1 2.00 11.00 1 5.00 H/MLA
Subansiri ko Pani.
Baririjo
24 Upper Har Khet MOA&FW Jekjek koro to Jibum Pasum at Tama Ripa 1 4.00 24.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo

829 | P a g e
25 Upper Har Khet MOA&FW Haye koro to Kamdarijo at Tode village 1 5.00 15.00 2 12.50 H/MLA
Subansiri ko Pani.
Baririjo
26 Upper Har Khet MOA&FW Siren koro to Sirenrijo at Yatekripa 1 2.00 25.00 1 5.00 H/MLA
Subansiri ko Pani.
Baririjo
27 Upper Har Khet MOA&FW Jishi koro to Jishi rijo at Tapi 1 4.00 26.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
28 Upper Har Khet MOA&FW Pipum koro to Pipum rijo at Riko vill 1 3.00 13.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
29 Upper Har Khet MOA&FW MI channel at Bokmarijo at Haider 1 3.00 9.00 1 7.50 CE
Subansiri ko Pani.
Baririjo
30 Upper Har Khet MOA&FW Niba Koro to Dagi rijo at Riko vill 1 3.00 8.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
31 Upper Har Khet MOA&FW Limik koro to Limik rijo at Tode 1 4.00 23.50 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
32 Upper Har Khet MOA&FW Sinyi koro to Kanya rijo at Tapi vill 1 3.00 12.00 1 7.50 H/MLA
Subansiri ko Pani.
Baririjo
33 Upper Har Khet MOA&FW Yapak koro to Biperrijo at Tapi 1 30.00 16.00 3 75.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
34 Upper Har Khet MOA&FW Lepa Koro to Jeba rijo at Tode 1 4.00 22.40 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
35 Upper Har Khet MOA&FW Rute koro to Ruche rijo at Tasi Doni 1 5.00 19.60 2 12.50 H/MLA
Subansiri ko Pani.
Baririjo
36 Upper Har Khet MOA&FW MI channel at Kau rijo at Haider 1 3.00 7.00 1 7.50 CE
Subansiri ko Pani.
Baririjo

830 | P a g e
37 Upper Har Khet MOA&FW Tagom koro to New Kulo at New Kulo vill 1 10.00 16.00 3 25.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
38 Upper Har Khet MOA&FW Lepa Koro to Tayen rijo at Tode 1 5.00 23.20 2 12.50 H/MLA
Subansiri ko Pani.
Baririjo
39 Upper Har Khet MOA&FW Limi koro to Jilu koro Padum at Tode 1 4.00 23.00 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
40 Upper Har Khet MOA&FW MI channel at Rokpo rijo at Haider 1 3.00 10.00 1 7.50 CE
Subansiri ko Pani.
Baririjo
41 Upper Har Khet MOA&FW Puche koro to Tajurijo at Riko vill 1 10.00 10.00 2 25.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
42 Upper Har Khet MOA&FW Jilu koro to Liparijo at Tode 1 4.00 96.50 1 10.00 H/MLA
Subansiri ko Pani.
Baririjo
43 Upper Har Khet MOA&FW Yam koro to Yamrijo at Riko vill 1 15.00 13.00 3 37.50 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
44 Upper Har Khet MOA&FW Silu koro to Pokrerijo at Tode 1 20.00 94.00 3 50.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
45 Upper Har Khet MOA&FW Sirum koro to Sirumrijo at Rumte vill 1 20.00 16.00 3 50.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
46 Upper Har Khet MOA&FW Tabom Koro (Nallah) to Yajum rijo at Tasi Doni 1 3.00 12 1 7.50 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
47 Upper Har Khet MOA&FW Bopum koro to Bopumrijo at Rumte vill 1 10.00 14.00 2 25.00 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
48 Upper Har Khet MOA&FW Yapak koro to Neperijo at Tapi 1 3.00 14.00 1 7.50 ZPM/Baririjo
Subansiri ko Pani.
Baririjo

831 | P a g e
49 Upper Har Khet MOA&FW Limik koro to Lepa rijo at Tode 1 3.00 19.00 1 7.50 ZPM/Baririjo
Subansiri ko Pani.
Baririjo
50 Upper Har Khet MOA&FW Liku koro to Liku rijo at Haider 1 2.00 8.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
51 Upper Har Khet MOA&FW Jete koro to Bogra rijo at Bora ropuk vill 1 4.00 16.00 1 10.00 CO Maro
Subansiri ko Pani.
Baririjo
52 Upper Har Khet MOA&FW Ribi koro to Rago Mori at Kulo 1 10.00 11.00 2 25.00 CO Maro
Subansiri ko Pani.
Baririjo
53 Upper Har Khet MOA&FW Chera stream to Cherarijo at Dego vill 1 2.00 35.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
54 Upper Har Khet MOA&FW Jinye koro to Pegom ripa at Yoka 1 1.00 18.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
55 Upper Har Khet MOA&FW CC lining from Jiren rijo to Yatekripa at Yatekripa 1 3.00 23.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
56 Upper Har Khet MOA&FW Jilu koro to Jumluk rijo at Tode 1 2.00 91.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
57 Upper Har Khet MOA&FW Dapo koro to Nyagamrijo at Tasidoni 1 2.00 21 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
58 Upper Har Khet MOA&FW Momi koro to Momi rijo at Chota Ropuk 1 3.00 51.20 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
59 Upper Har Khet MOA&FW Jite koro to Chererijo at Dego vill 1 2.00 13.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
60 Upper Har Khet MOA&FW Rade koro to Digirijo at Digi 1 3.00 87.00 1 7.50 ADO Maro
Subansiri ko Pani.
Baririjo

832 | P a g e
61 Upper Har Khet MOA&FW Banyum koro to Some rijo at Chota Ropuk 1 2.50 16.00 1 6.25 CO Maro
Subansiri ko Pani.
Baririjo
62 Upper Har Khet MOA&FW Ribi koro to Iti Mori at Kulo 1 10.00 16.00 2 25.00 CO Maro
Subansiri ko Pani.
Baririjo
63 Upper Har Khet MOA&FW Banyum koro to Banyum rijo at Chota Ropuk 1 2.00 14.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
64 Upper Har Khet MOA&FW Liba koro to Becha rijo at Bora ropuk vill 1 3.00 9.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
65 Upper Har Khet MOA&FW Aag koro to Yache rijo at Kulo 1 3.00 15.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
66 Upper Har Khet MOA&FW Pigyak koro to Depenrijo at Tasidoni 1 2.00 16 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
67 Upper Har Khet MOA&FW Tache koro to Riyirijo at Kulo 1 3.00 13.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
68 Upper Har Khet MOA&FW Pere koro to Milom Rikh at Gongo 1 3.00 23.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
69 Upper Har Khet MOA&FW Chere koro to Chere rijo at Dego vill 1 3.00 44.00 1 7.50 ADO Maro
Subansiri ko Pani.
Baririjo
70 Upper Har Khet MOA&FW Jeda koro to Tumte rijo at Bora ropuk vill 1 3.00 23.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
71 Upper Har Khet MOA&FW Tain koro to Sebririjo at Dula 1 4.00 19.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
72 Upper Har Khet MOA&FW Ru koro to Radi rijo at Gongo 1 3.00 49.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo

833 | P a g e
73 Upper Har Khet MOA&FW Jinium koro to Jinium rijo at Digi 1 2.00 248.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
74 Upper Har Khet MOA&FW Lerak koro to Geri ripa at Dula 1 4.00 20.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
75 Upper Har Khet MOA&FW Hano koro to Lomerijo at Dula 1 8.00 18.00 3 20.00 CO Maro
Subansiri ko Pani.
Baririjo
76 Upper Har Khet MOA&FW Dodo koro to Dodo rijo at Kulo vill 1 3.00 11.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
77 Upper Har Khet MOA&FW Jilu koro to Ligirijo at Tapi Luchi Vill 1 3.00 89.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
78 Upper Har Khet MOA&FW Kokek koro to Begerijo at Dula 1 3.00 31.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
79 Upper Har Khet MOA&FW Sigen koro to Libarijo at Gongo 1 4.00 316.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
80 Upper Har Khet MOA&FW Jilu koro to Rete rijo at Korarijo 1 1.00 91.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
81 Upper Har Khet MOA&FW Sigen koro to Tayerijo at Gongo 1 2.00 356.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
82 Upper Har Khet MOA&FW Jiga Koro to Ngubu rijo at Chota Ropuk 1 2.00 21.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
83 Upper Har Khet MOA&FW Jiten koro to Tamen rijo at Gongo 1 2.00 12.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
84 Upper Har Khet MOA&FW Lir koro to Lomeripa at Dula 1 6.00 23.00 2 15.00 CO Maro
Subansiri ko Pani.
Baririjo

834 | P a g e
85 Upper Har Khet MOA&FW Yachi koro to Marak rijo at Lebri vill 1 4.00 16.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
86 Upper Har Khet MOA&FW Jelak koro to Magra rijo at Maro 1 3.00 27.00 1 7.50 ADO Maro
Subansiri ko Pani.
Baririjo
87 Upper Har Khet MOA&FW CC lining from Ritumrijo to Hakerrijo at Maro 1 4.00 24.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
88 Upper Har Khet MOA&FW Rad koro to Puche Putu at New Haji 1 4.00 16.00 2 10.00 ADO Maro
Subansiri ko Pani.
Baririjo
89 Upper Har Khet MOA&FW Mete koro to Nyipo ko rijo at Lebri vill 1 4.00 13.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
90 Upper Har Khet MOA&FW Pere koro to Tachok rijo at Gongo 1 3.00 24.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
91 Upper Har Khet MOA&FW Lenyo koro to Pute rijo at Korarijo 1 2.00 14.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
92 Upper Har Khet MOA&FW Gombo koro to Dai rijo at Laigi vill 1 4.00 10.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
93 Upper Har Khet MOA&FW Bijir koro to Rite rijo at Maro 1 2.00 12.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
94 Upper Har Khet MOA&FW Jelak koro to Jelak rijo at Maro 1 3.00 22.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
95 Upper Har Khet MOA&FW Jelak Koro to Riktumko at Maro 1 4.00 21.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
96 Upper Har Khet MOA&FW Jelak koro to Dumar rijo at Maro 1 3.00 20.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo

835 | P a g e
97 Upper Har Khet MOA&FW Taram Koche to Jirek rijo at Maro 1 3.00 14.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
98 Upper Har Khet MOA&FW Tanjo river to Tanjo at Maro 1 2.00 9.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
99 Upper Har Khet MOA&FW Hito koro to Minyomrijo at Maro 1 2.00 16.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
100 Upper Har Khet MOA&FW Jilu koro to Pillirijo at Tapi Luchi Vill 1 1.00 94.50 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
101 Upper Har Khet MOA&FW Kote koro to Raterijo at Rumte 1 2.00 13.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
102 Upper Har Khet MOA&FW Jelak koro to Riterijo at Maro 1 1.00 26.50 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
103 Upper Har Khet MOA&FW Gipon koro to Nyigom rijo at Rumte 1 2.00 12.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
104 Upper Har Khet MOA&FW Jha koro to Bage rijo at Maro 1 2.00 21.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
105 Upper Har Khet MOA&FW Labe koro to Labe rijo at Lebri vill 1 2.00 14.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
106 Upper Har Khet MOA&FW Tur koro to Jheer Pata at Maro 1 3.00 11.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
107 Upper Har Khet MOA&FW Rade koro to Bumro Koro at Repe Haji 1 5.00 15.00 2 12.50 CO Maro
Subansiri ko Pani.
Baririjo
108 Upper Har Khet MOA&FW Jelak Koro to Ruter rijo at Maro 1 1.00 26.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo

836 | P a g e
109 Upper Har Khet MOA&FW Lomgo koro to Jesir rijo at Nuk 1 4.00 22.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
110 Upper Har Khet MOA&FW Rade koro to Panimuri rijo at Panimuri 1 2.00 20.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
111 Upper Har Khet MOA&FW Dese koro to Talirijo at New Haji 1 5.00 10.00 2 12.50 ADO Maro
Subansiri ko Pani.
Baririjo
112 Upper Har Khet MOA&FW Komjum nallah to Eli Tanorijo at New Haji 1 2.00 8.00 1 5.00 ADO Maro
Subansiri ko Pani.
Baririjo
113 Upper Har Khet MOA&FW Jha koro to Jigo Larjo rijo at Maro 1 2.00 23.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
114 Upper Har Khet MOA&FW Tangh koro to Raderijo at New Haji 1 2.50 10.00 1 6.25 CO Maro
Subansiri ko Pani.
Baririjo
115 Upper Har Khet MOA&FW Sinyum koro to Tajum rijo at Nuk 1 6.00 330.00 2 15.00 CO Maro
Subansiri ko Pani.
Baririjo
116 Upper Har Khet MOA&FW Sil koro to Boarijo at Riko vill 1 3.00 8.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
117 Upper Har Khet MOA&FW Sinyum koro to Nyumsen rijo at Ronya 1 4.00 275.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
118 Upper Har Khet MOA&FW Pobom koro to Pobomrijo at Riko 1 4.00 9.00 2 10.00 ADO Maro
Subansiri ko Pani.
Baririjo
119 Upper Har Khet MOA&FW Dikgi koro to Pikgi rijo at Riko vill 1 7.00 9.00 3 17.50 CO Maro
Subansiri ko Pani.
Baririjo
120 Upper Har Khet MOA&FW Jilu koro to Kamyarijo at Tapi Luchi Vill 1 4.00 93.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo

837 | P a g e
121 Upper Har Khet MOA&FW Pira koro to Rumteripa at Rumte vill 1 1.00 14.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
122 Upper Har Khet MOA&FW Jilu koro to Henne rijo/Morik at Tapi 1 3.00 81.00 1 7.50 ADO Maro
Subansiri ko Pani.
Baririjo
123 Upper Har Khet MOA&FW Bapum Stream to Gamrarijo at Rumte 1 6.00 13.00 2 15.00 ADO Maro
Subansiri ko Pani.
Baririjo
124 Upper Har Khet MOA&FW Sinyo nallah to Lero at Rumte 1 4.00 14.00 1 10.00 ADO Maro
Subansiri ko Pani.
Baririjo
125 Upper Har Khet MOA&FW Takgem nallah to Pache rijo at Rumte 1 5.00 11.00 2 12.50 ADO Maro
Subansiri ko Pani.
Baririjo
126 Upper Har Khet MOA&FW Jelak koro to Gekir rijo at Maro 1 1.00 25.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
127 Upper Har Khet MOA&FW Sinyo koro to Bagarijo at Rumte 1 1.00 10.00 1 2.50 ADO Maro
Subansiri ko Pani.
Baririjo
128 Upper Har Khet MOA&FW Neoro koro to Bamenrijo at Maro 1 1.00 10.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
129 Upper Har Khet MOA&FW Jenga koro to Tonyagenrijo at Tasidoni 1 2.00 14 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
130 Upper Har Khet MOA&FW Jenung koro to Rina rijo at Chota Ropuk 1 3.00 15.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
131 Upper Har Khet MOA&FW Namya koro to Didi ripa at Tasidoni 1 4.00 32 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
132 Upper Har Khet MOA&FW Kolu koro to Basirijo at Tapi 1 2.00 15.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo

838 | P a g e
133 Upper Har Khet MOA&FW Pege koro to Geriripa at Dula 1 10.00 25.00 3 25.00 CO Maro
Subansiri ko Pani.
Baririjo
134 Upper Har Khet MOA&FW Tayen koro to Jilu Ringo at Yoka 1 3.00 9.00 1 7.50 ADO Maro
Subansiri ko Pani.
Baririjo
135 Upper Har Khet MOA&FW Jilu koro to Jilurijo at Tapi Luchi Vill 1 2.00 93.50 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
136 Upper Har Khet MOA&FW Jelak koro to Kokak rijo at Maro 1 1.00 26.00 1 2.50 CO Maro
Subansiri ko Pani.
Baririjo
137 Upper Har Khet MOA&FW Jekek koro to Tajaripa at Tasidoni 1 3.00 25 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
138 Upper Har Khet MOA&FW Jilu koro to Kojerijo at Tapi Luchi Vill 1 2.00 91.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
139 Upper Har Khet MOA&FW Jile koro to Jajerijo at Rumte vill 1 10.00 32.00 3 25.00 CO Maro
Subansiri ko Pani.
Baririjo
140 Upper Har Khet MOA&FW Jingi koro to Jingi rijo at Riko vill 1 4.00 6.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
141 Upper Har Khet MOA&FW Jilu koro to Jilu rijo at Tode 1 4.00 97.80 2 10.00 ADO Maro
Subansiri ko Pani.
Baririjo
142 Upper Har Khet MOA&FW Jurpe koro to Degorijo at Bora ropuk vill 1 2.00 23.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
143 Upper Har Khet MOA&FW Jilukoro to Yircho rihjo at Tode vill 1 7.00 15.00 1 17.50 GPM
Subansiri ko Pani.
Baririjo
144 Upper Har Khet MOA&FW Koma koro to Liberipa at Yoka 1 6.00 14.00 2 15.00 ADO Maro
Subansiri ko Pani.
Baririjo

839 | P a g e
145 Upper Har Khet MOA&FW Silu koro to Yari rijo at Tode vill 1 7.00 10.00 3 17.50 GPM
Subansiri ko Pani.
Baririjo
146 Upper Har Khet MOA&FW Jete koro to Lidhir rijo at Bora ropuk vill 1 3.00 45.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
147 Upper Har Khet MOA&FW Jilu koro to Leperijo at Yatekripa 1 5.00 67.00 2 12.50 ADO Maro
Subansiri ko Pani.
Baririjo
148 Upper Har Khet MOA&FW Dalo koro to Kingamrijo at Maro 1 2.00 18.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
149 Upper Har Khet MOA&FW Hatu koro to Haturijo at Yoka 1 4.00 10.00 2 10.00 ADO Maro
Subansiri ko Pani.
Baririjo
150 Upper Har Khet MOA&FW Hahi koro to Kamde rijo at Tode 1 6.00 12.00 2 15.00 GPM
Subansiri ko Pani.
Baririjo
151 Upper Har Khet MOA&FW Koma Koro to Koma rijo at Yoka vill 1 3.00 15.00 1 7.50 CO Maro
Subansiri ko Pani.
Baririjo
152 Upper Har Khet MOA&FW Lepa koro to Mubrijo at Yoka 1 2.00 16.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
153 Upper Har Khet MOA&FW Jinye koro to Libe ripa at Yoka 1 4.00 17.00 2 10.00 CO Maro
Subansiri ko Pani.
Baririjo
154 Upper Har Khet MOA&FW Joli koro to Jolirijo at Bora ropuk vill 1 2.00 34.00 1 5.00 CO Maro
Subansiri ko Pani.
Baririjo
155 Upper Har Khet MOA&FW Ribi koro to Iti Muri rijo at Baririjo 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
156 Upper Har Khet MOA&FW Degokoro to Dego rijo at Bora ropuk vill 1 3.00 32.00 1 7.50
Subansiri ko Pani.
Baririjo

840 | P a g e
157 Upper Har Khet MOA&FW Jese River to Tabko A/field at Bora ropuk vill 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
158 Upper Har Khet MOA&FW Jeri koro to Tali rijo at Bora ropuk vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
159 Upper Har Khet MOA&FW Banyom koro to Banyom rijo at Bora ropuk vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
160 Upper Har Khet MOA&FW Jarpu Koro to Dego rijo at Bora ropuk vill 1 3.00 8.00 1 7.50
Subansiri ko Pani.
Baririjo
161 Upper Har Khet MOA&FW Rat Koro to heje rijo at Bora ropuk vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
162 Upper Har Khet MOA&FW Banyom Koro to Jeru rijo at Bora ropuk vill 1 4.00 11.00 2 10.00
Subansiri ko Pani.
Baririjo
163 Upper Har Khet MOA&FW Jete koro to Rao jo at Bora ropuk vill 1 4.00 42.00 2 10.00
Subansiri ko Pani.
Baririjo
164 Upper Har Khet MOA&FW Richi koro to Bogi rijo at Bora ropuk vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
165 Upper Har Khet MOA&FW Jolli koro to Jolli rijo at Bora ropuk vill 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
166 Upper Har Khet MOA&FW Jese koro to Jese rijo at Bora ropuk vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
167 Upper Har Khet MOA&FW Rama koro to Rama rijo at Bora ropuk vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
168 Upper Har Khet MOA&FW Rase koro to Namsi rijo at Bora ropuk vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo

841 | P a g e
169 Upper Har Khet MOA&FW Jebe koro to Jebi rijo at Bora ropuk vill 1 3.00 17.00 1 7.50
Subansiri ko Pani.
Baririjo
170 Upper Har Khet MOA&FW Jete koro to Hajo rijo at Bora ropuk vill 1 5.00 40.50 2 12.50
Subansiri ko Pani.
Baririjo
171 Upper Har Khet MOA&FW Jeme koro to Jetu rijo at Bora ropuk vill 1 3.00 42.00 1 7.50
Subansiri ko Pani.
Baririjo
172 Upper Har Khet MOA&FW Banyom Koro to Momey rijo at Chota Ropuk 1 3.00 15.40 1 7.50
Subansiri ko Pani.
Baririjo
173 Upper Har Khet MOA&FW Tali koro to Momi rijo at Chota Ropuk 1 3.00 54.00 1 7.50
Subansiri ko Pani.
Baririjo
174 Upper Har Khet MOA&FW Juru koro to Chere rite at Dego vill 1 4.00 76.00 2 10.00
Subansiri ko Pani.
Baririjo
175 Upper Har Khet MOA&FW Sigen koro to Tariko rijo at Dego vill 1 3.00 265.00 1 7.50
Subansiri ko Pani.
Baririjo
176 Upper Har Khet MOA&FW Sigen koro to Rakir Rayi at Dego vill 1 3.00 267.00 1 7.50
Subansiri ko Pani.
Baririjo
177 Upper Har Khet MOA&FW Tidi koro to Tidi padum at Dego vill 1 3.00 45.00 1 7.50
Subansiri ko Pani.
Baririjo
178 Upper Har Khet MOA&FW Tidi koro to Makmu rijo at Dego vill 1 3.00 43.00 1 7.50
Subansiri ko Pani.
Baririjo
179 Upper Har Khet MOA&FW Pabu koro to Takogi rijo at Dego vill 1 3.00 46.00 1 7.50
Subansiri ko Pani.
Baririjo
180 Upper Har Khet MOA&FW Pente koro to Kudum rijo at Digi 1 3.00 65.00 1 7.50
Subansiri ko Pani.
Baririjo

842 | P a g e
181 Upper Har Khet MOA&FW Penche koro to penche rijo at Digi 1 3.00 56.00 1 7.50
Subansiri ko Pani.
Baririjo
182 Upper Har Khet MOA&FW Sinyum koro to Sinyum rijo at Digi 1 4.00 245.00 2 10.00
Subansiri ko Pani.
Baririjo
183 Upper Har Khet MOA&FW Jija koro to Jija rijo at Dula 1 4.00 23.00 2 10.00
Subansiri ko Pani.
Baririjo
184 Upper Har Khet MOA&FW Lepa koro to Dapo ripa at Dula 1 5.00 22.00 2 12.50
Subansiri ko Pani.
Baririjo
185 Upper Har Khet MOA&FW Hano koro to Tayen rijo at Dula 1 6.00 23.50 3 15.00
Subansiri ko Pani.
Baririjo
186 Upper Har Khet MOA&FW Pere koro to Jitak koro at Dipu Gongo vill 1 3.00 21.00 1 7.50
Subansiri ko Pani.
Baririjo
187 Upper Har Khet MOA&FW Sigin Koro to Pere rijo at Gongo village 1 4.00 267.00 2 10.00
Subansiri ko Pani.
Baririjo
188 Upper Har Khet MOA&FW Taliloma Koro to Dugirijo art Labak gongo 1 3.00 45.00 1 7.50
Subansiri ko Pani.
Baririjo
189 Upper Har Khet MOA&FW Ru koro to Ru Hari at Gongo 1 2.00 47.00 1 5.00
Subansiri ko Pani.
Baririjo
190 Upper Har Khet MOA&FW Ru koro to Ru Ahk rijo at Gongo 1 3.00 45.00 1 7.50
Subansiri ko Pani.
Baririjo
191 Upper Har Khet MOA&FW Liren koro to Takajo Ridum at Gongo 1 3.00 37.00 1 7.50
Subansiri ko Pani.
Baririjo
192 Upper Har Khet MOA&FW Sigen koro to Milom rikke rijo at Gongo 1 4.00 281.00 2 10.00
Subansiri ko Pani.
Baririjo

843 | P a g e
193 Upper Har Khet MOA&FW Sigen koro to Sigen rijo at Gongo 1 3.00 283.00 1 7.50
Subansiri ko Pani.
Baririjo
194 Upper Har Khet MOA&FW Sigen koro to Hakrikji at Gongo 1 4.00 284.00 2 10.00
Subansiri ko Pani.
Baririjo
195 Upper Har Khet MOA&FW Sigen koro to Aki rite at Gongo 1 3.00 286.00 1 7.50
Subansiri ko Pani.
Baririjo
196 Upper Har Khet MOA&FW Sigen koro to Aki ridum at Gongo 1 3.00 287.00 1 7.50
Subansiri ko Pani.
Baririjo
197 Upper Har Khet MOA&FW Sigen koro to Kobene at Gongo 1 3.00 290.00 1 7.50
Subansiri ko Pani.
Baririjo
198 Upper Har Khet MOA&FW Lakbak Koro to Labak Palen at Gongo 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
199 Upper Har Khet MOA&FW Pere koro to Jame rijo at Gongo 1 3.00 25.00 1 7.50
Subansiri ko Pani.
Baririjo
200 Upper Har Khet MOA&FW Sigen koro to Lirerijo at Gongo 1 3.00 302.00 1 7.50
Subansiri ko Pani.
Baririjo
201 Upper Har Khet MOA&FW Sigen koro to Komye rijo at Gongo 1 3.00 305.00 1 7.50
Subansiri ko Pani.
Baririjo
202 Upper Har Khet MOA&FW Sigen koro to Tater rijo at Gongo 1 3.00 307.00 1 7.50
Subansiri ko Pani.
Baririjo
203 Upper Har Khet MOA&FW Sigen koro to Yadi rijo at Gongo 1 3.00 309.00 1 7.50
Subansiri ko Pani.
Baririjo
204 Upper Har Khet MOA&FW Sigen koro to Tajen rijo at Gongo 1 3.00 312.00 1 7.50
Subansiri ko Pani.
Baririjo

844 | P a g e
205 Upper Har Khet MOA&FW Sigen koro to Jentu rijo at Gongo 1 3.00 315.00 1 7.50
Subansiri ko Pani.
Baririjo
206 Upper Har Khet MOA&FW Jilok koro to Jilok Hari at Gongo 1 3.00 49.00 1 7.50
Subansiri ko Pani.
Baririjo
207 Upper Har Khet MOA&FW Sigen koro to Ngunu rijo at Gongo 1 3.00 352.00 1 7.50
Subansiri ko Pani.
Baririjo
208 Upper Har Khet MOA&FW Sigin koro to Bapu Yorlo at Gongo village 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
209 Upper Har Khet MOA&FW Jilak koro to Juirijo at Haider 1 3.00 34.00 1 7.50
Subansiri ko Pani.
Baririjo
210 Upper Har Khet MOA&FW Jet koro to Jetrijo at Haider 1 5.00 37.00 2 12.50
Subansiri ko Pani.
Baririjo
211 Upper Har Khet MOA&FW Jet koro to Belak-pu at Haider village 1 4.00 39.00 2 10.00
Subansiri ko Pani.
Baririjo
212 Upper Har Khet MOA&FW Jike stream to Rege Rijo at Haider 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
213 Upper Har Khet MOA&FW Namji koro to Gaserijo at Hyder village 1 3.00 17.00 1 7.50
Subansiri ko Pani.
Baririjo
214 Upper Har Khet MOA&FW Jetkoro to Gacherijo at Haider village 1 4.00 33.00 2 10.00
Subansiri ko Pani.
Baririjo
215 Upper Har Khet MOA&FW Dar Koro to Dar rijo at Haider 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
216 Upper Har Khet MOA&FW Jet koro to Mirko rijo at Haider 1 5.00 56.00 2 12.50
Subansiri ko Pani.
Baririjo

845 | P a g e
217 Upper Har Khet MOA&FW Jet koro to Take rijo at Haider 1 5.00 58.00 2 12.50
Subansiri ko Pani.
Baririjo
218 Upper Har Khet MOA&FW Ser koro to Ser rijo at Haider 1 3.00 18.00 1 7.50
Subansiri ko Pani.
Baririjo
219 Upper Har Khet MOA&FW Jelak koro to Bogma rijo at Haider 1 3.00 35.00 1 7.50
Subansiri ko Pani.
Baririjo
220 Upper Har Khet MOA&FW Jelak koro to Jumpak rijo at Haider 1 3.00 37.00 1 7.50
Subansiri ko Pani.
Baririjo
221 Upper Har Khet MOA&FW Sinye koro to Jinye rijo at Haider 1 4.00 23.00 2 10.00
Subansiri ko Pani.
Baririjo
222 Upper Har Khet MOA&FW Tayen Koche to Tayen ripa at Haider 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
223 Upper Har Khet MOA&FW Jet koro to Kirto rijo at Haider 1 3.00 43.00 1 7.50
Subansiri ko Pani.
Baririjo
224 Upper Har Khet MOA&FW Jelak koro to Migi rijo at Haider 1 5.00 34.00 2 12.50
Subansiri ko Pani.
Baririjo
225 Upper Har Khet MOA&FW Jet Koro to liku rijo at Haider 1 5.00 46.00 2 12.50
Subansiri ko Pani.
Baririjo
226 Upper Har Khet MOA&FW Jet koro to Rokpo rijo at Haider 1 5.00 49.00 2 12.50
Subansiri ko Pani.
Baririjo
227 Upper Har Khet MOA&FW Jiro koro to Koro rijo at Haider 1 3.00 13.00 1 7.50
Subansiri ko Pani.
Baririjo
228 Upper Har Khet MOA&FW Dar Koro to Chiku rijo at Haider 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo

846 | P a g e
229 Upper Har Khet MOA&FW Lenye koro to Pute rijo at Korarijo 1 4.00 10.00 2 10.00
Subansiri ko Pani.
Baririjo
230 Upper Har Khet MOA&FW Ngor Koro to Korarijo at Korarijo Vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
231 Upper Har Khet MOA&FW Jilu koro to Pega rikme at Korarijo 1 4.00 89.00 2 10.00
Subansiri ko Pani.
Baririjo
232 Upper Har Khet MOA&FW Jaa koro to Pekirrijo at Kulo 1 4.00 21.00 2 10.00
Subansiri ko Pani.
Baririjo
233 Upper Har Khet MOA&FW Aag Koro to Kamrekrijo at New Kulo 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
234 Upper Har Khet MOA&FW Kuchum Koro to Tamdurijo at Old Kulo 1 4.00 16.00 2 10.00
Subansiri ko Pani.
Baririjo
235 Upper Har Khet MOA&FW Tute koro to Riyi rijo at Kulo vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
236 Upper Har Khet MOA&FW Ruri koro to Yache rijo at Kulo vill 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
237 Upper Har Khet MOA&FW Rok muri koro to Muri rijo at Kulo vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
238 Upper Har Khet MOA&FW Ruri koro to Ruri rijo at Kulo vill 1 4.00 15.00 2 10.00
Subansiri ko Pani.
Baririjo
239 Upper Har Khet MOA&FW Dodo koro to Dodo ko rijo at Kulo vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
240 Upper Har Khet MOA&FW Tachak koro to Kulo rijo at Kulo vill 1 4.00 11.00 2 10.00
Subansiri ko Pani.
Baririjo

847 | P a g e
241 Upper Har Khet MOA&FW Rebe koro to rebe rijo at Kulo vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
242 Upper Har Khet MOA&FW Radkoro to Radrijo at Laigi vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
243 Upper Har Khet MOA&FW Sik koro to Sibri rijo at Laigi Vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
244 Upper Har Khet MOA&FW Gombo koro to Deey rijo at Laigi Vill 1 3.00 8.00 1 7.50
Subansiri ko Pani.
Baririjo
245 Upper Har Khet MOA&FW Choch koro to Choche rijo at Laigi Vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
246 Upper Har Khet MOA&FW Siip koro to Kulo repe rijo at Laigi Vill 1 3.00 7.00 1 7.50
Subansiri ko Pani.
Baririjo
247 Upper Har Khet MOA&FW Chere koro to Mehari rijo at Laigi Vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
248 Upper Har Khet MOA&FW Chere koro to Chere rijo at Laigi Vill 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
249 Upper Har Khet MOA&FW Hagrik Koro to Hagrik rijo at Laigi Vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
250 Upper Har Khet MOA&FW Rade rijo at Laigi village 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
251 Upper Har Khet MOA&FW Ngokko koro to Biram mori at Laigi Vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
252 Upper Har Khet MOA&FW Parke koro to Parke rijo at Laigi Vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo

848 | P a g e
253 Upper Har Khet MOA&FW Rade koro to Taktir rijo at Laigi Vill 1 3.00 19.00 1 7.50
Subansiri ko Pani.
Baririjo
254 Upper Har Khet MOA&FW Sipi koro to Kodum rijo at Laigi Vill 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
255 Upper Har Khet MOA&FW Sipou koro to Rade rijo at Laigi Vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
256 Upper Har Khet MOA&FW Chichi koro to Chichi rijo at Laigi Vill 1 4.00 9.00 2 10.00
Subansiri ko Pani.
Baririjo
257 Upper Har Khet MOA&FW Kopen koro to Dira Namchi at Laigi Vill 1 3.00 8.00 1 7.50
Subansiri ko Pani.
Baririjo
258 Upper Har Khet MOA&FW Lebe stream to Leberijo at Lebri vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
259 Upper Har Khet MOA&FW Maglam koro to Maglam rijo at Lebri vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
260 Upper Har Khet MOA&FW Mete koro to Mete rijo at Lebri vill 1 2.00 12.00 1 5.00
Subansiri ko Pani.
Baririjo
261 Upper Har Khet MOA&FW Meche koro to Tikru rijo at Lebri vill 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
262 Upper Har Khet MOA&FW Tumlongou koro to Tumloko at Lebri vill 1 2.00 16.00 1 5.00
Subansiri ko Pani.
Baririjo
263 Upper Har Khet MOA&FW Lebe koro to Lebe rijo at Lebri vill 1 2.00 23.00 1 5.00
Subansiri ko Pani.
Baririjo
264 Upper Har Khet MOA&FW Siiti koro to Sikri rijo at Lebri vill 1 3.00 12.00 2 7.50
Subansiri ko Pani.
Baririjo

849 | P a g e
265 Upper Har Khet MOA&FW Gohi koro to Komleri at Lebri vill 1 2.00 11.00 1 5.00
Subansiri ko Pani.
Baririjo
266 Upper Har Khet MOA&FW Paye koro to Silik rijo at Lebri vill 1 3.00 24.00 1 7.50
Subansiri ko Pani.
Baririjo
267 Upper Har Khet MOA&FW Silik koro to Silikgi rijo at Lebri vill 1 3.00 16.00 1 7.50
Subansiri ko Pani.
Baririjo
268 Upper Har Khet MOA&FW Silik koro to Peda rijo at Lebri vill 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
269 Upper Har Khet MOA&FW Paya koro to Paya rijo at Lebri vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
270 Upper Har Khet MOA&FW Paya koro to Bikar Namchi at Lebri vill 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
271 Upper Har Khet MOA&FW Leh koro to Kosak Konyak at Lebri 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
272 Upper Har Khet MOA&FW Kapjikoro to Taji rijo at Lipu 1 3.00 15.00 2 7.50
Subansiri ko Pani.
Baririjo
273 Upper Har Khet MOA&FW Lipu koro to lipu rijo at Lipu 1 2.00 14.00 1 5.00
Subansiri ko Pani.
Baririjo
274 Upper Har Khet MOA&FW Jilu koro to Tabarijo at Luchi 1 4.00 76.00 2 10.00
Subansiri ko Pani.
Baririjo
275 Upper Har Khet MOA&FW Pase koro to Jampu rijo at Luchi 1 5.00 10.00 2 12.50
Subansiri ko Pani.
Baririjo
276 Upper Har Khet MOA&FW Nyer koro to Jone rijo at Luchi 1 3.00 15.60 1 7.50
Subansiri ko Pani.
Baririjo

850 | P a g e
277 Upper Har Khet MOA&FW Jiren Koro to Jiren rijo at Luchi village 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
278 Upper Har Khet MOA&FW Gaj koro to Pasi rijo at Luchi 1 3.00 19.00 1 7.50
Subansiri ko Pani.
Baririjo
279 Upper Har Khet MOA&FW Jeren koro to Pili rijo at Luchi 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
280 Upper Har Khet MOA&FW Kasak koro to lape rijo at Luchi 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
281 Upper Har Khet MOA&FW Jibu koro to Pasi rijo at Luchi 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
282 Upper Har Khet MOA&FW Jibu koro to Jibu rijo at Luchi 1 4.00 15.00 2 10.00
Subansiri ko Pani.
Baririjo
283 Upper Har Khet MOA&FW Sim koro to Lepe rijo at Luchi 1 3.00 13.00 1 7.50
Subansiri ko Pani.
Baririjo
284 Upper Har Khet MOA&FW Tab Koro to Jerne rijo at Luchi 1 4.00 11.00 2 10.00
Subansiri ko Pani.
Baririjo
285 Upper Har Khet MOA&FW Jilu koro to Tare rijo at Luchi 1 4.00 79.00 2 10.00
Subansiri ko Pani.
Baririjo
286 Upper Har Khet MOA&FW Jilu koro to Jinir rijo at Luchi 1 4.00 81.00 2 10.00
Subansiri ko Pani.
Baririjo
287 Upper Har Khet MOA&FW Nyare koro to Takek rijo at Luchi 1 5.00 21.00 2 12.50
Subansiri ko Pani.
Baririjo
288 Upper Har Khet MOA&FW Nide koro to Jigorijo at Maro 1 4.00 22.00 2 10.00
Subansiri ko Pani.
Baririjo

851 | P a g e
289 Upper Har Khet MOA&FW Yama Koro to Jharijo at Maro 1 3.00 19.80 1 7.50
Subansiri ko Pani.
Baririjo
290 Upper Har Khet MOA&FW Jelak rijo at Maro village 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
291 Upper Har Khet MOA&FW Radir koro to Radir Rijo at Maro village 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
292 Upper Har Khet MOA&FW Lepa koro to Leparijo at under Maro circle 1 3.00 27.60 1 7.50
Subansiri ko Pani.
Baririjo
293 Upper Har Khet MOA&FW Limik Koro to Tode rijo under Maro circle. 1 3.00 21.00 1 7.50
Subansiri ko Pani.
Baririjo
294 Upper Har Khet MOA&FW Dil Koro to Dilrijo at Maro circle. 1 3.00 16.00 1 7.50
Subansiri ko Pani.
Baririjo
295 Upper Har Khet MOA&FW Bomtarijo WRC field at (Lote Bongo)Maro 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
296 Upper Har Khet MOA&FW Jha koro to Yamah rijo at Maro vill. 1 4.00 24.00 2 10.00
Subansiri ko Pani.
Baririjo
297 Upper Har Khet MOA&FW Jelak koro to Buchi rijo at Maro 1 4.00 23.00 2 10.00
Subansiri ko Pani.
Baririjo
298 Upper Har Khet MOA&FW Nyor koro to Nyor rijo at Maro 1 3.00 13.00 1 7.50
Subansiri ko Pani.
Baririjo
299 Upper Har Khet MOA&FW Jelak koro to Bijir rijo at Maro 1 3.00 24.00 1 7.50
Subansiri ko Pani.
Baririjo
300 Upper Har Khet MOA&FW Jelak koro to Jilak bokpen at Maro 1 3.00 25.00 1 7.50
Subansiri ko Pani.
Baririjo

852 | P a g e
301 Upper Har Khet MOA&FW Jha koro to Jaarijo at Maro 1 3.00 22.00 1 7.50
Subansiri ko Pani.
Baririjo
302 Upper Har Khet MOA&FW Jha koro to Marerijo at Maro 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
303 Upper Har Khet MOA&FW Jelak Bokche to Tager rijo at Maro 1 5.00 18.00 2 12.50
Subansiri ko Pani.
Baririjo
304 Upper Har Khet MOA&FW Jha koro to Mabom rijo at Maro 1 8.00 19.00 3 20.00
Subansiri ko Pani.
Baririjo
305 Upper Har Khet MOA&FW Banyom Koro to Banyom rijo at Nijomote 1 4.00 10.00 2 10.00
Subansiri ko Pani.
Baririjo
306 Upper Har Khet MOA&FW Bamyom to Ruku Koro at Nijo Mote 1 4.00 12.00 2 10.00
Subansiri ko Pani.
Baririjo
307 Upper Har Khet MOA&FW Jupkoro to Lelerijo at Old Haji. 1 2.00 8.00 1 5.00
Subansiri ko Pani.
Baririjo
308 Upper Har Khet MOA&FW Talumkoro to Bogbarijo at Old Haji village 1 2.00 9.00 1 5.00
Subansiri ko Pani.
Baririjo
309 Upper Har Khet MOA&FW Rade koro to Pente rijo at New Haji 1 2.00 11.39 1 5.00
Subansiri ko Pani.
Baririjo
310 Upper Har Khet MOA&FW Rade Koro to Bogdurijo at New Haji 1 4.00 10.50 2 10.00
Subansiri ko Pani.
Baririjo
311 Upper Har Khet MOA&FW Dike koro to Yachugii at New Haji 1 2.00 12.00 1 5.00
Subansiri ko Pani.
Baririjo
312 Upper Har Khet MOA&FW Mida Sike Koro to Mida sike at New Haji 1 2.00 9.00 1 5.00
Subansiri ko Pani.
Baririjo

853 | P a g e
313 Upper Har Khet MOA&FW Tangu koro to Tangu rijo at New Haji 1 2.00 14.00 1 5.00
Subansiri ko Pani.
Baririjo
314 Upper Har Khet MOA&FW Desh Nyolo stream to Desh Nyolo at new Haji 1 2.00 8.00 1 5.00
Subansiri ko Pani.
Baririjo
315 Upper Har Khet MOA&FW Rade koro to Kukum rijo at New Haji 1 4.00 13.00 2 10.00
Subansiri ko Pani.
Baririjo
316 Upper Har Khet MOA&FW Desh koro to Rat Bokpen at New Haji 1 2.00 8.00 1 5.00
Subansiri ko Pani.
Baririjo
317 Upper Har Khet MOA&FW Desh koro to Tangu Nyoche at New Haji 1 3.00 9.00 1 7.50
Subansiri ko Pani.
Baririjo
318 Upper Har Khet MOA&FW Desh koro to Bugde rijo at New Haji 1 3.00 9.40 1 7.50
Subansiri ko Pani.
Baririjo
319 Upper Har Khet MOA&FW Puru Koro to Puru rijo at New Haji 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
320 Upper Har Khet MOA&FW Rade Koro to Rade rijo at New Haji 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
321 Upper Har Khet MOA&FW Puru Koro to Yachugi at New Haji 1 3.00 16.00 1 7.50
Subansiri ko Pani.
Baririjo
322 Upper Har Khet MOA&FW Yachugi koro to Telgi rijo at New Haji 1 3.00 8.00 1 7.50
Subansiri ko Pani.
Baririjo
323 Upper Har Khet MOA&FW Siji koro to Kamli rijo at Old Haji 1 3.00 16.00 1 7.50
Subansiri ko Pani.
Baririjo
324 Upper Har Khet MOA&FW Siji koro to Ribi rijo at Old Haji 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo

854 | P a g e
325 Upper Har Khet MOA&FW Sigen Koro to Puhe Rijo at Old Haji 1 4.00 199.80 2 10.00
Subansiri ko Pani.
Baririjo
326 Upper Har Khet MOA&FW Pobom koro to Bogba rijo at Old Haji 1 3.00 21.00 1 7.50
Subansiri ko Pani.
Baririjo
327 Upper Har Khet MOA&FW Sigen koro to Garta rijo at Old Haji 1 3.00 200.00 1 7.50
Subansiri ko Pani.
Baririjo
328 Upper Har Khet MOA&FW Rine Koro to Guba rijo at New Haji 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
329 Upper Har Khet MOA&FW Rade koro to Bejor rijo at New Haji 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
330 Upper Har Khet MOA&FW Desh koro to Rade rijo at New Haji 1 3.00 18.00 1 7.50
Subansiri ko Pani.
Baririjo
331 Upper Har Khet MOA&FW Sinyum koro to Tajum Bukri at Nuk 1 3.00 361.00 1 7.50
Subansiri ko Pani.
Baririjo
332 Upper Har Khet MOA&FW Sinyum koro to Jisir rijo at Nuk 1 3.00 378.00 1 7.50
Subansiri ko Pani.
Baririjo
333 Upper Har Khet MOA&FW Sinyum koro to Rade rijo at Nuk 1 3.00 369.00 1 7.50
Subansiri ko Pani.
Baririjo
334 Upper Har Khet MOA&FW Subansiri river to Tamarijo at Nuk 1 3.00 4569.00 1 7.50
Subansiri ko Pani.
Baririjo
335 Upper Har Khet MOA&FW Subansiri river to Takarijo at Nuk 1 3.00 4569.00 1 7.50
Subansiri ko Pani.
Baririjo
336 Upper Har Khet MOA&FW Subansiri river to Namkorijo at Nuk 1 3.00 4569.00 2 7.50
Subansiri ko Pani.
Baririjo

855 | P a g e
337 Upper Har Khet MOA&FW Subansiri river to Raderijo at Nuk 1 3.00 4569.00 1 7.50
Subansiri ko Pani.
Baririjo
338 Upper Har Khet MOA&FW Subansiri river to Tain pub at Nuk 1 5.00 4569.00 2 12.50
Subansiri ko Pani.
Baririjo
339 Upper Har Khet MOA&FW Subansiri river to Jeser rijo at Nuk 1 4.00 4569.00 2 10.00
Subansiri ko Pani.
Baririjo
340 Upper Har Khet MOA&FW Subansiri river to Ruk rijo at Nuk 1 3.00 4569.00 1 7.50
Subansiri ko Pani.
Baririjo
341 Upper Har Khet MOA&FW Subansiri river to Rode rijo at Nuk 1 3.00 4569.00 1 7.50
Subansiri ko Pani.
Baririjo
342 Upper Har Khet MOA&FW Jisir koro to Jisir rijo at Nuk 1 5.00 25.00 2 12.50
Subansiri ko Pani.
Baririjo
343 Upper Har Khet MOA&FW Lungo Koro to Rukrijo at Nuk 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo
344 Upper Har Khet MOA&FW Ruk koro to Ruk rijo at Nuk 1 7.00 14.00 2 17.50
Subansiri ko Pani.
Baririjo
345 Upper Har Khet MOA&FW Rade koro to Tigli rite at Pani Muri 1 3.00 19.00 1 7.50
Subansiri ko Pani.
Baririjo
346 Upper Har Khet MOA&FW Til Koro to Tilrijo at Pani muri 1 3.00 15.00 1 7.50
Subansiri ko Pani.
Baririjo
347 Upper Har Khet MOA&FW Rade koro to Peka rijo at Pani Muri 1 3.00 24.00 1 7.50
Subansiri ko Pani.
Baririjo
348 Upper Har Khet MOA&FW Rade koro to Dojar riji at Pani Muri 1 3.00 21.00 1 7.50
Subansiri ko Pani.
Baririjo

856 | P a g e
349 Upper Har Khet MOA&FW Til Koro to Yamik rijo at Pani muri 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
350 Upper Har Khet MOA&FW Til Koro to Tikli rijo at Pani muri 1 3.00 18.00 1 7.50
Subansiri ko Pani.
Baririjo
351 Upper Har Khet MOA&FW Hulu Koro to Yalom rijo at Panimuri 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
352 Upper Har Khet MOA&FW Hulu Koro to Tadom rijo at Panimuri 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
353 Upper Har Khet MOA&FW Hulu Koro to Jumbuk rijo at Panimuri 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
354 Upper Har Khet MOA&FW Hulu Koro to Kemporijo at Panimuri 1 5.00 16.00 2 12.50
Subansiri ko Pani.
Baririjo
355 Upper Har Khet MOA&FW Rade koro to Takir rijo at Pani Muri 1 4.00 23.00 2 10.00
Subansiri ko Pani.
Baririjo
356 Upper Har Khet MOA&FW Rade koro to Yayo rijo at Pani Muri 1 3.00 21.00 1 7.50
Subansiri ko Pani.
Baririjo
357 Upper Har Khet MOA&FW Rade koro to Punia rijo at Pani Muri 1 3.00 19.00 1 7.50
Subansiri ko Pani.
Baririjo
358 Upper Har Khet MOA&FW Rade koro to Dora rijo at Pani Muri 1 3.00 22.00 1 7.50
Subansiri ko Pani.
Baririjo
359 Upper Har Khet MOA&FW Jutekoro to Jucherijo at Riko village 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
360 Upper Har Khet MOA&FW Pekgi stream to Pegki rijo at Riko village 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo

857 | P a g e
361 Upper Har Khet MOA&FW Rochi koro to WRC field at Riko 1 3.00 13.00 1 7.50
Subansiri ko Pani.
Baririjo
362 Upper Har Khet MOA&FW Puche koro to Jute rijo at Riko 1 3.00 11.00 1 7.50
Subansiri ko Pani.
Baririjo
363 Upper Har Khet MOA&FW Jute Koro to Juse rijo at Riko vill 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
364 Upper Har Khet MOA&FW Pimpu koro to rite rijo at Riko 1 4.00 14.00 2 10.00
Subansiri ko Pani.
Baririjo
365 Upper Har Khet MOA&FW Bute koro to Chiku namchi Riko 1 3.00 12.00 1 7.50
Subansiri ko Pani.
Baririjo
366 Upper Har Khet MOA&FW Lilekoro to Namsi rijo at Riko 1 3.00 14.00 1 7.50
Subansiri ko Pani.
Baririjo
367 Upper Har Khet MOA&FW Hid koro to Kuchi rijo at Riko vill 1 4.00 8.00 2 10.00
Subansiri ko Pani.
Baririjo
368 Upper Har Khet MOA&FW Roper koro to Lupa rijo at Riko vill 1 4.00 9.00 2 10.00
Subansiri ko Pani.
Baririjo
369 Upper Har Khet MOA&FW Tago koro to Tago rijo at Riko vill 1 4.00 7.00 2 10.00
Subansiri ko Pani.
Baririjo
370 Upper Har Khet MOA&FW Pobom koro to Dumchi rijo at Riko vill 1 5.00 8.00 2 12.50
Subansiri ko Pani.
Baririjo
371 Upper Har Khet MOA&FW Jute koro to Taju rijo at Riko vill 1 4.00 15.00 2 10.00
Subansiri ko Pani.
Baririjo
372 Upper Har Khet MOA&FW Pete koro to Pete rijo at Riko vill 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo

858 | P a g e
373 Upper Har Khet MOA&FW Toru koro to Toru rijo at Ronya 1 3.00 6.00 1 7.50
Subansiri ko Pani.
Baririjo
374 Upper Har Khet MOA&FW Tali koro to Talirijo at Ronya 1 2.00 9.00 1 5.00
Subansiri ko Pani.
Baririjo
375 Upper Har Khet MOA&FW Som koro to Banyom rijo at Ronya 1 2.00 11.00 1 5.00
Subansiri ko Pani.
Baririjo
376 Upper Har Khet MOA&FW Liba koro to Liba rijo at Ronya 1 2.00 14.00 1 5.00
Subansiri ko Pani.
Baririjo
377 Upper Har Khet MOA&FW Banyom koro to Yanya rijo at Ronya 1 2.00 49.00 1 5.00
Subansiri ko Pani.
Baririjo
378 Upper Har Khet MOA&FW Banyom koro to Liba rijo at Ronya 1 2.00 51.00 1 5.00
Subansiri ko Pani.
Baririjo
379 Upper Har Khet MOA&FW Yomdo koro to yomdo rijo at Ronya 1 3.00 21.00 2 7.50
Subansiri ko Pani.
Baririjo
380 Upper Har Khet MOA&FW Jorpi koro to Dego rijo at Ronya 1 2.00 13.00 1 5.00
Subansiri ko Pani.
Baririjo
381 Upper Har Khet MOA&FW Liga koro to Bopu rijo at Ronya 1 2.00 11.00 1 5.00
Subansiri ko Pani.
Baririjo
382 Upper Har Khet MOA&FW Rojum rijo to Nyoi Koro Rumte vill 1 3.00 56.00 1 7.50
Subansiri ko Pani.
Baririjo
383 Upper Har Khet MOA&FW Doyom koro to Doyom rijo at Rumte. 1 4.00 58.00 2 10.00
Subansiri ko Pani.
Baririjo
384 Upper Har Khet MOA&FW Meche koro to Meche rijo at Rumte vill 1 3.00 67.00 1 7.50
Subansiri ko Pani.
Baririjo

859 | P a g e
385 Upper Har Khet MOA&FW Jinyi Koro to Gerta rijo at Rumte vill 1 3.00 54.00 1 7.50
Subansiri ko Pani.
Baririjo
386 Upper Har Khet MOA&FW Lero Aji to Tador Hari at Rumte vill 1 3.00 66.00 1 7.50
Subansiri ko Pani.
Baririjo
387 Upper Har Khet MOA&FW Lero Aji to Mobara Hari at Rumte vill 1 3.00 60.00 1 7.50
Subansiri ko Pani.
Baririjo
388 Upper Har Khet MOA&FW Lero aji to Modi rijo at Rumte vill 1 3.00 66.00 1 7.50
Subansiri ko Pani.
Baririjo
389 Upper Har Khet MOA&FW Lero koro to lero kochum at Rumte vill 1 3.00 69.00 1 7.50
Subansiri ko Pani.
Baririjo
390 Upper Har Khet MOA&FW Lero aji to Pache rijo at Rumte vill 1 3.00 61.00 1 7.50
Subansiri ko Pani.
Baririjo
391 Upper Har Khet MOA&FW Sinyo koro to Sinyo Hari at Rumte vill 1 3.00 24.00 1 7.50
Subansiri ko Pani.
Baririjo
392 Upper Har Khet MOA&FW Sinyo koro to Epona at Rumte vill 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
393 Upper Har Khet MOA&FW Sinyo koro to Rumte rijo at Rumte vill 1 3.00 29.00 1 7.50
Subansiri ko Pani.
Baririjo
394 Upper Har Khet MOA&FW Sirum koro to Juli hari at Rumte vill 1 5.00 164.00 2 12.50
Subansiri ko Pani.
Baririjo
395 Upper Har Khet MOA&FW Sirum koro to Mirma rijo at Rumte vill 1 5.00 174.00 2 12.50
Subansiri ko Pani.
Baririjo
396 Upper Har Khet MOA&FW Sirum koro to Bolek rijo at Rumte vill 1 4.00 167.00 2 10.00
Subansiri ko Pani.
Baririjo

860 | P a g e
397 Upper Har Khet MOA&FW Bupum koro to Gamra rijo at Rumte vill 1 3.00 32.00 1 7.50
Subansiri ko Pani.
Baririjo
398 Upper Har Khet MOA&FW Lero koro to lero rijo at Rumte vill 1 4.00 62.00 2 10.00
Subansiri ko Pani.
Baririjo
399 Upper Har Khet MOA&FW Likke Koro to Jaje rite at Rumte vill 1 3.00 23.00 1 7.50
Subansiri ko Pani.
Baririjo
400 Upper Har Khet MOA&FW Kamdi koro to Kamdi Namsi at Rumte vill 1 3.00 36.00 1 7.50
Subansiri ko Pani.
Baririjo
401 Upper Har Khet MOA&FW Kerto koro to Kutu rijo at Rumte vill 1 3.00 62.00 1 7.50
Subansiri ko Pani.
Baririjo
402 Upper Har Khet MOA&FW Nyapik Rijo to Mirma Koro Rumte vill 1 3.00 76.00 1 7.50
Subansiri ko Pani.
Baririjo
403 Upper Har Khet MOA&FW Sinyum koro to Rinarijo at Tabarijo 1 4.00 274.60 2 10.00
Subansiri ko Pani.
Baririjo
404 Upper Har Khet MOA&FW Sinyum koro to Ngobi rijo at Tabarijo 1 3.00 273.30 1 7.50
Subansiri ko Pani.
Baririjo
405 Upper Har Khet MOA&FW Kose Koro to Kose Rijo at Tabarijo 1 3.00 53.00 1 7.50
Subansiri ko Pani.
Baririjo
406 Upper Har Khet MOA&FW Jiga koro to Yapak rijo at Tabarijo 1 3.00 56.00 1 7.50
Subansiri ko Pani.
Baririjo
407 Upper Har Khet MOA&FW Jiga koro to Yanya rijo at Tabarijo 1 3.00 59.00 1 7.50
Subansiri ko Pani.
Baririjo
408 Upper Har Khet MOA&FW Jiga koro to Yanyumrijo at Tabarijo 1 3.00 60.50 1 7.50
Subansiri ko Pani.
Baririjo

861 | P a g e
409 Upper Har Khet MOA&FW Jiga koro to Jiga rijo at Tabarijo 1 3.00 61.10 1 7.50
Subansiri ko Pani.
Baririjo
410 Upper Har Khet MOA&FW Jinyum koro to Nyumsen rijo at Tabarijo 1 5.00 272.00 2 12.50
Subansiri ko Pani.
Baririjo
411 Upper Har Khet MOA&FW Jiga koro to Tabarijo at Tabarijo 1 3.00 65.00 1 7.50
Subansiri ko Pani.
Baririjo
412 Upper Har Khet MOA&FW Moro koro to Guri Rijo at Tama Ripa 1 4.00 20.00 2 10.00
Subansiri ko Pani.
Baririjo
413 Upper Har Khet MOA&FW Ruche koro to Baterijo at tamaripa 1 5.00 11.00 3 12.50
Subansiri ko Pani.
Baririjo
414 Upper Har Khet MOA&FW Lipu-koche to Guririjo at Tamaripa 1 4.00 10.00 3 10.00
Subansiri ko Pani.
Baririjo
415 Upper Har Khet MOA&FW Nyanye koro to Kiborijo at Tamaripa 1 4.00 10.00 3 10.00
Subansiri ko Pani.
Baririjo
416 Upper Har Khet MOA&FW Nyanye koro to Pegyarijo at tamaripa 1 4.00 11.00 3 10.00
Subansiri ko Pani.
Baririjo
417 Upper Har Khet MOA&FW Nyar koro to Basirijo at Tapi 1 5.00 24.00 2 12.50
Subansiri ko Pani.
Baririjo
418 Upper Har Khet MOA&FW Jilu nallah to Jilurijo at Tapi 1 5.00 85.00 2 12.50
Subansiri ko Pani.
Baririjo
419 Upper Har Khet MOA&FW Nyar koro to Basirijo at Tapi 1 4.00 21.00 2 10.00
Subansiri ko Pani.
Baririjo
420 Upper Har Khet MOA&FW Dei koro to Dei rijo at Tapi vill 1 4.00 15.00 2 10.00
Subansiri ko Pani.
Baririjo

862 | P a g e
421 Upper Har Khet MOA&FW Silu koro to kukso rijo at Tapi vill 1 4.00 86.00 2 10.00
Subansiri ko Pani.
Baririjo
422 Upper Har Khet MOA&FW Silu koro to Lak rijo at Tapi vill 1 5.00 88.00 2 12.50
Subansiri ko Pani.
Baririjo
423 Upper Har Khet MOA&FW Yaro koro to Jampu rijo at Tapi vill 1 3.00 16.00 1 7.50
Subansiri ko Pani.
Baririjo
424 Upper Har Khet MOA&FW Raga koro to raga rijo at Tapi vill 1 3.00 13.00 1 7.50
Subansiri ko Pani.
Baririjo
425 Upper Har Khet MOA&FW Dii koro to Dii rijo at Tapi 1 2.00 10.00 1 5.00
Subansiri ko Pani.
Baririjo
426 Upper Har Khet MOA&FW Tape koro to Yanya rijo at Tasi doni 1 5.00 12.00 2 12.50
Subansiri ko Pani.
Baririjo
427 Upper Har Khet MOA&FW Nyanya Koro to Gararijo at Tasidoni 1 5.00 26.00 2 12.50
Subansiri ko Pani.
Baririjo
428 Upper Har Khet MOA&FW Mat Koro to Bat rijo at Tasi Doni village 1 4.00 20.00 2 10.00
Subansiri ko Pani.
Baririjo
429 Upper Har Khet MOA&FW Lipu Guri WRC field at Tasidoni. 1 4.00 19.70 2 10.00
Subansiri ko Pani.
Baririjo
430 Upper Har Khet MOA&FW Namya koro to Didi rijo at Tasidoni 1 4.00 22.80 2 10.00
Subansiri ko Pani.
Baririjo
431 Upper Har Khet MOA&FW Pak koro to Pak rijo at Tasidoni 1 5.00 27.50 2 12.50
Subansiri ko Pani.
Baririjo
432 Upper Har Khet MOA&FW Didi koro to Didi rijo at Tasidoni 1 5.00 20.00 2 12.50
Subansiri ko Pani.
Baririjo

863 | P a g e
433 Upper Har Khet MOA&FW Nyanye koro to Nyanye rijo at Tasidoni 1 5.00 19.50 2 12.50
Subansiri ko Pani.
Baririjo
434 Upper Har Khet MOA&FW Nyanye koro to Tatum ripa at Tasidoni 1 5.00 19.10 2 12.50
Subansiri ko Pani.
Baririjo
435 Upper Har Khet MOA&FW Nyanye koro to pupi haksi at Tasidoni 1 4.00 18.60 2 10.00
Subansiri ko Pani.
Baririjo
436 Upper Har Khet MOA&FW Guri koro to Guririjo at Tasidoni 1 5.00 15.00 2 12.50
Subansiri ko Pani.
Baririjo
437 Upper Har Khet MOA&FW Nyanye koro to Pikyarijo at Tasidoni 1 5.00 13.00 2 12.50
Subansiri ko Pani.
Baririjo
438 Upper Har Khet MOA&FW Guri koro to Jibum Palen 1 5.00 16.00 2 12.50
Subansiri ko Pani.
Baririjo
439 Upper Har Khet MOA&FW Nyanye koro to Jenge rijo at Tasidoni 1 4.00 18.40 1 10.00
Subansiri ko Pani.
Baririjo
440 Upper Har Khet MOA&FW Nyanye koro to Didi Ripa at Tasidoni 1 6.00 19.90 2 15.00
Subansiri ko Pani.
Baririjo
441 Upper Har Khet MOA&FW Nyanye koro to Taka ripa at Tasidoni 1 4.00 19.00 2 10.00
Subansiri ko Pani.
Baririjo
442 Upper Har Khet MOA&FW Nyanye koro to Tamar rijo at Tasidoni 1 4.00 19.40 2 10.00
Subansiri ko Pani.
Baririjo
443 Upper Har Khet MOA&FW Didi koro to Lukdam rijo at Tasidoni 1 4.00 17.00 2 10.00
Subansiri ko Pani.
Baririjo
444 Upper Har Khet MOA&FW Jekjek koro to Guri rijo at Tasidoni 1 5.00 16.00 2 12.50
Subansiri ko Pani.
Baririjo

864 | P a g e
445 Upper Har Khet MOA&FW Mase koro to Tana ripa at Tasidoni 1 5.00 21 2 12.50
Subansiri ko Pani.
Baririjo
446 Upper Har Khet MOA&FW Mar koro to bat rijo at Tasidoni 1 4.00 11.1 2 10.00
Subansiri ko Pani.
Baririjo
447 Upper Har Khet MOA&FW Jekjek koro to Lipu rijo at Tasidoni 1 5.00 23.5 2 12.50
Subansiri ko Pani.
Baririjo
448 Upper Har Khet MOA&FW Rute koro and Ruche koro to Batrijo at Tasidoni 1 3.00 35 1 7.50
Subansiri ko Pani.
Baririjo
449 Upper Har Khet MOA&FW Lirak koro to Giri ripa at Tode 1 4.00 23.00 2 10.00
Subansiri ko Pani.
Baririjo
450 Upper Har Khet MOA&FW Jilu koro to Jiba rijo at Tode 1 4.00 96.00 2 10.00
Subansiri ko Pani.
Baririjo
451 Upper Har Khet MOA&FW Lepa Koro to Taying rijo at Tode 1 5.00 23.20 2 12.50
Subansiri ko Pani.
Baririjo
452 Upper Har Khet MOA&FW Tipa Koro to Tayen rijo at Tode 1 5.00 22.60 2 12.50
Subansiri ko Pani.
Baririjo
453 Upper Har Khet MOA&FW Kakar koro to Bige Rijo at Tode 1 4.00 23.60 2 10.00
Subansiri ko Pani.
Baririjo
454 Upper Har Khet MOA&FW Jilu koro to Bege rijo at Tode 1 4.00 97.00 2 10.00
Subansiri ko Pani.
Baririjo
455 Upper Har Khet MOA&FW Jilu koro to Nyirso rijo at Tode 1 4.00 98.40 2 10.00
Subansiri ko Pani.
Baririjo
456 Upper Har Khet MOA&FW Tayu koro to Kamda rijo at Tode 1 4.00 24.00 2 10.00
Subansiri ko Pani.
Baririjo

865 | P a g e
457 Upper Har Khet MOA&FW Jilu koro to Lepa rijo at Tode 1 5.00 99.00 2 12.50
Subansiri ko Pani.
Baririjo
458 Upper Har Khet MOA&FW Henya Koro to Cheririjo at Yoka 1 4.00 13.00 2 10.00
Subansiri ko Pani.
Baririjo
459 Upper Har Khet MOA&FW Cherkoro to Lekbarijo at Yoka 1 3.00 10.00 1 7.50
Subansiri ko Pani.
Baririjo

1.1 District irrigation plan (dip) -- har khet ko pani -- cad (spillover schemes)

Perio
Estima
Comman d of
Concerned Total Catchmen ted
Sl./No Componen Activity d area / Imple
Name of District/ Block Ministry / Numbe t area Cost Remarks
. t (CAD for ....... ) Irrigation men-
Department r (Sq.Km.) (in
(in Ha) tation
Lakhs)
(year)

Upper Subansiri/ CADWM


GOI has
Blocks:- Programme
Har Khet approved this
Daporijo/Puchigeko/ for Cluster of
MoWR/ ko Pani 170.80 scheme. There
1 Dumporijo/Giba/Cheta MI Schemes 1 249.00 3
WRD (CAD) 75 are 5 Sub
m/ under
Spillover projects under
Taliha/Paying/Nacho/ Daporijo
this scheme.
Limeking/Siyum Division

(i) Cluster of
MIP under
Chetam,Daporij
Daporijio/Giba/ Chetam o and Giba
1 Block - do - - do - Circle 1 48.00 3 32.925

866 | P a g e
(ii) Cluster of
MIP under
Daporijo/ Puchigeko Puchigeku
2 Block - do - - do - Circle 1 49.00 3 33.615

(iii) Cluster of
MIP under
Dumporijo,
Gusar and
3 Dumporijo Block - do - - do - Baririjo Circle. 1 48.00 3 32.925

(iv) Cluster of
MIP under
Nacho/Limeking/ Siyum Nacho and
4 Block - do - - do - Siyum Circle. 1 66.00 3 45.275

(v) Cluster of
MIP under
Taliha and 26.067
5 Taliha/Paying Block - do - - do - Payeng Circle. 1 38.00 3 5

170.80
Total :- 249.00 75

867 | P a g e
2. Agriculture Department

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- BARIRIJO
Nam Concerned Component Activities Aver Period of Implementation Total
e of Ministry/ under Deptt. age
Bloc Deptt. of syste
k Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/
ber ted ber ted ber ted ber ted ber ted er/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 10 3.39 10 3.39 10 3.39 12 4.068 12 4.068 54 18.306

DPAP 0.852 4 3.408 4 3.408 5 4.26 6 5.112 5 4.26 24 20.448


Sprinkler
Non DPAP 0.235 25 5.875 30 7.05 30 7.05 40 9.4 50 11.75 175 41.125
(Wide space
crop)

868 | P a g e
Non DPAP 0.854 25 21.35 25 21.35 30 25.62 35 29.89 35 29.89 150 128.1
Drip (close
space crop)
Barir MOA&F Per drop more Non DPAP 0.589 25 14.73 30 17.67 35 20.615 35 20.615 40 23.56 165 97.19
ijo W- crop sprinkler(micr
DAC&F ( Micro o sprinkler))
W Irrigation)

Non DPAP 0.852 10 8.52 10 8.52 10 8.52 10 8.52 10 8.52 50 42.6


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 30 18 30 18 30 18 40 24 50 30 180 108


crop(Supplem MGNREGA
entary water
management
activities

Drought 0.5 80 40 30 15 30 15 40 20 40 20 220 110


proofing
through check
dams

98 36 70 63 65 58.5 62 55.8 61 54.9 356 268.2


0.9
Water
Harvesting
structures
0.9 56 50.4 35 31.5 40 36 40 36 40 36 211 189.9

869 | P a g e
Secondary
storage
structures
On farm 0.15 70 10.5 60 9 65 9.75 61 9.15 59 8.85 315 47.25
development
(Distribution
system)
On farm 0.1 120 12 87 8.7 45 4.5 40 4 40 4 332 33.2
development(
Raised bed &
furrow system
etc)
Area 0.5 90 45 80 40 65 65.5 57 28.5 55 27.5 347 206.5
expansion
TOTAL 269.17 246.58 276.71 255.05 263.29 2579 1310.8
8 5 8 19

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- CHETAM
Nam Concerned Component Activities Aver Period of Implementation Total
e of Ministry/ under Deptt. age
Bloc Deptt. of syste
k Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/
ber ted ber ted ber ted ber ted ber ted er/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 18 6.102 13 4.407 13 4.407 17 5.763 11 3.729 72 24.408

870 | P a g e
DPAP 0.852 13 11.076 18 15.336 9 7.668 9 7.668 9 7.668 58 49.416
Sprinkler
Non DPAP 0.235 32 7.52 45 10.575 29 6.815 36 8.46 40 9.4 182 42.77
(Wide space
crop)

Non DPAP 0.854 48 40.992 54 46.116 33 28.182 34 29.036 40 34.16 209 178.48
Drip (close 6
space crop)
Barir MOA&F Per drop more Non DPAP 0.589 38 22.382 32 18.848 35 20.615 33 19.437 38 22.382 176 103.66
ijo W- crop sprinkler(micr 4
DAC&F ( Micro o sprinkler))
W Irrigation)

Non DPAP 0.852 30 25.56 17 14.484 13 11.076 10 8.52 10 8.52 80 68.16


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 40 24 49 29.4 45 27 55 33 62 37.2 251 150.6


crop(Supplem MGNREGA
entary water
management
activities

Drought 0.5 46 23 39 19.5 30 15 44 23 58 28 217 108.5


proofing
through check
dams

871 | P a g e
22 19.8 25 22.5 21 18.9 30 27 28 25.2 126 113.4
0.9
Water
Harvesting
structures
Secondary 0.9 41 36.9 49 44.1 50 45 44 39.6 41 36.9 225 202.5
storage
structures

On farm 0.15 60 9 79 11.85 65 9.75 80 12 75 11.25 359 53.85


development
(Distribution
system)
On farm 0.1 50 5 38 3.8 38 3.8 59 5.9 79 7.9 264 26.4
development(
Raised bed &
furrow system
etc)
Area 0.5 20 10 25 12.5 15 7.5 10 5 22 11 92 46
expansion
TOTAL 241.33 253.41 205.71 224.38 243.30 2311 1168.1
6 4 9 54

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- DAPORIJO
Nam Concerned Component Activities Aver Period of Implementation Total
e of Ministry/ under Deptt. age
Bloc Deptt. of syste
k Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

872 | P a g e
per Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/ ber ted ber ted ber ted ber ted ber ted er/ ted
Ha cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 30 10.17 15 5.085 12 4.068 18 6.102 12 4.068 87 29.493

DPAP 0.852 15 12.78 20 17.04 11 9.372 9 7.668 10 8.52 65 55.38


Sprinkler
Non DPAP 0.235 35 8.225 50 11.75 30 7.05 40 9.4 42 9.87 197 46.295
(Wide space
crop)

Non DPAP 0.854 50 42.7 55 46.97 40 34.16 35 29.89 30 25.62 210 179.34
Drip (close
space crop)
Barir MOA&F Per drop more Non DPAP 0.589 40 23.56 35 20.615 35 20.615 36 21.204 42 24.738 188 110.73
ijo W- crop sprinkler(micr 2
DAC&F ( Micro o sprinkler))
W Irrigation)

Non DPAP 0.852 30 25.56 20 17.04 13 11.076 10 8.52 11 9.372 84 71.568


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 40 24 50 30 52 31.2 60 36 65 39 267 160.2


crop(Supplem MGNREGA
entary water

873 | P a g e
management
activities

Drought 0.5 70 35 60 30 30 15 45 22.5 60 30 265 132.5


proofing
through check
dams

90 81 70 63 75 67.5 72 64.8 67 60.3 374 336.6


0.9
Water
Harvesting
structures
Secondary 0.9 40 36 50 45 51 45.9 45 40.5 42 37.8 228 205.2
storage
structures

On farm 0.15 60 9 80 12 65 9.75 82 12.3 76 11.4 363 54.45


development
(Distribution
system)
On farm 0.1 70 7 75 7.5 60 6 65 6.5 80 8 350 35
development(
Raised bed &
furrow system
etc)
Area 0.5 95 47.5 85 42.5 90 45 88 44 85 42.5 443 221.5
expansion
TOTAL 362.5 348.5 306.69 309.38 311.18 3121 1638.2
4 8 58

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.

874 | P a g e
Name of Block :- DUMPORIJO
Name Concerne Component Activities Aver Period of Implementation Total
of d under Deptt. age
Block Ministry/ of syste
Deptt. Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estim Num Estim Num Estim Num Estim Num Estim Num Estim
unit/
ber ated ber ated ber ated ber ated ber ated ber/ ated
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 30 10.17 15 5.085 10 3.39 15 5.085 12 4.068 82 27.798

DPAP 0.852 13 11.076 11 9.372 9 7.668 9 7.668 10 8.52 52 44.304


Sprinkler
Non DPAP 0.235 35 8.225 50 11.75 30 7.05 40 9.4 42 9.87 197 46.295
(Wide space
crop)

Non DPAP 0.854 31 26.474 50 42.7 35 29.89 30 25.62 30 25.62 176 150.30
Drip (close 4
space crop)
Dumpo MOA&F Per drop Non DPAP 0.589 30 17.67 35 20.615 35 20.615 36 21.204 42 24.738 178 104.84
rijo W- more crop sprinkler(mic 2
DAC&F ( Micro ro sprinkler))
W Irrigation)

875 | P a g e
Non DPAP 0.852 20 17.04 14 11.928 13 11.076 10 8.52 11 9.372 68 57.936
sprinkler
(Mini
sprinkler)

Per drop Topping up 0.6 32 19.2 40 24 52 31.2 60 36 65 39 249 149.4


more MGNREGA
crop(Supple
mentary
water
management
activities Drought 0.5 60 30 40 20 30 15 45 23 60 28 235 116
proofing
through
check dams

70 63 95 85.5 50 45 65 58.5 70 63 350 315


0.9
Water
Harvesting
structures
Secondary 0.9 40 36 40 36 51 45.9 45 40.5 42 37.8 218 196.2
storage
structures

On farm 0.15 60 9 80 12 65 9.75 82 12.3 76 11.4 363 54.45


development
(Distribution
system)

876 | P a g e
On farm 0.1 90 9 80 8 40 4 60 6 80 8 350 35
development(
Raised bed &
furrow
system etc)
Area 0.5 100 50 90 45 90 90.5 85 42.5 85 42.5 450 270.5
expansion
TOTAL 306.86 331.95 321.04 296.29 311.88 2968 1568.0
7 8 29

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- GIBA
Na Concerned Component Activities Aver Period of Implementation Total
me Ministry/ under Deptt. age
of Deptt. of syste
Blo Agriculture. m
ck cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

877 | P a g e
per Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/ ber ted ber ted ber ted ber ted ber ted er/ ted
Ha cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 17 5.763 14 4.746 12 4.068 18 6.102 12 4.068 73 24.747

DPAP 0.852 14 11.928 19 16.188 11 9.372 9 7.668 9 7.668 62 52.824


Sprinkler
Non DPAP 0.235 33 7.755 46 10.81 29 6.815 36 8.46 41 9.635 185 43.475
(Wide space
crop)

Non DPAP 0.854 50 42.7 55 46.97 33 28.182 35 29.89 39 33.306 212 181.04
Drip (close 8
space crop)
Gib MOA&F Per drop more Non DPAP 0.589 37 21.793 34 20.026 36 21.204 33 19.437 37 21.793 177 104.25
a W- crop sprinkler(micr 3
DAC&FW ( Micro o sprinkler))
Irrigation)

Non DPAP 0.852 35 29.82 18 15.336 12 10.224 12 10.224 13 11.076 90 76.68


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 40 24 49 29.4 45 27 55 33 62 37.2 251 150.6


crop(Supplem MGNREGA
entary water

878 | P a g e
management
activities

Drought 0.5 45 22.5 40 20 32 16 45 23 58 28 220 109.5


proofing
through check
dams

27 24.3 29 26.1 40 36 34 30.6 20 18 150 135


0.9
Water
Harvesting
structures
Secondary 0.9 42 37.8 49 44.1 51 45.9 47 42.3 43 38.7 232 208.8
storage
structures

On farm 0.15 60 9 79 11.85 65 9.75 80 12 75 11.25 359 53.85


development
(Distribution
system)
On farm 0.1 51 5.1 39 3.9 39 3.9 59 5.9 81 8.1 269 26.9
development(
Raised bed &
furrow system
etc)
Area 0.5 30 15 35 17.5 32 40 20 10 18 9 135 91.5
expansion
TOTAL 257.46 266.92 258.42 238.58 237.79 2415 1259.1
6 1 6 77

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.

879 | P a g e
Name of Block :-LIMIKING TAKSING
Name Concerne Component Activities Aver Period of Implementation Total
of d under Deptt. age
Block Ministry/ of syste
Deptt. Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Num Estima
unit/
ber ted ber ted ber ted ber ted ber ted ber/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 18 6.102 14 4.746 10 3.39 18 6.102 12 4.068 72 24.408

DPAP 0.852 14 11.928 19 16.188 9 7.668 9 7.668 8 6.816 59 50.268


Sprinkler
Non DPAP 0.235 35 8.225 47 11.045 23 5.405 35 8.225 40 9.4 180 42.3
(Wide space
crop)

Non DPAP 0.854 48 40.992 56 47.824 32 27.328 31 26.474 38 32.452 205 175.07
Drip (close
space crop)
Limek MOA&F Per drop Non DPAP 0.589 38 22.382 30 17.67 36 21.204 30 17.67 38 22.382 172 101.30
ing W- more crop sprinkler(micr 8
DAC&F ( Micro o sprinkler))
W Irrigation)

880 | P a g e
Non DPAP 0.852 33 28.116 14 11.928 12 10.224 13 11.076 12 10.224 84 71.568
sprinkler
(Mini
sprinkler)

Per drop Topping up 0.6 41 24.6 42 25.2 48 28.8 57 25 62 37.2 250 140.8
more MGNREGA
crop(Supplem
entary water
management
activities
Drought 0.5 44 22 40 19 30 14 45 21 57 29 216 105
proofing
through check
dams

29 26.1 30 27 31 27.9 35 31.5 33 29.7 158 142.2


0.9
Water
Harvesting
structures
Secondary 0.9 39 35.1 52 46.8 48 43.2 48 43.2 43 38.7 230 207
storage
structures

On farm 0.15 60 9 80 12 67 10.05 81 12.15 75 11.25 363 54.45


development
(Distribution
system)

881 | P a g e
On farm 0.1 30 3 32 3.2 20 2 18 1.8 81 8.1 181 18.1
development(
Raised bed &
furrow
system etc)
Area 0.5 31 15.5 35 32 20 41 40 43 26 13 152 144.5
expansion
TOTAL 253.05 274.60 242.17 254.86 252.29 2322 1276.9
1 5 2 72

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- NACHO
Na Concerned Component Activities Aver Period of Implementation Total
me Ministry/ under Deptt. age
of Deptt. of syste
Blo Agriculture. m
ck cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/
ber ted ber ted ber ted ber ted ber ted er/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 20 6.78 14 4.746 11 3.729 18 6.102 12 4.068 75 25.425

DPAP 0.852 14 11.928 19 16.188 9 7.668 9 7.668 8 6.816 59 50.268


Sprinkler

882 | P a g e
Non DPAP 0.235 35 8.225 46 10.81 24 5.64 35 8.225 40 9.4 180 42.3
(Wide space
crop)

Non DPAP 0.854 49 41.846 56 47.824 32 27.328 36 30.744 38 32.452 211 180.19
Drip (close 4
space crop)
Nac MOA&F Per drop more Non DPAP 0.589 36 36.589 31 18.259 36 21.204 32 18.848 38 22.382 173 117.28
ho W- crop sprinkler(micr 2
DAC&FW ( Micro o sprinkler))
Irrigation)

Non DPAP 0.852 34 28.968 15 12.78 11 9.372 13 11.076 13 11.076 86 73.272


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 44 26.4 44 26.4 46 27.6 55 33 62 37.2 251 150.6
crop(Supplem MGNREGA
entary water
management
activities

Drought 0.5 45 22.5 40 20 30 15 45 21 58 29 218 107.5


proofing
through check
dams

27 36 21 18.9 25 22.5 27 24.3 15 13.5 115 115.2


0.9

883 | P a g e
Water
Harvesting
structures
Secondary 0.9 26 23.4 27 24.3 29 26.1 31 27.9 21 18.9 134 120.6
storage
structures

On farm 0.15 60 9 80 12 67 10.05 81 12.15 75 11.25 363 54.45


development
(Distribution
system)
On farm 0.1 50 5 36 3.6 41 4.1 58 5.8 81 8.1 266 26.6
development(
Raised bed &
furrow system
etc)
Area 0.5 20 10 25 12.5 30 41 31 15.5 36 18 142 97
expansion
TOTAL 266.64 228.30 221.29 222.31 222.14 2273 1160.6
7 3 4 91

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- PAYING
Nam Concerned Component Activities Aver Period of Implementation Total
e of Ministry/ under Deptt. age
Bloc Deptt. of syste
k Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/
ber ted ber ted ber ted ber ted ber ted er/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost

884 | P a g e
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 18 6.102 14 4.746 11 3.729 18 6.102 12 4.068 73 24.747

DPAP 0.852 14 11.928 19 16.188 11 9.372 9 7.668 9 7.668 62 52.824


Sprinkler
Non DPAP 0.235 34 7.99 46 10.81 27 6.345 35 8.225 40 9.4 182 42.77
(Wide space
crop)

Non DPAP 0.854 50 42.7 54 46.116 32 27.328 35 29.89 39 33.306 210 179.34
Drip (close
space crop)
Paye MOA&F Per drop more Non DPAP 0.589 36 21.204 33 19.437 36 21.204 34 20.026 37 21.793 176 103.66
ng W- crop sprinkler(micr 4
DAC&F ( Micro o sprinkler))
W Irrigation)

Non DPAP 0.852 34 28.968 17 14.484 12 10.224 13 11.076 11 9.372 87 74.124


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 41 24.6 47 28.2 42 25.2 55 31 62 37.2 247 146.2
crop(Supplem MGNREGA
entary water
management
activities

885 | P a g e
Drought 0.5 44 22 39 19.5 31 15.5 45 22 58 28 217 107
proofing
through check
dams

40 36 30 27 51 45.9 48 43.2 40 36 209 188.1


0.9
Water
Harvesting
structures
Secondary 0.9 30 27 40 36 32 28.8 47 42.3 43 38.7 192 172.8
storage
structures

On farm 0.15 60 9 79 11.85 65 9.75 80 12 75 11.25 359 53.85


development
(Distribution
system)
On farm 0.1 50 5 37 3.7 40 4 57 5.7 81 8.1 265 26.5
development(
Raised bed &
furrow system
etc)
Area 0.5 20 10 25 33 21 41 24 12 15 7.5 105 103.5
expansion
TOTAL 252.49 271.03 248.35 251.18 252.35 2384 1275.4
1 7 7 19

886 | P a g e
BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- PUCHIGEKO
Name Concerne Component Activities Aver Period of Implementation Total
of d under Deptt. age
Block Ministry/ of syste
Deptt. Agriculture. m
cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estim Num Estim Num Estim Num Estim Num Estim Num Estim
unit/
ber ated ber ated ber ated ber ated ber ated ber/ ated
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 19 6.441 13 4.407 12 4.068 17 5.763 10 3.39 71 24.069

DPAP 0.852 14 11.928 17 14.484 10 8.52 9 7.668 9 7.668 59 50.268


Sprinkler
Non DPAP 0.235 33 7.755 47 11.045 29 6.815 38 8.93 41 9.635 188 44.18
(Wide space
crop)

887 | P a g e
Non DPAP 0.854 49 41.846 54 46.116 35 29.89 34 29.036 29 24.766 201 171.65
Drip (close 4
space crop)
Puchig MOA&F Per drop Non DPAP 0.589 39 22.971 33 19.437 34 20.026 33 19.437 39 22.971 178 104.84
eko W- more crop sprinkler(mic 2
DAC&F ( Micro ro sprinkler))
W Irrigation)

Non DPAP 0.852 29 24.708 18 15.336 12 10.224 9 7.668 10 8.52 78 66.456


sprinkler
(Mini
sprinkler)

Per drop Topping up 0.6 38 22.8 48 28.8 50 30 59 35.4 63 37.8 258 154.8
more MGNREGA
crop(Supple
mentary
water
management
activities Drought 0.5 47 23.5 39 19.5 29 14.5 44 22 58 29 217 108.5
proofing
through check
dams

30 27 31 27.9 20 18 18 16.2 15 13.5 114 102.6


0.9
Water
Harvesting
structures
0.9 40 36 50 45 51 45.9 45 40.5 42 37.8 228 205.2

888 | P a g e
Secondary
storage
structures
On farm 0.15 60 9 80 12 65 9.75 82 12.3 76 11.4 363 54.45
development
(Distribution
system)
On farm 0.1 49 4.9 39 3.9 37 3.7 58 5.8 78 7.8 261 26.1
development(
Raised bed &
furrow
system etc)
Area 0.5 20 10 25 12.5 30 15 32 16 28 14 135 67.5
expansion
TOTAL 248.85 260.42 216.39 226.70 228.25 2351 1180.6
5 2 19

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- SIYUM
Na Concerned Component Activities Aver Period of Implementation Total
me Ministry/ under Deptt. age
of Deptt. of syste
Blo Agriculture. m
ck cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
per
Num Estima Num Estima Num Estima Num Estima Num Estima Numb Estima
unit/
ber ted ber ted ber ted ber ted ber ted er/ ted
Ha
cost(R cost(R cost(R cost(R cost(R cost
/unit s. in /unit s. in /unit s. in /unit s. in /unit s. in unit (Rs in
lakhs) lakhs lakhs lakhs lakhs lakhs)
DPAP Drip 0.339 19 6.441 14 4.746 10 3.39 18 6.102 12 4.068 73 24.747

889 | P a g e
DPAP 0.852 13 11.076 19 16.188 10 8.52 9 7.668 8 6.816 59 50.268
Sprinkler
Non DPAP 0.235 33 7.755 46 10.81 25 5.875 35 8.225 40 9.4 179 42.065
(Wide space
crop)

Non DPAP 0.854 48 40.992 57 48.678 32 27.328 36 30.744 38 32.452 211 180.19
Drip (close 4
space crop)
Siyu MOA&F Per drop more Non DPAP 0.589 37 37.589 32 18.848 36 21.204 33 19.437 38 22.382 176 119.46
m W- crop sprinkler(micr
DAC&FW ( Micro o sprinkler))
Irrigation)

Non DPAP 0.852 33 28.116 16 13.632 12 10.224 12 10.224 12 10.224 85 72.42


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 42 25.2 46 27.6 44 26.4 55 33 62 37.2 249 149.4
crop(Supplem MGNREGA
entary water
management
activities

Drought 0.5 44 22 39 19.5 31 15.5 45 21 58 29 217 107


proofing
through check
dams

890 | P a g e
31 36 29 26.1 34 30.6 32 28.8 26 23.4 152 144.9
0.9
Water
Harvesting
structures
Secondary 0.9 35 31.5 32 28.8 31 27.9 28 25.2 24 21.6 150 135
storage
structures

On farm 0.15 58 8.7 81 12.15 66 9.9 81 12.15 75 11.25 361 54.15


development
(Distribution
system)
On farm 0.1 49 4.9 37 3.7 41 4.1 58 5.8 80 8 265 26.5
development(
Raised bed &
furrow system
etc)
Area 0.5 30 15 28 14 25 41 20 10 15 7.5 118 87.5
expansion
TOTAL 275.27 244.75 231.94 218.35 223.29 2295 1193.6
2 2 04

BLOCKWISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DEPUTY DIRECTOR AGRICULTURE, UPPER SUBANSIRI DISTRICT, DAPORIJO UNDER PMKSY.
Name of Block :- TALHIA
Na Concerned Component Activities Aver Period of Implementation Total
me Ministry/ under Deptt. age
of Deptt. of syste
Blo Agriculture. m
ck cost 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

891 | P a g e
per Num Estima Num Estimate Nu Estima Num Estimate Nu Estimat Num Estimate
unit/ ber ted ber d mb ted ber d mb ed ber/ d cost
Ha cost(R cost(Rs. er cost(R cost(Rs. er cost(Rs
/unit s. in /unit in lakhs /uni s. in /unit in lakhs /uni . in unit (Rs in
lakhs) t lakhs t lakhs lakhs)
DPAP Drip 0.339 19 6.441 15 5.085 12 4.068 18 6.102 12 4.068 76 25.764

DPAP 0.852 14 11.928 19 16.188 11 9.372 9 7.668 9 7.668 62 52.824


Sprinkler
Non DPAP 0.235 33 7.755 46 10.81 29 6.815 36 8.46 41 9.635 185 43.475
(Wide space
crop)

Non DPAP 0.854 50 42.7 55 46.97 33 28.182 35 29.89 39 33.306 212 181.048
Drip (close
space crop)
Tali MOA&F Per drop more Non DPAP 0.589 37 21.793 34 20.026 36 21.204 33 19.437 37 21.793 177 104.253
ha W- crop sprinkler(micr
DAC&FW ( Micro o sprinkler))
Irrigation)

Non DPAP 0.852 35 29.82 18 15.336 12 10.224 12 10.224 13 11.076 90 76.68


sprinkler
(Mini
sprinkler)

Per drop more Topping up 0.6 40 24 49 29.4 45 27 55 33 62 37.2 251 150.6


crop(Supplem MGNREGA
entary water

892 | P a g e
management
activities

Drought 0.5 45 22.5 40 20 32 16 45 23 58 28 220 109.5


proofing
through check
dams

35 31.5 30 27 25 22.5 27 24.3 22 19.8 139 125.1


0.9
Water
Harvesting
structures
Secondary 0.9 30 27 25 22.5 20 18 18 16.2 15 13.5 108 97.2
storage
structures

On farm 0.15 60 9 79 11.85 65 9.75 80 12 75 11.25 359 53.85


development
(Distribution
system)
On farm 0.1 51 5.1 39 3.9 39 3.9 59 5.9 81 8.1 269 26.9
development(
Raised bed &
furrow system
etc)
Area 0.5 41 20.5 50 25 45 40 35 17.5 55 27.5 226 130.5
expansion
TOTAL 260.04 254.065 217.02 213.681 232.89 2374 1177.694
6

Detailed outlay of Project Implementation through Agriculture Department as nodal agency in the district (18% of the total project outlay)

Amount in Rs. lakhs

893 | P a g e
Particulars 2016-17 2017-18 2018-19 2019-20 2020-21 Total
Admin Cost 11838.03 4735.21 2367.61 2367.61 2367.61 23676.06
Monitoring Cost 1183.80 473.52 236.76 236.76 236.76 2367.61
Evaluation 1183.80 473.52 236.76 236.76 236.76 2367.61
ICB 4735.21 2367.61 2367.61 2367.61 2367.61 14205.63
Grand total 18940.84 8049.86 5208.73 5208.73 5208.73 42616.90

Detailed outlay of Project Implementation through Agriculture Department as nodal agency in the district

894 | P a g e
3. Horticulture Department

CIRCLE WISE STRATEGIC ACTION PLAN FOR IRRIGATION IN RESPECT OF DISTRICT HORTICULTURE
OFFICER, UPPER SUBANSIRI DISTRICT, DAPORIJO.
Name of Circle: - Giba

895 | P a g e
Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures

896 | P a g e
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)

897 | P a g e
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)

898 | P a g e
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Gusar


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 10 3.39 10 3.39 10 3.39 10 3.39 10 3.39 50 16.95
W- drop DPAP 0.852 10 8.52 10 8.52 10 8.52 10 8.52 10 8.52 50 42.6
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 10 2.35 10 2.35 10 2.35 10 2.35 10 2.35 50 11.75
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 10 8.54 10 8.54 10 8.54 10 8.54 10 8.54 50 42.7
Drip (close
space crop)
Non DPAP 0.589 10 5.89 10 5.89 10 5.89 10 5.89 10 5.89 50 29.45
sprinkler(mi

899 | P a g e
cro
sprinkler)
Non DPAP 0.852 10 8.52 10 8.52 10 8.52 10 8.52 10 8.52 50 42.6
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 10 23 10 23 10 23 10 23 10 23 50 115
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 112.5
expansion
for
Horticulture

900 | P a g e
crop on
Lichi(Acre)

Area 1.50 15 22.5 15 22.5 15 22.5 15 22.5 15 22.5 75 112.5


expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 10 15 10 15 10 15 10 15 10 15 10 15
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 10 17.5 10 17.5 10 17.5 10 17.5 10 17.5 50 87.5
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for

901 | P a g e
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 1715 1968.95

Name of Circle: - Puchigeko


Period of Implementation. Total

902 | P a g e
Name Concerne Compon Activities Averag 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
of d ent. under \deptt. e
Circle. Misnistry/ of system Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
Deptt. Horticulture. cost per Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
unit/Ha s.in s.in s.in s.in s.in t n Lakhs)
(Rs.in Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
Lakh)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures

903 | P a g e
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)

904 | P a g e
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)

905 | P a g e
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Gepen


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 5 1.695 5 1.695 5 1.695 5 1.695 5 1.695 25 8.475
W- drop DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 5 1.175 5 1.175 5 1.175 5 1.175 5 1.175 25 5.875
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 5 4.27 5 4.27 5 4.27 5 4.27 5 4.27 25 21.35
Drip (close
space crop)

906 | P a g e
Non DPAP 0.589 5 2.945 5 2.945 5 2.945 5 2.945 5 2.945 25 14.725
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 10 6 10 6 10 6 10 6 10 6 100 60
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 10 17.5 10 17.5 10 17.5 10 17.5 10 17.5 100 175
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 10 23 10 23 10 23 10 23 10 23 100 230
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)

907 | P a g e
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 10 17.5 10 17.5 10 17.5 10 17.5 10 17.5 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

908 | P a g e
Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 1780 1912.525

909 | P a g e
Name of Circle: - Sigin- I
Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 5 1.695 5 1.695 5 1.695 5 1.695 5 1.695 25 8.475
W- drop DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 5 1.175 5 1.175 5 1.175 5 1.175 5 1.175 25 5.875
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 5 4.27 5 4.27 5 4.27 5 4.27 5 4.27 25 21.35
Drip (close
space crop)
Non DPAP 0.589 5 2.945 5 2.945 5 2.945 5 2.945 5 2.945 25 14.725
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 5 3 5 3 5 3 5 3 5 3 25 15
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 5 2.5 5 2.5 5 2.5 5 2.5 5 2.5 25 12.5
ppleme proofing
ntary through
water check dams
manage Water 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
ment harvesting
structures

910 | P a g e
activitie Secondary 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
s storage
structures
Horticul Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 4 9.2 4 9.2 4 9.2 4 9.2 4 9.2 20 46
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on

911 | P a g e
P/Apple(Acr
e)

Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture

912 | P a g e
crop on
Kiwi(Acre)

Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 625 631.275

Name of Circle: - Sigin- II


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 5 1.695 5 1.695 5 1.695 5 1.695 5 1.695 25 8.475
W- drop DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 5 1.175 5 1.175 5 1.175 5 1.175 5 1.175 25 5.875
Irrigatio (Wide space
n) crop)

913 | P a g e
Non DPAP 0.854 5 4.27 5 4.27 5 4.27 5 4.27 5 4.27 25 21.35
Drip (close
space crop)
Non DPAP 0.589 5 2.945 5 2.945 5 2.945 5 2.945 5 2.945 25 14.725
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 5 3 5 3 5 3 5 3 5 3 25 15
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 5 2.5 5 2.5 5 2.5 5 2.5 5 2.5 25 12.5
ppleme proofing
ntary through
water check dams
manage Water 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
ment harvesting
activitie structures
s Secondary 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
storage
structures
Horticul Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 4 9.2 4 9.2 4 9.2 4 9.2 4 9.2 20 46
expansion
for
Horticulture
crop on

914 | P a g e
L/Cardamo
m (Acre)

Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5


expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on

915 | P a g e
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B

916 | P a g e
SUB-TOTAL 625 631.275

Name of Circle: - Limiking and Taksing


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams

917 | P a g e
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for

918 | P a g e
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion

919 | P a g e
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Siyum


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)

920 | P a g e
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on

921 | P a g e
L/Cardamo
m (Acre)

Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225


expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on

922 | P a g e
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B

923 | P a g e
SUB-TOTAL 2755 3137.85

Name of Circle: - Taliha


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)

924 | P a g e
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on

925 | P a g e
Banana(Acre
)

Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5


expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for

926 | P a g e
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Nacho


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler

927 | P a g e
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for

928 | P a g e
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on

929 | P a g e
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B

930 | P a g e
SUB-TOTAL 2755 3137.85

Name of Circle: - Dumporijo


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)

931 | P a g e
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for

932 | P a g e
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)

933 | P a g e
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Gite Ripa


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

934 | P a g e
Misnistry/ of cost per Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
Deptt. Horticulture. unit/Ha Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
(Rs.in s.in s.in s.in s.in s.in t n Lakhs)
Lakh) Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 5 1.695 5 1.695 5 1.695 5 1.695 5 1.695 25 8.475
W- drop DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 5 1.175 5 1.175 5 1.175 5 1.175 5 1.175 25 5.875
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 5 4.27 5 4.27 5 4.27 5 4.27 5 4.27 25 21.35
Drip (close
space crop)
Non DPAP 0.589 5 2.945 5 2.945 5 2.945 5 2.945 5 2.945 25 14.725
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 10 6 10 6 10 6 10 6 10 6 100 60
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 10 17.5 10 17.5 10 17.5 10 17.5 10 17.5 100 175
ture expansion
Develop for

935 | P a g e
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 10 23 10 23 10 23 10 23 10 23 100 230
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 10 15 10 15 10 15 10 15 10 15 100 150
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop on

936 | P a g e
Kinnow(Acre
)

Area 1.75 10 17.5 10 17.5 10 17.5 10 17.5 10 17.5 100 175


expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5


expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
expansion
for
Horticulture
crop

937 | P a g e
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 1780 1912.525

Name of Circle: - Maro


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)

938 | P a g e
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for

939 | P a g e
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)

940 | P a g e
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Baririjo


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021

941 | P a g e
Misnistry/ of cost per Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
Deptt. Horticulture. unit/Ha Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
(Rs.in s.in s.in s.in s.in s.in t n Lakhs)
Lakh) Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for

942 | P a g e
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on

943 | P a g e
Kinnow(Acre
)

Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175


expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop

944 | P a g e
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Payeng


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9
W- drop DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)

945 | P a g e
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for

946 | P a g e
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)

947 | P a g e
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Chetam


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
DPAP Drip 0.339 20 6.78 20 6.78 20 6.78 20 6.78 20 6.78 100 33.9

948 | P a g e
MOA&F Per DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
W- drop Sprinkler
DAC&FW more Non DPAP 0.235 20 4.7 20 4.7 20 4.7 20 4.7 20 4.7 100 23.5
(Micro (Wide space
Irrigatio crop)
n) Non DPAP 0.854 20 17.08 20 17.08 20 17.08 20 17.08 20 17.08 100 85.4
Drip (close
space crop)
Non DPAP 0.589 20 11.78 20 11.78 20 11.78 20 11.78 20 11.78 100 58.9
sprinkler(mi
cro
sprinkler)
Non DPAP 0.852 20 17.04 20 17.04 20 17.04 20 17.04 20 17.04 100 85.2
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 25 15 25 15 25 15 25 15 25 15 150 90
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 50 25 50 25 50 25 50 25 50 25 250 125
ppleme proofing
ntary through
water check dams
manage Water 0.90 50 45 50 45 50 45 50 45 50 45 250 225
ment harvesting
activitie structures
s Secondary 0.90 45 40.5 45 40.5 45 40.5 45 40.5 45 40.5 225 202.5
storage
structures
Horticul Area 1.75 30 52.5 30 52.5 30 52.5 30 52.5 30 52.5 150 262.5
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)

949 | P a g e
Area 2.30 30 69 60 138 60 138 60 138 60 138 300 690
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 30 45 30 45 30 45 30 45 30 45 150 225
expansion
for
Horticulture
crop on
Lichi(Acre)
Area 1.50 20 30 20 30 20 30 20 30 20 30 100 150
expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 25 37.5 25 37.5 25 37.5 25 37.5 25 37.5 125 187.5
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 15 26.25 15 26.25 15 26.25 15 26.25 15 26.25 75 131.25
expansion
for
Horticulture
crop on
Kinnow(Acre
)

950 | P a g e
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop
Assam/Khag
zi

951 | P a g e
Lemon(Acre
)

Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52


campaign/IC
B
SUB-TOTAL 2755 3137.85

Name of Circle: - Nilling


Name Concerne Compon Activities Averag Period of Implementation. Total
of d ent. under \deptt. e
Circle. Misnistry/ of system 2016-2017 2017-2018 2018-2019 2019-2020 2020-2021
Deptt. Horticulture. cost per
unit/Ha Number/ Estimate Numbe Estimate Estimate Numbe Estimate Numbe Estimate Numb Estimated
(Rs.in Unit d/cost(R r/Unit d/cost(R d/cost(R r/Unit d/cost(R r/Unit d/cost(R er/Uni /cost(Rs.i
Lakh) s.in s.in s.in s.in s.in t n Lakhs)
Lakhs) Lakhs) Lakhs) Lakhs) Lakhs)
MOA&F Per DPAP Drip 0.339 5 1.695 5 1.695 5 1.695 5 1.695 5 1.695 25 8.475
W- drop DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
DAC&FW more Sprinkler
(Micro Non DPAP 0.235 5 1.175 5 1.175 5 1.175 5 1.175 5 1.175 25 5.875
Irrigatio (Wide space
n) crop)
Non DPAP 0.854 5 4.27 5 4.27 5 4.27 5 4.27 5 4.27 25 21.35
Drip (close
space crop)
Non DPAP 0.589 5 2.945 5 2.945 5 2.945 5 2.945 5 2.945 25 14.725
sprinkler(mi

952 | P a g e
cro
sprinkler)
Non DPAP 0.852 5 4.26 5 4.26 5 4.26 5 4.26 5 4.26 25 21.3
sprinkler(Mi
ni sprinkler)
Per Topping up 0.60 5 3 5 3 5 3 5 3 5 3 25 15
drop MIDH
more (HMNEH)
crop(Su Drought 0.50 5 2.5 5 2.5 5 2.5 5 2.5 5 2.5 25 12.5
ppleme proofing
ntary through
water check dams
manage Water 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
ment harvesting
activitie structures
s Secondary 0.90 5 4.5 5 4.5 5 4.5 5 4.5 5 4.5 25 22.5
storage
structures
Horticul Area 1.75 5 8.75 5 8.75 5 8.75 5 8.75 5 8.75 25 43.75
ture expansion
Develop for
ment Horticulture
Activitie crop on
s Orange
(Acre)
Area 2.30 4 9.2 4 9.2 4 9.2 4 9.2 4 9.2 20 46
expansion
for
Horticulture
crop on
L/Cardamo
m (Acre)
Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5
expansion
for
Horticulture

953 | P a g e
crop on
Lichi(Acre)

Area 1.50 5 7.5 5 7.5 5 7.5 5 7.5 5 7.5 25 37.5


expansion
for
Horticulture
crop on
Banana(Acre
)
Area 1.50 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on
P/Apple(Acr
e)
Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop on
Kinnow(Acre
)
Area 1.75 20 35 20 35 20 35 20 35 20 35 100 175
expansion
for
Horticulture
crop on
Mosanbhi(A
cre)

Area 1.50 10 15 10 15 10 15 10 15 10 15 50 75
expansion
for

954 | P a g e
Horticulture
crop on
Walnut(Acre
)
Area 1.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Apple(Acre)
Area 2.50 Nil Nil Nil Nil Nil Nil Nil Nil Nil Nil
expansion
for
Horticulture
crop on
Kiwi(Acre)
Area 1.75 Nill Nill Nill Nill Nill Nill Nill Nill Nill Nill
expansion
for
Horticulture
crop
Assam/Khag
zi
Lemon(Acre
)
Awareness 0.40 15 6.0 30 12 30 12 25 10 30 12 130 52
campaign/IC
B
SUB-TOTAL 625 631.275

GRAND TOTAL 37455

955 | P a g e
4. DRDA

Daporijo DRDA

PROJECT PROFILE

1. NEW PROPOSAL OF PMKSY-WATERSHED : AT HEGI NECHE

2. MICRO-WATERSHED : HEGI NECHE

3. PROPOSED AREA : 5000 Hac.

4. TOTAL PROJECT COST : 750.0 Lakhs

5. DURATION OF COMPLETION : 5 Years (2016 – 2021) in 5 phases.

6. NAME OF PIA : C.D BLOCK, DAPORIJO


UPPER SUBANSIRI DISTRICT
ARUNACHAL PRADESH.

956 | P a g e
ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT HEGI NECHE UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2016-17 1

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 DRDA FisheryPonds/Cattle Ponds
Daporijo MIC 01 3.0
DAPORIJO SUB TOTAL 6.75
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

957 | P a g e
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 75 Ha. 11.25
I) Horitculture 82.5 Ha. 12.375
II) Agriculture
III) Pasture 97.5 Ha. 14.625
IV)
SUB TOTAL 38.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
DAPORIJO DRDA
IV) Bench Terracing 40 Ha. 6.0
Daporijo
V) Others 35 Ha. 5.25
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 11.25
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities 16 30.0


18.7(D) DPR 1 7.50
18.7(E) I&CB 03 22.50
18.7(F) Livelihood 10 7.50
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

958 | P a g e
Bee Keeping
Poultry
DAPORIJO DRDA Fishery
Daporijo Biofuel Plantation
Mithun rearing 15 7.50
Sub Total 75.0
18.7(H) Monitoring 1.50
18.7(I) Evaluation 2.25
18.7(J) Consolidation
18.7(K) Administration 15.0
Grand Total 150

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT HEGI NECHE UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2017 -18

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 6.50
17.2 Check Dam 01 1.40
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 6.50
SUB TOTAL 14.40
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others

959 | P a g e
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20
IV)
SUB TOTAL 81.60
18.7(B) Soil & Moisture
Conservation
I) DAPORIJO DRDA Staggered Trenching
II) Daporijo Contour Bunding
III) Graded Bunding
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75

960 | P a g e
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT HEGI NECHE UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2018 – 19

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 3.0
SUB TOTAL 6.75
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds

961 | P a g e
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20
IV)
DAPORIJO DRDA
Daporijo SUB TOTAL 81.60
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

962 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Dairy 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT HEGI NECHE UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2019 – 20

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam

963 | P a g e
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375
I) Horitculture 91 Ha. 13.65
II) Agriculture
III) Pasture 107 Ha. 16.05
IV)
SUB TOTAL 42.075
18.7(B) Soil & Moisture
DAPORIJO DRDA Conservation
I) Daporijo Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

964 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 11.25
Grand Total 101.25

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT HEGI NECHE UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2020 - 21

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 DRDA NallaBandhs
17.4 DAPORIJO Daporijo Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs

965 | P a g e
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375
I) Horitculture 90.5 Ha. 13.575
II) Agriculture
III) Pasture 107.5 Ha. 16.125
IV)
SUB TOTAL 42.075
18.7(B) DAPORIJO DRDA Soil & Moisture
Daporijo Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities

966 | P a g e
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation 22.50
18.7(K) Administration 11.25
Grand Total 123.75

PROJECT PROFILE

1. NEW PROPOSAL OF PMKSY-WATERSHED : AT YEKAR

2. MICRO-WATERSHED : YEKAR

3. PROPOSED AREA : 5000 Hac.

4. TOTAL PROJECT COST : 750.0 Lakhs

5. DURATION OF COMPLETION : 5 Years (2016 – 2021) in 5 phases.

967 | P a g e
6. NAME OF PIA : C.D BLOCK, DAPORIJO
UPPER SUBANSIRI DISTRICT
ARUNACHAL PRADESH.

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT YEKAR UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2016-17 1

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 DRDA FisheryPonds/Cattle Ponds
Daporijo MIC 01 3.0
DAPORIJO SUB TOTAL 6.75
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond

968 | P a g e
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 75 Ha. 11.25
I) Horitculture 82.5 Ha. 12.375
II) Agriculture
III) Pasture 97.5 Ha. 14.625
IV)
SUB TOTAL 38.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
DAPORIJO DRDA
IV) Bench Terracing 40 Ha. 6.0
Daporijo
V) Others 35 Ha. 5.25
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 11.25
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

969 | P a g e
18,7© Entry Point Activities 16 30.0
18.7(D) DPR 1 7.50
18.7(E) I&CB 03 22.50
18.7(F) Livelihood 10 7.50
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
DAPORIJO DRDA Fishery
Daporijo
Biofuel Plantation
Mithun rearing 15 7.50
Sub Total 75.0
18.7(H) Monitoring 1.50
18.7(I) Evaluation 2.25
18.7(J) Consolidation
18.7(K) Administration 15.0
Grand Total 150

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT YEKAR UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2017 – 18 4

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 6.50
17.2 Check Dam 01 1.40
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 6.50
SUB TOTAL 14.40
Water Harvesting Structures
18 (To be Renovated)

970 | P a g e
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20
IV)
SUB TOTAL 81.60
18.7(B) Soil & Moisture
Conservation
I) DAPORIJO DRDA Staggered Trenching
II) Daporijo Contour Bunding
III) Graded Bunding

971 | P a g e
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875

972 | P a g e
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT YEKAR UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2018 – 19 7

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 3.0
SUB TOTAL 6.75

973 | P a g e
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20
IV)

974 | P a g e
DAPORIJO DRDA SUB TOTAL 81.60
18.7(B) Daporijo Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery

975 | P a g e
Biofuel Plantation
Dairy 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT YEKAR UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2019 - 20 10

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Period of Estimates of
Block Department (Cum) Area/ Implementation Cost(Rs in Lac)
Irrigation
Potential
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 NallaBandhs
17.4 Percolation Tanks

976 | P a g e
17.5 DRDA Other ground water recharge
Daporijo structure
17.6 DAPORIJO FisheryPonds/Cattle Ponds
MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures (To
18 be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375
I) Horitculture 91 Ha. 13.65
II) Agriculture
III) Pasture 107 Ha. 16.05
IV)
SUB TOTAL 42.075

977 | P a g e
18.7(B) Soil & Moisture
DAPORIJO DRDA Conservation
I) Daporijo Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0

978 | P a g e
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 11.25
Grand Total 101.25

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT YEKAR UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2020 – 21 13

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 DRDA NallaBandhs
17.4 DAPORIJO Daporijo Percolation Tanks

979 | P a g e
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375
I) Horitculture 90.5 Ha. 13.575
II) Agriculture
III) Pasture 107.5 Ha. 16.125
IV)
SUB TOTAL 42.075
18.7(B) DAPORIJO DRDA Soil & Moisture
Daporijo Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs

980 | P a g e
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation 22.50
18.7(K) Administration 11.25
Grand Total 123.75

PROJECT PROFILE

1. NEW PROPOSAL OF PMKSY-WATERSHED : AT SIKA BABLA

2. MICRO-WATERSHED : SIKA BABLA

3. PROPOSED AREA : 5000 Hac.

981 | P a g e
4. TOTAL PROJECT COST : 750.0 Lakhs

5. DURATION OF COMPLETION : 5 Years (2016 – 2021) in 5 phases.

6. NAME OF PIA : C.D BLOCK, DAPORIJO


UPPER SUBANSIRI DISTRICT
ARUNACHAL PRADESH.

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT SIKA BABLA UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2016-17

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75
17.3 NallaBandhs

982 | P a g e
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 DRDA FisheryPonds/Cattle Ponds
Daporijo MIC 01 3.0
DAPORIJO SUB TOTAL 6.75
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 75 Ha. 11.25
I) Horitculture 82.5 Ha. 12.375
II) Agriculture
III) Pasture 97.5 Ha. 14.625
IV)

983 | P a g e
SUB TOTAL 38.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) DAPORIJO DRDA Bench Terracing 40 Ha. 6.0
V) Daporijo Others 35 Ha. 5.25
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 11.25
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities 16 30.0


18.7(D) DPR 1 7.50
18.7(E) I&CB 03 22.50
18.7(F) Livelihood 10 7.50
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry

984 | P a g e
DAPORIJO DRDA Fishery
Daporijo Biofuel Plantation
Mithun rearing 15 7.50
Sub Total 75.0
18.7(H) Monitoring 1.50
18.7(I) Evaluation 2.25
18.7(J) Consolidation
18.7(K) Administration 15.0
Grand Total 150

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT SIKA BABLA UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2017-18
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 6.50
17.2 Check Dam 01 1.40
17.3 NallaBandhs
17.4 Percolation Tanks

985 | P a g e
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 6.50
SUB TOTAL 14.40
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20

986 | P a g e
IV)
SUB TOTAL 81.60
18.7(B) Soil & Moisture
Conservation
I) DAPORIJO DRDA Staggered Trenching
II) Daporijo Contour Bunding
III) Graded Bunding
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping

987 | P a g e
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT SIKA BABLA UNDER DISTRICT IRRIGATION PLAN(DIP) FOR THE YEAR 2018 -19

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 0.75

988 | P a g e
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 3.0
SUB TOTAL 6.75
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)

989 | P a g e
LAND DEVELOPMENT

18.7(A) Afforestation 160 Ha. 24.0


I) Horitculture 176 Ha. 26.40
II) Agriculture
III) Pasture 208 Ha. 31.20
IV)
DAPORIJO DRDA
Daporijo SUB TOTAL 81.60
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 100 Ha. 15.0
V) Others 60 Ha. 9.0
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 24.0
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities

990 | P a g e
18.7(D) DPR
18.7(E) I&CB 03 7.50
18.7(F) Livelihood 18.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Dairy 38 18.75
Sub Total 45.0
18.7(H) Monitoring 1.875
18.7(I) Evaluation 1.875
18.7(J) Consolidation
18.7(K) Administration 18.75
Grand Total 187.50

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT SIKA BABLA UNDER DISTRICT IRRIGATION PLAN (DIP) FOR THE YEAR 2019-20

991 | P a g e
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 NallaBandhs
17.4 Percolation Tanks
17.5 DRDA Other ground water recharge structure
17.6 Daporijo FisheryPonds/Cattle Ponds
DAPORIJO MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375

992 | P a g e
I) Horitculture 91 Ha. 13.65
II) Agriculture
III) Pasture 107 Ha. 16.05
IV)
SUB TOTAL 42.075
18.7(B) Soil & Moisture
DAPORIJO DRDA Conservation
I) Daporijo Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities

993 | P a g e
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 11.25
Grand Total 101.25

ACTION PLAN OF NEW PROPOSAL OF PMKSY-WATERSHED PROJECT AT SIKA BABLA UNDER DISTRICT IRRIGATION PLAN FOR THE YEAR 2020 – 21

994 | P a g e
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting Structures
17 (Newly to be Created)
17.1 Farm Pond 01 3.0
17.2 Check Dam 01 1.425
17.3 DRDA NallaBandhs
17.4 DAPORIJO Daporijo Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 3.0
SUB TOTAL 7.425
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 NallaBandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

995 | P a g e
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period of Estimates of
Block Department (Cum) Irrigation Potential Implementation Cost(Rs in
(HA) Lac)
LAND DEVELOPMENT
18.7(A) Afforestation 82.5 Ha. 12.375
I) Horitculture 90.5 Ha. 13.575
II) Agriculture
III) Pasture 107.5 Ha. 16.125
IV)
SUB TOTAL 42.075
18.7(B) DAPORIJO DRDA Soil & Moisture
Daporijo Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 50 Ha. 7.50
V) Others 32.5 Ha. 4.875
VI) Crate Wire
VII) Land Leveling
SUB TOTAL 12.375
18.7(B) Vegetative &Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

996 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 11.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
DAPORIJO DRDA Poultry
Daporijo Fishery
Biofuel Plantation
Mithun rearing 30 15.0
Sub Total 26.25
18.7(H) Monitoring 1.125
18.7(I) Evaluation 0.75
18.7(J) Consolidation 22.50
18.7(K) Administration 11.25
Grand Total 123.75

997 | P a g e
A. TOTAL COST OF ON GOING IWMP PROJECT

SL.NO. PROJECT NO. TOTAL COST ( in lac.)

01. XXI 594.75

02. XXXI 359.41

03. XIX 233.34

04. XVII 307.26

05. VI 207.94115

06 II 124.8508

40 600.0

TOTAL Rs. 2427.55195

B. NEW PROPOSALS

SL.NO. NAME OF PROPOSED PLACE TOTAL COST ( in lac.)

01. HEGI NECHE 750.0

02. YEKAR 750.0

03. SIKA BABLA 750.0

TOTAL COST Rs. 2250.0

998 | P a g e
Dumporijo DRDA

DISTRICT IRRIGATION PLAN UNDER PMKSY(IWMP) 2016-17 TO 2020-21( Five Years) UNDER CD BLOCK DUMPORIJO,UPPER SUBANSIRI
DIST.ARUNACHAL PRADESH

Name of Concerned Component Activities- No. Capacity Command Period of Estimate


Block Ministry/Departme Wise (cum) Area/Irrigatio implementatio d
nt n n cost(Rs.in
Potential(Ha) lakh)
Water harvesting Farm Pond 80 12600cum 350 ha 72.00
structures(newly to
be created) Fishery 82 12915 cum 380 ha 73.80
Pond
Sub-Total
Water harvesting Farm pond 11 1732.50 55 ha 9.90
Dumporij District Watershed structure (to be cum
o Development renovated) Fishery 61 9607.50 305 ha 54.90
CD BLOCK Agency. pond
(MORD) Nallah band 9
Sub-Total
Land Development Afforestatio 1300 1300 ha 234.00
n
Horticulture 1400 1400 ha 252.00
Agriculture 826 826 ha 148.68
Pasture Nil
Sub-Total
Soil & Moisture Bench 493 493 ha 88.74
Conservation Terracing
Other

999 | P a g e
Sub-Total
Vegetative & Loose 75 75 nos. 13.50
Engg.structure boulders
Gabion 20 20 nos. 3.60
structure
Sub-Total
Total
Entry Point Activities
DPR
I &CB

Name of Concerned Component Activities- No. Capacit Command Period of Estimate


Block Ministry/Departme Wise y Area/Irrigation implementatio d
nt (cum) Potential(Ha) n cost(Rs.in
lakh)
Livelihoo Productio Sericulture
d n System Poultry 327 58.86
Dumporij District Watershed & Micro- Fishery 100 18.00
o Development Enterprise Bio- fuel 500 90.00
CD Block Agency. s plantation
(MORD) Other
Sub-Total
Monitoring 44.7192
Evaluation 5.00
Consolidation 4.00
Administration 33.7176
Grand Total 1205.416
8

1000 | P a g e
NEW OR
PROPOSED
SCHEMES OF
PMKSY(IWMP)
UNDER CD BLOCK
DUMPORIJO HEMES to be included in plan under watershed
MANAGEMENT ACTIVITIES )UNDER CD BLOCK DUMPORIJO,U/SUBANSIRI DIST/A.P.

cammand TFO
SL.NO DEPTT. SECTOR NAME OF THE PROJECT DISTRICT area CONSTITUency (Rs.lakh)
1 WRD Water harvesting structure at Jubirijo)
Aya Nirin village : 5 Nos. 20 ha Dumporijo 25
2 Agri. A. Horticulture development
A(i) E/o Cardamon Garden at Hali village 100 ha Dumporijo 50
A(ii) E/o Cardamon Garden at Aya Nirin village 100 ha Dumporijo 50
TOTAL Rs. 125

(Rupees One crore Crore twenty five thousand )only

Block Develompment Officer


CD Block Dumporijo

1001 | P a g e
NEW OR
PROPOSED
SCHEMES OF
PMKSY(IWMP)
UNDER CD BLOCK HEMES UNDER PER DROP MORE
DUMPORIJO CROP (SUPLEMENTARY WATER
MANAGEMENT ACTIVITIES )UNDER CD BLOCK DUMPORIJO,U/SUBANSIRI DIST/A.P.

SL.NO DEPTT. SECTOR NAME OF THE PROJECT DISTRICT CONSTITU TFO (Rs.lakh)
ENCY
1 WRD C/O secondary storage structure
at New Hali village Dumporijo 50.00
2 WRD Water harvesting structure at
New Hali village : 50 Nos. Dumporijo 100.00
3 Agri. On farm development(distribution
pipe/raised bed and furrow system
at New Hali village Dumporijo 50.00
4 Agri Non-DPAP Drip at Hali village Dumporijo 100.00
TOTAL Rs. 300.00

1002 | P a g e
1003 | P a g e
1004 | P a g e
1005 | P a g e
1006 | P a g e
Giba & Chetam DRDA

DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)


MICROWATERSHEDS (SILU 1000 Ha.) 2016-17
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development

1007 | P a g e
i) Afforestation 28 Ha 4.20
ii) -do- -do- Horticulture
iii.) Agriculture 10 Ha 1.50
iv) Pasture
5.70
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 6.00
18.7 ( D) DPR 1.5

1008 | P a g e
18.7 ( E) I & CB 4.5
18.7 ( F) Livelihood 2.70
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.30


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.30
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.000
Sub Total :- 3.60
30.00
GRAND TOTAL :-

1009 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SILU 1000 Ha.) 2017-18
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.24 Cum 3.00
17.2 Check Dams 87.40 Cum 2.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 5.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.75

1010 | P a g e
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.75
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50

1011 | P a g e
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 3.00
rearing)

8.625
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.5
37.5
GRAND TOTAL :-

1012 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SILU 1000 Ha.) 2018-19
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 4213.44 6.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.375
-do- -do-
ii) Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00

1013 | P a g e
iv) Pasture 20 Ha 3.00
16.375
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 2.00
vi) Crate wire
vii.) Land leveling
Sub total :- 2.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.

1014 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry 365 12 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 2 3.00
rearing)
8.625

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.50
37.5
GRAND TOTAL :-

1015 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SILU 1000 Ha.) 2019-20
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 3.00
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 3.33 Ha 5.00

1016 | P a g e
ii) -do- -do- Horticulture 37 Ha 5.55
iii.) Agriculture 3.33 Ha 5.00
iv) Pasture 3.33 Ha 5.00
20.55
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB

1017 | P a g e
18.7 ( F) Livelihood 4.05
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 1.50
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.45


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.45
18.7 ( J ) Consolidation 4.50
18.7 ( k ) Administration 4.50
Sub Total :- 9.90
45.00
GRAND TOTAL :-

1018 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 2000Ha)
MICROWATERSHEDS (BELU, BATAM 2000 Ha.) 2016-17
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 3.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 30 Ha 4.50
-do- -do-
ii) Horticulture 36 Ha. 5.40
iii.) Agriculture 10 Ha 1.50

1019 | P a g e
iv) Pasture
11.40
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 12.00
18.7 ( D) DPR 3.00
18.7 ( E) I & CB 9.00
18.7 ( F) Livelihood 5.40
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.

1020 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 12 06 6.00
rearing)

35.40
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.60


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.60
18.7 ( J ) Consolidation
18.7 ( k ) Administration 6.000
Sub Total :- 7.20
60.00
GRAND TOTAL :-

1021 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 2000Ha)
MICROWATERSHEDS (BELU, BATAM 2000 Ha.) 2017-18
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.24 Cum 3.00
17.2 Check Dams 87.40 Cum 2.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 5.00
Sub total :- 10.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 43.33 Ha 6.50

1022 | P a g e
ii) -do- -do- Horticulture 100 Ha 15.00
iii.) Agriculture 40 Ha 6.00
iv) Pasture 40 Ha 6.00
33.5
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 6.00
vi) Crate wire
vii.) Land leveling
Sub total :- 6.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 3.00

1023 | P a g e
18.7 ( F) Livelihood 6.75
18.7( G ) Production System & Activities wise
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 1.50
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 6.00
rearing)

17.25
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.75


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.75
18.7 ( J ) Consolidation
18.7 ( k ) Administration 7.50
Sub total :- 9.00
75.00
GRAND TOTAL :-

1024 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 2000Ha)
MICROWATERSHEDS (BELU, BATAM 2000 Ha.) 2018-19
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground 6.00
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 4213.44 6.00
Sub total :- 12.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 43.33 Ha 6.50
-do- -do-
ii) Horticulture 100 Ha 15.00
iii.) Agriculture 40 Ha 6.00

1025 | P a g e
iv) Pasture 40 Ha 6.00
33.50
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 2.00
vi) Crate wire
vii.) Land leveling
Sub total :- 2.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 3.00
18.7 ( F) Livelihood 6.75
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.

1026 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry 730 24 1.5
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 12 4 6.00
rearing)
17.25

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.75


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.75
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 7.50
75.00
GRAND TOTAL :-

1027 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 2000Ha)
MICROWATERSHEDS (BELU, BATAM 2000 Ha.) 2019-20
NEW PROPOSAL: - BLOCK: - CHETAM C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground 3.00
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 3.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 66.66 Ha 10.00
-do- -do-
ii) Horticulture 66.66 Ha 10.00
iii.) Agriculture 6.66 Ha 10.00

1028 | P a g e
iv) Pasture 74 Ha 11.10
41.10
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing 3.00
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 6.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB
18.7 ( F) Livelihood 8.10
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.

1029 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 3.00
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 6.00
rearing)

17.10
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.90


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.90
18.7 ( J ) Consolidation 9.00
18.7 ( k ) Administration 9.00
Sub Total :- 19.80
90.00
GRAND TOTAL :-

1030 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 3000Ha)
MICROWATERSHEDS (LERIAK 1000 Ha, PUDA 1000 Ha, DAMI 1000 Ha ) 2016-17
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.
S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 39.33 9.00
Sub total :- 9.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-

1031 | P a g e
18.7(A) Land Development
i) Afforestation
-do- -do-
ii) Horticulture 84 Ha. 12.60
iii.) Agriculture
iv) Pasture 30 Ha. 4.50
17.10
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 18.00

1032 | P a g e
18.7 ( D) DPR 4.50
18.7 ( E) I & CB 13.50
18.7 ( F) Livelihood 8.10
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 18 Units 9.00
rearing)
53.10

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.90


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.90
18.7 ( J ) Consolidation
18.7 ( k ) Administration 9.00
Sub total :- 10.800
90.00
GRAND TOTAL :-

1033 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 3000Ha)
MICROWATERSHEDS (LERIAK 1000 Ha, PUDA 1000 Ha, DAMI 1000 Ha) 2017-18
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.
S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams 262.2 Cum 6.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 12640.32 18.00
Sub total :- 24
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-

1034 | P a g e
18.7(A) Land Development
i) Afforestation 67.5 Ha 10.125
-do- -do-
ii) Horticulture 100 Ha 15.00
iii.) Agriculture 60 Ha 9.00
iv) Pasture 60 Ha 9.00
43.125
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 6.00
vi) Crate wire
vii.) Land leveling
Sub total :- 6.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities

1035 | P a g e
18.7 ( D) DPR
18.7 ( E) I & CB 4.50
18.7 ( F) Livelihood 10.125
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 1097 37 2.25
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 18 06 9.00
rearing)

25.875
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 1.125


18.7 ( I) GIBA DoLR-MoRD Evaluation 1.125
18.7 ( J ) Consolidation
18.7 ( k ) Administration 11.25
Sub total :- 13.50
112.50
GRAND TOTAL :-

1036 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 3000Ha)
MICROWATERSHEDS (LERIAK 1000 Ha, PUDA 1000 Ha , DAMI 1000 Ha ) 2018-19
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.
S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 12640.32 Cum 18.00
Sub total :- 18.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 67.50 10.125

1037 | P a g e
ii) -do- -do- Horticulture 140 21.00
iii.) Agriculture 60 9.00
iv) Pasture 60 9.00
49.125
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 6.00
vi) Crate wire
vii.) Land leveling
Sub total :- 6.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 4.50

1038 | P a g e
18.7 ( F) Livelihood 10.125
18.7( G ) Production System & Activities wise Unit Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 1097 37 2.25
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 18 06 9.00
rearing)
25.875

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 1.125


18.7 ( I) GIBA DoLR-MoRD Evaluation 1.125
18.7 ( J ) Consolidation
18.7 ( k ) Administration 11.25
Sub total :- 13.50
112.50
GRAND TOTAL :-

1039 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 3000Ha)
MICROWATERSHEDS (LERIAK 1000 Ha, PUDA 1000 Ha , DAMI 1000 Ha ) 2019-20
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.
S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 6320.16 Cum 9.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 2738.736 cum 3.90
Sub total :- 12.90
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 100 Ha 15.0
-do- -do-
ii) Horticulture 85 Ha 12.75
iii.) Agriculture 100 Ha 15.00

1040 | P a g e
iv) Pasture 100 Ha 15.00
37.75
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 9.00
vi) Crate wire
vii.) Land leveling
Sub total :- 9.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB
18.7 ( F) Livelihood 12.15
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.

1041 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 1.5
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 24 08 12.00
rearing)
25/65

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 1.350


18.7 ( I) GIBA DoLR-MoRD Evaluation 1.350
18.7 ( J ) Consolidation 13.50
18.7 ( k ) Administration 13.50
Sub total :- 29.70
135.00
GRAND TOTAL :-

1042 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (MARGING 1000 Ha.) 2016-17
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development

1043 | P a g e
i) Afforestation 28 Ha 4.20
ii) -do- -do- Horticulture
iii.) Agriculture 10 Ha 1.50
iv) Pasture
5.70
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 6.00
18.7 ( D) DPR 1.5

1044 | P a g e
18.7 ( E) I & CB 4.5
18.7 ( F) Livelihood 2.70
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.30


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.30
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.000
Sub Total :- 3.60
30.00
GRAND TOTAL :-

1045 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (MARGING 1000 Ha) 2017-18
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.24 Cum 3.00
17.2 Check Dams 87.40 Cum 2.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 5.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.75

1046 | P a g e
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.75
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50

1047 | P a g e
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 3.00
rearing)

8.625
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.5
37.5
GRAND TOTAL :-

1048 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (MARGING 1000 Ha. ) 2018-19
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 4213.44 6.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.375
-do- -do-
ii) Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00

1049 | P a g e
iv) Pasture 20 Ha 3.00
16.375
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling 1404.48 Cum 2.00
Sub total :- 2.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.

1050 | P a g e
i. Sericulture
ii. Bee-keeping
Iii Poultry 365 12 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 2 3.00
rearing)

8.625
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.50
37.5
GRAND TOTAL :-

A.D.O/ Team Leader


Block Development Officer

1051 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (MARGING 1000 Ha.) 2019-20
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 3.33 Ha 5.00

1052 | P a g e
ii) -do- -do- Horticulture 37 Ha 5.55
iii.) Agriculture 3.33 Ha 5.00
iv) Pasture 3.33 Ha 5.00
20.55
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB

1053 | P a g e
18.7 ( F) Livelihood 4.05
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 1.50
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.45


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.45
18.7 ( J ) Consolidation 4.50
18.7 ( k ) Administration 4.50
Sub Total :- 9.90
45.00
GRAND TOTAL :-

1054 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (LUCHI LUTE 1000 Ha.) 2016-17
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 28 Ha 4.20
-do- -do-
ii) Horticulture

1055 | P a g e
iii.) Agriculture 10 Ha 1.50
iv) Pasture
5.70
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 6.00
18.7 ( D) DPR 1.5
18.7 ( E) I & CB 4.5
18.7 ( F) Livelihood 2.70

1056 | P a g e
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.30


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.30
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.000
Sub Total :- 3.60
30.00
GRAND TOTAL :-

1057 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (LUCHI LUTE 1000 Ha.) 2017-18
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.24 Cum 3.00
17.2 Check Dams 87.40 Cum 2.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 5.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development

1058 | P a g e
i) Afforestation 22.5 Ha 3.75
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.75
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR

1059 | P a g e
18.7 ( E) I & CB 1.50
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 3.00
rearing)

8.625
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.5
37.5
GRAND TOTAL :-

1060 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (LUCHI LUTE 1000 Ha.) 2018-19
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 4213.44 6.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.375

1061 | P a g e
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.375
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling 1404.48 Cum 2.00
Sub total :- 2.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50

1062 | P a g e
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 365 12 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 2 3.00
rearing)
8.625

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.50
37.5
GRAND TOTAL :-

1063 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (LUCHI LUTE 1000 Ha.) 2019-20
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 3.33 Ha 5.00

1064 | P a g e
ii) -do- -do- Horticulture 37 Ha 5.55
iii.) Agriculture 3.33 Ha 5.00
iv) Pasture 3.33 Ha 5.00
20.55
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB

1065 | P a g e
18.7 ( F) Livelihood 4.05
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 1.50
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.45


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.45
18.7 ( J ) Consolidation 4.50
18.7 ( k ) Administration 4.50
Sub Total :- 9.90
45.00
GRAND TOTAL :-

1066 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SORUM & LEYA 1000 Ha.) 2016-17
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.72 Cum 3.00
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 28 Ha 4.20
-do- -do-
ii) Horticulture

1067 | P a g e
iii.) Agriculture 10 Ha 1.50
iv) Pasture
5.70
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others
vi) Crate wire
vii.) Land leveling
Sub total :-
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities 6.00
18.7 ( D) DPR 1.5
18.7 ( E) I & CB 4.5
18.7 ( F) Livelihood 2.70

1068 | P a g e
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.30


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.30
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.000
Sub Total :- 3.60
30.00
GRAND TOTAL :-

1069 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SORUM & LEYA 1000 Ha.) 2017-18
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds 2106.24 Cum 3.00
17.2 Check Dams 87.40 Cum 2.00
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC)
Sub total :- 5.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.75

1070 | P a g e
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.75
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50

1071 | P a g e
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 3.00
rearing)

8.625
Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.5
37.5
GRAND TOTAL :-

1072 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SORUM & LEYA 1000 Ha.) 2018-19
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI.

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 (Newly to be created) Other Ground
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 4213.44 6.00
Sub total :- 6.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 22.5 Ha 3.375

1073 | P a g e
ii) -do- -do- Horticulture 46.66 Ha 7.00
iii.) Agriculture 20 Ha 3.00
iv) Pasture 20 Ha 3.00
16.375
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 2.00
vi) Crate wire
vii.) Land leveling
Sub total :- 2.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB 1.50

1074 | P a g e
18.7 ( F) Livelihood 3.375
18.7( G ) Production System & Activities wise Units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 365 12 0.75
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 2 3.00
rearing)
8.625

Sub total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.375


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.375
18.7 ( J ) Consolidation
18.7 ( k ) Administration 3.75
Sub total :- 4.50
37.5
GRAND TOTAL :-

1075 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (TOTAL 1000Ha)
MICROWATERSHEDS (SORUM & LEYA 1000 Ha.) 2019-20
NEW PROPOSAL: - BLOCK: - GIBA C.D BLOCK, DISTRICT: - UPPER SUBANSIRI

S. No. Name of the Concerned Component Activity No. Total Command Area/ Period of Estimated
block Ministry/ Number/Capacity Irrigation Potential Implementation Cost (in lakhs)
Department (cum) (Ha.)
1 2 3 4 5 6 7 8 9 10
17
17.1 Farm Ponds
17.2 Check Dams
17.3 Nallah Bunds
17.4 DoLR-MoRD Percolation Tank
GIBA Water Har.structures
17.5 Other Ground
(Newly to be created)
Water Recharge
structure
17.6 Fishery
Ponds/cattle Ponds
Others (MIC) 3.00
Sub total :- 3.00
18 Water Har.structures(to be
18.1 renovated ) Farm Ponds
18.2 Check Dams
18.3 -do- -do- Nallah Bunds
18.4 Percolation Tank
18.5 Other Ground
Water Recharge
structure
18.6 Fishery
Ponds/cattle Ponds
18.7 Others
Sub total:-
18.7(A) Land Development
i) Afforestation 3.33 Ha 5.00
-do- -do-
ii) Horticulture 37 Ha 5.55

1076 | P a g e
iii.) Agriculture 3.33 Ha 5.00
iv) Pasture 3.33 Ha 5.00
20.55
Sub total :-

1 2 3 4 5 6 7 8 9 10
18.7(B) Soil & Moisture
i) conservation Staggered
Trenching
ii) GIBA DoLR-MoRD Contour bunding
iii) Graded bunding
iv) Bench terracing
v) Others 3.00
vi) Crate wire
vii.) Land leveling
Sub total :- 3.00
viii). Vegetative & Engg. Earthen checks
Structure
ix.) Brush wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others
xiv) Dry check dam
xv) Drainage
xvi) GIBA DoLR-MoRD Bunds repairs
Sub total :-
18.7 (C ) Entry point Activities
18.7 ( D) DPR
18.7 ( E) I & CB
18.7 ( F) Livelihood 4.05

1077 | P a g e
18.7( G ) Production System & Activities wise units Beneficiaries
Micro. Enter.
i. Sericulture
ii. Bee-keeping
Iii Poultry 731 24 1.50
iv. Fishery
v. Bio fuel plantation
vi. Others (Mithun 06 03 3.00
rearing)

17.70
Sub Total :-

1 2 3 4 5 6 7 8 9 10

18.7 ( H) Monitoring 0.45


18.7 ( I) GIBA DoLR-MoRD Evaluation 0.45
18.7 ( J ) Consolidation 4.50
18.7 ( k ) Administration 4.50
Sub Total :- 9.90
45.00
GRAND TOTAL :-

1078 | P a g e
Limeking DRDA
OFFICE OF THE DISTRICT RURAL DEV. AGENCY Page-01
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2016-17
Development Block---Limeking
DISTRICT:- UPPER SUBANSIRI Taksing
Total Project
PROJECT NAME:- IWMP-III AT BOGUM AND LINGBING (MWS) Area=695 Ha.
Name of Block Concerned Comma
Ministry/De nd Pariod
Estimated
partment Qty Area/Irri of
Component Activities-Wise Unit cost (Rs in
. gation Impleme
lac)
Potenti ntation
Sl.No al (ha)
1 2 3 4 5 6 7 8 9 10
Water Harvesting
structure (Newly to be
17 created)
District
LIMEKING TAKSING

17.1 Farm Ponds


Watershed
17.2 Developme Check Dams
17.3 nt Nalla Bandhs
17.4 Agency,AB Percolation Tanks 3 nos 1.5 1 Year 13.05
C at PQR
(MoRD) Other ground water
17.5 recharge structure
Fishry Pond/Cattel
17.6 Ponds

1079 | P a g e
Others
Sub Total 13.05
water Harvesting
structure ( to be
18 Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
18.4 Percolation Tanks
Other ground water
18.5 recharge structure
Fishry Pond/Cattel
18.6 Ponds
18.7 Others
Sub Total
18.7(A) Land Development
180
i) Afforestation .4 Ha. 1 Year 39.237
ii) Horticulture 30 Ha. 1 Year 6.525
iii) Agriculture
iv) Pasture 30 Ha. 1 Year 6.525
240
Sub Total .4 52.287
Soil & Moisture
18.7(B) Conservation
Staggered
i) Trenching
ii) Contour Bunding

1080 | P a g e
iii) Grraded Bunding
iv) Bench Terracing 25 Ha. 1 Year 5.4375
v) Other
vi) Crate wire
vii) Land leveling 25 Ha. 1 Year 5.4375
Sub Total 50 10.875
Page-02

Name of Block Concerned Comma


Ministry/De nd Pariod
Estimated
partment Qty Area/Irri of
Component Activities-Wise Unit cost (Rs in
. gation Impleme
lac)
Potenti ntation
Sl.No al (ha)
1 2 3 4 5 6 7 8 9 10
Vegetation & Engg.
18.7(B) Structure
viii) Earthen Checks
ix) District Brush Wood Checks
LIMEKING TAKSING

x) Watershed Gully Plugs


Developme
xi) nt Loose Boulders
xii) Agency,AB Gabion Structure
C at PQR
xiii) (MoRD) Other
xiv) Dry check Dam
xv) Drainage
xvi) Bunds repair
1081 | P a g e
Sub Total
Total
18.7('C) Entry point Activities
18.7(D) DPR
18.7(E) I & CB 3 1 Year 1.45
18.7(F) Livelihood 6 1 Year 11.908125
Benefi
18.7(G) Activities-Wise No. ciaries
Sericuluture
Prod. Sys. & Micro Bee Keeping
Enter. Poultry 6 24 1 Year 11.908125
Fishry
Bio Fuel Plantation
Others
Sub Total 6 24 11.908125
Monitoring 1.1908125
18.7(H)
18.7(I) Evaluation 1.1908125
18.7(J) consolidation 0
18.7(K) Administration 11.908125
305
Grand Total .4 115.768
Block Development
Officer
CD Block Limeking
Taksing

1082 | P a g e
OFFICE OF THE DISTRICT RURAL DEV. AGENCY
page-01
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2017-18
DISTRICT:- UPPER SUBANSIRI
PROJECT NAME:- IWMP-III AT Total Project
BOGUM &LINGBING (MWS) Area=695 Ha.
Na Concerned Comma
me Ministry/De nd Pariod
Estimated
of partment Activities- Area/Irri of
Component cost (Rs in
Bl Wise gation Impleme
lac)
oc Qty Potenti ntation
Sl.No k . Unit al (ha)
1 2 3 4 5 6 7 8 9 10
Water Harvesting structure
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams
District
LIMEKING TAKSING

17.3 Nalla Bandhs


Watershed Percolation
17.4 Developme Tanks
nt Agency, Other ground
ABC at water
PQR recharge
17.5 (MoRD) structure
Fishry
Pond/Cattel
17.6 Ponds
Others

1083 | P a g e
Sub Total
water Harvesting structure (
18 to be Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
Other ground
water
recharge
18.5 structure
Fishry
Pond/Cattel
18.6 Ponds
Others
Sub Total
18.7(A) Land Development
58.
i) Afforestation 475 ha 12.7183125
ii) Horticulture 4.5 ha 0.97875
iii) Agriculture
iv) Pasture 2 ha 0.435
64.
Sub Total 975 14.1320625
18.7(B) Soil & Moisture Conservation
Staggered
i) Trenching

1084 | P a g e
Contour
ii) Bunding
Graded
iii) Bunding
Bench
iv) Terracing
v) Other
vi) Crate wire
vii) Land leveling 10 ha 2.175
Sub Total 10 2.175
Na Concerned Comma
me Ministry/De nd Pariod
Estimated
of partment Activities- Area/Irri of
Component cost (Rs in
Bl Wise gation Impleme
lac)
oc Qty Potenti ntation
Sl.No k . Unit al (ha)
1 2 3 4 5 6 7 8 9 10
18.7(B) Vegetation & Engg. Structure
Earthen
viii) Checks
Brush Wood
ix) Checks
x) Gully Plugs
Loose
xi) Boulders
Gabion
xii) Structure
xiii) Other

1085 | P a g e
Dry check
xiv) Dam
xv) Drainage
xvi) Bunds repair
Sub Total
Total
18.7( C ) Entry point Activities
18.7(D) DPR
18.7(E) I & CB
18.7(F) Livelihood 6 9.5265
Benefi
18.7(G) Activities-Wise No. ciaries
Sericuluture
Bee Keeping
Prod. Sys. & Micro Enter. Poultry 6 nos 16.671375
District Fishry
LIMEKING TAKSING

Watershed Bio Fuel


Developme Plantation
nt Agency, Others
ABC at
PQR Sub Total 6 16.671375
(MoRD)

18.7(H) Monitoring 0.476325


18.7(I) Evaluation 0.7144875
18.7(J) consolidation 11.908125
18.7(K) Administration 7.144875

1086 | P a g e
86.
Grand Total 975 62.74875

OFFICE OF THE DISTRICT RURAL DEV. AGENCY Page-01


DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2016-17
Development Block---Limeking Taksing
DISTRICT:- UPPER SUBANSIRI
PROJECT NAME:- IWMP-XXII AT ORAK,REDDY AND REDDING KACHA (MWS) Total Project Area=4000 Ha.
Name of Block Concerne Comm
d and Pariod
Estimated
Ministry/D Activitie Area/Irr of
Component Qty. Unit cost (Rs in
epartment s-Wise igation Implem
lac)
Potenti entation
Sl.No al (ha)
1 2 3 4 5 6 7 8 9 10
Water Harvesting structure
17 (Newly to be created)
Farm
District
LIMEKING TAKSING

17.1 Ponds 6 nos 3 1 Year 26


Watershed Check
17.2 Developme Dams 6 nos 3 1 Year 13
nt Nalla
17.3 Agency,AB Bandhs
C at PQR Percolati
17.4 (MoRD) on Tanks
Other
17.5 ground

1087 | P a g e
water
recharge
structure
Land
Protection
17.6 work 6 nos 1 Year 35.1
MIC 6 nos 3 1 Year 24.7
Sub Total 98.8
water Harvesting structure (
18 to be Renovated )
Farm
18.1 Ponds
Check
18.2 Dams
Nalla
18.3 Bandhs
Percolati
18.4 on Tanks
Other
ground
water
recharge
18.5 structure
Fishry
Pond/Ca
ttel
18.6 Ponds
18.7 Others
Sub Total
18.7(A) Land Development
i) Afforestation 100 Ha. 1 Year 19.5

1088 | P a g e
ii) Horticulture 280 Ha. 1 Year 54.6
iii) Agriculture
iv) Pasture 53.34 Ha. 1 Year 10.4
Sub Total 433.34 84.5
Soil &
Moisture
Conservatio
18.7(B) n
i) Staggered Trenching
ii) Contour Bunding
iii) Grraded Bunding
iv) Bench Terracing 186.76 Ha. 1 Year 36.4
v) Other
vi) Crate wire
vii) Land leveling 153.33 Ha. 1 Year 92
Sub Total 340.09 128.4
Page-02
Name of Block Concerne Comm
d and Pariod
Estimated
Ministry/D Componen Area/Irr of
Activities-Wise Qty. Unit cost (Rs in
epartment t igation Implem
lac)
Potenti entation
Sl.No al (ha)
1 2 3 4 5 6 7 8 9 10
District Vegetation
LIMEKING

Watershed & Engg.


TAKSING

18.7(B) Developme Structure


viii) nt Earthen Checks
ix) Agency,AB Brush Wood Checks

1089 | P a g e
x) C at PQR Gully Plugs
xi) (MoRD) Loose Boulders
xii) Gabion Structure
xiii) Other
xiv) Dry check Dam
xv) Drainage
xvi) Bunds repair
Sub Total
Total
Entry point
18.7('C) Activities
18.7(D) DPR
18.7(E) I & CB 3 1 Year 15.6
18.7(F) Livelihood 12 1 Year 39

Prod. Sys. & Micro Enter.


Benefi
18.7(G) Activities-Wise No. ciaries
Sericuluture
Bee Keeping
Poultry 6 36 1 Year 13
Fishry
Bio Fuel Plantation
Mithun rearing 12 24 26
Sub Total 18 60 39
18.7(H) District Monitoring 3.9
LIMEKING
TAKSING

18.7(I) Watershed Evaluation 3.9


Developme consolidatio
18.7(J) nt n

1090 | P a g e
Agency,AB Administrati
18.7(K) C at PQR on 39
(MoRD) Grand
Total 806.43 452.1

page-01
OFFICE OF THE DISTRICT RURAL DEV. AGENCY
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2017-18
DISTRICT:- UPPER SUBANSIRI Development Block:- LIMEKING TAKSING
PROJECT NAME:-
IWMP-XXII AT
ORAK,REDDY AND
REDDING KACHA
(MWS) Total Project Area=4000 Ha.
Name of Block Concerned Comm
Ministry/Depa and Pariod
Estimated
rtment Area/Irr of
Component Activities-Wise cost (Rs in
igation Implem
lac)
Potenti entation
Sl.No Qty. Unit al (ha)
1 2 3 4 5 6 7 8 9 10
Water Harvesting
LIMEKING TAKSING

District structure (Newly to


17 Watershed be created)
17.1 Development Farm Ponds 9 4.5 1Year 12.375
17.2 Agency, ABC Check Dams 3 1.5 1Year 8.9375
17.3 at PQR Nalla Bandhs
(MoRD) Percolation
17.4 Tanks

1091 | P a g e
Land protection
17.5 work 9 Nos 1Year 26.125
Fishry
Pond/Cattel
17.6 Ponds
MIC 3 Nos 1Year 8.9375
Sub Total 21 1Year 56.375
water Harvesting
structure ( to be
18 Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
Other ground
water recharge
18.5 structure
Fishry
Pond/Cattel
18.6 Ponds
Others
Sub Total
18.7(A) Land Development
i) Afforestation 86.67 ha 1Year 17.875
ii) Horticulture 86.67 ha 1Year 17.875
iii) Agriculture
iv) Pasture 66.67 ha 1Year 13.75
Sub Total 240.01 1Year 49.5

1092 | P a g e
Soil & Moisture
18.7(B) Conservation
Staggered
i) Trenching
Contour
ii) Bunding
iii) Graded Bunding
iv) Bench Terracing 66.67 ha 1Year 13.75
v) Other
vi) Crate wire
vii) Land leveling 80 ha 1Year 16.5
Sub Total 146.67 30.25
page-02
Comm
and Pariod
Concerned Estimated
Area/Irr of
Sl.No Name of Block Ministry/Depa Component Activities-Wise Qty. Unit cost (Rs in
igation Implem
rtment lac)
Potenti entation
al (ha)
1 2 3 4 5 6 7 8 9 10
LIMEKING TAKSING

District
Watershed
Development
Agency, ABC
at PQR Vegetation & Engg.
18.7(B) (MoRD) Structure
viii) Earthen Checks

1093 | P a g e
Brush Wood
ix) Checks
x) Gully Plugs
xi) Loose Boulders
Gabion
xii) Structure
xiii) Other
xiv) Dry check Dam
xv) Drainage
xvi) Bunds repair
Sub Total
Total
18.7© Entry point Activities
18.7(D) DPR
18.7(E) I & CB
18.7(F) Livelihood 12 24.75
Benefic
18.7(G) Activities-Wise No. iaries
Sericuluture
Bee Keeping
Prod. Sys. & Micro
Enter. Poultry 6 nos 1Year 6.875
Fishry
Dairy
development 3 nos 1Year 9.625
Mithun rearing 6 nos 1Year 16.5
Sub Total 12 23.375
18.7(H) Monitoring 1Year 2.475
18.7(I) Evaluation 1Year 1.65

1094 | P a g e
18.7(J) consolidation 1Year 24.75
18.7(K) Administration 1Year 24.75
Grand Total 431.68 237.875

OFFICE OF THE DISTRICT RURAL DEV. AGENCY Page-01


DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2016-17
Development Block---Limeking Taksing
DISTRICT:- UPPER SUBANSIRI
PROJECT NAME:- IWMP-XXXVIII AT NILO,NAVA AND ESHNIA (MWS) Total Project Area=3000 Ha.
Comma
nd Pariod
Concerned Estimated
Area/Irr of
Sl.No Name of Block Ministry/Depart Component Activities-Wise Qty. Unit cost (Rs in
igation Impleme
ment lac)
Potenti ntation
al (ha)
1 2 3 4 5 6 7 8 9 10
Water Harvesting
LIMEKING TAKSING

District structure (Newly to


17 Watershed be created)
17.1 Development Farm Ponds 3 3.45
17.2 Agency,ABC at Check Dams 3 3.45
17.3 PQR (MoRD) Nalla Bandhs
17.4 Percolation Tanks

1095 | P a g e
Other ground water
17.5 recharge structure
17.6 MIC 3 6.9
Land Protection work 3 5.175
Sub Total 12 18.975
water Harvesting
structure ( to be
18 Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
18.4 Percolation Tanks
Other ground water
18.5 recharge structure
18.6 MIC
Land protection
18.7 work
Sub Total
18.7(A) Land Development
Afforesta
i) tion 15 Ha. 1 Year 27.3125
Horticult
ii) ure 23.5 Ha. 1 Year 3.88125
Agricultu
iii) re
iv) Pasture 9.998 Ha. 1 Year 1.725
Sub Total 48.5 32.91875
18.7(B) Soil & Moisture Conservation

1096 | P a g e
Staggere
d
Trenchin
i) g
Contour
ii) Bunding
Grraded
iii) Bunding
Bench
Terracin
iv) g 65 Ha. 1 Year 11.2125
v) Other
Crate
vi) wire
Land
vii) leveling 60 Ha. 1 Year 10.35
Sub Total 125 21.5625
Page-02
Name of Block Concerned Comma
Ministry/Depart nd Pariod
Estimated
ment Activitie Area/Irr of
Component Qty. Unit cost (Rs in
s-Wise igation Impleme
lac)
Potenti ntation
Sl.No al (ha)
1 2 3 4 5 6 7 8 9 10
18.7(B) Vegetation & Engg. Structure
District
Earthen
LIMEKING
TAKSING

Watershed
viii) Checks
Development
Agency,ABC at Brush
PQR (MoRD) Wood
ix) Checks

1097 | P a g e
Gully
x) Plugs
Loose
xi) Boulders
Gabion
xii) Structure
xiii) Other
Dry
check
xiv) Dam
xv) Drainage
Bunds
xvi) repair
Sub Total
Total
18.7('C) Entry point Activities 11 20.7
18.7(D) DPR 1 5.175
18.7(E) I & CB 12 1 Year 12.075
18.7(F) Livelihood 8.25 1 Year 5.175
Activities Benefi
18.7(G) -Wise No. ciaries

Prod. Sys. & Micro Enter.


Sericulut
ure
Bee
Keeping
Poultry 1 36 1 Year 3
Fishry
Bio Fuel
Plantatio
n

1098 | P a g e
Mithun
rearing 3 24 3
Sub
Total 4 60 6
18.7(H) District Monitoring 1.035

LIMEKING
18.7(I) Evaluation 1.5525

TAKSING
Watershed
18.7(J) Developmentconsolidation
18.7(K) Agency,ABC at
Administration 10.35
PQR (MoRD) Grand Total 220.7 130.34375
OFFICE OF THE DISTRICT RURAL DEV. AGENCY
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2017-18
DISTRICT:- UPPER SUBANSIRI Development Block:- LIMEKING TAKSING
PROJECT NAME:- IWMP-XXXVIII AT
NILO,NAVA AND ESHNIA (MWS) Total Project Area=3000 Ha.
Na Concerned Comma
me Ministry/De nd Pariod
Estimated
of partment Activities- Area/Irr of
Component cost (Rs in
Bl Wise igation Impleme
lac)
oc Qt Potenti ntation
Sl.No k y. Unit al (ha)
1 2 3 4 5 6 7 8 9 10
District Water Harvesting structure
LIMEKING TAKSING

17 Watershed (Newly to be created)


17.1 Developme Farm Ponds 3 1Year 3.675
17.2 nt Agency, Check Dams 3 1Year 7.35
17.3 ABC at Nalla Bandhs
PQR Percolation
17.4 (MoRD) Tanks

1099 | P a g e
Land
protection
17.5 work 6 1Year 33.075
17.6 MIC 3 1Year 11.025
Others
Sub Total 15 1Year 55.125
water Harvesting structure
18 ( to be Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
Land
protection
18.5 work
18.6 MIC
Others
Sub Total
18.7(A) Land Development
i) Afforestation 75 ha 1Year 13.78125
21
ii) Horticulture 0 ha 1Year 38.5875
iii) Agriculture
40.
iv) Pasture 5 ha 1Year 7.35
32
Sub Total 5.5 1Year 59.71875
18.7(B) Soil & Moisture Conservation

1100 | P a g e
Staggered
i) Trenching
Contour
ii) Bunding
Graded
iii) Bunding
Bench 14
iv) Terracing 0 ha 1Year 25.725
v) Other
vi) Crate wire
11
vii) Land leveling 5 ha 1Year 21.13125
25
Sub Total 5 46.85625
page-02
Na Comma
me nd Pariod
Concerned Estimated
of Activities- Qt Area/Irr of
Sl.No Ministry/De Component Unit cost (Rs in
Bl Wise y. igation Impleme
partment lac)
oc Potenti ntation
k al (ha)
1 2 3 4 5 6 7 8 9 10

District
LIMEKING TAKSING

Watershed
Developme
nt Agency,
ABC at
18.7(B) PQR Vegetation & Engg. Structure
(MoRD) Earthen
viii) Checks

1101 | P a g e
Brush Wood
ix) Checks
x) Gully Plugs
Loose
xi) Boulders
Gabion
xii) Structure
xiii) Other
Dry check
xiv) Dam
xv) Drainage
xvi) Bunds repair
Sub Total
Total
18.7© Entry point Activities
18.7(D) DPR
18.7(E) I & CB 6 1Year 14.7
18.7(F) Livelihood 9 1Year 27.5625
Activities- No Benefic

Prod. Sys. & Micro Enter.


18.7(G) Wise . iaries
Sericuluture
Bee Keeping
Poultry 6 nos 1Year 6.125
Fishry

Mithun
rearing 11 nos 1Year 14.7
Sub Total 17 20.825
18.7(H) Monitoring 1Year 2.75625

1102 | P a g e
18.7(I) Evaluation 1Year 2.75625
18.7(J) consolidation 1Year
18.7(K) Administration 1Year 27.5625
62
Grand Total 7.5 257.8625

OFFICE OF THE DISTRICT RURAL DEV. AGENCY


DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) FOR 2018-19 page-01
DISTRICT:- UPPER SUBANSIRI Development Block:- LIMEKING TAKSING
PROJECT NAME:- IWMP-XXXVIII AT
NILO,NAVA AND ESHNIA (MWS) Total Project Area=3000 Ha.
Na Concerned Comma
me Ministry/De nd Pariod
Estimated
of partment Activities- Area/Irr of
Component cost (Rs in
Bl Wise igation Impleme
lac)
oc Qt Potenti ntation
Sl.No k y. Unit al (ha)
1 2 3 4 5 6 7 8 9 10
District Water Harvesting structure
17 (Newly to be created)
LIMEKING
TAKSING

Watershed
17.1 Developme Farm Ponds
17.2 nt Agency, Check Dams 1.5 1Year
17.3 ABC at Nalla Bandhs

1103 | P a g e
PQR Percolation
17.4 (MoRD) Tanks
Land
protection
17.5 work 9 Nos 1Year 24.7
Fishry
Pond/Cattel
17.6 Ponds
MIC Nos
Sub Total 9 1Year 24.7
water Harvesting structure
18 ( to be Renovated )
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
Other ground
water
recharge
18.5 structure
Fishry
Pond/Cattel
18.6 Ponds
Others
Sub Total
18.7(A) Land Development
i) Afforestation 65 ha 1Year 12.675
ii) Horticulture 65 ha 1Year 12.675
iii) Agriculture

1104 | P a g e
iv) Pasture 50 ha 1Year 9.75
18
Sub Total 0 1Year 35.1
18.7(B) Soil & Moisture Conservation
Staggered
i) Trenching
Contour
ii) Bunding
Graded
iii) Bunding
Bench
iv) Terracing 50 ha 1Year 9.75
v) Other
vi) Crate wire
vii) Land leveling 60 ha 1Year 11.7
11
Sub Total 0 21.45
page-02
Na Comma
me nd Pariod
Concerned Estimated
of Activities- Qt Area/Irr of
Sl.No Ministry/De Component Unit cost (Rs in
Bl Wise y. igation Impleme
partment lac)
oc Potenti ntation
k al (ha)
1 2 3 4 5 6 7 8 9 10
District
LIMEKING
TAKSING

Watershed
Developme
nt Agency,
ABC at

1105 | P a g e
18.7(B) PQR Vegetation & Engg. Structure
(MoRD) Earthen
viii) Checks
Brush Wood
ix) Checks
x) Gully Plugs
Loose
xi) Boulders
Gabion
xii) Structure
xiii) Other
Dry check
xiv) Dam
xv) Drainage
xvi) Bunds repair
Sub Total
Total
18.7© Entry point Activities
18.7(D) DPR
18.7(E) I & CB
18.7(F) Livelihood 9 17.55
Activities- No Benefi
Prod. Sys. & Micro Enter.
18.7(G) Wise . ciaries
Sericuluture
Bee Keeping
Poultry 2 nos 1Year 6.5
Fishry
Dairy
development 3 nos 1Year 9.1

1106 | P a g e
Mithun
rearing 5 nos 1Year 13
Sub Total 7 19.5
18.7(H) Monitoring 1Year 1.755
18.7(I) Evaluation 1Year 1.17
18.7(J) consolidation 1Year 17.55
18.7(K) Administration 1Year 17.55
31
Grand Total 5 156.325

Nacho DRDA
Sr.N Name of Concerned Compone Activities-wise No. Capacity Command Period of Estimat
o. Block Ministry/ nt (cum) Area/Irrigat Implementat ed Cost
Department ion ion (Rs in
Potential lac)
(ha)
Water Harvesting Structures (Newly to
17 be created)
District
17.1
Watershed Farm Ponds
17.2 Meyabarai Developmen Check Dams
17.3 (MWS) t Nalla Bandhs
17.4 Agency,(Mo Percolation Tanks
17.5 RD)
Other ground water
recharge structure

1107 | P a g e
17.6 Fishry Pond/Cattel Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures ( to be
18 Renovated)
2106.72
18.1 Farm Ponds 0 3.000
18.2 Check Dams 218.500 5.000
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5
Other ground water
recharge structure
18.6 Fishry Pond/Cattel Ponds
Others 12078.5
28 17.200
Sub Total 0 14404 0 0 25.20
18.7(
A) Land Development
i) Afforestation 30.000 4.500
ii) Horticulture 95.670 14.350
iii) Agriculture 81.670 12.250
iv) Pasture
Sub Total 0 207 0 0 31.10
18.7(
B) Soil & Moisture Conservation
i) Staggered Trenching
ii) Contour Bunding
iii) Graded Bunding
iv) Bench terrracing
v) Others
vi) Crate Wire

1108 | P a g e
vii) 11235.8
Land leveling 4 16.000
Sub Total 11236 0 0 0 16.000
Sr.N Name of Concerned Compone Activities-wise No. Capacity Command Period of Estimat
o. Block Ministry/ nt (cum) Area/Irrigat Implementat ed Cost
Department ion ion (Rs in
Potential lac)
(ha)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen Checks
ix) Brush Wood Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion structures
xiii) Others R/Well
xiv) Dry check dam
xv) Drainage
xvi)
District
Meyabarai Watershed Bunds repair
(MWS) Developmen Sub Total 0.00 0.00 0.00 0.00 0.00
t Agency, Total 11236 14611 0 0 72.30
18.7
(D) Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 6.000
18.7(
G) Livelihood 10.800
18.7( No. Beneficiar -
H) Prod. Sys. Activities-wise ies
& Mirco Sericulutre
Enter.
Bee Keeping

1109 | P a g e
1171.0
Poultry 00 39.000 2.400
Fishry
Bio fuel Plantation
Othersm (Mithun rearing) 20.000 10.000 9.600
Sub Total 1191 0 49 0 12.000
18.7(I) Monitoring 1.200
18.7(J
) Evaluation 1.200
18.7( Consolidati
K) on 4.500
18.7(L Administrat
) ion 12.000
Grand 12427 14611 49 0 120.00
Total 0

Sr.N Name Concerne Component Activities- No. Capacit Comman Period of Estima
o. of d Ministry/ wise y (cum) d Implement ted
Block Departme Area/Irrig ation Cost
nt ation (Rs in
Potential lac)
(ha)
Water Harvesting Structures (Newly
17 District to be created)
17.1
Watershed Farm Ponds
Meyab Developme
17.2
arai nt Check Dams
17.3 Agency,(M Nalla Bandhs
oRD) Percolation
17.4 Tanks

1110 | P a g e
17.5 Other ground
water recharge
structure
17.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures ( to be
18 Renovated)
1053.36
18.1 Farm Ponds 0 1.500
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 1053 0 0 1.50
18.7(
A) Land Development
i) 547.8416 82.176
Afforestation 7 25
ii) 1081.816 162.27
Horticulture 7 25
iii) 547.8416 82.176
Agriculture 7 25
iv) Pasture

1111 | P a g e
Sub Total 0 0 2178 0 326.63
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 4213.
Land leveling 440 6.000
Sub Total 4213 0 0 0 6.000
Sr.N Name Concerne Component Activities- No. Capacit Comman Period of Estima
o. of d Ministry/ wise y (cum) d Implement ted
Block Departme Area/Irrig ation Cost
nt ation (Rs in
Potential lac)
(ha)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
District
Meyab Watershed Checks
x) Gully plugs
arai Developme
xi) nt Agency, Loose
boulders
xii) Gabion
structures
xiii) Others R/Well

1112 | P a g e
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 4213 1053 2178 0 334.13
18.7
(D) Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 33.413
18.7(
G) Livelihood 54.000
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
5926.
Poultry 829 198.000 12.150
Prod. Sys. & Mirco Enter.
Fishry
Bio fuel
Plantation
97.00
Others 0 33.000 48.600
Sub Total 6024 231 0 0 60.750
18.7(I
) Monitoring 6.750
18.7(
J) Evaluation 6.750
18.7(
K) Consolidation 20.250
18.7(
L) Administration 66.994
10237 1284 2178 0 583.03
Grand Total 1

1113 | P a g e
Sr.N Na Concerned Component Activities-wise No. Capacit Command Period of Estimat
o. me Ministry/ y (cum) Area/Irriga Implement ed
of Departmen tion ation Cost
Blo t Potential (Rs in
ck (ha) lac)
Water Harvesting Structures (Newly
17 to be created)
17.1 Farm Ponds
17.2 Check Dams
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 Other ground
water recharge
structure
17.6 District Fishry
Watershed Pond/Cattel
Developme Ponds
Diri Others
nt
Agency,(Mo Sub Total 0 0 0 0 0.000
RD) Water Harvesting Structures ( to be
18 Renovated)
1053.36
18.1 Farm Ponds 0 1.500
18.2 Check Dams 218.500 5.000
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure

1114 | P a g e
18.6 Fishry
Pond/Cattel
Ponds
Others 9129.12
0 13.000
Sub Total 0 10401 0 0 19.50
18.7(
A) Land Development
i) Afforestation 73.330 11.000
ii) Horticulture 104.150 15.623
iii) Agriculture 98.333 14.750
iv) Pasture
Sub Total 0 0 276 0 41.37
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 9515.3
Land leveling 52 13.550
Sub Total 9515 0 0 0 13.550
Sr.N Na Concerned Component Activities-wise No. Capacit Command Period of Estimat
o. me Ministry/ y (cum) Area/Irriga Implement ed
of Departmen tion ation Cost
Blo t Potential (Rs in
ck (ha) lac)

1115 | P a g e
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
District Sub Total 0.00 0.00 0.00 0.00 0.00
Watershed Total 9515 10401 276 0 74.42
Diri
18.7 Developme
(D) nt Agency, Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 6.000
18.7(
G) Livelihood 10.800
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1171.0
Prod. Sys. & Mirco Enter. Poultry 00 39.000 2.400
Fishry
Bio fuel
Plantation
Others 20.000 10.000 9.600

1116 | P a g e
Sub Total 1191 49 0 0 12.000
18.7(I
) Monitoring 1.200
18.7(
J) Evaluation 1.200
18.7(
K) Consolidation 4.500
18.7(
L) Administration 12.000
10706 10450 276 0 122.12
Grand Total 3

Sr.N Name Concern Component Activities- No. Capacit Command Period of Estima
o. of ed wise y (cum) Area/Irrig Implement ted
Block Ministry/ ation ation Cost
Departm Potential (Rs in
ent (ha) lac)
Water Harvesting Structures (Newly
17 to be created)
17.1
District Farm Ponds
Watersh
17.2
ed Check Dams
17.3 Charu Develop Nalla Bandhs
ment Percolation
17.4 Agency,( Tanks
17.5 MoRD) Other ground
water recharge
structure

1117 | P a g e
17.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures ( to be
18 Renovated)
2106.72
18.1 Farm Ponds 0 3.000
18.2 Check Dams 349.600 8.000
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others 20154.2
89 28.700
Sub Total 0 22611 0 0 39.70
18.7(
A) Land Development
i) Afforestation 169.333 25.400
ii) Horticulture 166.670 25.000
iii) Agriculture 177.670 26.250
iv) Pasture
Sub Total 0 0 514 0 76.65
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching

1118 | P a g e
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 21067.
Land leveling 200 30.000
Sub Total 21067 0 0 0 30.000
Sr.N Name Concern Component Activities- No. Capacit Command Period of Estima
o. of ed wise y (cum) Area/Irrig Implement ted
Block Ministry/ ation ation Cost
Departm Potential (Rs in
ent (ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) District Gully plugs
xi) Watersh Loose boulders
xii) ed Gabion
Charu
Develop structures
xiii) ment
Agency, Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 21067 22611 514 0 146.35

1119 | P a g e
18.7
(D) Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 13.375
18.7(
G) Livelihood 24.000
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
2469.0
Prod. Sys. & Mirco Enter. Poultry 00 88.000 5.430
Fishry
Bio fuel
Plantation
Others 44.000 21.000 21.720
Sub Total 2513 109 0 0 27.150
18.7(I
) Monitoring 2.400
18.7(
J) Evaluation 3.000
18.7(
K) Consolidation 9.000
18.7(
L) Administration 28.251
23580 22720 514 0 253.52
Grand Total 6

Sr.N Name of Concerne Component Activities-wise No. Capacit Command Period of Estima
o. Block d y (cum) Area/Irriga Implement ted
Ministry/ tion ation Cost

1120 | P a g e
Departme Potential (Rs in
nt (ha) lac)

Water Harvesting Structures


17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 Other ground
water recharge
structure
17.6 Fishry
District Pond/Cattel
Watershe Ponds
d Others
Cheke Developm
ent Sub Total 0 0 0 0 0.000
Agency,( Water Harvesting Structures ( to
18 MoRD) be Renovated)
18.1 Farm Ponds
18.2 Check Dams 218.500 5.000
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel 1053.36
Ponds 0 1.500

1121 | P a g e
Others 10533.6
00 15.000
Sub Total 0 11805 0 0 21.50
18.7(
A) Land Development
i) Afforestation 99.666 14.95
ii) Horticulture 120.333 18.05
iii) Agriculture 96.666 14.5
iv) Pasture
Sub Total 0 0 317 0 47.50
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 10533.6
Land leveling 00 15.000
Sub Total 0 10534 0 0 15.000
Sr.N Name of Concerne Component Activities-wise No. Capacit Command Period of Estima
o. Block d y (cum) Area/Irriga Implement ted
Ministry/ tion ation Cost
Departme Potential (Rs in
nt (ha) lac)
18.7(
C) District Vegetative & Engg. Structure
viii) Cheke Watershe Earthen
d Checks

1122 | P a g e
ix) Developm Brush Wood
ent Checks
x) Agency, Gully plugs
xi) Loose boulders
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 0 22339 317 0 84.00
18.7
(D) Entry Point Activities 0.600
18.7
(E) DPR
18.7
(F) I & CB 7.330
18.7(
G) Livelihood 13.500
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1952.0
Prod. Sys. & Mirco Enter. Poultry 00 65.000 4.000
Fishry
Bio fuel
Plantation
Others 22.000 11.000
Sub Total 1974 65 0 0 15.000
18.7(I
) Monitoring 1.500

1123 | P a g e
18.7(
J) Evaluation 1.500
18.7(
K) Consolidation 4.500
18.7(
L) Administration 14.831
1974 22404 317 0 142.76
Grand Total 1

Sr.N Name of Concerne Component Activities-wise No. Capacit Command Period of Estimat
o. Block d y (cum) Area/Irriga Implement ed
Ministry/ tion ation Cost
Departme Potential (Rs in
nt (ha) lac)
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams
17.3 Nalla Bandhs
Percolation
17.4 District Tanks
17.5 Watershe Other ground
d water recharge
Chekar Developm structure
17.6 ent Fishry
Agency,( Pond/Cattel
MoRD) Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures ( to
18 be Renovated)
18.1 Farm Ponds
18.2 Check Dams

1124 | P a g e
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.00
18.7(
A) Land Development
i) Afforestation 48.000 7.200
ii) Horticulture 84.000 12.600
iii) Agriculture
iv) Pasture
Sub Total 0 0 132 0 19.80
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) Land leveling
Sub Total 0 0 0 0 0.000

1125 | P a g e
Sr.N Name of Concerne Component Activities-wise No. Capacit Command Period of Estimat
o. Block d y (cum) Area/Irriga Implement ed
Ministry/ tion ation Cost
Departme Potential (Rs in
nt (ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv) District
Watershe Drainage
xvi) Bunds repair
d
Chokar
Developm Sub Total 0.00 0.00 0.00 0.00 0.00
ent Total 0 0 132 0 19.80
18.7 Agency,
(D) Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 2.565
18.7(
G) Livelihood 5.050
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Prod. Sys. & Mirco Enter.
Bee Keeping
854.0
Poultry 00 29.000 1.750

1126 | P a g e
Fishry
Bio fuel
Plantation
Others 8.000 4.000 4.000
Sub Total 862 33 0 0 5.750
18.7(I
) Monitoring 0.600
18.7(
J) Evaluation 0.600
18.7(
K) Consolidation 1.800
18.7(
L) Administration 5.820
Grand Total 862 33 132 0 41.985

Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estima
o. of Ministry/ y (cum) Area/Irriga Implement ted
Block Departmen tion ation Cost
t Potential (Rs in
(ha) lac)
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams
17.3 District Nalla Bandhs
Watershed Percolation
17.4 Developme Tanks
Dingsi
17.5 nt Other ground
Agency,(Mo water recharge
RD) structure
17.6 Fishry
Pond/Cattel
Ponds
Others

1127 | P a g e
Sub Total 0 0 0 0 0.000
Water Harvesting Structures ( to
18 be Renovated)
18.1 Farm Ponds
18.2 Check Dams 218.500 5.000
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others 1053.36
0 15.000
Sub Total 0 1272 0 0 20.00
18.7(
A) Land Development
i) Afforestation 99.670 14.950
ii) Horticulture 130.330 19.550
iii) Agriculture 96.670 14.500
iv) Pasture
Sub Total 0 0 327 0 49.00
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding

1128 | P a g e
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 10533.6
Land leveling 00 15.000
Sub Total 0 10534 0 0 15.000
Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estima
o. of Ministry/ y (cum) Area/Irriga Implement ted
Block Departmen tion ation Cost
t Potential (Rs in
(ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion
District structures
xiii) Watershed Others R/Well
Dingsi
xiv) Developme Dry check dam
xv) nt Agency,
Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 0 11805 327 0 84.00
18.7
(D) Entry Point Activities 0.600
18.7
(E) DPR
18.7
(F) I & CB 7.331

1129 | P a g e
18.7(
G) Livelihood 13.500
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1952.0
Prod. Sys. & Mirco Enter. Poultry 00 65.000 4.000
Fishry
Bio fuel
Plantation
Others 22.000 11.000 11.000
Sub Total 1974 76 0 0 15.000
18.7(I
) Monitoring 1.500
18.7(
J) Evaluation 1.500
18.7(
K) Consolidation 4.500
18.7(
L) Administration 14.831
1974 11881 327 0 142.76
Grand Total 3

Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estimat
o. of Ministry/ y (cum) Area/Irriga Implement ed
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
District Water Harvesting Structures
17 Watershed (Newly to be created)
Ebiya
17.1 Development Farm Ponds
17.2 Agency,(MoRD) Check Dams

1130 | P a g e
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 Other ground
water recharge
structure
17.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures
18 ( to be Renovated)
18.1 Farm Ponds
18.2 Check Dams 218.500 5.000
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel 1053.36
Ponds 0 1.500
Others 11235.8
40 16.000
Sub Total 0 12508 0 0 22.50
18.7(
A) Land Development
i) Afforestation 76.670 11.500
ii) Horticulture 105.000 17.063
iii) Agriculture 113.750 15.750
iv) Pasture

1131 | P a g e
Sub Total 0 0 295 0 44.31
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 10569.7
Land leveling 10 15.050
Sub Total 0 10570 0 0 15.050
Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estimat
o. of Ministry/ y (cum) Area/Irriga Implement ed
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
District Checks
x) Watershed
Ebiya Gully plugs
Development
xi) Loose boulders
Agency,
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam

1132 | P a g e
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 0 23077 295 0 81.86
18.7
(D) Entry Point Activities
18.7
(E) DPR
18.7
(F) I & CB 6.000
18.7(
G) Livelihood 10.800
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1464.0
Prod. Sys. & Mirco Enter. Poultry 00 49.000 3.000
Fishry
Bio fuel
Plantation
Others 18.000 9.000 9.000
Sub Total 1482 58 0 0 12.000
18.7(I
) Monitoring 1.200
18.7(
J) Evaluation 1.200
18.7(
K) Consolidation 4.500
18.7(
L) Administration 12.000
1482 23135 295 0 129.56
Grand Total 3

1133 | P a g e
Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estima
o. of Ministry/ y (cum) Area/Irriga Implement ted
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams 305.900 7.000
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 Other ground
water recharge
structure
17.6 Fishry
District Pond/Cattel
Watershed Ponds
Gingba Others 9339.79
Development
Agency,(MoRD) 2 13.300
Sub Total 0 9646 0 0 20.300
Water Harvesting Structures (
18 to be Renovated)
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure

1134 | P a g e
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.00
18.7(
A) Land Development
i) Afforestation 86.670 13.000
ii) Horticulture 80.000 12.000
iii) Agriculture 98.000 14.700
iv) Pasture 66.670 10.000
Sub Total 0 0 331 0 49.70
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 9831.3
Land leveling 60 14.000
Sub Total 9831 0 0 0 14.000
Sr.N Name Concerned Component Activities-wise No. Capacit Command Period of Estima
o. of Ministry/ y (cum) Area/Irriga Implement ted
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
18.7(
C)
Gingba Vegetative & Engg. Structure

1135 | P a g e
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 9831 9646 331 0 84.00
District
18.7
(D)
Watershed Entry Point Activities 6.000
18.7 Development
(E) Agency, DPR 1.500
18.7
(F) I & CB 7.500
18.7(
G) Livelihood 13.500
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1464.0
Prod. Sys. & Mirco Enter. Poultry 00 49.000 3.000
Fishry
Bio fuel
Plantation
Others 24.000 12.000 12.000
Sub Total 1488 61 0 0 15.000

1136 | P a g e
18.7(I
) Monitoring 1.500
18.7(
J) Evaluation 1.500
18.7(
K) Consolidation 4.500
18.7(
L) Administration 15.000
11319 9707 331 0 150.00
Grand Total 0

Sr.N Name of Concerned Component Activities- No. Capacit Command Period of Estima
o. Block Ministry/ wise y (cum) Area/Irrig Implement ted
Department ation ation Cost
Potential (Rs in
(ha) lac)
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 District Other ground
Watershed water recharge
Jibaying
Development structure
17.6 Agency,(MoRD) Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.000
Water Harvesting Structures (
18 to be Renovated)
18.1 Farm Ponds

1137 | P a g e
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.00
18.7(
A) Land Development
i) 93.333 14
Afforestation
ii) 194.422 29.163
Horticulture 41
iii) 80 12
Agriculture
iv) Pasture
Sub Total 0 0 368 0 55.16
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) Land leveling

1138 | P a g e
Sub Total 0 0 0 0 0.000
Sr.N Name of Concerned Component Activities- No. Capacit Command Period of Estima
o. Block Ministry/ wise y (cum) Area/Irrig Implement ted
Department ation ation Cost
Potential (Rs in
(ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) Loose boulders
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv)
District
Watershed Drainage
xvi) Jibaying Bunds repair
Development
Agency, Sub Total 0.00 0.00 0.00 0.00 0.00
Total 0 0 368 0 55.16
18.7
(D) Entry Point Activities
18.7
(E) DPR
18.7 7.47615
(F) I & CB
18.7( 12.1402
G) Livelihood
18.7( No. Beneficia -
H) Activities-wise ries
Prod. Sys. & Mirco Enter. Sericulutre
Bee Keeping

1139 | P a g e
1859.0
Poultry 00 61.990 3.810
Fishry
Bio fuel
Plantation
Others 20.000 10.000
Sub Total 1879 62 0 0 13.810
18.7(I
) Monitoring 1.518
18.7(
J) Evaluation 1.518
18.7(
K) Consolidation 4.500
18.7(
L) Administration 12.631
1879 62 368 0 108.75
Grand Total 7

Sr.N Name Concerned Component Activities- No. Capacit Command Period of Estima
o. of Ministry/ wise y (cum) Area/Irriga Implement ted
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 District Check Dams 305.900 7.000
17.3 Watershed Nalla Bandhs
Kargam
Development Percolation
17.4
Agency,(MoRD) Tanks
17.5 Other ground
water recharge
structure

1140 | P a g e
17.6 Fishry
Pond/Cattel
Ponds
Others 9339.79
2 13.300
Sub Total 0 9646 0 0 20.300
Water Harvesting Structures (
18 to be Renovated)
18.1 Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.00
18.7(
A) Land Development
i) Afforestation 86.670 13.000
ii) Horticulture 80.000 12.000
iii) Agriculture 98.000 14.700
iv) Pasture 66.670 10.000
Sub Total 0 0 331 0 49.70
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching

1141 | P a g e
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 9831.3
Land leveling 60 14.000
Sub Total 9831 0 0 0 14.000
Sr.N Name Concerned Component Activities- No. Capacit Command Period of Estima
o. of Ministry/ wise y (cum) Area/Irriga Implement ted
Block Department tion ation Cost
Potential (Rs in
(ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
Checks
ix) Brush Wood
Checks
x) Gully plugs
xi) District Loose boulders
xii) Watershed Gabion
Kargam
Development structures
xiii) Agency,
Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 9831 9646 331 0 84.00

1142 | P a g e
18.7
(D) Entry Point Activities 6.000
18.7
(E) DPR 1.500
18.7
(F) I & CB 7.500
18.7(
G) Livelihood 13.500
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1464.0
Prod. Sys. & Mirco Enter. Poultry 00 49.000 3.000
Fishry
Bio fuel
Plantation
Others 24.000 12.000 12.000
Sub Total 1488 61 0 0 15.000
18.7(I
) Monitoring 1.500
18.7(
J) Evaluation 1.500
18.7(
K) Consolidation 4.500
18.7(
L) Administration 15.000
11319 9707 331 0 150.00
Grand Total 0

Sr.N Name of Concerned Component Activities- No. Capacit Command Period of Estima
o. Block Ministry/ wise y (cum) Area/Irrig Implement ted
Departmen ation ation Cost
t Potential (Rs in
(ha) lac)

1143 | P a g e
Water Harvesting Structures
17 (Newly to be created)
17.1 Farm Ponds
17.2 Check Dams 305.900 7.000
17.3 Nalla Bandhs
Percolation
17.4 Tanks
17.5 Other ground
water recharge
structure
17.6 Fishry
Pond/Cattel
Ponds
Others 9339.79
District 2 13.300
Watershed
Developme Sub Total 0 9646 0 0 20.300
Kyamdo Water Harvesting Structures ( to
nt
18 Agency,(Mo be Renovated)
18.1 RD) Farm Ponds
18.2 Check Dams
18.3 Nalla Bandhs
Percolation
18.4 Tanks
18.5 Other ground
water recharge
structure
18.6 Fishry
Pond/Cattel
Ponds
Others
Sub Total 0 0 0 0 0.00
18.7(
A) Land Development

1144 | P a g e
i) 86.666667 13
Afforestation
ii) 80 12
Horticulture
iii) 98 14.7
Agriculture
iv) 66.666667 10
Pasture
Sub Total 0 0 331 0 49.70
18.7(
B) Soil & Moisture Conservation
i) Staggered
Trenching
ii) Contour
Bunding
iii) Graded
Bunding
iv) Bench
terrracing
v) Others
vi) Crate Wire
vii) 9831.36
Land leveling 0 14.000
Sub Total 0 9831 0 0 14.000
Sr.N Name of Concerned Component Activities- No. Capacit Command Period of Estima
o. Block Ministry/ wise y (cum) Area/Irrig Implement ted
Departmen ation ation Cost
t Potential (Rs in
(ha) lac)
18.7(
C) Vegetative & Engg. Structure
viii) Earthen
District
Watershed Checks
ix) Kyamdo Brush Wood
Developme
nt Agency, Checks
x) Gully plugs
xi) Loose boulders

1145 | P a g e
xii) Gabion
structures
xiii) Others R/Well
xiv) Dry check dam
xv) Drainage
xvi) Bunds repair
Sub Total 0.00 0.00 0.00 0.00 0.00
Total 0 19477 331 0 84.00
18.7 6
(D) Entry Point Activities
18.7 1.5
(E) DPR
18.7 7.5
(F) I & CB
18.7( 13.5
G) Livelihood
18.7( No. Beneficia -
H) Activities-wise ries
Sericulutre
Bee Keeping
1464.0
Prod. Sys. & Mirco Enter. Poultry 00 49.000 3.000
Fishry
Bio fuel
Plantation
Others 24.000 12.000 12.000
Sub Total 1488 61 0 0 15.000
18.7(I
) Monitoring 1.500
18.7(
J) Evaluation 1.500
18.7(
K) Consolidation 4.500
18.7(
L) Administration 15.000

1146 | P a g e
1488 19538 331 0 150.00
Grand Total 0

Payeng DRDA
DISTRICT IRRIGANTION PLAN UNDER PMKSY (IWMP) 2016-21
DISTRICT: UPPER SUBANSIRI
BLOCK: PAYENG
A):

1147 | P a g e
Sl.No. Name of Name Ministry/Dept. Component Activity Quantity Est. Design Capacity Year of Work
village of Cost(in Command in CUM Implementation Priority
Block lakh) area in Ha
1 Haring Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High
Kamsar
2 Geri Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
3 Aching Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Low
Moring
4 Esso Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
5 Chawa Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
Kamsar
6 Linguline Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 08 5 yr High
7 Kargar Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 07 5 yr Law
Maling
8 Pakpu Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 09 5 yr Medium
Maling
9 Kargar Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High
Lipumaling
10 Ginglo Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
11 Pekiring Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Low
12 Payeng Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
13 Baring Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High
14 Kamda Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 08 5 yr Law
15 Kamra Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 07 5 yr Medium
16 Nungnu Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 09 5 yr High
17 Leya Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
18 Maying Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Low
Moring
19 Pakba Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
20 Dolorupu Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr High
21 Pakba-I Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr Law
22 Tasiring Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 08 5 yr Medium

1148 | P a g e
23 Jarjo Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 07 5 yr High
Riamuk
24 Bibe Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 09 5 yr Medium
Riamuk
25 Lingruk Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr Low
Riamuk
26 Paktung Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr Medium
27 Tajering Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr High
28 Kaji Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr Law
29 Tarba Payeng MORD/DOLR PMKSY(IWMP) farm Pond 5 30 10 5 yr Medium

30 Yagampu Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High


31 Bomdampuring Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
32 Haning Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Low
33 Lingri Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
34 Kamlo Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 08 5 yr High
35 Pillong Maling Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 07 5 yr Law
36 Nyompu Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 09 5 yr Medium
37 Ngaba Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High
38 Jami Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
39 Upper Ngaba Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Low
40 Lower Ngaba Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
41 Chingring Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr High
Moring
42 Madar Dui Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 08 5 yr Law
43 Gongne Dui Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 07 5 yr Medium
44 Dagam Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 09 5 yr High
45 Ramsing Payeng MORD/DOLR PMKSY(IWMP) Fish Pond 5 30 10 5 yr Medium
Total 1350
Amount

1149 | P a g e
B):
Sl.No. Name of Name Ministry/Dept. Component Activity Quantity Est. Design Capacity Year of Work
village of Cost(in Command in Implementation Priority
Block lakh) area in Ha CUM/HA
1 Haring Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 100 300 Ha 5 yr medium
Kamsar Garden
2 Geri Payeng MORD/DOLR PMKSY(IWMP) Orange 45 50 300 Ha 5 yr High
3 Aching Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 10 300 Ha 5 yr Medium
Moring Garden
4 Esso Payeng MORD/DOLR PMKSY(IWMP) Banana 45 60 300 Ha 5 yr Low
Garden
5 Chawa Payeng MORD/DOLR PMKSY(IWMP) Orange 45 60 300 Ha 5 yr Low
Kamsar Garden
6 Linguline Payeng MORD/DOLR PMKSY(IWMP) Cardamom 67.5 100 450 Ha 5 yr Medium
Garden
7 Kargar Payeng MORD/DOLR PMKSY(IWMP) Cardamom 67.5 100 450 Ha 5 yr High
Maling Garden
8 Pakpu Payeng MORD/DOLR PMKSY(IWMP) Cardamom 75 100 500 Ha 5 yr Law
Maling Garden
9 Kargar Payeng MORD/DOLR PMKSY(IWMP) Cardamom 67.5 90 450 Ha 5 yr Medium
Lipumaling Garden
10 Ginglo Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 10 300 Ha 5 yr High
Garden
11 Pekiring Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 60 300 Ha 5 yr Medium
Garden
12 Payeng Payeng MORD/DOLR PMKSY(IWMP) Cardamom 67.5 100 450 Ha 5 yr Low
Garden
13 Baring Payeng MORD/DOLR PMKSY(IWMP) Cardamom 67.5 100 450 Ha 5 yr Medium
Garden
14 Kamda Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 90 450 Ha 5 yr High
Garden

1150 | P a g e
15 Kamra Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 100 300 Ha 5 yr Law
Garden
16 Nungnu Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 50 300 Ha 5 yr Medium
Garden
17 Leya Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 10 300 Ha 5 yr High
Garden
18 Maying Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 60 300 Ha 5 yr Medium
Moring Garden
19 Pakba Payeng MORD/DOLR PMKSY(IWMP) Orange 45 100 300 Ha 5 yr Low
Garden
20 Dolorupu Payeng MORD/DOLR PMKSY(IWMP) Orange 45 50 300 Ha 5 yr Medium
Garden
21 Pakba-I Payeng MORD/DOLR PMKSY(IWMP) Orange 45 10 300 Ha 5 yr High
Garden
22 Tasiring Payeng MORD/DOLR PMKSY(IWMP) Orange 45 60 300 Ha 5 yr Law
Garden
23 Jarjo Payeng MORD/DOLR PMKSY(IWMP) Orange 45 100 300 Ha 5 yr Medium
Riamuk Garden
24 Bibe Payeng MORD/DOLR PMKSY(IWMP) Orange 45 50 300 Ha 5 yr High
Riamuk Garden
25 Lingruk Payeng MORD/DOLR PMKSY(IWMP) Orange 45 10 300 Ha 5 yr Medium
Riamuk Garden
26 Paktung Payeng MORD/DOLR PMKSY(IWMP) Orange 45 60 300 Ha 5 yr Low
Garden
27 Tajering Payeng MORD/DOLR PMKSY(IWMP) Orange 45 100 300 Ha 5 yr Medium
Garden
28 Kaji Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 50 300 Ha 5 yr High
Garden
29 Tarba Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 10 300 Ha 5 yr Law
Garden

1151 | P a g e
30 Yagampu Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 100 300 Ha 5 yr 45 High
Garden
31 Bomdampuring Payeng MORD/DOLR PMKSY(IWMP) Cardamom 45 50 300 Ha 5 yr 45 Medium
Garden
32 Haning Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 10 300 Ha 5 yr 45 Low
33 Lingri Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 60 300 Ha 5 yr 45 Medium
34 Kamlo Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 High
35 Pillong Maling Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 Law
36 Nyompu Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 50 300 Ha 5 yr 45 Medium
37 Ngaba Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 10 300 Ha 5 yr 45 High
38 Jami Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 60 300 Ha 5 yr 45 Medium
39 Upper Ngaba Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 Low
40 Lower Ngaba Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 Medium
41 Chingring Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 50 300 Ha 5 yr 45 High
Moring
42 Madar Dui Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 10 300 Ha 5 yr 45 Law
43 Gongne Dui Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 60 300 Ha 5 yr 45 Medium
44 Dagam Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 High
45 Ramsing Payeng MORD/DOLR PMKSY(IWMP) Orange Garden 45 100 300 Ha 5 yr 45 Medium
Total 2167.5
Amount

C):-
Sl.No Name of Name of Ministry/De Component Activit Quantity Est. Design Capacit Year of Work
. village Block pt. y Cost(i Comman y in Implementatio Priority
n lakh) d area in CUM n
Ha
1 Haring Kamsar Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr mediu
R ) Rmtr/No m
2 Geri Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr High
R ) Bandh Rmtr/No

1152 | P a g e
3 Aching Moring Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
R ) Rmtr/No m
4 Esso Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Low
R ) Rmtr/No
5 Chawa Kamsar Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Low
R ) Rmtr/No
6 Linguline Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
R ) Rmtr/No m
7 Kargar Maling Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr High
R ) Rmtr/No
8 Pakpu Maling Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Law
R ) Bandh Rmtr/No
9 Kargar Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
Lipumaling R ) Rmtr/No m
10 Ginglo Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr High
R ) Rmtr/No
11 Pekiring Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
R ) Rmtr/No m
12 Payeng Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Low
R ) Rmtr/No
13 Baring Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Mediu
R ) Bandh Rmtr/No m
14 Kamda Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr High
R ) Bandh Rmtr/No
15 Kamra Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Law
R ) Bandh Rmtr/No
16 Nungnu Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Mediu
R ) Bandh Rmtr/No m
17 Leya Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr High
R ) Bandh Rmtr/No
18 Maying Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Mediu
Moring R ) Bandh Rmtr/No m

1153 | P a g e
19 Pakba Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Low
R ) Bandh Rmtr/No
20 Dolorupu Payeng MORD/DOL PMKSY(IWMP Nalla 14000 49.56 110 5 yr Mediu
R ) Bandh Rmtr/No m
21 Pakba-I Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr High
R ) Rmtr/No
22 Tasiring Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Law
R ) Rmtr/No
23 Jarjo Riamuk Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
R ) Rmtr/No m
24 Bibe Riamuk Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr High
R ) Rmtr/No
25 Lingruk Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
Riamuk R ) Rmtr/No m
26 Paktung Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Low
R ) Rmtr/No
27 Tajering Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Mediu
R ) Rmtr/No m
28 Kaji Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr High
R ) Rmtr/No
29 Tarba Payeng MORD/DOL PMKSY(IWMP MIC 14000 49.56 110 5 yr Law
R ) Rmtr/No
30 Yagampu Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr High
R ) o
31 Bomdampurin Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr Law
g R ) o
32 Haning Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Mediu
R ) Bandh o m
33 Lingri Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr High
R ) Bandh o
34 Kamlo Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Mediu
R ) Bandh o m

1154 | P a g e
35 Pillong Maling Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Low
R ) Bandh o
36 Nyompu Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Mediu
R ) Bandh o m
37 Ngaba Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr High
R ) Bandh o
38 Jami Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Law
R ) Bandh o
39 Upper Ngaba Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr High
R ) Bandh o
40 Lower Ngaba Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Law
R ) Bandh o
41 Chingring Payeng MORD/DOL PMKSY(IWMP Nalla 14000Rmtr/N 49.56 100 5 yr Mediu
Moring R ) Bandh o m
42 Madar Dui Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr High
R ) o
43 Gongne Dui Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr Mediu
R ) o m
44 Dagam Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr Low
R ) o
45 Ramsing Payeng MORD/DOL PMKSY(IWMP MIC 14000Rmtr/N 49.56 100 5 yr Mediu
R ) o m
Total Amount 2230.
2

D):-
Sl.No Name of Name Ministry/Dept Component Activity Quantity Est. Design Capacit Year of Work
. village of . Cost(i Comman y in Implementatio Priority
Block n lakh) d area in CUM & n
Ha Ha

1155 | P a g e
1 Haring Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr mediu
Kamsar ) plantation m
2 Geri Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
3 Aching Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Law
Moring ) plantation
4 Esso Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
) Plantation m
5 Chawa Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
Kamsar ) Plantation m
6 Linguline Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
7 Kargar Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Mediu
Maling ) plantation m
8 Pakpu Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Low
Maling ) plantation
9 Kargar Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Mediu
Lipumaling ) plantation m
10 Ginglo Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
11 Pekiring Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Law
) Plantation
12 Payeng Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr High
) Plantation
13 Baring Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Law
) Plantation
14 Kamda Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
) Plantation m
15 Kamra Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr High
) Plantation
16 Nungnu Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
) Plantation m

1156 | P a g e
17 Leya Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Low
) plantation
18 Maying Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Mediu
Moring ) plantation m
19 Pakba Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
20 Dolorupu Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Law
) plantation
21 Pakba-I Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
22 Tasiring Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Law
) plantation
23 Jarjo Riamuk Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr Mediu
) plantation m
24 Bibe Riamuk Payeng MORD/DOLR PMKSY(IWMP Bamboo 49.50 110 330 Ha 5 yr High
) plantation
25 Lingruk Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
Riamuk ) Plantation m
26 Paktung Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Low
) Plantation
27 Tajering Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Mediu
) Plantation m
28 Kaji Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr High
) Plantation
29 Tarba Payeng MORD/DOLR PMKSY(IWMP Toko 49.50 110 330 Ha 5 yr Law
) Plantation
30 Yagampu Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr High
R
31 Bomdampuri Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Law
ng R
32 Haning Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Medium
R

1157 | P a g e
33 Lingri Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr High
R
34 Kamlo Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Medium
R
35 Pillong Maling Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Low
R
36 Nyompu Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Medium
R
37 Ngaba Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr High
R
38 Jami Payeng MORD/DOL PMKSY(IWMP) Toko Plantation 49.50 110 330 Ha 5 yr Law
R
39 Upper Ngaba Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr High
R plantation
40 Lower Ngaba Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr Law
R plantation
41 Chingring Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr Medium
Moring R plantation
42 Madar Dui Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr High
R plantation
43 Gongne Dui Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr Medium
R plantation
44 Dagam Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr Low
R plantation
45 Ramsing Payeng MORD/DOL PMKSY(IWMP) Bamboo 49.50 110 330 Ha 5 yr Medium
R plantation
Total 2227.
Amount 5
E):-
Sl.No. Name of Name Ministry/Dept. Component Activity Quantity Est. Design Capacity Year of Work
village of Block Cost(in Command in CUM Implementation Priority
lakh) area in Ha & Ha

1158 | P a g e
1 Haring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr medium
Kamsar building
2 Geri Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
3 Aching Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
Moring building
4 Esso Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
5 Chawa Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Kamsar building
6 Linguline Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
7 Kargar Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Maling building
8 Pakpu Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Low
Maling building
9 Kargar Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Lipumaling building
10 Ginglo Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
11 Pekiring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
12 Payeng Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
13 Baring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
14 Kamda Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
15 Kamra Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
16 Nungnu Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building

1159 | P a g e
17 Leya Payeng MORD/DOLRPMKSY(IWMP) Capacity 2 10 2 yr Low
building
18 Maying Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Moring building
19 Pakba Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
20 Dolorupu Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
21 Pakba-I Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
22 Tasiring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
23 Jarjo Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Riamuk building
24 Bibe Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
Riamuk building
25 Lingruk Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Riamuk building
26 Paktung Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Low
building
27 Tajering Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
28 Kaji Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
29 Tarba Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
30 Yagampu Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
31 Bomdampuring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
32 Haning Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building

1160 | P a g e
33 Lingri Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
34 Kamlo Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
35 Pillong Maling Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Low
building
36 Nyompu Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
37 Ngaba Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
38 Jami Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
39 Upper Ngaba Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
40 Lower Ngaba Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Law
building
41 Chingring Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
Moring building
42 Madar Dui Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr High
building
43 Gongne Dui Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
44 Dagam Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Low
building
45 Ramsing Payeng MORD/DOLR PMKSY(IWMP) Capacity 2 10 2 yr Medium
building
Total 450
Amount

F): -
Sl.No. Component Activity Est. cost in lakh Year of implementation
Livelihood Activity 1. Handicraft-wood/ bamboo curving & cane works 758.268 5 yr

1161 | P a g e
1 2. Piggary

2 Production System & Micro Enterprises 1. Vermi-composition 842.52 5 yrs


2. Mithun Rearing
3 Administration 842.52
4 Monitoring 84.252
5 Evaluation 84.252
Grand Total Amount (A+B+C+D+E+F) 11037.012

Puchigeko DRDA
Watershed Development at Tarko, Gichi Village 500 ha.
Comma
nd
Area/
No. Irrigati
Name Concerned on Period of
Sr. of Ministry/De Capacity(C Potenti Implementatio Estimated
No. Block partment Component Activities um) al (ha) n Cost(Rs in Lac)

Water Harvesting
Structures (Newly to be
1 created)
Puchige 2016-17 to
RD Farm Ponds 60 675/nos 100 2021-22 5697000
ko
2016-17 to
Check Dams 20 30mtr/NOS 100 2021-23 2899800
2016-17 to
Nalla bandhs 20 30mtr/NOS 80 2021-23 2899800
Percolation

1162 | P a g e
Other ground water recharge
structure
2016-17 to
fishry Pond/Cattle Ponds 70 675/nos 100 2021-23 21262500
Others
Sub Total 32759100

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 20 2021-23 300000
2016-17 to
Pasture 50 2021-23 750000
Sub Total 1350000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
100 2016-17 to
-
Bench Terracing 0 72cum/nos 2021-23 137000
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 500 s 2021-23 4000000
Sub total
4137000

1163 | P a g e
Vegetative & Engg.
4 Structure
2016-17 to
Earthen Checks 12 30mtr/nos 200 2021-23 1739880
Brush Wood Checks
Gully plugs
2016-17 to
Gabion structures 2 30mtr 200 2021-23 289980
Others
Dry Check dam
200mtr/ea 2016-17 to
Drainage 12 ch 2021-23 849600
bunds repair
Sub total
Total 2879460
5 Entry Point activities
6 DPR
7 I & CB
8 livelihood
9 Prod. Sys. & Micro Enter. Activities Wise No.
2016-17 to
Sericulture 5 2021-23 75000
2016-17 to
Bee Keeping 5 2021-23 75000
2016-17 to
Poultry 35 2021-23 525000
2016-17 to
Fishry 35 2021-23 525000
Bio fuel Plantation
Others

1164 | P a g e
Sub Total 1200000
Total 42325560
10 Monitoring 2% 846511.2
11 Evaluation 2% 846511.2
12 Consolidation
13 Administration 3% 1269766.8
Grand Total 45288349

Watershed Development at Gichi Atak, Gichi Putu Village.200ha


Comma
nd
Area/
N
Irrigatio
o.
Concerned n Period of
Sr. Name Ministry/De Capacity(C Potenti Implementatio Estimated
No. of Block partment Component Activities um) al (ha) n Cost(Rs in Lac)

Water Harvesting Structures


1 Puchige (Newly to be created)
RD
ko 675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890
2016-17 to
Nalla bandhs 10 300m/nos 80 2021-22 949500

1165 | P a g e
Percolation
Other ground water recharge
structure
675 2016-17 to
fishry Pond/Cattle Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
20 2016-17 to
-
Bench Terracing 0 72cum/nos 2021-23 1972800
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2612800

1166 | P a g e
Vegetative & Engg.
4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
N
9 Prod. Sys. & Micro Enter. Activities Wise o.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others

1167 | P a g e
Sub Total 1200000
Total 25497190
2
10 Monitoring % 509944
2
11 Evaluation % 509944
12 Consolidation
3
13 Administration % 764915.7
Grand Total 27281993

Watershed Development at Raj Koro,Kach Koro , Pega Lomdak And Pega Koto for 200ha.
Comma
nd
Area/
N
Irrigati
o.
Concerned on Period of
Sr. Name Ministry/Dep Capacity(C Potenti Implementatio Estimated Cost(Rs
No. of Block artment Component Activities um) al (ha) n in Lac)

Water Harvesting
Puchige Structures (Newly to be
RD
1 ko created)
675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890

1168 | P a g e
2016-17 to
Nalla bandhs 10 300m/nos 80 2021-22 949500
Percolation
Other ground water recharge
structure
675 2016-17 to
fishry Pond/Cattle Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
20 2016-17 to
-
Bench Terracing 0 72cum/nos 2021-23 1972800
Others
Crate Wire

1169 | P a g e
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2612800

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
N
9 Prod. Sys. & Micro Enter. Activities Wise o.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000

1170 | P a g e
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1200000
Total 25497190
2
10 Monitoring % 509944
2
11 Evaluation % 509944
12 Consolidation
3
13 Administration % 764915.7
Grand Total 27281993
Wat
ersh
ed
Deve
lopm
ent
at
Rop
Koro
Ango
Lom
dak
Villa
ge.2
00ha
.

1171 | P a g e
Comma
nd
Area/
Irrigatio
Concerned n Period of
Sr. Name Ministry/Depa N Capacity(C Potenti Implementatio Estimated Cost(Rs
No. of Block rtment Component Activities o. um) al (ha) n in Lac)
Water Harvesting
Puchige Structures (Newly to be
1 ko RD created)
675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890
2016-17 to
Nalla bandhs 10 300m/nos 80 2021-22 949500
Percolation
Other ground water recharge
structure
675 2016-17 to
fishry Pond/Cattle Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000

1172 | P a g e
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
15 2016-17 to
Bench Terracing 0 72cum/nos - 2021-23 1479600
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2119600

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total

1173 | P a g e
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
N
9 Prod. Sys. & Micro Enter. Activities Wise o.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1200000
Total 25003990
2
10 Monitoring % 500080
2
11 Evaluation % 500080
12 Consolidation
3
13 Administration % 750119.7
Grand Total 26754269

Watershed Development at Sichin Sa, Laa Village.300ha.

1174 | P a g e
Comma
nd
Area/
No. Irrigati
Concerned on Period of
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Estimated Cost(Rs
No. of Block ment Component Activities um) al (ha) n in Lac)

Water Harvesting
Structures (Newly to be
1 created)
675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890
2016-17 to
Puchige
RD Nalla bandhs 10 300m/nos 80 2021-22 949500
ko
Percolation
Other ground water
recharge structure
fishry Pond/Cattle 675 2016-17 to
Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000

1175 | P a g e
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
2016-17 to
-
Bench Terracing 200 72cum/nos 2021-23 1972800
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2612800

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam

1176 | P a g e
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities Wise No.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1200000
Total 25497190
10 Monitoring 2% 509944
11 Evaluation 2% 509944
12 Consolidation
13 Administration 3% 764915.7
Grand Total 27281993

1177 | P a g e
Watershed Development at Rekpe Rijo,Tumleko Rijo and Bodak Rijo, Belakmuri & Gami Village.200ha.
Comma
nd
Area/
No. Irrigatio
Concerned n Period of
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Estimated
No. of Block ment Component Activities um) al (ha) n Cost(Rs in Lac)

Water Harvesting
Structures (Newly to be
1 created)
2016-17 to
Farm Ponds 10 675/nos 200 2021-22 949500
2016-17 to
Check Dams 5 30mtr 200 2021-23 724950
Puchige
RD Nalla bandhs
ko
Percolation
Other ground water
recharge structure
fishry Pond/Cattle 2016-17 to
Ponds 50 675/nos 200 2021-23 15187500
Others
Sub Total 16861950

2 Land Development

1178 | P a g e
2016-17 to
Afforestation 30 2021-23 450000
2016-17 to
Horticulture 20 2021-23 300000
2016-17 to
Agriculture 20 2021-23 300000
2016-17 to
Pasture 30 2021-23 450000
Sub Total 1500000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
2016-17 to
-
Bench Terracing 500 72cum/nos 2021-23 685000
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 1325000

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others

1179 | P a g e
2016-17 to
Dry Check dam 5 210mtr 2021-23 371700
Drainage
bunds repair
Sub total
Total 371700
5 Entry Point activities
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities Wise No.
2016-17 to
Sericulture 20 2021-23 300000
2016-17 to
Bee Keeping 20 2021-23 300000
2016-17 to
Poultry 20 2021-23 300000
2016-17 to
Fishry 20 2021-23 300000
Bio fuel Plantation
Others
Sub Total 1200000
10 Monitoring
11 Evaluation
12 Consolidation
13 Administration
Grand Total 21258650

1180 | P a g e
Watershed Development at Koch Atak,Mugli Village, Pate-VII for 300ha.
Comma
nd
Area/
No. Irrigati
Concerned on Period of Estimated
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Cost(Rs in
No. of Block ment Component Activities um) al (ha) n Lac)

Water Harvesting
Structures (Newly to be
1 created)
2016-17 to
Farm Ponds 40 675/nos 100 2021-22 3798000
2016-17 to
Check Dams 10 600mtr 100 2021-23 483300
Nalla bandhs
Percolation
Puchige Other ground water
RD
ko recharge structure
fishry Pond/Cattle 2016-17 to
Ponds 80 675/nos 100 2021-23 24300000
Others
Sub Total 28581300

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000

1181 | P a g e
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 30 2021-23 450000
Sub Total 900000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
2016-17 to
-
Bench Terracing 500 72cum/nos 2021-23 68500
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 100 s 2021-23 800000
Sub total 868500

Vegetative & Engg.


4 Structure
Earthen Checks 15 60mtr 1221300
Brush Wood Checks
Gully plugs
Gabion structures 10 60mtr 2899800
Others
Dry Check dam
Drainage 15 230mtr 1221300
bunds repair
Sub total

1182 | P a g e
Total 1221300
5 Entry Point activities
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities
2016-17 to
Sericulture 5 2021-23 75000
2016-17 to
Bee Keeping 5 2021-23 75000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1050000
10 Monitoring
11 Evaluation
12 Consolidation
13 Administration
Grand Total 32621100
Wat
ersh
ed
Deve
lopm
ent
at
Pitak

1183 | P a g e
Atak,
Lut
Mugl
i,Pat
e-
VIII.3
00ha
Comma
nd
Area/
Irrigatio
Concerned n Period of Estimated
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Cost(Rs in
No. of Block ment Component Activities No. um) al (ha) n Lac)
Water Harvesting
Puchige Structures (Newly to be
1 ko RD created)
2016-17 to
Farm Ponds 30 675/nos 100 2021-22 2848500
2016-17 to
Check Dams 10 600mtr 100 2021-23 483300
Nalla bandhs
Percolation
Other ground water
recharge structure
fishry Pond/Cattle 2016-17 to
Ponds 40 675/nos 100 2021-23 12150000
Others
Sub Total 15481800

2 Land Development

1184 | P a g e
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 100 2021-23 1500000
Sub Total 1950000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
2016-17 to
Bench Terracing 500 72cum/nos - 2021-23 68500
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 100 s 2021-23 800000
Sub total 868500

Vegetative & Engg.


4 Structure
Earthen Checks 15 60mtr 1221300
Brush Wood Checks
Gully plugs
Gabion structures 10 60mtr 2899800
Others

1185 | P a g e
Dry Check dam
Drainage 15 230mtr 1221300
bunds repair
Sub total
Total 1221300
5 Entry Point activities
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities
2016-17 to
Sericulture 5 2021-23 75000
2016-17 to
Bee Keeping 5 2021-23 75000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1050000
10 Monitoring
11 Evaluation
12 Consolidation
13 Administration
Grand Total 20571600

Watershed Development at Marom Rijo, Sikiputu Village.200ha.

1186 | P a g e
Comma
nd
Area/
No. Irrigati
Concerned on Period of Estimated
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Cost(Rs in
No. of Block ment Component Activities um) al (ha) n Lac)

Water Harvesting
Structures (Newly to be
1 created)
675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890
2016-17 to
Nalla bandhs 10 300m/nos 80 2021-22 949500
Percolation
Other ground water
Puchige recharge structure
RD
ko 675 2016-17 to
fishry Pond/Cattle Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000

1187 | P a g e
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
2016-17 to
-
Bench Terracing 200 72cum/nos 2021-23 1972800
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2612800

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total

1188 | P a g e
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities Wise No.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1200000
Total 25497190
10 Monitoring 2% 509944
11 Evaluation 2% 509944
12 Consolidation
13 Administration 3% 764915.7
Grand Total 27281993

Watershed Development at Yager Atak,Mugli Village, Pate-VII for 300ha.

1189 | P a g e
Comma
nd
Area/
N
Irrigatio
o.
Concerned n Period of Estimated
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Cost(Rs in
No. of Block ment Component Activities um) al (ha) n Lac)

Water Harvesting
Structures (Newly to
1 be created)
2016-17 to
Farm Ponds 30 675/nos 100 2021-22 2848500
2016-17 to
Check Dams 20 600mtr 100 2021-23 1933200
Puchige Nalla bandhs
RD
ko Percolation
Other ground water recharge
structure

2016-17 to
fishry Pond/Cattle Ponds 40 675/nos 100 2021-23 12150000
Others

1190 | P a g e
Sub Total 16931700

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 30 2021-23 450000
Sub Total 900000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
50 2016-17 to
-
Bench Terracing 0 72cum/nos 2021-23 68500
Others
Crate Wire
10 100sqm/no 2016-17 to
Land Levelling 0 s 2021-23 800000
Sub total 868500

Vegetative & Engg.


4 Structure
Earthen Checks 15 60mtr 1221300
Brush Wood Checks

1191 | P a g e
Gully plugs
Gabion structures 10 60mtr 2899800
Others
Dry Check dam
Drainage 15 230mtr 1221300
bunds repair
Sub total
Total 1221300
5 Entry Point activities
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro
9 Enter. Activities
2016-17 to
Sericulture 5 2021-23 75000
2016-17 to
Bee Keeping 5 2021-23 75000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1050000
10 Monitoring
11 Evaluation
12 Consolidation
13 Administration
Grand Total 20971500

1192 | P a g e
Watershed Development at Sonio Rijo , Gomko Mugli Village.200ha.
Comma
nd
Area/
N
Irrigatio
o.
Concerned n Period of Estimated
Sr. Name Ministry/Depart Capacity(C Potenti Implementatio Cost(Rs in
No. of Block ment Component Activities um) al (ha) n Lac)
Water Harvesting
Structures (Newly to be
1 created)
675cum/no 2016-17 to
Farm Ponds 30 s 80 2021-22 2848500
2016-17 to
Check Dams 11 30mtr 80 2021-23 1594890
2016-17 to
Nalla bandhs 10 300m/nos 80 2021-22 949500
Puchige Percolation
RD Other ground water recharge
ko
structure
675 2016-17 to
fishry Pond/Cattle Ponds 50 cum/nos 100 2021-23 15187500
Others
Sub Total 20580390

2 Land Development
2016-17 to
Afforestation 10 2021-23 150000

1193 | P a g e
2016-17 to
Horticulture 10 2021-23 150000
2016-17 to
Agriculture 10 2021-23 150000
2016-17 to
Pasture 20 2021-23 300000
Sub Total 750000

Soil and Moisture


3 Conservation
Staggered Trenching
Contour Bunding
Graded Bunding
20 2016-17 to
-
Bench Terracing 0 72cum/nos 2021-23 1972800
Others
Crate Wire
100sqm/no 2016-17 to
Land Levelling 80 s 2021-23 640000
Sub total 2612800

Vegetative & Engg.


4 Structure
Earthen Checks
Brush Wood Checks
Gully plugs
Gabion structures
Others
Dry Check dam

1194 | P a g e
2016-17 to
Drainage 5 200mtr 2021-23 354000
bunds repair
Sub total
Total
5 Entry Point activities 354000
6 DPR
7 I & CB
8 livelihood
Prod. Sys. & Micro N
9 Enter. Activities Wise o.
2016-17 to
Sericulture 10 2021-23 150000
2016-17 to
Bee Keeping 10 2021-23 150000
2016-17 to
Poultry 30 2021-23 450000
2016-17 to
Fishry 30 2021-23 450000
Bio fuel Plantation
Others
Sub Total 1200000
Total 25497190
2
10 Monitoring % 509944
2
11 Evaluation % 509944
12 Consolidation
3
13 Administration % 764915.7
Grand Total 27281993

1195 | P a g e
Siyum DRDA
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Kampong MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond

1196 | P a g e
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire

1197 | P a g e
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15

1198 | P a g e
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal (Pirong MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5

1199 | P a g e
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5

1200 | P a g e
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75

1201 | P a g e
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal (Pirong MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly
SIYUM DRDA to be Created)
17.1 Daporijo Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1202 | P a g e
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19 1.5
18.2 Check Dam 01 109.3 16.7 2.5
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 02 30 2018-19 4.5
II) Horitculture 02 30 4.5
III) Agriculture 03 23 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 08 93 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19 2.0

1203 | P a g e
V) Others
VI) Crate Wire 01 1053.4 10 1.5
VII) Land Leveling
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0

1204 | P a g e
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal (Kampong MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4

1205 | P a g e
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation

1206 | P a g e
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

1207 | P a g e
Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

Sd
Block Development
Officer
C.D.Block :: Siyum

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM

1208 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal (Kampong MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond
Daporijo
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 632 6 2020-21
18.2 Check Dam 01 52.5 8
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL 02 14

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT

1209 | P a g e
I) Afforestation 01 6 2020-21
II) Horitculture 01 12.7
III) Agriculture 01 26
IV) Pasture 01 8
SUB TOTAL 04 52.7
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR

1210 | P a g e
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

DEVELOPMENT BLOCK :: C.D.BLOCK


SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Nyogin MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of

1211 | P a g e
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1212 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam

1213 | P a g e
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM

1214 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal (Nyogin MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1215 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others

1216 | P a g e
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM

1217 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal (Nyogin MWS
Area :1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly
SIYUM DRDA to be Created)
17.1 Daporijo Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19 1.5
18.2 Check Dam 01 109.3 16.7 2.5
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5

1218 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 02 30 2018-19 4.5
II) Horitculture 02 30 4.5
III) Agriculture 03 23 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 08 93 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19 2.0
V) Others
VI) Crate Wire 01 1053.4 10 1.5
VII) Land Leveling
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others

1219 | P a g e
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

1220 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK ::
SIYUM
DEVELOPMENT BLOCK ::

C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal (Nyogin MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of

1221 | P a g e
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1222 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage

1223 | P a g e
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

1224 | P a g e
Sd
Block Development
Officer
C.D.Block :: Siyum

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal (Nyogin MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10

1225 | P a g e
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 632 6 2020-21 0.9
18.2 Check Dam 01 52.5 8 1.2
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds 1.2
Others 1.2
SUB TOTAL 02 14 4.5

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)

1226 | P a g e
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 6 2020-21 0.90
II) Horitculture 01 12.7 1.90
III) Agriculture 01 26 3.87
IV) Pasture 01 8 1.2
SUB TOTAL 04 52.7 7.87
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

1227 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Rai MWS Area :1000 Ha
Cost:Rs150 Lac)

1228 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1229 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders

1230 | P a g e
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

1231 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal (Rai MWS Area :1000 Ha Cost:Rs150
Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10

1232 | P a g e
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1233 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage

1234 | P a g e
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM

1235 | P a g e
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal (Rai MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly
SIYUM DRDA to be Created)
17.1 Daporijo Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19 1.5
18.2 Check Dam 01 109.3 16.7 2.5
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5

1236 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 02 30 2018-19 4.5
II) Horitculture 02 30 4.5
III) Agriculture 03 23 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 08 93 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19 2.0
V) Others
VI) Crate Wire 01 1053.4 10 1.5
VII) Land Leveling
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure

1237 | P a g e
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK ::


SIYUM
1238 | P a g e
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal (Rai MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure

1239 | P a g e
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks

1240 | P a g e
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation

1241 | P a g e
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal (Rai MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond
Daporijo
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 632 6 2020-21

1242 | P a g e
18.2 Check Dam 01 52.5 8
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL 02 14

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 01 6 2020-21
II) Horitculture 01 12.7
III) Agriculture 01 26
IV) Pasture 01 8
SUB TOTAL 04 52.7
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks

1243 | P a g e
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75

1244 | P a g e
Grand Total 22.37

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM

1245 | P a g e
DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Taring MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly
DRDA to be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks

1246 | P a g e
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks

1247 | P a g e
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

1248 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal (Taring MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure

1249 | P a g e
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks

1250 | P a g e
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

1251 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal (Taring MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
17.1 SIYUM DRDA Farm Pond
17.2 Daporijo Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19
18.2 Check Dam 01 109.3 16.7
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7
SUB TOTAL 03 43.4

1252 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 02 30 2018-19 4.5
II) Horitculture 02 30 4.5
III) Agriculture 03 23 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 08 93 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19 2.0
V) Others
VI) Crate Wire 01 1053.4 10 1.5
VII) Land Leveling
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam

1253 | P a g e
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

1254 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK ::
SIYUM
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal (Taring MWS Area :1000
Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4

1255 | P a g e
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing

1256 | P a g e
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping

1257 | P a g e
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

Sd

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal (Taring MWS Area :1000
Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10

1258 | P a g e
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 632 6 2020-21 0.9
18.2 Check Dam 01 52.5 8 1.2
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds 1.2
Others 1.2
SUB TOTAL 02 14 4.5

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)

1259 | P a g e
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 6 2020-21 0.90
II) Horitculture 01 12.7 1.90
III) Agriculture 01 26 3.87
IV) Pasture 01 8 1.2
SUB TOTAL 04 52.7 7.87
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

1260 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

1261 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Bogia MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0

1262 | P a g e
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding

1263 | P a g e
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery

1264 | P a g e
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal ( Bogia MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds

1265 | P a g e
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding

1266 | P a g e
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation

1267 | P a g e
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal ( Bogia MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block

1268 | P a g e
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly
SIYUM DRDA to be Created)
17.1 Daporijo Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19 1.5
18.2 Check Dam 01 109.3 16.7 2.5
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5

1269 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 02 30 2018-19 4.5
II) Horitculture 02 30 4.5
III) Agriculture 03 23 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 08 93 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19 2.0
V) Others
VI) Crate Wire 01 1053.4 10 1.5
VII) Land Leveling
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage

1270 | P a g e
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal ( Bogia MWS Area :1000
Ha Cost:Rs150 Lac)

1271 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

1272 | P a g e
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam

1273 | P a g e
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

1274 | P a g e
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal ( Bogia MWS Area :1000
Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 632 6 2020-21 0.9
18.2 Check Dam 01 52.5 8 1.2
18.3 Nalla Bandhs
18.4 Percolation Tanks

1275 | P a g e
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds 1.2
Others 1.2
SUB TOTAL 02 14 4.5

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 6 2020-21 0.90
II) Horitculture 01 12.7 1.90
III) Agriculture 01 26 3.87
IV) Pasture 01 8 1.2
SUB TOTAL 04 52.7 7.87
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL

1276 | P a g e
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring

1277 | P a g e
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Kajiring MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 1 843 8 2016-17 1.2
17.2 Check Dam 1 105 16 2016-17 2.4
17.3 Nalla Bandhs
17.4 Percolation Tanks

1278 | P a g e
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-17 1.2
Others 1.2
SUB TOTAL 03 32 6.0
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 1 10 2016-17 1.5
II) Horitculture 1 8 2016-17 1.5
III) Agriculture 1 8 2016-17 1.2
IV) Pasture 1 7 2016-17 1.05

1279 | P a g e
SUB TOTAL 04 33 5.25
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5

1280 | P a g e
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal (Kajiring MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond 01 1053.4 10 2017-18
Daporijo
17.2 Check Dam 01 109.3 16.7

1281 | P a g e
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7
SUB TOTAL 03 43.4
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 01 30 2017-18
II) Horitculture 01 23.3
III) Agriculture 01 23.3
IV) Pasture 01 10
SUB TOTAL 04 86.6
18.7(B) Soil & Moisture Conservation

1282 | P a g e
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13
SUB TOTAL 02 23
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery

1283 | P a g e
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal (Kajiring MWS
Area :1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
17.1 SIYUM DRDA Farm Pond
17.2 Daporijo Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds

1284 | P a g e
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19
18.2 Check Dam 01 109.3 16.7
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7
SUB TOTAL 03 43.4

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 02 30 2018-19
II) Horitculture 02 30
III) Agriculture 03 23
IV) Pasture 01 10
SUB TOTAL 08 93
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19
V) Others
VI) Crate Wire 01 1053.4 10
VII) Land Leveling
SUB TOTAL 02 23

1285 | P a g e
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75

1286 | P a g e
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal (Kajiring MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond 01 1053.4 10 2019-20
Daporijo
17.2 Check Dam 01 52.5 8
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10

1287 | P a g e
MIC 01 843 8
SUB TOTAL 04 36
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 01 8.5 2019-20
II) Horitculture 01 18
III) Agriculture 01 11
IV) Pasture 01 9.3
SUB TOTAL 04 46.8
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling

1288 | P a g e
SUB TOTAL
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5

1289 | P a g e
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal (Kajiring MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond
Daporijo
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds

1290 | P a g e
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 632 6 2020-21
18.2 Check Dam 01 52.5 8
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL 02 14

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 01 6 2020-21
II) Horitculture 01 12.7
III) Agriculture 01 26
IV) Pasture 01 8
SUB TOTAL 04 52.7
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire

1291 | P a g e
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25

1292 | P a g e
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK
SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (New) 2016-17 New Proposal ( Bogia MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9
Water Harvesting Structures
17 (Newly to be Created)
DRDA
17.1 SIYUM Farm Pond 1 843 8 2016-1
Daporijo
17.2 Check Dam 1 105 16 2016-1

1293 | P a g e
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds 1 825 8 2016-1
Others
SUB TOTAL 03 32
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 1 10 2016-1
II) Horitculture 1 8 2016-1
III) Agriculture 1 8 2016-1
IV) Pasture 1 7 2016-1
SUB TOTAL 04 33
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching

1294 | P a g e
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities Local Hut/Transit Camp/R/o 02 40 2016-17 6.0


water supply
18.7(D) DPR 1.5
18.7(E) I&CB 03 4.5
18.7(F) Livelihood Poultry 01 1.5
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery

1295 | P a g e
Biofuel Plantation
Upgradation of local 1.5
cattle/mithun
Sub Total 06 15
18.7(H) Monitoring 0.45
18.7(I) Evaluation 0.30
18.7(J) Consolidation
18.7(K) Administration 3.0
Sub Total 3.75
Total 30

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK :: C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY 2017-18 New Proposal ( Bogia MWS Area :1000 Ha
Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2017-18 1.5
17.2 Check Dam 01 109.3 16.7 2.5
17.3 Nalla Bandhs

1296 | P a g e
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7 2.5
SUB TOTAL 03 43.4 6.5
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 30 2017-18 4.5

1297 | P a g e
II) Horitculture 01 23.3 3.5
III) Agriculture 01 23.3 3.5
IV) Pasture 01 10 1.5
SUB TOTAL 04 86.6 14.0
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1053.4 10 2017-18 1.5
V) Others
VI) Crate Wire
VII) Land Leveling 01 1405 13 2.0
SUB TOTAL 02 23 3.5
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR

1298 | P a g e
18.7(E) I&CB 02 2017-18 1.5
18.7(F) Livelihood Poultry/Piggery 02 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 3.75
Mithun/cattle
Sub Total 9.0
18.7(H) Monitoring 0.75
18.7(I) Evaluation 0.75
18.7(J) Consolidation
18.7(K) Administration 3.75
Sub Total 5.25
Grand Total 38.25

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM


DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2018-19 New Proposal ( Bogia MWS Area
:1000 Ha Cost:Rs150 Lac)
SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
1. 2 3 4 5 6 7 8 9

1299 | P a g e
Water Harvesting Structures
17 (Newly to be Created)
17.1 SIYUM DRDA Farm Pond
17.2 Daporijo Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting Structures
18 (To be Renovated)
18.1 Farm Pond 01 1053.4 10 2018-19
18.2 Check Dam 01 109.3 16.7
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge structure
18.6 FisheryPonds/Cattle Ponds
MIC 01 1756 16.7
SUB TOTAL 03 43.4

SL.NO. Name of Concerned Component Activity Wise No Capacity Command Area/ Period o
Block Department (Cum) Irrigation Potential Impleme
(HA)
18.7(A) LAND DEVELOPMENT
I) Afforestation 02 30 2018-19

1300 | P a g e
II) Horitculture 02 30
III) Agriculture 03 23
IV) Pasture 01 10
SUB TOTAL 08 93
18.7(B) Soil & Moisture Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing 01 1405 13 2018-19
V) Others
VI) Crate Wire 01 1053.4 10
VII) Land Leveling
SUB TOTAL 02 23
18.7(B) Vegetative & Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL
TOTAL

18,7© Entry Point Activities

1301 | P a g e
18.7(D) DPR
18.7(E) I&CB 01 2018-19 1.5
18.7(F) Livelihood 01 3.75
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local mithun 01 3.75
Sub Total 03 9.0
18.7(H) Monitoring 01 0.75
18.7(I) Evaluation 01 0.75
18.7(J) Consolidation
18.7(K) Administration 02 3.75
Sub Total 04 5.25
Grand Total 38.25
OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK ::
SIYUM
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2019-20 New Proposal ( Bogia MWS Area :1000
Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10

1302 | P a g e
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond 01 1053.4 10 2019-20 1.5
17.2 Check Dam 01 52.5 8 1.2
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds 01 1053.4 10 1.5
MIC 01 843 8 1.2
SUB TOTAL 04 36 5.4
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond
18.2 Check Dam
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure
18.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)

1303 | P a g e
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 8.5 2019-20 1.28
II) Horitculture 01 18 2.7
III) Agriculture 01 11 1.6
IV) Pasture 01 9.3 1.4
SUB TOTAL 04 46.8 6.98
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

1304 | P a g e
18,7© Entry Point Activities
18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood 01 2019-20 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter. Sericulture

Bee Keeping
Poultry 1.5
Fishery
Biofuel Plantation
Upgradation of Mithun/Cattle 01 1.5
Sub Total 02 5.25
18.7(H) Monitoring 0.30
18.7(I) Evaluation 0.45
18.7(J) Consolidation
18.7(K) Administration 2.25
Sub Total 3.0
Grand Total 20.63

OFFICE OF THE BLOCK DEVELOPMENT OFFICER C.D.BLOCK :: SIYUM

1305 | P a g e
DEVELOPMENT BLOCK ::
C.D.BLOCK SIYUM
DISTRICT IRRIGATION PLAN UNDER PMKSY (IWMP) 2020-21 New Proposal ( Bogia MWS Area :1000
Ha Cost:Rs150 Lac)
SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Block Department (Cum) Area/ Implementation of
Irrigation Cost(Rs
Potential in Lac)
(HA)
1. 2 3 4 5 6 7 8 9 10
Water Harvesting
17 Structures (Newly to
DRDA be Created)
SIYUM Daporijo
17.1 Farm Pond
17.2 Check Dam
17.3 Nalla Bandhs
17.4 Percolation Tanks
17.5 Other ground water recharge
structure
17.6 FisheryPonds/Cattle Ponds
Others
SUB TOTAL
Water Harvesting
18 Structures (To be
Renovated)
18.1 Farm Pond 01 632 6 2020-21 0.9
18.2 Check Dam 01 52.5 8 1.2
18.3 Nalla Bandhs
18.4 Percolation Tanks
18.5 Other ground water recharge
structure

1306 | P a g e
18.6 FisheryPonds/Cattle Ponds 1.2
Others 1.2
SUB TOTAL 02 14 4.5

SL.NO. Name Concerned Component Activity Wise No Capacity Command Period of Estimates
of Department (Cum) Area/ Implementation of
Block Irrigation Cost(Rs
Potential in Lac)
(HA)
18.7(A) LAND
DEVELOPMENT
I) Afforestation 01 6 2020-21 0.90
II) Horitculture 01 12.7 1.90
III) Agriculture 01 26 3.87
IV) Pasture 01 8 1.2
SUB TOTAL 04 52.7 7.87
18.7(B) Soil & Moisture
Conservation
I) Staggered Trenching
II) Contour Bunding
III) Graded Bunding
IV) Bench Terracing
V) Others
VI) Crate Wire
VII) Land Leveling
SUB TOTAL
18.7(B) Vegetative &
Engg,Structure
VII) Earthen Checks
IX) Brush Wood Checks
X)) Gully Plugs

1307 | P a g e
XI) Loose Boulders
XII) Gabion Structure
XIV) Others
XV) Dry Check Dam
XVI) Drainage
Bunds Repair
SUB TOTAL

18,7© Entry Point Activities


18.7(D) DPR
18.7(E) I&CB
18.7(F) Livelihood poultry 01 2020-21 2.25
18.7(G) Activities -Wise
Prod. Sys & Micro Enter.
Sericulture
Bee Keeping
Poultry
Fishery
Biofuel Plantation
Upgradation of local 01 3.0
mithun/cattle
Sub Total 5.25
18.7(H) Monitoring
18.7(I) Evaluation
18.7(J) Consolidation 01 4.5
18.7(K) Administration 01 2.25
Sub Total 04 6.75
Grand Total 22.37

1308 | P a g e
Project Profile of Newly Proposed IWMP/PMKSY to be included in District Irrigation
Plan(DIP) against CD Block Siyum
The newly proposed IWMP project covering Kampong,Nyogin,Taring,Kicherai,Bogia,Kajiring and Pirong Village.Being Hilly
and terrain these areas are prone to landslide during rainy season hence needs to protect for many reasons and thereby
improve earning of poor villagers.
Project wise Profile of the selected watershed project
Sl.No Villages Areas of Areas Total
Name Census Panchayat Block District Project proposed to Project
Code in Ha be treated Cost in Rs PIA
in Ha in Lac
1. Kampong 262878 Kampong 10000 1000 150
Yorbe
C.D.Block Siyum

Upper Subansiri
2. Nyogin 262880 Kampong District. A.P. 5000 1000 150

Development
Officer Siyum
Yorbe

Block
3. Taring 262879 Kampong 3230 1000 150
Yorbe
4. KicheRai 262881 Jingba Yorbe 4300 1000 150
5. Bogia 262869 Bogia Yorbe 3500 1000 150
1309 | P a g e
6. Kajiring 262870 Bogia Yorbe 3250 1000 150
7. Piromg 262872 Bogia Yorbe 5300 1000 150
Total 34580 7000 10500

PROJECT PROFILE
PMKSY/IWMP UNDER THE DEPARTMENT OF RURALDEVELOPMENT OF C.D.BLOCK:SIYUM

1. IWMP-VIII ( EKKE MWS)


AREAS :-1100 Ha
Profile Village : Ekke
Fund not received : RS 49.5 Lac
Project started During 2010-11
2. IWMP-VIII ( PAPI-DAPO MWS )
AREAS :-1073 Ha
Profile Village :- 1073 Ha
Fund not received :- Rs 48 Lac
Project started During 2010-11
3. IWMP-XIV ( PAPI-DAPO MWS)
AREAS:-2000Ha
Profile Village :-Papi,.Dingdopa
Fund not received:-Rs 204 Lac
Project started During 2010-11
4. IWMP-XXVII (MOSU MWS)
AREAS :-1100 Ha
Profile Village : Ekke
Fund not received : RS 49.5 Lac
Project started During 2010-11
5. IWMP-XXVII (Dagu MWS)

1310 | P a g e
AREAS :-1000 Ha
Profile Village : Mosu,Sarta
Fund not received : RS 120 Lac
Project started During 2012-13
6. IWMP-XXVII (Jingba Rai MWS)
AREAS :-1000 Ha
Profile Village : Jingba Rai
Fund not received : RS 120 Lac
Project started During 2012-13
7. IWMP-XXVII (Hatte MWS)
AREAS :-1000 Ha
Profile Village : Hatte
Fund not received : RS 120 Lac
Project started During 2012-13
8. IWMP-XXXVI (Byamer MWS)
AREAS :-1000 Ha
Profile Village : Byamer
Fund not received : RS 120 Lac
Project started During 2012-13

9. IWMP-XXXVI (Takiongporing MWS)


AREAS :-1000 Ha
Profile Village : Takiongporing,Kawngring
Fund not received : RS 120 Lac
Project started During 2012-13
10. IWMP-XXXVI (Row MWS)
AREAS :-1000 Ha
Profile Village : Row,Pagring
Fund not received : RS 120 Lac

1311 | P a g e
Project started During 2012-13
11. IWMP-XXXVI (Janering MWS)
AREAS :-1000 Ha
Profile Village : Janering
Fund not received : RS 120 Lac
Project started During 2012-13
12. IWMP-XXXVI (Ketha MWS)
AREAS :-1000 Ha
Profile Village : Ketha
Fund not received : RS 120 Lac
Project started During 2012-13

Taliha DRDA
Name of Concerned Component Activities-wise No. Capacity Command Period of Estimate
Block Ministry/ (cum) Area/Irrigatio Implementatio d Cost
Department n Potential n (Rs in
(ha) lac)
Taliha Water Harvesting Structures (Newly to be created)

1312 | P a g e
12.00
Farm Ponds 0 14730.000 45.000 0.000 168.000
45.00
Check Dams 0 3644.000 331.000 0.000 857.500
22.00
Nalla Bandhs 0 28595.000 135.000 0.000 370.000
Percolation Tanks 4.000 1524.000 0.000 0.000 46.000
Other ground
water recharge
structure 0.000 0.000 0.000 0.000 0.000
Fishry Pond/Cattel 72.00 518881.00
Ponds 0 0 2000.000 0.000 843.000
Others M/P 56.00 302211.00
District 0 0 6323.000 0.000 905.000
Watershed Sub Total 211 869585 8834 0 3189.500
Development Water Harvesting Structures ( to be Renovated)
Agency, Farm Ponds 0.000 0.000 0.000 0.000 10.000
Taleha at
Check Dams 0.000 0.000 0.000 0.000 0.000
Dharamshal
a (MoRD) Nalla Bandhs 7.000 29272.000 104.000 0.000 93.800
Percolation Tanks 1.000 400.000 2.000 0.000 25.000
Other ground
water recharge
structure 0.000 0.000 0.000 0.000 0.000
Fishry Pond/Cattel 14.00
Ponds 0 17200.000 20.000 0.000 52.000
Others 3.000 23000.000 20.000 0.000 44.000
Sub Total 25 69872 146 0 224.80
Land Development
48.00
Afforestation 0 0.000 1912.000 0.000 960.000
56.00
Horticulture 0 0.000 1223.000 0.000 850.000

1313 | P a g e
49.00
Agriculture 0 0.000 1236.000 0.000 852.000
36.00
Pasture 0 0.000 245.000 0.000 541.000
Sub Total 189 0 4616 0 3203.00
Soil & Moisture Conservation
Staggered 10.00
Trenching 0 0.000 2.000 0.000 30.000
Contour Bunding 1.000 24.000 3.000 0.000 7.000
Graded Bunding 0.000 0.000 0.000 0.000 0.000
68.00
Bench terrracing 0 0.000 603.000 0.000 837.000
Others 0.000 0.000 0.000 0.000 0.000
Crate Wire 2.000 0.000 10.000 0.000 20.000
11.00
Land leveling 0 0.000 36.000 0.000 135.000
Sub Total 92 24 654 0 1029.000
Name of Concerned Component Activities-wise No. Capacity Command Period of Estimate
Block Ministry/ (cum) Area/Irrigatio Implementatio d Cost
Department n Potential n (Rs in
(ha) lac)
Vegetative & Engg. Structure
Earthen Checks 0.000 0.000 0.000 0.000 0.000
District Brush Wood
Watershed Checks 0.000 0.000 0.000 0.000 0.000
Development Gully plugs 0.000 0.000 0.000 0.000 0.000
Taliha Agency, Loose boulders 4.000 0.000 4.000 0.000 26.000
Taleha at Gabion structures 4.000 25.000 0.000 0.000 15.200
Dharamshal 50.00
a (MoRD) Others R/Well 0 0.000 314.000 0.000 885.000
Dry check dam 0.000 0.000 0.000 0.000 0.000
Drainage 8.000 250.000 16.000 0.000 90.000

1314 | P a g e
Bunds repair 0.000 0.000 0.000 0.000 0.000
Sub Total 66.00 275.00 334.00 0.00 1016.20
Total 583 939756 14584 0 8662.50
Entry Point Activities 0.000 0.000 0.000 0.000 279.500
DPR 0.000 0.000 0.000 0.000 136.000
I & CB 7.000 2.000 0.000 0.000 377.000
24.00
Livelihood 0 0.000 0.000 0.000 1180.000
No. Beneficiarie -
Activities-wise s
Sericulutre 0.000 0.000 0.000 0.000 10.000
Bee Keeping 0.000 0.000 0.000 0.000 30.000
71.00
Prod. Sys. & Mirco Poultry 0 0.000 3.000 0.000 962.650
Enter. 65.00
Fishry 0 0.000 42.000 0.000 692.000
Bio fuel Plantation 0.000 0.000 0.000 0.000 50.000
11.00
Others 0 20.000 0.000 0.000 1900.000
Sub Total 147 20 45 0 3644.650
Monitoring 0.000 0.000 0.000 0.000 0.000
Evaluation 0.000 0.000 0.000 0.000 0.000
Consolidation 0.000 0.000 0.000 0.000 0.000
Administration 0.000 0.000 0.000 0.000 0.000
761 939778 14629 0 14279.65
Grand Total 0
Ongoing Treatment Estimated Cost (Rs in
Schemes Area lac)
IWMP-XXVIII 5600 840
IWMP-XXXIII 1600 288.525
IWMP-XXXIV 2400 432.785

1315 | P a g e
IWMP-XX 3680 449.19
IWMP-XIII 1600 223.4385
IWMP-VII 800 213.92
IWMP-XXXIX 2500 825
IWMP-XXIX 800 192
IWMP-XV 2720 325.92
IWMP-XVI 4800 653.94
Total 26500.00 4444.72 0.00

SAVE WATER SAVE FUTURE

********

1316 | P a g e

You might also like