AON Diagram
BSCE 4 OVF
0 8 8 16 16 23 23 32
E J G F
8 8 7 9
2 10 10 18 18 25 25 34
Activity Immediately
10 14 14 20 20 25
Activity Code Preceding Following Duration (days)
D P,R None 8 T N P
B L R,W 6 4 6 5
G J F 7
19 23 23 29 29 34 34 42
L M B 8
T M N 4 D
E None J 8 8
C A S 8 24 34
34 42
S C,W None 10 R
A M C 8
10
W B S 8
0 10 10 18 18 24
J E G 8 24 34
F G None 9 M L B
N T P 6 8 6
10
M None T, L, A 10 24 32
0 10 10 18 18 24
P N D 5
W
R B D 10
8
24 32
A C S
8 8 10
16 24 24 32 32 42
CRITICAL ACTIVITIES
SANTOS, Christine Mae P.
BSCE 4 OVF
T M N 4 T
L M B 8 L
A M C 8 A
N T P 6 N
B L R,W 6 B
C A S 8 C
P N D 5 P
R B D 10 R
D P,R None 8 D
W B S 8 W
S C,W None 10 S
SANTOS, Christine Mae P.
BSCE 4 OVF
DURATION: 42 DAYS
100
Percent ( % ) Accomplishment
90
80
70
60
50
40
30
20
10
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Duration (day s)
SANTOS, Christine Mae P.
BSCE 4 OVF
DAYS PLANNED ACCOMPLISHMENT
S-CURVE VALUE
X Y
1 2.38 0.11
2 4.76 0.45
3 7.14 1.02
4 9.52 1.81
5 11.90 2.83
6 14.29 4.08
7 16.67 5.56
8 19.05 7.26
9 21.43 9.18
10 23.81 11.34
11 26.19 13.72
12 28.57 16.33
13 30.95 19.16
14 33.33 22.22
15 35.71 25.51
16 38.10 29.02
17 40.48 32.77
18 42.86 36.73
19 45.24 40.93
20 47.62 45.35
21 50.00 50.00
22 52.38 54.65
23 54.76 59.07
24 57.14 63.27
25 59.52 67.23
26 61.90 70.98
27 64.29 74.49 Variance from a normal S-curve (± slippage)
28 66.67 77.78
29 69.05 80.84
30 71.43 83.67
31 73.81 86.28
32 76.19 88.66 Days Lapsed Target Performance (%) Actual Performance (%) Variance (± slippage)
33 78.57 90.82
10 11.34 23 11.66
34 80.95 92.74
35 83.33 94.44 25 67.23 55 -12.23
36 85.71 95.92
35 94.44 75 -19.44
37 88.10 97.17
38 90.48 98.19 40 99.55 89 -10.55
39 92.86 98.98
40 95.24 99.55
41 97.62 99.89
42 100.00 100.00
SANTOS, Christine Mae P.
BSCE 4 OVF
Instruction:
1. Draw the Time Grid Diagram (all critical activities must align along the same horizontal line).
2. What is the minimum cost necessary to reduce project duration by 2 days?
3. What is the total project cost as a result of this reduction? Assume indirect cost is P3000 per day.
4. After a lapse of 20 days, you are directed by the Project owner to implement a crash program to accelerate project completion by 2 days.
What is the additional minimum cost necessary to accomplish this objective (assume no changes in duration and costs of remaining activities).
BSCE 4 OVF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
E J G F
T N P
M L B R D
W S
A C
SANTOS, Christine Mae P.
BSCE 4 OVF
Activity to Crash Crash Duration Cost Slope per Day (Php) Total Cost
M 2 1200 ₱2,400.00
Therefore, the minimum cost necessary to reduce project duration by 2 days is 2,400 php.
3. What is the total project cost as a result of this reduction? Assume indirect cost is P3000 per day.
Activity to Crash Crash Duration Cost Slope per Day (Php) Total Cost
M 2 ₱1,200.00 ₱2,400.00
Total Normal Cost ₱335,600.00
TOTAL COST ₱338,000.00
Indirect Cost per Day 2 ₱3,000.00 ₱6,000.00
TOTAL PROJECT COST DUE TO REDUCTION: ₱332,000.00
Therefore, the total project cost as a result of this reduction is 332, 000 php.
4. After a lapse of 20 days, you are directed by the Project owner to implement a crash program to accelerate project completion by 2 days.
What is the additional minimum cost necessary to accomplish this objective (assume no changes in duration and costs of remaining activities).
Activity to Crash Crash Duration Cost Slope per Day (Php) Total Cost
S 2 1400 ₱2,800.00
R 2 1800 ₱3,600.00
ADDITIONAL MINIMUM COST NECESSARY ₱6,400.00
Therefore, the additional minimum cost necessary to accomplish the objective is 6, 400 php.