JGC JOB No. 0-6037-21 KBR JOB No. F034 CHIYODA JOB No. 11051
SHEET 1 OF 56
D R A
IN
30-O
C T - 2 013
FORM EPC-1 5
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 2 of 56
Contents
1. INTRODUCTION............................................................................................... 4
1.1 Purpose ............................................................................................................. 4
1.2 Scope ................................................................................................................ 4
1.3 Definitions ......................................................................................................... 4
1.4 Applicable Specifications and Standards .......................................................... 5
1.5 Abbreviations .................................................................................................... 6
2. COMMISSIONING PROCESS.......................................................................... 8
2.1 Care, Control and Custody ................................................................................ 9
2.2 Pre-Commissioning ......................................................................................... 10
2.3 Commissioning Testing ................................................................................... 11
2.4 Operational Testing ......................................................................................... 12
2.5 Temporary Utilities for Commissioning and Operational Testing .................... 13
2.6 Ready for Start-Up .......................................................................................... 15
2.7 Handover Certificate ....................................................................................... 15
2.8 Start-up Procedures ........................................................................................ 15
2.9 Performance Test ............................................................................................ 15
3. GENERAL REQUIREMENT ........................................................................... 16
3.1 Deliverables during Home Office Engineering ................................................ 16
3.2 Pre-Commissioning ......................................................................................... 16
3.3 Commissioning ................................................................................................ 17
4. COMMISSIONING ORGANISATION AT DARWIN SITE............................... 17
4.1 Organisation .................................................................................................... 17
4.2 Manning Chart ................................................................................................. 17
4.3 Vendor Service Man Mobilisation .................................................................... 17
5. COMMISSIONING/ MODULE FABRICATION/ DARWIN
CONSTRUCTION INTERFACE...................................................................... 17
6. PROGRESS TRACKING & RECORDING DATABASE ................................ 18
6.1 Completion Management System ................................................................... 18
6.2 Information Management ................................................................................ 18
7. INVOLVEMENT OF COMPANY OPERATIONS START-UP TEAM.............. 18
8. PERMIT-TO-WORK (PTW) SYSTEM............................................................. 19
8.1 Construction Permits (Pre-Start-Up) ............................................................... 19
8.2 Commissioning Permits .................................................................................. 19
9. SIMOPS & HYDROCARBON INDTRODUCTION.......................................... 20
10. SEPARABLE PORTION HANDOVER TO COMPANY.................................. 20
11. RIGHT FIRST TIME ........................................................................................ 21
11.1 RFT Objective Areas ....................................................................................... 21
11.2 RFT Key Element Steps .................................................................................. 21
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 3 of 56
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 4 of 56
1. INTRODUCTION
1.1 Purpose
The purpose of this document is to present the basic strategy for the site commissioning
activities and the handover of completed facilities to COMPANY.
1.2 Scope
This document is a plan, not a procedure, and should be reviewed as such.
This document addresses commissioning and handover activities at Site. Activities in
the fabrication yards will be addressed in a separate document.
1.3 Definitions
Agreement Contract with Articles and Annexes
Company INPEX Operations Australia Pty Ltd
Company Items Equipment and materials supplied to Contractor by
Company
Construction Everything necessary for the Works but not incorporated in
Equipment the Plant
Contractor JKC Australia LNG Pty Ltd
Contractor Items Everything to be incorporated into the Plant
Deliverables All documents by Contractor necessary for the Works
Design Dossier FEED Package
Final Documentation As-built documents, certificates, manuals and the like
Ichthys Project The Ichthys Gas Field Development Project
Project Gateway Web system to communicate business opportunities and to
register suppliers
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 5 of 56
1.5 Abbreviations
AIP Australian Industry Participation
AQIS Australian Quarantine Inspections Services
ATSI Aboriginal and Torres Strait Islander
EIS Environmental Impact Statement
EPC Engineering, Procurement and Construction
EPBS Enhanced Project By-law Scheme
HR Human Resources
IR Industrial Relations
ITP Inspection and Test Plan
IVB Independent Validation Body
NTG Northern Territory Government
ICNNT Industry Capability Network (NT)
POC Perth Operations Centre
PEC Production Engineering Centre
TCO Tariff Concession Order
TOC Tsurumi Operations Centre
YOC Yokohama Operations Centre
DOC Darwin Operations Centre
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 7 of 56
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 8 of 56
2. COMMISSIONING PROCESS
The Commissioning process is a series of plant verification activities which are required
before operation of any systems or introduction of hydrocarbons to processing facilities.
The Commissioning process ensures that all equipment is installed and operates as per
design and meets functional intent. These verification activities include the last critical
review of the design before achieving a state of Ready for Start Up (RFSU)
The checking and testing of the facilities is, by necessity a detailed and complex
process which needs to be planned and managed in a manner that ensures safety and
efficiency while providing transparency and auditability. Commissioning execution is
fundamentally managed and driven by a systems based approach whereby the plant is
broken into small manageable sections which can be checked and tested independently
of other sections of the plant.
The commissioning process can be viewed as a series of stages and gates. Each stage
consists of specific checks and tests which must be completed prior to moving to the
next stage. The completion of all checks and tests results in the issue and acceptance
of a specific document certifying the completion of the stage. These documents can be
considered as gates which must be passed in order to move to the next stage.
DR20A
To enable the efficient use of resources and to allow commissioning testing to be
commenced while construction is still ongoing on nearby equipment, commissioning
IN
30-O
13
CT-
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 9 of 56
The Commissioning process requires effective and efficient planning and execution to
ensure a successful project handover including:
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 10 of 56
2.2 Pre-Commissioning
Precommissioning, abbreviated and quoted as PC, is the last major activity and
milestone achieved by construction. Precommissioning includes all necessary
installation and fabrication checks to prove equipment has been constructed and
installed correctly and in accordance with drawings, specifications, applicable statutory
codes and practices.
Precommissioning includes all necessary documentation, certification, verification and
checks prior to declaring the system Ready for Commissioning.
Pre-Commissioning checks are assigned by completions in consultation with
Commissioning and Construction and are compiled by Functional System.
Pre-Commissioning checks are single discipline and non-energised / non pressurised,
except for strength testing and insulation testing.
Pre-Commissioning checks are performed by construction and witnessed by
Commissioning as required to ensure a high degree of confidence in the process and
facilitate simple and seamless handover.
Pre-Commissioning checks are of two types, Inspection Check Records which have
results recorded and Inspection Check Lists which do not record results. Completions,
in consultation with construction and Commissioning will assign Inspection Test Lists
and Inspection Check Records as required depending on the tag type and checks
required.
The Pre-Commissioning schedule is developed by Functional System to reflect the
Commissioning schedule and becomes an integral part of completions planning and
reporting. The completions schedule forms part of and is integrated into the overall
project schedule. Pre-Commissioning Inspection Check Records will be compiled by
Functional System into Dossiers. The content of PC Dossiers shall be as per
L290-AR-PLN-10011, System completion execution plan.
DR20A
2.2.3 Hazardous Area Certification (Ex Checks)
IN
30-O
13
CT-
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 11 of 56
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 12 of 56
Commissioning Inspection Test Records will be compiled with all other commissioning
records by Functional System into Commissioning dossiers. The content of
Commissioning dossiers shall be as per L290-AR-PLN-10011, System Completion
Execution Plan.
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 13 of 56
IN DT-
RA
2 0 1 3
individual temporary diesel generator installed nearby each LER/LIR building. The
C
30-O
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 14 of 56
temporary power will be distributed through the temporary distribution board and
necessary temporary cablings which are prepared by AG&P Module Yard and delivered
to Darwin-site together with LER/LIR module. For Utility LER and Utilities Annex LER,
temporary diesel generators will be installed near the LER’s to supply power for Motor
No Load Run Test and required Mechanical Run-in Test.
(2) Stage-2 Supply Scheme
Purpose of Stage-2 temporary power distribution is mainly for Motor No Load Run Test
and required Mechanical Run-in Test at Train-2.
Power supply of other than Train-2 process LERs will be switched-over LER by LER to
permanent EDG distribution scheme once after the permanent EDG and associated
downstream distribution scheme were commissioned and became ready for use (i.e.,
Project Month 39).
In order to maximise the use of permanent EDG supply for commissioning purpose,
temporary bypass (i.e., jumper wire) will be used to allow simultaneous closure of
Normal and Emergency 400V switchgear tie-circuit breaker and Emergency 400V
Switchgear Incomer breaker. The bypass wire shall be removed prior to the permanent
GTG supply is fed to the Normal 400V Switchgear.
Train-2 permanent EDG distribution cannot feed the Train-2 Normal 400V Switchgears
due to a number of split normal switchgear distributions. In order to commence the
Motor No Load Run Test and critical part of Mechanical Run-in Test in Train-2 area,
larger size temporary diesel generators will be installed in Stage-2 period. Tie-in point of
the larger temporary generators will be equipped spare feeder circuit of Train-2 LER
6.6kV Switchgears.
Refer to Attachment-7 “Temporary Diesel Generator Mobilization Plan” and
Attachment-8 “Temporary electrical power distribution scheme for Stage-1 and
Stage-2”.
A 6.6kV Temporary Diesel Generator will be mobilised and connected to the emergency
6.6kV switchboard (in Main Substation) instead of one of the permanent Emergency
Diesel Generators. This temporary generator will be operated in lieu of the permanent
Emergency Diesel Generators when the total power demand is very low in order to
avoid light load operation of the permanent generators.
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 15 of 56
Temporary vents will not be used for early Utility area Commissioning in current plan.
Warm Flare will be used for initial venting of nitrogen from Gas Export Pipeline.
However, dispersion studies for the utilisation of Temporary Vents have been carried
out and confirmed that it’s safe.
A
IN0-OCTR
D 2.9 Performance Test
-2013
3
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 16 of 56
Once the plant is running and stable, output will be increased to the design nameplate
value which will be held for a predetermined period to prove the facility can perform to
the nameplate rating.
A set of performance testing procedures will be developed by CONTRACTOR with the
support of their VENDORS and Licensors outlining the steps to be taken and testing to
be performed to prove to COMPANY’s satisfaction the performance of the plant. All
readings recorded and testing performed shall be detailed in the performance testing
procedures. All recordings taken, and results of tests performed during performance
testing shall be recorded in the relevant performance testing procedure.
Upon completion of Performance Testing all utility and process systems will have been
tested and proven to perform to design intent and manufacturers specifications. The
ability of each system and system component to meet COMPANY acceptance criteria
will have been demonstrated by the conclusion of Performance Testing.
3. GENERAL REQUIREMENT
Like any project, a major key to successful field execution is the relationship between
the Construction and Commissioning teams – during the home office EPC period, the
fabrication yard activities and, finally, the site erection phase. Although Commissioning
is Construction’s “customer”, both of these field execution groups must have the same
objective – a smooth start-up leading to continuous commercial operation and a
satisfied client.
3.2 Pre-Commissioning
Executing Pre-Commissioning tasks will involve one or more of the following
methodologies:
water-flushing
air-blowing
mechanical cleaning
chemical cleaning
steam-blowing
The responsibility for a “clean-build” fabrication and construction approach rests with the
Construction group. It is CONTRACTOR’s intention to maximise the amount of
pre-commissioning work that is performed in the fabrication yards or supplier shops and
CONTRACTOR will assign Commissioning personnel to witness for these activities.
Philosophy for pre-commissioning in the fabrication yards is shown in
L290-AB-PLN-0151, CONSTRUCTION AND PRECOMMISSIONING EXECUTION
FOR MODULE FABRICATION.
That said, however, it has to be recognised that there are certain pre-commissioning
activities that require the major portions of the system to be physically connected and
essentially construction-complete, e.g.:
A
INDTR
degreasing and water circulation within the AGRU unit
-2013
C
30-O
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 17 of 56
3.3 Commissioning
Commissioning is the phase of a project in which the facilities transition from an erected
(or partially construction-complete) status to an operational status. Commissioning
focuses on “subsystems” rather than geographical areas; on the place of each system
in the overall process; and the bringing of each subsystem to an “operational readiness”
condition in a logic-based sequence that aligns with the start-up sequence for the
complex.
Block commissioning & start up sequences, one for utility including CCPP and the other
for LNG train, have been developed.
These block sequences are showing:
Interaction among units during commissioning & start up phases
Major milestones of commissioning & start up
These sequences will be the basis of Commissioning & Start up Schedule.
Refer to Block Sequence of Commissioning and Start up in Attachment 2.
4.1 Organisation
As required, experienced commissioning personnel will be mobilised to the appropriate
Engineering Centre to assist with the development of deliverables. Refer to
Organisation Chart showing Commissioning Reporting System, in Attachment 3.
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 18 of 56
Work demarcation matrix plan showing the split of works between commissioning,
module fabrication and Darwin construction has been developed and will be updated as
required. Basic philosophy of this plan is to minimise the workforce at Darwin site.
Refer to CONTRACTOR Document L290-AR-PLN-0002, Commissioning/ Module
Fabrication/ Darwin Construction work demarcation plan.
Work Demarcation Plan for Building in Attachment 6 shows the basic strategy for
Building (LER/ Substation) Commissioning.
A
INDTR
7. INVOLVEMENT OF COMPANY OPERATIONS START-UP TEAM
-2013
C
30-O
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 19 of 56
To assist in the seamless handover of systems and to provide full buy-in to the
completions and commissioning process, a COMPANY Commissioning group has been
established to work with the CONTRACTOR Commissioning team. The COMPANY
Commissioning group will work together with the CONTRACTOR Commissioning group
to facilitate information flow and to give the end users of the facility valuable exposure to
the design, build and commissioning methods applied.
COMPANY input to the Project at FAT level, during Pre-Commissioning and during
function testing alleviates many problems due to a greater understanding of the
reasoning behind certain methodologies and decisions.
The COMPANY Commissioning group will provide input from FEED through detailed
design, Construction and Commissioning and will represent the COMPANY during all
project phases.
The COMPANY Commissioning team will support the CONTRACTOR to safely manage
and execute each phase of the project. Responsibility remains with the CONTRACTOR
to manage Project Controls.
The Contractor will provide facilities to accommodate the logistics requirements
required to allow integration of the COMPANY Commissioning team with the
CONTRACTOR Commissioning team.
The CONTRACTOR will develop Commissioning Team, consisting of but not limited to:
CONTRACTOR Design Engineers
CONTRACTOR Commissioning Engineers/Supervisors
CONTRACTOR Commissioning Support
Specialist Vendor Representatives.
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 20 of 56
D R A
IN
30-O
C T - 2 013
INPEX Operations Australia Pty Ltd COMPANY Doc. No. L290-AR-PEP-0001
ICHTHYS ONSHORE LNG FACILITIES JKC Doc. No. S-0290-1711-0001 Rev.2
Commissioning Execution Plan Sheet No. 21 of 56
The definition and composition of the subsystems or areas that comprise the separable
portion has been defined, refer to L290-AR-LIS-10009, Commissioning Subsystem and
Separable Portion Definition List.
CONTRACTOR shall lead and direct the Right First Time program up to Acceptance of
Handover Certificate for each Separable Portion.
DR20A
STEP 16 – Post Project Review
IN
30-O
13
CT-