Professional Documents
Culture Documents
SessionII 4 Igarashi en
SessionII 4 Igarashi en
Iceland
1 Unit
34 MW
Korea
UK 28 Units
1 Unit 2,138 MW
210 MW Italy Japan Puerto Rico
4 Units Mexico 1 Unit
1,447 Units 214 MW
Cyprus 994 MW 30 Units Antigua
g
81,134
81 134 MW
2 Units 2,512 MW 2 Units
120 MW Philippines 18 MW
Egypt 27 Units Venezuela
1,114 MW Nauru
6 Units UAE 7 Units
1,764 MW 1 Unit 1,418 MW
4 Units 0.1 MW
Nigeria 968 MW
Papua New Guinea Brazil
4 Units Sri Lanka Costa Rica
Lebanon 3 Units 3 Units
56 MW 135 MW 1 Unit
4 Units 1 Unit 155 MW
6 MW Indonesia 55 MW
130 MW
15 Units
Bangladesh 2,328 MW Argentina
Bahrain 5 Units
Botswana
B 41 MW 3 Units
1 Unit Malaysia
1 Unit 14 MW
33 MW South Africa 65 MW 22 Units
Myanmar Australia
2 Units 2 Units 4556 MW 55 Units
118 MW 0.9 MW 11,672MW
T t l 1
Total: 1,890
890 U
Units,
it 160GW iin 37
37countries
t i since
i 1927
© TOSHIBA CORPORATION 2010, All rights reserved. 4
Recent EPC Thermal Power Projects in the World
Bulgaria – Maritsa East 2 China - Taizhou #1,#2 Japan – Maizuru
J M i #2 USA - Iatan
I t
#1,3,4 3x177MW Coal Fired 2x1000MW Coal Fired 900MW Coal Fired 2x1000MW Coal Fired
USC 24.5MPa595/595℃ USC 25.5MPa582/582℃
Plant Rehabilitation USC 25MPa600/600℃
(COD:#1 Sep.2007, #3 (COD:#1 Dec.2007/#2 Mar.2008)
(COD: Aug. 2010) (Under Construction)
Nov.2008,, #4 Feb.2009))
Indonesia - Tanjung
Jati B Extension
2x660MW Coal Fired
(Under Construction)
Rumania – Paroseni #4
1x150MW Coal Fired
Plant Rehabilitation
(COD: Aug.2007) India - Mundra Malaysia - Tanjung Bin Malaysia - Jimah
5x800MW Coal Fired 3x700MW Coal Fired 2x700MW Coal Fired
USC 24.2MPa565/593℃ (COD:#1 Oct.2006/ (COD:#1 Jan./#2 Jul.2009)
((Under Construction)) #2 Feb./#3 Aug.2007)
C l Fi
Coal Fired
d Pl
Plantt with
ith th
the L
Latest
t tT Technologies
h l i
© TOSHIBA CORPORATION 2010, All rights reserved. 6
Profile of the Project (2)
R b tD i
Robust-Designed
d Turbine
T bi forf Breakdown
B kd Maintenance
M i t
© TOSHIBA CORPORATION 2010, All rights reserved. 8
Contents
【Europe】
Shift to Low Emission Power Plants 【China】
Mega Market more than 50% in the World
Local Manufactures Supplied Equipment
42GW
371GW
35GW
76GW 15GW
【Japan】 【America】
【Middle East】 C
Construction of
Shift from Oil Fired to 80GW Combined Cycle
Shift from Coal to CC in North America
Natural Gas Fired Plant Large Scale Thermal Plant
71GW in South America
【India】
Large Scale Coal 【Asia & Oceania】
39GW Fired Thermal Plant Large Scale Thermal Power Plant
Geo Thermal
【Africa】
Coal Firing Unit
& Combined Cycle
Plant
Source: IEA World Energy Outlook 2009
Advanced
Renewable • Hydro
Hydro, CSP,
CSP Countries
Energy Geothermal Emerging
(23%) Countries
450ppm Stabilization Scenario Neucler(10%)
2 0 – 2.4
temperature Increase 2.0 2 4 deg C
CCS(10%) • Thermal Plant Advanced
Countries
with CCS
26 Gt
(Source: World Energy Outlook 2009) @2030
45 %
The Latest Plant Efficiency Level
43 %
41 % Japan
fficiency (LHV)
39 % UK&Ireland
37 % German
35 % USA
33 %
Australia
Gross Eff
31 %
China
29 %
India
G
27 %
25 %
1990 1992 1994 1996 1998 2000 2002 2004 2006
T Level
Top L l Efficiency
Effi i as Coal
C l Fired
Fi d Thermal
Th l Plant
Pl t
© TOSHIBA CORPORATION 2010, All rights reserved. 12
CO2 Reduction by Efficiency Improvement
World
W ld T
Total
t l coal-fired
l fi d th
thermall plant
l t
capacity: 1,440GW
Efficiency and CO2 emissions of
(1/3 of entire power plants capacity) C l Fi d Th
Coal-Fired Thermall Pl
Plants
t
The Latest Plant Efficiency Level
Coal-Fired Thermal Plants
in the World (%)
40
China Base +760kt +1690kt
CO2 emissions
Others +1760kt
37% 35%
Effiiciency*
e
41 6%
41.6%
1,440GW 35
India 36.7%
5% USA
23% * 32.1% 31.8%
30
Japan USA China India
Source: IEA World Energy Outlook 2009
・ECOFYS INTERNATIONAL COMPARISON
・ECOFYS, *Gross
G efficiencyy (
(LHV)
)
OF FOSSIL POWER EFFICIENCY(2008) *CO2 emissions from a 1,000MW plant
elative)
7
600/610℃
ent (% re 6
593/593℃
5 566/593℃
4 566/566℃
proveme
538/566℃
3
538/538℃
ency Imp
2
MST/RST Temperature
1
Efficie
0
15 20 25 30 35
Main Steam Pressure (MPa)
Company E TOSHIBA
Company D 9%
14%
27%
16%
Company C 18%
Company B Company A
16%
as of 2009
MST/RST
J Power TACHIBANA BAY #1
J-Power
1050MW (CC) TAIZOH #1&2
(25MPag 600/610℃) 1000MW (TC)
(25MPag 600/600℃)
600/610℃ MAIZURU #2
KAWAGOE #1,#2 NANAO OTA #2 900MW (CC)
700MW (TC) 700MW (TC) (24 5MP 595/595℃)
(24.5MPag
(31MPag 566/566/566℃) (24.1MPag 593/593℃)
Nozzle
Box LP Inlet
IP Exhaust
Lead Piping
IP Inlet
Abradable Seal
Award from
The Japan Machinery
Federation
as
Excellent Energy-saving
Equipment
in 2009
HP Turbine Generator
MSV/CV
Condenser
Bypass valve
Condenser
Generator
V i
Various Technical
T h i l Improvements
I t for
f Both
B th Performance
P f & Reliability
R li bilit
Others
Others
B F
日立
50% D
三菱
C B
Alstom
E 64% 61% C
Siemens
D 46%
37% 36% 32% 40% E
GE
TOSHIBA Toshiba
8%
0%
Total:362,393MW 03 04 05 06 07 08 09
No 4 Share worldwide
No. No 1 Share in US for 7 years
No.1
L t t Technology
Latest T h l for
f High-efficiency
Hi h ffi i & Life
Lif Extension
E t i
© TOSHIBA CORPORATION 2010, All rights reserved. 23
Profile of the latest Project (4)
Bulgaria – Maritsa East 2 #1-#6 6x177MW Plant Rehabilitation
Custo e
Customer Maritsa
a tsa East
ast II TPP
Taking Over #1 Sep.2007, #2 Jan.2007
#3 Nov.2008, #4 Feb.2009
#5 (Mar.2011),
( ) #6 (Aug.2010)
( )
(under construction) (under construction)
#1-4:4x150
#1 4:4x150 MW STG Replacement
Turbine:LMZ Make → Toshiba Latest Turbine
Generator:LMZ Make →
T hib Air
Toshiba Ai Cooling
C li Generator
G t for
f unit2
it2
→40 Years old Machine to Latest
#3,4: 2x210 MW LMZ Make Turbine Rehabilitation
HP IP LP Blade Nozzle, LP Rotor Replacement
→24 Years old Machine to renewal
550 500MW
CrMoV alloy
24.1MPa
525 566/566℃
Sub / Super Critical
500
1950 1960 1970 1980 1990 2000 2010 2020(year)
Material Development as National Project
© TOSHIBA CORPORATION 2010, All rights reserved. 26
A-USC (Advanced Ultra Super Critical) Turbines
Main steam
(35MPa 700C)
Steam turbine
η/η (%)
Generator 16 700/720/720℃ A-USC
Efficiency ⊿η
D bl Reheat
Double R h t
Reheat steam VHP HP IP LP LP 14
(750C)
12
10
ovement of E
Boiler 8
FWH Condenser 600/700C A-USC
6
elative Impro
4 600/610C
Overall system Steam Valve Steam Turbine USC 566/566/566C USC
●Steam condition ●High temperature ●High temperature material 2 Dual Reheat
●Heat balance material ●Turbine Structure / Flowpath
0 538/566C
Re
USC
20 30 40
Main Steam Pressure (MPa)
Drive towards Advanced USC technology for future low CO2 emissions
Plant Overview
- Location: Sigma Power Mikawa,
Omuta, Fukuoka, Japan
- Post Combustion Method
- Capacity:2,100Nm3/hr (Feed)
(10t CO2/day)
(10t-CO /d )
- Exhaust Flow: 2,100 Nm3/h
- Commenced: September, 2009
Objectives
- Testing using the actual flue gas of
live thermal power plant
- Verification of performance,
operability, maintainability, etc.
i view
in i off scaled
l d up plant
l t design.
d i
D
Development
l t iin Progress
P for
f Full-Scaled
F ll S l d Plant
Pl t
© TOSHIBA CORPORATION 2010, All rights reserved. 28
Thermal Power Plant with CCS
Steam Turbine Boiler
Carbon Capture System Stack
Generator
DeNOx FGD
Absorber
Stripper
Condenser
EP Compressor
Reboiler
CO2
R&D ffor Hi
High
hPPerformance
f S
Solvent
l t
© TOSHIBA CORPORATION 2010, All rights reserved. 29
Towards Clean Coal Thermal Power Plant
grams / kWh) 1400
1200
USC
ssions (g
800 A USC
A-USC
600
USC+CCS
USC CCS
CO2 Emis
200
USC+CCS A-USC+CCS
( 90% CO2 Capture ) ( 90% CO2 Capture )
0
30 35 40 45 50 55 60
Plant Net Efficiency (LHV)
St
Steam turbine
t bi line-up
li f R
for Renewable
bl Energy
E Plant
Pl t
© TOSHIBA CORPORATION 2010, All rights reserved. 31
© TOSHIBA CORPORATION 2010, All rights reserved. 32