CHECK LIST

CLIENT CUMMINS MIDDLE EAST (FZE)

PROJECT NO 301167

PROJECT Olayan Power Box – 50 units

ITEM DESCRIPTION Check List for Motor Replacement

CONTAINER NUMBER
SL
INSPECTION CRITERIA OK / Not OK Remarks
NO.

1. Obtain work permit form authorized person.

2. Switch off the main breaker and lock out for safety reason.

3. Verify power supply is totally off by using a multimeter.

Write down the details of the motor from the nameplate


4.
(Model, Power supply, Serial Number, Brand, Manufacture, ETC)

5. Open the terminal cover using proper tool.

Marking and Tagging all cable and terminal position to avoid


6.
mistaken after re-wiring back the cable and motor connection.
Identify, record and confirm the wiring connection and terminal
7. whether it is Delta Or Star point for the motor to avoid any
mistaken during installation.
Disconnect the cables at the terminal block and pull out the
8.
cable with gentle to avoid any damage using a proper tools
Check the KW ratings, Voltage and frequency of the ventilation
9.
fan motor (new motor to be replaced) as per the datasheet.
When the new motor is installed, rewire the connection at the
10.
terminal block according to original connection
Make sure that there is no exposed cable that is dangling out of
11.
cable gland and make sure the wiring is done in proper way
Verify the cable continuity test / Megger between the motor and
12
control panel prior to power up the unit
Verify the cable ends (Lugs) are used at the cable termination
13.
end.
Verify the tightness of the cable termination by random wire pull
14.
test.
Turn ON/OFF Ventilation fan motors MCB/MPCB for checking
15.
the functionality.
Format No: ACE-ELE-F-04 Rev 02 (Issued on 13-03-2017)
CHECK LIST

SL
INSPECTION CRITERIA OK / Not OK Remarks
NO.

16 Check the incoming power supply phase sequence (RYB).

Verify there is no abnormal heating on motors during running


17.
condition.
Verify there are no abnormal vibrations during running
18.
condition.
Verify the motor foot dimensions & the mounting frame
19.
arrangement both are matching prior to replace.
Verify the mounting bolts are properly tightened and torqued as
20.
per standards.

21. Fan direction of rotation of the fan must be checked.

22. Inspect the complete system for overheating marks.

Old damaged motor shall be properly packed and brought to


23.
ACE KSA facility

Notes:

Verified by:
Witnessed by:

Name: Name:

Signature: Signature:

Date:
Date:

Format No: ACE-ELE-F-04 Rev 02 (Issued on 13-03-2017)