Date: 2022-01-29
U1 Running
Unit Status
U2 Running
U1 AB AB AB A
U2 AB AB AB A
Unit 1:
Unit 2:
Event record
23:00 Measure the motor insulation of unit-2 10KV secti
Common:
Log of Shift Leader(middle shift)
Shift: middle shift Shift leader:
AB B A B AC B
AB A B B AB A
U1 Running
FGD
U2 Running
B B AB A ABCDE
A B AB A ABCDE
Keep load at 1243.517MW
20:10 Terminated and reserviced work ticket "Check the
Maintenance personnel replied that spring dislocati
which has been recovered now/Start the #5A belt c
Existing Work
ticket
d work ticket "Check the power breaker and control circuit of #5A belt conveyor m
eplied that spring dislocation of the internal mechanical device of the power breaker
d now/Start the #5A belt conveyor it running normally