Professional Documents
Culture Documents
Date: 2022-01-30
U1 Running
Unit Status
U2 Running
U1 AB AB AB A
U2 AB AB AB A
Unit 1:
Unit 2:
Event record
17:43 Terminated and reserviced work ticket:Adjust the
Common:
Log of Shift Leader(middle shift)
Shift: middle shift Shift leader:
AB B A B AC B
AB A B B AB A
ced work ticket:Unit-1 turbine PC room left style fan-coil unit motor overhaul.
ced work ticket:Adjust the nozzle of boiler-2 short soot blower E1 to E10.
Shift leader: Sun Jingjun
U1 Running
FGD
U2 Running
B B AB A ABCDE
A B AB A ABCDE
or overhaul.
to E10.
16:01 NPCC command to decrease load to 1220MW, 16
Existing Work
ticket
rease load to 1220MW, 16:06 increased load to 1243MW.