Date: 2022-01-30

U1 Running
Unit Status
U2 Running

EQP FDF PAF IDF CEP

U1 AB AB AB A

U2 AB AB AB A

Unit 1:

19:53 Terminated and reserviced work ticket:Unit-1 tur

Unit 2:

Event record
17:43 Terminated and reserviced work ticket:Adjust the

Common:
Log of Shift Leader(middle shift)
Shift: middle shift Shift leader:

Outgoing Lahore Running


Line Sahiwal Running

APH CWP OCCWP CCCWP VAC P LUB P

AB B A B AC B

AB A B B AB A

ced work ticket:Unit-1 turbine PC room left style fan-coil unit motor overhaul.

ced work ticket:Adjust the nozzle of boiler-2 short soot blower E1 to E10.
Shift leader: Sun Jingjun

U1 Running
FGD
U2 Running

SEL P EHP BFPT GSC P Mill

B B AB A ABCDE

A B AB A ABCDE

or overhaul.

to E10.
16:01 NPCC command to decrease load to 1220MW, 16

1. No.1 steam turbine #3, #6 and #7 bearing have vibr


Main defect
2. No.2 steam turbine #1 bearing have vibration high alar

Existing Work
ticket
rease load to 1220MW, 16:06 increased load to 1243MW.

and #7 bearing have vibration high alarm.


g have vibration high alarm at low load.