运行部 2022 年 02 月份培训计划

February 2022 Operations Department Training Plan


Major 培训内容 Training Content
 Electrical:
CCO
 Generator and Excitation System: relative operation code, system diagrams, operation sheets, inspection items, operation
parameters, specifications, regular work, accident handling and measures.Measures to Prevent Operation Accident in
Switchgear Room
 Boiler:
 炉前燃油及微油点火系统运行方式及参数、系统图、定期工作、投停步骤条件、相关联锁、事故处理 Operation
mode and parameters of fuel and micro-oil ignition system of the furnace, system diagram, regular work, conditions of
operation and shutdown steps, related interlocks, and accident handling
 Turbine:
 大小机润滑油、密封油、系统运行方式及参数、系统图、定期工作、投停步骤条件、相关联锁、事故处理 Lube
oil and seal oil of main turbine and BFPTs, system operating methods and parameters, system diagrams, regular work,
conditions of operation steps, related interlocks, and accident handling
 EH 油系统图, 油净化装置及外置油净化装置运行方式及参数、定期工作、投停步骤、事故处理 EH oil system
diagram, operation mode and parameters of oil purification device and external oil purification device, regular work, steps
of putting on and off, accident handling
 Simulator:
 EH oil pump trips
 Large and small lubricating oil pumps trip
 Large and small lubricating oil coolers leak
 Turbine oil cooler outlet regulating valve failure
 Generator AC seal oil pump B trip (A standby is not connected to start)
 BFPT A fault-trip
 Safety:
 Firefighting Water System
 Thermal and Mechanical Safety:
 Appendix A - A2 Fire aid for electric shock (A2.1, A2.2, A2.3, A2.4)
 Topic 3.1 Basic provisions for operation and maintenance of coal storage and conveying equipment (Pages 42-44)
 Operation Code:
 Chapter 2 – Water Source and Raw Water Pre-treatment System (2.1)
 Chapter 2 – Water Source and Raw Water Pre-treatment System (2.2)
 Chapter 2 – Water Source and Raw Water Pre-treatment System (2.3.1–2.3.6)
 Chapter 2 – Water Source and Raw Water Pre-treatment System (2.3.7)
 Chapter 2 – Water Source and Raw Water Pre-treatment System (2.4)
 Safety:
CHO  10 Prohibitions and Epidemic Prevention Regulations
 Management Standard for PTW and Operation Sheet (3.1 – 3.7)
 Management Standard for PTW and Operation Sheet (3.8 – 3.14)
 Management Standard for PTW and Operation Sheet (4.5)
 Management Standard for PTW and Operation Sheet (5.2)
 Firefighting Water System
 Thermal and Mechanical Safety:
 Appendix A - A2 Fire aid for electric shock (A2.1, A2.2, A2.3, A2.4)
 Electrical:
FGD
 FGD 10KV diagram
 Training Lecture:
 What are interlock protection trip conditions of FGD system and oxidation air system?
 Control of lower pH of absorber in a situation where limestone purity is below 80%
 What are interlock protection conditions of vacuum belt system?
 Operation measures for rain water pumps
 Operation measures for ash conveying
 Problem Analysis
 Why gypsum quality is poor these days?
 Reason of low pressure of limestone hydrocyclone B? How was it dealt?
 What is the effect of oxidation air in absorber system? What problem was faced when the blowers inlets were opened less
than 50%?
 Causes and handling of rain water pumps when it stopped suction?
 Causes and handling of high pressure at outlet of ash hopper fluidizing blower
 Operation Code:
 Operation of FGD sub-systems (3.1-3.2)
 Operation of FGD sub-systems (3.3-3.4)
 Operation of FGD sub-systems (3.5-3.6)
 Operation of FGD sub-systems (3.7-3.8)
 Operation of FGD sub-systems (3.9-3.10)
 Diagram:
 FGD flue gas system diagram
 Oxidation air system diagram
 Safety:
 Anti-violation management standards
 Shortcomings in Fuel oil foam Fire fighting drill
 Firefighting Water System
 Thermal and Mechanical Safety:
 Appendix A - A2 Fire aid for electric shock (A2.1, A2.2, A2.3, A2.4)
 Topic 1.0 General Provisions (Pages 1-15)
 Training:
 Boiler Chemical Cleaning - Pickling
 Reagent preparation for Copper testing
 Surface Tension instrument
QCD  HCl Standardization
 Quality of Sodium Hypochlorite
 Safety:
 Thermal and Mechanical Safety:
 Appendix A - A2 Fire aid for electric shock (A2.1, A2.2, A2.3, A2.4)