Language Objectives:
By the end of the session students will be able to use key concepts of Project Management in the
context of Implementation Planning:
• Work Plan
• Gantt chart
• Resource plan
• Budget
The project design requires an implementation plan (also called work plan) for the activities listed
in the logframe. The work plan demonstrates that the project is feasible in terms of
responsibilities, schedule and resources.
It allows the project manager to see whether all the planned activities are implemented in the
planned time, by the right staff and within the planned budget.
The work plan is established by the project design team and consists of the following four
matrices:
• A work breakdown matrix, which lists the activities and specific tasks.
• A responsibility matrix, which sets out who is responsible for each activity.
The work plan is a key tool for monitoring project operations. It helps the team in charge of imple-
mentation to see whether the activities are carried out:
• on time
It also gives you an insight into whether the activities actually lead to the outputs in the logframe
(see also the next chapter).
Case Study
Immediate objective :
Members’ income, particularly that of women and young farmers, increased through the
improvement of the cooperative’s governance and business performance.
The calendar states when each activity starts, how long it lasts and when it will be completed.
This is usually presented in the form of a bar chart, which sets out the sequence of activities and
links them to critical events or milestones.
The recommended tool is called a Gantt chart.
The chart uses the activities from the work breakdown matrix as headings for each row, and time
units (years, quarters, months, weeks, etc.) as the headings for each column.
1) Use the work breakdown structure and decide on the level of detail required. This may differ
from the level of detail used to prepare the responsibility matrix.
2) Identify the sequence in which the tasks should be performed. Re-arrange the order (rows) of
the work breakdown structure to reflect the sequence.
3) Decide whether you will use years, seasons, quarters, months, weeks or days to measure time.
4) Prepare the format of the calendar. The work breakdown structure is presented in the left-hand
column and the time scale is presented across the top rows.
The results-based management approach prepares the resource plan on the basis of the activities
in the work breakdown matrix and calendar. For each activity, a list of inputs is prepared, and
these can then be aggregated by category (raw materials, equipment, personnel, etc.) to produce
an overall project procurement plan.
The resource plan is the basis for the budget preparation. It allows you to assess the cost of each
activity exactly. It is important to put the management needs, such as staff and administrative
costs, in the resource plan, and then to transfer those costs to the budget format per heading:
total staff, equipment, training, etc.
Resource Plan
Project outputs Activities Inputs Cost
1. Output 1.1)Provide 1.1.1)Twenty
training for days of
farmers in consultancy
basic 1.1.2)50 training
veterinary manuals
skills 1.1.3)Two 3-day
training courses
for 20 people in
all
2. Output 2.1 |Add 2.1.1)|Add |Add cost per |calculate total
activity| input| unit| cost
2.2 Etc.
CLASS WORK 4
STEP 3 IMPLEMENTATION PLANNING
Formulate: