Professional Documents
Culture Documents
EAST-WEST
LATERAL ROAD
Submitted by
Ella Marie Bentulan
PROJECT NAME:
EAST-WEST LATERAL ROAD
REGION:
XIII- CARAGA
START DATE:
BUDGET:
PHP. 4,873,000,000.00
PROJECT REMARKS
This project forms part of the total regional connectivity between the Region
XIII and Region X and promotes biodiversity in the Northern Mindanao Corridor. It
will encourage farmers to till additional farmlands. Consequently, this promotes
development in different fields such as eco-tourism, agriculture, industry and
domestic trade. This project will provide an accessible route for the remote area
settlers, thus uplifting their economic growth. Furthermore, the project reduces
hauling cost and travel time of agri-farm produce products to the nearest market. It
also provides access of public facilities and services as well as promote peace to
conflict affected areas.
PROJECT DESCRIPTION
The project involves 57-km road opening and upgrading (unpaved to paved)
with pavement width of 6.70 meters and thickness of 0.28 meters and construction
of six (6) concrete bridges (327lm). It also includes provision of drainage and slope
protection structures/facilities with road safety devices.
FUNDING SOURCE
PHOTOSGeneral Appropriations Act (GAA)