You are on page 1of 3

BAHAGIAN TEKNOLOGI DIGITAL IBU PEJABAT JABATAN PENGANGUTAN JALAN MALAYSIA

NO : 02 CYBERJAYA
JKR MN POWER SERVICES
Electrical Plan Preventive Maintenance February 2022
SELANGOR

WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8


24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Code System Description No. Equipment/ Asset Description Freq Location
MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE

1.1 Switch Room including Riser Room W/M

Main Switch Board (MSB)/ Sub Switch


1.2 W/M
Boards (SSB)/Capacitor Bank Boards

Main Switchboard / Sub-


1.3 Air Circuit Breakers (ACB) M
1.0 Switchboard And Low Voltage LV ROOM
Components 1.5 Residual Current Device (RCD) M
1.7 Distribution Board (DB) 3M

1.8 Surge Protection Devices (SPD/ESPD) M

1.9 Record and Log Book D

Paper or XLPE or PVC insulated armoured


2.1 M
underground cables

Low Voltage Distribution Bus duct and sub main risers in trunking BLOCK A &
2.0 System 2.2
/cable tray
M BLOCK B

XLPE / PVC Insulated Type Cable On


2.4 M
Cable Tray.

TAHUN BARU CINA


3.1 Luminaries W/M

Fluorescent Luminaries (Including SL & PL


3.2 D/W/M
Type )

3.3 Switches and Switch Socket Outlets W/M

Luminaries, Switches And


Socket Outlets, Fans, Water 3.4 Fans (Ventilating & Exhaust) D/M/3M
BLOCK A &
3.0 Heaters, P.A. System, Motors
BLOCK B
And Water Pumps And Outdoor
Lighting 3.6 Public Address (PA) System D/W/M

Outdoor Lighting – Compound and Street


3.7 Lighting, Building Flood Lighting & D/W
Security Lightings.

3.8 Fireman’s Switch D/M

4.1 General Testing M

Final Circuit Continuity and Protection


Electrical Testing (To Ensure 4.2 M
Circuit Tests
Compliance With B.S.
BLOCK A &
4.0 7671:1992- 16th Edition IEE
BLOCK B
Wiring Regulations; Ms.Iec 4.6 Testing of Residual Current Devices (RCD) M
60364-1996)

4.7 Measurement of Earth Electrode Impedance M

LEGEND (AREA) VERIFICATION

D DAILY Prepared By: Checked by: Verified by:

WEEKLY
W
…….……………………… …………………………… …………………………
M MONTHLY, QUARTERLY Name: Name: Name:
Project Manager Electrical Verifier Jabatan Kerja Raya
QUARTERLY Date : Date : Date :
3M
BAHAGIAN TEKNOLOGI DIGITAL IBU PEJABAT JABATAN PENGANGUTAN JALAN MALAYSIA
NO : 02 CYBERJAYA
JKR MN POWER SERVICES
Electrical Plan Preventive Maintenance February 2022
SELANGOR

WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8


24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Code System Description No. Equipment/ Asset Description Freq Location
MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE

5.1 Batteries D

Ups (Uninterruptible Power UPS FLYWHEEL


5.0 Supply) Building & Flywheel
5.2 Battery Charger D
ROOM
5.6 Ups Flywheel D

6.1 Lubrication System W/M

6.2 Fuel System D/W/3M

6.3 Cooling System D/W/M

6.4 Air System M/3M

6.0 Generator Set( 3 X 1000kVA) 6.5


Electrical System (To Comply with 5.1 &
W/M GENSET ROOM
5.2)

6.6 Alternator M

6.7 Generator Set Control Panel W

TAHUN BARU CINA


6.8 Operation Testing and General Servicing W/M/3M

7.2 Vacuum Circuit Breaker (VCB) M

7.7 Metering (Voltmeter and Ammeter) D

7.9 Direct Current (D.C) Supply W/M


7.0 High Voltage (HV) system HT ROOM
7.11 Transformer (Resin / Dry Type) D/W

7.13 Earthing System M

7.14 H.T. Switch Room W/M

BLOCK A &
8.0 Lightning Protection System M
BLOCK B

Telecommunication System
9.0 (Voice Communication)
9.1 Telephone / PABX System D/W/M MDF ROOM

BLOCK A &
10.0 Master Antenna System (Matv) W
BLOCK B

BLOCK A &
11.0 Structured Cabling System W
BLOCK B

LEGEND (AREA) VERIFICATION

D DAILY Prepared By: Checked by: Verified by:

WEEKLY
W
…….……………………… …………………………… …………………………
M MONTHLY, QUARTERLY Name: Name: Name:
Project Manager Electrical Verifier Jabatan Kerja Raya
3M QUARTERLY Date : Date : Date :
BAHAGIAN TEKNOLOGI DIGITAL IBU PEJABAT JABATAN PENGANGUTAN JALAN MALAYSIA
NO : 02 CYBERJAYA
JKR MN POWER SERVICES
Electrical Plan Preventive Maintenance February 2022
SELANGOR

WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8


24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
System Code System Description No. Equipment/ Asset Description Freq Location
MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE TH FR SA SU MO TU WE

12.1 Video Screens & Projection Systems D/M

12.2 Sound Reinforcement System D/M


12.0 Audio And Video System MEETING ROOM

12.3 Conference System W/M

12.4 Projector & Audio System 3M

TAHUN BARU CINA


BLOCK A &
14.0 Security, CCTV And Card Access System D
BLOCK B

17.1 Routine Inspections D

17.2 Lamps W/3M

17.3 Lamp Control Gears 3M

17.0 Compound Lightings 17.4 Poles W/3M EXTERNAL AREA

17.5 Feeder Pillar. W/3M

17.6 Cable and Wiring. W

17.7 Earthing System. 3M

LEGEND (AREA) VERIFICATION

D DAILY Prepared By: Checked by: Verified by:

WEEKLY
W
…….……………………… …………………………… …………………………
M MONTHLY Name: Name: Name:
Project Manager Electrical Verifier Jabatan Kerja Raya