ACKNOWLEDGEMENT

Industrial training is an indispensable part of any curriculum. It provides


the students with an opportunity to gain experience on the practical
application of our knowledge.

I express my gratitude to all the people at Maruti Suzuki India Limited who
helped me during the past six weeks. The exposure and experience
gained at Maruti has been unique.

I would like to thank Mr. Sanjeev Bhatnaagar. (DPM Assembly Shop-1)


for giving me this opportunity to work in their departments and guiding me
through the projects for his constant guidance and support.

I would also like to express my sincere gratitude to Mr. Mahinder Vikram


Singh , Training Incharges their able guidance and keen interest in my
training.

ROHIT
GITM GURGAON

GITM GURGAON
Page 1
ABSTRACT
In order to get faster result over a particular period, maximum utilization of is very much
required. So if the proper utilization of time will be done then the maximum efficiency will be
produced with in the industry. My topic “Time study of ETSA & Rear axle sub assembly and
design layout of line no.1 (assembely-1)”at Maruti is very much related with above fact.
There are many reasons for wanting to know the amount of time a particular task should take to

be completed. It may simply be for reasons of curiosity. But realistically, it is for any of three

reasons: (1) to accomplish planning, (2) determine performance and (3) establish costs.

In this project I have calculated the total time that the each worker at each station took to

complete its task in ETSA(Engine Transmission Sub Assembly of WagonR) and rear axle sub

assembly of line no-4 (Eeco & Ritz) and I also design the layout of line no.1(Omni & Ritz).I

have calculated time at different station with the help of stop watch and for layout design I visit

all the station of line no.1 to find how many workers are engaged there and note all the workers

working in different sections of line no.1 and know its category(category such as permanent, T.T,

casual, apprentice, repairmen & reliever. After finding various details of 3 sections –trim, chasis

and final of line no.1, I designed the layout of line no.1.

GITM GURGAON
Page 2
CONTENTS:

• Introduction to MSIL

• Organisational structure of MSIL

• Production overview

• Milestones reached by MSIL

• How a car is made in reality

• Different shops in MSIL

• Project report on Plant Improvement

• Conclusion

GITM GURGAON
Page 3
COMPANY’S VISION:

TERMS OF PRODUCTION VOLUME, COSTS AND PROFITS. WE


MUST NOT ONLY MAINTAIN LE“TO BECOME AN
INTERNATIONALLY COMPETETIVE COMPANY IN ADERSHIP IN
INDIA BUT SHOULD ASPIRE TO BE AMONGST THE GLOBAL
PLAYERS. THE CULTURE, THINKING AND ACTIONS HAVE ALL TO
BE CONSISTENT WITH THIS VISION “

GITM GURGAON
Page 4
INTRODUCTION

An aerial view of the MSIL ,Gurgaon.

PLANT LAYOUT OF
GITM GURGAON
Page 5
MARUTI SUZUKI INDIA LIMITED

MARUTI SUZUKI INDIA LIMITED

GITM GURGAON
Page 6
ABOUT MARUTI SUZUKI INDIA LIMITED

THE START OF A NEW ERA:


Maruti Suzuki India Limited (MSIL) was established in Feb 1981 through an Act of
Parliament, to meet the growing demand of a personal mode of transport caused by the lack
of an efficient public transport system.

Suzuki Motor Company was chosen from seven prospective partners worldwide. This was
done not only due to their undisputed leadership in small cars but also due to their
commitment to actively bring to MSIL contemporary technology and Japanese management
practices (which had catapulted Japan over USA to the status of the top auto manufacturing
country in the world).

A license and a Joint Venture agreement were signed between Govt. of India and Suzuki
Motor Company (now Suzuki Motor Corporation of Japan) in Oct 1982.

The objectives of MSIL then were:

1. Modernization of the Indian Automobile Industry.

2. Production of fuel-efficient vehicles to conserve scarce resources.

3. Production of large number of motor vehicles, which was necessary for economic
growth.

THE REVOLUTION:
Maruti created history by going into production in a record time of 13 months. On 14
December 1983, the then Prime Minister of India, Mrs. Indira Gandhi, handed over the keys
of the first car to Mr. Harpal Singh of Delhi. Volume targets were routinely exceeded, and in
March 1994, Maruti became the first Indian company to produce over one million vehicles.
Maruti is one of the most successful automobile joint ventures, and has made profits every
year since inception till 2000-01. In 2000-01, although Maruti generated operating profits on
an income of Rs. 92.5 billion, high depreciation on new model launches resulted in a book
loss. Maruti revolutionized the way Indians looked at cars. "No other car company so
completely dominates its home market" - (The Economist). Despite there being more
than 10 companies now in the passenger car market, Maruti holds about 54.5% of the total
market share. MSIL is also the first and only car company in the world to lead its home
market in terms of both market share and in the JD Power Customer Satisfaction study.

GITM GURGAON
Page 7
TRANSFER OF TECHNOLOGY:
Every 26 seconds a vehicle rolls out of the Maruti plant. It is therefore imperative that the
transfer of contemporary technology from its partner SUZUKI is a smooth process. Great
stresses are laid on training and motivating the people who man and maintain the equipment,
since the best equipment alone can’t guarantee high quality and productivity. From the
beginning it was a conscious decision to send people to SUZUKI Motor Corporation for on
the job training for line technician supervisors and engineers. These help them to imbibe the
culture in a way that merely transferring technology through documents can never replicate.
At present 20% of its workforce has been trained under this program.

ETHOS OF MARUTI:
Employees are Maruti’s greatest strength and asset. It is this underlying philosophy that has
moulded its workforce into a team with common goals and objectives. The employee-
management relationship is therefore characterized by:
• Customer obsession
• Fast, flexible and first mover
• Innovation and creativity
• Networking and partnership
• Openness and learning
• Participative management
• Team work and kaizen
• Communication and information sharing
• Open office culture for easy accessibility
To implement this philosophy, Maruti has taken several measures like a flat organizational
structure. There are only three levels of responsibilities ranging from the Board of Directors,
Division to Head of departments. Other visible features of this philosophy are an open office,
common uniforms at all levels, and a common canteen to all.
The structure ensures better communication and speedy decision making process. It also
creates an environment that builds trust, transparency and a sense of belonging amongst
employees.

GITM GURGAON
Page 8
SHAREHOLDING:
Maruti Suzuki India Limited was set up as a deemed public limited company in 1981 by an
Act of Parliament. MSIL was classified in the Public Sector as long as the equity of
Government of India remained over 51%. A License and Joint Venture Agreement was
signed in 1982, with Suzuki Motor Corporation (SMC) acquiring 26% of the equity. SMC
increased its equity to 40% in 1989. In 1992, Maruti ceased to be a government company, as
SMC's equity holding went up to 50%.
In 2002, SMC's share went up to 54.2%, making MSIL a subsidiary of SMC. The Govt. of
India held 46.6%, and employees trust holds the balance 0.2%.
As of Sept 2006, Suzuki holds 54.21% shares, Govt. of India hold 10.27%, rest of the shares
are distributed between the public, Insurance companies, FIIs, Mutual funds etc.

VISION OF MARUTI:
• To be The leader in the Indian automobile industry
• Creating customer delight and shareholder’s wealth
• Be A pride of India

GITM GURGAON
Page 9
MARUTI SUZUKI INDIA CULTURE

Building a distinctive organizational culture is one of the most challenging tasks faced by
any company. By organizational culture, is meant an organizational philosophy, which
guides the actions and behavioral pattern of the members. It also defines implicitly how
the external agents perceive the organization. Hence the necessity of a work culture
which, while appealing to those within, also satisfies the expectations of those outside
the organizational environment. There is no use for a work ethic that creates highly
efficient pseudo-robots out of the employees. Such an approach might look like giving
dividend in the short term but will definitely lead to stagnation and frustration in the long
term.
A harmony between the work culture and organizational objectives is hence very
essential. It is the duty of every employee to work towards sustaining the “MARUTI
CULTURE”, which is built over the years.

5 S OF MSIL
 SEIRI - PROPER SELECTION
 SEITON - ARRANGEMENT
 SEISO - CLEANING
 SEIKETSU - CLEANLINESS
 SHITSUKE - DISCIPLINE

3M OF MSIL
In factory various problems occur which hamper production and adversely affect the
quality of products. Most of these problems occur due to 3M: -
 MURI - INCONVENIENCE
 MUDA - WASTAGE
 MURA - INCONSISTENCY

GITM GURGAON
Page 10
3G OF MSIL
3G means, “In case of an abnormality, all concerned members should actually go to the
place where the problem has occurred, see the actual thing and take Realistic action to
solve the problem”. In the Japanese language this point is compiled in 3 words: -

 GENCHI - ACTUAL PLACE


 GENBUTSU - ACTUAL THING
 GENJITSU - ACTUALLY

3K OF MSIL

 KIMERAARETA KOTO GA: What has been decided


 KIHON DORI: As per the standard
 KICHIN TO MAMORU: Must be followed

COMMUNICATION CHANNELS

As a part of open culture, all managers strive to facilitate both top-down as well as
bottom-up communications. At all levels, throughout the company employees can
communicate on any business, organizational or personal concern, without having to
cross many channels. The organizational structure has deliberately been kept very flat
to facilitate communication.

GITM GURGAON
Page 11
ORGANISATIONAL STRUCTURE AT MSIL

MSIL is a functional organization. The Company is divided into different divisions


according to the various functional areas. A Divisional Manager heads each Division.
Divisions are further divided into Departments, which are headed by Department
Managers who report to the respective divisional managers. Designations in the
Company are based on the functional responsibility in terms of the Company's
philosophy of de linking designations and functional responsibility from the salary levels.

The total operations of the Company are divided into Divisions like Marketing & Sales,
Spares, Engineering, Q.A. & Services, Production, Production Engineering, Materials,
Information Services, Finance, Personnel & Administration, etc. Each Division is further
divided into Departments.
For example: -
In Marketing & Sales Division, the departments are Exports, Marketing, Sales Planning,
Sales & Dispatch, RO-East, - West, - South, - North-I, North-II & MSS-N. In Information
Services Division, the departments are Marketing & Sales Information, Production
Management Information, Materials Management information & Resource Management
Information.
Maruti Suzuki india Limited has a total of 3354 employees (not including trainees or
Japanese experts).

GITM GURGAON
Page 12
SYSTEM OF DESIGNATION
There will be a dual set of designations. Internally, only the designations linked to
functional responsibility will be used. For external dealings a different set of
designations may be followed.
The following system of designations would be practiced without any exception within
the Company. For the purposes of defining explicit responsibility centers,
The Company has been divided into three layers of management.
 Division
 Department
 Section
An official of the Company, who will be designated as Divisional Manager, Department
Manager, Section Manager respectively would head each of these responsibility
centers. Remaining employees of the Company will have no specific designation and
would simply use the name of the Division/Department/Section to which they belong, to
identify their location in the Company.
The MD would make appointment to positions of Divisional Managers and Department
Managers only. The Divisional Managers would appoint section Managers.

GITM GURGAON
Page 13
Designation Flowchart

M a n a g i n g D i r e c t o r
( M D )

J o i n t M a n a g i n g D i r e c t o r
( J M D )

D i r e c t o r

D i v s i o n a l M a n a g e r ( D V M ) / C G M

D e p u t y D i v s i o n a l M a n a g e r ( D D V

D e p a r t m e n t M a n a g e r ( D P M ) / D G

M a n a g e r

D e p u t y M a n a g e r

S e n i o r E x e c u t i v e / A s s t . M a n a g e

E x e c u t i v e

S u p e r v i s o r

T e c h n i c i a n

GITM GURGAON
Page 14
OVERVIEW OF PRODUCTION AT MARUTI

The plants were setup with an initial collective capacity of 5 lakh cars per year. But over
the years as the demand has increased Maruti has risen to the task and responded
tremendously to the market. By introducing automation at various levels, streamlining
and refinement of material handling systems and operator motivation and incentives,
Maruti is now churning out close to 10 lakh vehicles from the plants that were planned
only for 5 lakh.

GITM GURGAON
Page 15
MILESTONES REACHED BY MARUTI

2007
• Launch of SX4
2006
• WagonR Lx & Lxi LPGew car plant and the diesel engine facility commenced
operations during 2006-2007 at Manesar, Haryana
2005
• The fiftieth lakh car rolls out in April, 2005
2004
• Alto becomes India's new best selling car
• LPG variant of 'Omni Cargo'
• Versa 5-seater, a new variant
• Baleno LXi, a new variant
• Maruti closed the financial year 2003-04 with an annual sale of 472122 units, the
highest ever since the company began operations 20 years ago
2003
• New Suzuki Grand Vitara XL-7
• Enters into partnership with State Bank of India
• Production of 4 millionth vehicle. Listed on BSE and NSE after a public issue
oversubscribed 10 times
2002
• WagonR Pride
• Esteem Diesel. All other variants upgraded
• Maruti Insurance. Two new subsidiaries started: Maruti Insurance Distributor
Services and Maruti Insurance Brokers Limited
• Alto Spin LXi, with electronic power steering
• Special edition of Maruti 800, India’s first colour-coordinated car
GITM GURGAON
Page 16
• Maruti Finance in Mumbai with 10 finance companies
2001
• Zen LXi
Maruti True Value launched in Bangalore and Delhi
• Maruti Versa, India’s first luxury MPV
• Alto Vxi
2000
• First car company in India to launch a Call Center
• New Alto
• Altura, a luxury estate car
1999
• Maruti 800 EX (796cc, hatchback car)
• Zen VXi (993cc, hatchback car with power steering)
• Omni XL ( 796cc, MUV, high roof)
• Baleno (1600cc, 3 Box Car)
• Wagon R
1998
• Zen D (1527 cc diesel, hatchback car)
• New (Omni & Omni E) (796cc, MUV)
• Launch of website as part of CRM initiatives
1997

• 1998 Esteem (1299cc, 3 box car) LX, VX and AX


• New Maruti 800 (796cc,hatchback Car) Standard and Deluxe
• Produced the 2 millionth vehicle since the commencement of production

GITM GURGAON
Page 17
1996

• Gypsy King (1298cc, 4WD, off road vehicle)


• Zen Automatic (993cc, hatchback car)
• Launch of 24-hour emergency on-road vehicle service

1995

• With the launch of second plant, installed capacity reached 200,000 units
1994

• Esteem1.3L (1298cc, 3 box car)LX


• Produced the 1 millionth vehicle since the commencement of production
1993

• Zen(993cc, hatchback Car), which was later exported in Europe and elsewhere
as the Alto
1991

• Reaches cumsilative indigenisation of 65 percent for all vehicles produced


1990

• Maruti 1000(970cc, 3 box), India’s first contemporary sedan


1988

• Installed capacity increased to 100,000 units


1987

• Exported first lot of 500 cars to Hungary


1986

• Maruti 800 ( New Model-796cc, hatchback Car)


• Produced 100,000 vehicles (cumsilative production)

GITM GURGAON
Page 18
1985

• Launch of Maruti Gypsy (970cc, 4WD off-road vehicle)


1984

• Omni, a 796cc MUV


• Installed capacity reached 40,000 units

1983

• Maruti 800, a 796 cc hatchback, India’s first affordable car.


• Production was started under JVA
1982

• License and JV agreement signed between Maruti Suzuki india Ltd. and SMC of
Japan
1981

• Maruti Suzuki india Ltd was incorporated under the provisions of the Indian
Companies Act, 1956.

GITM GURGAON
Page 19
HOW IS A CAR MADE

The making of a car starts from the press shop, where the raw material is obtained in
the form of cold- rolled sheets. From the press shop, the parts are send to the weld
shop, where they are welded to make the frame of the car. From the weld shop, these
frames are transferred via conveyors to the paint shop, where these are coated and
glazed. From the paint shop, these are send to the assembly shop, where through a
conveyor system, various parts are fitted at various canopies or stations. The machine
shop and the Engine assembly shops are located close to the respective assemblies,
and the car engine and
other transmission parts are also fitted in the assembly shop itself. Then, the V.I deptt.
conducts various tests to ensure that no defects remain before the car is dispatched via
trucks to various parts of the country.

GITM GURGAON
Page 20
The flow chart for a typical car body weld line looks as follows:

GITM GURGAON
Page 21
The basic layout of a paint shop is as follows:

From weld shop

GITM GURGAON
Page 22
The features of an assembly shop is shown as follows :

Trim line: The car body moves over the conveyor on mounts, as shown below:

Chassis Line: Here, the car is loaded on overhead jigs as shown below:

Final Line: Here, as both the engine and wheels have been fitted, the car once again
moves over the conveyor belt.

GITM GURGAON
Page 23
DIFFERENT SHOPS IN MARUTI SUZUKI INDIA LIMITED

1. PRESS SHOP

The press shop can be regarded as the starting point of the car manufacturing process.
Centrally located between weld 1, weld 2 and weld 3 supplies components to all the
three plants. The press shop has a batch production system whereas the plants have a
line production system. The press shop maintains an inventory of at least two days. The
weld shop as per the requirements picks the finished body parts from the press shop.
These may be divided as A, B and C. ‘A’ components are large outer components as for
example roof, door panels etc. These components are manufactured in the press shop
at Maruti due to design secrecy and huge investment requirements. ‘B’ and ‘C’
components are manufactured by joint ventures or bought from vendors. The press
shop can be explained under following headings:

(a) Raw material


(b) Blanking line
(c) Stamping line

(a) Raw material: The raw material is in the form of cold rolled steel coils. It is specified
in terms of steel grade and width of coil required. The coils weigh about 15000 kg.

(b) Blanking line: There are two blanking lines; ROSL (Rotary Oscillatory shear line)
for rectangular shapes and the others employing die cutting for irregular shapes.

(c) Stamping line: there are six presses of capacity varying from 1500 Ton to 4000
Ton, out of which five are transfer presses and one is semi-automatic press. The die
can be changed to obtain different body components.

GITM GURGAON
Page 24
2. WELD SHOP

The body panels produced in the press shop and the other small components are joined
here to give the “white body” or “shell”. In a typical car body 1400 different components
are welded together. The weld shops have the following facilities.

 Welding jigs
 Spot welding guns
 Kawasaki welding robots
 Hemming machines
 Punching machines

PROCESS OUTLINE: The shop has different lines for different models, each of, which
is further divided into three parts:
UNDER BODY: Here different underbody panels are welded together. These comprise
of rear underbody, central underbody, front engine room panel. These underbodies are
put on the conveyor and welded together to give the underbody.
MAIN BODY: As the body moves on, the conveyor roof and side body panels (prepared
on the sub lines) are welded to it to give the main body. The chassis number is punched
on the cowl top and it is welded to the front engine room panel.
WHITE BODY: The doors, hood and back door are attached on the main body with the
help of bolts and screws to make it a “white body”. The body is checked for dent, burr
and spatter and these defects are repaired. After inspection and repairs the body is
called WBOK. It is sent to the paint shop thereafter.

GITM GURGAON
Page 25
3. PAINT SHOP

In the paint shop following processes are carried out: -


There are five plants/units that provide a uniform painting over the white body coming
from the weld shop. In paint shop all the models are painted on the same line. The five
units are: -
(a) Pre-treatment (PT): The body is thoroughly washed to remove the dirt and oil
scales. Then the body is treated with ZnPO4 (phosphating) to prevent corroding of
the body.
(b) ED coat: This is done by electric deposition method, at 240V-dc supply. After
applying the ED coat the body is baked in oven.
(c) Sol-sealer and under coat: Here the left in the body (due to welding) are filled with
sol-sealer to provide waterproofing. Under coat is done on the surface above wheels
to prevent damage of body in that portion.
(d) Intermediate coat: This is done by spray-painting method using 10 Kawasaki
Robots. After applying the coat, the body is dried in the oven. Painting done is
basically an intermediate coating to provide base for the final coat.
(e) Topcoat: This is done by spray-painting method using 20 Kawasaki Robots. For
metallic coating, double coats are applied and aluminum flakes are provided to
shine the metallic paints.
After inspection and touch up, the PBOK, i.e. the paint body ok is sent to the assembly
shop.

GITM GURGAON
Page 26
MACHINE SHOP
The machine shop is the source of all major components for the Engine Assy. Shop.
The unmachined crankshaft and camshaft forgings, transmission case, cylinder head
and cylinder block castings are brought in as raw material from vendors. The cylinder
head and transmission case are aluminum castings while crankshaft and camshaft are
steel forgings.
It has the following lines
 Transmission Case Line
 Cylinder Head Line
 Cylinder Block Line
 Crankshaft Line
 Camshaft Line

ENGINE ASSEMBLY
Engine assembly 3 is currently used to assemble the 1061cc engine for WagonR, F8D
engine (5-speed transmission, 796cc MPFI) for Car800 and Alto. Engine assembly is
divided into 3 main Sub-Assemblies, one Main Line and a Firing Test. The sub
assemblies are:
 Cylinder Block Line
 Cylinder Head Line
 Transmission Line

The cylinder block, cylinder head, transmission case, camshaft and crankshaft are
received here from the machine shop.

GITM GURGAON
Page 27
ASSEMBLY SHOP -I
There are 3 assembly shops in MSIL which produce on an average 1750 cars daily.
The assembly shop receives PB-OK i.e. paint body OK from the paint shop. Here the
body is loaded on an over head conveyor. As the conveyor moves the body, fitments
are made at various stations.
Assembly I mainly produces MARUTI 800 (Domestic & Export Mainly), ZEN ESTILO
(Domestic& Export), OMNI(Passenger & Cargo), EECO,RITZ & WAGON R(new
model).
The Whole process of assembling undergoes through different number of stations.
There are about 375 employees in two shifts. The Asssembly shop can be further
subdivided as following
 Trim
 Chassis
 Final

TRIM LINE
Trim can be further subdivided as following:

Trim 1
This is the beginning of the assembly line conveyor. Here amongst the first tasks done
is attaching the hydraulic supporters for the boot. The assembly line check sheet is put
inside the body. Door is removed here and sent to final line .The various fitments made
here are door/floor grommets, electric wiring, and door trims parking brake cable, inner
and outer door openers, model stickers and emblems, roof silencer and cabin lamp.
Steering gear case is put inside to be fixed later.

Trim 2
GITM GURGAON
Page 28
It starts with Rear combination light fitment. Other operations done here are vacuum
booster/ brake master cylinder fitment, seat belts, fuse box, wiper sprayer and motor,
accelerator, clutch, brake pedals, door glasses and a/c panel fitment. Trim 2 ends with
the fitment of the instrument panel, which is received from an instrument panel sub-
assembly. This sub assembly involves the fitting of the speedometer console, ashtray
and stereo system. .

Trim 3
The fittings done here are rear inside cover for boot, back door glass and windshield,
quarter glasses and connecting pipe between fuel lid and fuel tank. Steering gear is
mounted. For cemendine application on the windshield, Motoman robots are employed.
Here a process check is done

CHASSIS
The chassis receives a trim up body. Here underbody fitments are made, hence body is
loaded on overhead jigs. Chassis is subdivided as following:

Chassis 1
Various fitments made here are rear shock absorbers, brake pipes, front coil spring with
knuckle, steering wheel, tie rods, rear suspension, fuel pipes, fuel tank and rear brake
drum. There is a knuckle sub assembly that feeds the line with knuckles for the front
suspension system. Process check is done at the end of Chassis 1.

Chassis 2
The fitments made here the exhaust system (silencer and catalytic converter), engine
cum transmission case assembly, gearshift rod, front and rear bumpers, stabilizer bars
and tyres. The tie rod and drive shafts are connected to the knuckle to complete the
front suspension system and ID plate fixation. A process check is done at the end of
chassis 2.

GITM GURGAON
Page 29
FINAL
Since all the fitments have been made, the body is referred as vehicle from now
onwards. The vehicle is loaded on the final conveyor. Final area is further subdivided
as: -

Final 1
The fitments made here are Spare wheel cover, scuff, seats, roof trim and carpet, boot
carpet, battery and air cleaner. Clutch cable and parking brake connections are made.
Brakes are evacuated and brake oil is filled. Coolant is also filled.

Final 2
Five liters of petrol is filled in the vehicle. A/C vaccum and charging is also done here,
the refrigerant used here is R134a (400 gm +- 50).Door Assembly is also done here.

Final 3
There is a process check at the end of this line. The vehicle is said to be AB-OK now. It
is handed over to the vehicle inspection department.

GITM GURGAON
Page 30
VEHICLE INSPECTION - I

The VEHICLE INSPECTION II having the following stations :


 Toe-in test
 Slip tester
 Head lamp test
 Appearance test
 Drum test
 Brake test
 Engine room and Pit inspection
 Shower test
 Road test
 Final check

General Procedure
In VI a vehicle is checked at checkpoints in the above mentioned order. At each
checkpoint different parameters are checked. Each vehicle is issued a check-sheet in
which the operator at the check points marks down the defects if any, otherwise he
marks an OK stamp. After the road test if the vehicle has no defects marked in the
check sheet it goes to the final check conveyor belt where it is again checked for overall
appearance. If a vehicle has any defect then it is sent to the following repair areas
depending on the type of defect:

 Assembly repair
 Weld repair
 Paint repair
 Engine Assembly repair

GITM GURGAON
Page 31
After repairs the vehicle is then sent to the final check conveyor where the repair work is
checked and if satisfactory then the vehicle is given final clearance.

Toe-In Test
This is the first inspection point for a vehicle once it comes off the assembly line
conveyor. Before the vehicle is accepted for this test it is checked for external damages,
feel of the brakes and floor carpet. The objectives of doing the toe-in test are as follows:

 Minimum tyre wear


 Steering position OK
 Minimum side slip

Toe-In refers to the alignment of the wheels. It is not possible to have a wheel alignment
such that the wheels are perfectly straight (ideally this leads to minimum tyre wear). The
wheels are either pointing slightly inwards (toe-in) or outwards (toe-out). Also when a
car is in motion then the wheels tend to align outwards so vehicles are generally set with
a toe-in condition. Statistical analysis and experiments has given a value of toe-in 2 and
toe-out 1 for front wheels in Car800, WagonR and Baleno. Baleno has rear wheel
allowance of toe-in 3.5 and toe-out 0.5.

Another point checked here is the steering position. Correct steering position refers to
that setting of the steering wheel that would allow the car to move in a straight line and
which is the natural position of the wheel i.e. the driver isn’t holding the steering wheel.
Figure no. 5 shows the toe-in tester machine.

GITM GURGAON
Page 32
SLIP TESTER
This machine checks vehicle slipping after the toe in adjustment. The machine is
calibrated for 2 unit toe-in and 1 unit toe-out. If the vehicle slipping falls in between the
calibration limits, the vehicle is OK in slipping otherwise NOT OK.

HEAD LAMP TESTER


Often the car driver faces the problem, the headlight beam adjustment. Because of the
maladjustment the light beam falls on unwanted objects. At the headlamp tester, a
yellow cross represents the position of the headlamp whereas the point where it should
ideally be is shown as green rectangle. The operator manning the test tries to get the
yellow cross inside the green rectangle by adjusting screws for horizontal and vertical
alignment of the lamp.
Apart from checking the headlamp, turning radius and other things are also checked at
this checkpoint.

Appearance Test
This test involves evaluating a vehicle on a large number of parameters ranging mainly
from external appearance of the vehicle to the internal trim fittings to checking for
coolant level and braking fluid level. The vehicle is loaded on a conveyor. The vehicle is
visually inspected for weld, paint and assembly defects and the same are marked on the
diagrammatic representation given on the checksheet. The appearance check points
are I.D plate, emblems, bumper, doors, fuel lid, front hood, routing and clamping, seats,
interiors, seat belts, weather strips, tyres and glasses.
Various paint defects are paint peel off, scratches, paint miss, overflow, orange peel,
shade mismatch, pin holes sealer application and sanding marks. Various weld defects
are level difference, dents, door gap and fouling.

The vehicle is driven in all the gears and the various parameters checked are as follows:

GITM GURGAON
Page 33
 Steering wheel : position/vibration
 Clutch : free play 20-30 mm/noise/engagement/disengagement
 Accelerator Pedal: free play 2-7 mm/operation
 Gear shifting: hard/noise/slippage
 Speedometer: needle vibration/error/reading at 40 km/h
 Horn: volume/tone
 Wiper/washer (front/rear): auto stop position/wiping/spraying position
 Warning lamps and indications: parking brake/battery changing/oil
pressure/hazard lamp/turn signal/pilot lamp/room lamp/panel light/pre heat/brake
oil indication.
 Rear view mirror: blurred image/ distortion
 Fuel/Temperature gauge: function
 Lamps: Parking, head lamp high/low, side turn signal, cabin lamp/door switch/fog
lamp, brake light, hazard lamp, reverse light
 Blower: Operation of switch at different speeds, air direction control, fresh/re-
circulating air control, fins
 Heater: functioning, switch operation
 A/C: functioning, switch operation
 Choke: operation/ function
 Abnormal noise of any kind from wheels/body/engine should not be there.

Brake Tester
The front and rear brake forces are measured here. Here the brake pedal is checked
for hardness, sponginess, play and noise. Parking brake force is also checked here.
The vehicle is moved onto the drums, vehicle brakes are employed and the
corresponding resistance force is measured with the help of computerized machine. The
measured force is displayed on the screen and must lie between the values prescribed
by the company.

GITM GURGAON
Page 34
Engine Room
Here the engine is inspected for various kinds of defects such as tappet noise, clutch
lever play (Car800), exhaust emissions as per the standards laid down, idling rpm with
and without A/C switched on. In case of MPI cars, a DLC (Data Link Connector) cable
is used to detect the working of Electronic Control Module and various sensors. The
DLC cable is connected to a computer which shows not ok if there is any malfunctioning
in the engine. The defects are noted on the checksheet to be repaired in assembly or
engine assembly.

Pit Inspection
The underbody of the vehicle is checked for:
Brake fluid/coolant/fuel/engine oil leakage
Red and yellow paint on nuts, bolts and fuel and brake pipes (the paint indicates that the
nuts and bolts have been properly assembled and checked for torque)Muffler mounting
bolt Rear suspension coil or leaf spring

Shower Tester
The vehicle is moved on the shower tester conveyor belt where it passes through a
series of shower jets aligned at different angles and locations. While passing through,
the vehicle is sealed i.e. all window glasses are rolled up and doors closed. When the
vehicle exits from other side of the shower tester an inspector checks the cabin for
water seepage. If water is found, then the particular leak defect is repaired in the shower
repair section following which the vehicle is sent for the road test.

Road Test

GITM GURGAON
Page 35
Road test of a vehicle consists of a track on which the vehicle is run at predetermined
speed. The track is designed so as to check the various aspects of the vehicle such as
braking, acceleration, handling, performance etc. Distance traveled after application of
brakes, reverse braking and Steering positioning is also checked. After driving the car at
a fast speed it is made to take a U-turn to try and find for any loose part in the panel.
Other parameters checked in the road test are:
 Steering stability: position/play/vibration
 Clutch/accelerator pedal: play/noise
 Brake: noise/sponginess/brake pulling
 Rear view mirror: blurred image/distortion
 Gear shifting: gear slip/engagement/hard disengagement/noise
 Defogger: functioning
 Speedometer: needle vibration
 Abnormal noise of any kind from panels, doors, wheels , engine, hood etc is noted
down

Final Check
This is the last of the vehicle inspection checks. After the vehicle has gone through the
other tests and if there are no repairs to be done then it is sent to final check. Here the
overall appearance of the vehicle is checked again.
Scratches, dents, cleanliness and Cemedine(windscreen sealer) leftovers are checked
for. Also secondary defects i.e. defects that may creep in while repairing the primary
defects are also checked for. Inspection stamps for all the previous check stations are
checked to see that there is no inspection miss. Finally the chassis and engine number
on the I.D. plate are verified and the Final Check OK ( FCOK) sticker is put on the car
and it is sent to the final check parking area. FC OK’ed vehicles are later picked by the
Sales and Dispatch drivers.

GITM GURGAON
Page 36
NEED FOR THE PROJECT

The need of the project is to increase the productivity of the workers both in terms of quality and
quantity. This can be achieved by doing the time study of the various working stations of line.
The main purpose of implementing time study in ETSA & Rear Axle Sub Assembly and layout
design is to-

 Identify and Eliminate hidden waste of time- Hidden waste refers to those waste which
are not visible during the process but still exist.

 To calculate standard time of each process- Standard time of each action performed by
the worker is calculated by using MOST, thus standard time of each process can be
found.

 Line balancing- The goal in balancing an assembly line is to assign tasks to stations such
that equal amount of work is performed at each station.

 Man power reduction- To optimize the Line by calculating the required Man power &
removing the extra workers from the line.

GITM GURGAON
Page 37
Introduction to Time Study

In business efficiency studies, Time Study (an Industrial Engineering term) is the time required
for a person to complete a task or operation at a defined rate of working. It includes appropriate
allowances to allow the person to recover from fatigue and, where necessary, an additional
allowance to cover contingent elements which may occur but have not been observed. The
Standard Time is the product of three factors:

1. Observed Time - The time required to complete the task.

1. Rating Factor - The pace the person is working at. 90% is working slower than normal,

110% is working faster than normal, 100% is normal. This factor is calculated by an Industrial
Engineer trained to observe and determine the rating.

1. PFD Allowance - Personal, Fatigue, and Delay Allowances. These include factors such
as: Are the workers standing all day? Are they working in a cold environment? Do they
have to wear safety equipment?

Method to Calculate Time:


In this project I have calculated time at different stations by using stop watch. Before calculating
the time at each, first we have saw that how many operator at each station has and what is their
method of doing the work. If we analyze all the relevant details of station and accurately knew
the amount of component that each operator fit in the object then only accurate time is measured
with the stop watch.

GITM GURGAON
Page 38
Rear Axle Sub Assembly Line No.4
In rear axle sub assembly of line no.4 rear axle of Eeco & Ritz are made. In this section there are
3 stations in which different operation performed by each operator. In this various components
attached to the axle frame. The components such as brake sub assembly, drum head, trailing
arm, parking cable, break pipe, E rings, clamps, spindle rear, sticker, oil filling in Eeco, hose
pipe, plug, bump stopper, helical springs etc.
In this section there are two stations on conveyor belt and one station for engine mounting.

Stations of Rear Axle Sub Assembly

 Station no.1

 Station no.2R

 Station no.2L

 Station no.3

DESCRIPTION OF STATIONS AT REAR AXLE SUB ASSEMBLY:

STATION NO.1:

GITM GURGAON
Page 39
In this station the axle of Eeco & Ritz first transfer from trolleys to the station no1 with the help
of crane and then component such as brake sub assembly, hose pipe, oil filing etc. done on axle
frame. In this station only one worker is engaged.

STATION NO.2:

In this station 2 workers are engaged on left and right side. At station no.2 (R&L) the component
such as trailing arms, brake pipes, hose pipes, clamps, parking cable and drum head attach on the
axle body.

STATION NO.3:

In this station the axle is moved from conveyer belt to lift and from lift it is attached to car body
with the help of bolts and lateral rod, helical springs also attach at the same time.

Time Calculation:

Time at each station is calculated 3 times with the stop watch, so that standard time can be
obtained. Standard time of both cars of line no.4 Eeco & Ritz at each station is shown below in
the table.

GITM GURGAON
Page 40
Operator working at rear axle sub assembly

Time Study Data Sheet

Axle Sub Assembly

Station no. total time taken(in seconds)

station no.1
Eeco 1.51"68total)
loading from trolley 17"18sec

Ritz 1"20"38min (total)


loading 12.22sec
fetching of component 2.08sec

station no.2
Ecco 1"15.62min
Ritz 1"44.42min

station no.3

Ritz 1.53"16
Ecco 1.53"16
Ecco(lining front fender) 8.86(seconds)

GITM GURGAON
Page 41
ENGINE MOUNTING STATION

At this station an engine is fited to the car by using an automatin lift.


Two operators work on this station below the lift.

The time observed is as follow:

PERSON 1
OPERARIONS TIME(EECO) TIME(RITZ)
Total time 69.90sec 75.56sec

PERSON 2
GITM GURGAON
Page 42
OPERARIONS TIME(EECO) TIME(RITZ)
Total time 68.54sec 102.98sec

Line Layout of Line no.5

INTRODUCTION:
A line layout study is an engineering study used to analyze
different physical configurations for an industrial plant.

Definition:
Definition of Line Lay out

Line Layout is the physical arrangement of equipment, facilities & man power within a line. The
Line Layout can be indicated on a floor plan showing the distances between different features of
the line. Optimizing the Layout of a line can improve productivity, safety and quality of
Products. Unnecessary efforts of materials handling can be avoided when the Line Layout is
optimized. This is valid for:
- Distances Material has to move
- Distances Equipment has to move
- Distances Operators have to move
- Types of Handling Equipments needed
- Energy required to move items against resistance (i.e. gravity)

GITM GURGAON
Page 43
Line Lay out of line no.5(WAGON-R)
Line no.5 mainly contains three most important sections. The sections are:
 Trim
 Chassis
 Final

Trim:
Trim of line no.5 has 23 stations on its right side and 23 stations on its left side. In trim sections
34 workers are engaged at its different stations and all are of different categories. The categories
such as casual, permanent, T.T, apprentice, reliver and repairmen. The category of each worker
at each station is shown in table 3.

Chassis:
Chassis of line no.5 has 14 stations on its right side and 14 stations on its left side. In chassis
sections 26 workers are engaged at its different stations and all are of different categories. The
categories such as casual, permanent, T.T, apprentice, reliver and repairmen. The category of
each worker at each station is shown in table 4.

Final:
Final of line no.5 has 29 stations on its right side and 29 stations on its left side. In final sections
47 workers are engaged at its different stations and all are of different categories. The categories
such as casual, permanent, T.T, apprentice, reliver and repairmen. The category of each worker
at each station is shown in table 5.

GITM GURGAON
Page 44
Table Notations:
C-CASUAL P-PERMANENT
T.T-TRAINEE A-APPRENTICE

Trim Data: Left Station (table no.1)

Station Category of worker

1L C
2L C
3L C
4L C
5L T.T , R
6L C
7L C
8L C
11L T.T
12L C
14L C
15L1 C
15L2 C
16L C
18L C
20L T.T
21L P
23L P

GITM GURGAON
Page 45
Trim Data: Right Station

Station Category of worker


1R C
2R C
3R C
4R C
5R C
6R C
7R C
8R T.T
9R C
11R C
12R C
14R C
18R P
20R C
21R C
23R P

IPSA 2P
5C
ETSA 1P
1T.T
5C

RELIEVER-3

Chassis Data: Left Station

Station Category of worker


24L C
25L C
26L APP.
27L C
28L C
29L C
GITM GURGAON
Page 46
33L C
34L C
35L C
36L C
37L P

REAR AXLE ASSEMBLY


CENTRE C
LEFT C,C

Chassis Data: Right Station

Station Category of worker


24R C
25R C
26R APP.
27R C
28R C
29R C
31R C
34R C
35R C
36R C
37R P

REAR AXLE ASSEMBLY

GITM GURGAON
Page 47
RIGHT C,C

RELIVER-3

Final Data: Left Station


Station Category of worker
38L C
39L C
41L P , APP.
42L APP.
43L C
46L C
47L P
48L P
49L C
50L T.T
52L C
53L C
55L P
56L C , C(underbody-PIT)

57L C
58L P
59L P

60L P

GITM GURGAON
Page 48
61L P

62L P
63L P
65L P

Final Data: Right Station


Station Category of worker
38R C
39R C
41R C
42R T.T
43R P
44R C
47R C
48R C
49R C
50R C
51R C
52R C
53R C
55R C
56R C
57R C
58R P
59R P
60R C
61R P

GITM GURGAON
Page 49
62R P
64R P
66R P

RELIEVER-2 WORKERS AT CNG STATION -5


DRIVER-2 REPAIRMAN-10 (OFFLINE-2 , ONLINE-2

LINE LAY OUT

Line layout is made on white board in which 2 tapes of blue and red color stick on it borders.
Blue tape is stick on white showing the trim, chassis & final sections and also showing all the
working stations that 3 section of line no.1 has. Every stations on white board is shown with the
of marker and all workers on each station are then implement with the of above tables. In this
line layout each worker assigned different color of magnets and then each magnet are put on
mark station in white board according to its category. After doing all the above stated task line
layout is made on white board.

GITM GURGAON
Page 50
CONCLUSION

The 6 weeks Industrial Training is indeed the most important part of our curriculum at the

Mechanical Engineering Department of GITM GURGAON. It provides me an opportunity to

gain experience on the practical application our technical knowledge.

I have done my industrial training in the ASSEMBLY SHOP-1 of MARUTI SUZUKI INDIA

LIMITED. In my training I have leaned 2 topics TIME STUDY TECHNIQUE AND LINE

LAY OUT DESIGN. Time Study is a very useful tool which can be employed in manufacturing

companies like Maruti which have to constantly cater to ever increasing demand from the market

with very small lead times. The overall experience that I have gained at Maruti helped me a lot in

my future. In the end I would like to thank my Mentor at Maruti and all staff members of

assembly shop -1 who have encouraged and inspired me to achieve higher goals.

GITM GURGAON
Page 51
RESULT

1. Standard time for each operation in ENGINE

MOUNTING, LINE NO.4 is known.

2. Standard time for each operation in REAR AXLE SUB

ASSEMBLY is known.

3. LINE LAY OUT OF LINE NO.5 is made.