You are on page 1of 1

ENGINEERING DEPARTMENT

PENCATATAN HARIAN UTILITY

EQUITMENT Hari / Tgl : Senin / 17 - 02 - 2020


Kwh meter PLN Shif Pagi jam … Shif Sore jam 16:00 - 24:00 Shif malam jam …
LBP 497,20
BP 109,54
KWH total 606,75
KW tot 0,0694
Kvarh 152,91
PF (cos θ) 0,94
Stand Meter PDAM M3 2006 M3 M3
Record R S T
LVMDP ( Trafo 1 ) Tower A Record R S T Record R S T Record R S T
Tegangan (phase - 0) 228 229 228
Tegangan (phase - phase) 397 396 395
Arus A 91,06 A A
PF ( cos Ø ) 0,99
Kwh meter Out going trafo 1 445,00
LVMDP ( Trafo 2 ) Tower B Record R S T Record R S T Record R S T
Tegangan (phase - 0) 229 229 228
Tegangan (phase - phase) 392 392 392
Arus A 71 A A
PF ( cos Ø ) 0,96
GENSET 1 ( Tower A ) Status …… Status …… Auto Status ……
Meter Gen 1 (Running Hours) Jam menit 10 Jam 21 menit Jam menit
Volt charger Vdc 26,7 Vdc Vdc
Ampere charger A A A

Level Solar Daily Tank 1 (kap Liter 75% Liter Liter


1000 lt)
GENSET 2 ( Tower B ) Status …… Status …… Auto Status ……
Meter Gen 2 (Running Hours) Jam menit 9 Jam 29 menit Jam menit
Volt charger Vdc 26,7 Vdc Vdc
Ampere charger A A A

Level Solar Daily Tank 2 (kap Liter 75% Liter Liter


1000 lt)
Level Solar Monthly Tank Liter 75% Liter Liter
( 2x1000
Selector lt) Transfer Pump
Switch
Status …… Status …… Auto Status ……
Air Bersih
Selector A Transfer Pump
Switch
Status …… Status …… Auto Status ……
Air Bersih
Selector B / Handle Jockey
Switch
Status …… Status …… Auto Status ……
Pump
Selector Switch / Handle Electric
Status …… Status …… Off Status ……
Fire Pump
Selector Switch / Handle Diesel
Status …… Status …… Auto Status ……
Pump
Tekanan Hydrant / Pressure Low Zone High Zone Low Zone High Zone Low Zone High Zone
Gauge Psi/Bar Psi/Bar 8 Psi/Bar 16 Psi/Bar Psi/Bar Psi/Bar

Level Solar Diesel Pump Liter 75% Liter Liter


Level Ground Tank % full % %

Level Roof Tank Air Bersih Tower A % full % %


Selector Switch Booster Pump
Status …… Status …… Auto Status ……
Air Bersih booster pump air
Pressure Bar 2 Bar Bar
bersih
Level Roof Tank Air Bersih Tower B % full % %
Selector Switch Booster Pump
Status …… Status …… Manual Status ……
Air Bersihbooster pump air
Pressure Bar Bar Bar
bersih
STP
Selector Switch / Handle
Status …… Status …… Auto Status ……
Effluent
SelectorPump
Switch1 / Handle
Status …… Status …… Auto Status ……
Effluent Pump
Selector Switch2 / Handle
Status …… Status …… off Status ……
Dozing
Selector Switch / Handle
Status …… Status …… Auto Status ……
Blower 1 Switch / Handle
Selector
Status …… Status …… Auto Status ……
Blower 2
Meter Air STP M3 M3 M3
Selector Switch Sumpit 1 Status …… Status …… Auto Status ……
Selector Switch Sumpit 2 Status …… Status …… Auto Status ……
Selector Switch Sumpit
Status …… Status …… Auto Status ……
Bosem
Crew Engineering : 1 1 Tri.H 1
2 2 Lucky 2
3 3 3