The document outlines the 9-step procedure for starting up and operating a motor-driven pump. The steps include: 1) opening suction gate valves; 2) ensuring the pump is full of water; 3) lowering the pressure switch setting; 4) turning on the main circuit breaker; 5) checking rotation direction; 6) opening the discharge gate valve; 7) bleeding the system; 8) checking the motor current; and 9) bleeding again until the desired startup pressure is reached.
The document outlines the 9-step procedure for starting up and operating a motor-driven pump. The steps include: 1) opening suction gate valves; 2) ensuring the pump is full of water; 3) lowering the pressure switch setting; 4) turning on the main circuit breaker; 5) checking rotation direction; 6) opening the discharge gate valve; 7) bleeding the system; 8) checking the motor current; and 9) bleeding again until the desired startup pressure is reached.
The document outlines the 9-step procedure for starting up and operating a motor-driven pump. The steps include: 1) opening suction gate valves; 2) ensuring the pump is full of water; 3) lowering the pressure switch setting; 4) turning on the main circuit breaker; 5) checking rotation direction; 6) opening the discharge gate valve; 7) bleeding the system; 8) checking the motor current; and 9) bleeding again until the desired startup pressure is reached.
2. Check that pump is full of water and that all air contained in pump has been allowed to escape through the air release valve 3. Lower setting of pressure switch (discharge line pressure) to prevent pump from starting 4. Place the Main Circuit Breaker in the “ON” position 5. Check direction of driver rotation by pressing momentarily the “Start” and then “Stop” push buttons on the controller (proper direction is indicated by arrow on pump casing); for in-line pump use a light on shaft to see rotation (this is clockwise look- ing down from top of motor). If rotation is wrong interchange motor leads in panel per instructions in panel 6. Open Discharge Gate Valve 7. Bleed the system by opening a valve on the pressure line to create a pressure drop 8. As soon as fire pump starts check if full load current value is within the electric motor nameplate rating with service factor taken into account 9. Bleed again until desired start-up pressure is attained
Prepared by;
Ariel A. Alcantara LJIFI Pump Division 0917 167 8666
Main Office: 1422 Librada Avelino St.,Pandacan, Manila
Sales & Marketing Office: LJ Industrial Compound, South Drive, Brgy. San Antonio, San Pedro, Laguna Cebu Office: 2nd Level The Persimmon Plus, MJ Cuenco Avenue, Mabolo, Cebu City 6000 Davao Office: Door 1 Royeca Apartment, Capricorn St. Dona Luisa Phase @, Davao City 8000 Tel.Nos.: 808-5931/808-2956/808-4592/TeleFax.:808-5249 Pump Star-up and Operating Procedure Method Statement
(Engine Driven)
1. Open Suction Gate Valves
2. Check that pump is full of water and that all air contained in pump has been allowed to escape through the air release valve 3. Close the Main Relief Valve using the maximum spring pres- sure (or the Discharge Gate Valve) 4. Start engine manually or either battery 5. Adjust Main Relief Valve (MRV) spring to allow valve to fully open 6. Stop engine and open system or the Discharge Gate Valve 7. Bleed the system by opening a valve on the pressure line to create a pressure drop 8. Bleed again until desired start-up pressure is attained 9. Allow Jockey Pump to run and to stop with pressure setting
Prepared by;
Ariel A. Alcantara LJIFI Pump Division 0917 167 8666
Main Office: 1422 Librada Avelino St.,Pandacan, Manila
Sales & Marketing Office: LJ Industrial Compound, South Drive, Brgy. San Antonio, San Pedro, Laguna Cebu Office: 2nd Level The Persimmon Plus, MJ Cuenco Avenue, Mabolo, Cebu City 6000 Davao Office: Door 1 Royeca Apartment, Capricorn St. Dona Luisa Phase @, Davao City 8000 Tel.Nos.: 808-5931/808-2956/808-4592/TeleFax.:808-5249