5. Start up the main motor.

9.4.2 GAP/CLEARANCE ADJUSTMENT


1. Switch the main control to the MANUAL mode.
2. Press the “MANUAL ON” display button.
3. Press the “HYDRAULIC” tank Icon to start up the hydraulic tank, the red indicator light “RUN” is on.
4. Press UP/+ or DOWN/- to adjust the clearance, the LED display will operate and display the adjusted
clearance value, the unit here is mm.
For example, if necessary clearance setting before start-up is 20 mm: steps 1-4 should be done first,
press the “DOWN -” display button until concave and mantle touch, in order to adjust the clearance to 0.
The displayed value is 0 too at this time. And then press the “UP +” display button until the displayed value
of the LED is 20 mm. Finally, press the “MANUAL OFF” display button to finish the adjustment.

9.4.3 CLEARING/FOREIGN MATTER DISCHARGE


1. The main machine stops running.
2. Switch the main control to the MANUAL mode.
3. Press the “MANUAL ON” display button.
4. Press the “HYDRAULIC” tank Icon to start up the hydraulic tank, the red indicator light “RUN” is on.
5. Press UP/↑ or DOWN/↓ to clear the materials in the crushing chamber and lock the clearing cylinder.
6. After clearing, main frame hydraulic cylinder must be completely relocked, pressure must reach 150
kg/cm².
7. Timing for Chamber Clearing: Upon sudden power failure or sudden machine stop, causing aggregates
piling up in crushing chamber.
8. Strictly prohibited to run crusher or main motor during chamber clearing.
9. Strictly prohibited to run conveyor & feed material into crusher during chamber clearing.
10. During chamber clearing, rise Top Frame Assembly up & down repeatedly several times, in order to
let all material fall down and clear crushing chamber completely.
11. Prohibited to use pressure of descending hydraulic clearing cylinders for material crushing.

9.4.4 Necessary Conditions to Control the Main Machine Operation


① Upper section locking completed: pressure 190-210 Kg/cm² (186-206 Bar) (Top Cell Locking
Cylinder #2A01).
② Lower section locking completed: pressure 150-160 Kg/cm² (147-157 Bar) (Main Frame Locking
Cylinder #1600, #1700).
③ Lubrication oil tank pressure at 1.2~1.8 Kg/cm².
④ Lubrication oil tank temperature lower than 55℃.

9.5 No-Load Test Running


1. Start the oil pump, and confirm the return oil to the tank. Manually turn the pulley, and
determine whether or not the Mantle and the Concave are in contact with each other. THEY SHOULD