You are on page 1of 1

12.1.

2 Mounting the Concave

First, place Concave on work platform.


Lift up Top Cell (2101) and spin it into slot of Concave.
Attention: Avoid collision of parts during lifting work.

Lift up Tightener (2161) and spin it into slot of Concave.

Fit Stopper (2181) into gap between Concave and Top Cell.

Measure clearance between Top Cell (2101) and Concave (2121),


Value required below 0.1 mm.

Tighten bolts and secure with stainless steel wire.

35

You might also like