Professional Documents
Culture Documents
MSP300 0078 Conica 3
MSP300 0078 Conica 3
9 OPERATION…………………………………………………………………….…23
9.1 Drive Rotation Direction………………………………………………….……..23
9.2 Hydraulic Pressure & Control System…………………………………………24
9.3 SP Cone Crusher Controller Instructions…………………………………...…24
9.4 Basic Operation and Setting………………………………………………….…25
9.4.1 Operation Procedures before Start-Up…………………………………..25
9.4.2 Gap Adjustment……………………………………………………………25
9.4.3 Foreign Material Clearing……………………………………………...…25
9.4.4 Necessary Conditions to Control the Main Machine Operation……..…26
9.5 No-Load Test Running………………………………………………………..…26
9.6 Loaded Operation…………………………………………………….……….…27
9.7 Stopping the Cone Crusher…………………………………………….…….…27
9.8 Main Frame Hydraulic Locking Cylinder Adjustment…...…………………..28
10 DAILY INSPECTION………………………………………………………….…29
iii