Project: Direct Reduction Plant, Water Treatment Unit, Shiraz, Iran Date: Sheet: 2 of 2
Operating
Stand By
Manufacturer:
Mechanical
Seal
Type/Size: Thrust Reduction:
Press./Temp. Limit:
Function Fluid Flow (m3/hr) Temp. (oC) Press.(Barg) Temp. (oC) Press.(Barg) Total Shaft Bushes (mm):
Clearance
Balance Drum (mm):
Pump+Base Plate+Coupling(kg):
Weight
Motor (kg):
Remarks: (1) Vendor shall detail material specification of all components in proposal,as minimum, for mechanical seal (seal end plate, throttle bushing,
rotating ring, stationary ring, spring, etc.), coupling (hubs, spacer, flexible elements, coupling guard,
(2) All accesossories, including: coupling, motor, auxiliary piping, lubrication system, etc. shall be supplied and mounted by vendor.
(4) The selected materials by vendor shall be suitable for service fluid as per analysis and Meteorological and Site Data in M.R.
(5) If gear unit is required it is in vendor scope and Mfr, type, size, model, ratio, etc. shall be noted in proposal.
(6) Counter flanges for suction and discharge connections shall be supplied by vendor.
M FULAD SANAT DARA PASARGAD STEEL
CO.
Project: Direct Reduction Plant, Water Treatment Unit, Shiraz, Iran Date: Sheet: 1 of 2
Operating
Stand By
Operating Temp.
Rotation viewed from coupling end:
(Max/Norm/Min) (oC):
Corrosion/Erossion
Casused By: Column Pipe Type/Line Shaft Type:
Rated (Barg):
Outlet Pressure
Max. (Barg): Manufacturer/Type:
Rated Driver Power (Kw): Nozzles: Size Rating Facing Location Remark