Professional Documents
Culture Documents
(Name Of Project)
WS Atkins & Partners Overseas Calculation Title Fire Protection System Calculations (Project No)
P.0.Box 24656 Date Of Issue
Doha, Qatar
Sr. No Rev. Calculation Description No of Pages Calcs By Date Checked By Date Remarks
NOTE
1) The calculations are based on the relevant sections of NFPA 13 - 2010 Standard for the installation of Sprinkler Systems & NFPA 14 - 2010 Standard for the Installation of
standpipe and hose systems.
2) The design values in the yellow fields are indicative only (i.e prepared as a sample calculation) .The actual values to be used, in particular for the project as per selected fire
hazard classification.In addition to that, the designer shall ensure the correctness of the values in the yellow fields as per the latest edition of the relevant NFPA Standards.
Project Job ref.:
NAFFCO QATAR (Name Of Project)
Calculation Title
Fire Water Storage (Project No)
P.0.Box 24656 Calc. by Date Checked by Date Calc sheet no.: Rev. no.
Doha, Qatar F001
Selected Class II standpipe system 83.3 IMP gal Ordinary Hazard (Group 1) 0,50,100 250
with Ordinary Hazard (Group 2) 0,50,100 250
hose station of 40mm (1 1/2") Extra hazard (Group 1) 0,50,100 500
Extra hazard (Group 2) 0,50,100 500
Ref. NFPA 13, Chapter 11.2.3 (Edition 2010)
D Power Required
Calculations