Has the Plan (or Plans) been reviewed this school year? Yes No N/A
10-3-09
(second date)
Location:
Status of the Asbestos repair and maintenance Work Order System: N/A Established,
Pending
Comments:
Note: During today’s visit I met with the lead food service person and Mike
Pokrzywinski to discuss the asbestos containing materials in the building.
Note: The overarching issue with asbestos at this school is the ceilings consist of a
spray on sound proofing containing asbestos fibers. The ceiling appears to be in a
stable condition and have not noted any delaminating or damage due to water
intrusion. The cost would be prohibitive to remove so recommend just monitoring
and repairing as needed. A significant amount of asbestos TSI covers the hot water
plumbing in the crawl space below the entire structure. I did do repairs on the TSI
during a visit 2008. During that same visit I conducted O&M on the TSI located in the
boiler room. The boiler room pipe insulation consists of a combination of asbestos
containing lagging and some newer fiberglass lagging. I have repaired both but the
heat of the boiler room is so great that deterioration of the repairs can occur.
The floor covering primarily consists of 9”X9” ACBM. They are in remarkably good
condition. I noted that the north east entry to the gymnasium has had the FT
removed. The lagging in the catacomb has some nicks and scratches that should be
repaired. LC 5-27-2010