Professional Documents
Culture Documents
BAY 02 - GRID K
OBS. PT TOP RAIL POINT LEVEL TOP RAIL POINT LEVEL ACTUAL DISTANCE ASBUILT DISTANCE
(Rail no.1) (Rail No. 2) RECORDED SEMI (Hypotenuse Distance (Hypotenuse Distance
H1 (m) H2 (m) GANTRY HEIGHT Between Rail 1 and 2) Between Rail 1 and 2)
H (m) L1 L2
0.014
0.013
0.016
0.017
0.020
0.019
0.015
0.018
0.017
0.015
UPC - DIC FACTORY - SEMI GANTRY SURVEY OBSERVATIONS
0.020
0.020
0.018
0.030
0.023
UPC - DIC FACTORY - SEMI GANTRY SURVEY OBSERVATIONS
BAY 02 - GRID L
OBS. PT TOP RAIL POINT LEVEL TOP RAIL POINT LEVEL ACTUAL DISTANCE ASBUILT DISTANCE
(Rail no.1) (Rail No. 2) RECORDED SEMI (Hypotenuse Distance (Hypotenuse Distance
H1 (m) H2 (m) GANTRY HEIGHT Between Rail 1 and 2) Between Rail 1 and 2)
H (m) L1 L2
DIFFERENCE b/n
REQUIRED AND
OBSERVED REMARKS
DIMENSIONS
L1-L2
Reference Point for Level
0.013
Measurement
0.000
0.010
0.001
0.002
0.005
0.003
-0.003
0.002
0.000
-0.005
-0.001
-0.001
0.010
0.005
0.001
0.000
0.000
-0.008
-0.009
-0.006
-0.007
-0.007
-0.008
0.000
-0.006
0.000
-0.007
-0.008
-0.004
-0.005
0.002
0.002
0.000
0.002
0.005