DAILY 

WORK PLAN PROGRESS REPORT CLIENT :        UPC / DIC
PROJECT ‐ 672100 DATE : 17‐AUG‐2017
SHIFT :              NIGHT 
DAY 27 THURSDAY
TOTAL  TOTAL 
TOTAL MANPOWER IN TIME OUT TIME EQUIPMENTS &  Elec.DB   AVAILABILITY
IDLE Hrs. Hrs.
SITE ENGINEER 1 MAN LIFT ‐
FOREMAN 1 EOT CRANE ‐
FABRICATOR 1 8hrs 30  MOBILE CRANE ‐
6:00 PM 2:30 AM ‐
WELDER 4 min DB AT BAY3 ‐
SEMI SKILLED 3
HELPER ‐
SL NO SCHEDULED JOB ACTIVITIES PRODUCTION ACHIEVED REMARKS CORRECTIVE ACTION

crane limit switch and manlift issues are not rectified. 
1
Due to this reason don’t have wor at site.

general work ‐ 8.5 hrs for all workers

FOREMAN PRODUCTION ENGINEER QA/QC ENGINEER


DAILY WORK PLAN PROGRESS REPORT CLIENT :        UPC / DIC
PROJECT ‐ 672100 DATE : 17‐AUG‐2017
SHIFT :              NIGHT 

WORKING 
NAME TEAM  IDLE HRS
HRS
ANOOP R day
KARTHICK PR

ALEX BASKARAN C 9.5 3.5


BINU CHELLAPAN A 9.5 ‐
CHANDRAMOHAN G1 9.5 3.5
PRADEEP K B 9.5 ‐
UNNIKRISHNAN Y A 9.5 ‐
UPENDRA SHAH C 9.5 3.5
SIBIMON ‐ ‐
VIKRAMAN G2 9.5 ‐

ARAVINDAKSHAN B 9.5 ‐
SUBIN AK D 9.5 3.5
TOTAL HRS 85.5 14

FOREMAN PRODUCTION ENGINEER QA/QC ENGINEER