2021)
NOT PROVIDED Prepared theConnection Drawing 26.08.2021 26.08.2021 0.5 Day 2 Ragu& Ramesh
NOT PROVIDED Prepared theConnection Drawing 27.09.2021 27.09.2021 0.5 Day 1 Ramesh
DESIGN CALCULATION FOR CROSSOVER AND ACCESS PLATFORM -OFF PAD WATER SUPPLY
WELL -REV-B P12516-12-20-83-1601
DESIGN CALCULATION FOR CROSSOVER AND ACCESS PLATFORM - OFF PAD OIL PRODUCER Prepared the REV-B STAAD Analysis ,output
2 WELL WITH GAS LIFT P12516-12-70-83-1651 and calculation Report 03.09.2021 05.09.2021 2 Days 2 Suguna & Asar
DESIGN CALCULATION FOR CROSSOVER AND ACCESS PLATFORM -OFF PAD OIL PRODUCER P12516-12-70-83-1656
WELL WITH GAS LIFT
3 DESIGN CALCULATION FOR TYPICAL PIPE SUPPORTS AND PIPE SLEEPERS DETAILS -ON PAD OIL NOT PROVIDED Prepared the REV-A STAAD Analysis ,output , 02.09.2021 4.09.2021 2 Days Suguna & Asar
PRODUCER WELL WITH GAS LIFT Foundation Design and calculation Report
DESIGN CALCULATION FOR TYPICAL PIPE SUPPORTS AND Prepared the REV-A STAAD Analysis ,output ,
4 PIPE SLEEPERS DETAILS - OFF PAD OIL PRODUCER WELL NOT PROVIDED 9.09.2021 10.09.2021 2 Days 2 Suguna & Asar
WITH GAS LIFT Foundation Design and calculation Report
DESIGN CALCULATION FOR WELLHEAD CROSSOVER AND ACCESS PLATFORM - ON PAD OIL Prepared the REV-B STAAD Analysis ,output ,
5 P12516-12-28-83-1601 14.09.2021 15.09.2021 2 Days 2 Suguna & Asar
PRODUCER WELL WITH GAS LIFT (SINGLE/DUAL) Foundation Design and calculation Report
Design Calculation for crossover and access platform - ON-PAD OIL PRODUCER WELLS
(SINGLE/DUAL) P12516-12-28-83-1611
Design Calculation for crossover and access platform - ON-PAD WATER INJECTORS
(SINGLE/DUAL) P12516-12-28-83-1621
DESIGN CALCULATION FOR PIPE SUPPORTS AND PIPE SLEEPERS - ON-PAD OIL PRODUCER WELLS
(SINGLE/DUAL) P12516-12-28-83-1612-REV-A
DESIGN CALCULATION FOR PIPE SUPPORTS AND PIPE SLEEPERS - ON-PAD WATER INJECTORS Prepared the REV-A STAAD Analysis ,output ,
8 (SINGLE/DUAL P12516-12-28-83-1622-REV-A Foundation Design and calculation Report 22.09.2021 23.09.2021 1 Day 2 Suguna & Asar
DESIGN CALCULATION FOR PIPE SUPPORTS AND PIPE SLEEPERS - OFF PAD WATER SUPPLY WELL P12516-12-20-83-1602-REV-B
DESIGN CALCULATION OF ACCESS PLATFORMS & CROSS OVER OIL PRODUCER WELL ON PAD-
(SINGLE & DUAL) P12516-12-70-83-1601-REV_A
Design Calculation of ACCESS Platforms & CROSS OVER WATER INJECTION WELL OFF PAD- P12516-12-70-83-1604-REV_A
(single & dual)
9 Design Calculation of Wind Sock Foundation P12516-12-99-83-1637-REV-B Prepared the STAAD Analysis ,output , 24.09.2021 25.09.2021 2 Days 3 Suguna , Asar & Gowri
Foundation Design and calculation Report
DESIGN CALCULATION OF ACCESS PLATFORMS & CROSS OVER GAS LIFT WELL ON PAD P12516-12-99-83-1652-REV-A
DESIGN CALCULATION OFACCESS PLATFORMS& CROSS OVER WATER INJECTION WELL ON PAD-
P12516-12-99-83-1653-REV_A
(SINGLE & DUAL)
DESIGN CALCULATION FOR CHEMICAL INJECTION SHELTER-OFF PAD OIL PRODUCER WELL P12516-12-70-83-1654 Rev B
DESIGN CALCULATION FOR CHEMICAL INJECTION SHELTER-OFF PAD GAS LIFT WELL P12516-12-70-83-1659 Rev B
DESIGN CALCULATION FOR PIPE SLEEPER AND PIPE SUPPORTS – GLW-OFF PAD P12516-12-99-83-1650-Rev B
DESIGN CALCULATION FOR PIPE SLEEPER AND PIPE SUPPORTS – OPW - OFF PAD P12516-12-99-83-1649-REV-B
Prepared the STAAD Analysis ,output ,
12 MAT3D Foundation Design and calculation 28.10.2021 31.10.2021 4 Days 3 Suguna , Asar & Gowri
Report
DESIGN-CALCULATION FOR PIPE SLEEPER AND PIPE SUPPORTS – WI –OFF PAD P12516-12-99-83-1651-REV-B
DESIGN CALCULATION FOR PIPE SLEEPER AND PIPE SUPPORTS – WS –OFF PAD P12516-12-99-83-XXXX-REV-A
4 CHEMICAL INJECTION PLANT Revised the Document 11.11.2021 12.11.2021 1 Day 1 Asar
DESIGN CALCULATION FOR CROSSOVER AND ACCESS Prepared the STAAD Analysis ,output
5 PLATFORM Not Provided and calculation Report 12.11.2021 15.11.2021 2 Days 1 Asar
DESIGN CALCULATION FOR CROSSOVER AND ACCESS Prepared the REV-A STAAD
6 PLATFORM -PLAT-7-REV-A Not Provided Analysis ,output and calculation Report 15.11.2021 17.11.2021 2 Days 1 Asar