M I N U T E S OF M E E T I N G
Note: Please Sign the attendance sheet (which is available with the Project Management
Consultant during the meeting) to include your names in the participants list.
PARTICIPANTS:
SL # NAME ORGANISATION ABBREVIATION
Note: If the minutes of meeting have not reached within 2 days, or in case of any
clarification in the MOM, please contact our office +80 -26639780 or Mr. B.L. Suresh , if not
responded within 24 Hours it will be treated as accepted by all the participants.
Ab b r e v i a t i o n s :
MOM: MINUTES OF MEETING, IMM : IMME DIATELY, INFO: INFORMATION, OG: ON-GOING, ASAP: AS
SOON AS POSSIBLE, GFC: GOOD FOR CONSTRUCTION , IMP: IMPORTANT.
A.N. Prakash Construction Project Management Consultants Pvt. Ltd Page: 1/3
A. N. PRAKASH CONSTRUCTION PROJECT MANAGE MENT CONS ULTANTS PVT. LTD.
E-mail: prakashcpm@anpcpmc.com Tel/fax # 26639780
ABT & LEAD informed to have PCC with gradual slope on external -
ABT, LEAD &
5. area for OC visit. Later steps can be executed as per issued
ANPC
Architectural drawing.
ABT & ANPC shared the proposed positions of DG, Transformer, ABT & ANPC to discuss the
6. MC & RMU, LEAD acknowledge the same. same with ELE and conclude ABT & ANPC
on tree cutting.
ABT suggested having a glass partition above one course of SBM LEAD to issue detail for the
7. LEAD
between ramp & north passage. same.
ABT & LEAD concluded to have overhead sintex tank above -
8. RADINS
staircase head room.
ARCH LEAD
ANPC requested LEAD on issuing of hard copies of all GFC -
drawings with seal & signature. ABT informed that prints of the
9. ABT
issued drawings will be taken by their end until LEAD office
reopens.
LEAD informed to check required levels & slopes in toilet areas -
10. before fixing FFL in all the floors. ABT & ANPC
LEAD confirmed on executing toilet & room doors lintels at 2.15m In progress.
11. from SSL. ABT & ANPC
LEAD informed to have an 10mm aluminum C channel at floor ABT informed to go with
12. levels in external plastering. Sample of the same had been regular groove. LEAD & ANPC
executed at site.
LEAD informed to have a light point in wall at each mid landing (at -
13. 7’ or 7’6” height from FFL), so has to have paintings/photos on wall. ABT & ANPC
STR GLAZ
GLAZ
HVAC HVACE
Following points have been discussed and concluded :- In progress.
a. All AHU units will be placed at Terrace level.
b. Ducts will be executed on east side & requirement of
closing them for aesthetics to be checked.
c. ABT informed HVACE not to consider AHU’s in North East
corner of any floors including Terrace.
d. HVACE informed the weight of each AHU shall be from
18. ALL
600 Kgs to 1000 Kgs. Architect informed that HVAC units
shall be placed on 2.4m height frame work in terrace,
since it has been planned to have an cafeteria, however
the same will be planned & confirmed after discussing with
structural consultant.
e. ANPC informed HVACE to submit the budget for the
options proposed.
A.N. Prakash Construction Project Management Consultants Pvt. Ltd Page: 2/3
A. N. PRAKASH CONSTRUCTION PROJECT MANAGE MENT CONS ULTANTS PVT. LTD.
E-mail: prakashcpm@anpcpmc.com Tel/fax # 26639780
Following points were discussed in site meeting on 27.07.21:- ABT has confirmed that there
a. HVACE to share duct positions details on east elevation is no requirement of
drawing, so that working space for plumbing & DG exhaust ventilators at toilets.
can be worked out.
19. b. LEAD suggested moving ODU from staircase headroom to
the AHU platform, so that head room can be used for OHT
position.
c. To confirm on closing of ventilators at toilets, since
ventilators will collide with duct position.
LIFT MIT
PMC ANPCPMC
A.N. Prakash Construction Project Management Consultants Pvt. Ltd Page: 3/3