You are on page 1of 2

PT USAHA KAWAN BERSAMA SITE ORGANIZATION STRUCTURE

SITE BIIH KECAMATAN KARANG INTAN KALIMANTAN SELATAN

MINE PLAN DESIGN ENGINEER


& DRAFTER
CREW
MINE SURVEY ASS. SURVEY

ENGINEERING CREW
DEPT. HEAD PIT GEOLOGIST
GEOLOGIST & COAL
MODELLING
EXPLORATION
GEOLOGIST
ADM ENG.
MINE FOREMAN

PRODUCTION DEPT. PIT MONITORING & QUALITY CONTROL


HEAD CONTROL

FINANCE & ADM PRODUCTION


ACCOUNTING
KTT
SITE MANAGER HR SECTION
GENERAL ADM.
DEPT. HEAD
GENERAL AFFAIR

CSR

SHE. DEPT HEAD SHE OFFICER


CHECKER
STOCKPILE SECTION
CHECKER

STOCKPILE & PORT CHECKER


DEPT.HEAD
PORTSITE SECTION
CHECKER
ADM. STOCKPILE &
PORT
PT USAHA KAWAN BERSAMA EMPLOYEE SALARY ESTIMATION
SITE BIIH KECAMATAN KARANG INTAN KALIMANTAN SELATAN

SALARY
NO POSITION
MIN MAX
1 SITE MANAGER Rp 35,000,000 Rp 50,000,000
2 KTT Rp 30,000,000 Rp 35,000,000
3 ENGINEERING DEPT. HEAD Rp 25,000,000 Rp 30,000,000
4 MINE PLAN Rp 15,000,000 Rp 20,000,000
5 DESIGN ENGINEER & DRAFTER Rp 8,000,000 Rp 12,000,000
6 MINE SURVEY Rp 8,000,000 Rp 10,000,000
7 ASS. SURVEYOR Rp 6,000,000 Rp 7,000,000
8 CREW SURVEY Rp 3,500,000
9 CREW SURVEY Rp 3,500,000
10 GEOLOGIST & COAL MODELLING Rp 15,000,000 Rp 20,000,000
11 PIT GEOLOGIST Rp 10,000,000 Rp 15,000,000
12 EXPLORATION GEOLOGIST Rp 8,000,000 Rp 10,000,000
13 ADM ENG. Rp 3,500,000 Rp 5,000,000
14 PRODUCTION DEPT. HEAD Rp 25,000,000 Rp 30,000,000
15 PIT MONITORING & CONTROL Rp 15,000,000 Rp 20,000,000
16 MINE FOREMAN Rp 8,000,000 Rp 10,000,000
17 QUALITY CONTROL Rp 8,000,000 Rp 10,000,000
18 ADM PRODUCTION Rp 3,500,000 Rp 5,000,000
19 GENERAL ADM. DEPT. HEAD Rp 15,000,000 Rp 20,000,000
20 FINANCE & ACCOUNTING Rp 6,000,000 Rp 8,000,000
21 HR SECTION Rp 8,000,000 Rp 10,000,000
22 GENERAL AFFAIR Rp 4,000,000 Rp 6,000,000
23 CSR Rp 6,000,000 Rp 8,000,000
24 SHE. DEPT HEAD Rp 12,000,000 Rp 15,000,000
25 SHE OFFICER Rp 6,000,000 Rp 8,000,000
26 STOCKPILE & PORT DEPT.HEAD Rp 15,000,000 Rp 20,000,000
27 STOCKPILE SECTION Rp 8,000,000 Rp 10,000,000
28 CHECKER STOCKPILE Rp 3,500,000
29 CHECKER STOCKPILE Rp 3,500,000
30 PORTSITE SECTION Rp 8,000,000 Rp 10,000,000
31 CHECKER PORT Rp 3,500,000
32 CHECKER PORT Rp 3,500,000
33 ADM. STOCKPILE & PORT Rp 3,500,000 Rp 5,000,000
Rp 314,500,000 Rp 430,000,000

You might also like